pcs marathon presentation

Upload: juan-i-sanchez

Post on 03-Apr-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 PCS Marathon Presentation

    1/18

    Gas Well Deliquification Workshop

    Sheraton Hotel, Denver, Colorado

    February 23 - 26, 2009

    Below Packer Annular Gas Lift WithVelocity Enhancement

    Bill Holmes, Marathon Oil Company

    Steve Pohler, Marathon Oil Company

    Sonny Stephenson, PCS-Opti Flow

    Contents of this presentation by Marathon Oil Company and PCS-Opti Flow. Copyright 2009 Marathon Oil Company LLC and PCS-Opti-Flow

  • 7/27/2019 PCS Marathon Presentation

    2/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    2

    Below Packer Annular Gas Liftwith Velocity Enhancement

    Developed to effectively deliquify wells with

    completion interval lengths up to several

    thousand feet

    Allows well to be lifted from the bottom of theperforation interval

    Increases fluid velocity in the annular flow area below

    the packer by reducing the cross sectional flow area

    Allows wellbore access below the packer

  • 7/27/2019 PCS Marathon Presentation

    3/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    3

    Below Packer Annular Gas Liftwith Velocity Enhancement

    ProductionLift Gas

    Side Pocket Mandrel

    Packer

  • 7/27/2019 PCS Marathon Presentation

    4/18Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    4

    Cross Over System

    Lift Gas Production

  • 7/27/2019 PCS Marathon Presentation

    5/18Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    5

    Benefits of System

    Can produce zones several thousand feet long

    Allows for using standard wireline retrievable gas lift

    valves below the packer

    Allows for running pressure/temperature memory tools

    below the packer

    Maintains access to the wellbore below the

    perforations.

  • 7/27/2019 PCS Marathon Presentation

    6/18Feb. 23 - 26, 2009

    2009 Gas Well Deliquification Workshop

    Denver, Colorado

    6

    Benefits of System

    Reduces lift gas volume required to reach critical

    velocity

    Allows corrosion inhibitor to be injected to the

    bottom of the wellbore with the lift gas.

    Minimal flow restriction through system.

    Remove more liquid, make more gas.

  • 7/27/2019 PCS Marathon Presentation

    7/18Feb. 23 - 26, 2009

    2009 Gas Well Deliquification Workshop

    Denver, Colorado

    7

    Application of System

    Wells producing from multiple zones with overall

    length of 1500 to 2000 feet.

    System installed and wells placed on gas lift

  • 7/27/2019 PCS Marathon Presentation

    8/18Feb. 23 - 26, 2009

    2009 Gas Well Deliquification Workshop

    Denver, Colorado

    8

    Well A

    0

    500

    1000

    1500

    2000

    2500

    12/4/2006 6/22/2007 1/8/2008 7/26/2008 2/11/2009

    MCFDBWPD

    FTP

    Installed Below Packer

    Annular Gas Lift w/Velocity

    Enhancement

  • 7/27/2019 PCS Marathon Presentation

    9/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    9

    Well B

    0

    400

    800

    1200

    1600

    2000

    11/9/2005 5/28/2006 12/14/2006 7/2/2007 1/18/2008 8/5/2008 2/21/2009

    MCFDBWPD

    FTP

    Installed Below Packer

    Annular Gas Lift w/Velocity

    Enhancement

  • 7/27/2019 PCS Marathon Presentation

    10/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    10

    Application of System

    Wells with previously abandoned zones below

    bridge plugs

    Plugs are removed and System is installed

    Entire interval of approximately 2000 feet placed

    on production

  • 7/27/2019 PCS Marathon Presentation

    11/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    11

    Well C

    0

    200

    400

    600

    800

    1000

    1200

    1400

    10/15/2007 1/23/2008 5/2/2008 8/10/2008 11/18/2008 2/26/2009

    MCFD

    BWPD

    FTPDrill plugs. Installed

    Below Packer Annular

    Gas Lift w/Velocity

    Enhancement

  • 7/27/2019 PCS Marathon Presentation

    12/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    12

    Application of System

    Wells with new zones being completed

    Immediately after fracture stimulation, system is

    installed to produce both the old and new

    completion interval

    Eliminates the need for using CO2 or N2 in the

    frac for clean up

    Reduces time and cost since the well is cleaned up with

    the gas lift system

    Eliminates the need for swabbing or jetting with

    N2

  • 7/27/2019 PCS Marathon Presentation

    13/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    13

    Well D

    0

    200

    400

    600

    800

    1000

    1200

    9/25/2007 1/3/2008 4/12/2008 7/21/2008 10/29/2008 2/6/2009

    MCFD

    BWPD

    FTPRecomplete Upper Zones, Install

    Below Packer Annular Gas Lift

    w/Velocity Enhancement

  • 7/27/2019 PCS Marathon Presentation

    14/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    14

    Applications

    Marathon has 10 installations in EastTexas

    Has been successful at increasing

    production in existing completions

    Has allowed for producing previously

    abandoned zones in addition to

    existing zones.

    Has allowed for producing all zones in

    newly recompleted wells

  • 7/27/2019 PCS Marathon Presentation

    15/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    15

    Future Plans and Applications

    Marathon has plans to continue to expand the

    use of this system in its East Texas Fields

    Marathon is currently designing a retrofit

    installation in an Offshore deliquification project

    Reviewing potential application in other fields

  • 7/27/2019 PCS Marathon Presentation

    16/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    16

    Conclusion

    Any Questions?

  • 7/27/2019 PCS Marathon Presentation

    17/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    17

    Copyright

    Rights to this presentation are owned by the company(ies) and/orauthor(s) listed on the title page. By submitting this presentation tothe Gas Well Deliquification Workshop, they grant to the Workshop,the Artificial Lift Research and Development Council (ALRDC), andthe Southwestern Petroleum Short Course (SWPSC), rights to:

    Display the presentation at the Workshop.

    Place it on the www.alrdc.com web site, with access to the site to beas directed by the Workshop Steering Committee.

    Place it on a CD for distribution and/or sale as directed by theWorkshop Steering Committee.

    Other uses of this presentation are prohibited without the expressed

    written permission of the company(ies) and/or author(s) who own itand the Workshop Steering Committee.

  • 7/27/2019 PCS Marathon Presentation

    18/18

    Feb. 23 - 26, 20092009 Gas Well Deliquification Workshop

    Denver, Colorado

    18

    Disclaimer

    The Artificial Lift Research and Development Council and its officers and trustees,and the Gas Well Deliquification Workshop Steering Committee members, and theirsupporting organizations and companies (here-in-after referred to as the SponsoringOrganizations), and the author(s) of this Technical Presentation or ContinuingEducation Training Course and their company(ies), provide this presentation and/ortraining material at the Gas Well Deliquification Workshop "as is" without anywarranty of any kind, express or implied, as to the accuracy of the information or theproducts or services referred to by any presenter (in so far as such warranties may beexcluded under any relevant law) and these members and their companies will not be

    liable for unlawful actions and any losses or damage that may result from use of anypresentation as a consequence of any inaccuracies in, or any omission from, theinformation which therein may be contained.

    The views, opinions, and conclusions expressed in these presentations and/ortraining materials are those of the author and not necessarily those of the SponsoringOrganizations. The author is solely responsible for the content of the materials.

    The Sponsoring Organizations cannot and do not warrant the accuracy of thesedocuments beyond the source documents, although we do make every attempt towork from authoritative sources. The Sponsoring Organizations provide thesepresentations and/or training materials as a service. The Sponsoring Organizationsmake no representations or warranties, express or implied, with respect to thepresentations and/or training materials, or any part thereof, including any warranteesof title, non-infringement of copyright or patent rights of others, merchantability, orfitness or suitability for any purpose.