B Keto 212085662OMP presentation Klikklok waste

December 2014

Page 2: OMP presentation

2

Table of content

• Introduction

• Background to problem statement

• Problem statement − Project objectives

• Six sigma Methodology DMAIC − Define− Measure− Analyse− Improve− Control

• Conclusion & Recommendation

Page 3: OMP presentation

3

Introduction

• It is said the manufacturing industry favours manufactures that are able to apply the concept of lean manufacturing − Lean manufacturing entails producing what the customer wants− In the quantity the customer requires the product in− And when the customer requires it− Minimal resources

• Heinz foods is a world renown food manufacture that manufactures frozen and pre-baked pies − Strive to be lean in our manufacturing process − All products that are sent to the customer are packed in an inner & outer carton

Page 4: OMP presentation

4

Background to problem statement

• The company on an hourly basis can either be producing goods or not producing goods

• Illustrated in the graph on the right is data collected over a period of six months distinguishing the time between production and no production.

production No production 0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

85.89%

14.11%

Productive time vs Non-Productive

Page 5: OMP presentation

5

• Other − no hot filling, power failures and no raw materials

• York− Situations related to refrigeration such as

refrigeration repair, soft products and product pile ups inside the York

• Change over− Chance-over refers to the time lost when switching

from one product to another

• No pastry − breakdowns occurring on the laminator or

ingredients are not available to produce the pastry

• Cleaning − production is stopped at the end of the shift prior

completion of the shift

• Klikklok − breakage on the klikklok and pile-ups that occur

on the klikklok

5%

22%

19%

5%

21%

29%

No production Klikklok cleaning no pastrychange over York other

Background to problem statement

Page 6: OMP presentation

6

• The lower the production volume is the higher the task conformity

• The average conformance for this period equates to 94%.

Week 2

8

Week 2

9

Week 3

0

Week 3

1

Week 3

2

Week 3

3

Week 3

4

Week 3

5

Week 3

6

Week 3

7

Week 3

8 -

10,000

20,000

30,000

40,000

50,000

60,000

84%

86%

88%

90%

92%

94%

96%

98%

100%

Klikklok conformance Total Issued Total good litho's usedConformity %

Background to problem statement

Week 3

1

Week 2

8

Week 3

4

Week 3

7

Week 3

8

Week 3

6

Week 3

2

Week 3

3

Week 3

5

Week 2

9

Week 3

00

500

1000

1500

2000

2500

3000

3500

4000

0.10%

1.00%

10.00%

100.00%

Total Klikklok waste

• week 31 has the highest litho’s waste, <18% of the total waste

• The target is to achieve < 1940 litho’s per week

• Majority of the data are above the target

Page 7: OMP presentation

7

Week 28 production figures

Date Target (tons) Actual (tons) Percentage

07-Jul Mon 9.907 5.576 56.3%

08-Jul Tue 9.907 5.084 51.3%

09-Jul Wed 8.042 6.980 86.8%

10-Jul Thu 7.138 8.667 121.4%

11-Jul Fri - 2.808  

Total 34.994 29.115 83.2%

Background to problem statement

• Klikklok begins to act as a bottleneck– Team leaders try to apply TOC– Decreasing capacity, increasing buffer

– More white buckets, more trolleys – Products can not stay outside refrigeration for

long period of time

– Trolleys are taken to the blast freezer – Full blast freezer

Page 8: OMP presentation

8

A countermeasure team leaders have taken in the past

• switch product packaging– from making 12×6’s to making 1×24’s

Lean ManufacturingProducing what the customer wants

Giving it to the customer in the quantity they want it in

Background to problem statement

Page 9: OMP presentation

9

Problem statement & project objectives

PROBLEM STATEMENT

The waste produced by the Klikklok machine is a key contributor to the company not reaching its desired targets and not being able to supply the customers with their desired form of product.

OBJECTIVES

• Raise awareness about the amount of waste being produced by the Klikklok

• Raise awareness about what transpires when the klikklok produces waste

• Reduce waste by identifying the root cause

• Promoting the use of six sigma methodology for problem solving

• Promoting the use of preventative maintenance calendar

Page 10: OMP presentation

10

Six Sigma methodology

A feasible way of understanding and dealing with this problem is to make use of a six sigma methodology most commonly known as DMAIC, which is an acronym for Define, Measure, Analyze, improve and control

ALTENATIVE METHODOLOGY

• Select

• Record

• Examine

• Develop

• Install

• Maintain

Page 11: OMP presentation

11

• Company clients are retails stores such as Spar and Pick n’ Pay which distribute Heinz’s products to the public.

• CTQ characteristic– Number of units inside – Condition of the inner packaging box– Properly sealed box– Properly dated

Define Measure Analyze Improve Control

Flow process chart Saving

-R

14 4.67 *5 0.22 *

4 0.24 *0.26 *0.22 *0.25 *0.24 *0.25 *0.26 *0.22 *0.24 *0.24 *0.26 *0.24 *

0.05 0.22 *0.26 *

1.5 0.22 *45 *

2 0.21 *1.5 0.28 *

0.23 *0.22 *0.25 *0.27 *

10.05 54.97 16 5 0 2 1Total

pass though Printer beltpass though X-ray Machinepack in outer packaging by hand

slant-band conveyortransfer conveyorinsert products into inner packaging by TRACC Klikklok

spray egg on each unitK.V.P Transfer conveyorproducts go into York 1 (fridge)

press top pastry onto bottomremove unused top pastry by conveyoreject on to dif ferent conveyor

inspectionInsert top pastry dough on conveyor by handadd top pastry

54.97Cost Labour Material

Insert f illing into bulk f illing pump by handDeposit f illing onto f lattend dough in foilSpray w ater on each unit

Insert bottom Pastry in dough extruderDough Extrusion by handflatten dough on foil

0Inspection 2

Location: Atlantis Factory 1 & 2

dispense foil on to machine

Total -R -R

Description Qty. Distance (m) Time (min)

Symbol Remarks

Roll dough up into strips by hand & conveyorTake strips to the Mama's line by hand

Operative(s): Time (w ork- min)

Storage 1

Charted by: B. Keto date: 15/07/2014

Approved by: date:

Subject charted: B. Keto Activity Present ProposedOperation 16

Distance (m) 10.05

Activity: Making steak and kidney pie on the Mama's LineMethod: Present / Proposed

Transport 5Delay

Page 12: OMP presentation

12

– Z score of 3 was used– This means that 99.73% of the data should

be within the control limits in order to classify the process as in control

– Process has 5 points above the UCL

– 5 points below the LCL

– Process is not capable of conforming to desired specification limits

– Sigma level: 2.41

Define Measure Analyze Improve Control

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 170.03

0.08

0.13

0.18

0.23

0.28

0.33

0.38

0.43

P Chart - 10 Jul 2014 Week 28

UCL

P bar

LCL

Frac

tion

defe

ctive

Sample size Defects Fraction

defective404 22 0.05

404 95 0.24

404 124 0.31

404 49 0.12

404 31 0.08

404 32 0.08

404 36 0.09

404 71 0.18

404 97 0.24

404 149 0.37

404 112 0.28

404 83 0.21

404 102 0.25

404 81 0.2

404 54 0.13

404 105 0.26

404 4 0.01-4 -3 -2 -1 0 1 2 3 4

USLLSL

Page 13: OMP presentation

13

• When the machine produces a single defective box not much information about the problem can be abstracted from just that singular box

• However when the machine produces several defective boxes all sharing similar characteristics, this provides the perfect environment for problem solving

Define Measure Analyze Improve Control

The flip on the right hand side, on

the side of the bar code (Bar code is

underneath the box) is not in place.

The box comes out of the klikklok

perfectly sealed but with little or no

units inside.

The flip on the rear end side (right

hand side) of the Litos is glued out of

place also causing a small tear in the

near side of the box.

This Litos is not sealed on either

side and the rear side is wrinkled

and one of the corners is torn.

This Litos jammed whist still inside

the machine hence causing the

machine to stop or risk damaging the

other Litos after it. It is wrinkled on

the side with the bar code and not

sealed on either side

Page 14: OMP presentation

14

• The cause and effect diagram categorizes variables that may cause variation in the process leading to an out of control process in four categories namely Man, method, machine & material.

Define Measure Analyze Improve Control

Page 15: OMP presentation

15

• Suspicions that the main source of the problem was due to worn out loader arms.

• The company purchased the new equipment

• The repairs were done in week 39

• A great drop in the total waste can be seen

• Average conformance increased to 98%

Define Measure Analyze Improve Control

Week 2

8

Week 2

9

Week 3

0

Week 3

1

Week 3

2

Week 3

3

Week 3

4

Week 3

5

Week 3

6

Week 3

7

Week 3

8

Week 3

9

Week 4

0

Week 4

1

Week 4

2

Week 4

3

Week 4

40

5001000150020002500300035004000

Total Klikklok waste

Week 2

8

Week 2

9

Week 3

0

Week 3

1

Week 3

2

Week 3

3

Week 3

4

Week 3

5

Week 3

6

Week 3

7

Week 3

8

Week 3

9

Week 4

0

Week 4

1

Week 4

2

Week 4

3

Week 4

4 -

10,000

20,000

30,000

40,000

50,000

60,000

84%86%88%90%92%94%96%98%100%

Klikklok task conformance Total Issued Total good litho's usedConformity %

Week 43 Production FiguresDate Target (tons) Actual (tons) Percentage

20-Oct Mon 9.907 11.347 114.5%

21-Oct Tue 9.907 11.578 116.9%

22-Oct Wed 9.907 10.621 107.2%

23-Oct Thu 9.907 9.089 91.7%

24-Oct Fri - 10.932  

Total39.628 53.567 135.2%

Page 16: OMP presentation

16

• As a means of controlling this process the P chart can be used again

• This P chart was constructed after the specialist had come to Heinz to replace the loader arms on the Klikklok

• The process in technical viewing may still be seen as being out of control

• however when it is compared to the first one, a great improvement can be seen.

• 2 points fall outside the desired specification limits

• Sigma level = 3.67

Define Measure Analyze Improve Control

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180

0.005

0.01

0.015

0.02

0.025

0.03

0.035

0.04

P Chart - 21 Oct 2014Week 43 UCL

P barLCL

Frac

tion

defe

ctiv

e

Sample size

DefectsFraction

defective670 4.00 0.006670 2.00 0.003670 1.00 0.001670 2.00 0.003670 20.00 0.030670 10.00 0.015670 24.00 0.036670 13.00 0.019670 12.00 0.018670 8.00 0.012670 19.00 0.028670 6.00 0.009670 3.00 0.004670 4.00 0.006670 7.00 0.010670 18.00 0.027670 21.00 0.031670 7.00 0.010 -4 -3 -2 -1 0 1 2 3 4

UCLLCLµ

Page 17: OMP presentation

17

• Make use of the PM calendar to maintain the new loader arms

• The main aim of the PM calendar is to schedule checks that aught to be done on the machine

• It breaks down the machine in to individual opponents

• Each component will have a listed set of tasks that must be done on the e.g. replace or lubricate

• Each task will also have a frequency column, which displays how frequent the task should be done.

Define Measure Analyze Improve Control

Page 18: OMP presentation

18

Conclusion & Recommendation

Conclusion • There has been a great improvement in the

waste produced by the Klikklok

• The production figures of have increased

• However there are still points that fall outside the desired control limits

• This is an indication that the problems solved up until now are not the only problems

• And that there is still room for improvement

Recommendation • Looking at the DMAIC process it is most

beneficial to the organization to go back to the measure phase

• Study why we have points out of control after replacing the loader arms

• The use of preventative maintenance in the form of daily check sheets for individual parts

• The use of the preventative maintenance calendar