    PROG

    AREA TOTALES POR SECCIONES (m2)

    CORTE TOTAL RELLENO TOTAL

    0+000.000 0.00 0.000+020.000 0.00 0.00 0.00 0.000+040.000 8.27 82.74 6.17 61.650+060.000 8.81 170.84 6.66 128.250+073.000 22.86 205.86 20.35 175.550+080.000 4.32 95.12 2.43 79.730+100.000 0.00 43.17 0.00 24.320+120.000 0.00 0.00 0.00 0.00

    0+140.000 0.00 0.00 0.00 0.000+160.000 0.00 0.00 0.00 0.000+180.000 0.00 0.00 0.00 0.000+200.000 0.00 0.00 0.00 0.00

    597.73 469.50120% 717.28 563.40

    MOVIMIENTO DE TIERRAS EXCAVACION PARA COLOCACION DE PLACAIMPERMEABLE

    VOLUENCORTE

    VOLUENRELLENO

  • 7/24/2019 MOV TIERRAS DEF.xls

    2/9

    PROG

    AREA TOTALES POR SECCIONES (m2)

    CORTE TOTAL RELLENO TOTAL

    0+000.000 0.00 0.000+020.000 0.00 0.00 0.00 0.000+040.000 8.27 82.74 6.17 61.650+060.000 8.81 170.84 6.66 128.250+073.000 22.86 205.86 20.35 175.550+080.000 4.32 95.12 2.43 79.730+100.000 0.00 43.17 0.00 24.320+120.000 0.00 0.00 0.00 0.00

    0+140.000 0.00 0.00 0.00 0.000+160.000 0.00 0.00 0.00 0.000+180.000 0.00 0.00 0.00 0.000+200.000 0.00 0.00 0.00 0.00

    597.73 469.50120% 717.28 563.40

    153.88

    VOLUMEN A ELIMINAR DE LA CONSTRUCCION DE LA PLACAIMPERMEABLE

    VOLUENCORTE

    VOLUENRELLENO

    V!"#m$ &

    E"'m'&

  • 7/24/2019 MOV TIERRAS DEF.xls

    3/9

    AREA DE PICADO EN EL MURO EXISTENTE

    PROG

    AREA TOTAL

    0+000.000 0.000+020.000 0.00 0.000+040.000 5.27 52.700+060.000 5.83 111.000+073.000 7.38 85.840+080.000 4.15 40.320+100.000 0.00 0.000+120.000 0.00 0.00

    0+140.000 0.00 0.000+160.000 0.00 0.000+180.000 0.00 0.000+200.000 0.00 0.00

    289.86110% 318.85

    7.97

    AREA TOTALES POR SECCIONES(m2)

    LONGITUTOTAL

    V!"#m$ &

    E"'m'&

  • 7/24/2019 MOV TIERRAS DEF.xls

    4/9

    PROG

    AREA TOTAL

    0+000.000 0.000+020.000 0.00 0.000+040.000 5.27 52.700+060.000 5.83 111.000+073.000 7.38 85.840+080.000 4.15 40.320+100.000 0.00 41.450+120.000 0.00 0.00

    0+140.000 0.00 0.000+160.000 0.00 0.000+180.000 0.00 0.000+200.000 0.00 0.00

    331.31110% 364.44

    E*$*! 0.025

    9.11

    VOLUMEN A ELIMINAR POR PICADO DEMURO EXISTENTE

    AREA TOTALES POR SECCIONES(m2)

    LONGITUTOTAL

    V!"#m$ &

    E"'m'&

  • 7/24/2019 MOV TIERRAS DEF.xls

    5/9

    MOVIMIENTO DE TIERRAS PARA LA INSTALACION DE LA TUBERIA

    PROG

    AREA TOTALES POR SECCIONES (m2)

    CORTE TOTAL RELLENO TOTAL

    0+000.000 0.00 0.00 0.000+020.000 0.00 0.00 0.00 0.000+030.000 0.19 0.96 0.08 0.390+040.000 0.19 1.93 0.08 0.770+060.000 0.19 3.85 0.08 1.540+073.000 0.19 2.50 0.08 1.000+080.000 0.19 1.35 0.08 0.540+100.000 0.19 3.85 0.08 1.54

    0+115.000 0.19 2.89 0.08 1.1617.33 6.93

    120% 20.79 8.32

    V!"#m$ S!,&-$ 12.47

    VOLUENCORTE

    VOLUENRELLENO

  • 7/24/2019 MOV TIERRAS DEF.xls

    6/9

    MOVIMIENTO DE TIERRAS PARA LA INSTALACION DE LA TUBERIA

    ESCRIPCION PARTIA

    CAA E APOO A/0.60 m E/0.10 m 0.0700 85.00

    0.4490 85.00

    0.2430 85.00

    0.48 30.00

    AREA

    TRANSVERSAL(2)

    LONGITU TOTAL(m)

    RELLENO E PROTECCIN E TUERA CONATERIAL PROPIO ARANEAO 0.20 ENCIAE CLAVE E TUERA

    RELLENO COPACTAO INAL CON ATERIALPROPIO / 0.20

    RELLENO PLATAORA PARA TUERA ENTROE LAGUNA CON ATERIAL PROPIO

  • 7/24/2019 MOV TIERRAS DEF.xls

    7/9

    5.95

    38.17

    20.66

    14.40

    VOLUEN TOTAL(3)

  • 7/24/2019 MOV TIERRAS DEF.xls

    8/9

    RESUMEN DEL MOVIMIENTO DE TIERRA

    DESCRIPCION ACTIVIDAD

    717.28 563.40 153.88

    7.97 7.97

    OVIIENTO E TIERRAS PARA LA INSTALACION E LA TUERIA 20.79 8.32 12.47

    38.17

    RELLENO COPACTAO INAL CON ATERIAL PROPIO / 0.20 20.66

    14.40

    OVIIENTO E TIERRAS EL ALIVIAERO 120.00 10.17

    751.79 751.79

    TOTAL 1617.84 644.94 936.29

    VOLUMENCORTE (M3)

    VOLUMENRELLENO (M3)

    VOLUMEN AELIMINAR (M3)

    OVIIENTO E TIERRAS ECAVACION PARA COLOCACION E

    PLACA IPEREALE

    VOLUEN A ELIINAR E LA CONSTRUCCION E LA PLACAIPEREALE

    RELLENO E PROTECCIN E TUERA CON ATERIAL PROPIOARANEAO 0.20 ENCIA E CLAVE E TUERA

    RELLENO PLATAORA PARA TUERA ENTRO E LAGUNA CONATERIAL PROPIO

    OVIIENTO E TIERRAS EL CANAL E EVACUACION EALIVIAERO

  • 7/24/2019 MOV TIERRAS DEF.xls

    9/9

    MOVIMIENTO DE TIERRAS DEL ALIVIADERO

    PROG

    AREA TOTALES POR SECCIONES (m2)

    PROG

    AREA TOTALES POR SECCIONES (m2)

    CORTE TOTAL RELLENO TOTAL

    0+000.000 0.00 0.00 0.00 0+000.000 0.00 0.000+010.000 5.00 25.00 0.00 0.00 0+010.000 0.00 0.00

    0+040.000 0.00 75.00 0.00 0+040.000 5.00 75.00 0.00 0.000+060.000 0.00 0.00 0.00 0+060.000 5.20 102.00 0.00 0.000+073.000 0.00 0.00 0.00 0+073.000 7.49 82.49 0.00 0.000+080.000 0.00 0.00 0.00 0+080.000 7.49 52.43 0.00 0.000+100.000 0.00 0.00 0.00 0+100.000 7.49 149.80 0.00 0.000+122.000 0.00 0.00 0.00 0+122.000 7.49 164.78 0.00 0.00

    100.00 0.00 626.50 0.00120% 120.00 0.00 120% 751.79 0.00

    MOVIMIENTO DE TIERRAS DEL CANAL DE EVACUACION DEALIVIADERO

    VOLUENCORTE

    VOLUENCORTE

    CORTETOTAL

    VOLUENCORTE

    RELLENOTOTAL

    VOLUENCORTE