Energy Substitution of Electricity with Natural Gas for Industrial Dryers Kumar Aanjaneya (graduate student) & Hayden Youngs (Senior) Completed the work Danielle Kyser (graduated) & Karl Stimmel (graduated) Started the work Advisors: Arvind Atreya ([email protected] ) & Claus Borgnakke ( [email protected] ) Department of Mechanical Engineering University of Michigan, Ann Arbor 48109 1 MEUS: ME 490 | 12/10/2015

Upload: hayden-youngs

Post on 15-Jan-2017

186 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEUS PRESENTATION-ME 490

Energy Substitution of Electricity with Natural Gas for Industrial Dryers

Kumar Aanjaneya (graduate student) & Hayden Youngs (Senior)Completed the work

Danielle Kyser (graduated) & Karl Stimmel (graduated)Started the work

Advisors:Arvind Atreya ([email protected]) & Claus Borgnakke ([email protected])

Department of Mechanical EngineeringUniversity of Michigan, Ann Arbor 48109

1MEUS: ME 490 | 12/10/2015

Page 2: MEUS PRESENTATION-ME 490

Acknowledgements

• This work was sponsored by the DoE via the University of Michigan Industrial Assessment Center (IAC)

• Special thanks to:– Weiyu Cao, Yawei Chen (PhD Students), Dr. Jacek Szymczyk (Visiting

Researcher), Harald Eberhart (Glass Blower)

2MEUS: ME 490 | 12/10/2015

Page 3: MEUS PRESENTATION-ME 490

Inspiration• Currently electric dryers are used in the plant• Substitution with natural gas dryers, benefits:

– Cheaper to run– Lower Carbon footprint– Faster heating; thus increased production speed

3MEUS: ME 490 | 12/10/2015

Page 4: MEUS PRESENTATION-ME 490

Concerns• Temperature Control

• Factory Air Quality Issues

• Flame Stability

• Incomplete Combustion

• Pollutant Formation

4MEUS: ME 490 | 12/10/2015

Page 5: MEUS PRESENTATION-ME 490

Data from the Plant• The plant uses dryers rated at 15 kW (0.05 MMBtu/hr)

• Dryers are used for 3120 hrs/year

• Cost of Electricity: $0.08/kWh (=$23.5/MMBtu)

• Cost of Natural Gas: $5.5/MMBtu

5MEUS: ME 490 | 12/10/2015

Page 6: MEUS PRESENTATION-ME 490

Current Set-Up

6

AirBlower

Electric Heater

Air Knife

Conveyor belt

Dry hot air jet

MEUS: ME 490 | 12/10/2015

Page 7: MEUS PRESENTATION-ME 490

Proposed Set-Up

7

AirBlower

Conveyor belt

Dry hot air jet

Air Knife

Combustion Air Fuel

Burner

MEUS: ME 490 | 12/10/2015

Page 8: MEUS PRESENTATION-ME 490

Carbon Footprints• Combustion of Natural Gas:

– emissions per kg of Natural Gas = kg– Fuel rate for a 15 kW dryer = – production rate for the dryer = 1.08 x 2.75 = 2.97 kg/hr– Annual production = 2.97 x 3120 = 9.2 tons/year

• Similar Energy produced by a Power plant (~40% efficient ):– production rate = 23 tons/year

• A reduction of 13.8 tons/year

8MEUS: ME 490 | 12/10/2015

Hayden Youngs
check CO2 production
Hayden Youngs
may be a conservative understatement
Page 9: MEUS PRESENTATION-ME 490

Design• Co-Annular tubes for the burner1.• High velocity stream of air entrains high temperature combustion

products.• Optimum mixing to achieve uniform temperatures.

9

1. Gillon, P., Chahine, M., Gilard, V., and Sarh, B. 2014. “Heat Transfer from A Laminar Jet Methane Flame in A Co-Annular Jet of Oxygen Enriched Air” Combustion Science and Technology.

MEUS: ME 490 | 12/10/2015

Hayden Youngs
Put design slides before cost savings
Page 10: MEUS PRESENTATION-ME 490

Experimental Design• Obstacles to induce turbulence and mixing2

• High levels of dilution to:– Achieve complete combustion– Achieve desired temperatures

• Burner tubes made of glass to optically determine flame color and soot formation

• Temperature measurements at three radial locations downstream

10

2. Guo, P., Zang, S., and Ge, B. 2010. “Predictions of Flow Field for Circular-Disk Bluff-Body Stabilized Flame Investigated by Large Eddy Simulation and Experiments” Journal of Engineering for Gas Turbines and Power.

MEUS: ME 490 | 12/10/2015

Page 11: MEUS PRESENTATION-ME 490

Experimental Design (contd.)• Current small-scale apparatus designed for 1kW capacity (0.016

g/s fuel inlet)

• Idea is to have low fuel momentum but high primary air flow momentum to promote fuel-air mixing2

• Secondary (dilution) Air Flow kept constant by using a computer fan– For 150 C (302 F) outlet temperature, flow is ~35 CFM

11

2. Guo, P., Zang, S., and Ge, B. 2010. “Predictions of Flow Field for Circular-Disk Bluff-Body Stabilized Flame Investigated by Large Eddy Simulation and Experiments” Journal of Engineering for Gas Turbines and Power.

MEUS: ME 490 | 12/10/2015

Page 12: MEUS PRESENTATION-ME 490

Experimental Design

12

Outer TubePrimary Tube

MEUS: ME 490 | 12/10/2015

Hayden Youngs
show combustion
Page 13: MEUS PRESENTATION-ME 490

FLUENT Calculations• FLUENT calculations were carried out for the design prior to

fabrication

• Simplifications made:– 2D Axisymmetric model– Neglect heat loss through walls

13MEUS: ME 490 | 12/10/2015

Page 14: MEUS PRESENTATION-ME 490

Temperature Contours using FLUENT

14MEUS: ME 490 | 12/10/2015

Hayden Youngs
take flame and put into slide 15
Page 15: MEUS PRESENTATION-ME 490

Laboratory Apparatus

15

• Outer Tube: 1.8” Dia

• Fuel Tube: 0.9” Dia

• Inner (Air) Tube: 0.125’ Dia

• Fuel and Inner Tubes: 2” Long

• Outer Tube: 1’ Long

MEUS: ME 490 | 12/10/2015

Page 16: MEUS PRESENTATION-ME 490

16

Thermocouple

Computer Fan

Primary Tube

Outer Tube

Apparatus (Contd.)

MEUS: ME 490 | 12/10/2015

Page 17: MEUS PRESENTATION-ME 490

Images

17MEUS: ME 490 | 12/10/2015

Page 18: MEUS PRESENTATION-ME 490

Temperature Plots

18MEUS: ME 490 | 12/10/2015

Page 19: MEUS PRESENTATION-ME 490

Cost savings/dryer• Considering a 15kW dryer, running for 3120 hrs/year

• For Electricity powered dryer, annual electricity cost:– Costelec dryer = Wel x HR x Ce=15 x 3120 x 0.08= $3,750

• For gas powered dryer, annual fuel cost:– CostNG dryer = Wel x HR x CNG= 0.05 x 3120 x 5.5= $858

• Cost Savings = $2892/dryer• Here:

– Wel : Power rating (kW or MMBtu/hr)– HR: Hours of use per year (3120 hrs)– Ce: Cost of electricity ($/kWh)– CNG: Cost of electricity ($/MMBtu)

19MEUS: ME 490 | 12/10/2015

Page 20: MEUS PRESENTATION-ME 490

Potential Cost Savings

20MEUS: ME 490 | 12/10/2015

Hayden Youngs
explanation: consider putting this later in presentation
Page 21: MEUS PRESENTATION-ME 490

Comments• Temperatures decreases with increase in primary air flow.

(Dilution)

• Actual temperatures are lower than predicted– Can be explained due to heat loss in the real case

• Actual mixing higher near the wall than FLUENT– Because of additional obstacles (spiders to hold the central tube)

• No evidence of soot on any surface

21MEUS: ME 490 | 12/10/2015

Page 22: MEUS PRESENTATION-ME 490

Comments (Contd.)• Flame was stable.

– No flame-blowout throughout the duration of the experiments for all cases

• Calculations suggest no significant increase in humidity.– Relative Humidity increases from 3% to 4% due to additional water in the

stream produced by combustion – air still suitable for drying

• Costs of implementation– Burners cost around $1000-$1500 (15kW)– Burners would require more maintenance than electrical heaters (around

$700 per year)– With savings of $2892 per year, these costs are reasonable

22MEUS: ME 490 | 12/10/2015

Page 23: MEUS PRESENTATION-ME 490

Future Work• Current prototype is a lab scale model

• Needs to be scaled up for usage in industry– Use of multiple fuel jets to achieve better mixing and combustion in higher

power regimes– Metallic burners with additional active/passive mixing enhancers

• Detailed gas analysis of exhaust

• Closer control of the flow rates

23MEUS: ME 490 | 12/10/2015

Page 24: MEUS PRESENTATION-ME 490

Future Work• Increased control of flow to:

– Achieve desired temperatures– Maintain flame stability (by maintaining stoichiometric ratio)

• Flame sensor and Ignitor– Ignite the fuel at start up – Reignite if the flame blows off or turn fuel off

24MEUS: ME 490 | 12/10/2015

Page 25: MEUS PRESENTATION-ME 490

Thank You!

Questions?