01 BOSQUE DE PIEDRAS DESCRIPCION UND METRADO 01.01 TRABAJOS PROVISIONALES LIMPIEZA DEL TERRENO m2 120,000.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Glb 1.00 ALMACEN, OFICINA Y GUARDIANIA m2 100.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m und 3.00 CERCO DE SEGURIDAD EXTERIOR CON ARPILLERA H=3.00M m 250.00 DEMOLICION DE ESTRUCTURAS EXISTENTE Glb 1.00 SERVICIOS HIGIENICOS PORTATILES Glb 1.00 TRAZO DE NIVELES Y REPLANTEO m2 120,000.00 LIMPIEZA PERMANENTE EN OBRA m2 120,000.00 SEGURIDAD EN OBRA Glb 1.00 1.02 MOVIMIENTO DE TIERRAS - EXCAVACIONES MASIVAS C/MAQ m3 11,020.00 EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS m3 50.00 REFINE DE ZANJA m 120.00 RELLENO CON MATERIAL PROPIO m3 384.00 ACARREO DE MATERIAL EXCEDENTE (d=40 m) m3 150.00 ELIMINACION DE MATERIAL EXCEDENTE CON MAQ (5 km) m3 11,000.00 NIVELACION Y COMPACTACION DE TERRENO PARA FALSO PISO m2 354.00 01.04 OBRAS DE CONCRETO SIMPLE - SARDINELES BAJOS TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCI M2 EXCAVACION MANUAL M3 Sardinel tipo D-6 (ver detalle nº6) ENCOFRADO Y DESENCOFRADO DE SARDINELES M2 Sardinel tipo D-6 (ver detalle nº6) CONCRETO f'c = 175 Kg/cm2 M3 Sardinel tipo D-6 (ver detalle nº6) Sardinel tipo D-6 (ver detalle nº6 en costado de vereda existente) CURADO DE SARDINELES M2 Sardinel tipo D-6 (ver detalle nº6) SELLADO DE JUNTAS EN SARDINELES, e=3/4", h=0.15 m. M PINTADO GL 01.05.01 VEREDAS TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCI M2 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 EMPEDRADO DE 6" M2 CONCRETO f'c = 175 Kg/cm2 M3 ACABADO CON ADOQUINES DE CONCRETO M2 01.05.03 CURADO DE CONCRETO M2 SELLADO DE JUNTAS, e=3/4", h=0.05 m. M EMPEDRADO DE 6" M2 MUROS DE MAMPOSTERIA DE PIEDRA TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 Muro cercano a los SS.HH. Muro cercano a las losas existentes Muro cercano al anfiteatro EXCAVACION PARA MUROS M3 Muro cercano a los SS.HH. Muro cercano a las losas existentes Muro cercano al anfiteatro RELLENO COMPACTADO CON MATERIAL PROPIO (muro - manualM3

Upload: yelsin-huancachoque

Post on 04-Sep-2015

282 views

Category:

Documents


2 download

DESCRIPTION

EJEMPLO DE METRADOS

TRANSCRIPT

MET RESUMEN01BOSQUE DE PIEDRASDESCRIPCIONUNDMETRADOTOTALET.01.01TRABAJOS PROVISIONALESLIMPIEZA DEL TERRENOm2120,000.00400300MOVILIZACION Y DESMOVILIZACION DE EQUIPOSGlb1.00ALMACEN, OFICINA Y GUARDIANIAm2100.0048.00CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mund3.001.00CERCO DE SEGURIDAD EXTERIOR CON ARPILLERA H=3.00Mm250.00123.60DEMOLICION DE ESTRUCTURAS EXISTENTEGlb1.00445.32SERVICIOS HIGIENICOS PORTATILESGlb1.00TRAZO DE NIVELES Y REPLANTEOm2120,000.002,853.35LIMPIEZA PERMANENTE EN OBRAm2120,000.002,853.35SEGURIDAD EN OBRAGlb1.001.02MOVIMIENTO DE TIERRAS0.0TORTUGAPLAZA INGRESOPLAZA SEUNDARIAALTURAEXCAVACIONES MASIVAS C/MAQm311,020.00PLAZAS73701850180011102011020EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOSm350.001,459.38ZAPATAS REST211.21.20.824.192REFINE DE ZANJAm120.00332.26VIGAS REST16.40.40.539.84RELLENO CON MATERIAL PROPIOm3384.00960.603.40.40.510.68ACARREO DE MATERIAL EXCEDENTE (d=40 m)m3150.001,678.296.80.40.511.36ELIMINACION DE MATERIAL EXCEDENTE CON MAQ (5 km)m311,000.001,751.263.70.40.532.22NIVELACION Y COMPACTACION DE TERRENO PARA FALSO PISOm2354.005.70.40.522.2801.04OBRAS DE CONCRETO SIMPLE0.00.010.40.40.512.08SARDINELES BAJOS7.30.40.511.46TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIONM23.10.40.521.2421.16EXCAVACION MANUALM356.80.40.8045.352Sardinel tipo D-6 (ver detalle n6)LONGALTOANCHOCANTENCOFRADO Y DESENCOFRADO DE SARDINELESM20.522.72Sardinel tipo D-6 (ver detalle n6)LOSA REST160CONCRETO f'c = 175 Kg/cm2M3LOSA COCINA60Sardinel tipo D-6 (ver detalle n6)LOSA SH24Sardinel tipo D-6 (ver detalle n6 en costado de vereda existente)TERRAZA110HCURADO DE SARDINELESM2354135430384Sardinel tipo D-6 (ver detalle n6)CIMSELLADO DE JUNTAS EN SARDINELES, e=3/4", h=0.15 m.M0.03.82ENCOF ZAPATAS REST214.60.877.28M3PINTADOGL0.0327.89ENCOF VIGAS REST16.40.8339.3601.05.01VEREDAS0.03.40.812.72TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIONM2150.956.80.815.44ENCOFRADO Y DESENCOFRADO DE VEREDASM23.70.838.88EMPEDRADO DE 6"M25.70.829.12CONCRETO f'c = 175 Kg/cm2M310.40.818.32ACABADO CON ADOQUINES DE CONCRETOM280.787.30.815.8401.05.03CURADO DE CONCRETOM20.03.10.824.96SELLADO DE JUNTAS, e=3/4", h=0.05 m.M0.04,852.0084.64M2EMPEDRADO DE 6"M20.01,110.603.10.824.96MUROS DE MAMPOSTERIA DE PIEDRATRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIONM2Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroEXCAVACION PARA MUROSM3Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroRELLENO COMPACTADO CON MATERIAL PROPIO (muro - manual)M3Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroSOLADO DE 2" MEZCLA 1:12M2Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTOM2Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroMAMPOSTERIA DE PIEDRA 70% P.G. + C 1:6M3Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatro(area=area promedio entre las areas de los extremos)Muro parte porterior de tribunasTARRAJEODRENES TRANSVERSALESMMuro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatroCURADO DE CONCRETOM2Muro cercano a los SS.HH.Muro cercano a las losas existentesMuro cercano al anfiteatro01.05OBRAS DE CONCRETO ARMADO0.00.00.50RESTAURANTE01.05.01ZAPATAS0.00.0LOSA REST160CONCRETO EN ZAPATAS F'C =210 KG/CM2m350.82150.95LOSA COCINA60ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATASm280.00325.16LOSA SH24ACERO Fy = 4200 KG/CM2 EN ZAPATASkg13,615.9914,514.56TERRAZA110H01.05.02VIGAS DE CIMENTACION0.0354135430384CONCRETO F'C =210 KG/CM2m321.0080.78CIMENCOFRADO Y DESENCOFRADOm284.64403.88ENCOF ZAPATAS REST214.60.877.28ACERO fy=4200 kg/cm2kg14,619.8118,611.59ENCOF VIGAS REST16.40.8339.3601.05.03SOBRECIMIENTO0.00.03.40.812.72CONCRETO F'C=140 KG/CM2m332.0032.00124.266.80.815.44ENCOFRADO Y DESENCOFRADOm2253.92253.92994.113.70.838.88ACERO DE REFUERZO FY = 4200 KG/CM2 GRADO 60kg8,106.648,106.644,852.005.70.829.1201.05.04COLUMNAS0.00.010.40.818.32CONCRETO F'C =210 KG/CM2m313.2313.2396.077.30.815.84ENCOFRADO Y DESENCOFRADOm2176.40176.401,110.603.10.824.96ACERO DE REFUERZO FY = 4200 KG/CM2kg20,178.0020,178.0020,178.0084.64M201.05.06VIGAS0.00.0C SOBRECIM REST16.40.251.2314.76CONCRETO F'C =210 KG/CM2m322.0022.00123.833.40.251.211.02ENCOFRADO Y DESENCOFRADOm2232.76232.76982.016.80.251.212.04ACERO DE REFUERZO FY = 4200 KG/CM2kg17,720.0017,720.0017,720.003.70.251.233.3301.05.08LOSAS ALIGERADAS DE 0.200.00.05.70.251.223.4201.05.08.01CONCRETO F'C =210 KG/CM2 Em398.0098.0077.7010.40.251.213.1201.05.08.02ENCOFRADO Y DESENCOFRADOm2909.68909.68776.977.30.251.212.1901.05.08.03ACERO DE REFUERZO FY = 4200 KG/CM2kg7,073.037,073.034,063.573.10.251.221.8601.05.08.04LADRILLO DE TECHO DE 0.30X0.30X0.15und1,326.001,326.001,988.3316.98M301.05.09ESCALERAS Y LOSAS MACISAS0.00.0ENCO SOBREC16.42.43118.0801.05.09.01CONCRETO F'C =210 KG/CM2m310.2010.2010.203.42.418.1601.05.09.02ENCOFRADO Y DESENCOFRADOm233.0033.0034.006.82.4116.3201.05.09.03ACERO DE REFUERZO FY = 4200 KG/CM2kg1,405.601,405.601,405.603.72.4326.6401.05.10PLACAS DE CONCRETO EXPUESTO0.00.05.72.4227.3601.05.10.01CONCRETO F'C =210 KG/CM2m313.0013.007.8710.42.4124.9601.05.10.02ENCOFRADO Y DESENCOFRADO CARA VISTAm2115.00115.00122.587.32.4117.5201.05.10.03ACERO DE REFUERZO FY = 4200 KG/CM2kg667.18667.18667.183.12.4214.8801.06.10MUROS DE CONTENCION0.00.0253.92M201.05.10.01CONCRETO F'C =210 KG/CM2m30.07.87C COL REST0.30.372113.23M301.05.10.02ENCOFRADO Y DESENCOFRADOm20.0122.58ENCOF COL1.2721176.4M201.05.10.03ACERO DE REFUERZO FY = 4200 KG/CM2kg0.0667.18MODULO ADMINISTRATIVO01.05.01ZAPATAS0.00.0LOSA REST160CONCRETO EN ZAPATAS F'C =210 KG/CM2m3150.95LOSA COCINA60ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATASm2325.16LOSA SH24ACERO Fy = 4200 KG/CM2 EN ZAPATASkg14,514.56TERRAZA110H01.05.02VIGAS DE CIMENTACION354135430384CONCRETO F'C =210 KG/CM2m380.78CIMENCOFRADO Y DESENCOFRADOm2403.88ENCOF ZAPATAS REST214.60.877.28ACERO fy=4200 kg/cm2kg18,611.59ENCOF VIGAS REST16.40.8339.3601.05.03SOBRECIMIENTO3.40.812.72CONCRETO F'C=140 KG/CM2m3124.266.80.815.44ENCOFRADO Y DESENCOFRADOm2994.113.70.838.88ACERO DE REFUERZO FY = 4200 KG/CM2 GRADO 60kg4,852.005.70.829.1201.05.04COLUMNAS10.40.818.32CONCRETO F'C =210 KG/CM2m396.077.30.815.84ENCOFRADO Y DESENCOFRADOm21,110.603.10.824.96ACERO DE REFUERZO FY = 4200 KG/CM2kg20,178.0084.64M201.05.06VIGASC SOBRECIM REST16.40.251.2314.76CONCRETO F'C =210 KG/CM2m3123.833.40.251.211.02ENCOFRADO Y DESENCOFRADOm2982.016.80.251.212.04ACERO DE REFUERZO FY = 4200 KG/CM2kg17,720.003.70.251.233.3301.05.08LOSAS ALIGERADAS DE 0.205.70.251.223.4201.05.08.01CONCRETO F'C =210 KG/CM2 Em377.7010.40.251.213.1201.05.08.02ENCOFRADO Y DESENCOFRADOm2776.977.30.251.212.1901.05.08.03ACERO DE REFUERZO FY = 4200 KG/CM2kg4,063.573.10.251.221.8601.05.08.04LADRILLO DE TECHO DE 0.30X0.30X0.15und1,988.3316.98M301.05.09ESCALERAS Y LOSAS MACISASENCO SOBREC16.42.43118.0801.05.09.01CONCRETO F'C =210 KG/CM2m310.203.42.418.1601.05.09.02ENCOFRADO Y DESENCOFRADOm234.006.82.4116.3201.05.09.03ACERO DE REFUERZO FY = 4200 KG/CM2kg1,405.603.72.4326.6401.05.10PLACAS DE CONCRETO EXPUESTO5.72.4227.3601.05.10.01CONCRETO F'C =210 KG/CM2m37.8710.42.4124.9601.05.10.02ENCOFRADO Y DESENCOFRADO CARA VISTAm2122.587.32.4117.5201.05.10.03ACERO DE REFUERZO FY = 4200 KG/CM2kg667.183.12.4214.88MODULO SS.HH.OBRAS PROVISIONALESCARTEL DE OBRAUNDTRABAJOS PRELIMINARESTRANSPORTE DE MATERIALES Y EQUIPOS A OBRAGLBTRAZO, NIVELES Y REPLANTEOM2MOVIMIENTO DE TIERRASTRAZO NIVELES Y REPLANTEO DURANTE EL PROCESOM2Area de SS.HH.Area de KioskoNIVELACION Y COMPACTADO MANUAL DEL TERRENOM2Area de SS.HH.Area de KioskoEXCAVACION MANUALM3zapatas del SS.HH.zapatas del Kioskozapatas del muro decorativo al lado del kioskoCimientos corridos SSHH ejes A y CCimientos corridos SSHH eje BCimientos corridos SSHH eje 1Cimientos corridos SSHH entre ejes 1 y 2Cimientos corridos Kiosko ejes D y FCimientos corridos Kiosko eje ECimientos corridos Kiosko eje 1Cimientos corridos Kiosko eje 2Cimientos corridos Kiosko entre ejes 1 y 2Cimientos corridos del muro decorativo al lado del kioskoELIMINACION DE MATERIAL EXCEDENTEM3De la excavacion manualOBRAS DE CONCRETO SIMPLECIMIENTOS CORRIDOSCIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PGM3Cimientos corridos SSHH ejes A y CCimientos corridos SSHH eje BCimientos corridos SSHH eje 1Cimientos corridos SSHH entre ejes 1 y 2Cimientos corridos Kiosko ejes D y FCimientos corridos Kiosko eje ECimientos corridos Kiosko eje 1Cimientos corridos Kiosko eje 2Cimientos corridos Kiosko entre ejes 1 y 2Cimientos corridos del muro decorativo al lado del kioskoZAPATASSOLADO DE 2" MEZCLA 1:12M2zapatas del SS.HH.zapatas del Kioskozapatas del muro decorativo al lado del kioskoSOBRECIMIENTOSCONCRETO f'c = 210 Kg/cm2M3Sobrecimientos SSHH ejes A y CSobrecimientos SSHH eje BSobrecimientos SSHH eje 1Sobrecimientos SSHH entre ejes 1 y 2Sobrecimientos Kiosko ejes D y FSobrecimientos Kiosko eje ESobrecimientos Kiosko eje 1Sobrecimientos Kiosko eje 2Sobrecimientos Kiosko entre ejes 1 y 2Sobrecimientos del muro decorativo al lado del kioskoENCOFRADO Y DESENCOFRADOM2Sobrecimientos SSHH ejes A y CSobrecimientos SSHH eje BSobrecimientos SSHH eje 1Sobrecimientos SSHH entre ejes 1 y 2Sobrecimientos Kiosko ejes D y FSobrecimientos Kiosko eje ESobrecimientos Kiosko eje 1Sobrecimientos Kiosko eje 2Sobrecimientos Kiosko entre ejes 1 y 2Sobrecimientos del muro decorativo al lado del kioskoOBRAS DE CONCRETO ARMADOZAPATASCONCRETO f'c = 210 Kg/cm2M3zapatas del SS.HH.zapatas del Kioskozapatas del muro decorativo al lado del kioskoACERO DE REFUERZO fy=4200 kg/cm2, G-60KGdel cuadro de metrado de aceroCURADO DE CONCRETOM2zapatas del SS.HH.zapatas del Kioskozapatas del muro decorativo al lado del kioskoCOLUMNASCONCRETO f'c = 210 Kg/cm2M3Columna C-1Columna C-2Columna C-3Columna C-4Columna C-5ENCOFRADO Y DESENCOFRADO DE COLUMNASM2Columna C-1Columna C-2Columna C-3Columna C-4Columna C-5ACERO DE REFUERZO fy=4200 kg/cm2, G-60KGdel cuadro de metrado de aceroCURADO DEL CONCRETOM2Columna C-1Columna C-2Columna C-3Columna C-4Columna C-5VIGASCONCRETO f'c = 210 Kg/cm2M3Viga frontal superior entre ejes A,C,D,F (V-1)Viga lateral inclinada del eje A y B, C y B (SSHH) (V-2)Viga lateral horizontal entre ejes 1 y 2 (SSHH) (V-3)Viga frontal intermedia entre ejes A y C (SSHH) (V-4)Viga lateral inclinada del eje D y E, F y E (KIOSKO) (V-5)Viga lateral horizontal entre ejes 1 y 2 (KIOSKO) (V-6)Viga frontal intermedia entre ejes F y D (KIOSKO) (V-7)Viga muro decorativo (V-8)ENCOFRADO Y DESENCOFRADO DE VIGASM2Viga frontal superior entre ejes A,C,D,F (V-1)Viga lateral inclinada del eje A y B, C y B (SSHH) (V-2)Viga lateral horizontal entre ejes 1 y 2 (SSHH) (V-3)Viga frontal intermedia entre ejes A y C (SSHH) (V-4)Viga lateral inclinada del eje D y E, F y E (KIOSKO) (V-5)Viga lateral horizontal entre ejes 1 y 2 (KIOSKO) (V-6)Viga frontal intermedia entre ejes F y D (KIOSKO) (V-7)Viga muro decorativo (V-8)ACERO DE REFUERZO fy=4200 kg/cm2, G-60KGdel cuadro de metrado de aceroCURADO DEL CONCRETOM2Viga frontal superior entre ejes A,C,D,F (V-1)Viga lateral inclinada del eje A y B, C y B (SSHH) (V-2)Viga lateral horizontal entre ejes 1 y 2 (SSHH) (V-3)Viga frontal intermedia entre ejes A y C (SSHH) (V-4)Viga lateral inclinada del eje D y E, F y E (KIOSKO) (V-5)Viga lateral horizontal entre ejes 1 y 2 (KIOSKO) (V-6)Viga frontal intermedia entre ejes F y D (KIOSKO) (V-7)Viga muro decorativo (V-8)LOSA ALIGERADA (DE CONCRETO)CONCRETO f'c = 210 Kg/cm2M3SS.HH.Kiosko(Volumen de C por cada metro cuadrado = 0.08 m3)ENCOFRADO Y DESENCOFRADOM2SS.HH.KioskoACERO DE REFUERZO fy=4200 kg/cm2, G-60KGdel cuadro de metrado de aceroBLOQUE HUECO DE CONCRETOM2SS.HH.KioskoCURADO DEL CONCRETOM2SS.HH.KioskoCOBERTURASTEJAS DE ARCILLAM2SS.HH.KioskoTARRAJEO EN TECHO CON IMPERMEBILIZANTEM2SS.HH.KioskoMUROS DE ALBAILERIAMURO DE LADRILLO KK DE ARCILLAMUROS DE LADRILLO KK DE ARCILLA-CABEZAM2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje B (altura promedio entre extremos)Muro SSHH eje 1Muro SSHH entre ejes 1 y 2Muro Kiosko ejes D y FMuro Kiosko eje EMuro Kiosko eje 1Muro Kiosko eje 2Muro Kiosko entre ejes 1 y 2Muro decorativo al lado del kioskoREVOQUES, ENLUCIDOS Y MOLDURASTARRAJEO EN INTERIORESM2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje B (altura promedio entre extremos)Muro SSHH eje 1Muro SSHH entre ejes 1 y 2Muro Kiosko ejes D y FMuro Kiosko eje EMuro Kiosko eje 1Muro Kiosko eje 2Muro Kiosko entre ejes 1 y 2TARRAJEO EN EXTERIORESM2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje 1Muro Kiosko ejes D y FMuro decorativo al lado del kioskoTARRAJEO EN COLUMNASM2Columna C-1Columna C-2Columna C-3Columna C-4Columna C-5TARRAJEO EN VIGASM2Viga frontal superior entre ejes A,C,D,F (V-1)Viga lateral inclinada del eje A y B, C y B (SSHH) (V-2)Viga lateral horizontal entre ejes 1 y 2 (SSHH) (V-3)Viga frontal intermedia entre ejes A y C (SSHH) (V-4)Viga lateral inclinada del eje D y E, F y E (KIOSKO) (V-5)Viga lateral horizontal entre ejes 1 y 2 (KIOSKO) (V-6)Viga frontal intermedia entre ejes F y D (KIOSKO) (V-7)Viga muro decorativo (V-8)PISOS Y PAVIMENTOSPISOS DE MAYOLICAPISO DE MAYOLICA 40 x 40 cm.M2SS.HH.KioskoZOCALOSZOCALOS DE MAYOLICAZOCALO DE MAYOLICA 20 x 40 cm.M2Muro SSHH ejes A y C (altura = 1.20 m.)Muro SSHH eje BMuro SSHH eje 1Muro SSHH entre ejes 1 y 2Muro Kiosko eje EMuro Kiosko eje 2Muro Kiosko entre ejes 1 y 2Menos area de puertas (hasta la altura de 1.20 m.)CARPINTERIA DE MADERAPUERTAS DE MADERAPUERTA DE MADERA SEGN DISEOUNDVENTANAS DE MADERAVENTANA DE MADERA SEGN DISEOUNDCARPINTERIA METALICAPUERTAS METALICAS CON MALLA DE ACEROPUERTA CON MALLA OLIMPICA Y TUB DE FGM2DIVISION DE SS.HH.DIVISION METALICA PARA SS.HH. Inc/puerta y accesoriosUNDCERRAJERIABISAGRASBISAGRA TIPO CAPUCHINAPZACERRADURASPARA PUERTA PRINCIPAL DE SOBRE PONER 2 GOLPES, LLAVE EXTERIORPZACERRAJERIA PARA VENTANASPZAVIDRIOS, CRISTALESVIDRIOS SEMIDOBLESM2PINTURADE CIELORRASOS, MUROSPINTURA DE CIELO RASO c/latex vinilico (vinilatex o similar)M2SS.HH.KioskoPINTURA VINILICA EN MUROS EXTERIORES (2 manos)M2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje 1Muro Kiosko ejes D y FMuro decorativo al lado del kioskoPINTURA VINILICA EN MUROS INTERIORES (2 manos)M2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje B (altura promedio entre extremos)Muro SSHH eje 1Muro SSHH entre ejes 1 y 2Muro Kiosko ejes D y FMuro Kiosko eje EMuro Kiosko eje 1Muro Kiosko eje 2Muro Kiosko entre ejes 1 y 2Menos areas de zocalo con mayolica (del item 10.01.01)PINTURA EN PUERTAS CON BARNIZ (2 manos)M2Puertas de madera(el coeficiente 2 es por ambas caras)APARATOS SANITARIOS Y ACCESORIOSINODOROSINODORO TANQUE BAJOPZALAVATORIOSLAVATORIO DE PARED CON UNA LLAVEPZAURINARIOSURINARIO DE PARED inc/accesoriosPZALAVADEROS DE COCINALAVADERO DE ACERO INOXIDABLE CON UNA LLAVEPZAINSTALACION SANITARIADESAGUE Y VENTILACIONSALIDA DE DESAGUE PVC SAL 2"PTOSALIDA DE DESAGUE PVC SAL 3"PTOSALIDA DE DESAGUE PVC SAL 4"PTOSALIDA DE VENTILACION PVC SAL 2"PTOSOMBRERO DE VENTILACION PVC SAL 2"PTOREDESEXCAVACION MANUALM3Excavacion para tuberia de 6"Excavacion para tuberia de 4"Para evacuacion de aguas pluviales del anfiteatro tuberia de 4"Para evacuacion de aguas pluviales del cancha sintetica tuberia de 4"Para evacuacion de aguas pluviales del skate park tuberia de 4"Para evacuacion de aguas pluviales del Tenis tuberia de 4"Excavacion para tuberia de 3"Excavacion para tuberia de 2"RELLENO DE ZANJASM3Excavacion para tuberia de 6"Menos diametro de tuberia de 6"Excavacion para tuberia de 4"Menos diametro de tuberia de 4"Para evacuacion de aguas pluviales del anfiteatro tuberia de 4"Menos diametro de tuberia de 4"Excavacion para tuberia de 3"Menos diametro de tuberia de 3"Excavacion para tuberia de 2"Menos diametro de tuberia de 2"TUBERIA DE PVC SAL 2"MTuberia de 2"TUBERIA DE PVC SAL 3"MTuberia de 3"TUBERIA DE PVC SAL 4"MTuberia de 4"Para evacuacion de aguas pluviales del anfiteatro tuberia de 4"Para evacuacion de aguas pluviales del cancha sintetica tuberia de 4"Para evacuacion de aguas pluviales del skate park tuberia de 4"Para evacuacion de aguas pluviales del Tenis tuberia de 4"ACCESORIOS DE REDESCODO PVC SAL 3" x 45UNDCODO PVC SAL 4" x 45UNDYEE PVC SAL 3"UNDYEE PVC SAL 4"UNDYEE PVC SAL 4" CON REDUCCION A 3"UNDYEE PVC SAL 4" CON REDUCCION A 2"UNDADITAMENTOS VARIOSSUMIDERO DE BRONCE DE 3"UNDREGISTRO DE BRONCE DE 4"UNDCAMARAS DE INSPECCIONCAJAS DE REGISTROUNDSISTEMADE AGUA FRIASALIDA DE AGUA FRIASALIDA DE AGUA FRIA CON TUBERIA PVC SAP 1/2"PTOREDES DE DISTRIBUCIONRED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAPMTuberia horizontalTuberia vertical (conexion a cada aparato sanitario)RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAPMTuberia principalACCESORIOS DE REDESCODO PVC SAP 1/2" x 90UNDconexin al aparato sanitarioForma de la redCODO PVC SAP 3/4" x 90UNDForma de la redTEE PVC SAP 1/2"UNDTEE PVC SAP 3/4"UNDREDUCCION PVC SAP DE 3/4" A 1/2"UNDVALVULA ESFERICA DE BRONCE DE UNION ROSCADA DE 1/2"UNDVALVULA ESFERICA DE BRONCE DE UNION ROSCADA DE 3/4"UNDSISTEMA DE AGUA DE LLUVIACANALETASCANALETAS DE PVCMSS.HH.KioskoTUBERIAS DE BAJADA Y DISTRIBUCIONMONTANTES DE AGUAS PLUVIALESUNDSS.HH.KioskoCAJAS DE REGISTROUNDSS.HH.KioskoINSTALACIONES ELECTRICAS DE SS.HHINSTALACIONES ELECTRICASGLBPISOS Y PAVIMENTOS (AREA EXTERIOR)FALSO PISOFALSO PISO MEZCLA C:H - 1:6 e=2"m2CONTRAPISOCONTRAPISO DE 48 mmm2PISOSPISO DE TERRAZO PULIDO CLARO C/PLATINA ALUMINIOm2PISO DE PORCELANATO DE 30X60 CMm2PISO DE CERAMICO DE 30X30 CMm3PISO DE MADERA EN TERRAZA TIPO DEKCm2PISO DE LAJAS DE PIEDRA NATURALm3PISO DE CANTO RODADOPISO DE ADOQUINES DE CONCRETOmPISO DE COCRETO SELLADOPISO DE LADRILLO MOLIDOASFALTO EN ESTACIONAMIENTOCANTONERA DE FIERRO ESTRIADO DE 2" X 3/16"mCERCO PERIMETRICOOBRAS PRELIMINARESLIMPIEZA DE TERRENOm2TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRAm2MOVIMIENTO DE TIERRASEXCAVACIONm3ELIMINACION DE MATERIAL EXCEDENTEm3OBRAS DE CONCRETO SIMPLECIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30MTm2CONCRETO 1:8+25% PM PARA SOBRECIMIENTOSm3OBRAS DE CONCRETO ARMADOCOLUMNASCONCRETO F'C =175 KG/CM2 PARA COLUMNASm3ENCOFRADO Y DESENCOFRADO EN COLUMNASm2ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNASkgVIGASCONCRETO F'C =175 KG/CM2 PARA VIGASm3ENCOFRADO Y DESENCOFRADO EN VIGASm2ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGASkgARQUITECTURAMURO DE LADRILLO MECANIZADO DE 8 X 13 X24 CM. CABEZAm2TARRAJEO EN EXTERIORES CON CEMENTO-ARENAm2PINTURA LATEX EN MUROS EXTERIORESm201.06.02SISTEMA DE AGUA GENERAL4.004.004.006.81.117.4801.06.03RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAPM1.001.001.003.71.1312.21SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4"PTOVALVULA DE PASO TIPO BOLA DE 3/4"UNDRED PRINCIPALSISTEMA DE RIEGOASPERSORES DE 3/4"UNDSISTEMA DE RIEGOMEDIDOR DE AGUAUNDRED PRINCIPALTRABAJOS DE CANTERIATRABAJOS DE CANTERIAGLBMOBILIARIO PARQUE INFANTILMODULOS DE JUEGOS INFANTILESGLBMOBILIARIO GIMNASIO EXTERIOR TERCERA EDADEQUIPOS DE GIMNASIOUNDRAMPA DE SKATECONSTRUCCION DE RAMPA PARA SKATE DE CONCRETOGLBEQUIPAMIENTO Y MOBILIARIOVARIOSBANCAS DE CARPINTERIA MIXTA METAL MADERAund17.00BANCAS Y MESAS DE PICNICDESCANSOS - MIRADORESund1.00PERGOLASALEGORIASund20.00MURALESGLB360.00BASURERO DE ESTRUCTURA METALICAund360.00ESTACIONAMIENTOESTACIONAMIENTO VEHICULARESTACIONAMIENTO PARA BICICLETASEALIZACION DE SEGURIDADSEALIZACIONES DE SEGURIDADundSEALETICASEALIZACIONES Y LETREROSundINSTALACIONES ELECTRICAS GENERALGLBINSTALACIONES ELECTROMECANICASGLBESPEJOS DE AGUAFUENTES DE AGUACONTROL DE CALIDADROTURA DE BRIQUETASUNDPRUEBAS DE SOLDADURAUNDPRUEBAS DE COMPACTACION DE CAMPOUNDDISEO DE MEZCLASESTUDIO GEOLOGICOUNDACONDICIONAMIENTO DE AREAS VERDESACONDICIONAMIENTO DE AREAS VERDESM2MITIGACION AMBIENTALLIMPIEZA FINAL DE OBRAM201.07CONCRETO f'c = 210 Kg/cm2M30.00.05.71.1212.5401.07.01SS.HH.1,217.361,217.361,217.3610.41.1111.4401.07.02Kiosko94.7894.7894.787.31.118.0301.08(Volumen de C por cada metro cuadrado = 0.08 m3)0.00.03.11.126.8201.08.011,629.011,629.011,629.0158.52M201.08.02ENCOFRADO Y DESENCOFRADOM2351.69351.69351.69LOSA REST1600.2322117.04M201.09SS.HH.0.00.0LOSA COCINA600.21201.09.01Kiosko2,912.392,912.392,912.39LOSA SH240.24.801.09.022,476.682,476.682,476.6848.8M301.09.03ACERO DE REFUERZO fy=4200 kg/cm2, G-60KG435.70435.70435.70297.6M301.09.04del cuadro de metrado de acero471.24471.24471.24ENCOF LOSAS820.2232.8M201.09.05205.43205.43205.43HANCHOLONG01.09.06BLOQUE HUECO DE CONCRETOM21,134.471,134.471,134.47PLACAS90.2536.7501.09.07SS.HH.17.4817.4817.488.50.2536.375Kiosko13.125M301.100.00.0ENCOF PLACAS96.558.501.10.01CURADO DEL CONCRETOM20.00.08.56.555.2501.10.01.01SS.HH.963.25963.25963.25113.75M201.10.02Kiosko0.00.001.10.02.011,557.801,557.801,557.80MURO CONT RES82101.10.03COBERTURAS0.00.001.10.03.0113.5113.5113.5101.10.03.02TEJAS DE ARCILLAM2586.20586.20586.20SS.HH.971.60971.60587.2001.10.03.03Kiosko971.60971.60971.6030.4030.40972.60TARRAJEO EN TECHO CON IMPERMEBILIZANTEM201.10.03.04SS.HH.30.4030.4030.40KioskoMUROS DE ALBAILERIA0.00.031.4001.11MURO DE LADRILLO KK DE ARCILLA0.00.001.11.01MUROS DE LADRILLO KK DE ARCILLA-CABEZAM20.00.001.11.01.01Muro SSHH ejes A y C (altura promedio entre extremos)660.00660.00660.0001.11.02Muro SSHH eje B (altura promedio entre extremos)0.00.001.11.02.01Muro SSHH eje 1338.00338.00338.00Muro SSHH entre ejes 1 y 2115.78115.78908.84Muro Kiosko ejes D y F01.12Muro Kiosko eje E0.00.001.12.01Muro Kiosko eje 1994.80994.80994.8001.12.02Muro Kiosko eje 2855.20855.20855.20Muro Kiosko entre ejes 1 y 2Muro decorativo al lado del kiosko01.130.00.001.13.01REVOQUES, ENLUCIDOS Y MOLDURAS115.78115.78115.780.00.0115.78TARRAJEO EN INTERIORESM2Muro SSHH ejes A y C (altura promedio entre extremos)Muro SSHH eje B (altura promedio entre extremos)01.14Muro SSHH eje 10.00.001.14.01Muro SSHH entre ejes 1 y 2353.60353.60353.6001.14.02Muro Kiosko ejes D y F340.79340.79340.7901.14.03Muro Kiosko eje E7.007.007.0001.14.04Muro Kiosko eje 154.4454.4454.4401.14.05Muro Kiosko eje 215.2015.2015.20Muro Kiosko entre ejes 1 y 201.150.00.001.15.01TARRAJEO EN EXTERIORESM20.00.001.15.01.01Muro SSHH ejes A y C (altura promedio entre extremos)192.00192.00192.0001.15.02Muro SSHH eje 10.00.001.15.02.01Muro Kiosko ejes D y F48.0048.0048.0001.16Muro decorativo al lado del kiosko0.00.001.16.01340.79340.79340.7901.17TARRAJEO EN COLUMNASM20.00.001.17.01Columna C-11,989.601,989.601,989.6001.17.02Columna C-23,153.353,153.353,153.3501.17.03Columna C-3435.70435.70435.70Columna C-401.18Columna C-50.00.001.18.011.001.001.00TARRAJEO EN VIGASM20.00.0Viga frontal superior entre ejes A,C,D,F (V-1)0.00.01.0001.19Viga lateral inclinada del eje A y B, C y B (SSHH) (V-2)0.00.001.19.01Viga lateral horizontal entre ejes 1 y 2 (SSHH) (V-3)0.00.001.19.01.01Viga frontal intermedia entre ejes A y C (SSHH) (V-4)24.0024.0026.0001.19.01.02Viga lateral inclinada del eje D y E, F y E (KIOSKO) (V-5)31.0031.0031.0001.19.01.03Viga lateral horizontal entre ejes 1 y 2 (KIOSKO) (V-6)13.0013.0013.0001.19.01.04Viga frontal intermedia entre ejes F y D (KIOSKO) (V-7)2.002.002.0001.19.01.05Viga muro decorativo (V-8)21.0021.0020.0001.19.01.060.00.072.0001.19.01.070.00.020.0001.19.02PISOS Y PAVIMENTOS0.00.001.19.02.01SALIDA DE DESAGUE EN PVC INODOROSpto24.0024.0025.0001.19.02.02SALIDA DE DESAGUE EN PVC URINARIOSpto13.0013.0013.0001.19.02.03SALIDA DE DESAGUE EN PVC LAVATORIOSpto31.0031.0031.0001.19.02.04SALIDA DE DESAGUE EN PVC SUMIDEROS DE 2"pto47.0047.0015.0001.19.02.05SALIDA DE DESAGUE EN PVC SUMIDEROS DE 4"pto6.006.002.0001.19.02.06SALIDA DE DESAGUE PARA REGISTRO ROSCADO DE 2"pto8.008.0023.0001.19.02.07SALIDA DE DESAGUE PARA REGISTRO ROSCADO DE 4"pto19.0019.0013.0001.19.03SISTEMA DE REDES DE DESAGUE0.00.001.19.03.01TUBERIA PVC SAL DE 4"m104.34104.3497.4001.19.03.02TUBERIA PVC SAL DE 2"m77.6577.6582.4501.19.03.03TUBERIA PVC SAL DE 6"m79.9079.9061.0001.19.04ACCESORIOS VARIOS0.00.001.19.04.01YEE PVC SAL DE 4" X 2"und10.0010.0010.0001.19.04.02YEE PVC SAL DE 4"pza36.0036.0036.0001.19.04.03YEE PVC SAL 2"pza31.0031.0031.0001.19.04.04CODO PVC SAL 2"X45pza15.0015.0015.0001.19.04.05CODO PVC SAL 2"X90pza18.0018.0018.0001.19.04.06CODO PVC SAL 4"X45pza8.008.008.0001.19.04.07CODO PVC SAL 4"X90pza42.0042.0042.0001.19.05CAJAS DE INSPECCION0.00.001.19.05.01CAJA DE REGISTRO DE DESAGUE 24" X 24"pza11.0011.0011.0001.19.06VENTILACION0.00.001.19.06.01SOMBRERO VENTILACION PVC DE 2"pza13.0013.0013.0001.19.06.02SALIDA DE VENTILACIONpto13.0013.0013.0001.19.07PRUEBAS HIDRAULICAS0.00.001.19.07.01PRUEBA HIDRAULICA DE DESAGUE Y DESINFECCIONm250.85250.85250.8501.19.08MOVIMIENTO DE TIERRAS, SISTEMA DE DESAGUE0.00.001.19.08.01TRAZO Y REPLANTEOkm0.060.060.0601.19.08.02EXCAVACION DE ZANJASm314.6414.6414.6401.19.08.03REFINE DE ZANJA INCL. CAMA EN TERRENO NORMAL-SEMIROCOSO 3-62m61.0061.0061.0001.19.08.04RELLENO COMP. MAT. PROPIO EN ZANJASm314.6414.6414.6401.20SISTEMA DE AGUA FRIA0.00.001.20.01SALIDA PARA PUNTOS DE AGUA0.00.001.20.01.01SALIDA DE AGUA FRIA EN INODOROS TANQUE BAJOpto26.0026.0026.0001.20.01.02SALIDA DE AGUA FRIA EN URINARIOSpto13.0013.0013.0001.20.01.03SALIDA DE AGUA FRIA EN LAVATORIOSpto40.0040.0040.0001.20.01.04SALIDA DE AGUA FRIA PARA DUCHASpto20.0020.0020.0001.20.02TUBERIAS DE DISTRIBUCION DE AGUA0.00.001.20.02.01TUBERIA PVC SAP DE 3"m114.40114.40114.4001.20.02.02TUBERIA DE PVC A-10 SP DE 2" (50 mm) INCL.ELEM.UNION + 2% DESPERDICIOm9.409.409.4001.20.02.03TUBERIA PVC SAP DE 1 1/2"m10.2010.2010.2001.20.02.04TUBERIA PVC SAP DE 1"m21.6021.6021.6001.20.02.05TUBERIA PVC SAP DE 3/4"m73.9073.9073.9001.20.02.06TUBERIA PVC SAP DE 1/2"m30.9030.9030.9001.20.03ACCESORIOS SISTEMA DE AGUA FRIA0.00.001.20.03.01TEE PVC-SAP 1/2"und10.0010.0010.0001.20.03.02TEE PVC-SAP 3/4"und63.0063.0063.0001.20.03.03TEE PVC-SAP 1"und12.0012.0012.0001.20.03.04TEE PVC-SAP 1 1/2"und3.003.003.0001.20.03.05TEE PVC-SAP 3"und8.008.008.0001.20.03.06CODO PVC-SAP 1/2" * 90und11.0011.0011.0001.20.03.07CODO PVC-SAP 3/4" * 90und21.0021.0021.0001.20.03.08CODO PVC-SAP 1" * 90und1.001.001.0001.20.03.09CODO PVC-SAP 3" * 90und5.005.005.0001.20.03.10REDUCCION PVC SAP 1 1/2" A 1"pza3.003.003.0001.20.03.11REDUCCION PVC SAP 1 1/2" A 3/4"pza4.004.004.0001.20.03.12REDUCCION PVC SAP 1" A 3/4"pza8.008.008.0001.20.03.13REDUCCION PVC SAP 1" A 1/2"pza11.0011.0011.0001.20.03.14REDUCCION PVC SAP 3/4" A 1/2"pza66.0066.0066.0001.20.04VALVULAS Y LLAVES0.00.001.20.04.01VALVULA DE COMPUERTA 3"und2.002.002.0001.20.04.02VALVULA DE COMPUERTA BRONCE DE 3/4"pza13.0013.0013.0001.20.04.03VALVULA DE COMPUERTA BRONCE DE 1/2"pza2.002.002.0001.20.04.04NICHO DE VALVULAS EN LA PAREDund15.0015.0015.0001.20.04.05CAJA DE VALVULAS DE 12" X 24" CON TAPA DE FIERRO FUNDIDOund5.005.005.0001.20.05PRUEBAS HIDRAULICAS SISTEMA DE AGUA FRIA0.00.001.20.05.01PRUEBA HIDRAULICA DE AGUA Y DESINFECCIONm260.40260.40260.4001.20.06MOVIMIENTO DE TIERRAS, SISTEMA DE AGUA0.00.001.20.06.01TRAZO Y REPLANTEOkm0.260.260.2601.20.06.02EXCAVACION DE ZANJASm311.7011.7011.7001.20.06.03REFINE DE ZANJA INCL. CAMA EN TERRENO NORMAL-SEMIROCOSO 3-62m260.00260.00260.0001.20.06.04RELLENO COMP. MAT. PROPIO EN ZANJASm311.7011.7011.7001.20.07TANQUE ELEVADO0.00.001.20.07.01TANQUE ELEVADO DE ETERNIT DE 1.00 m3pza8.008.008.0001.21SISTEMA DE EVACUACION DE AGUAS PLUVIALES0.00.001.21.01MONTAJE E INSTALACION DE AGUAS PLUVIALESm211.20211.20211.2001.21.02COLUMNETA DE PROTECCION DE CONCRETOund33.0033.0033.0001.21.03CANALETA DE CONCRETOm116.23116.23116.2301.21.04REJILLA DE CANAL DE CONCRETOm116.23116.23116.2301.21.05TUBERIA PVC UF DE 6" X 6 Mm24.8024.8024.8001.21.06MOVIMIENTO DE TIERRAS, SISTEMA DE EVACUACION DE AGUAS PLUVIALES0.00.001.21.06.01TRAZO Y REPLANTEOkm0.150.150.1501.21.06.02EXCAVACION DE ZANJASm341.6341.6341.6301.21.06.03REFINE DE ZANJAm154.20154.20154.2001.21.06.04RELLENO CON MATERIAL PROPIOm341.6341.6341.6301.22INSTALACIONES ELECTRICAS0.00.001.22.01MOVIMIENTO DE TIERRAS0.00.001.22.01.01EXCAVACION PARA COLOCACION DE CABLE SUBTERRANEOm312.5012.5012.5001.22.01.02RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJASm311.0011.0011.0001.22.01.03ELIMINACION DE MATERIAL EXCEDENTEm34.004.004.0001.22.02SALIDA DE ELECTRICAS0.00.001.22.02.01SALIDA CENTRO DE LUZpto285.00285.00285.0001.22.02.02SALIDA DE PAREDpto52.0052.0052.0001.22.02.03KIT DE CONEXION PARA INTERNETEqp1.001.001.0001.22.02.04KIT DE CONEXION PARA ALARMA CONTRA INCENDIOSEqp1.001.001.0001.22.03SALIDA PARA COMUNICACIONES Y SEALES0.00.001.22.03.01SALIDA PARA TELEFONIApto23.0023.0023.0001.22.03.02SALIDA PARA INTERNETpto40.0040.0040.0001.22.03.03SALIDA PARA DATA INTERNETpto70.0070.0070.0001.22.03.04SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto116.00116.00116.0001.22.03.05SALIDA PARA TOMACORRIENTES DOBLES CON PUESTA A TIERRApto45.0045.0045.0001.22.03.06SALIDA PARA TOMACORRIENTE TRIFACICO CON LINEA A TIERRApto3.003.003.0001.22.03.07SALIDA ESPECIAL DE CAJA DE PASO FUERZAund10.0010.0010.0001.22.03.08SALIDA ESPECIAL DE CAJA DE PASO SERVICIO ESPECIALESund12.0012.0012.0001.22.03.09SALIDA ESPECIAL DE CAJA DE PASO PARA OTROSund35.0035.0035.0001.22.03.10SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLEpto30.0030.0030.0001.22.03.11SALIDA PARA INTERRUPTOR UNIPOLAR DOBLEpto6.006.006.0001.22.03.12SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLEpto14.0014.0014.0001.22.03.13SALIDA PARA INTERRUPTOR HORARIOpto1.001.001.0001.22.04TABLERO DE DISTRIBUCION E INTERRUPTORES0.00.001.22.04.01INTERRUPTOR THERMOMAGNETICO 3*200Apza1.001.001.0001.22.04.02INTERRUPTOR THERMOMAGNETICO 3 X 80Apza1.001.001.0001.22.04.03INTERRUPTOR THERMOMAGNETICO 3 X 50Apza5.005.005.0001.22.04.04INTERRUPTOR THERMOMAGNETICO 2 X 40Apto12.0012.0012.0001.22.04.05INTERRUPTOR THERMOMAGNETICO 2 X 20 Apza24.0024.0024.0001.22.04.06INTERRUPTOR THERMOMAGNETICO 2 X 15Apza12.0012.0012.0001.22.04.07TABLERO DE DISTRIBUCIN CAJA METALICA 48 POLOS-RIELpza1.001.001.0001.22.04.08TABLERO DE DISTRIBUCIN CAJA METALICA 26 POLOS - RIELpza2.002.002.0001.22.04.09TABLERO DE DISTRIBUCIN CAJA METALICA 18 POLOS - RIELpza6.006.006.0001.22.04.10TABLERO DE DISTRIBUCIN CAJA METALICA CON 16 POLOS - RIELpza3.003.003.0001.22.04.11TABLERO DE DISTRIBUCIN CAJA METALICA CON 10 POLOS - RIELpza3.003.003.0001.22.05EQUIPOS Y ACCESORIOS0.00.001.22.05.01ARTEFACTO FLUORESCENTE REJILLA METALICA COLGADO RAS M 2 X 36 Wund224.00224.00224.0001.22.05.02ARTEFACTO FLUORESCENTE REJILLA METALICA COLGADO RAS M 1 X 40 Wund48.0048.0048.0001.22.05.03ARTEFACTO BRAQUETE CON AHORRADOR DE 22 Wund59.0059.0059.0001.22.05.04ARTEFACTO FLUORESCENTE TPC 1 X 32 Wund10.0010.0010.0001.22.05.05POSTE TIPO PLAZA CON LAMPARA DE VAPOR DE MERCURIO 150Wund10.0010.0010.0001.22.05.06INTERRUPTOR HORARIOpza1.001.001.0001.22.05.07CAJA DE PASE STANDAR 8X8und12.0012.0012.0001.22.05.08CAJA DE PASE ESPECIAL6X6pza10.0010.0010.0001.22.05.09TOMACORRIENTE SIMPLE C/TOMA A TIERRApza116.00116.00116.0001.22.05.10TOMACORRIENTE BIPOLAR C/TOMA A TIERRApza45.0045.0045.0001.22.05.11TOMACORRIENTE TRIFACICO C/TOMA A TIERRApza3.003.003.0001.22.05.12SISTEMA PUESTA A TIERRAund6.006.006.0001.22.05.13PARARRAYOSund1.001.001.0001.22.06CONDUCTORES0.00.001.22.06.01CONDUCTOR TH 2 2X2.5MM2 + 1X2.5 MM2 (T)m1,120.001,120.001,120.0001.22.06.02CONDUCTOR TH 2 2X4MM2+1X4MM2 (T)m1,080.001,080.001,080.0001.22.06.03CONDUCTOR TH 2 2X6MM2+1X2.5MM2 (T)m720.00720.00720.0001.22.06.04CONDUCTOR N2XH 2 1X10MM2+1X6MM2 (T)m485.00485.00485.0001.22.06.05CONDUCTOR N2XH 2 1X25MM2+1X6MM2 (T)m400.00400.00400.0001.22.06.06CONDUCTOR N2XH 3 1X50MM2+1X35MM2 (T)m250.00250.00250.0001.22.06.07CONDUCTOR N2XH 3 1X25MM2+1X25MM2 (T)m100.00100.00100.0001.22.07PRUEBAS DE INSTALACIONES ESPECIALES0.00.001.22.07.01PRUEBAS DE INSTALACIONES ESPECIALESglb1.001.001.0002CERCO PERIMETRICO0.00.002.01OBRAS PRELIMINARES0.00.002.01.01LIMPIEZA DE TERRENOm2571.50571.50350.5502.01.02TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRAm2266.70266.70140.2202.02MOVIMIENTO DE TIERRAS0.00.002.02.01EXCAVACIONm3342.90342.9098.1502.02.02ELIMINACION DE MATERIAL EXCEDENTEm3411.48411.48127.6002.03OBRAS DE CONCRETO SIMPLE0.00.002.03.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3106.68106.6898.1502.03.02ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30MTm2533.40533.40210.3402.03.03CONCRETO 1:8+25% PM PARA SOBRECIMIENTOSm326.3326.3326.2902.04OBRAS DE CONCRETO ARMADO0.00.002.04.01COLUMNAS0.00.002.04.01.01CONCRETO F'C =175 KG/CM2 PARA COLUMNASm320.2520.2518.7502.04.01.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm2384.00384.00150.0002.04.01.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNASkg2,014.662,014.662,018.4002.04.02VIGAS0.00.002.04.02.01CONCRETO F'C =175 KG/CM2 PARA VIGASm314.1014.1014.0202.04.02.02ENCOFRADO Y DESENCOFRADO EN VIGASm2210.33210.33210.3202.04.02.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGASkg874.78874.781,687.6902.05ARQUITECTURA0.00.002.05.01MURO DE LADRILLO MECANIZADO DE 8 X 13 X24 CM. CABEZAm2947.70947.70877.5002.05.02TARRAJEO EN EXTERIORES CON CEMENTO-ARENAm21,997.311,997.311,963.0802.05.03PINTURA LATEX EN MUROS EXTERIORESm21,997.311,997.311,963.0803OTRAS OBRAS0.00.003.01VEREDAS EXTERIORES0.00.003.01.01TRAZO Y REPLANTEOm2292.21292.21148.0803.01.02NIVELADOm2292.21292.21148.0803.01.03PERFILADO Y COMPACTADOm2292.21292.21148.0803.01.04EMPEDRADO PARA VEREDAS e=0.15Mm2292.21292.21148.0803.01.05CONCRETO F'c = 140 KG/CM2m323.3823.3814.8103.01.06ACABADO FROTACHADO - SEMIPULIDOm2292.21292.21140.0803.02PATIO CENTRAL - LOSA0.00.003.02.01EMPEDRADO DE LOSAm21,465.001,465.001,691.9603.02.02PISO DE CONCRETO E=2" f'c 140 kg/cm2 X 4 cm PULIDO 1:2 X 1 cmm20.00.01,691.9603.02.03JUNTAS ASFALTICASm0.00.01,027.3703.02.04SARDINELES DE CONCRETO DE F'c=175 KG/CM2m0.00.0169.1603.02.05PINTADO DE MARCAS EN LOSAS DEPORTIVASglb317.25317.2522.0003.03ACCESORIOS PLAZAS0.00.003.03.01ALEGORIA PLAZA CENTRALglb1.001.001.0003.03.02ALEGORIA PLAZA SECUNDARIAund22.0022.0022.0003.03.03und1.001.001.0003.05MITIGACION DE IMPACTO AMBIENTAL0.00.003.05.01RIEGO PREVENTIVO DE POLVOm22,853.352,853.352,853.3503.05.02LIMPIEZA Y RECUPERACION DE AREAS OCUPADASm296.0096.0096.0003.05.03ACONDICIONAMIENTO Y RECUPERACION DE BOTADEROSglb1.001.001.0003.05.04REVEGETACION DE BOTADEROSglb1.001.001.0003.06FLETE0.00.003.06.01FLETEkg975,000.00975,000.00975,000.0004COMPONENTE EQUIPAMIENTO Y MOBILIARIO0.00.004.01VARIOS0.00.004.01.01BANCAS DE MADERAund17.0017.0017.00BANCAS Y MESAS DE PICNIC04.01.02DESCANSOS - MIRADORESund1.001.001.0004.01.03ALEGORIASund20.0020.0020.0004.01.04MURALESund360.00360.00360.0004.01.05TACHOS DE BASURAund360.00360.00360.0004.01.06GIMNASIO EXTERIORund29.0029.0029.00JUEGOS INFANTILESBICICLETASAREAS VERDESREVEGETACION04.01.07FUENTES DE AGUAund36.0036.0036.0004.01.08CUARTO DE MAQUINASund31.0031.0031.0004.01.09SISTEMA DE RIEGOund4.004.004.0004.01.10SKATE PARKund10.0010.0010.0004.01.11RETOQUE DE PIEDRASund80.0080.0080.0004.01.12und10.0010.0010.0004.01.13und80.0080.0080.0004.02FLETE0.00.004.02.01FLETEkg930,000.00930,000.00930,000.00

MET DETALLE01COMPONENTE INFRAESTRUCTURA EDUCATIVADESCRIPCIONUNDLARGOANCHOALTURAREAVOLUM.CANTIDADPARCIALTOTALOBSERVACIONMET ET.DIFERENCIA01.01OBRAS PROVISIONALES01.01.01ALMACEN, OFICINA Y GUARDIANIAm248.0048.000.0001.01.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mund3.003.003.001.002.0001.01.03CERCO PERIMETRICO CON ARPILLERA H=3.00Mm123.60123.60123.60123.600.0001.02OBRAS PRELIMINARES0.0001.02.01DEMOLICION DE ALBAILERIA EXISTENTEm2473.32473.32473.32445.3228.0001.02.02LIMPIEZA DE TERRENO MANUALm22,853.352,853.352,853.352,853.350.0001.02.03TRAZO Y REPLANTEO PRELIMINARm22,853.352,853.352,853.352,853.350.0001.02.04TRAZO Y REPLANTEO DURANTE LA EJECUCIONm25,706.705,706.705,706.702,853.352,853.3501.02.05LIMPIEZA PERMANENTE EN OBRAm22,853.352,853.35-2,853.35PN01.02.06DEMOLICION DE LOSA DEPORTIVAm2756.00756.00756.0001.03MOVIMIENTO DE TIERRAS0.0001.03.01EXCAVACION DE ZANJAS P/CIMIENTOSm31,459.381,459.380.000.85862EXCAVACION DE CIMIENTOS CORRIDOS43.550.772.201.0074.04Cim. Corr. boques0.000.90EXCAVACION DE VIGAS DE CIMENTACION0.000.0040X50178.801.162.20Con sobrecim.0.001.3540X60169.241.162.101.00411.96Con sobrecim.0.001.3540X5050.550.772.301.0089.84Sin sobrecim.0.000.9040X6060.110.772.401.00111.48Sin sobrecim.0.000.90EXCAVACION DE ZAPATA2.60214.461.00557.600.00EXCAVACION DE SUB-ZAPATAS1.00214.461.00214.460.000.0001.03.02REFINE DE ZANJAm332.26-332.2601.03.03RELLENO CON MATERIAL PROPIOm31.00958.50958.50960.60-2.1001.03.04ACARREO DE MATERIAL EXCEDENTE (d=40 m)m31.001,678.291,678.291,678.29-0.0001.03.05ELIMINACION DE MATERIAL EXCEDENTE (5 km)m31.001,751.261,751.261,751.26-0.00PN01.03.06RELLENO CON MATERIAL DE PRESTAMO C/EQUIPO MEC.m30.40920.00368.00368.0001.04OBRAS DE CONCRETO SIMPLE0.0001.04.01CIMIENTOS CORRIDOS C:H 1:10 + 30% P.G.m343.930.500.6013.1813.1812.960.2201.04.02CONCRETO 1:8+25% PM PARA SOBRECIMIENTOSm30.00.03.82-3.8201.04.03ENCOFRADO SOBRECIMIENTOSm20.00.050.92-50.9201.04.04CONCRETO EN SUB-ZAPATAS F'C=140 KG/CM2 +50% PG.m31.00211.421.00211.42211.42327.89-116.47PN01.04.05SOLADO P/ VIGAS DE CONEXIN 5CM. MEZCLA 1:12m2297.301.00297.30297.3001.05OBRAS DE CONCRETO ARMADO0.0001.05.01ZAPATAS0.0001.05.01.01CONCRETO EN ZAPATAS F'C =210 KG/CM2m350.8250.82Sin impermeab.150.95-100.1301.05.01.02ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATASm2252.121.00252.12252.12325.16-73.0401.05.01.03ACERO Fy = 4200 KG/CM2 EN ZAPATASkg13,615.9913,615.9914,514.56-898.5701.05.01.01CONCRETO EN ZAPATAS F'C =210 KG/CM2 C/IMPERMEAB.m31.00131.73131.73Con impermeab.131.7301.05.02VIGAS DE CIMENTACION0.0001.05.02.01VIGAS DE CIMENTACION - CONCRETO F'C =210 KG/CM2m31.0026.3326.33Sin impermeab.80.78-54.4501.05.02.02VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADOm21.00601.98601.98403.88198.1001.05.02.03VIGAS DE CIMENTACION - ACERO fy=4200 kg/cm2kg14,619.8118,611.59-3,991.7801.05.02.01CONCRETO F'C =210 KG/CM2 C/IMPERMEAB.m31.0060.9160.91Con impermeab.60.9101.05.03SOBRECIMIENTO0.0001.05.03.01CONCRETO EN SOBRECIMIENTO REFORZADO F'C=175 KG/CM2m3165.19124.2640.93GUARDIANIACabeza14.940.251.856.916.91Soga7.540.131.851.811.81BLOQUE ICabeza74.420.251.8534.4234.42Soga30.060.131.857.237.23BLOQUE IICabeza115.150.251.8553.2653.26Soga5.120.131.851.231.23BLOQUE IIICabeza59.140.251.8527.3527.35Soga16.080.131.853.873.87BLOQUE IVCabeza41.460.251.8519.1819.18Soga41.320.131.859.949.9401.05.03.02ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOm21,499.35994.11505.24GUARDIANIACabeza14.941.8527.642.0055.28Soga7.541.8513.952.0027.90BLOQUE ICabeza74.421.85137.682.00275.35Soga30.061.8555.612.00111.22BLOQUE IICabeza115.151.85213.032.00426.06Soga5.121.859.472.0018.94BLOQUE IIICabeza59.141.85109.412.00218.82Soga16.081.8529.752.0059.50BLOQUE IVCabeza41.461.8576.702.00153.40Soga41.321.8576.442.00152.8801.05.03.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN SOBRECIMIENTO GRADO 60kg8,106.644,852.003,254.64GUARDIANIA440.06BLOQUE I2,080.34BLOQUE II2,650.94BLOQUE III1,474.23BLOQUE IV1,461.06PN01.05.03.01PINTURA ASFALTICA IMPERMEABILIZANTEm2816.20816.2001.05.04COLUMNAS0.0001.05.04.01CONCRETO F'C =210 KG/CM2 PARA COLUMNASm3102.4196.076.34PRIMER NIVELBLOQUE I25X400.250.404.250.436.002.5525X600.250.604.250.6420.0012.7530X600.300.604.050.734.002.92BLOQUE II0.00.025X400.250.404.250.438.003.4025X600.250.604.250.6423.0014.6630X600.300.604.050.736.004.37BLOQUE III0.00.025X600.250.604.250.6418.0011.48BLOQUE IV0.00.030X300.300.304.250.3816.006.12GUARDIANIA0.00.025X250.250.252.650.179.001.49SEGUNDO NIVEL0.00.0BLOQUE I0.00.025X400.250.402.750.286.001.6525X600.250.602.750.4120.008.2530X600.300.602.650.484.001.91BLOQUE II0.00.025X400.250.402.750.288.002.2025X600.250.602.750.4123.009.4930X600.300.602.650.486.002.86BLOQUE III0.00.025X600.250.602.750.4118.007.43BLOQUE IV0.00.030X300.300.302.750.255.001.24TIMPANO0.00.0BLOQUE I0.00.025X600.250.604.520.682.001.3625X600.250.602.440.372.000.73BLOQUE II0.00.025X600.250.604.520.682.001.3625X600.250.602.440.372.000.73BLOQUE IV0.00.030X300.300.303.720.335.001.6730X300.300.302.630.246.001.42GUARDIANIA0.00.025X250.250.251.270.084.000.3225X250.250.250.340.023.000.0601.05.04.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm21,190.531,110.6079.93PRIMER NIVELBLOQUE I25X400.250.404.255.536.0033.1525X600.250.604.257.2320.00144.5030X600.300.604.057.294.0029.16BLOQUE II0.00.025X400.250.404.255.538.0044.2025X600.250.604.257.2323.00166.1730X600.300.604.057.296.0043.74BLOQUE III0.00.025X600.250.604.257.2318.00130.05BLOQUE IV0.00.030X300.300.304.255.1016.0081.60GUARDIANIA0.00.025X250.250.252.652.659.0023.85SEGUNDO NIVEL0.00.0BLOQUE I0.00.025X400.250.402.753.586.0021.4525X600.250.602.754.6820.0093.5030X600.300.602.654.774.0019.08BLOQUE II0.00.025X400.250.402.753.588.0028.6025X600.250.602.754.6823.00107.5230X600.300.602.654.776.0028.62BLOQUE III0.00.025X600.250.602.754.6818.0084.15BLOQUE IV0.00.030X300.300.302.753.305.0016.50TIMPANO0.00.0BLOQUE I0.00.025X600.250.604.527.682.0015.3725X600.250.602.444.152.008.30BLOQUE II0.00.025X600.250.604.527.682.0015.3725X600.250.602.444.152.008.30BLOQUE IV0.00.030X300.300.303.724.465.0022.3230X300.300.302.633.166.0018.94GUARDIANIA0.00.025X250.250.251.271.274.005.0825X250.250.250.340.343.001.0201.05.04.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNASkg20,178.0020,178.0020,178.000.00PN01.05.04.01PINTURA ASFALTICA IMPERMEABILIZANTEm2114.10114.1001.05.05COLUMNAS DE AMARRE0.0001.05.05.01CONCRETO F'C =210 KG/CM2 PARA COLUMNETAS DE AMARREm340.7540.75-0.00Bloque IPrimer nivelCa1 15X250.150.252.250.0814.001.18Ca1 15X250.150.251.450.056.000.33Ca3 25X250.250.252.250.1417.002.39Ca3 25X250.250.251.450.0912.001.09Ca3 25X250.250.250.800.058.000.40Segundo nivel0.00.0Ca1 15X250.150.251.120.0410.000.42Ca3 25X250.250.252.600.1618.002.93Ca3 25X250.250.251.770.1112.001.33Ca3 25X250.250.251.120.078.000.56Ca3 25X250.250.251.000.0610.000.63Bloque II0.00.0Primer nivel0.00.0Ca1 15X250.150.252.250.084.000.34Ca3 25X250.250.252.250.1432.004.50Ca3 25X250.250.251.450.0918.001.63Ca3 25X250.250.250.800.0512.000.60Segundo nivel0.00.0Ca1 15X250.150.252.250.083.000.25Ca3 25X250.250.252.600.1634.005.53Ca3 25X250.250.251.770.1117.001.88Ca3 25X250.250.251.120.0712.000.84Ca3 25X250.250.251.000.0614.000.88Bloque III0.00.0Primer nivel0.00.0Ca1 15X250.150.250.800.038.000.24Ca1 15X250.150.250.800.034.000.12Ca3 25X250.250.252.250.1410.001.41Ca3 25X250.250.250.800.0514.000.70Segundo nivel0.00.0Ca1 15X250.150.251.000.0414.000.53Ca1 15X250.150.252.570.104.000.39Ca3 25X250.250.251.950.1210.001.22Ca3 25X250.250.251.000.066.000.38Ca3 25X250.250.251.000.0610.000.63Bloque IV0.00.0Primer nivel0.00.0Ca1 15X250.150.252.250.0813.001.10Ca1 15X250.150.251.050.042.000.08Ca3 25X250.250.252.250.1424.003.38Ca3 25X250.250.250.800.055.000.25Guardiania0.00.0Primer nivel0.00.0Ca1 15X250.150.252.250.087.000.59Ca1 15X250.150.251.050.042.000.08Ca3 25X250.250.252.250.148.001.13Ca3 25X250.250.250.800.052.000.1001.05.05.02ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARREm2362.75362.75-0.00Bloque IPrimer nivelCa1 15X250.150.252.251.0314.0014.84Ca1 15X250.150.251.450.676.003.99Ca3 25X250.250.252.251.2017.0020.43Ca3 25X250.250.251.450.7712.009.29Ca3 25X250.250.250.800.438.003.42Segundo nivel0.00.0Ca1 15X250.150.251.120.5110.005.14Ca3 25X250.250.252.601.3918.0024.99Ca3 25X250.250.251.770.9512.0011.34Ca3 25X250.250.251.120.608.004.78Ca3 25X250.250.251.000.5310.005.34Bloque II0.00.0Primer nivel0.00.0Ca1 15X250.150.252.251.034.004.13Ca3 25X250.250.252.251.2032.0038.45Ca3 25X250.250.251.450.7718.0013.94Ca3 25X250.250.250.800.4312.005.13Segundo nivel0.00.0Ca1 15X250.150.252.251.033.003.10Ca3 25X250.250.252.601.3934.0047.21Ca3 25X250.250.251.770.9517.0016.07Ca3 25X250.250.251.120.6012.007.18Ca3 25X250.250.251.000.5314.007.48Bloque III0.00.0Primer nivel0.00.0Ca1 15X250.150.250.800.378.002.94Ca1 15X250.150.250.800.374.001.47Ca3 25X250.250.252.251.2010.0012.02Ca3 25X250.250.250.800.4314.005.98Segundo nivel0.00.0Ca1 15X250.150.251.000.4614.006.43Ca1 15X250.150.252.571.184.004.72Ca3 25X250.250.251.951.0410.0010.41Ca3 25X250.250.251.000.536.003.20Ca3 25X250.250.251.000.5310.005.34Bloque IV0.00.0Primer nivel0.00.0Ca1 15X250.150.252.251.0313.0013.43Ca1 15X250.150.251.050.482.000.96Ca3 25X250.250.252.251.2024.0028.84Ca3 25X250.250.250.800.435.002.14Guardiania0.00.0Primer nivel0.00.0Ca1 15X250.150.252.251.037.007.23Ca1 15X250.150.251.050.482.000.96Ca3 25X250.250.252.251.208.009.61Ca3 25X250.250.250.800.432.000.8501.05.05.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNETAS DE AMARREkg4,698.524,698.524,698.520.0001.05.05.04JUNTA DE CONSTRUCCION CON TEKNOPORTm2157.42157.42157.420.0001.05.06VIGAS0.0001.05.06.01CONCRETO F'C =210 KG/CM2 PARA VIGASm373.07123.83-50.76BLOQUE ISegundo nivelV25X40156.860.250.4015.6915.69V30X5031.700.300.504.764.76TimpanoV25X504.250.250.502.001.06xxV25X504.640.250.502.001.16yyBLOQUE IISegundo nivelV25X40177.200.250.4017.7217.72V30X5031.450.300.504.724.72TimpanoV25X504.250.250.502.001.06xxV25X504.640.250.502.001.16yyBLOQUE IIISegundo nivelV25X40120.710.250.4012.0712.07BLOQUE IVPrimer nivelV25X4082.450.250.408.258.25timpanoV25X4015.560.250.401.561.56GUARDIANIAPrimer nivelV25X4027.150.250.402.712.71timpanoV25X4011.640.250.401.161.1601.05.06.02ENCOFRADO Y DESENCOFRADO EN VIGASm218,702.00982.0117,719.99BLOQUE IPrimer nivelV25X40177.950.250.40186.841.00186.84V30X6037.960.300.6056.941.0056.94Segundo nivelV25X40156.860.250.40101.961.00101.96V30X5031.700.300.5028.531.0028.53TimpanoV25X504.250.250.503.611.003.61V25X504.640.250.503.941.003.94BLOQUE IIPrimer nivelV25X40173.290.250.40112.641.00112.64V30X6031.450.300.6034.601.0034.60Segundo nivelV25X40177.200.250.40115.181.00115.18V30X5031.450.300.5028.311.0028.31TimpanoV25X504.250.250.503.611.003.61V25X504.640.250.503.941.003.94BLOQUE IIIPrimer nivelV25X40120.710.250.4078.461.0078.46Segundo nivelV25X40120.710.250.4078.461.0078.46BLOQUE IVPrimer nivelV25X4082.450.250.4053.591.0053.59timpanoV25X4015.560.250.4010.111.0010.11GUARDIANIAPrimer nivelV25X4027.150.250.4017.641.0017.64timpanoV25X4011.640.250.407.571.007.5701.05.06.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGASkg17,720.0017,720.0017,720.000.0001.05.06.04CONCRETO PREMEZCLADO F'C =210 KG/CM2m356.06BLOQUE IPrimer nivelV25X40152.950.250.4015.2915.29V30X6031.700.300.605.715.71BLOQUE II0.0Primer nivel0.0V25X40173.290.250.4017.3317.33V30X6031.450.300.605.665.66BLOQUE III0.0Primer nivel0.0V25X40120.710.250.4012.0712.0701.05.07VIGUETAS DE AMARRE0.0001.05.07.01CONCRETO F'C =210 KG/CM2 PARA VIGUETAS DE AMARREm323.6115.208.41Bloque I1er nivelVa1 15X2521.020.150.150.470.47Va3 25X2573.890.250.152.772.772do nivelVa1 15X2517.050.150.150.380.38Va3 25X2583.600.250.153.143.14Bloque II1er nivelVa1 15X254.210.150.150.090.09Va3 25X2594.520.250.153.543.542do nivelVa1 15X255.490.150.150.120.12Va3 25X25129.240.250.154.854.85Bloque III1er nivelVa1 15X2512.140.150.150.270.27Va3 25X2552.410.250.151.971.972do nivelVa1 15X2518.640.150.150.420.42Va3 25X2571.130.250.152.672.67Bloque IV1er nivelVa1 15X2536.700.150.150.830.83Va3 25X2540.750.250.151.531.53Guardiania1er nivelVa1 15X259.420.150.150.210.21Va3 25X259.390.250.150.350.3501.05.07.02ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARREm2189.43121.6067.8285Bloque I1er nivelVa1 15X2521.020.153.152.005.15Va3 25X2573.890.2518.472.0020.472do nivelVa1 15X2517.050.152.562.004.56Va3 25X2583.600.2520.902.0022.90Bloque II1er nivelVa1 15X254.210.150.632.002.63Va3 25X2594.520.2523.632.0025.632do nivelVa1 15X255.490.150.822.002.82Va3 25X25129.240.2532.312.0034.31Bloque III1er nivelVa1 15X2512.140.151.822.003.82Va3 25X2552.410.2513.102.0015.102do nivelVa1 15X2518.640.152.802.004.80Va3 25X2571.130.2517.782.0019.78Bloque IV1er nivelVa1 15X2536.700.155.512.007.51Va3 25X2540.750.2510.192.0012.19Guardiania1er nivelVa1 15X259.420.151.412.003.41Va3 25X259.390.252.352.004.3501.05.07.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGUETAS DE AMARREkg2,415.982,415.982,415.980.0001.05.08LOSAS ALIGERADAS0.0001.05.08.01CONCRETO F'C =210 KG/CM2 EN LOSA ALIGERADAm30.077.70-77.7001.05.08.02ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADASm2909.68776.97132.71Bloque I1er nivel304.90304.90Bloque II1er nivel395.31395.31Bloque III1er nivel209.47209.4701.05.08.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN LOSA ALIGERADAkg7,073.034,063.573,009.46Bloque I1er nivel1,711.70Viguetas554.07temperaturaBloque II1er nivel2,389.87Viguetas727.63temperaturaBloque III1er nivel1,287.14Viguetas402.62temperatura01.05.08.04BLOQUE DE TECKNOPORT H=15 CM. PARA TECHO ALIGERADOund1,326.001,988.33-662.33Bloque I1er nivel390.00390.002do nivel50.0050.00Bloque II0.01er nivel536.00536.002do nivel50.0050.00Bloque III0.01er nivel300.00300.0001.05.08.01CONCRETO PREMEZCLADO F'C =210 KG/CM2m384.40140.46Bloque I1er nivel48.79losa304.9012.8612.86viguetas14.9314.93Bloque II1er nivellosa395.3117.1317.13viguetas19.6619.66Bloque III1er nivellosa209.478.968.96viguetas10.8510.8501.05.09ESCALERAS Y LOSAS MACISAS0.0001.05.09.01CONCRETO F'C =210 KG/CM2 EN ESCALERASm310.2010.20-0.00Bloque Itramo I1.880.831.561.56tramo II1.880.731.371.37Descanso3.750.521.971.97Bloque IItramo I2.130.831.771.77tramo II2.130.731.561.56Descanso3.750.521.971.9701.05.09.02ENCOFRADO Y DESENCOFRADO EN ESCALERASm243.2334.009.23Bloque Itramo I2.861.881.005.36cara inferior0.832.001.66cara lateraltramo II2.701.881.005.06cara inferior0.732.001.47cara lateralDescanso1.873.751.007.01cara inferior0.522.001.05cara lateralBloque IItramo I2.861.881.005.36cara inferior0.832.001.66cara lateraltramo II2.701.881.005.06cara inferior0.732.001.47cara lateralDescanso1.873.751.007.01cara inferior0.522.001.05cara lateral01.05.09.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN ESCALERASkg1,405.601,405.601,405.600.0001.05.10PARAPETOS0.0001.05.10.01CONCRETO F'C =210 KG/CM2 EN PARAPETOSm365.540.2315.0715.0715.077.877.2001.05.10.02ENCOFRADO Y DESENCOFRADO EN PARAPETOSm2173.68122.5851.1065.542.65173.68173.6801.05.10.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN PARAPETOSkg667.18667.18667.180.0001.06PRUEBAS DE CONTROL DE CALIDAD0.0001.06.01PRUEBA A LA COMPRESION DEL CONCRETOund65.0065.0065.000.0001.06.02DISEO DE MEZCLASund4.004.004.000.0001.06.03ESTUDIO DE SUELOSund1.001.001.000.0001.07COBERTURAS0.0001.07.01COBERTURA CON TEJA PREFABRICADAm21,217.361,217.361,217.360.0001.07.02CUMBRERA PARA TEJA ANDINA PREFABRICADAm94.7894.7894.780.0001.07.03TIJERAL TIPO Iund70.0070.0070.000.0001.07.04TIJERAL TIPO IIund26.0026.0026.000.0001.07.05TIJERAL TIPO IIIund18.0018.0018.000.0001.07.06TIJERAL TIPO IVund5.005.005.000.0001.08ALBAILERIA0.0001.08.01MURO DE LADRILLO MECANIZADO DE 8 X 13 X24 CM. CABEZAm21,629.011,629.011,629.010.0001.08.02MURO DE LADRILLO MECANIZADO DE 8 X 13 X24 CM. SOGAm2351.69351.69351.690.0001.09REVOQUES ENLUCIDOS Y MOLDURAS0.0001.09.01TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5m22,912.392,912.392,912.390.0001.09.02TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENAm22,476.682,476.682,476.680.0001.09.03TARRAJEO EN EXTERIORES CON CEMENTO-ARENAm2435.70435.70435.700.0001.09.04TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENAm2471.24471.24471.240.0001.09.05TARRAJEO DE SUPERFICIES. VIGAS PERALTADAS INDEPENDIENTES (EN INTERIORES)m2205.43205.43205.430.0001.09.06VESTIDURA DE DERRAMES EN VANOSm1,134.471,134.471,134.470.0001.09.07FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO COLOREADOm17.4817.4817.480.0001.10PISOS Y PAVIMENTOS0.0001.10.01FALSO PISO0.0001.10.01.01FALSO PISO MEZCLA C:H - 1:6 e=2"m2963.25963.25963.250.0001.10.02CONTRAPISO0.0001.10.02.01CONTRAPISO DE 48 mmm21,557.801,557.801,557.800.0001.10.02.02ZOCALO DE MADERAm908.84908.84908.840.0001.10.03PISOS0.0001.10.03.01PISO DE TERRAZO PULIDO CLARO C/PLATINA ALUMINIOm213.5113.5113.510.0001.10.03.02PISO DE CERAMICO DE 30X30 CMm2586.20586.20586.200.0001.10.03.03PISO DE PARQUETm2971.60971.60971.600.0001.10.03.04CANTONERA DE FIERRO ESTRIADO DE 2" X 3/16"m30.4030.4030.400.0001.11ZOCALOS Y CONTRAZOCALOS0.0001.11.01CONTRAZOCALOS0.0001.11.01.01CONTRAZOCALO DE CERAMICOm660.00660.00660.000.0001.11.02ZOCALOS0.0001.11.02.01ZOCALO DE CERAMICO DE 20 X 40 CMSm2338.00338.00338.000.0001.12CIELORRASOS0.0001.12.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAm2994.80994.80994.800.0001.12.02CIELO RASO CON YESO SOBRE ENCHACLADOm2855.20855.20855.200.0001.13CARPINTERIA DE MADERA0.0001.13.01PUERTA DE MADERA AGUANO TABLERO REBAJADOm2115.78115.78115.780.0001.14CARPINTERIA METALICA0.0001.14.01REJAS METALICAS DE PROTECCION (VENTANAS EXTERNAS)m2353.60353.60353.600.0001.14.02VENTANAS DE ALUMINIOm2340.79340.79340.790.0001.14.03BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2" - PARANTE 1" X 1 mm7.007.007.000.0001.14.04PUERTA METALICA LAC 1/16" CON MARCO 2"X2"X1/4" Y REFUERZOSm254.4454.4454.440.0001.14.05JUNTA METALICA DE 4" X 3/16"m15.2015.2015.200.0001.15CERRAJERIA0.0001.15.01BISAGRAS0.0001.15.01.01BISAGRA CAPUCHINA BRONCEADA DE 3 1/2" X 3 1/2"pza192.00192.00192.000.0001.15.02CERRADURA0.0001.15.02.01CERRADURA PUERTA INTERIOR DE EMBUTIRpza48.0048.0048.000.0001.16VIDRIOS, CRISTALES Y SIMILARES0.0001.16.01VIDRIO TEMPLADO POLARIZADO DE 6 MMm2340.79340.79340.790.0001.17PINTURA0.0001.17.01PINTURA LATEX CIELO RASOm21,989.601,989.601,989.600.0001.17.02PINTURA LATEX EN INTERIORES 2 MANOSm23,153.353,153.353,153.350.0001.17.03PINTURA LATEX EN MUROS EXTERIORESm2435.70435.70435.700.0001.18SEALIZACION DE SEGURIDAD0.0001.18.01SEALIZACIONES DE SEGURIDADund1.001.001.000.0001.19SISTEMA DE DESAGUE0.0001.19.01APARATOS Y ACCESORIOS SANITARIOS0.0001.19.01.01INODORO TANQUE BAJO BLANCOpza24.0026.00-2.00Primer nivelBloque I3.00Bloque II1.00Bloque III7.002.00Guardiania1.00Segundo nivelBloque II1.00Bloque III7.002.0001.19.01.02LAVATORIO DE PARED BLANCO 1 LLAVEpza31.0031.000.00Primer nivelBloque I3.00Bloque II2.00Bloque III12.00Guardiania1.00Segundo nivelBloque II1.00Bloque III12.0001.19.01.03URINARIOS DE LOZA DE PICO BLANCOpza13.0013.000.00Primer nivelBloque I1.00Bloque III6.00Segundo nivelBloque III6.0001.19.01.04LAVADERO DE COCINA DE ACERO INOXIDABLEpza2.002.000.00Primer nivelBloque III1.00Bloque IV1.0001.19.01.05DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORApza21.0020.001.00Primer nivelBloque III5.00Bloque IV10.00Guardiania1.00Segundo nivelBloque III5.0001.19.01.06COLOCACION DE APARATOS CORRIENTESpza72.00-72.0001.19.01.07COLOCACION DE ACCESORIOS SANITARIOS CORRIENTESpza20.00-20.0001.19.02SALIDA DE DESAGUE0.0001.19.02.01SALIDA DE DESAGUE EN PVC INODOROSpto24.0025.00-1.00Primer nivelBloque I3.00Bloque II1.00Bloque III7.002.00Guardiania1.00Segundo nivelBloque II1.00Bloque III7.002.0001.19.02.02SALIDA DE DESAGUE EN PVC URINARIOSpto13.0013.000.00Primer nivelBloque I1.00Bloque III6.00Segundo nivelBloque III6.0001.19.02.03SALIDA DE DESAGUE EN PVC LAVATORIOSpto31.0031.000.00Primer nivelBloque I3.00Bloque II2.00Bloque III12.00Guardiania1.00Segundo nivelBloque II1.00Bloque III12.0001.19.02.04SALIDA DE DESAGUE EN PVC SUMIDEROS DE 2"pto47.0015.0032.00Primer nivelBloque I3.00Bloque II1.00Bloque III15.00Bloque IV17.00Guardiania1.00Segundo nivelBloque II1.00Bloque III9.0001.19.02.05SALIDA DE DESAGUE EN PVC SUMIDEROS DE 4"pto6.002.004.00Primer nivelBloque III6.0001.19.02.06SALIDA DE DESAGUE PARA REGISTRO ROSCADO DE 2"pto8.0023.00-15.00Primer nivelBloque III4.00Segundo nivelBloque III4.0001.19.02.07SALIDA DE DESAGUE PARA REGISTRO ROSCADO DE 4"pto19.0013.006.00Primer nivelBloque I2.00Bloque II1.00Bloque III5.00Bloque IV3.00Guardiania1.00Segundo nivelBloque II1.00Bloque III3.00Bloque IV3.0001.19.03SISTEMA DE REDES DE DESAGUE0.0001.19.03.01TUBERIA PVC SAL DE 4"m104.34104.3497.406.9401.19.03.02TUBERIA PVC SAL DE 2"m77.6577.6582.45-4.8001.19.03.03TUBERIA PVC SAL DE 6"m79.9079.9061.0018.9001.19.04ACCESORIOS VARIOS0.00.0001.19.04.01YEE PVC SAL DE 4" X 2"und10.0010.0010.000.0001.19.04.02YEE PVC SAL DE 4"pza36.0036.0036.000.0001.19.04.03YEE PVC SAL 2"pza31.0031.0031.000.0001.19.04.04CODO PVC SAL 2"X45pza15.0015.0015.000.0001.19.04.05CODO PVC SAL 2"X90pza18.0018.0018.000.0001.19.04.06CODO PVC SAL 4"X45pza8.008.008.000.0001.19.04.07CODO PVC SAL 4"X90pza42.0042.0042.000.0001.19.05CAJAS DE INSPECCION0.00.00.0001.19.05.01CAJA DE REGISTRO DE DESAGUE 24" X 24"pza11.0011.0011.000.0001.19.06VENTILACION0.00.00.0001.19.06.01SOMBRERO VENTILACION PVC DE 2"pza13.0013.0013.000.0001.19.06.02SALIDA DE VENTILACIONpto13.0013.0013.000.0001.19.07PRUEBAS HIDRAULICAS0.00.00.0001.19.07.01PRUEBA HIDRAULICA DE DESAGUE Y DESINFECCIONm250.85250.85250.850.0001.19.08MOVIMIENTO DE TIERRAS, SISTEMA DE DESAGUE0.00.00.0001.19.08.01TRAZO Y REPLANTEOkm0.060.060.060.0001.19.08.02EXCAVACION DE ZANJASm314.6414.6414.640.0001.19.08.03REFINE DE ZANJA INCL. CAMA EN TERRENO NORMAL-SEMIROCOSO 3-62m61.0061.0061.000.0001.19.08.04RELLENO COMP. MAT. PROPIO EN ZANJASm314.6414.6414.640.0001.20SISTEMA DE AGUA FRIA0.00.00.0001.20.01SALIDA PARA PUNTOS DE AGUA0.00.00.0001.20.01.01SALIDA DE AGUA FRIA EN INODOROS TANQUE BAJOpto26.0026.0026.000.0001.20.01.02SALIDA DE AGUA FRIA EN URINARIOSpto13.0013.0013.000.0001.20.01.03SALIDA DE AGUA FRIA EN LAVATORIOSpto40.0040.0040.000.0001.20.01.04SALIDA DE AGUA FRIA PARA DUCHASpto20.0020.0020.000.0001.20.02TUBERIAS DE DISTRIBUCION DE AGUA0.00.00.0001.20.02.01TUBERIA PVC SAP DE 3"m114.40114.40114.400.0001.20.02.02TUBERIA DE PVC A-10 SP DE 2" (50 mm) INCL.ELEM.UNION + 2% DESPERDICIOm9.409.409.400.0001.20.02.03TUBERIA PVC SAP DE 1 1/2"m10.2010.2010.200.0001.20.02.04TUBERIA PVC SAP DE 1"m21.6021.6021.600.0001.20.02.05TUBERIA PVC SAP DE 3/4"m73.9073.9073.900.0001.20.02.06TUBERIA PVC SAP DE 1/2"m30.9030.9030.900.0001.20.03ACCESORIOS SISTEMA DE AGUA FRIA0.00.00.0001.20.03.01TEE PVC-SAP 1/2"und10.0010.0010.000.0001.20.03.02TEE PVC-SAP 3/4"und63.0063.0063.000.0001.20.03.03TEE PVC-SAP 1"und12.0012.0012.000.0001.20.03.04TEE PVC-SAP 1 1/2"und3.003.003.000.0001.20.03.05TEE PVC-SAP 3"und8.008.008.000.0001.20.03.06CODO PVC-SAP 1/2" * 90und11.0011.0011.000.0001.20.03.07CODO PVC-SAP 3/4" * 90und21.0021.0021.000.0001.20.03.08CODO PVC-SAP 1" * 90und1.001.001.000.0001.20.03.09CODO PVC-SAP 3" * 90und5.005.005.000.0001.20.03.10REDUCCION PVC SAP 1 1/2" A 1"pza3.003.003.000.0001.20.03.11REDUCCION PVC SAP 1 1/2" A 3/4"pza4.004.004.000.0001.20.03.12REDUCCION PVC SAP 1" A 3/4"pza8.008.008.000.0001.20.03.13REDUCCION PVC SAP 1" A 1/2"pza11.0011.0011.000.0001.20.03.14REDUCCION PVC SAP 3/4" A 1/2"pza66.0066.0066.000.0001.20.04VALVULAS Y LLAVES0.00.00.0001.20.04.01VALVULA DE COMPUERTA 3"und2.002.002.000.0001.20.04.02VALVULA DE COMPUERTA BRONCE DE 3/4"pza13.0013.0013.000.0001.20.04.03VALVULA DE COMPUERTA BRONCE DE 1/2"pza2.002.002.000.0001.20.04.04NICHO DE VALVULAS EN LA PAREDund15.0015.0015.000.0001.20.04.05CAJA DE VALVULAS DE 12" X 24" CON TAPA DE FIERRO FUNDIDOund5.005.005.000.0001.20.05PRUEBAS HIDRAULICAS SISTEMA DE AGUA FRIA0.00.00.0001.20.05.01PRUEBA HIDRAULICA DE AGUA Y DESINFECCIONm260.40260.40260.400.0001.20.06MOVIMIENTO DE TIERRAS, SISTEMA DE AGUA0.00.00.0001.20.06.01TRAZO Y REPLANTEOkm0.260.260.260.0001.20.06.02EXCAVACION DE ZANJASm311.7011.7011.700.0001.20.06.03REFINE DE ZANJA INCL. CAMA EN TERRENO NORMAL-SEMIROCOSO 3-62m260.00260.00260.000.0001.20.06.04RELLENO COMP. MAT. PROPIO EN ZANJASm311.7011.7011.700.0001.20.07TANQUE ELEVADO0.00.00.0001.20.07.01TANQUE ELEVADO DE ETERNIT DE 1.00 m3pza8.008.008.000.0001.21SISTEMA DE EVACUACION DE AGUAS PLUVIALES0.00.00.0001.21.01MONTAJE E INSTALACION DE AGUAS PLUVIALESm211.20211.20211.200.0001.21.02COLUMNETA DE PROTECCION DE CONCRETOund33.0033.0033.000.0001.21.03CANALETA DE CONCRETOm116.23116.23116.230.0001.21.04REJILLA DE CANAL DE CONCRETOm116.23116.23116.230.0001.21.05TUBERIA PVC UF DE 6" X 6 Mm24.8024.8024.800.0001.21.06MOVIMIENTO DE TIERRAS, SISTEMA DE EVACUACION DE AGUAS PLUVIALES0.00.00.0001.21.06.01TRAZO Y REPLANTEOkm0.150.150.150.0001.21.06.02EXCAVACION DE ZANJASm341.6341.6341.630.0001.21.06.03REFINE DE ZANJAm154.20154.20154.200.0001.21.06.04RELLENO CON MATERIAL PROPIOm341.6341.6341.630.0001.22INSTALACIONES ELECTRICAS0.00.00.0001.22.01MOVIMIENTO DE TIERRAS0.00.00.0001.22.01.01EXCAVACION PARA COLOCACION DE CABLE SUBTERRANEOm312.5012.5012.500.0001.22.01.02RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJASm311.0011.0011.000.0001.22.01.03ELIMINACION DE MATERIAL EXCEDENTEm34.004.004.000.0001.22.02SALIDA DE ELECTRICAS0.00.00.0001.22.02.01SALIDA CENTRO DE LUZpto285.00285.00285.000.0001.22.02.02SALIDA DE PAREDpto52.0052.0052.000.0001.22.02.03KIT DE CONEXION PARA INTERNETEqp1.001.001.000.0001.22.02.04KIT DE CONEXION PARA ALARMA CONTRA INCENDIOSEqp1.001.001.000.0001.22.03SALIDA PARA COMUNICACIONES Y SEALES0.00.00.0001.22.03.01SALIDA PARA TELEFONIApto23.0023.0023.000.0001.22.03.02SALIDA PARA INTERNETpto40.0040.0040.000.0001.22.03.03SALIDA PARA DATA INTERNETpto70.0070.0070.000.0001.22.03.04SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVCpto116.00116.00116.000.0001.22.03.05SALIDA PARA TOMACORRIENTES DOBLES CON PUESTA A TIERRApto45.0045.0045.000.0001.22.03.06SALIDA PARA TOMACORRIENTE TRIFACICO CON LINEA A TIERRApto3.003.003.000.0001.22.03.07SALIDA ESPECIAL DE CAJA DE PASO FUERZAund10.0010.0010.000.0001.22.03.08SALIDA ESPECIAL DE CAJA DE PASO SERVICIO ESPECIALESund12.0012.0012.000.0001.22.03.09SALIDA ESPECIAL DE CAJA DE PASO PARA OTROSund35.0035.0035.000.0001.22.03.10SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLEpto30.0030.0030.000.0001.22.03.11SALIDA PARA INTERRUPTOR UNIPOLAR DOBLEpto6.006.006.000.0001.22.03.12SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLEpto14.0014.0014.000.0001.22.03.13SALIDA PARA INTERRUPTOR HORARIOpto1.001.001.000.0001.22.04TABLERO DE DISTRIBUCION E INTERRUPTORES0.00.00.0001.22.04.01INTERRUPTOR THERMOMAGNETICO 3*200Apza1.001.001.000.0001.22.04.02INTERRUPTOR THERMOMAGNETICO 3 X 80Apza1.001.001.000.0001.22.04.03INTERRUPTOR THERMOMAGNETICO 3 X 50Apza5.005.005.000.0001.22.04.04INTERRUPTOR THERMOMAGNETICO 2 X 40Apto12.0012.0012.000.0001.22.04.05INTERRUPTOR THERMOMAGNETICO 2 X 20 Apza24.0024.0024.000.0001.22.04.06INTERRUPTOR THERMOMAGNETICO 2 X 15Apza12.0012.0012.000.0001.22.04.07TABLERO DE DISTRIBUCIN CAJA METALICA 48 POLOS-RIELpza1.001.001.000.0001.22.04.08TABLERO DE DISTRIBUCIN CAJA METALICA 26 POLOS - RIELpza2.002.002.000.0001.22.04.09TABLERO DE DISTRIBUCIN CAJA METALICA 18 POLOS - RIELpza6.006.006.000.0001.22.04.10TABLERO DE DISTRIBUCIN CAJA METALICA CON 16 POLOS - RIELpza3.003.003.000.0001.22.04.11TABLERO DE DISTRIBUCIN CAJA METALICA CON 10 POLOS - RIELpza3.003.003.000.0001.22.05EQUIPOS Y ACCESORIOS0.00.00.0001.22.05.01ARTEFACTO FLUORESCENTE REJILLA METALICA COLGADO RAS M 2 X 36 Wund224.00224.00224.000.0001.22.05.02ARTEFACTO FLUORESCENTE REJILLA METALICA COLGADO RAS M 1 X 40 Wund48.0048.0048.000.0001.22.05.03ARTEFACTO BRAQUETE CON AHORRADOR DE 22 Wund59.0059.0059.000.0001.22.05.04ARTEFACTO FLUORESCENTE TPC 1 X 32 Wund10.0010.0010.000.0001.22.05.05POSTE TIPO PLAZA CON LAMPARA DE VAPOR DE MERCURIO 150Wund10.0010.0010.000.0001.22.05.06INTERRUPTOR HORARIOpza1.001.001.000.0001.22.05.07CAJA DE PASE STANDAR 8X8und12.0012.0012.000.0001.22.05.08CAJA DE PASE ESPECIAL6X6pza10.0010.0010.000.0001.22.05.09TOMACORRIENTE SIMPLE C/TOMA A TIERRApza116.00116.00116.000.0001.22.05.10TOMACORRIENTE BIPOLAR C/TOMA A TIERRApza45.0045.0045.000.0001.22.05.11TOMACORRIENTE TRIFACICO C/TOMA A TIERRApza3.003.003.000.0001.22.05.12SISTEMA PUESTA A TIERRAund6.006.006.000.0001.22.05.13PARARRAYOSund1.001.001.000.0001.22.06CONDUCTORES0.00.00.0001.22.06.01CONDUCTOR TH 2 2X2.5MM2 + 1X2.5 MM2 (T)m1,120.001,120.001,120.000.0001.22.06.02CONDUCTOR TH 2 2X4MM2+1X4MM2 (T)m1,080.001,080.001,080.000.0001.22.06.03CONDUCTOR TH 2 2X6MM2+1X2.5MM2 (T)m720.00720.00720.000.0001.22.06.04CONDUCTOR N2XH 2 1X10MM2+1X6MM2 (T)m485.00485.00485.000.0001.22.06.05CONDUCTOR N2XH 2 1X25MM2+1X6MM2 (T)m400.00400.00400.000.0001.22.06.06CONDUCTOR N2XH 3 1X50MM2+1X35MM2 (T)m250.00250.00250.000.0001.22.06.07CONDUCTOR N2XH 3 1X25MM2+1X25MM2 (T)m100.00100.00100.000.0001.22.07PRUEBAS DE INSTALACIONES ESPECIALES0.00.00.0001.22.07.01PRUEBAS DE INSTALACIONES ESPECIALESglb1.001.001.000.0002CERCO PERIMETRICO0.00.00.0002.01OBRAS PRELIMINARES0.0002.01.01LIMPIEZA DE TERRENOm2381.001.50571.50571.50571.50350.55220.9502.01.02TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRAm2381.000.70266.70266.70266.70140.22126.4802.02MOVIMIENTO DE TIERRAS0.0002.02.01EXCAVACIONm3381.000.901.00342.90342.90342.90cim. Cer. Per98.15244.7502.02.02ELIMINACION DE MATERIAL EXCEDENTEm3381.000.901.00342.901.20411.48411.48127.60283.8802.03OBRAS DE CONCRETO SIMPLE0.0002.03.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3381.000.400.70106.68106.68106.6898.158.5302.03.02ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30MTm2381.000.70266.702.00533.40533.40210.34323.0602.03.03CONCRETO 1:8+25% PM PARA SOBRECIMIENTOSm3381.000.250.3026.3326.3326.3326.290.0402.04OBRAS DE CONCRETO ARMADO0.0002.04.01COLUMNAS0.0002.04.01.01CONCRETO F'C =175 KG/CM2 PARA COLUMNASm30.250.252.700.17120.0020.2520.2518.751.5002.04.01.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm20.502.703.20120.00384.00384.00150.00234.0002.04.01.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNASkg120.0016.792,014.662,018.40-3.7402.04.02VIGAS0.0002.04.02.01CONCRETO F'C =175 KG/CM2 PARA VIGASm3381.000.0414.1014.1014.1014.020.0802.04.02.02ENCOFRADO Y DESENCOFRADO EN VIGASm2381.000.55210.33210.33210.33210.320.0102.04.02.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGASkg381.00874.78874.781,687.69-812.9102.05ARQUITECTURA0.0002.05.01MURO DE LADRILLO MECANIZADO DE 8 X 13 X24 CM. CABEZAm2351.002.70947.70947.70947.70877.5070.2002.05.02TARRAJEO EN EXTERIORES CON CEMENTO-ARENAm2381.003.001,143.002.001,997.311,997.311,963.0834.2302.05.03PINTURA LATEX EN MUROS EXTERIORESm2381.003.001,143.002.001,997.311,997.311,963.0834.2303OTRAS OBRAS0.0003.01VEREDAS EXTERIORES0.0003.01.01TRAZO Y REPLANTEOm2292.21292.21292.21148.08144.1303.01.02NIVELADOm2292.21292.21292.21148.08144.1303.01.03PERFILADO Y COMPACTADOm2292.21292.21292.21148.08144.1303.01.04EMPEDRADO PARA VEREDAS e=0.15Mm2292.21292.21292.21148.08144.1303.01.05CONCRETO F'c = 140 KG/CM2m323.3823.3823.3814.818.5703.01.06ACABADO FROTACHADO - SEMIPULIDOm2292.21292.21292.21140.08152.1303.02PATIO CENTRAL - LOSA0.0003.02.01EMPEDRADO DE LOSAm21,465.001,465.001,465.001,691.96-226.9603.02.02PISO DE CONCRETO E=2" f'c 140 kg/cm2 X 4 cm PULIDO 1:2 X 1 cmm21,691.96-1,691.9603.02.03JUNTAS ASFALTICASm1,027.37-1,027.3703.02.04SARDINELES DE CONCRETO DE F'c=175 KG/CM2m169.16-169.1603.02.05PINTADO DE MARCAS EN LOSAS DEPORTIVASglb317.25M.317.25317.2522.00295.2503.03ACCESORIOS PATIO CENTRAL0.0003.03.01ACCESORIOS PATIO CENTRALglb1.001.001.000.0003.03.02ASIENTOS DE CONCRETO (SEGUN PLANO DE DETALLES)und22.0022.0022.000.0003.03.03OBELISCO (SEGUN PLANO DE DETALLES)und1.001.001.000.0003.04RAMPA DE CONCRETO0.00.00.0003.04.01ZAPATAS0.00.00.0003.04.01.01EXCAVACION DE ZANJAS P/CIMIENTOSm313.6113.6113.610.0003.04.01.02CONCRETO F'C =210 KG/CM2 EN ZAPATASm313.6113.6113.610.0003.04.01.03ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATASm247.5247.5247.520.0003.04.01.04ACERO DE REFUERZO FY = 4200 KG/CM2 EN ZAPATASkg250.00250.00250.000.0003.04.02COLUMNAS0.00.00.0003.04.02.01CONCRETO F'C =210 KG/CM2 PARA COLUMNASm32.482.482.480.0003.04.02.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm225.5225.5225.520.0003.04.02.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN COLUMNASkg450.00450.00450.000.0003.04.03VIGAS0.00.00.0003.04.03.01CONCRETO F'C =210 KG/CM2 PARA VIGASm31.491.491.490.0003.04.03.02ENCOFRADO Y DESENCOFRADO EN VIGASm215.9815.9815.980.0003.04.03.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN VIGASkg375.00375.00375.000.0003.04.04LOSAS MACISAS Y PARAPETO0.00.00.0003.04.04.01CONCRETO EN LOSAS MACIZAS Y PARAPETO f'c=210 kg/cm2m316.0716.0716.070.0003.04.04.02ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS Y PARAPETOm288.6988.6988.690.0003.04.04.03ACERO DE REFUERZO FY = 4200 KG/CM2 EN LOSA MACIZAS Y PARAPETOkg1,105.001,105.001,105.000.0003.04.05ARQUITECTURA0.00.00.0003.04.05.01BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2" - PARANTE 1" X 1 mm78.1078.1078.100.0003.04.05.02TARRAJEO EN EXTERIORES CON CEMENTO-ARENAm288.6988.6988.690.0003.04.05.03PINTURA EN BARANDAS METALICASm78.1078.1078.100.0003.04.05.04PINTURA LATEX EN MUROS EXTERIORESm288.6988.6988.690.0003.05MITIGACION DE IMPACTO AMBIENTAL0.00.00.0003.05.01RIEGO PREVENTIVO DE POLVOm22,853.352,853.352,853.350.0003.05.02LIMPIEZA Y RECUPERACION DE AREAS OCUPADASm296.0096.0096.000.0003.05.03ACONDICIONAMIENTO Y RECUPERACION DE BOTADEROSglb1.001.001.000.0003.05.04REVEGETACION DE BOTADEROSglb1.001.001.000.0003.06FLETE0.00.00.0003.06.01FLETEkg975,000.00975,000.00975,000.000.0004COMPONENTE EQUIPAMIENTO Y MOBILIARIO0.00.00.0004.01VARIOS0.00.00.0004.01.01PIZARRAS ACRILICASund17.0017.0017.000.0004.01.02PLACA RECORDATORIAund1.001.001.000.0004.01.03ARMARIO DE MADERA AGUANO SEGUN DISEOund20.0020.0020.000.0004.01.04CARPETAS DE MADERAund360.00360.00360.000.0004.01.05SILLAS PARA NIOS SEGUN DISEOund360.00360.00360.000.0004.01.06ESCRITORIOS DE MADERAund29.0029.0029.000.0004.01.07EQUIPO DE COMPUTOund36.0036.0036.000.0004.01.08MODULO DE COMPUTADORASund31.0031.0031.000.0004.01.09IMPRESORASund4.004.004.000.0004.01.10MESAS PARA BIBLIOTECAund10.0010.0010.000.0004.01.11SILLAS PARA BIBLIOTECAund80.0080.0080.000.0004.01.12MESAS PARA COMEDORund10.0010.0010.000.0004.01.13SILLAS PARA COMEDORund80.0080.0080.000.0004.02FLETE0.00.00.0004.02.01FLETEkg930,000.00930,000.00930,000.000.00

aceroHOJA DE METRADO DE ACEROOBRA : MEJORAMIENTO DE LA PRESTACION DE SERVICIOS EDUCATIVOS EN LA I.E. 501419 CENTRO POBLADO DE ESTRELLADISTRITO DE QUELLOUNO - LA CONVENCION - CUSCOPROPIETARIO : MUNICIPALIDAD DISTRITAL DE QUELLOUNOLUGAR : QUELLOUNOFECHA : MAYO 2011HECHO POR :SUB - PRESUPUESTO (02) :CONSTRUCCION DE MOD. AULAS Y LABORATORIOSREVISADO :ITEMDescripcionDiseoN deN deN deLong.Longitud (m) por Pesodelmoduloelem.pzas xPor1/4"3/8"1/2"5/8"3/4"1"fierroigualesigualeselem.pieza0.250.581.021.562.243.973kg1666160858084202.04.01.02ACERO GRADO 60 EN ZAPATAS0.011,194.2314,514.00CUADRO DE ACERO POR MODULO1p6,p81y3/4"34102.400.00.00.00.0288.00.0645.12836.442.401.803/8"1/2"5/8"3/4"1"2P73/4"14152.200.00.00.00.0132.00.0295.68383.372.201.600.00.00.00.03P8-P93/4"2492.200.00.00.00.0158.40.0354.82460.042.201.60330368904P103/4"1492.300.00.00.00.082.80.0185.47240.482.301.700.00.00.00.05P11-P123/4"24162.300.00.00.00.0294.40.0659.46855.032.301.706P133/4"1282.500.00.00.00.040.00.089.60116.172.501.907P153/4"1482.600.00.00.00.083.20.0186.37241.642.602.008P16 P203/4"2462.200.00.00.00.0105.60.0236.54306.692.201.609P173/4"1472.300.00.00.00.064.40.0144.26187.042.301.7010P213/4"1482.700.00.00.00.086.40.0193.54250.932.702.1011P223/4"1482.500.00.00.00.080.00.0179.20232.342.501.9012P233/4"1462.100.00.00.00.050.40.0112.90146.382.101.5013P243/4"1451.700.00.00.00.034.00.076.1698.751.701.1014P26P28P112P113P1161/2"5451.250.00.0125.00.00.00.0127.50165.311.250.6515P27-P1111/2"2251.250.00.025.00.00.00.025.5033.061.250.6516P32-P33-P34,P35,p391/2"5251.300.00.065.00.00.00.066.3085.961.300.7017P361/2"1241.100.00.08.80.00.00.08.9811.641.100.5018P371/2"1461.300.00.031.20.00.00.031.8241.261.300.7019P381/2"12171.650.00.056.10.00.00.057.2274.191.651.05201/2"1292.700.00.048.60.00.00.049.5764.272.702.1021P401/2"1491.700.00.061.20.00.00.062.4280.941.701.1022P411/2"1481.600.00.051.20.00.00.052.2267.711.601.00421/2"1271.400.00.019.60.00.00.019.9925.921.400.80451/2"1141.400.00.05.60.00.00.05.717.411.400.801/2"1171.050.00.07.40.00.00.07.509.721.050.45461/2"1141.600.00.06.40.00.00.06.538.461.601.001/2"1181.050.00.08.40.00.00.08.5711.111.050.45471/2"1141.300.00.05.20.00.00.05.306.881.300.701/2"1181.050.00.08.40.00.00.08.5711.111.050.4571-75-983/4"3471.800.00.00.00.0151.20.0338.69439.131.801.20721/2"14111.700.00.074.80.00.00.076.3098.921.701.10761/2"14131.900.00.098.80.00.00.0100.78130.661.901.30775/8"1281.900.00.00.030.40.00.047.4261.491.901.30783/4"1461.900.00.00.00.045.60.0102.14132.441.901.30793/4"1251.600.00.00.00.016.00.035.8446.471.601.00823/4"12101.500.00.00.00.030.00.067.2087.131.500.903/4"1252.400.00.00.00.024.00.053.7669.702.401.80salidas993/4"1462.100.00.00.00.050.40.0112.90146.382.101.5050100120100-1013/4"2462.200.00.00.00.0105.60.0236.54306.692.201.606070-128.41033/4"1281.350.00.00.00.021.60.048.3862.731.350.753/4"1242.050.00.00.00.016.40.036.7447.632.051.451051/2"14152.100.00.0126.00.00.00.0128.52166.632.101.501063/4"1471.900.00.00.00.053.20.0119.17154.511.901.301073/4"1482.100.00.00.00.067.20.0150.53195.172.101.501-575/8"12114.250.00.00.093.50.00.0145.86189.124.253.655/8"12331.750.00.00.0115.50.00.0180.18233.611.751.152-555/8"12114.250.00.00.093.50.00.0145.86189.125/8"12331.750.00.00.0115.50.00.0180.18233.613-483/4"1164.150.00.00.00.024.90.055.7872.324.153.555/8"1184.150.00.00.033.20.00.051.7967.154.153.553/4"12191.650.00.00.00.062.70.0140.45182.101.651.054-503/4"1164.150.00.00.00.024.90.055.7872.324.153.551"1144.150.00.00.00.00.016.665.9585.514.153.553/4"12191.650.00.00.00.062.70.0140.45182.101.651.055-521/2"14182.350.00.0169.20.00.00.0172.58223.772.351.7518-191/2"14303.600.00.0432.00.00.00.0440.64571.323.603.0043-441"2144.450.00.00.00.00.035.6141.44183.384.453.8549-62.51-633/4"2144.450.00.00.00.035.60.079.74103.394.453.8556-663/4"22201.300.00.00.00.0104.00.0232.96302.051.300.7058-671"1144.450.00.00.00.00.017.870.7291.694.453.853/4"1144.450.00.00.00.017.80.039.8751.704.453.853/4"12191.300.00.00.00.049.40.0110.66143.471.300.7059-683/4"1164.450.00.00.00.026.70.059.8177.544.453.853/4"1144.450.00.00.00.017.80.039.8751.704.453.853/4"12191.300.00.00.00.049.40.0110.66143.471.300.7060-691"1134.550.00.00.00.00.013.654.2370.314.553.953/4"1144.550.00.00.00.018.20.040.7752.864.553.953/4"12191.400.00.00.00.053.20.0119.17154.511.400.8061-701"1134.650.00.00.00.00.014.055.4271.864.654.053/4"1154.650.00.00.00.023.20.052.0867.524.654.053/4"12201.500.00.00.00.060.00.0134.40174.261.500.9080-831"1134.450.00.00.00.00.013.453.0468.774.453.851/2"1174.450.00.031.20.00.00.031.7741.204.453.851/2"12391.300.00.0101.40.00.00.0103.43134.101.300.7086-931"1144.500.00.00.00.00.018.071.5192.724.503.903/4"1144.500.00.00.00.018.00.040.3252.284.503.903/4"12211.350.00.00.00.056.70.0127.01164.671.350.7587-941"1164.700.00.00.00.00.028.2112.04145.263.144.103/4"1144.700.00.00.00.018.80.042.1154.604.704.103/4"12161.600.00.00.00.051.20.0114.69148.701.601.0088-951"1154.700.00.00.00.00.023.593.37121.054.704.105/8"1164.700.00.00.028.20.00.043.9957.044.704.105/8"12241.600.00.00.076.80.00.0119.81155.341.601.0089-863/4"1184.600.00.00.00.036.80.082.43106.884.604.001/2"1194.600.00.041.40.00.00.042.2354.754.604.001/2"12401.500.00.0120.00.00.00.0122.40158.701.500.9090-971"1144.400.00.00.00.00.017.669.9290.664.403.803/4"1144.400.00.00.00.017.60.039.4251.124.403.803/4"12201.300.00.00.00.052.00.0116.48151.021.300.7014-1081"1125.200.00.00.00.00.010.40041.3253.575.204.603/4"1125.200.00.00.00.010.40.023.3030.205.204.603/4"12241.050.00.00.00.050.40.0112.90146.381.050.45102-1043/4"14132.950.00.00.00.0153.40.0343.62445.522.952.3553-54-64-653/4"12201.550.00.00.00.062.00.0138.88180.071.550.953/4"1184.400.00.00.00.035.20.078.85102.234.403.803/4"1154.400.00.00.00.022.00.049.2863.894.403.8084-85-91-921"1154.500.00.00.00.00.022.50089.39115.905.204.603/4"1164.500.00.00.00.027.00.060.4878.425.204.603/4"12211.650.00.00.00.069.30.0155.23201.271.050.4511,194.231918.3626281/21,762.361922115/8915.1065723/47598.416377415metrado145141.3011977.8228365

Col COMIE. CHIMPAHUAYLLACUADRO DE METRADOSCOLUMNASNIVELESColumnaacero columnasTIPOh b colh colNROnroabhConcretoEncofrado1/4"nro3/8"nro1/2"nro5/8"nro3/4"nro1"nroTotalmpisosundmmmm3m2mlmlmlmlmlmlKgPRIMER NIVELBQI58.2525X40-1.62.65160.250.404.252.5533.1517.004.0017617185,328.4825X60-1.62.651200.250.604.2512.75144.501.0072.00835.2030X60-1.62.45140.300.604.052.9229.162.5048.00278.40BQII14,924.8025X40-1.62.65180.250.404.253.4044.2017.004.0017617187,104.6425X60-1.62.651230.250.604.2514.66166.171.0072.00960.4830X60-1.62.45160.300.604.054.3743.742.5048.00417.6052.13590.97BQIII45.48515.1025X60-1.62.651180.250.604.2511.48130.051.0072.00751.687COL DE BQ3BQIV30X30-1.62.651160.300.304.256.1281.6017.004.00176171814,209.28GUAR25X2502.65190.250.252.651.4923.8517.004.0017617187,992.72SEGUNDO NIVELBQI25X4002.75160.250.402.751.6521.4517.004.0017617185,328.4825X6002.751200.250.602.758.2593.501.0072.00835.2030X6002.65140.300.602.651.9119.082.5048.00278.40BQII25X4002.75180.250.402.752.2028.6017.004.0017617187,104.6425X6002.751230.250.602.759.49107.521.0072.00960.4830X6002.65160.300.602.652.8628.622.5048.00417.60BQIII25X6002.751180.250.602.757.4384.151.0072.00751.68BQIV30X3002.75150.300.302.751.2416.5017.004.0017617184,440.40TIMPANOBQI25X606.6611.18120.250.604.521.3615.3717.004.0017617181,776.1625X606.669.10120.250.602.440.738.301.0072.0083.52BQII25X606.6611.18120.250.604.521.3615.3717.004.0017617181,776.1625X606.669.10120.250.602.440.738.301.0072.0083.52BQ IV30X3003.72150.300.303.721.6722.3217.004.0017617184,440.4030X3002.63160.300.302.631.4218.941.0072.00250.56GUAR25X2501.27140.250.251.270.325.0817.004.0017617183,552.3225X2500.34130.250.250.340.061.021.0072.00125.28102.411,143.1861,714.7265,899.00TOTAL102.411,166.86COLUMNETAS0.97Bloque IPrimer nivelCa1 15X250.002.25140.150.252.251.1820.480.9014.002.754.00133.42LLENOCa1 15X250.001.4560.150.251.450.335.660.9010.001.954.0040.64ALF. 1.85Ca3 25X250.002.25170.250.252.252.3928.691.1014.002.754.00256.19LLENOCa3 25X250.001.45120.250.251.451.0913.051.1010.001.954.0087.29ALF.1.85Ca3 25X250.000.8080.250.250.800.404.801.106.001.304.0037.33ALF. 1.2Segundo nivel0.0Ca1 15X250.001.12100.150.251.120.427.280.908.001.624.0055.58ALF. 1.2Ca3 25X250.002.60180.250.252.602.9335.101.1015.003.104.00301.91LLENOCa3 25X250.001.77120.250.251.771.3315.931.1011.002.274.00147.44FACHADACa3 25X250.001.1280.250.251.120.566.721.108.001.624.0047.67PAS.AULACa3 25X250.001.00100.250.251.000.637.501.107.001.504.0054.05PAZASIZOBloque II0.0iPrimer nivel0.0Ca1 15X250.002.2540.150.252.250.345.850.9014.002.754.0038.12Ca3 25X250.002.25320.250.252.254.5054.001.1014.002.754.00482.24Ca3 25X250.001.45180.250.251.451.6319.581.1010.001.954.00192.71Ca3 25X250.000.80120.250.250.800.607.201.106.001.304.0055.99Segundo nivel0.0Ca1 15X250.002.2530.150.252.250.254.390.9014.002.754.0028.59Ca3 25X250.002.60340.250.252.605.5366.301.1015.003.104.00570.28LLENOCa3 25X250.001.77170.250.251.771.8822.571.1011.002.274.00208.87FACHADACa3 25X250.001.12120.250.251.120.8410.081.108.001.624.0071.50PASADIZO AULACa3 25X250.001.00140.250.251.000.8810.501.107.001.504.0075.67PAZASIZOBloque III0.0Primer nivel0.0Ca1 15X250.000.8080.150.250.800.244.160.906.001.304.0034.93Ca1 15X250.000.8040.150.250.800.122.080.906.001.304.0017.46Ca3 25X250.002.25100.250.252.251.4116.881.1014.002.754.00150.70Ca3 25X250.000.80140.250.250.800.708.401.106.001.304.0065.32Segundo nivel0.0Ca1 15X250.001.00140.150.251.000.539.100.907.001.504.0070.77Ca1 15X250.002.5740.150.252.570.396.680.9015.003.074.0041.99Ca3 25X250.001.95100.250.251.951.2214.631.1012.002.454.00132.96Ca3 25X250.001.0060.250.251.000.384.501.107.001.504.0032.43PASADIZO AULACa3 25X250.001.00100.250.251.000.637.501.107.001.504.0054.05PAZASIZOBloque IV0.0Primer nivel0.0Ca1 15X250.002.25130.150.252.251.1019.010.9014.002.754.00123.89Ca1 15X250.001.0520.150.251.050.081.370.908.001.554.0010.79LLENOCa3 25X250.002.25240.250.252.253.3840.501.1014.002.754.00361.68Ca3 25X250.000.8050.250.250.800.253.001.106.001.304.0023.33Guardiania0.0Primer nivel0.0Ca1 15X250.002.2570.150.252.250.5910.240.9014.002.754.0066.71Ca1 15X250.001.0520.150.251.050.081.370.908.001.554.0010.79Ca3 25X250.002.2580.250.252.251.1313.501.1014.002.754.00120.56Ca3 25X250.000.8020.250.250.800.101.201.106.001.304.009.3339.98509.764,213.203,632.44TOTAL39.98509.76

vigasAMPLIACION PABELLON DE CONTABILIDADCUADRO DE METRADOSVigaFierro vigaTIPOEJEnronroLAHConcretoEncofrado3/8"nro1/2"nro5/8"nro3/4"nro 1"nroTotalpisosmmmm2m2mlmlmlmlmlKgVIGASV-0118-16117.950.300.601.4311.939.0015.00137.70114.000.250.400.404.2016515.800.250.705.0747.859.0015.00688.5017413.800.250.702.6625.089.002.009.004.009.004.00972.00114.000.250.400.404.200.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00111.300.250.700.232.152.309.001.602.001.602.0024.290.000.00V-0410134.150.250.702.1820.542.3081.0016.102.00540.55133.800.250.701.9918.812.202.0021.12133.300.250.701.7316.333.702.0035.52130.000.003.902.0037.44130.000.002.202.0021.12130.000.0018.002.00241.92V-059145.400.250.703.7835.642.30139.0028.202.001,247.05143.800.250.702.6625.082.902.0037.12143.800.250.702.6625.084.002.0051.20143.200.250.702.2421.123.102.0039.68143.200.250.702.2421.123.102.0039.68140.000.003.102.0039.68140.000.002.902.0028.202.00542.46121.100.250.700.393.632.308.003.501.003.502.0063.90120.000.005.002.003.502.0063.36111.300.250.700.232.152.308.003.501.003.502.0031.95110.000.003.502.0015.68VP-0611145.000.250.703.5033.002.3045.004.502.005.505.00544.12141.702.0021.76141.302.0016.64VP-07101412.900.250.709.0385.142.3070.001.802.0012.904.00858.90143.202.0012.902.00272.13141.202.0015.36140.00V-08J143.800.250.702.6625.082.3053.0011.502.00488.89143.800.250.702.6625.082.502.0020.40145.100.250.703.5733.663.902.002.602.0011.502.00271.18221.300.250.700.918.582.308.001.502.0061.89118.502.0038.08112.3043.003.302.008.502.00106.00V-09I123.800.250.701.3312.542.3042.002.502.0010.502.00189.46121.800.250.700.635.947.002.007.002.0073.36123.800.250.701.3312.542.3058.003.502.0013.502.00255.42121.800.250.700.635.947.902.0013.502.00118.63221.200.250.700.847.920.00V-10H126.300.250.702.2020.792.3055.0011.502.00249.78122.150.250.700.757.102.752.0024.64120.000.005.302.0047.49120.000.0011.502.00103.04120.000.003.302.0029.57116.300.250.701.1010.402.3072.0012.502.00152.05112.150.250.700.383.552.3020.004.202.0045.50116.202.0027.78110.000.0012.502.0056.00221.200.250.700.847.923.302.0059.14V-11G123.900.250.701.3712.872.3087.004.102.00258.36122.150.250.700.757.102.502.0016.00124.400.250.501.1011.002.602.0016.64121.400.250.700.494.623.702.0018.002.00184.96120.700.250.700.242.312.303.0018.002.00123.20121.200.250.700.423.962.306.00123.900.250.701.3712.872.3087.005.202.0019.202.00437.43122.150.250.700.757.102.502.0016.00124.400.250.501.1011.002.602.0016.64121.400.250.700.494.623.702.0019.202.00195.71V-12F124.700.250.701.6515.512.3094.0018.202.00413.86123.750.250.701.3112.382.602.0016.64125.900.250.501.4814.753.102.0027.78120.000.002.302.0020.61120.000.009.602.0086.02121.200.250.700.423.962.306.0018.202.00179.08124.700.250.701.6515.512.3094.0019.402.00424.62123.750.250.701.3112.383.602.0032.26125.900.250.702.0719.473.104.0055.55120.000.002.302.0020.61120.000.009.602.0086.02120.000.0019.402.00173.82V-13E142.350.250.701.6515.512.3047.006.702.006.702.00391.22143.750.250.702.6324.756.702.005.002.00175.36140.000.002.102.0037.63140.000.002.102.0037.63140.000.005.002.0089.60V-arcoE147.500.250.705.2549.502.3075.002.002.0014.302.00682.06145.350.250.703.7435.313.202.0014.302.00297.22140.000.001.802.0023.04VIGA CHATA ESCALERA 1ER NIVEL112.200.250.400.222.311.7013.002.804.0030.74111.500.250.200.080.981.309.001.704.0017.67110.000.000.00VIGA CANALETA1150.000.301.1016.50125.001.60334.00309.951150.000.500.5012.5075.001.00334.00193.721150.002.600.1013.00140.002.60334.00503.67110.000.0050.0018.00522.00PARAPETO AZOTEA1114.800.151.804.0055.501.80100.00104.40117.000.150.500.538.0514.8014.00120.18110.000.000.00140.691,293.3715,377.00TOTAL140.691,293.3715,377.00

columnasBLOQUE IColumnas2025x607.95625x401.5921.356430x601.908BLOQUE II2325x609.1425825x402.1221.356630x602.862BLOQUE IV1825x607.155vigasIV25X40152.9513.3810.375V30X6031.705.23IIV25X40173.2917.3310.375V30X6031.455.66IIIV25X60120.7110.56BQ IVarea4.70x4.2519.97525x407.92

losaPRIMER NIVELVconcretoVIGASrealVIGUETASAREA22.4045.001.350.06I33.0521.00I247.7714.93resumen5% merma304.9area288.8214.4412.05I47.9950.38V25X40152.9513.3815.2933.05II58.9861.93V30X6031.705.235.71II31.8933.48II39.3222.99II326.2519.66138.85145.79395.31area379.2918.9616.33V25X40173.2915.1617.33V30X6031.455.195.66III21.0412.07III180.1210.85BQIV137.14area209.4710.478.96I-II-III936.9V25X40120.7110.5612.07GUARD13.183IV14.701087.2234180.3844657444V25X4082.458.82GUARD2.94V25X4027.152.94SEGUNDO NIVELVIGASAREAATlog viguetasn tecnoporL. ACERO VIGKG VIGL. ACERO TEMPI20.44IPAS79.70288.82284.27237.00249.001,210.90554.07V25X40156.8615.69AULA209.12137.92115.00121.00500.80V30X5031.704.76IIPAS115.76379.29412.88345.00363.001,724.921,758.77727.63II22.44AULA263.53173.81145.00153.00973.34631.10V25X40177.2017.72IIIPAS61.30209.87218.64183.00193.00931.34402.62V30X5031.454.72AULA148.5797.9982.0087.00355.80III12.071,107.001,166.005,388.711,684.327,073.03V25X40120.7112.071,273.05TIMPANOIV1.56V25X4015.561.56GUARD0.87V25X4011.640.87124.55PARAPETOAREALON0.3565.5423.20

piedra pisom3factorpiso1,142.28171.34171.34cerco350.000.42147.00152.0460.8221.000.245.04sobre cim371.000.0622.2611.13patio162.000.1524.3024.30267.59factor347.8618.31

ALMACEN1/43/81/25/83/4111247100010012020021332421916723550854015131229553316371102128801040901110142728120920081437110104012104190132465501009342856310569986414224455010835226042583482847410832800502943010030010472870200202040161851401426495802181685820808434517689712218410044816201816814148254822823823100658121420027661483108513345313323443001642341826481223428416846385041826121261389412420616225684926242242757614144916272546184111224944288438332031291530410442104111299503050245252127668041182184848202423241088038388711202520545073412409468214231266124512181850221575405820263550602060112494817648093826983213412638716706691105694311321320671698735611,685.49197325711,048.654,852.009481180129566910002069,591.110.250.560.991.552.243.971,112.8821330005947.2011538.45009332.550020160007360.3856,471.584,237.6252,518.570.01,629.1026.0444,182.888,335.69