metrado santamaria
DESCRIPTION
metrado de pavimentacion urbanaTRANSCRIPT
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE OBRA UND 1 --- --- --- 1.00 1.00
01.02.00 ALMACEN Y CASETA DE GUARDIANIA M2 1 Area= 120.00 --- 120.00 120.00
02.00.00 OBRAS PRELIMINARES
02.01.00 ELEMENTOS DE SEGURIDAD
02.01.01 SEGURIDAD DURANTE LA CONSTRUCCION UND 1 --- --- --- 1.00 1.00
Cinta de seguridad color amarillo rllo 1 --- --- --- 1.00
Malla de seguridad color naranja rllo 1 --- --- --- 1.00
Tanquera de madera und 2 --- --- --- 2.00
Parantes de seguridad und 2 --- --- --- 2.00
Señales en zona de trabajo und 2 --- --- --- 2.00
02.01.02 CERCO PERIMETRICO CON ARPILLA M 100.00
1 100.00 --- --- 100.00
02.02.00 TRAZO, NIVELACIÓN Y REPLANTEO
02.02.01 TRAZO Y REPLANTEO INICIAL M 959.32
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 162.54 --- --- 162.54
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 13.23 --- --- 13.23
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 1 10.73 --- --- 10.73
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 211.23 --- --- 211.23
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 7.83 --- --- 7.83
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 1 6.02 --- --- 6.02
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 267.24 --- --- 267.24
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 69.50 --- --- 69.50
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 13.20 --- --- 13.20
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 14.30 --- --- 14.30
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 17.67 --- --- 17.67
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 1 8.78 --- --- 8.78
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 73.76 --- --- 73.76
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 7.83 --- --- 7.83
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 66.45 --- --- 66.45
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 9.03 --- --- 9.03
02.02.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 31100.55
Area de pavimentación 3 Area = 10,366.85 --- 31100.55
02.04.00 MOVILIZACION Y DESMOVILIZACION DE MQUINARIA Y EQUIPO
02.04.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA UND 1.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y/O MAQUINARIA (TIENE SEP 1 --- --- --- 1.00
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 CORTES
03.01.01 CORTE DE TERRENO CON MAQUINARIA M3 6995.98
todos los jirones donde se está interveniendo 1 Volum= 6,995.98 --- 6995.98
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 207.34
en zona de corte c/maquinaria 1 Area= 10,366.85 0.02 207.34
03.03.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
03.03.01 ACARREO DE MATERIAL EXCEDENTE M3 259.17
volumen de excavación manual 1.25 207.34 --- --- 259.17
03.03.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3 9004.15
del corte de terreno con máquinaria 1.25 Volum= 6,995.98 --- 8744.98
del acarreo de material excedente 1.25 Volum= 207.34 --- 259.17
03.04.00 PERFILADO Y COMPACTADO DE ZONA DE CORTE
03.04.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE M2 10366.85
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 --- 2790.72
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 --- 1962.48
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 --- 4254.60
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 --- 667.34
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 --- 691.71
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL SELECCIONADO M3 4043.07
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 0.30 837.22
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 0.30 588.74
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 0.30 1276.38
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 0.30 200.20
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 0.30 207.51
04.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE M2 3110.06
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 0.30 837.22
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 0.30 588.74
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 0.30 1276.38
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 0.30 200.20
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 0.30 207.51
04.02.00 SUB BASE
04.02.01 MATERIAL SELECCIONADO M3 1347.69
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 0.10 279.07
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 0.10 196.25
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 0.10 425.46
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 0.10 66.73
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 0.10 69.17
04.02.02 MATERIAL HORMIGON M3 1244.02
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 0.10 279.07
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 0.10 196.25
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 0.10 425.46
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 0.10 66.73
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 0.10 69.17
04.02.03 MATERIAL MEZCLADO M3 2591.71
1 Volum= 1,347.69 --- 1347.69
1 Volum= 1,244.02 --- 1244.02
04.02.04 PERFILADO Y COMPACTADO DE LA SUB BASE M2 10366.85
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,790.72 --- 2790.72
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,962.48 --- 1962.48
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 4,254.60 --- 4254.60
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 667.34 --- 667.34
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 691.71 --- 691.71
04.04.00 PAVIMENTO RIGIDO
04.04.01 CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1829.32
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 Area= 2,164.89 0.20 432.98
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 1 Area= 128.81 0.20 25.76
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 1 Area= 1,656.23 0.20 331.25
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 1 Area= 61.14 0.20 12.23
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 Area= 3,830.10 0.20 766.02
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 1 Area= 98.17 0.20 19.63
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 Area= 587.97 0.20 117.59
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 Area= 619.28 0.20 123.86
04.04.02 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO M2 567.67
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 3 162.54 --- 0.20 97.52
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 11 13.20 --- 0.20 29.04
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 3 10.73 --- 0.20 6.44
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 3 211.23 --- 0.20 126.74
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 14 7.80 --- 0.20 21.84
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 3 6.02 --- 0.20 3.61
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 2 267.24 --- 0.20 106.90
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 69.50 --- 0.20 13.90
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 13 13.20 --- 0.20 34.32
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 5 14.27 --- 0.20 14.27
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 17.67 --- 0.20 3.53
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 3 8.78 --- 0.20 5.27
Jr. Sandia (Av. Circunvalación - Av. Ferial) 3 73.76 --- 0.20 44.26
Jr. Sandia (Av. Circunvalación - Av. Ferial) 6 7.80 --- 0.20 9.36
Jr. Huascar (Av. Circunvalación - Av. Ferial) 3 66.45 --- 0.20 39.87
Jr. Huascar (Av. Circunvalación - Av. Ferial) 6 9.00 --- 0.20 10.80
04.04.03 PAVIMENTO RIGIDO: CURADO DE LOSA M2 9146.59
1 Area= 9,146.59 --- 9146.59
04.04.04 PAVIMENTO RIGIDO: CORTE EN JUNTA TRANSVERSAL DE CONTRACCI M 2320.57
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 44 13.20 --- --- 580.80
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 3 11.40 --- --- 34.20
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 56 7.80 --- --- 436.80
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 50 13.20 --- --- 660.00
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 21 14.27 --- --- 299.77
Jr. Sandia (Av. Circunvalación - Av. Ferial) 20 7.80 --- --- 156.00
Jr. Huascar (Av. Circunvalación - Av. Ferial) 17 9.00 --- --- 153.00
04.04.05 PAVIMENTO RIGIDO: SELLADO EN JUNTA TRANSVERSAL DE CONTRAC M 2320.57
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 44 13.20 --- --- 580.80
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 3 11.40 --- --- 34.20
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 56 7.80 --- --- 436.80
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 50 13.20 --- --- 660.00
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 21 14.27 --- --- 299.77
Jr. Sandia (Av. Circunvalación - Av. Ferial) 20 7.80 --- --- 156.00
Jr. Huascar (Av. Circunvalación - Av. Ferial) 17 9.00 --- --- 153.00
04.04.06 PAVIMENTO RIGIDO: CORTE EN JUNTA LONGITUDINAL DE CONSTRUCC M 1043.50
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 162.21 --- --- 162.21
1 162.87 --- --- 162.87
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 1 10.62 --- --- 10.62
1 10.85 --- --- 10.85
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 269.21 --- --- 269.21
1 265.20 --- --- 265.20
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 1 17.59 --- --- 17.59
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 1 12.04 --- --- 12.04
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 67.93 --- --- 67.93
1 64.98 --- --- 64.98
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
04.04.07 PAVIMENTO RIGIDO: SELLADO EN JUNTA LONGITUDINAL DE CONSTRU M 1043.50
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 1 162.21 --- --- 162.21
1 162.87 --- --- 162.87
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 1 10.62 --- --- 10.62
1 10.85 --- --- 10.85
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 269.21 --- --- 269.21
1 265.20 --- --- 265.20
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 1 17.59 --- --- 17.59
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 1 12.04 --- --- 12.04
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 67.93 --- --- 67.93
1 64.98 --- --- 64.98
04.04.08 PAVIMENTO RIGIDO: SELLADO DE JUNTA DE DILATACION M 2838.35
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 3 162.54 --- --- 487.62
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 11 13.20 --- --- 145.20
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre 3 10.73 --- --- 32.19
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 3 211.23 --- --- 633.69
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 14 7.80 --- --- 109.20
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias 3 6.02 --- --- 18.06
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 2 267.24 --- --- 534.48
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 69.50 --- --- 69.50
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 13 13.20 --- --- 171.60
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 5 14.27 --- --- 71.37
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 1 17.67 --- --- 17.67
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda 3 8.78 --- --- 26.34
Jr. Sandia (Av. Circunvalación - Av. Ferial) 3 73.76 --- --- 221.28
Jr. Sandia (Av. Circunvalación - Av. Ferial) 6 7.80 --- --- 46.80
Jr. Huascar (Av. Circunvalación - Av. Ferial) 3 66.45 --- --- 199.35
Jr. Huascar (Av. Circunvalación - Av. Ferial) 6 9.00 --- --- 54.00
05.00.00 PRUEBAS DE CONTROL DE CALIDAD
05.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD UND 1.00
1 --- --- --- 1.00
06.00.00 MITIGACION DE IMPACTO AMBIENTAL
06.01.00 ETAPA PRELIMINAR
06.01.01 REUNIONES DE CONCERTACION (RESIDENTE - HABITANTES) UND 1 --- --- --- 1.00 1.00
06.02.00 ETAPA DE CONSTRUCCION
06.02.01 RIEGO DE LAS VIAS AUXILIARES M2 1 Area= 4,500.00 --- 4500.00 4500.00
06.02.02 RIEGO DE MATERIAL EN CANTERA M3 1 Volum= 539.08 --- 539.08 539.08
06.02.03 HABILITACION PROVISIONAL DE LETRINAS INCLUIDO CONEXION UND 1 2.00 --- --- 2.00 2.00
06.02.04 HABILITACION PROVISIONAL DE BASUREROS UND 1 2.00 --- --- 2.00 2.00
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 01: CONSTRUCCION DE CALZADA
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
06.02.05 MITIGACION AMBIENTAL UND 1 --- --- --- 1.00 1.00
Programa de educación y capacitación ambiental
Señalización provisional de obra und 1 --- --- --- 1.00
Diseño y elaboración de manuales informativos und 1 --- --- --- 1.00
Señalización ambiental para el personal de obra und 1 --- --- --- 1.00
Sensibilización ambiental para la población beneficiaria und 2 --- --- --- 2.00
Programa de mitigación y/o prevención
Rehabilitación de área por construcción de campamento und 1 --- --- --- 1.00
Rehabilitación de canteras und 1 --- --- --- 1.00
Programa de contingencia
Capacitación en medidas de contingencia y primeros auxilios und 1 --- --- --- 1.00
Unidad de contigencia und 1 --- --- --- 1.00
Programa de monitoreo ambiental
Unidad de monitoreo ambiental und 1 --- --- --- 1.00
06.03.00 ETAPA DE ABANDONO
06.03.01 RECONFORMACION DE CANTERA HA 1 0.25 --- --- 0.25 0.25
06.03.02 SEMBRADO DE ARBUSTOS UND 1 50.00 --- --- 50.00 50.00
06.03.03 RECONFORMACION DE BOTADERO HA 1 0.25 --- --- 0.25 0.25
07.00.00 VARIOS, LIMPIEZA Y OTROS
07.01.00 NIVELACION DE BUZONES UND 12.00
12 --- --- --- 12.00
07.02.00 EVALUACION Y REPARACION CONEXIONES DOMICILIARIA AGUA UND 22.00
22 --- --- --- 22.00
07.03.00 EVALUACION Y REPARACION CONEXIONES DOMICILIARIAS DESAGUE UND 22.00
22 --- --- --- 22.00
07.04.00 CAMA DE APOYO CONEXIONES DOMICILIARIAS AGUA M 264.00
22 12.00 --- --- 264.00
07.05.00 CAMA DE APOYO CONEXIONES DOMICILIARIAS DESAGUE M 308.00
22 14.00 --- --- 308.00
07.06.00 PROTECCION DEL CONCRETO M2 440.00
1 Area= 440.00 --- 440.00
07.07.00 LIMPIEZA FINAL DE OBRA M2 9146.59
Area de intervención 1 Area= 9,146.59 --- 9146.59
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 OBRAS PRELIMINARES
01.01.00 TRAZO, NIVELACIÓN Y REPLANTEO
01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 2426.37
En veredas acabado coloreado - frotachado incluye rampas 1 Area= 2426.37 --- 2426.37
01.02.00 DEMOLICIONES
01.02.01 DEMOLICION DE VEREDAS Y CUNETAS M2 1799.68
Manzana (M-1) 1 154.24 1.30 --- 200.51
Manzana (M-2) 1 163.16 1.30 --- 212.11
Manzana (M-3) 1 155.42 1.30 --- 202.05
Manzana (M-4) 1 158.36 1.30 --- 205.86
Manzana (M-5) 1 157.31 1.30 --- 204.51
1 76.61 1.30 --- 99.59
Manzana (M-6) 1 154.38 1.30 --- 200.70
Manzana (M-8) 1 60.40 1.30 --- 78.53
Manzana (M-9) 1 56.02 1.30 --- 72.83
Manzana (M-12) 1 163.76 1.30 --- 212.89
1 84.68 1.30 --- 110.09
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACIONES
02.01.01 EXCAVACION EN FORMA MANUAL M3 222.30
En veredas acabado coloreado - frotachado incluye rampas 1 Area = 2222.95 0.10 222.30
02.02.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
02.02.01 ACARREO DE MATERIAL EXCEDENTE M3 277.87
Volumen de excavación en forma manual 1.25 222.30 --- --- 277.87
02.02.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3 2797.41
Volumen de demolición de veredas 1.40 1799.68 --- --- 2519.55
Volumen de excavación en forma manual 1.25 222.30 --- --- 277.87
02.03.00 NIVELADO Y COMPACTADO
02.03.01 MATERIAL SELECCIONADO M3 337.09
Manzana (M-1) 1 Area= 189.62 0.10 18.96
Manzana (M-2) 1 Area= 293.25 0.10 29.33
Manzana (M-3) 1 Area= 174.74 0.10 17.47
Manzana (M-4) 1 Area= 291.38 0.10 29.14
Manzana (M-5) 1 Area= 248.26 0.10 24.83
1 Area= 149.89 0.10
Manzana (M-6) 1 Area= 264.95 0.10 26.49
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
Manzana (M-7) 1 Area= 384.69 0.10 38.47
Manzana (M-8) 1 Area= 120.67 0.10 12.07
Manzana (M-9) 1 Area= 105.50 0.10 10.55
Manzana (M-12) 1 Area= 279.59 0.10 27.96
1 Area= 240.32 0.10 24.03
02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO M3 337.09
Del volumen de Material Seleccionado 1 Volum= 337.09 --- 337.09
02.03.03 NIVELADO Y COMPACTADO C/EQUIPO LIVIANO M2 2592.97
Manzana (M-1) 1 Area= 189.62 --- 189.62
Manzana (M-2) 1 Area= 293.25 --- 293.25
Manzana (M-3) 1 Area= 174.74 --- 174.74
Manzana (M-4) 1 Area= 291.38 --- 291.38
Manzana (M-5) 1 Area= 248.26 --- 248.26
1 Area= 149.89 ---
Manzana (M-6) 1 Area= 264.95 --- 264.95
Manzana (M-7) 1 Area= 384.69 --- 384.69
Manzana (M-8) 1 Area= 120.67 --- 120.67
Manzana (M-9) 1 Area= 105.50 --- 105.50
Manzana (M-12) 1 Area= 279.59 --- 279.59
1 Area= 240.32 --- 240.32
03.00.00 CONCRETO SIMPLE
03.01.00 SARDINELES
03.01.01 SARDINELES: CONCRETO F'C=175 KG/CM2 M3 83.40
Manzana (M-1) 1 154.37 0.15 0.41 9.49
Manzana (M-2) 1 163.32 0.15 0.41 10.04
Manzana (M-3) 1 155.53 0.15 0.41 9.57
Manzana (M-4) 1 158.44 0.15 0.41 9.74
Manzana (M-5) 1 157.54 0.15 0.41 9.69
1 140.27 0.15 0.41 8.63
Manzana (M-6) 1 154.39 0.15 0.41 9.50
Manzana (M-7) 1 155.82 0.15 0.41 9.58
Manzana (M-8) 1 60.37 0.15 0.41 3.71
Manzana (M-9) 1 56.05 0.15 0.41 3.45
Manzana (M-12) 1 164.13 0.15 0.41 10.09
1 147.76 0.15 0.41 9.09
03.01.02 SARDINELES: ENCOFRADO Y DESENCOFRADO M2 551.34
Manzana (M-1) 1 154.37 --- 0.31 47.85
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
Manzana (M-2) 1 163.32 --- 0.31 50.63
Manzana (M-3) 1 155.53 --- 0.31 48.22
Manzana (M-4) 1 158.44 --- 0.31 49.12
Manzana (M-5) 1 157.54 --- 0.31 48.84
1 140.27 --- 0.31 43.48
Manzana (M-6) 1 154.39 --- 0.31 47.86
Manzana (M-7) 1 155.82 --- 0.31 48.30
Manzana (M-8) 1 60.37 --- 0.31 18.72
Manzana (M-9) 1 56.05 --- 0.31 17.38
Manzana (M-12) 1 164.13 --- 0.31 50.88
1 147.76 --- 0.31 45.81
Separaciones Para Junta de Dilatación 1 557.00 0.15 0.41 34.26
03.01.03 SARDINELES: JUNTA ASFALTICA M 220.17
Manzana (M-1) 50 --- --- 0.41 20.50
Manzana (M-2) 53 --- --- 0.41 21.73
Manzana (M-3) 50 --- --- 0.41 20.50
Manzana (M-4) 51 --- --- 0.41 20.91
Manzana (M-5) 51 --- --- 0.41 20.91
45 --- --- 0.41 18.45
Manzana (M-6) 50 --- --- 0.41 20.50
Manzana (M-7) 50 --- --- 0.41 20.50
Manzana (M-8) 19 --- --- 0.41 7.79
Manzana (M-9) 17 --- --- 0.41 6.97
Manzana (M-12) 53 --- --- 0.41 21.73
48 --- --- 0.41 19.68
03.02.00 VEREDAS
03.02.01 VEREDAS: CONCRETO F'C=175 KG/CM2, E=10 CM. ACABADO FROTACH M2 1111.48
Manzana (M-1) 0.5 Area= 189.62 --- 94.81
Manzana (M-2) 0.5 Area= 293.25 --- 146.63
Manzana (M-3) 0.5 Area= 174.74 --- 87.37
Manzana (M-4) 0.5 Area= 291.38 --- 145.69
Manzana (M-5) 0.5 Area= 248.26 --- 124.13
0.5 Area= 149.89 --- 74.94
Manzana (M-6) 0.5 Area= 264.95 --- 132.47
Manzana (M-7) 0.5 Area= 384.69 --- 192.34
Manzana (M-8) 0.5 Area= 120.67 --- 60.33
Manzana (M-9) 0.5 Area= 105.50 --- 52.75
Manzana (M-12) 0.5 Area= 279.59 --- 139.79
0.5 Area= 240.32 --- 120.16
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
03.02.02 VEREDAS: CONCRETO F'C=175 KG/CM2, E=10 CM. ACABADO COLOREA M2 1111.48
Manzana (M-1) 0.5 Area= 189.62 --- 94.81
Manzana (M-2) 0.5 Area= 293.25 --- 146.63
Manzana (M-3) 0.5 Area= 174.74 --- 87.37
Manzana (M-4) 0.5 Area= 291.38 --- 145.69
Manzana (M-5) 0.5 Area= 248.26 --- 124.13
0.5 Area= 149.89 --- 74.94
Manzana (M-6) 0.5 Area= 264.95 --- 132.47
Manzana (M-7) 0.5 Area= 384.69 --- 192.34
Manzana (M-8) 0.5 Area= 120.67 --- 60.33
Manzana (M-9) 0.5 Area= 105.50 --- 52.75
Manzana(M-12) 0.5 Area= 279.59 --- 139.79
0.5 Area= 240.32 --- 120.16
03.02.03 VEREDAS: ENCOFRADO Y DESENCOFRADO M2 209.27
Manzana (M-1) 52 2.06 --- 0.20 21.42
Manzana (M-2) 55 2.16 --- 0.20 23.76
Manzana (M-3) 52 2.64 --- 0.20 27.46
Manzana (M-4) 53 1.76 --- 0.20 18.66
Manzana (M-5) 53 1.41 --- 0.20 14.95
47 1.41 --- 0.20
Manzana (M-6) 52 1.29 --- 0.20 13.42
Manzana (M-7) 54 3.76 --- 0.20 40.61
Manzana (M-8) 21 1.87 --- 0.20 7.85
Manzana (M-9) 19 1.49 --- 0.20 5.66
Manzana (M-12) 55 1.69 --- 0.20 18.59
50 1.69 --- 0.20 16.90
03.02.04 VEREDAS: JUNTA ASFALTICA M 1046.36
Manzana (M-1) 52 2.06 --- --- 107.12
Manzana (M-2) 55 2.16 --- --- 118.80
Manzana (M-3) 52 2.64 --- --- 137.28
Manzana (M-4) 53 1.76 --- --- 93.28
Manzana (M-5) 53 1.41 --- --- 74.73
47 1.41 --- ---
Manzana (M-6) 52 1.29 --- --- 67.08
Manzana (M-7) 54 3.76 --- --- 203.04
Manzana (M-8) 21 1.87 --- --- 39.27
Manzana (M-9) 19 1.49 --- --- 28.31
Manzana (M-12) 55 1.69 --- --- 92.95
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
50 1.69 --- --- 84.50
03.03.00 RAMPAS
03.03.01 RAMPAS: CONCRETO F'C=175 KG/CM2, E=10 CM. BRUÑADO UND 32.00
RAMPA TIPO I
Manzana (M-1) 2 2.00
Manzana (M-2) 4 4.00
Manzana (M-3) 2 2.00
Manzana (M-4) 3 3.00
Manzana (M-5) 4 4.00
2 2.00
Manzana (M-6) 2 2.00
Manzana (M-7) 1 1.00
Manzana (M-8) 2 2.00
Manzana (M-9) 2 2.00
Manzana (M-12) 4 4.00
2 2.00
RAMPA TIPO II
Manzana (M-4) 1 1.00
Manzana (M-7) 1 1.00
03.03.02 RAMPAS: REJILLA METALICA UND 32.00
Numero de Rampas 32 --- --- --- 32.00
04.00.00 PRUEBAS DE CONTROL DE CALIDAD
04.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD UND 1.00
1 --- --- --- 1.00
05.00.00 MITIGACION DE IMPACTO AMBIENTAL
05.01.00 ETAPA DE CONSTRUCCION
05.01.01 RIEGO DE MATERIAL EN CANTERA M3 1 33.71 --- --- 33.71 33.71
05.02.00 ETAPA DE ABANDONO
05.02.01 RECONFORMACION DE BOTADERO HA 1 Area= 0.25 --- 0.25 0.25
06.00.00 VARIOS, LIMPIEZA Y OTROS
06.01.00 CURADO: SARDINELES, VEREDAS Y RAMPAS M2 2426.37
1 Area= 2426.37 --- 2426.37
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 02: CONSTRUCCION DE VEREDAS
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
06.02.00 NIVELACION DE CAJAS DE REGISTRO AGUA INSTALACIONES DOMICILI UND 50.00
50 --- --- --- 50.00
06.03.00 NIVELACION DE CAJAS DE REGISTRO DESAGUE INSTALACIONES DOMIC UND 50.00
50 --- --- --- 50.00
06.04.00 LIMPIEZA FINAL DE OBRA M2 2426.37
Area de intervención 1 Area= 2426.37 --- 2426.37
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 03: CONSTRUCCION DE CUNETAS LATERALES
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 OBRAS PRELIMINARES
01.01.00 TRAZO, NIVELACIÓN Y REPLANTEO
01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 763.01
En cuneta tipo I 1 1,411.47 0.50 --- 705.74
En cuneta tipo II 1 57.27 1.00 --- 57.27
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACIONES
02.01.01 EXCAVACION EN FORMA MANUAL M3 10.49
En cuneta tipo I 1 1,411.47 Area= 0.005 7.06
En cuneta tipo II 1 57.27 Area= 0.060 3.44
02.02.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
02.02.01 ACARREO DE MATERIAL EXCEDENTE M3 13.12
Excavación en forma manual 1.25 10.49 --- --- 13.12
02.02.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3 13.12
Acarreo de material excedente 1.25 Volum= 10.49 --- 13.12
03.00.00 CONCRETO SIMPLE
03.01.00 CUNETA TIPO I
03.01.01 CUNETA TIPO I: CONCRETO F'C=175 KG/CM2 M3 105.86
Manzana (M-1) 1 154.91 Area= 0.075 11.62
Manzana (M-2) 1 164.35 Area= 0.075 12.33
Manzana (M-3) 1 156.02 Area= 0.075 11.70
Manzana (M-4) 1 158.92 Area= 0.075 11.92
Manzana (M-5) 1 158.68 Area= 0.075 11.90
1 191.94 Area= 0.075 14.40
Manzana (M-6) 1 154.43 Area= 0.075 11.58
Manzana (M-7) 1 155.78 Area= 0.075 11.68
Manzana (M-8) 1 60.24 Area= 0.075 4.52
Manzana (M-9) 1 56.18 Area= 0.075 4.21
Manzna (M-12) 1 165.87 Area= 0.075 12.44
1 148.96 Area= 0.075 11.17
03.01.02 CUNETA TIPO I: ENCOFRADO Y DESENCOFRADO M2 51.60
Manzana (M-1) 52 0.50 --- 0.20 5.20
Manzana (M-2) 55 0.50 --- 0.20 5.50
Manzana (M-3) 53 0.50 --- 0.20 5.30
Manzana (M-4) 53 0.50 --- 0.20 5.30
Manzana (M-5) 53 0.50 --- 0.20 5.30
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 03: CONSTRUCCION DE CUNETAS LATERALES
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
64 0.50 --- 0.20
Manzana (M-6) 52 0.50 --- 0.20 5.20
Manzana (M-7) 52 0.50 --- 0.20 5.20
Manzana (M-8) 21 0.50 --- 0.20 2.10
Manzana (M-9) 19 0.50 --- 0.20 1.90
Manzana (M-12) 56 0.50 --- 0.20 5.60
50 0.50 --- 0.20 5.00
03.01.03 CUNETA TIPO I: JUNTA ASFALTICA M 258.00
Manzana (M-1) 52 0.50 --- --- 26.00
Manzana (M-2) 55 0.50 --- --- 27.50
Manzana (M-3) 53 0.50 --- --- 26.50
Manzana (M-4) 53 0.50 --- --- 26.50
Manzana (M-5) 53 0.50 --- --- 26.50
64 0.50 --- ---
Manzana (M-6) 52 0.50 --- --- 26.00
Manzana (M-7) 52 0.50 --- --- 26.00
Manzana (M-8) 21 0.50 --- --- 10.50
Manzana (M-9) 19 0.50 --- --- 9.50
Manzana (M-12) 56 0.50 --- --- 28.00
50 0.50 --- --- 25.00
03.02.00 CUNETA TIPO II
03.02.01 CUNETA TIPO II: CONCRETO F'C=210 KG/CM2 M3 11.45
Jr. Miguel Iglesias - Jr. Victor Humareda 1 30.15 Area= 0.20 6.03
Jr. Victor Humareda - Jr. Los Laureles 1 27.12 Area= 0.20 5.42
03.02.02 CUNETA TIPO II: ENCOFRADO Y DESENCOFRADO M2 15.65
Jr. Miguel Iglesias - Jr. Victor Humareda 11 1.00 --- 0.20 2.20
Jr. Victor Humareda - Jr. Los Laureles 10 1.00 --- 0.20 2.00
todos los lados 1 57.27 --- 0.20 11.45
03.02.03 CUNETA TIPO II: JUNTA ASFALTICA M 74.27
Jr. Miguel Iglesias - Jr. Victor Humareda 9 1.00 --- --- 9.00
Jr. Victor Humareda - Jr. Los Laureles 8 1.00 --- --- 8.00
todos los lados 1 57.27 --- --- 57.27
04.00.00 PRUEBAS DE CONTROL DE CALIDAD
04.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD UND 1.00
1 --- --- --- 1.00
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 03: CONSTRUCCION DE CUNETAS LATERALES
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
05.00.00 VARIOS, LIMPIEZA Y OTROS
05.01.00 CURADO: CUNETAS TIPO I Y II M2 763.01
1 Area= 763.01 --- 763.01
05.02.00 LIMPIEZA FINAL DE OBRA M2 763.01
Area de intervención 1 Area= 763.01 --- 763.01
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 04: SEÑALIZACION VIAL
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 OBRAS PRELIMINARES
01.01.00 TRAZO, NIVELACIÓN Y REPLANTEO
01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 656.36
En señalizacion de via 1 Area = 656.36 --- 656.36
02.00.00 SEÑALIZACION HORIZONTAL
02.01.00 PINTURA EN SARDINELES M2 733.66
Manzana (M-1) 1 75.87 0.46 --- 34.90
Manzana (M-2) 1 76.83 0.46 --- 35.34
Manzana (M-3) 1 246.55 0.46 --- 113.41
Manzana (M-4) 1 179.59 0.46 --- 82.61
Manzana (M-5) 1 106.20 0.46 --- 48.85
Manzana (M-6) 1 181.64 0.46 --- 83.55
Manzana (M-7) 1 184.86 0.46 --- 85.04
Manzana (M-8) 1 198.09 0.46 --- 91.12
Manzana (M-9) 1 107.78 0.46 --- 49.58
Manzana (M-10) 1 170.12 0.46 --- 78.26
Manzana (M-11) 1 67.39 0.46 --- 31.00
02.02.00 PINTURA EN PAVIMENTO M2 656.36
pase peatonal
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 48 3.00 0.50 --- 72.00
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 32 3.00 0.50 --- 48.00
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 84 3.00 0.50 --- 126.00
Jr. Sandia (Av. Circunvalación - Av. Ferial) 16 3.00 0.50 --- 24.00
Jr. Huascar (Av. Circunvalación - Av. Ferial) 16 3.00 0.50 --- 24.00
flechas direccionales tipo 1 (Frente y Voltea)
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 7 Área = 1.80 --- 12.60
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 4 Área = 1.80 --- 7.20
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 12 Área = 1.80 --- 21.60
Jr. Sandia (Av. Circunvalación - Av. Ferial) 2 Área = 1.80 --- 3.60
Jr. Huascar (Av. Circunvalación - Av. Ferial) 2 Área = 1.80 --- 3.60
flechas direccionales tipo 1 (Frente y Voltea ambos lados)
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 0 Área = 1.80 --- 0.00
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 0 Área = 1.80 --- 0.00
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 0 Área = 1.80 --- 0.00
Jr. Sandia (Av. Circunvalación - Av. Ferial) 0 Área = 1.80 --- 0.00
Jr. Huascar (Av. Circunvalación - Av. Ferial) 0 Área = 1.80 --- 0.00
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 04: SEÑALIZACION VIAL
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
flechas direccionales tipo 2 (Frente)
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 8 Área = 1.30 --- 10.40
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 4 Área = 1.30 --- 5.20
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 12 Área = 1.30 --- 15.60
Jr. Sandia (Av. Circunvalación - Av. Ferial) 2 Área = 1.30 --- 2.60
Jr. Huascar (Av. Circunvalación - Av. Ferial) 2 Área = 1.30 --- 2.60
linea parada
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 4 6.5000 0.50 --- 13.00
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 4 3.9127 0.50 --- 7.83
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 5 6.5000 0.50 --- 16.25
1 7.2344 0.50 --- 3.62
Jr. Sandia (Av. Circunvalación - Av. Ferial) 1 7.7254 0.50 --- 3.86
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 8.9254 0.50 --- 4.46
linea central de parada
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 8 15.00 0.10 --- 12.00
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 4 15.00 0.10 --- 6.00
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 12 15.00 0.10 --- 18.00
Jr. Sandia (Av. Circunvalación - Av. Ferial) 2 15.00 0.10 --- 3.00
Jr. Huascar (Av. Circunvalación - Av. Ferial) 2 15.00 0.10 --- 3.00
linea central descontinua
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 12 3.00 0.10 --- 3.60
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 14 3.00 0.10 --- 4.20
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 24 3.00 0.10 --- 7.20
Jr. Sandia (Av. Circunvalación - Av. Ferial) 3 3.00 0.10 --- 0.90
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 3.00 0.10 --- 0.30
linea de borde del pavimento y central
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle) 4 53.22 0.10 --- 21.29
4 58.13 0.10 --- 23.25
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles) 2 80.16 0.10 --- 16.03
2 84.56 0.10 --- 16.91
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial) 4 48.11 0.10 --- 19.24
4 58.48 0.10 --- 23.39
1 80.71 0.10 --- 8.07
1 77.63 0.10 --- 7.76
1 76.99 0.10 --- 7.70
1 73.87 0.10 --- 7.39
Jr. Sandia (Av. Circunvalación - Av. Ferial) 2 52.97 0.10 --- 10.59
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 04: SEÑALIZACION VIAL
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
Jr. Huascar (Av. Circunvalación - Av. Ferial) 1 44.55 0.10 --- 4.46
1 40.51 0.10 --- 4.05
03.00.00 SEÑALIZACION VERTICAL
03.01.00 SEÑALES INFORMATIVAS UND 15.00
15 --- --- --- 15.00
04.00.00 VARIOS, LIMPIEZA Y OTROS
04.01.00 LIMIPIEZA FINAL DE OBRA M2 656.36
En señalizacion de via 1 Area = 656.36 --- 656.36
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 05: AREAS VERDES
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 OBRAS PRELIMINARES
01.01.00 TRAZO, NIVELACIÓN Y REPLANTEO
01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIÓN M2 77.77
Manzana (M-1): Jardinera 8 1.00 1.00 --- 8.00
Manzana (M-2): Jardinera 8 1.00 1.00 --- 8.00
Manzana (M-3): Jardinera 24 1.00 1.00 --- 24.00
Manzana (M-4): Jardinera 8 1.00 1.00 --- 8.00
Manzana (M-7): Jardinera 15 1.00 1.00 --- 15.00
Manzana (M-8): Jardinera 8 1.00 1.00 --- 8.00
Manzana (M-1): Asiento Tipo I 8 0.20 0.20 --- 0.32
Manzana (M-2): Asiento Tipo I 8 0.20 0.20 --- 0.32
Manzana (M-3): Asiento Tipo I 24 0.20 0.20 --- 0.96
Manzana (M-4): Asiento Tipo I 8 0.20 0.20 --- 0.32
Manzana (M-7): Asiento Tipo I 12 0.20 0.20 --- 0.48
Manzana (M-8): Asiento Tipo I 8 0.20 0.20 --- 0.32
Manzana (M-1): Asiento Tipo II 3 1.00 0.15 --- 0.45
Manzana (M-2): Asiento Tipo II 3 1.00 0.15 --- 0.45
Manzana (M-3): Asiento Tipo II 9 1.00 0.15 --- 1.35
Manzana (M-4): Asiento Tipo II 3 1.00 0.15 --- 0.45
Manzana (M-7): Asiento Tipo II 6 1.00 0.15 --- 0.90
Manzana (M-8): Asiento Tipo II 3 1.00 0.15 --- 0.45
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACIONES
02.01.01 EXCAVACION EN FORMA MANUAL M3 25.19
Jardineras 1 Area = 71.00 0.35 24.85
Asiento Tipo I 1 Area = 2.72 0.05 0.14
Asiento Tipo II 1 Area = 4.05 0.05 0.20
02.02.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
02.02.01 ACARREO DE MATERIAL EXCEDENTE M3 31.49
Volumen de excavación en forma manual: jardineras 1.25 24.85 --- --- 31.06
Volumen de excavación en forma manual: asiento tipo I 1.25 0.14 --- --- 0.17
Volumen de excavación en forma manual: asiento tipo II 1.25 0.20 --- --- 0.25
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
02.02.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3 31.49
Volumen de excavación en forma manual: jardineras 1.25 24.85 --- --- 31.06
Volumen de excavación en forma manual: asiento tipo I 1.25 0.14 --- --- 0.17
Volumen de excavación en forma manual: asiento tipo II 1.25 0.20 --- --- 0.25
03.00.00 JARDINERAS Y ASIENTOS DE CONCRETO
03.01.00 JARDINERAS
03.01.01 JARDINERAS: CONCRETO F'C=175 KG/CM2 M3 39.83
Manzana (M-1) 8 Area= 0.51 1.10 4.49
Manzana (M-2) 8 Area= 0.51 1.10 4.49
Manzana (M-3) 24 Area= 0.51 1.10 13.46
Manzana (M-4) 8 Area= 0.51 1.10 4.49
Manzana (M-7) 15 Area= 0.51 1.10 8.42
Manzana (M-8) 8 Area= 0.51 1.10 4.49
03.01.02 JARDINERAS: ENCOFRADO Y DESENCOFRADO M2 531.08
Manzana (M-1) 8 Perim. 6.80 1.10 59.84
Manzana (M-2) 8 Perim. 6.80 1.10 59.84
Manzana (M-3) 24 Perim. 6.80 1.10 179.52
Manzana (M-4) 8 Perim. 6.80 1.10 59.84
Manzana (M-7) 15 Perim. 6.80 1.10 112.20
Manzana (M-8) 8 Perim. 6.80 1.10 59.84
03.01.03 JARDINERAS: RELLENO MANUAL CON MATERIAL PROPIO M3 21.73
Manzana (M-1) 8 Area= 0.51 0.60 2.45
Manzana (M-2) 8 Area= 0.51 0.60 2.45
Manzana (M-3) 24 Area= 0.51 0.60 7.34
Manzana (M-4) 8 Area= 0.51 0.60 2.45
Manzana (M-7) 15 Area= 0.51 0.60 4.59
Manzana (M-8) 8 Area= 0.51 0.60 2.45
03.01.04 JARDINERAS: PREPARACION DE TERRENO PARA AREA VERDE M3 14.48
Manzana (M-1) 8 Area= 0.51 0.40 1.63
Manzana (M-2) 8 Area= 0.51 0.40 1.63
Manzana (M-3) 24 Area= 0.51 0.40 4.90
Manzana (M-4) 8 Area= 0.51 0.40 1.63
Manzana (M-7) 15 Area= 0.51 0.40 3.06
Manzana (M-8) 8 Area= 0.51 0.40 1.63
03.01.05 JARDINERAS: SEMBRADO DE GRASS M2 36.21
Manzana (M-1) 8 Area= 0.51 --- 4.08
Manzana (M-2) 8 Area= 0.51 --- 4.08
Manzana (M-3) 24 Area= 0.51 --- 12.24
Manzana (M-4) 8 Area= 0.51 --- 4.08
Manzana (M-7) 15 Area= 0.51 --- 7.65
Manzana (M-8) 8 Area= 0.51 --- 4.08
03.01.06 JARDINERAS: SEMBRADO DE ARBUSTOS Y ARBOLES UND 71.00
Manzana (M-1) 8 --- --- --- 8.00
Manzana (M-2) 8 --- --- --- 8.00
Manzana (M-3) 24 --- --- --- 24.00
Manzana (M-4) 8 --- --- --- 8.00
Manzana (M-7) 15 --- --- --- 15.00
Manzana (M-8) 8 --- --- --- 8.00
03.02.00 ASIENTOS DE CONCRETO
03.05.01 ASIENTO TIPO I: CONCRETO F'C=175 KG/CM2 M3 2.79
Manzana (M-1) 8 Area= 0.09 0.30 0.22
8 Area= 0.04 0.35 0.11
Manzana (M-2) 8 Area= 0.09 0.30 0.22
8 Area= 0.04 0.35 0.11
Manzana (M-3) 24 Area= 0.09 0.30 0.65
24 Area= 0.04 0.35 0.34
Manzana (M-4) 8 Area= 0.09 0.30 0.22
8 Area= 0.04 0.35 0.11
Manzana (M-7) 12 Area= 0.09 0.30 0.32
12 Area= 0.04 0.35 0.17
Manzana (M-8) 8 Area= 0.09 0.30 0.22
8 Area= 0.04 0.35 0.11
03.05.02 ASIENTO TIPO I: ENCOFRADO Y DESENCOFRADO M2 35.36
Manzana (M-1) 8 Perim= 1.20 0.30 2.88
8 Perim= 0.80 0.20 1.28
Manzana (M-2) 8 Perim= 1.20 0.30 2.88
8 Perim= 0.80 0.20 1.28
Manzana (M-3) 24 Perim= 1.20 0.30 8.64
24 Perim= 0.80 0.20 3.84
Manzana (M-4) 8 Perim= 1.20 0.30 2.88
8 Perim= 0.80 0.20 1.28
Manzana (M-7) 12 Perim= 1.20 0.30 4.32
12 Perim= 0.80 0.20 1.92
Manzana (M-8) 8 Perim= 1.20 0.30 2.88
8 Perim= 0.80 0.20 1.28
03.05.03 ASIENTO TIPO I: ACERO GRADO 60 KG 58.92
Manzana (M-1) 8 Peso= 0.87 --- 6.93
Manzana (M-2) 8 Peso= 0.87 --- 6.93
Manzana (M-3) 24 Peso= 0.87 --- 20.79
Manzana (M-4) 8 Peso= 0.87 --- 6.93
Manzana (M-7) 12 Peso= 0.87 --- 10.40
Manzana (M-8) 8 Peso= 0.87 --- 6.93
03.02.01 ASIENTO TIPO II: CONCRETO F'C=175 KG/CM2 M3 3.04
Manzana (M-1) 3 1.50 0.50 0.15 0.34
Manzana (M-2) 3 1.50 0.50 0.15 0.34
Manzana (M-3) 9 1.50 0.50 0.15 1.01
Manzana (M-4) 3 1.50 0.50 0.15 0.34
Manzana (M-7) 6 1.50 0.50 0.15 0.67
Manzana (M-8) 3 1.50 0.50 0.15 0.34
03.02.02 ASIENTO TIPO II: ENCOFRADO Y DESENCOFRADO M2 17.10
Manzana (M-1) 3 1.50 0.50 --- 2.25
3 3.00 --- 0.15 1.35
Manzana (M-2) 3 1.50 0.50 0.15 0.34
3 3.00 --- 0.15 1.35
Manzana (M-3) 9 1.50 0.50 0.15 1.01
9 3.00 --- 0.15 4.05
Manzana (M-4) 3 1.50 0.50 0.15 0.34
3 3.00 --- 0.15 1.35
Manzana (M-7) 6 1.50 0.50 0.15 0.67
6 3.00 --- 0.15 2.70
Manzana (M-8) 3 1.50 0.50 0.15 0.34
3 3.00 --- 0.15 1.35
03.02.03 ASIENTO TIPO II: ACERO GRADO 60 KG 191.98
Manzana (M-1) 3 Peso= 3.56 --- 10.67
3 Peso= 3.56 --- 10.67
Manzana (M-2) 3 Peso= 3.56 --- 10.67
3 Peso= 3.56 --- 10.67
Manzana (M-3) 9 Peso= 3.56 --- 32.00
9 Peso= 3.56 --- 32.00
Manzana (M-4) 3 Peso= 3.56 --- 10.67
3 Peso= 3.56 --- 10.67
Manzana (M-7) 6 Peso= 3.56 --- 21.33
6 Peso= 3.56 --- 21.33
Manzana (M-8) 3 Peso= 3.56 --- 10.67
3 Peso= 3.56 --- 10.67
04.00.00 PRUEBAS DE CONTROL DE CALIDAD
04.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD UND 1.00
1 --- --- --- 1.00
05.00.00 VARIOS, LIMPIEZA Y OTROS
05.01.00 CURADO: JARDINERAS Y ASIENTOS M2 583.54
1 Area= 583.54 --- 583.54
05.02.00 LIMPIEZA FINAL DE OBRA M2 77.77
Area de intervención 1 Area= 77.77 --- 77.77
PLANILLA DE METRADOS
PROYECTO
COMPONENTE 05: EDUCACION VIAL
Partida Descripción UndN° Medidas
Parcial Totalveces Largo Ancho Alto
01.00.00 EDUCACION VIAL
01.01.00 EDUCACION VIAL UND 1.00
Educación Vial 1 --- --- --- 1.00
“MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL URBANO, II ETAPA, EN LA URBANIZACION MUNICIPAL TAPARACHI PRIMER SECTOR DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN – PUNO”
03.04.00 PERFILADO Y COMPACTADO DE ZONA DE CORTE veces Largo Ancho Alto Parcial Total
03.04.01 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO M2
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle)
Jr. Huaraz (Av. Circunvalación - Jr. Torre Tagle)
Intersección entre Jr. Huaraz - Jr. 23 de Noviembre
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles)
Jr. Huaraz (Jr. Torre Tagle - Jr. L os Laureles)
Intersección entre Jr. Huaraz - Jr. Miguel Iglesias
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial)
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial)
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial)
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial)
Jr. Torre Tagle (Av. Ferrocarril - Av. Ferial)
Intersección entre Jr. Torre Tagle - Jr. Victor Humareda
Jr. Sandia (Av. Circunvalación - Av. Ferial)
Jr. Sandia (Av. Circunvalación - Av. Ferial)
Jr. Huascar (Av. Circunvalación - Av. Ferial)
Jr. Huascar (Av. Circunvalación - Av. Ferial)
Jr. José Antonio Encinas (Jr. Sandia - Jr. Huascar)
Jr. José Antonio Encinas (Jr. Sandia - Jr. Huascar)
Jr. José Antonio Encinas (Jr. Huascar - Jr. 2 de Mayo)
Jr. José Antonio Encinas (Jr. Huascar - Jr. 2 de Mayo)
Jr. José Antonio Encinas (Jr. 2 de Mayo - Jr. Inca Garcilaso)
Jr. José Antonio Encinas (Jr. 2 de Mayo - Jr. Inca Garcilaso)
Jr. José Antonio Encinas (Jr. Inca garcilaso - Jr. Jauregui)
Jr. José Antonio Encinas (Jr. Inca garcilaso - Jr. Jauregui)
Jr. José Antonio Encinas (Jr. Jauregui - Jr. Huayna Capac Hasta el Final)
Jr. José Antonio Encinas (Jr. Jauregui - Jr. Huayna Capac Hasta el Final)
Intersección entre Jr. José Antonio Encinas - Jr. Calixto Arestegui
Intersección entre Jr. José Antonio Encinas - Jr. Huayna Roque
03.04.00 PERFILADO Y COMPACTADO DE ZONA DE CORTE veces Largo Ancho Alto Parcial
03.04.01 JARDINERAS: CONCRETO F'C=175 KG/CM2 M2
Manzana (M-1) Area= 0.51 1.10
Manzana (M-2) Area= 0.51 1.10
Manzana (M-3) Area= 0.51 1.10
Manzana (M-4) Area= 0.51 1.10
Manzana (M-5) Area= 0.51 1.10
Manzana (M-6) Area= 0.51 1.10
Manzana (M-7 Area= 0.51 1.10
Manzana (M-8) Area= 0.51 1.10
Manzana (M-9) Area= 0.51 1.10
Manzana (M-10) Area= 0.51 1.10
Manzana (M-11) Area= 0.51 1.10
Manzana (M-12) Area= 0.51 1.10
Manzana (M-13) Area= 0.51 1.10
Manzana (M-14) Area= 0.51 1.10
Manzana (M-15) Area= 0.51 1.10
Manzana (M-16) Area= 0.51 1.10
Manzana (M-17) Area= 0.51 1.10
Manzana (M-18) Area= 0.51 1.10
Manzana (M-19) Area= 0.51 1.10
Manzana (M-20) Area= 0.51 1.10
Manzana (M-21) Area= 0.51 1.10
Manzana (M-22) Area= 0.51 1.10
Manzana (M-23) Area= 0.51 1.10
Manzana (M-23) Area= 0.51 1.10
Total