Chennai Branch An over view
List of Major Jobs executed / under Execution Chennai
Product Portfolio Voltas Ltd.
Partial Installation List of Voltas Green Series Chiller
MEP Credentials
Few of land mark installations in All India/Tamilnadu.
-
8/12/2019 MEP Presentation - BSNL
3/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Full-fledged, Well Equipped two Offices ( apprx. 20000 Sq.ft ) in Sprawling own
premises
Total Staff Strength 200+ 90% of the staff are technically qualified Engineers
Ready availability of Spares and Services in Chennai and Area Offices
Represented by 2 Area offices (Madurai & Coimbatore) in the state. Track Record of Handling projects of various critical nature in vide spectrum of
applications
Our projects is being executed with the support of remarkable 150+ sub contractors,
who are all having long term business relationship with us.
Chennai Branch An over view
-
8/12/2019 MEP Presentation - BSNL
4/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Full fledged customer care department in chennai and area offices to take care of
after sales support and services for complete MEP solutions
60 + trained staff including Engineers/ Supervisors/ Technicians on
MEP system who are 100% dedicated towards customer care
department separate from contracting department.
Sufficient spares for critical equipment kept in chennai
stores for quick replacement. 560+ chillers including (120+ Screw
Chillers are in our maintenance scheme.)
After Sales Support & Service
-
8/12/2019 MEP Presentation - BSNL
5/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
List of Major Jobs executed/ under Execution (Chennai Branch):Flextronics, Chennai Electronics goods Mfg Setup 10.5 Crores Executed
Perlos (Inside NOKIA SEZ) Electronics goods Mfg Setup 6.82 Crores Executed
Foxconn (Inside NOKIA SEZ) Electronics goods Mfg Setup 15.1 Crores Executed
Motorola Chennai Electronics goods Mfg Setup 18 Crores Executed
DLF Chennai IT Park 34 Crores Executed
TCS, Chennai - IT Park 57 Crores Executed
Syntel, Chennai - IT Park 7.56 Crores Under Execution
Hansen Drives (Coimbatore) Gear Mfg Setup 18.5 Crores Under Execution
Foxconn Phase Chennai Electronics goods Mfg Setup 4.34 Crores Executed
TCS Phase 2
IT PARK 52.8 Crores Under Execution
Chennai AirportExpansion Works 150 Crores Under Execution
Mahindra & Mahindra EDC 32 Crores Under Execution
-
8/12/2019 MEP Presentation - BSNL
6/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Few Slides about our ProjectExecution Capabilities ..
-
8/12/2019 MEP Presentation - BSNL
7/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
FOXCONN SEZ SITE - CHENNAI
-
8/12/2019 MEP Presentation - BSNL
8/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
TCS Chenn ai Thermal Storage Tanks
-
8/12/2019 MEP Presentation - BSNL
9/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
TCS Chenn ai Plate Type Heat Exch angers
-
8/12/2019 MEP Presentation - BSNL
10/64
-
8/12/2019 MEP Presentation - BSNL
11/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
TCS Chenn ai Screw Chi l lers
-
8/12/2019 MEP Presentation - BSNL
12/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
TCS Chenn ai Chi l led Water Pumps
-
8/12/2019 MEP Presentation - BSNL
13/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
TCS Chenn ai Chi l led Water Pump s with Ex. Tank
-
8/12/2019 MEP Presentation - BSNL
14/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Flextronics , Chennai Battery Li f t in s i te
-
8/12/2019 MEP Presentation - BSNL
15/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Flextronics , Chennai Precis ion AC - Server Room
-
8/12/2019 MEP Presentation - BSNL
16/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
PRODUCT PORTFOLIO HVAC
SYSTEM
-
8/12/2019 MEP Presentation - BSNL
17/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
VOLTAS WATER COOLED SCREW CHILLERS
RANGE : 100 TR - 330 TR
WATER COOLED
-
8/12/2019 MEP Presentation - BSNL
18/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
VOLTAS AIR COOLED SCREW CHILLERS
RANGE : 90 TR - 360 TR
AIR COOLED
-
8/12/2019 MEP Presentation - BSNL
19/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
-
8/12/2019 MEP Presentation - BSNL
20/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
-
8/12/2019 MEP Presentation - BSNL
21/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
-
8/12/2019 MEP Presentation - BSNL
22/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
VOLTAS VAM
Equation1 MW Engine = 270 TR FreeChilling
Range : 80 TR to 1450 TR
-
8/12/2019 MEP Presentation - BSNL
23/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Equation1 MW Engine = 270 TR Free Chilling
VOLTAS VAM
-
8/12/2019 MEP Presentation - BSNL
24/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
700 TR SINGLE EFFECT VAM
Range Heat source
120 TR1000 TR Saturated Steam at 1.0 kg /cm2
60 TR
450 TR Low Temp. At 85o C Hot Water120 TR1000 TR High Temp. At 140o C Hot Water
Steam Consumption:8.5 kg/ HR/ TR
Hot water Consumption: 4500 Kcal/ HR/ TR
VAPOUR ABSORPTION MACHINES
-
8/12/2019 MEP Presentation - BSNL
25/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
200 TR SINGLE EFFECT VAM
Range Heat source
120 TR1000 TR Saturated Steam at 1.0 kg /cm
60 TR450 TR Low Temp. At 85o C Hot Wate120 TR
1000 TR High Temp. At 140
oC Hot Wat
Steam Consumption:8.5 kg/ HR/ TR
Hot water Consumption: 4500 Kcal/ HR/ TR
VAPOUR ABSORPTION MACHINES
-
8/12/2019 MEP Presentation - BSNL
26/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Range: 120 TR1000 TR
Heat Source:HSD/ LDO/ SKO/ Natural Gas/Bio Gas/ LPG/ Clean Exhaust flue gases
Steam Consumption:0.258 NM3/ HR/TR
Oil Consumption: 0.313 Lit/ HR/TR
VAPOUR ABSORPTION MACHINES
Direct Fired & Co-generation
-
8/12/2019 MEP Presentation - BSNL
27/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Range: 80 TR 1250 TR
Special range upto 2000 TR
Heat Source:Saturated steam at 8 kg/cm2g
Steam Consumption:4.3 Kg /HR/ TR
VAPOUR ABSORPTION MACHINES
Double Effect, Steam Fired
-
8/12/2019 MEP Presentation - BSNL
28/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Variable Refrigeration Flow Systems
-
8/12/2019 MEP Presentation - BSNL
29/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Variable Refrigeration Flow Systems
DIGITAL SCROLL VRF SYSTEMSNEX
Cutting edge technology
Very low power consumption
Wide variety of indoor units
Compressor capacityunloading from 10% to 100%
Simple to operate & maintain
-
8/12/2019 MEP Presentation - BSNL
30/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
PARTIAL INSTALLATION LIST
OFVOLTAS GREEN SERIES CHILLER
Green series order List1.xls
http://d/backup%20e%20bkp/VSK/MEP/Green%20series%20order%20List1.xlshttp://d/backup%20e%20bkp/VSK/MEP/Green%20series%20order%20List1.xls -
8/12/2019 MEP Presentation - BSNL
31/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
MEP CREDENTIALS
-
8/12/2019 MEP Presentation - BSNL
32/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
NEX
HVAC
Electrical
Fire Detection & Protection
Indoor Air Quality
Integrated Building Management Syste
Public Health Engineering
Cold Chain & Food Processing
Water Treatment Plant & STP
Voltas MEP Offerings include
-
8/12/2019 MEP Presentation - BSNL
33/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
ADVANTAGE OF MEP INTERGRATION
LOWER RISK
GREATER RELIABILITY
INTERFACE MANAGEMENT
IMPROVED SERVICEABILITY
SINGLE WINDOW APPROACH
HARMONIZATION IN ALL PHASES
NEX
-
8/12/2019 MEP Presentation - BSNL
34/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Electrical Systems..
NEX
-
8/12/2019 MEP Presentation - BSNL
35/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Electrical Systems
EHV HV Systems EHV & HV transmission systems.
Receiving Substations and application basedSubstations, Switch yards etc.
Reactive power management.
Grounding Systems
HV Distribution Systems.
Lightning Protection Systems
Protection, Monitoring and Control SystemsNEX
-
8/12/2019 MEP Presentation - BSNL
36/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Power Generation Systems
Captive Power Generation
Standby Power Generation
Grid Connection Power Evacuation Systems
Voltage regulation and Synchronization System
Protection, Monitoring and Control Systems
Application based automation
NEX
Electr ical Systems
-
8/12/2019 MEP Presentation - BSNL
37/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Fire Fighting Systems..
NEXT
-
8/12/2019 MEP Presentation - BSNL
38/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Fire Fighting Systems
Industrial Applications
Automatic Fire Hydrant Systems
Automatic High / Medium Velocity Water Spray Systems
Automatic Foam Systems
Automatic Sprinkler Systems
Automatic Gas Based Fire Suppression Systems like FM-200 /
Inergen /Argonite and CO2 Systems
Fire Detection Cum Alarm Systems.
NE
-
8/12/2019 MEP Presentation - BSNL
39/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Commercial Applications
Wet Riser Hydrant System
Hose Reel System
Sprinkler System
Fire Detection Cum Alarm Systems.
Automatic Gas Based Fire Suppression Systems link FM-
200 / Inergen /Argonite and CO2 Systems
NE
Fire Fighting Systems
-
8/12/2019 MEP Presentation - BSNL
40/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Integrated Building Management Systems..
N
-
8/12/2019 MEP Presentation - BSNL
41/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
HVAC Primary Control
HVAC Individual Room Control
Lighting Control
Power DistributionEnergy Data Evaluation
Management Station
Fire Detection
Intrusion Detection
Access Control
CCTVVoice Evacuation System
Gas Detection NE
Concept of Integrated B ui lding Management System (IBMS)
-
8/12/2019 MEP Presentation - BSNL
42/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Plumbing & Sanitary..
-
8/12/2019 MEP Presentation - BSNL
43/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Public Health Engineering
Plumbing & sanitary system
Toilets
Kitchens and Pantries
Water conservation
Easy Maintenance
Automation
Optimum design
-
8/12/2019 MEP Presentation - BSNL
44/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Public Health EngineeringExternal PHE services
Water supply & Distribution
Sewerage Storm water Drainage system
Pumping Stations
Rain Water Harvesting
Irrigation and Fountains for aesthetics
Solar water heater
-
8/12/2019 MEP Presentation - BSNL
45/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Public Health EngineeringSpecialized services
Green Building concepts
Sewage Treatment plant
Water Treatment Plant
Swimming pool
Environmental Management plans
Environmental Impact Assessment
Water Audit
MASTER PLANNING Kitchen Equipment Design
-
8/12/2019 MEP Presentation - BSNL
46/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Water Treatment Plant
-
8/12/2019 MEP Presentation - BSNL
47/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Sewage Treatment Plant
-
8/12/2019 MEP Presentation - BSNL
48/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Wide Network Trained servicepersonnel
Comprehensive service
Life- long After SalesService
All Voltas installations are backed by
N
-
8/12/2019 MEP Presentation - BSNL
49/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Domestic MEP Projects at a glance INR10 Crores and aboveEMAAR MGF COMPLEX KOLKOTA & DELHI 21 CRORES
TATA CANCER HOSPITAL KOLKOTA 11 CRORES
FORTIS HOSPITAL DELHI 29 CRORES
LUCKNOW AIRPORT LUCKNOW 15 CRORES
PURE EARTH COMPLEX DELHI 13 CRORES
GODREJ WATERSIDE IT PARK KOLKOTA 110 CRORES
LODHA CORPORATE HOUSE MUMBAI 15 CRORES
NEPTUNE MALL MUMBAI 29 CRORES
GALLERIA MALL MUMBAI 12 CRORES
HYDERABAD INTERNATIONAL AIRPORT HYDERABAD 180 CRORES
VIZAG STEEL PLANT VIZAG 11 CRORES
MOTOROLA FACILITY CHENNAI 21 CRORES
INGERSOLL RAND BANGALORE 10 CRORES
KOLKATA AIRPORT KOLKATA 160 CRORES
CHENNAI AIRPORT CHENNAI 150 CRORES
MAHINDRA & MAHINDRA ENGINE DESIGN CENTRE CHENNAI 32 CRORES
-
8/12/2019 MEP Presentation - BSNL
50/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
PARTIAL INSTALLATION LIST
OF
VOLTAS ELECTRICAL PROJECTS
Electrical Projects presentation.xls
http://d/backup%20e%20bkp/VSK/MEP/Electrical%20Projects%20presentation.xlshttp://d/backup%20e%20bkp/VSK/MEP/Electrical%20Projects%20presentation.xls -
8/12/2019 MEP Presentation - BSNL
51/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Hyderabad International Airport
-
8/12/2019 MEP Presentation - BSNL
52/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken
HVAC (Low & High Side)
Electrical System (HT & LT Side)
Plumbing System Fire Detection & Alarm System
Fire Fighting System
Automation system
Visual Docking System
Hyderabad I nternational Air port
Status..ON SCHEDULE COMPLETED
-
8/12/2019 MEP Presentation - BSNL
53/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
GODREJ WATERSIDE IT PARK
-
8/12/2019 MEP Presentation - BSNL
54/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken
HVAC (Low & High Side)
Electrical System (HT & LT Side)
Plumbing System
Fire Detection & Alarm System Fire Fighting System
IBMS
DG Sets 10 x 2000KW
Water Treatment & STP
Godrej WatersideIT Park
-
8/12/2019 MEP Presentation - BSNL
55/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken:
HVAC Systems
Electr ical Systems
Fire Fight ing Systems Plumbing Systems
Promoters Purearth Infrastructures Ltd.
New Delhi
Location Bara Hindurao, New Delhi,
Total Area Approx. 4.5 lakhs Sq.Ft. for Mall & Offices
Central Square III, Purearth
-
8/12/2019 MEP Presentation - BSNL
56/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken:
HVAC Syst ems
Electr ical Systems
Galleria Palm Beach Mall
Location: Vashi (Mumbai)
-
8/12/2019 MEP Presentation - BSNL
57/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Locat ion Bh andup, Mumbai
Owners Neptune Enterpr ises
Services Undertaken:
HVAC System s
Electr ical Systems
Fire Fight ing Sys tems
Plumbing Systems
Status Under Execut ion
Neptune Mall
-
8/12/2019 MEP Presentation - BSNL
58/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken:
HVAC Systems900 TR
Electr ical Systems4000 KVA
F ire F ighting & Detection System
Plumbing System
Location Shalimar Baugh, New Delhi Owners Oscar Biotech Private Ltd.Services Consultants Dew Point / TS Sethi & Engg./ Services
Project Management Consultants JLL
Fortis Hospital
First Registered Green Building Hospital
-
8/12/2019 MEP Presentation - BSNL
59/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Services Undertaken:
HVAC Systems
Electrical Systems
Fire Fighting & Detection Syste
Plumbing System
EMAAR MGF Headquarters
Location Gurgaon
Status Under Execution
-
8/12/2019 MEP Presentation - BSNL
60/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
Special Services Undertaken:
(apart from Standard MEP)
Compressed Air Systems
Fuel Supply Systems
CNG
Diesel
Petrol
Fire & Safety System
High Pressure MIST Systems
Gas Detection Systems
MAHINDRA & MAHINDRA EDC
Location Chennai
Status Under Executio
-
8/12/2019 MEP Presentation - BSNL
61/64
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
BSNL AB PROJECT
-
8/12/2019 MEP Presentation - BSNL
62/64
HVAC
AIR CONDITIONINGChillers -300 TR x 4 Nos.
Primary Chilled Water Pumps 720 USGPM/15 Mtr. Head
Secondary Chilled Water Pumps 1080 USGPM/30 Mtr. Head
Air Handling Units 35 Nos.(Range of 48 TR/19200 CFM to 5 TR / 2000 CFM)
DX Units 2 Nos.(16.5 TR for Server and UPS room)Heat Recovery Units 4 Nos.
Fan Coil Units 48 Nos.(Range of 3 TR to 1 TR)
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
-
8/12/2019 MEP Presentation - BSNL
63/64
VENTILATION
Axial Flow Fans 18 Nos.(For Basement Ventilation)
Jet Fans 32 Nos.(Basement car park Ventilation)
Kitchen Exhaust Fans 1 No.
Staircase Pressurization Fans 6 Nos.
Toilet Exhaust Fans
4 Nos.Lift well Pressurization Fans 8 Nos.
Roof Top Extract Fans 4 Nos.
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE
-
8/12/2019 MEP Presentation - BSNL
64/64
THANK YOU
VOLTAS LTD.
EM&RBGINTEGRATED SYSTEMS INCOMPARAB LE