javier garcía gutiérrez

27
Newbuilding Project Newbuilding Project Manager Manager Name: Name: Javier García Gutiérrez Javier García Gutiérrez Telephone: Telephone: +34687837820 +34687837820 E-mail: E-mail: [email protected] [email protected] Skype: Skype: javiergarcia73 javiergarcia73

Upload: javier-garcia-gutierrez

Post on 21-Mar-2017

66 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Javier García Gutiérrez

Newbuilding Project Newbuilding Project ManagerManager

Name:Name: Javier García GutiérrezJavier García GutiérrezTelephone:Telephone: +34687837820+34687837820E-mail:E-mail: [email protected]@gmail.comSkype:Skype: javiergarcia73javiergarcia73

Page 2: Javier García Gutiérrez

What do I offer?What do I offer? Education:Education:

– Technical Naval ArchitectTechnical Naval Architect– Bachelor degree in naval EnginesBachelor degree in naval Engines– Chief engineer licence No power limitationChief engineer licence No power limitation

Experience (Newbuilding):Experience (Newbuilding):

– Coordination of the construction and preparation of project plans related to the general plan (design drawings), Coordination of the construction and preparation of project plans related to the general plan (design drawings), specifications, delivery time, work and action list, etc., including holding construction meetings with the client, preparation of specifications, delivery time, work and action list, etc., including holding construction meetings with the client, preparation of construction planning in consultation with the relevant subcontractors and responsible for the delivery of required construction planning in consultation with the relevant subcontractors and responsible for the delivery of required information, drawings, specifications, etc.information, drawings, specifications, etc.

– Drawing up the planning for the commissioning of systems and the sea trails. Organising the commissioning process and Drawing up the planning for the commissioning of systems and the sea trails. Organising the commissioning process and making sure all of the required specialists are present. Responsible for directing the sea trials, drawing up the action list for making sure all of the required specialists are present. Responsible for directing the sea trials, drawing up the action list for any defects and the follow-up of such, calculating the cost of contract extras and deductions and subsequent calculations, any defects and the follow-up of such, calculating the cost of contract extras and deductions and subsequent calculations, drawing up sea trial reports, and arranging the handover documents, certificates, etc.drawing up sea trial reports, and arranging the handover documents, certificates, etc.

– Coordinate and oversee the construction process. Monitoring of scheduling, progress, quality and budget;Coordinate and oversee the construction process. Monitoring of scheduling, progress, quality and budget;

– Coordinate the commissioning, sea trials and delivery of the ship to the customer, in collaboration with the classification Coordinate the commissioning, sea trials and delivery of the ship to the customer, in collaboration with the classification agency and our manufacturers and suppliers;agency and our manufacturers and suppliers;

– Improve processes and products on design and detail level related to the various sub-processes, e.g. the engineering, Improve processes and products on design and detail level related to the various sub-processes, e.g. the engineering, procurement and construction process, prevent costs related to failures and improve quality;procurement and construction process, prevent costs related to failures and improve quality;

– Manage the project team, take measures to ensure and monitor correct implementation of instructionsManage the project team, take measures to ensure and monitor correct implementation of instructions

– Deliver the vessel to the owner on time and between the desired marging and control all guarantee claims during guarantee Deliver the vessel to the owner on time and between the desired marging and control all guarantee claims during guarantee periodperiod

Page 3: Javier García Gutiérrez

1. PROFESIONAL EXPERIENCE ORIENTED 1. PROFESIONAL EXPERIENCE ORIENTED TO NAVAL INDUSTRY :TO NAVAL INDUSTRY :

Page 4: Javier García Gutiérrez

1.1 Hull paint application1.1 Hull paint applicationFinal appearanceFinal appearance Vessel external protection (Winter) Vessel external protection (Winter)

-Example of Cap finistere (Ferry vessel) carried out last february during her docking the treatment was:Example of Cap finistere (Ferry vessel) carried out last february during her docking the treatment was:

LP washing from boottoping areas LP washing from boottoping areas Hydroblasting of Hull until 800 bar Hydroblasting of Hull until 800 bar Vessel wet areas complete covering, dehumidifiers and heaters installed to reach properly silicon paint conditions Vessel wet areas complete covering, dehumidifiers and heaters installed to reach properly silicon paint conditions Touch – up painting 20% Touch – up painting 20% Full painting with JOTUN Safeguard UNIV Buff @ 100 microns dft Full painting with JOTUN Safeguard UNIV Buff @ 100 microns dft 1 FC sealion Tie coat @ 90 microns 1 FC sealion Tie coat @ 90 microns 1 FC sealion Repulse @150 microns 1 FC sealion Repulse @150 microns

Page 5: Javier García Gutiérrez

1.2 Tankcoating1.2 Tankcoating Ballast tanks cleaning (Salt analisys)Ballast tanks cleaning (Salt analisys)

Access holes opening procedure before Access holes opening procedure before tankcoatingtankcoating

Installation and cost control of services Installation and cost control of services (Lighting, ventilation fans, heaters, grit (Lighting, ventilation fans, heaters, grit collection…)collection…)

Treatment depending on defect foundTreatment depending on defect found

Coating procedure and timingCoating procedure and timing

Checking of layers Checking of layers

Final inspectionFinal inspection

Page 6: Javier García Gutiérrez

1.3 Mechanical Jobs1.3 Mechanical Jobs High knowledge in several engine room accesories maintenance / overhaul:High knowledge in several engine room accesories maintenance / overhaul:

– High pressure BoilersHigh pressure Boilers

– Main steam turbinesMain steam turbines

– Turbogenerators and turbo feed pumpsTurbogenerators and turbo feed pumps

– Air compressorsAir compressors

– Air condition and cooling systemsAir condition and cooling systems

– Main and auxiliary steam valvesMain and auxiliary steam valves

– Overboard valvesOverboard valves

– Pumps (Screw, centrifugal, cargo pumps…)Pumps (Screw, centrifugal, cargo pumps…)

– Auxiiary diesel generators (MAN, SULZER, Wartsila, Hedemora, Yammar…)Auxiiary diesel generators (MAN, SULZER, Wartsila, Hedemora, Yammar…)

Page 7: Javier García Gutiérrez

1.3.1 Boiler Jobs1.3.1 Boiler Jobs Main Boilers general Main Boilers general

surveysurvey

– Burner arrangementBurner arrangement– Main and auxiliary valves Main and auxiliary valves

overhauloverhaul– Economizer tubes Economizer tubes

replacementreplacement– Burner tiles and furnace Burner tiles and furnace

concrete repairconcrete repair– Cleaning of boilersCleaning of boilers– Checking of automatic Checking of automatic

systemssystems– Superheater tubes UT Superheater tubes UT

gauging and replacementgauging and replacement– Bellows repair jobsBellows repair jobs– Insulation replacementInsulation replacement

Page 8: Javier García Gutiérrez

1.3.2 Turbine Jobs (Main & T/G)1.3.2 Turbine Jobs (Main & T/G) Main bearings check (Clearances, Main bearings check (Clearances,

Thickness measurement, Dye Thickness measurement, Dye check…)check…)

Lifting of HP and LP rotors Lifting of HP and LP rotors (Microblasting / balancing)(Microblasting / balancing)

Checking of maoeuvring valvesChecking of maoeuvring valves

Cheking of flexible couplingsCheking of flexible couplings

Main LO driven pumpMain LO driven pump

Turning gearTurning gear

General inspection of turbineGeneral inspection of turbine

Gland systemGland system

Page 9: Javier García Gutiérrez

1.3.3 Rudder and Tailshaft1.3.3 Rudder and Tailshaft Rudder:Rudder:

– Rudder clearancesRudder clearances– Rudder stock removalRudder stock removal– Steering gear removal and Steering gear removal and

chock fast chock fast – Rudder blade removalRudder blade removal– Pintle & rudder stock bearings Pintle & rudder stock bearings

changechange

TailshaftTailshaft

– Tailsaft weardownTailsaft weardown– Propeller removalPropeller removal– Propeller repairsPropeller repairs– Tailshaft removalTailshaft removal– Chrome liners skimmingChrome liners skimming– Starn tube bearings removalStarn tube bearings removal– Bounding / change of starn Bounding / change of starn

tube sealstube seals– Intermediate shaft bearing Intermediate shaft bearing

change and adjustement change and adjustement – Shaft line alignmentShaft line alignment

Page 10: Javier García Gutiérrez

1.4 Steel and piping jobs1.4 Steel and piping jobs Steel jobs:Steel jobs:

– Steel replacementSteel replacement– Welding proceduresWelding procedures– Minimun class Minimun class

requirementsrequirements– Steel weight Steel weight

calculationcalculation– Test to be done (UT, Test to be done (UT,

Vacuum, X-Ray…)Vacuum, X-Ray…)

Piping:Piping:

– Piping replacementPiping replacement– Welding proceduresWelding procedures– Treatment Treatment

(Galvanizing, acid (Galvanizing, acid cleaning…)cleaning…)

– Testing proceduresTesting procedures

Page 11: Javier García Gutiérrez

1.5 Other Jobs1.5 Other Jobs Deck and cargo Deck and cargo

equipment:equipment:

– Windlass / winches Windlass / winches repairsrepairs

– Cargo pumpsCargo pumps– Hydraulic valvesHydraulic valves– Cargo compressorsCargo compressors– Bow thrustersBow thrusters– Electric motorsElectric motors– Alternators (Cleaning/ Alternators (Cleaning/

winding, overhaul)winding, overhaul)

Accomodation jobsAccomodation jobs

– Refurbisment of Refurbisment of accomodationaccomodation

– New cabin distributionNew cabin distribution– Air conditioningAir conditioning– Electrical installationElectrical installation– Other:Other:

Ship Bridge equipment Ship Bridge equipment UpdateUpdate

Page 12: Javier García Gutiérrez

1.6 Electrical, automation and 1.6 Electrical, automation and engineeringengineering

Electrical & Automation:Electrical & Automation:

– Inspection of new vessel Inspection of new vessel electrical installationelectrical installation

– Testing of electrical equipmentTesting of electrical equipment– Checking of signals and Checking of signals and

processesprocesses– Upgrading of old integrated Upgrading of old integrated

automation system (IAS)automation system (IAS)– Electric motors / alternators Electric motors / alternators

repairsrepairs

Engineering:Engineering:

– Contact with engineering Contact with engineering companies (problem solving)companies (problem solving)

– Engine systems design (FORAN, Engine systems design (FORAN, Navisworks, ACAD…)Navisworks, ACAD…)

– Upgrading of vessel systems in Upgrading of vessel systems in order to adapt them to new order to adapt them to new requirementsrequirements

– Coordinate shipyard, owner and Coordinate shipyard, owner and engineering companiesengineering companies

– Cassification societies / Flag state Cassification societies / Flag state relationshiprelationship

– Planning of diferent companiesPlanning of diferent companies

Page 13: Javier García Gutiérrez

2. DEMONSTRATED EXPERIENCE2. DEMONSTRATED EXPERIENCE

Ship MaintenanceShip Maintenance

Vessel repairs (Owner and shipyard side)Vessel repairs (Owner and shipyard side)

RebuildingRebuilding

New building (Project managing and New building (Project managing and supervising)supervising)

Page 14: Javier García Gutiérrez

2.1 Vessel maintenance2.1 Vessel maintenance Wide experience in vessel maintenance.Wide experience in vessel maintenance.

Laietá Methane Arctic Hilli & Kannur

Al Hamra, Umm Al Ashtan, Mraweh Castillo de Villalba Cádiz Knutsen

Page 15: Javier García Gutiérrez

2.2 Vessel Docking as Engineer2.2 Vessel Docking as Engineer Preparing and attending Dry docking jobs as EngineerPreparing and attending Dry docking jobs as Engineer

Vessel: CTE Magallanes

Yard: Cádiz

Vessel: Laietá

Yard: Barcelona

Vessel: Umm Al Ashtan

Yard: Dubai World DD

Vessel: Mraweh

Yard: Dubai World DD

Vessel: Al Hamra

Yard: Dubai World DD

Page 16: Javier García Gutiérrez

2.3 Vessel Repairs As Ship 2.3 Vessel Repairs As Ship ManagerManager

Some examples of the repairs as Ship Repair Manager:Some examples of the repairs as Ship Repair Manager:

Vessel: Dominica

Owner: Ership

Vessel: Ridley Thomas

Owner: EGS

Vessel: Acergy Discovery

Owner: Subsea 7

Vessel: Cap Finistere

Owner: Brittany Ferries

Vessel: Stolt Tern

Owner: Stolt Tankers

Vessel: Geowave Commander

Owner: Wavefield Inseas

Page 17: Javier García Gutiérrez

2.4 Rebuilding2.4 Rebuilding Prepare yard quotation according to Prepare yard quotation according to

vessel rebuilt specificationvessel rebuilt specification

Contact to auxiliary companies to ask Contact to auxiliary companies to ask for pricesfor prices

Manufacture planning and end date Manufacture planning and end date goalsgoals

Follow jobs in place and correct non Follow jobs in place and correct non controlled items automaticallycontrolled items automatically

Vessel jobs cost controlVessel jobs cost control

Flag and Clasification societies dealingFlag and Clasification societies dealing

Delivering vesselDelivering vessel

Experience: ASTANDER: 2006-2007 GEOMASTER Conversion

ASTANDER: 2012 TEAM OMAN Conversion

Vessel: GEOMASTER

Yard: ASTANDER

Year: 2007

Job: CABLE LAYER TO SEISMIC VESSEL

http://www.astander.es/pdfs/conv-geowave.pdf

Vessel: TEAM OMAN

Yard: ASTANDER

Year: 2012

Job: New accomodation block, new bow thruster block

Page 18: Javier García Gutiérrez

2.5 Newbuilding 2.5 Newbuilding Vessel specification preparationVessel specification preparation Dealing with Owner pending Dealing with Owner pending

itemsitems Dealing with Classification Dealing with Classification

society pending items (AQS, society pending items (AQS, AQP)AQP)

Planning followPlanning follow Checking of shiyard jobs (Steel, Checking of shiyard jobs (Steel,

paint, electric, automation, paint, electric, automation, mechanic, piping…)mechanic, piping…)

Additional jobs controlAdditional jobs control Cost controlCost control Managing inspection teamManaging inspection team Assiting to test and trialsAssiting to test and trials Guarantee claimsGuarantee claims

Vessel: Cristina Masaveu

Yard: ASTANDER

Year: 2011

Type: Cement Carrier

http://www.astander.es/pdfs/conv_masaveu.pdf

Vessels: Castillo de Villalba / Cadiz Knutsen

Yard: Puerto Real

Year: 2004-2005

Type: LNG Carriers

Experience: ASTANDER: 2010-2012 Newbuilding Project manager

IZAR PUERTO REAL: 2004- 2005 LNG Newbuilding Superintendent

Page 19: Javier García Gutiérrez

2.5 Newbuilding (Current)2.5 Newbuilding (Current) Vessel planning preparationVessel planning preparation Dealing with Owner pending Dealing with Owner pending

itemsitems Dealing with Classification Dealing with Classification

society pending items (AQS, society pending items (AQS, AQP)AQP)

Planning followPlanning follow Checking of shiyard jobs (Steel, Checking of shiyard jobs (Steel,

paint, electric, automation, paint, electric, automation, mechanic, piping…)mechanic, piping…)

Additional jobs controlAdditional jobs control Cost controlCost control Managing building teamManaging building team Assiting to test and trialsAssiting to test and trials Guarantee claimsGuarantee claims

Vessel: Ronja Polaris

Yard: ZAMAKONA YARDS

Year: 2013

Type: Live fish carrier

http://www.zamakonayards.com/esp/blog/zamakona-yards-entrega-el-ronja-polaris-a-solvstrans/

Vessel: Izaro

Yard: ZAMAKONA YARDS

Year: 2013 -2014

Type: Tuna Purse Seiner

Experience: ZAMAKONA YARDS 2013- ACTUAL Newbuilding Manager

http://www.zamakonayards.com/esp/blog/botadura-del-atunero-congelador-izaro/

Page 20: Javier García Gutiérrez

2.6 Projects done2.6 Projects done Re-Engineering process to adapt a repairing and rebuilding shipyard Re-Engineering process to adapt a repairing and rebuilding shipyard

to a newbuikding shipyard (Based on Cristina Masaveu Newbuilding to a newbuikding shipyard (Based on Cristina Masaveu Newbuilding experience)experience)

Processes to be done to adapt a traditionally dedicated repair/rebuild shipyard to be able to make new buildings of all types of vessels.

Protocolary guide to inspect all Jobs during a steam turbine LNG Protocolary guide to inspect all Jobs during a steam turbine LNG vessel newbuildingvessel newbuilding

Field guide for checking all equipment installed in a steam turbine propulsed LNG Wessel (New building superintendente manual)

Mubaraz class Dry Docking procedure proposalMubaraz class Dry Docking procedure proposal

Guide to Establish all control standards to plan a big LNG steam turbine wessel drydoking (From office to the vessel)

Page 21: Javier García Gutiérrez

2.7 Reference letters2.7 Reference letters

Page 22: Javier García Gutiérrez
Page 23: Javier García Gutiérrez
Page 24: Javier García Gutiérrez
Page 25: Javier García Gutiérrez
Page 26: Javier García Gutiérrez
Page 27: Javier García Gutiérrez