86
CUADRO RESUMEN DE MANO DE OBRA POR MESES OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. CODIGO : 9002-2165284-400084-15-036-0074-0111 SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION TEC. ADM. ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO CODIGO PRESUPUESTAL 2.6.2.3.2.4 RESUMEN DE MANO DE OBRA PARTIDA MESES ENERO FEBRERO MARZO ABRIL OBREROS S/. 17,218.19 S/. 3,017.35 S/. 11,408.71 S/. 11,958.20 EMPLEADOS S/. 5,730.88 S/. 4,348.72 S/. 8,859.75 S/. 8,568.98 GRATIFICACIONES S/. - ESCOLARIDAD OBREROS S/. 3,199.98 S/. - ESCOLARIDAD EMPLEADOS S/. 933.33 S/. - COSTO SUB TOTAL POR MESES S/. 27,082.38 S/. 7,366.07 ### ###

Upload: lalolex01

Post on 22-Oct-2015

69 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Inventario Fisico

CUADRO RESUMEN DE MANO DE OBRA POR MESES

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-2165284-400084-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 01 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADM.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

CODIGO PRESUPUESTAL 2.6.2.3.2.4

RESUMEN DE MANO DE OBRA

PARTIDAMESES

TOTALESENERO FEBRERO MARZO ABRIL

OBREROS S/. 17,218.19 S/. 3,017.35 S/. 11,408.71 S/. 11,958.20 S/. 43,602.45 EMPLEADOS S/. 5,730.88 S/. 4,348.72 S/. 8,859.75 S/. 8,568.98 S/. 27,508.33 GRATIFICACIONES S/. - S/. - ESCOLARIDAD OBREROS S/. 3,199.98 S/. - S/. 3,199.98

ESCOLARIDAD EMPLEADOS S/. 933.33 S/. - S/. 933.33

COSTO SUB TOTAL POR MESES S/. 27,082.38 S/. 7,366.07 S/. 20,268.46 S/. 20,527.18 S/. 75,244.09

Page 2: Inventario Fisico
Page 3: Inventario Fisico

RESUMEN DE CAJA CHICA

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-2165284-400084-15-036-0074-0111

SUPERVISOR : VICTOR HUGO PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOSALMACENERA :ROCIO DEL PILAR CASTILLO PINTOFECHA DE INICIO : 02 DE ENERO DEL 2013FECHA DE CULM. : 17 DE ABRIL DEL 2013

ITEM FECHA DOCUM. Nº PROVEEDOR DESCRIPCIÓNDETALLE SUB

TOTALUND.CANT. P.UNIT

TOTALMED S/

PARTIDA: 2.6.2.3.2.5. (BIENES) 1.00 4/18/2013 B/V000690 INVERSIONES "JUVISA" NET TECNOPOR DE 1" PLANCHA 6.00 15.00 90.00 90.00 2.00 4/18/2013 B/V000690 INVERSIONES "JUVISA" NET DISCO DE CORTE PARA CPNCRETO UND. 1.00 55.00 55.00 55.00

COSTO SUB TOTAL 145.00

RESUMEN DE CAJA CHICA

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-2165284-400084-15-036-0074-0111

SUPERVISOR : VICTOR HUGO PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOSTECN. ADM. : VICTOR HUGO PONCE CARHUAMACA

ALMACENERA :ROCIO DEL PILAR CASTILLO PINTOFECHA DE INICIO : 02 DE ENERO DEL 2013FECHA DE CULM. : 17 DE ABRIL DEL 2013

ITEM FECHA DOCUM. Nº PROVEEDOR DESCRIPCIÓNDETALLE SUB

TOTALUND.CANT. P.UNIT

TOTALMED S/

PARTIDA: 2.6.2.3.2.6. (SERVICIOS)1 3/26/2013 B/V006180 VULCANIZADORA EL GRINGO REPARACION DE LLANTA SERV. 4.00 12.50 50.00 50.002 3/26/2013 F/V002034 SENAMHI REPORTE METEREOLOGICO SERV. 1.00 180.00 180.00 180.003 4/1/2013 B/V000368 LAZO GONZALES ANDRETTY JOEL REP. DE APISONADOR T/CANGURO SERV. 1.00 300.00 300.00 300.004 4/18/2013 B/V002859 FERRETERIA "MILY" REPARACION DE TALADRO SERV. 1.00 20.00 20.00 20.005 4/18/2013 B/V002859 FERRETERIA "MILY" REPARACION DE TALADRO SERV. 1.00 20.00 35.00 35.006 4/18/2013 B/V002860 FERRETERIA "MILY" RE. Y MANT. DE VIBRADOR DE CONCRETO SERV. 1.00 150.00 150.00 150.00

Page 4: Inventario Fisico

COSTO SUB TOTAL 735.00

Page 5: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACIONDE OBRA

OBRA : MEJORAMIENTO DEL PSJE SAN IGNACIO, SUB SECTOR CA1 -21 PROV. DE HYO - JUNIN

CODIGO : 9002-2165284-400084-15-036-0074-0111SUPERVISOR :VICTOR PONCE CARHUAMACA FECHA DE INICIO : 01 DE ENERO DEL 2013

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

ALMACENERO :SRA. ROCIO DEL PILAR CASTILLO PINTO

RESUMEN DE PECOSASITEM FECHA NRO. PCS DESCRIPCION CANT.

UND PRECIO PRECIO MED. UNIT. PARCIAL

2.00 IMPLEMENTOS DE SEGURIDAD1 4/19/2013 634 BOTA DE JEBE CAÑA ALTA PARA CABALLERO 8.00 PAR 19.00 152.002 4/19/2013 634 GUANTE DE CUERO REFORZADO PARA SEGURIDAD 10.00 PAR 8.00 80.003 4/19/2013 634 GUANTES DE JEBE CALIBRE 35 VIRUTEX 6.00 PAR 9.00 54.004 4/19/2013 634 LENTE PROTECTOR DE PLASTICO TRANSPARENTE 6.00 UND 5.00 30.00

SUB TOTAL 316.00

4.00 LUBRICANTES Y COMBUSTIBLE1 1/2/2013 266 GRASA MULTIPROPOSITO CAM-2 4.25 KG 15.00 63.752 1/2/2013 266 ACEITE DE MOTOR SAE 20 W50 SHELL 2.00 GLN 60.00 120.003 4/2/2013 503 PETROLEO BIODIESEL B5 180.00 GLN 14.29 2572.204 1/2/2013 266 GASOHOL DE 84 PLUS 134.50 GLN 12.45 1674.265 1/2/2013 266 GASOHOL DE 90 PLUS 15.00 GLN 14.03 210.42

PETROLEO BIODIESEL B5 150.00 GLN 13.50 2025.00

SUB TOTAL 6665.63

5.00 MATERIAL DE LIMPIEZA1 4/11/2013 575 TACHO DE METAL PARA 2 TIPOS DE DESECHOS 1.00 UND 375.00 375.00

SUB TOTAL 375.00

7 UTILES DE ESCRITORIO1 4/19/2013 637 ARCHIVADOR ARTESCO CARTON OFICIO L/ANCHO 8.00 UND 3.19 25.522 1/2/2013 245 CUADERNO JUSTUS DELUXE TAMAÑO A4 3.00 UND 2.60 7.803 4/19/2013 637 PAPEL BOND 80 GRS TAMAÑO A4 8.00 UND 12.89 103.124 4/19/2013 637 PAPEL CARBON TAMAÑO A4 COLOR NEGRO 1.00 UND 11.90 11.905 4/19/2013 637 TONER PARA IMPRESORA HP LASER JET 1200 1.00 UND 195.00 195.00

SUB TOTAL 343.34

8.1 AGREGADOS1 4/19/2013 636 ARENA GRUESA 70.00 M3 68.00 4760.002 4/19/2013 636 PIEDRA CHANCADA DE 1/2" 95.00 M3 65.50 6222.503 3/23/2013 475 MATERIAL DE BASE GRANULAR 75.00 M3 36.00 2700.004 MATERIAL DE BASE GRANULAR 100.00 M3 35.00 3500.00

SUB TOTAL 17182.50

8.2 CEMENTO1 CEMENTO PORTLAND TIPO I 800.00 BLS 18.20 14560.002 CEMENTO PORTLAND TIPO I 300.00 BLS 19.60 5880.00

SUB TOTAL 20440.00

Page 6: Inventario Fisico

8.3 ACEROS1 1/2/2013 282 ALAMBRE NEGRO NRO.16 69.00 KG 4.40 303.602 1/2/2013 282 ALAMBRE NRO. 8 5.00 KG 3.80 19.003 1/2/2013 282 CLAVOS C/CABEZA DE 2/12" 73.50 KG 4.30 316.054 1/2/2013 282 CLAVOS C/CABEZA DE 3" 4.50 KG 4.30 19.355 4/1/2013 500 TAPA Y MARCO DE F°F° PARA BUZON DE 125KG 2.00 UND 360.00 720.006 4/1/2013 500 VARILLA DE FIERRO CORRUGADO DE 1/2" X 9MTS 9.00 UND 25.00 225.00

1/2/2013 282 VARILLA DE FIERRO CORRUGADO DE 1/2" X 9MTS 6.00 UND 32.00 192.007 4/1/2013 500 VARILLA DE FIERRO LISO DE 3/8" X 6MTS 4.00 UND 15.00 60.008 4/1/2013 500 VARILLA DE FIERRO LISO DE 5/8" X 6MTS 25.00 UND 39.00 975.00

SUB TOTAL 2830.00

ITEM FECHA NRO. PCS DESCRIPCION CANT.UND PRECIO PRECIO MED. UNIT. PARCIAL

8.5 MATERIAL SANITARIO1 3/15/2013 693 LUBRICANTE PARA TUBERIA 1.00 GLN 30.88 30.882 3/15/2013 693 TUBO UPVC UF S-25 D=8" 2.00 UND 175.00 350.003 1/2/2013 00004 TUBO PVC DE 1/2" 3.00 UND 9.50 28.504 1/2/2013 00004 TUBO PVC DE 1" 5.00 UND 14.50 72.505 1/2/2013 00004 TUBO PVC DE 1" 4.00 UND 10.13 40.526 3/15/2013 693 TUBO UPVC UF S-25 D=10" 2.00 UND 239.00 478.00

SUB TOTAL 1000.40

8.7 MATERIAL DE ACABADOS1 4/19/2013 635 PINTURA TRAFICO JET COLOR BLANCO 4.00 GLN 53.00 212.002 4/19/2013 635 PINTURA TRAFICO JET COLOR AMARILLO 3.00 GLN 58.00 174.003 1/2/2013 244 MICROESFERA 11.00 KGS 4.85 53.354 1/2/2013 244 MICROESFERA 36.00 KGS 4.65 167.405 1/2/2013 244 MICROESFERA 0.50 KGS 4.65 2.336 1/2/2013 244 MICROESFERA 2.50 BLS 4.85 12.137 1/2/2013 244 YESO X 28 KLS 2.00 BLS 13.00 26.008 1/2/2013 244 YESO X 25 KLS 5.00 BLS 9.00 45.009 1/2/2013 244 YESO X 25 KLS 2.00 BLS 11.80 23.60

10 1/2/2013 244 PLANTILLA Y PLOTEO NACIONAL 1.00 UND 50.00 50.00

SUB TOTAL 765.80

8.8 MADERAS1 4/11/2013 576 MADERA DE 2in X 2in X 10ft EUCALIPTO 50.00 UND 7.00 350.002 4/11/2013 576 MADERA DE 2in X 2in X 10ft ROBLE 80.00 UND 8.00 640.003 4/11/2013 576 MADERA DE 1in X 8in X 10ft ROBLE 50.00 UND 17.00 850.004 4/11/2013 576 MADERA DE 1in X 10in X 10ft ROBLE 20.00 UND 19.00 380.00

SUB TOTAL 2220.00

8.9 MATERIA PRIMA1 4/22/2013 640 ASFALTO LIQUIDO CUT-BACK GRADO RC-250 29.00 GLN 11.90 345.10

SUB TOTAL 345.10

8.10 OTROS1 4/1/2013 509 CORDEL DE NYLON Nº 16 X 300 M 2.00 UND 15.00 30.002 4/1/2013 509 PLASTICO REFORZADO DE TRIPLE ANCHO 200.00 METRO 3.40 680.003 1/2/2013 185 CINTA DE SEGURIDAD 1.00 KG 48.00 48.00

SUB TOTAL 758.00

9.00 MATERIAL IMPRESO1 2/26/2013 299 PEDIDO COMPROBANTE DE SALIDA 0.10 MILLAR 280.00 28.00

SUB TOTAL 28.00

Page 7: Inventario Fisico

10.00 MATERIAL DE PUBLICIDAD1 4/22/2013 647 PLACA RECORDATORIA DE MARMOL 1.00 UND 550.00 550.002 4/13/2013 586 GIGANTOGRAFIA EN BANNER 1.00 UND 265.00 265.003 4/13/2013 585 LETRERO DE SEÑAL PREVENTIVA 1.00 TLN 209.00 209.00

SUB TOTAL 1024.00

12 HERRAMIENTAS1 4/1/2013 494 CARRETILLA PARA CONSTRUCCION TIPO BUGUI 5.00 UND 175.00 875.002 4/1/2013 494 CEPILLO PARA CARPINTERIA METALICO Nº 6 KAMAS 1.00 UND 60.00 60.003 4/1/2013 494 LLANTA PARA CARRETILLA TIPO BUGUI 10.00 UND 60.00 600.00

SUB TOTAL 1535.00

TOTAL 55828.77

Page 8: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNIN

CODIGO : 9002-2165284-400084-15-036-0074-0111

SUPERVISOR : VICTOR PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE INICIO : 02 DE ENERO DEL 2013

TEC. ADM. FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

RESUMEN GENERAL DE GASTOS DE LA MPHITEM DESCRIPCION COSTO RECIBIDO COSTO UTILIZADO SALDO

2.6.2.3.2.4 PERSONAL1.00 RETRIBUCIONES CONTRAT.PLANILLAS EMPLEADOS S/. 27,508.33 S/. 27,508.33 S/. - 2.00 RETRIBUCIONES CONTRAT.PLANILLAS OBREROS S/. 43,602.45 S/. 43,602.5 S/. - 3.00 GRATIFICACIONES Y AGUINALDOS S/. 4,133.31 S/. 4,133.3 S/. -

COSTO TOTAL S/. 75,244.09 S/. 75,244.09 S/. - 2.6.2.3.2.5 BIENES

1.00 1.00 VESTUARIO S/. - S/. - S/. - 2.00 2.00 IMPLEMENTOS DE SEGURIDAD S/. 316.00 S/. - S/. 316.00 3.00 4.00 COMBUSTIBLE Y LUBRICANTES S/. 6,665.63 S/. 5,734.27 S/. 931.36 4.00 5.00 MATERIAL DE LIMPIEZA S/. 375.00 S/. 375.00 S/. - 5.00 7.00 UTILES DE ESCRITORIO S/. 343.34 S/. 343.34 S/. - 6.00 8.1 AGREGADOS S/. 17,182.50 S/. 17,182.50 S/. - 7.00 8.2 CEMENTO PORTLAND TIPO I S/. 20,440.00 S/. 20,440.00 S/. - 8.00 8.3 ACEROS S/. 2,830.00 S/. 2,296.80 S/. 533.20 9.00 8.4 MATERIALES ELECTRICOS S/. - S/. - S/. -

10.00 8.5 MATERIALES SANITARIOS S/. 1,000.40 S/. 1,000.40 S/. - 11.00 8.7 MATERIALES ACABADOS S/. 765.80 S/. 463.00 S/. 302.80 12.00 8.8 MADERAS S/. 2,220.00 S/. 1,710.00 S/. 510.00 13.00 8.9 MATERIAS PRIMAS S/. 345.10 S/. 285.60 S/. 59.50 14.00 8.10 OTROS S/. 758.00 S/. 695.00 S/. 63.00 15.00 9.00 MATERIAL IMPRESO S/. 28.00 S/. 28.00 S/. - 16.00 10.00 PUBLICIDAD S/. 1,024.00 S/. 1,024.00 S/. - 17.00 11.00 REPUESTOS Y ACCESORIOS S/. - S/. - S/. - 18.00 12.00 HERRAMIENTAS S/. 1,535.00 S/. 1,475.00 S/. 60.00 19.00 13.00 EQUIPOS DURADEROS S/. - S/. - S/. -

COSTO SUB TOTAL BIENES SEGÚN O/C Y SALDOS S/. 55,828.77 S/. 53,052.91 S/. 2,775.86 1.00 CAJA CHICA BIENES S/. 145.00 S/. 145.00 S/. -

COSTO TOTAL BIENES S/. 55,973.77 S/. 53,197.91 S/. 2,775.86

2.6.2.3.2.6 SERVICIOS1.00 SERVICIOS S/. - S/. - S/. - 2.00 CAJA CHICA-SERVICIOS S/. 735.00 S/. 735.00 S/. -

COSTO TOTAL SERVICIOS S/. 735.00 S/. 735.00 S/. -

TOTAL S/. 131,952.86 S/. 129,177.00 S/. 2,775.86

Page 9: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE PROLG. JOSE OLAYA TRAMO (JR. SAN AGUSTIN - JR. LOS FRESNOS) HUANCAYO - JUNIN"CODIGO : 9002-2132835-4000084-15-036-0074-0189SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : DE ENERO DEL 2013

RESIDENTE : ING. MERLY CAROL PIMENTEL ROJAS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

ALMACENERO : ROCIO DEL PILAR CASTILLO PINTO

2. IMPLEMENTOS DE SEGURIDAD

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 BOTAS DE JEBE CAÑA ALTA P/CABALLERO PAR 0.00 0.00 0.00 8.00 152.00 8.00 19.00 152.00 0.00 0.00 8.00 152.00 PCS 634/13

2 GUANTES DE CUERO REFORZADO P/SEGURIDAD PAR 0.00 0.00 0.00 10.00 80.00 10.00 8.00 80.00 0.00 0.00 10.00 80.00 PCS 634/13

3 GUANTES DE JEBE CALIBRE 35 PAR 0.00 0.00 0.00 6.00 54.00 6.00 9.00 54.00 0.00 0.00 6.00 54.00 PCS 634/13

4 LENTE PROTECTOR DE PLASTICO TRANSPARENT UND 0.00 0.00 0.00 6.00 30.00 6.00 5.00 30.00 0.00 0.00 6.00 30.00 PCS 634/13

COSTO TOTAL IMPLEMENTOS DE SEGURIDAD 0.00 0.00 316.00 316.00 0.00 316.00

MOVIMIMAQ

INGRESO O/C

Page 10: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

2. IMPLEMENTOS DE SEGURIDAD

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 BOTAS DE JEBE CAÑA ALTA P/CABALLERO PAR 0.00 0.00 0.00 8.00 152.00 8.00 19.00 152.00 0.00 0.00 8.00 152.00 PCS 634/13

2 GUANTES DE CUERO REFORZADO P/SEGURIDAD PAR 0.00 0.00 0.00 10.00 80.00 10.00 8.00 80.00 0.00 0.00 10.00 80.00 PCS 634/13

3 GUANTES DE JEBE CALIBRE 35 PAR 0.00 0.00 0.00 6.00 54.00 6.00 9.00 54.00 0.00 0.00 6.00 54.00 PCS 634/13

4 LENTE PROTECTOR DE PLASTICO TRANSPARENT UND 0.00 0.00 0.00 6.00 30.00 6.00 5.00 30.00 0.00 0.00 6.00 30.00 PCS 634/13

COSTO TOTAL IMPLEMENTOS DE SEGURIDAD 0.00 0.00 316.00 316.00 0.00 316.00

INGRESO O/C

Page 11: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

4 COMBUSTIBLES Y LUBRICANTESITEM PARTIDA DESCRIPCION

UND CAJA COSTO SALDO COSTOABAST.

COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTOOBSERV.

MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL ABAST. UTILIZ. UTILIZ. DEVT. DEVT.

PETROLEO BIODIESEL B-51 04.00.00 BIODIESEL D-2 GLN. 0.00 0.00 0.00 180.00 2,572.20 180.00 14.29 2,572.20 180.00 2572.20 0.00 0.00 PCS 503

SUB TOTAL GLN. 0.00 0.00 0.00 180.00 2572.20 180.00 14.29 2572.20 180.00 2572.20 0.00 0.00

2 04.00.00 BIODIESEL D-2 GLN. 0.00 0.00 0.00 150.00 2,025.00 150.00 13.50 2,025.00 150.00 2025.00 0.00 0.00 O/C 624

SUB TOTAL GLN. 0.00 0.00 0.00 150.00 2025.00 150.00 13.50 2025.00 150.00 2025.00 0.00 0.00

3

4

5

6

COSTO SUB TOTAL 0.00 0.00 4,597.20 4,597.20 4,597.20 0.00

Page 12: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNIN

CODIGO : 9002-4000084-2083936-15-036-0074-0111

SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

4 COMBUSTIBLES Y LUBRICANTES

ITEM PARTIDA DESCRIPCIONUND CAJA COSTO SALDO COSTO

ABAST.COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL ABAST. UTILIZ. UTILIZ. DEVT. DEVT.

GASOHOL DE 84 PLUS1 04.00.00 GASOHOL 84 OCT. GLN 0.00 134.50 1,674.26 0.00 0.00 134.50 12.45 1,674.26 64.50 802.90 70.00 871.36 PCS 266

SUB TOTAL GLN 0.00 134.50 1674.26 0.00 0.00 134.50 12.45 1674.26 64.50 802.90 70.00 871.36

COSTO SUB TOTAL 0.00 1,674.26 0.00 1,674.26 802.90 871.36

Page 13: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

4 COMBUSTIBLES Y LUBRICANTESITEM PARTIDA DESCRIPCION

UND CAJA COSTO SALDO COSTOABAST.

COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTOOBSERV.

MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT. TOTAL ABAST. UTILIZ. UTILIZ. DEVT. DEVT.

GASOHOL 90 PLUS1 04.00.00 GASOHOL 90 OCT. GLN 0.00 15.00 210.42 0.00 0.00 15.00 14.03 210.42 15.00 210.42 0.00 0.00 PCS 266

SUB TOTAL GLN 0.00 15.00 210.42 0.00 0.00 15.00 14.03 210.42 15.00 210.42 0.00 0.00

COSTO SUB TOTAL 0.00 210.42 0.00 210.42 210.42 0.00

Page 14: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

4 COMBUSTIBLES Y LUBRICANTES

ITEM PARTIDA DESCRIPCIONUND CAJA COSTO SALDO COSTO

ABAST.COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT. TOTAL ABAST. UTILIZ. UTILIZ. DEVT. DEVT.

LUBRICANTES

1 04.00.00 GLN 0.00 2.00 120.00 0.00 0.00 2.00 60.00 120.00 1.00 60.00 1.00 60.00 PCS 266

2 04.00.00 GRASA MULTIPROPOSITO KILO 0.00 4.25 63.75 0.00 0.00 4.25 15.00 63.75 4.25 63.75 0.00 0.00 PCS 266

3

COSTO SUB TOTAL 0.00 183.75 0.00 183.75 123.75 60.00

COSTO TOTAL COMBUSTIBLE Y LUBRICANTES 0.00 2,068.43 4,597.20 6,665.63 5,734.27 931.36

ACEITE DE MOTOR SAE 20W50 SHELL

Page 15: Inventario Fisico

CUADRO DE RESUMEN MENSUAL DE COMBUSTIBLE DE LA MPH

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOSALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

BIODIESEL B-2

UND CONSUMO MENSUAL TOTAL COSTO COSTO

Nº MED ENERO FEBRERO MARZO ABRIL COMB. UNIT. TOTAL

1 BIODIESEL B-2 GLN 60.00 20.00 98.50 178.50 14.29 2550.77

2 BIODIESEL B-2 GLN 1.50 1.50 14.29 21.44

3 BIODIESEL B-2 GLN 150.00 150.00 13.50 2025.00

TOTAL CONSUMO POR MES GLN 60.00 20.00 98.50 151.50 330.00 4597.20

J17
Obras01: COSTO PROMEDIO
Page 16: Inventario Fisico

CUADRO DE RESUMEN MENSUAL DE COMBUSTIBLE DE LA MPHOBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNIN

CODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

GASOHOL 84 PLUS

UND CONSUMO MENSUAL TOTAL COSTO COSTO Nº MED ENERO FEBRERO MARZO ABRIL COMB. UNIT. TOTAL

1 GASOHOL 84 PLUS GLN 13.50 14.00 37.00 64.50 12.45 802.902 GASOHOL 84 PLUS GLN 0.003 GASOHOL 84 PLUS GLN 0.004 GASOHOL 84 PLUS GLN 0.005 GASOHOL 84 PLUS GLN 0.00

TOTAL CONSUMO POR MES GLN 13.50 0.00 14.00 37.00 64.50 12.45 802.90

Page 17: Inventario Fisico

CUADRO DE RESUMEN MENSUAL DE COMBUSTIBLE DE LA MPHOBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNIN

CODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACARESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

GASOHOL 90 PLUSUND CONSUMO MENSUAL TOTAL COSTO COSTO

Nº MED ENERO FEBRERO MARZO ABRIL COMB. UNIT. TOTAL

1 GASOHOL 90 PLUS GLN 3.50 5.00 6.50 15.00 14.03 210.422 GASOHOL 90 PLUS GLN

3 GASOHOL 90 PLUS GLN

4 GASOHOL 90 PLUS GLN

5 GASOHOL 90 PLUS GLN

TOTAL CONSUMO POR MES GLN 3.50 5.00 6.50 0.00 15.00 14.03 210.42

Page 18: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

5. MATERIALES DE LIMPIEZAITEM PART. DESCRIPCION

UND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTOOBSERV.

MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 TACHO DE METAL PARA 2 TIPOS DE DESECHOS ECOLOGICO

01.04.01 Para ser colocado en vereda y acum. De desechos UND 0.00 0.00 0.00 1.00 375.00 1.00 375.00 375.00 1.00 375.00 0.00 0.00 PCS 575

COSTO TOTAL DE MAT. DE LIMPIEZA 0.00 0.00 375.00 375.00 375.00 0.00

INGRESO O/C

Page 19: Inventario Fisico

: 02 DE ENERO DEL 2013

Page 20: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

7. UTILES DE ESCRITORIO

ITEM PART. DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 01.01.00 ARCHIVADOR DE CARTON C/PALANCA LOMO ANCHO T/OF.O UND 0.00 0.00 0.00 8.00 25.52 8.00 3.19 25.52 8.00 25.52 0.00 0.00 PCS 637/13

2 01.01.00 PAPEL BOND 80G TAMAÑO A 4 EMPX500 0.00 0.00 0.00 8.00 103.12 8.00 12.89 103.12 8.00 103.12 0.00 0.00 PCS 637/13

3 01.01.00 PAPEL CARBON TAMAÑO A4 COLOR NEGRO CTO. 0.00 0.00 0.00 1.00 11.90 1.00 11.90 11.90 1.00 11.90 0.00 0.00 PCS 637/13

4 01.01.00 TONER P/ IMPESORA HP LASER JET 1200 COD.REF. C71154 NEGRO UND 0.00 0.00 0.00 1.00 195.00 1.00 195.00 195.00 1.00 195.00 0.00 0.00 PCS 637/13

5 01.01.00 CUADERNO J/DELUXE T/A 4 X 100 HOJAS UND 0.00 0.00 0.00 3.00 7.80 3.00 2.60 7.80 3.00 7.80 0.00 0.00 PCS 245/13

COSTO SUB TOTAL 0.00 0.00 343.34 343.34 343.34 0.00

INGRESO O/C

Page 21: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.1 AGREGADOS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNITARIO TOTAL ABASTEC. UTILIZ. UTILIZ. DEVT. DEVT.

1 ARENA GRUESA01.03.02.01 Vaciado veredas M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 7.65 520.20 0.00 0.0001.03.01.02 Vaciado de sardinel M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 5.51 374.68 0.00 0.0002.05.01.02 Vaciado de buzones M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 2.72 184.96 0.00 0.0002.05.02.02 Vaciado de solado para sumideros M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 0.14 9.52 0.00 0.0002.05.02.01 Vaciado caja de sumidero M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 1.17 79.56 0.00 0.0002.05.01.04 Vaciado dados de Concreto M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 0.58 39.44 0.00 0.00

ADC Concreto y camas de apoyo p/reinst. de tub de de M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 4.04 274.72 0.00 0.0001.04.03.02 Vaciado de Pavimento rigido M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 42.84 2,913.12 0.00 0.00

01.05.02 Vaciado de Cunetas M3. 0.00 0.00 0.00 0.00 0.00 0.00 68.00 0.00 5.35 363.80 0.00 0.00SUB TOTAL M3. 0.00 0.00 0.00 70.00 4,760.00 70.00 68.00 4,760.00 70.00 4,760.00 0.00 0.00

2 PIEDRA CHANCADA DE 1/2"01.03.02.01 Vaciado veredas M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 8.82 577.71 0.00 0.0001.03.01.02 Vaciado de sardinel M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 7.14 467.67 0.00 0.0002.05.01.02 Vaciado de buzones M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 3.75 245.63 0.00 0.00

02.05.02.02 Vaciado de solado para sumideros M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 0.17 11.14 0.00 0.00

02.05.02.01 Vaciado caja de sumidero M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 1.37 89.74 0.00 0.00

02.05.01.04 Vaciado dados de Concreto M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 0.68 44.54 0.00 0.00

ADC Concreto y base de apoyo p/reinst. de tub de des M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 0.99 64.85 0.00 0.00

01.04.03.02 Vaciado de Pavimento rigido M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 64.09 4,197.90 0.00 0.00

01.05.02 Vaciado de Cunetas M3. 0.00 0.00 0.00 0.00 0.00 0.00 65.50 0.00 7.99 523.35 0.00 0.00SUB TOTAL M3. 0.00 0.00 0.00 95.00 6,222.50 95.00 65.50 6,222.50 95.00 6,222.50 0.00 0.00

MATERIAL DE BASE GRANULAR01.04.01.01 Extendido en mejoramiento de sub razante M3. 0.00 0.00 0.00 75.00 2,700.00 75.00 36.00 2,700.00 75.00 2,700.00 0.00 0.00

MATERIAL DE BASE GRANULAR01.04.02.01 Extendido en base M3. 0.00 0.00 0.00 100.00 3,500.00 100.00 35.00 3,500.00 100.00 3,500.00 0.00 0.00

COSTO SUB TOTAL AGREGADOS 0.00 0.00 17182.50 17182.50 17182.50 0.00

ABAST. O/C

Page 22: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

: 02 DE ENERO DEL 2013

: 17 DE ABRIL DEL 2013

8.1 AGREGADOS

OBSERV.

PCS 636

PCS 636

PCS 475

Page 23: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.2 CEMENTO PORTLAND TIPO I

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL ABAST. UTILIZ. UTILIZ. DEVT. DEVT.

1 CEMENTO PORTLAND TIPO I01.03.02.01 Vaciado veredas Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 112.50 2,047.50 0.00 0.00

01.03.01.02 Vaciado de sardinel Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 88.50 1,610.70 0.00 0.00

02.05.01.02 Vaciado de buzones Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 46.00 837.20 0.00 0.00

02.05.02.02 Vaciado de solado para sumideros Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 2.00 36.40 0.00 0.00

02.05.02.01 Vaciado caja de sumidero Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 15.00 273.00 0.00 0.00

02.05.01.04 Vaciado dados de Concreto Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 7.00 127.40 0.00 0.00

ADC Concreto y base de apoyo p/reinst. de tub Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 23.00 418.60 0.00 0.00

ADC Suelo cemento Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 4.00 72.80 0.00 0.00

01.04.03.02 Vaciado de Pavimento rigido Bls 0.00 0.00 0.00 0.00 0.00 0.00 18.20 0.00 502.00 9,136.40 0.00 0.00

SUB TOTAL Bls 0.00 0.00 0.00 800.00 14,560.00 800.00 18.20 14,560.00 800.00 14,560.00 0.00 0.00

2 CEMENTO PORTLAND TIPO I01.04.03.02 Vaciado de Pavimento rigido Bls 0.00 0.00 0.00 0.00 0.00 0.00 19.60 0.00 211.00 4,135.60 0.00 0.00

01.05.02 Vaciado de Cunetas Bls 0.00 0.00 0.00 0.00 0.00 0.00 19.60 0.00 89.00 1,744.40 0.00 0.00

SUB TOTAL Bls 0.00 0.00 0.00 300.00 5,880.00 300.00 19.60 5,880.00 300.00 5,880.00 0.00 0.00

COSTO TOTAL CEMENTO 0.00 0.00 20,440.00 20,440.00 20,440.00 0.00

ABAST. O/C

Page 24: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMAC FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.3 ACEROS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNITARIO TOTAL ABASTEC. UTILIZ. UTILIZ. DEVT. DEVT.

1 ALAMBRE NEGRO Nº 16 PCS 282

01.03.02.01 Encpfrado en veredas Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.40 0.00 6.00 26.40 0.00 0.00

02.08.01 Asegurado en ventanas para sumideros Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.40 0.00 1.00 4.40 0.00 0.00

02.05.02.01 Encofrado de sumideros Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.40 0.00 1.00 4.40 0.00 0.00

Adc. Refuerzo sobre tuberia de desagüe Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.40 0.00 2.00 8.80 0.00 0.00

SUB TOTAL Kg. 0.00 69.00 303.60 0.00 0.00 69.00 4.40 303.60 10.00 44.00 59.00 259.602 ALAMBRE NEGRO Nº 8 PCS 282

01.03.02.01 Encofrado de Veredas Kg. 0.00 0.00 0.00 0.00 0.00 0.00 3.80 0.00 1.25 4.75 0.00 0.00

01.04.03.01 Encofrado de Pavimento Kg. 0.00 0.00 0.00 0.00 0.00 0.00 3.80 0.00 0.75 2.85 0.00 0.00

SUB TOTAL Kg. 0.00 5.00 19.00 0.00 0.00 5.00 3.80 19.00 2.00 7.60 3.00 11.403 CLAVOS CON CABEZA DE 2 1/2" PCS 282

01.03.02.01 Encofrado en veredas Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 10.50 45.15 0.00 0.00

02.05.02.01 Encofrado caja de sumideros Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 2.50 10.75 0.00 0.00

01.04.03.01 Encofrado de Pavimento Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 6.50 27.95 0.00 0.00

SUB TOTAL Kg. 0.00 73.50 316.05 0.00 0.00 73.50 4.30 316.05 19.50 83.85 54.00 232.204 CLAVOS CON CABEZA DE 3" PCS 282

01.03.02.01 Encofrado de Veredas Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 3.00 12.90 0.00 0.00

02.05.02.01 Encofrado de sumideros Kg. 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 1.50 6.45 0.00 0.00

SUB TOTAL Kg. 0.00 4.50 19.35 0.00 0.00 4.50 4.30 19.35 4.50 19.35 0.00 0.005 FIERRO CORRUGADO DE 1/2" PCS 282

02.05.02.01 Construcción de Sumideros -tapa VAR 0.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00 2.00 64.00 0.00 0.00

03.05.02 Refuerzo sobre tuberia de desagüe VAR 0.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00 4.00 128.00 0.00 0.00

SUB TOTAL VAR 0.00 6.00 192.00 0.00 0.00 6.00 32.00 192.00 6.00 192.00 0.00 0.006 FIERRO CORRUGADO DE 1/2" PCS 500

02.05.01.02 Construcción techo de desagüe pluvial-agua VAR 0.00 0.00 0.00 0.00 0.00 0.00 25.00 0.00 8.00 200.00 0.00 0.00

03.05.02 Refuerzo sobre tuberia de desagüe VAR 0.00 0.00 0.00 0.00 0.00 0.00 25.00 0.00 1.00 25.00 0.00 0.00

SUB TOTAL VAR 0.00 0.00 0.00 9.00 225.00 9.00 25.00 225.00 9.00 225.00 0.00 0.007 FIERRO LISO DE 3/8" PCS 500

02.08.01 Preparado en ventana para sumideros VAR 0.00 0.00 0.00 4.00 60.00 4.00 15.00 60.00 2.00 30.00 2.00 30.008 FIERRO LISO DE 5/8" PCS 500

01.04.03.03 Acero en Pavimento Rigido VAR 0.00 0.00 0.00 25.00 975.00 25.00 39.00 975.00 25.00 975.00 0.00 0.009 MARCO Y TAPA F° F° P/DESAGÜE DE 60 CM. PCS 500

02.05.01.02 Colocado e techo de desagüe pluvial UND 0.00 0.00 0.00 0.00 0.00 0.00 325.00 63.00 1.00 0.00 0.00 0.00

Adc. Coloc. en techo de desagüe de aguas serv. UND 0.00 0.00 0.00 0.00 0.00 0.00 325.00 63.00 1.00 0.00 0.00 0.00

SUB TOTAL UND 0.00 0.00 0.00 2.00 720.00 2.00 360.00 720.00 2.00 720.00 0.00 0.00

ABAST. O/C

Page 25: Inventario Fisico

COSTO SUB TOTAL 0.00 850.00 1,980.00 2,830.00 2,296.80 533.20

Page 26: Inventario Fisico
Page 27: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANACAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : VICTOR HUGO PONCE CARHUAMAC FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE CULMINACION : 17 DE ABRIL DEL 2013

TEC. ADMINST.

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.5 MATERIALES SANITARIOS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO

ABAST.COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL ABASTEC. UTILIZ. UTILIZ. DEVT. DEVT.

1 LUBRICANTE PARA TUBERIA02.06.01 Untado en tuberia para desagüe pluvial GLN 0.00 1.00 30.88 0.00 1.00 30.88 30.88 1.00 30.88 0.00 0.00 PCS 0693

2 TUBO PVC D=8"02.06.02 Tendido de tuberia para desagüe pluvial UND. 0.00 2.00 350.00 0.00 2.00 175.00 350.00 2.00 350.00 0.00 0.00 PCS 0693

3 TUBO PVC DE 1/2"ADC reinstalaciones domiciliarias de agua UND. 0.00 3.00 28.50 0.00 3.00 9.50 28.50 3.00 28.50 0.00 0.00 PCS 0004

4 TUBO PVC DE 1"01.04.03.03 colocado en pav. Rigido protec. De fierro liso UND 0.00 5.00 72.50 0.00 5.00 14.50 72.50 5.00 72.50 0.00 0.00 PCS 0004

TUBO PVC DE 1"01.04.03.03 colocado en pav. Rigido protec. De fierro liso UND 0.00 4.00 40.52 0.00 4.00 10.13 40.52 4.00 40.52 0.00 0.00 PCS 0004

6 TUBO UPVC D =10'

02.06.01 Tendido de tuberia para desagüe pluvial UND 0.00 2.00 478.00 0.00 2.00 239.00 478.00 2.00 478.00 0.00 0.00 PCS 0693

COSTO SUB TOTAL 0.00 1000.40 0.00 1000.40 1000.40 0.00

Page 28: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.7 MATERIAL DE ACABADOS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO

ABAST.COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT T/ ABASTEC. UTILIZ. UTILIZ. DEVT. DEVT.

1 MICROESFERA kg 0.00 11.00 53.35 0.00 0.00 11.00 4.85 53.35 0.00 0.00 11.00 53.35

2 MICROESFERA kg 0.00 36.00 167.40 0.00 0.00 36.00 4.65 167.40 0.00 0.00 36.00 167.40

3 MICROESFERA kg 0.00 0.50 2.33 0.00 0.00 0.50 4.65 2.33 0.00 0.00 0.50 2.33

4 MICROESFERA kg 0.00 2.50 12.13 0.00 0.00 2.50 4.85 12.13 0.00 0.00 2.50 12.13

5 PINTURA TRAFICO COLOR BLANCO02.09.01.03 Pintado en cruce peatonal Gln 0.00 0.00 0.00 0.00 0.00 0.00 53.00 0.00 2.50 132.50 0.00 0.00

02.09.01.04 Pintura de Simbolos y flechas Gln 0.00 0.00 0.00 0.00 0.00 0.00 53.00 0.00 0.50 26.50 0.00 0.00

SUB TOTAL Gln 0.00 4.00 212.00 0.00 0.00 4.00 53.00 212.00 4.00 212.00 0.00 0.00

6 PINTURA TRAFICO COLOR AMARILLO02.09.01.01 Pintura Lineal en Sardinel Gln 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 2.50 145.00 0.00 0.00

02.09.01.02 Pintura Lineal Discontinua en eje de via Gln 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 0.50 29.00 0.00 0.00

SUB TOTAL Gln 0.00 3.00 174.00 0.00 0.00 0.00 58.00 174.00 3.00 174.00 0.00 0.00

7 PLANTILLA Y PLOTEO NACIONAL kg 0.00 1.00 50.00 0.00 0.00 1.00 50.00 50.00 1.00 50.00 0.00 0.00

8 YESO X 25 KILOS

01.02.02 Trazo y Replanteo Bolsa 0.00 5.00 45.00 0.00 0.00 5.00 9.00 45.00 3.00 27.00 2.00 18.00

9 YESO X 25 KILOS

01.02.02 Trazo y Replanteo Bolsa 0.00 2.00 23.60 0.00 0.00 2.00 11.80 23.60 0.00 0.00 2.00 23.60

10 YESO X 28 KILOS

01.02.02 Trazo y Replanteo Bolsa 0.00 2.00 26.00 0.00 0.00 2.00 13.00 26.00 0.00 0.00 2.00 26.00

COSTO SUB TOTAL MATERIAL ACABADOS 0.00 765.80 0.00 765.80 463.00 302.80

Page 29: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

: 02 DE ENERO DEL 2013

: 17 DE ABRIL DEL 2013

8.7 MATERIAL DE ACABADOS

OBSERV.

PCS 244-13

PCS 244-13

PCS 244-13

PCS 244-13

PCS 635-13

PCS 635-13

PCS 244-13

PCS 244-13

PCS 244-13

PCS 244-13

Page 30: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.8 MADERAS ( CUARTONES, TABLAS, ETC )

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL INGRESO UTILIZ. UTILIZ. DEVT. DEVT.

1 CUARTON DE 2" x2" x10' EUCALIPTO PCS 576

01.05.01 Encofrado de cunetas UND 0.00 0.00 0.00 50.00 350.00 50.00 7.00 350.00 18.00 126.00 32.00 224.002 CUARTON DE 2" X2 " X10' ROBLE CTE. PCS 576

01.03.01.01 Encofrado sardinel UND 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 51.00 408.00 0.00 0.00

02.05.02.01 Encofrado sumidero UND 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 8.00 64.00 0.00 0.00

01.05.01 Encofrado de cunetas UND 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 1.00 8.00 0.00 0.00

01.04.03.01 Encofrado de Pavimento UND 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 20.00 160.00 0.00 0.00

SUB TOTAL UND 0.00 0.00 0.00 80.00 640.00 80.00 8.00 640.00 80.00 640.00 0.00 0.00

3 CUARTON DE 1" X8 " X10' TORNILLO PCS 576

01.05.01 Encofrado de cunetas UND 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 21.00 357.00 0.00 0.00

01.04.03.01 Encofrado de Pavimento UND 0.00 0.00 0.00 0.00 0.00 0.00 17.00 0.00 20.00 340.00 0.00 0.00

SUB TOTAL UND 0.00 0.00 0.00 50.00 850.00 50.00 17.00 850.00 41.00 697.00 9.00 153.004 TABLA DE 1X10X10 ROBLE CTE. PCS 576

02.05.02.01 Enofrado caja de sumidero UND 0.00 0.00 0.00 0.00 0.00 0.00 19.00 0.00 11.00 209.00 0.00 0.00

01.04.03.01 Encofrado de Pavimento UND 0.00 0.00 0.00 0.00 0.00 0.00 19.00 0.00 2.00 38.00 0.00 0.00

SUB TOTAL UND 0.00 0.00 0.00 20.00 380.00 20.00 19.00 380.00 13.00 247.00 7.00 133.00

COSTO SUB TOTAL MADERAS 0.00 0.00 2,220.00 2,220.00 1,710.00 510.00

ABAST. O/C

Page 31: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.9 MATERIAS PRIMAS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO

ABAST. O/CCOSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNIT TOTAL INGRESO UTILIZ. UTILIZ. DEVT. DEVT.

1 ASFALTO LIQUIDO CUT-BACK GRADO RC-250 PCS 640

01.04.03.04 Relleno de Juntas en Pavimento GLN 0.00 0.00 0.00 0.00 0.00 0.00 11.90 0.00 21.00 249.90 0.00 0.00

01.05.03 Relleno de Juntas en cunetas GLN 0.00 0.00 0.00 0.00 0.00 0.00 11.90 0.00 3.00 35.70 0.00 0.00

SUB TOTAL GLN 0.00 0.00 0.00 29.00 345.10 29.00 11.90 345.10 24.00 285.60 5.00 59.50

COSTO TOTAL MATERIAS PRIMAS 0.00 0.00 345.10 345.10 285.60 59.50

Page 32: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACIO: 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

8.10 OTROS

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 PLASTICO DOBLE ANCHO PCS 509/13

ADC Utilizado en proteccion de caliche MTS 0.00 0.00 0.00 0.00 0.00 3.40 0.00 100.00 340.00 0.00 0.00

ADC Utilizado en proteccion de sub razante MTS 0.00 0.00 0.00 0.00 0.00 3.40 0.00 100.00 340.00 0.00 0.00

SUB TOTAL MTS 0.00 0.00 0.00 200.00 680.00 200.00 3.40 680.00 200.00 680.00 0.00 0.002 CINTA DE SEGURIDAD X 5 KG. ROLLO 0.00 1.00 48.00 0.00 1.00 48.00 48.00 0.00 0.00 1.00 48.00 PCS 185/13

3 CORDEL NYLON Nº16 X 300M-LUCERO PCS 509/13

01.02.01 Trazo y Replanteo Und. 0.00 0.00 0.00 2.00 30.00 2.00 15.00 30.00 1.00 15.00 1.00 15.00

COSTO TOTAL DE OTROS 0.00 48.00 710.00 758.00 695.00 63.00

INGRESO O/C

Page 33: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACIO : 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

9 MATERIAL IMPRESO

ITEM PART. DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 01.01.00 PEDIDO COMPROBANTE DE SALIDA MLLR 0.00 0.10 28.00 0.00 0.00 0.10 280.00 28.00 0.10 28.00 0.00 0.00 PCS 299/13

COSTO TOTAL MATERIAL IMPRESO 0.00 28.00 0.00 28.00 28.00 0.00

INGRESO O/C

Page 34: Inventario Fisico

: 02 DE ENERO DEL 2013

Page 35: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNINCODIGO : 9002-4000084-2083936-15-036-0074-0111SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADMINST. :ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

10 PUBLICIDAD

ITEM PART DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

OBSERV.MED. CHICA C.CHICA RECIB. RECIB. ABAST. INGRS. UNITARIO TOTAL INGRESO UTILIZ. UTILIZ. DEVT. DEVT.

1 LETRERO DE SEÑAL PREV. INFORM. Y REGLAM. PCS 585

02.09.02.01 Colocado en vereda para identificación de calle UND 1.00 209.00 1.00 209.00 209.00 1.00 209.00 0.00 0.00

2 PLACA RECORDATORIA DE MARMOL 80 X 59 X 2 CM PCS 647

02.10.01 Colocado en pared para inauguración de Obra UND 1.00 550.00 1.00 550.00 550.00 1.00 550.00 0.00 0.00

3 GIGANTOGRAFIA EN BANNER PCS 586

01.01.02 Colocado para identificación de Obra UND 1.00 265.00 1.00 265.00 265.00 1.00 265.00 0.00 0.00

COSTO TOTAL MATERIAS PRIMAS 0.00 0.00 1,024.00 1,024.00 1,024.00 0.00

ABAST. O/C

Page 36: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DEL PASAJE SAN IGNACIO, SUB SECTOR CA1 -21 DISTRITO DE HUANCAYO, PROV. DE HUANCAYO - JUNIN

CODIGO : 9002-4000084-2083936-15-036-0074-0111

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA FECHA DE INICIO : 02 DE ENERO DEL 2013

RESIDENTE : ARQ. FERNANDO FERNANDEZ BARRIENTOS FECHA DE PRESENTACION : 17 DE ABRIL DEL 2013

TEC. ADMINST. :

ALMACENERO : SRA. ROCIO DEL PILAR CASTILLO PINTO

12 HERRAMIENTAS

ITEM PART. DESCRIPCIONUND CAJA COSTO NEA COSTO COSTO TOTAL PRECIO COSTO TOTAL COSTO TOTAL COSTO

MED. CHICA C.CHICA RECIB. RECIB. O/C INGRS. UNITARIO TOTAL UTILIZ. UTILIZ. DEVT. DEVT.

1 01.04.03.02 CARRETILLA P/CONST. T/BUGUI (MENOR A1/8 DE LA UIT) TRUPER UND 0.00 0.00 5.00 875.00 5.00 175.00 875.00 5.00 875.00 0.00 0.002 CEPILLO PARA CARPINTERO METALICO DE 6"-KAMASA UND 0.00 0.00 1.00 60.00 1.00 60.00 60.00 0.00 0.00 1.00 60.003 01.04.03.02 LLANTA P/CARRETILLA TIPO BUGUI DE 40 CM INCLUYE LLANTA DE JEBE Y CAMARA TR UND 0.00 0.00 10.00 600.00 10.00 60.00 600.00 10.00 600.00 0.00 0.00

COSTO SUB TOTAL 0.00 0.00 1,535.00 1,535.00 1,475.00 60.00

INGRESO O/C

Page 37: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

: 02 DE ENERO DEL 2013

: 17 DE ABRIL DEL 2013

12 HERRAMIENTAS

OBSERV.

PCS 494PCS 494PCS 494

Page 38: Inventario Fisico

INVENTARIO FISICO

OBRA: "MEJORAMIENTO DE PISTAS Y VEREDAS DE PROLG. JOSE OLAYA TRAMO (JR. SAN AGUSTIN - JR. LOS FRESNOS) HUANCAYO - JUNIN"

EQUIPO DE OFICINA ………………………………………. DEPENDENCIA GOP

ALMACENES CODIGO : 9002-2132835-4000084-15-036-0074-0189

LUGAR : HUANCAYO MES: NOVIEMBRE DEL 2013

1 2 3Nº A R T I C U L O EXISTENCIAS FISICASDE a b d a V A L O R

ORD. Codigo DESCRIPCION UNIDAD UND.MED. b UNITARIO c. TOTAL1.0 VESTUARIO

1 1.0 MAMELUCO DE DRILL MANGA LARGA UNISEX 25.00 UND 49.50 1,237.501,237.50

2.0 IMPLEMENTOS DE SEGURIDAD2 2.0 ANTEOJOS PROTECTORES DE LUNA CLARA 10.00 PAR 2.20 22.003 2.0 BOTAS DE JEBE RAMBO 11.00 PAR 16.50 181.504 2.0 CASCO DE SEGURIDAD DE PLASTICO COLOR BLANCO 2.00 UND 0.005 2.0 GUANTES DE CUERO REFORZADO 20.00 PAR 8.00 160.006 2.0 GUANTES DE JEBE CALIBRE 35 20.00 PAR 9.00 180.007 2.0 RESPIRADOR DE MEDIA DE SILICONA KAMASA 2.00 UND 7.00 14.008 2.0 RESPIRADOR DE MEDIA CARA DE SILICONA TAMAÑO MEDIANA 3.00 UND 0.009

557.504.0 LUBRICANTES Y COMBUSTIBLES

10 4.0 ACEITE PETROLERO 15W-40 5.00 GLN 48.00 240.0011 4.0 ACEITE GASOLINERO 20W 50 4.50 GLN 60.00 270.0012 4.0 BIODIESEL 209.0013 4.0 GASOHOL 90 PLUS 21.50

510.005.0 MATERIAL DE LIMPIEZA7.0 UTILES DE ESCRITORIO

15 7.0 ARCHIVADOR DE CARTON CON PALANCA LOMO ANCHO T/ OFICIO 6.00 UND 3.19 19.1416 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR AZUL FABER CASTELL 18.00 UND 0.26 4.6817 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR NEGRO FABER CASTELL 8.00 UND 0.26 2.0818 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR ROJO FABER CASTELL 9.00 UND 0.26 2.3419 7.0 CALCULADORA SOLAR DE 12 DIGITOS - CASIO 1.00 UND 16.00 16.0020 7.0 CD REGRABABLE DE 700MB 2.00 EMPx25 31.80 63.6021 7.0 CINTA ADHESIVA TRANSPARENTE 1" x 72" YD - SHURTAPE 4.00 UND 1.69 6.7622 7.0 CINTA MASKING TAPE 1" x 40YD TRANSPARENTE 2.00 UND 2.50 5.0023 7.0 CORRECTOR LIQUIDO - ARTESCO 2.00 UND 1.76 3.5224 7.0 CUADERNO CUADRICULADO T/A4 X 92 HOJAS - LORO 3.00 UND 2.86 8.5825 7.0 CUADERNO DE CARGO EMPASTADO TAMAÑO A5 x 100 Hojas 1.00 UND 2.50 2.5026 7.0 ENGRAPADOR DE METAL 1.00 UND 21.80 21.8027 7.0 CUADERNO ESPIRAL CUADRICULADO T/A4 x 200 Hojas 2.00 UND 7.93 15.8628 7.0 FOLDER MANILA TAMAÑO A-4 - GALLO 1.00 EMPx25 3.70 3.7029 7.0 FORRO DE PLASTICO TAMAÑO A-4 ARTESCO 2.00 UND 2.65 5.3030 7.0 GRAPA 26/6 x 5000 ARTESCO 2.00 UND 1.74 3.4831 7.0 PAPEL BOND 75G TAMAÑO A-4 - ULTRACOPY 19.00 EMPX500 10.90 207.1032 7.0 PAPEL CARBON TAMAÑO A-4 PALIAN 1.00 UND 12.35 12.3533 7.0 PAPEL LUSTRE DE 50CM X 65CM COLOR AMARILLO APOLO 3.00 UND 0.18 0.5434 7.0 PAPEL LUSTRE DE 50CM X 65CM COLOR AZUL APOLO 18.00 UND 0.18 3.2435 7.0 PERFORADOR DE 2 ESPIGAS PARA 15 A 20 HOJAS - ARTESCO 1.00 UND 6.25 6.2536 7.0 PLUMON RESALTADOR PUNTA MEDIANA BISELADA ART. VERDE 1.00 UND 1.52 1.5237 7.0 PLUMON RESALTADOR PUNTA MEDIANA BISELADA ART, AMARILLO 3.00 UND 1.52 4.5638 7.0 SUJETADOR PARA PAPEL TIPO FASTENER DE METAL ARTESCO 1.00 EMP X 50 4.19 4.1939 7.0 TAMPON CON CUBIERTA COLOR AZUL 1.00 UND 2.45 2.4540 7.0 TAMPON CON CUBIERTA COLOR ROJO 1.00 UND 2.45 2.4541 7.0 TINTA PARA TAMPON COLOR AZUL 1.00 UND 1.30 1.3042 7.0 TINTA PARA TAMPON COLOR ROJO 1.00 UND 1.30 1.30

431.598.1 MATERIAL AGREGADOS

43 8.1 MATERIAL SELECCIONADO DE CANTERA 36.03 0.000.00

VAN… 2,736.59

Page 39: Inventario Fisico

INVENTARIO FISICO

OBRA: "MEJORAMIENTO DE PISTAS Y VEREDAS DE PROLG. JOSE OLAYA TRAMO (JR. SAN AGUSTIN - JR. LOS FRESNOS) HUANCAYO - JUNIN"

EQUIPO DE OFICINA ………………………………………. DEPENDENCIA GOP

ALMACENES CODIGO : 9002-2132835-4000084-15-036-0074-0189

LUGAR : HUANCAYO MES: OCTUBRE DEL 2013

1 2 3Nº A R T I C U L O EXISTENCIAS FISICASDE a b d a V A L O R

ORD. Codigo DESCRIPCION UNIDAD UND.MED. b UNITARIO c. TOTAL… VIENEN 2,736.59

8.3 MATERIAL ACEROS

44 8.3 ALAMBRE NEGRO Nº 16 18.00 KLG 4.15 74.7045 8.3 ALAMBRE NEGRO Nº 08 53.00 KLG 4.15 219.9546 8.3 CLAVOS DE FIERRO DE 1" 5.00 KLG 0.0047 8.3 CLAVOS DE FIERRO DE 2" 30.00 KLG 0.0048 8.3 CLAVOS DE FIERRO DE 3" 29.50 KLG 4.15 122.4349 8.3 VARILLA DE FIERRO LISO 1/2in x 6m 7.00 UND 0.0050 8.3 PLATINA DE FIERRO 1/4" X 2" X 6m 6.00 UND 0.0051 8.3 SOLDADURA CELLO CORD 1/8" 8.00 KLG 0.0052 8.3 VARILLA DE FIERRO CORRUGADO DE 1/2" x 9m SIDER PERU 4.00 UND 27.99 111.96

529.048.5 MATERIAL SANITARIOS

53 8.5 CACHIMBA DE PVC 8in x 12in x 45º 7.00 UND54 8.5 LUBRICANTE PARA TUBOS 2.00 GALON

0.008.8. MADERAS

55 8.8 MADERA TRIPLAY LUPUNA 6MM X 2.4O X 1.20M LUPUNA 10.00 UND 39.50 395.0056 8.8 MADERA ROBLE 2" x 3" x 10 ft 50.00 UND 12.50 625.0057 8.8 MADERA ROBLE 1" x 8" x 10ft 52.00 UND 16.90 878.8058 8.8 MADERA ROBLE 1/2" x 8" x 10ft 50.00 UND 9.10 455.0059 8.8 MADERA EUCALIPTO 4in x 4in x 10ft APROX. EUCALIPTO 44.00 UND 31.00 1,364.0060 8.8 MADERA EUCALIPTO 2in x 2in x 10ft APROX. EUCALIPTO 21.00 UND 7.00 147.0061 8.8 MADERA ROBLE 1" x 10" x 10ft 6.00 UND 18.70 112.20

3,977.008.10 MATERIAL IMPRESO

62 8.1 YESO X 28KG 2.00 BOLSA0.00

9.00 MATERIAL IMPRESO63 10 FORMATO DE CONTROL DE CONSUMO DE COMBUSTIBLE BLOCK X 50UND 1.00 UND 17.00 17.0064 10 FORMATO RESUMEN HM - COMBUSTIBLE AUTOCOPIATIVO BLOCK X 50 1.00 UND 27.00 27.0065 10 FORMATO PARTE DIARIO DE MAQUINARIA BLOCK X 50 UND 2.00 UND 17.00 34.0066 10 FORMATO PEDIDO COMPROBANTE DE SALIDA 2.00 UND 22.00 44.0067 10 FORMATO KARDEX 1.00 CIENTO 0.0068 10 TARJETA DE CONTROL VISIBLE DE ALMACEN 1.00 CIENTO 0.0069 10 TARJETA DE CONTROL DE EXISTENCIAS VALORADAS DE ALMACEN 0.20 MILLAR 39.50 7.90

129.9011 REPUESTOS Y ACCESORIOS

70 11 DISCO DE CORTE DIAMANTADO 1.00 UND 62.80 62.8071 11 DISCO DE CORTE PARA METAL 7" 2.00 UND 0.0072 11 DISCO DE CORTE DE 7" PARA MADERA 1.00 UND 0.0073 11 FAJA A- 72 BAHCO 2.00 UND 25.00 50.0074 11 FAJA A- 37 PARA COMPACTADOR TIPO PLANCHA BAHCO 2.00 UND 15.00 30.00

142.8012 HERRAMIENTAS

75 12 MALLA DE ALAMBRE DE FIERRO GALVANIZADA COCADA 1"x1"x1m 10.00 METRO 0.0076 12 CORDEL DE NYLON Nº 18 x 300m 1.00 UND 0.0077 12 BRUÑA DE CANTO 3.00 UND 0.0078 12 BRUÑA DE CENTRO 4.00 UND 0.0079 12 CEPILLO PARA CARPINTERO METALICO DE 6" 1.00 UND 0.0080 12 BROCHA Nº 4 4.00 UND 0.0081 12 MANGUERA DE JEBE LONA 3/4" 30.00 UND 0.0082 12 MANGUERA DE PVC DE 1/2" 50.00 UND 0.00

0.00

COSTO TOTAL 7,515.33PARA EL INFORME PERIODICO (ANUAL O SEMESTRAL)

Page 40: Inventario Fisico

…………………………………………………………………………………….. …………………………………………………….ALMACENERO O JEFE DE DEPENDENCIA QUE INFORMA ALMACENERO O JEFE DE DEPENDENCIA QUE RECIBE ALMACENERO O JEFE DE DEPENDENCIA QUE ENTREGA

Page 41: Inventario Fisico

1A R T I C U L O

3Nº EXISTENCIAS FISICASDE a

b. DESCRIPCION d a V A L O R

ORD. Codigo UNIDADUND.MED.b UNITARIO c. TOTAL VESTUARIO

1.00 1.0 MAMELUCO DE DRILL MANGA LARGA UNISEX UND. 2.00 49.50 99.0099.00

IMPLEMENTOS DE SEGURIDAD2.00 2.0 ANTEOJOS PROTECTORES DE LUNA CLARA UND. 7.00 2.20 15.403.00 2.0 BOTAS DE JEBE RAMBO PAR 10.00 16.50 165.004.00 2.0 CASCO DE SEGURIDAD DE PLASTICO COLOR BLANCO UND. 2.00 10.00 20.005.00 2.0 GUANTES DE CUERO REFORZADO PAR 6.00 8.00 48.006.00 2.0 GUANTES DE JEBE CALIBRE 35 PAR 6.00 9.00 54.007.00 2.0 RESPIRADOR DE MEDIA DE SILICONA KAMASA UND. 2.00 7.00 14.008.00 2.0 RESPIRADOR DE MEDIA CARA DE SILICONA TAMAÑO MEDIANA UND. 1.00 22.00 22.00

338.40

LUBRICANTES Y COMBUSTIBLES9.00 4.0 ACEITE PETROLERO 15W-40 GALON 5.00 46.00 230.00

10.00 4.0 ACEITE GASOLINERO 20W 50 GALON 3.50 60.00 210.0011.00 4.0 BIODIESEL GALON 107.50 0.00 0.0012.00 4.0 GASOHOL 90 PLUS GALON 24.00 0.00 0.00

440.00 UTILES DE ESCRITORIO

13.00 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR AZUL FABER CASTELL UND 17.00 0.26 4.4214.00 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR NEGRO FABER CASTELL UND 8.00 0.26 2.0815.00 7.0 BOLIGRAFO T/SECA PUNTA FINA COLOR ROJO FABER CASTELL UND 7.00 0.26 1.8216.00 7.0 CD REGRABABLE DE 700MB EMP X 25 1.00 31.80 31.8017.00 7.0 CUADERNO DE OBRA TAMAÑO A4X100 HOJAS UND 1.00 0.26 0.2618.00 7.0 CUADERNO CUADRICULADO T/A4 X 92 HOJAS - LORO UND 2.00 2.86 5.7219.00 7.0 CUADERNO DE CARGO EMPASTADO TAMAÑO A5 x 100 Hojas UND 1.00 2.50 2.5020.00 7.0 CUADERNO ESPIRAL CUADRICULADO T/A4 x 200 Hojas UND 2.00 7.93 15.8621.00 7.0 FORRO DE PLASTICO TAMAÑO A-4 ARTESCO UND 2.00 2.65 5.3022.00 7.0 GRAPA 26/6 x 5000 ARTESCO UND 1.00 1.74 1.7423.00 7.0 PAPEL BOND 75G TAMAÑO A-4 - ULTRACOPY EMP X 500 13.00 10.90 141.7024.00 7.0 PAPEL CARBON TAMAÑO A-4 PALIAN UND 1.00 12.35 12.3525.00 7.0 PAPEL LUSTRE DE 50CM X 65CM COLOR AZUL APOLO UND 18.00 0.18 3.2426.00 7.0 PAPEL BOND 90GR DE 91CM X 150M UND 1.00 32.00 32.0027.00 7.0 TAMPON CON CUBIERTA COLOR AZUL UND 1.00 2.45 2.4528.00 7.0 TAMPON CON CUBIERTA COLOR ROJO UND 1.00 2.45 2.4529.00 7.0 TINTA PARA TAMPON COLOR AZUL UND 1.00 1.30 1.3030.00 7.0 TINTA PARA TAMPON COLOR ROJO UND 1.00 1.30 1.3031.00 7.0 TINTA LIQUIDA PARA RECARGA DE CARTUCHO UND 1.00 83.00 83.00

Err:522

AGREGADOS1.00 8.1 MATERIAL SELECCIONADO DE CANTERA M3 94.09 0.00 0.00

0.00

CEMENTOS PORTLAND TIPO I1.00 8.2 CEMENTO PORTLAND TIPO I BOLSA 27.00 19.59 528.93

ACEROS1.00 8.3 ALAMBRE NEGRO Nº 16 KILO 3.00 4.15 12.452.00 8.3 ALAMBRE NEGRO Nº 08 KILO 22.50 4.15 93.383.00 8.3 CLAVOS DE FIERRO DE 1" KILO 4.50 5.80 26.104.00 8.3 CLAVOS DE FIERRO DE 2" KILO 19.50 4.15 80.935.00 8.3 PLATINA DE FIERRO 1/4" X 2" X 6m UND 6.00 0.00 0.006.00 8.3 SOLDADURA CELLO CORD 1/8" KILO 8.00 15.00 120.007.00 8.3 VARILLA DE FIERRO CORRUGADO DE 1/2" x 9m SIDER PERU UNIDAD 3.00 27.99 83.97

8.00

MATERIALES SANITARIOS1.00 8.5 CACHIMBA DE PVC 8in x 12in x 45º UND 7.00 86.40 604.80

Page 42: Inventario Fisico

2.00 8.5 LUBRICANTE PARA TUBOS GALON 1.00 33.00 33.00

3.00 8.5 PEGAMENTO PARA PVC - NICOLL GALON 0.25 8.00 2.00

4.00 8.5 TUBO DE PVC PARA FLUIDOS A PRESION CLASE 10 GALON 18.00 8.00 144.005.00 8.5 TUBO UPVC PARA LINEA DE DESAGUE CLASE SDR 8" UND 3.00 165.00 495.00

6.00

MADERAS1.00 8.8 MADERA TRIPLAY LUPUNA 6MM X 2.4O X 1.20M LUPUNA UND. 8.00 39.50 316.002.00 8.8 MADERA ROBLE 1" x 8" x 10ft UND. 35.00 16.90 591.503.00 8.8 MADERA EUCALIPTO 4in x 4in x 10ft APROX. EUCALIPTO UND. 20.00 31.00 620.004.00 8.8 MADERA EUCALIPTO 2in x 2in x 10ft APROX. EUCALIPTO UND. 17.00 7.00 119.00

MATERIAL IMPRESO1.00 9.00 FORMATO RESUMEN HM - COMBUSTIBLE AUTOCOPIATIVO BLOCK X 50 UND 1.00 27.00 27.002.00 9.00 FORMATO PARTE DIARIO DE MAQUINARIA BLOCK X 50 UND UND 1.00 17.00 17.003.00 9.00 FORMATO PEDIDO COMPROBANTE DE SALIDA UND 2.00 22.00 44.004.00 9.00 TARJETA DE CONTROL DE EXISTENCIAS VALORADAS DE ALMACEN MILLAR 0.20 39.50 7.90

REPUESTOS Y ACCESORIOS1.00 11 DISCO DE CORTE DIAMANTADO UND. 1.00 62.80 62.802.00 11 DISCO DE CORTE PARA METAL 7" UND. 1.00 7.80 7.803.00 11 DISCO DE CORTE DE 7" PARA MADERA UND. 1.00 65.50 65.504.00 11 FAJA A- 72 BAHCO UND. 2.00 25.00 50.005.00 11 FAJA A- 37 PARA COMPACTADOR TIPO PLANCHA BAHCO UND. 2.00 15.00 30.00

12 HERRAMIENTAS 12.1 HERRAMIENTAS NUEVAS

1.00 12.1 BROCHA Nº 4 UND. 1.00 17.00 17.002.00 12.1 BRUÑA DE CANTO UND. 2.00 4.50 9.003.00 12.1 CORDEL DE NYLON Nº 18 x 300m UND. 1.00 20.00 20.004.00 12.1 MALLA DE ALAMBRE DE FIERRO GALVANIZADA COCADA 1"x1"x1m METRO 10.00 18.50 185.005.00 12.1 MANGUERA DE JEBE LONA 3/4" UND. 30.00 1.30 39.006.00 12.1 MANGUERA DE PVC DE 1/2" UND. 8.00 1.50 12.007.00 12.1 WINCHA DE FIBRA DE VIDRIO 50M UND. 1.00 45.00 45.00

APORTE VECINAL1.00 ACEITE 15W40 RIMULA R-3 MULTIGRADO SHELL GALON 3.00 49.00 147.002.00 ARENA FINA DE RIO M3 3.54 98.00 346.923.00 ARENA GRUESA DE RIO M3 9.34 58.00 541.724.00 PIEDRA CHANCADA DE 1/2" M3 9.90 59.00 584.10

Page 43: Inventario Fisico

12.1 HERRAMIENTAS NUEVAS

Page 44: Inventario Fisico

INVENTARIO FISICO

OBRA: MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

EQUIPO DE OFICINA ………………………………………. DEPENDENCIA GOP

EQUIPO DE TRANSPORTE ALMACENES CODIGO : 9002-2165284-400084-15-036-0074-0111

COD. DE LA CTA . INVENT. LUGAR : HUANCAYO MES: ABRIL DEL 2013

1 2 3Nº A R T I C U L O EXISTENCIAS FISICASDE a Nº de Parte b c d a V A L O R

ORD. Codigo o Fabrica DESCRIPCION UBICACION UNIDAD UND.MED. b UNITARIO c. TOTAL1.0 VESTUARIO2.0 IMPLEMENTOS DE SEGURIDAD

2.0 PCS 634/13 BOTAS DE JEBE CAÑA ALTA P/CABALLERO 8.00 PAR 19.00 152.002.0 PCS 634/13 GUANTES DE CUERO REFORZADO P/SEGURIDAD 10.00 PAR 8.00 80.002.0 PCS 634/13 GUANTES DE JEBE CALIBRE 35 6.00 PAR 9.00 54.002.0 PCS 634/13 LENTE PROTECTOR DE PLASTICO TRANSPARENTE 6.00 UND 5.00 30.00

316.004.0 LUBRICANTES Y COMBUSTIBLES

4.0 PCS 266/13 ACEITE DE MOTOR SAE 20 W50 SHELL 1.00 GLN 60.00 60.004.0 PCS 266/13 GASOHOL 84 OCT. 70.00 GLN 12.45 871.36

931.365.0 MATERIAL DE LIMPIEZA7.0 UTILES DE ESCRITORIO8.1 AGREGADOS8.2 CEMENTO PORTLAND TIPO I8.3 ACEROS

8.3 PCS 282/13 ALAMBRE NEGRO N° 16 59.00 KILO 4.40 259.608.3 PCS 282/13 ALAMBRE NEGRO N°8 3.00 KILO 3.80 11.408.3 PCS 282/13 CLAVOS CON CABEZA 2 1/2" 54.00 KILO 4.30 232.208.3 PCS 282/13 2.00 VARILLA 15.00 30.00

533.208.5 MATERIAL SANITARIO8.7 MATERIAL DE ACABADOS

8.7 PCS 244/13 MICROESFERA 11.00 KILO 4.85 53.358.7 PCS 244/13 MICROESFERA 36.00 KILO 4.65 167.408.7 PCS 244/13 MICROESFERA 0.50 KILO 4.65 2.338.7 PCS 244/13 MICROESFERA 2.50 KILO 4.85 12.138.7 PCS 244/13 YESO X 25 KG 2.00 BOLSA 9.00 18.008.7 PCS 244/13 YESO X 25 KG 2.00 BOLSA 11.80 23.608.7 PCS 244/13 YESO X 28 KG 2.00 BOLSA 13.00 26.00

302.808.8 MADERAS

8.8 PCS 576/13 MADERA DE 2in X 2in X 10ft EUCALIPTO 32.00 UND 7.00 224.008.8 PCS 576/13 MADERA DE 1in X 8in X 10ft ROBLE 9.00 UND 17.00 153.008.8 PCS 576/13 MADERA DE 1in X 10in X 10ft ROBLE 7.00 UND 19.00 133.00

510.008.9 MATERIAS PRIMAS

8.9 PCS 640/13 ASFALTO LIQUIDO RC-250 5.00 GLN 11.90 59.5059.50

8.10 OTROS8.10 PCS 185/13 CINTA DE SEGURIDAD 1.00 ROLLO 48.00 48.008.10 PCS 509/13 CORDEL DE NYLON N° 16 X 300MTS 1.00 UND 15.00 15.00

63.0012 HERRAMIENTAS

12 PCS 494/13 CEPILLO PARA CARPINTERIA METALICO 1.00 UND 60.00 60.0060.00

COSTO TOTAL 2,775.86PARA EL INFORME PERIODICO (ANUAL O SEMESTRAL)

……………………………………………. …………………………………………….. …………………………………………………….

FIERRO LISO Ø 3/8

MUNICIPALIDADPROVINCIAL DE

HUANCAYO

Page 45: Inventario Fisico

ALMACENERO O JEFE DE DEPENDENCIA QUE INFORMA ALMACENERO O JEFE DE DEPENDENCIA QUE RECIBE ALMACENERO O JEFE DE DEPENDENCIA QUE ENTREGA

Page 46: Inventario Fisico

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 1/2/2013

Fecha de presentacion : 1/31/2013

BIODIESEL ENEROTOTAL

MAQUINARIAM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PIG-459 3.00 3.00

CARGADOR FRONT. CAT 938 G ### 4.00 16.00

VOLQUETE EGA-647 VOLVO 9.00 4.00 3.00 4.00 20.00

VOLQUETE IVECO WP-9850 5.00 3.00 8.00

VOLQUETE EGA-648 VOLVO 9.00 3.00 12.00

MANTENIMIENTO DE TABLEROS 1.00 1.00

60.00

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 1/2/2013

FECHA DE PRESENTACION 2/28/2013

BIODIESEL FEBREROTOTAL

MAQUINARIA1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCARGADOR FRONT. CAT 938 G 8.00 8.00

VOLQUETE EGA-647 VOLVO 4.00 4.00

VOLQUETE IVECO WP-9849 4.00 4.00

VOLQUETE EGA-648 VOLVO 4.00 4.00

20.00

M M J V S D L M M J V S D L M M J V S D L M M J V S D L M J

V S D L M M J V S D L M M J V S D L M M J V S D L M M J

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013

Page 47: Inventario Fisico

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 1/2/2013

Fecha de presentacion : 3/31/2013

BIODIESEL MARZOTOTAL

MAQUINARIAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PIG-459 2.00 2.00 4.00

MOTONIVELADORA KOMATZU ### ### ### 4.00 4.00 ### 51.00

RODILLO LISO VIBR. HAMM 5.00 2.50 3.00 5.00 5.00 2.50 5.00 1.50 29.50

CARGADOR FRONT. CAT 938 G 4.00 4.00

CARGADOR FRONT. KOMATZU ### 10.00

98.50

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 1/2/2013

Fecha de presentacion : 4/17/2013

BIODIESEL ABRILTOTAL

MAQUINARIAM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOMOTONIVELADORA KOMATZU 9.00 ### 23.00

RODILLO LISO VIBR. HAMM 7.50 7.50 3.00 18.00

CARGADOR FRONT. CAT 938 G ### 25.00

VOLQUETE EGA-647 VOLVO ### 12.00

VOLQUETE F0RD-9000 7.00 4.00 4.50 15.50

VOLQUETE IVECO WP-9849 9.00 ### 21.00

VOLQUETE IVECO WP-9850 9.00 ### 21.00

VOLQUETE EGA-648 VOLVO 5.00 ### 17.00

152.50

V S D L M M J V S D L M M J V S D L M M J V S D L M M J V D

L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M

Page 48: Inventario Fisico

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de presentacion 10/31/2012

GASOHOL DE 90 PLUS ENEROTOTAL

MAQUINARIAJ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PP-6577 2.00 2.00

COMPACTADOR TIPO PLANCHA 2.00 2.00

MEZCLADORA TIPO TROMPO 1.50 1.00 2.50

APISONADOR TIPO CANGURO -

-

OTROS

-

-

311.50

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de presentacion 10/31/2012

GASOHOL DE 90 PLUS FEBREROTOTAL

MAQUINARIAD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PP-6577 2.00 3.00 5.00

CAMIONETA TOYOTA OQ-6120 -

COMPACTADOR TIPO PLANCHA -

MEZCLADORA TIPO TROMPO -

APISONADOR TIPO CANGURO -

CAMION CISTERNA F-800

OTROS

-

M J V S D L M M J V S D L M M J V S D L M M J V S D L M M V

S D L M M J V S D L M M J V S D L M M J V S D L M M J V S

Page 49: Inventario Fisico

5.00

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS

ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012Fecha de presentacion 10/31/2012

GASOHOL DE 90 PLUS MARZOTOTAL

MAQUINARIAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PP-6577 -

CAMIONETA TOYOTA OQ-6120 -

COMPACTADOR TIPO PLANCHA 2.00 2.00

MEZCLADORA TIPO TROMPO -

APISONADOR TIPO CANGURO 2.00 2.00 4.00

CAMION CISTERNA F-800 -

OTROS

-

-

6.00

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS

ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012Fecha de presentacion 10/31/2012

GASOHOL DE 90 PLUS ABRILTOTAL

MAQUINARIAM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PP-6577 -

CAMIONETA TOYOTA OQ-6120 -

COMPACTADOR TIPO PLANCHA -

MEZCLADORA TIPO TROMPO -

APISONADOR TIPO CANGURO -

V S D L M M J V S D L M M J V S D L M M J V S D L M M J V D

L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M

Page 50: Inventario Fisico

CAMION CISTERNA F-800 -

OTROS

-

-

-

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de presentacion : 10/31/2012

GASOLINA 84º ENEROTOTAL

MAQUINARIAJ

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA TOYOTA PP-6577 2.00 2.00

MEZCLADORA TIPO TROMPO 1.50 1.00 2.00 4.50

CAMION CISTERNA F-800 -

APISONADOR TIPO CANGURO 2.00 1.00 3.00

COMPACTADOR TIPO PLANCHA PATITO -

OTROS

COMPACTADOR TIPO PLANCHA PATITO -

COMPACTADOR TIPO PLANCHA ALQUILADO -

9.50

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de presentacion : 10/31/2012

GASOLINA 84º FEBREROTOTAL

MAQUINARIAD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA ROJA PP-6577 -

MEZCLADORA TIPO TROMPO -

CAMION CISTERNA -

TANQUE IMPRIMADOR -

-

M J V S D L M M J V S D L M M J V S D L M M J V S D L M M V

S D L M M J V S D L M M J V S D L M M J V S D L M M J V S

Page 51: Inventario Fisico

OTROS

COMPACTADOR TIPO PLANCHA PATITO -

COMPACTADOR TIPO PLANCHA ALQUILADO -

-

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de Culminación : 10/31/2012

GASOLINA 84º MARZOTOTAL

MAQUINARIAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA ROJA PP-6577 2.00 2.00 2.00 6.00

MEZCLADORA TIPO TROMPO -

CAMION CISTERNA -

TANQUE IMPRIMADOR -

-

OTROS

COMPACTADOR TIPO PLANCHA PATITO 2.00 1.00 1.00 4.00 1.00 0.50 9.50

COMPACTADOR TIPO PLANCHA ALQUILADO -

15.50

PRE-LIQUIDACION ADMINISTRATIVA POR CULMINACION DE OBRA 2013

OBRA : MEJORAMIENTO DE PISTAS Y VEREDAS EN EL PSJE. SAN IGNACIO - SUB SECTOR CA1-21 - HUANCAYO

CODIGO :9002-2083936-4000084-15-036-0074-096

SUPERVISOR : ING. VICTOR PONCE CARHUAMACA

RESIDENTE :ARQ. FERNANDO FERNANDEZ BARRIENTOS ALMACENERO :ROCIO CASTILLO PINTO Fecha Inicio : 8/1/2012

Fecha de Culminación : 10/31/2012

GASOLINA 84º ABRILTOTAL

MAQUINARIAM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MUNICIPALIDAD PROVINCIAL DE HUANCAYOCAMIONETA ROJA PP-6577 2.00 2.00 2.00 6.00

MEZCLADORA TIPO TROMPO 2.00 2.00 0.50 1.00 2.00 1.50 2.00 1.00 12.00

CAMION CISTERNA -

V S D L M M J V S D L M M J V S D L M M J V S D L M M J V D

L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M

Page 52: Inventario Fisico

TANQUE IMPRIMADOR -

OTROS

COMPACTADOR TIPO PLANCHA 3.00 4.00 2.00 4.00 13.00

APISONADOR TIPO CANGURO 1.00 1.00 2.00 4.00

35.00

Page 53: Inventario Fisico

PRE - LIQUIDACION FINANCIERA POR CULMINACION DE OBRA 2013