Precios y cantidades de recursos requeridos por tipo

Obra INSTALACION DE LOSA DE RECREACION MULTIUSO EN LA URBANIZACION HART,

DISTRITO DE JAUJA - JAUJA - JUNIN

0102007

Subpresupuesto 004 MODULO SS.HH

01/03/2015Fecha

JUNIN - JAUJA - JAUJALugar  120401

Código CantidadUnidadRecurso Parcial S/.Precio S/.

MANO DE OBRA

 2,073.1005 29,977.0314.46OPERARIO0101010003 hh 735.5983 9,025.7912.27OFICIAL0101010004 hh

 2,320.7052 25,643.7911.05PEON0101010005 hh 6.3465 70.3211.08TOPOGRAFO0101030000 hh

 64,716.93

MATERIALES

 50.8230 215.494.24ALAMBRE NEGRO RECOCIDO N° 802040100010001 kg 165.7370 702.724.24ALAMBRE NEGRO N° 1602040100020001 kg

 2,958.1086 8,992.653.04FIERRO CORRUGADO 1/2"02040300010043 kg 1,967.8709 5,942.973.02FIERRO CORRUGADO 3/8"02040300010044 kg

 812.4700 2,437.413.00FIERRO CORRUGADO 1/4"02040300010045 kg 36.8182 156.114.24CLAVOS PARA MADERA CON CABEZA DE 3"02041200010005 kg 28.3500 481.9517.00TUBERIA PVC-SAP PARA DESAGÜE 4"02050700020024 m

 58.8000 441.007.50TUBERIA PVC-SAP PARA DESAGÜE 2"02050700020025 m 36.0000 259.207.20TRAMPA "P" PVC-SAP 2"02050700020026 und 4.0000 36.409.10REGISTRO CROMADO 2"02050700020028 und

 27.3000 370.1913.56TUBERIA PVC-SAP C-10 PRESION PARA AGUA 3/4"02050700020029 m 68.2500 750.7511.00TUBERIA PVC-SAP C-10 PRESION PARA AGUA 1/2"02050700020030 m 7.0000 9.101.30CODO PVC SAP 1/2" X 90°02050900010018 und

 12.0000 34.802.90CODO PVC SAP 4" X 45°02051000010018 und 9.0000 26.102.90CODO PVC SAP 4" X 90°02051000010019 und 4.0000 2.600.65CODO PVC SAP 3/4" X 90°02051000020008 und 4.0000 22.005.50TEE PVC-SAP 4"02051100010016 und

 11.0000 46.204.20TEE PVC-SAP PARA AGUA C-10 1/2"02051100020007 und 11.0000 16.501.50TEE PVC-SAP PARA AGUA C-10 3/4"02051100020008 und 8.0000 8.801.10ADAPTADOR PVC-SAP S/P 1/2"02051900020001 und

 14.0000 21.001.50REDUCCION PVC SAP C-10 3/4" A 1/2"02052300010045 und 23.0000 57.502.50YEE PVC-SAP 4"02060600010028 und 2.0000 13.806.90YEE PVC-SAP CON REDUCCION 4" a 2"02060600010029 und

 18.2505 1,005.4255.09PIEDRA CHANCADA 1/2"02070100010002 m3 1.3295 67.6150.85PIEDRA CHANCADA 3/4"02070100010003 m3 1.4028 47.5533.90PIEDRA MEDIANA0207010005 m3 7.7150 424.9455.08PIEDRA GRANDE DE 8"0207010006 m3

 10.9484 899.9682.20ARENA FINA02070200010001 m3 223.2633 8,515.2638.14ARENA GRUESA02070200010002 m3 159.0062 6,062.9138.13HORMIGON0207030001 m3 113.1377 339.413.00AGUA PUESTA EN OBRA0207070001 m3

 4.9000 10.782.20TUBERIA PVC-SEL 5/8" X 3 m02080100010001 und 4.0000 103.4025.85TAPA CON MARCO F°G° DE DESAGUE 30 x 30 cm0209040002 und

 2,549.2282 46,446.9418.22CEMENTO PORTLAND TIPO I (42.5 kg)0213010001 bol 11.3343 79.347.00YESO BOLSA 28 kg02130300010001 bol 16.6924 79.624.77OCRE0213060001 kg 23.2196 115.634.98FRAGUA0213070001 kg

 12,842.9400 12,200.790.95LADRILLO KK 18 HUECOS 9X13X24 cm02160100010005 und 7,627.8000 14,874.211.95LADRILLO DE ARCILLA HUECO DE 15X30X30 cm02160100040006 und

 3.8452 38.079.90PEGAMENTO PARA PVC0222080012 gal  8.5777 120.0914.00PEGAMENTO EN POLVO0222080017 bol 40.7883 499.6612.25PEGAMENTO PARA CERAMICO02221300010003 bol

 146.8110 2,092.0614.25CERAMICA 0.20X0.30 m0225020133 m2 79.9365 1,625.9120.34CERAMICA ANTIDESLIZANTE PARA PISO 0.30X0.30 m0225020134 m2 26.5658 154.085.80PORCELANA0225060003 kg

 1,157.1043 3,725.883.22MADERA TORNILLO0231010001 p2 4.5314 15.863.50ESTACAS DE MADERA0231040002 p2

 18.0471 32.481.80LIJA DE FIERRO #8002380100020005 und 39.1021 1,094.8628.00PINTURA LATEX LAVABLE0240010011 gal 4.5329 126.9228.00PINTURA ESMALTE0240020001 gal

 205.6845 4,113.6920.00PINTURA IMPRIMANTE0240020018 gal 4.5338 65.7414.50THINNER0240080012 gal

 17.4700 51.362.94CINTA AISLANTE0241020001 rll 5.0900 7.641.50CINTA TEFLON0241030001 und

 18.0000 106.205.90SUMIDERO CROMADO0246020001 und

19/03/2015 12:27:15p.m.Fecha :

Page 2: In Sumos

7/17/2019 In Sumos

http://slidepdf.com/reader/full/in-sumos-5691390a5c36c 2/2

 2Página :S10

Precios y cantidades de recursos requeridos por tipo

Obra INSTALACION DE LOSA DE RECREACION MULTIUSO EN LA URBANIZACION HART,

DISTRITO DE JAUJA - JAUJA - JUNIN

0102007

Subpresupuesto 004 MODULO SS.HH

01/03/2015Fecha

JUNIN - JAUJA - JAUJALugar  120401

Código CantidadUnidadRecurso Parcial S/.Precio S/.

 8.0000 46.965.87ANILLO DE CERA PARA INODORO0246140001 und 6.0000 402.0067.00LAVATORIO 23"x17" P/GRIFERIA 4"BLANCO CON ACCESORIOS02470100020018 und 8.0000 1,016.00127.00INODORO TANQUE BAJO NORMAL CON ACCESORIOS02470200010019 und 1.0000 60.0060.00LAVADERO DE ACERO INOXIDABLE DE 1 POZA02470700010008 und 3.0000 294.0098.00URINARIO PICO LORO0247110002 und 4.0000 34.008.50VALVULA COMPUERTA DE 1/2"0253180001 und 6.0000 210.0035.00DUCHA CROMADA02560300010003 und

 87.0000 1,113.6012.80INTERRUPTOR BIPOLAR 2 x 20 A02620500020001 und 161.0000 2,720.9016.90TOMACORRIENTE BIPOLAR CON PUNTO DE TIERRA02621300010006 und

 27.6000 90.803.29CAJA OCTOGONAL SEL0268030001 und 9.3000 30.603.29CAJA RECTANGULAR PVC DE 4" X 2"02680600010001 und 4.0000 320.0080.00CAJA DE REGISTRO CONCRETO PREFABRICADO 30 x 30 cm02682700010005 und

 620.4250 508.750.82CONDUCTOR TW SOLIDO N° 14 AWG 2.5 mm20270010292 m 23.0000 1,196.0052.00FLUORESCENTE RECTO 2x40W (EMPOTRADO)0270110324 und 2.0000 135.6067.80TABLERO THERMOMAGNETICO 5 CIRCUITOS0274010003 und

 134,368.72

EQUIPOS

 6.3465 56.178.85TEODOLITO0301000011 hm 15.6937 50.223.20REGLA DE MADERA03010600020008 pza 57.7547 185.973.22REGLA DE MADERA03010600020009 p2 5.0361 730.23145.00CAMION VOLQUETE DE 10 m303012200040002 hm

 16.0652 212.0613.20VIBRADOR DE CONCRETO 4 HP 1.25"03012900010002 hm 41.5209 1,038.0225.00MEZCLADORA DE CONCRETO TAMBOR 11 P3 (18 HP)03012900030004 hm 86.7706 737.558.50CIZALLA ELECTRICA DE FIERRO03013300020002 hm

 626.1169 2,016.103.22ANDAMIOS DE MADERAANDAMIO DE MADERA

03013400010009 p2

 16.6513 70.604.24CLAVO PARA MADERA 3"03013400010010 kg

 5,096.92

SUBCONTRATOS

 7.0000 1,365.00195.00PUERTA DE MADERA CEDRO APANELADO04110300020009 und

 1,365.00

Total S/. 205,547.57