 a) Manning- Tramo I Datos b (m)= 1.2 z= 1.5 S= 0.0017 n c= 0.022679 Q (m³/s)= 4 Manning: y (m)= 1.08910073 proponer n1 = 0.025 P1 = 1.96340427  A (m²)= 3.0861315 n2 = 0.014 P2 = 1.2 P(m)= 5.12680854 P3 = 1.96340427 R (m)= 0.60195958 Pt= 5.12680854 T (m)= 4.4673022 Q (m³/s)= 3.99999809 Comprobar V ( m/ s) = 1. 29612043 suel o con mampost er iaV max 2 m/s D ( m)= 0.69082667 F = 0.49788186 Subcrítico Manning- Tramo II Datos b (m)= 1.2 z= 1.5 S= 0.03 n c= 0.02103324 Q (m³/s)= 4 Manning: y (m)= 0.51408199 proponer n1 = 0.025 P1 = 0.92677448  A (m²)= 1.01331882 n2 = 0.014 P2 = 1.2 P(m)= 3.05354897 P3 = 0.92677448 R (m)= 0.33184954 Pt= 3.05354897 T (m)= 2.74224597 Q (m³/s)= 3.99970584 Comprobar V ( m/ s) = 3. 94713466 suel o con mampost er iaV max 2 m/s D ( m)= 0.36952149 F = 2.07313502 Supercrítico 3. El canal del problema 1 se reviste con concreto la base y los lados con mampostería de piedra, el canal ahora recorre 2 tramos, Tramo I con S= 1.7 ‰ y Tramo I con S= 3 %, determinar: a) ¿cuál es el tirante en los Tramos I y II? b) ¿a qué conclusiones llega a partir de l os resultados obtenidos? c) si detecta algún problema ¿qué solución plantearía? 3 2 2 3         T i i c  P  P n n P1 P2 P3 n1  n2 n1 3 2 2 3         T i i c  P  P n n P1 P2 P3 n1  n2 n1 

Upload: patty-garcia

Post on 05-Oct-2015

2 views

Category:

Documents


0 download

DESCRIPTION

HIDRAULICA

TRANSCRIPT

  • a)

    Manning- Tramo IDatos

    b (m)= 1.2

    z= 1.5

    S= 0.0017

    n c= 0.022679

    Q (m/s)= 4

    Manning:

    y (m)= 1.08910073 proponer n1 = 0.025 P1 = 1.96340427

    A (m)= 3.0861315 n2 = 0.014 P2 = 1.2

    P(m)= 5.12680854 P3 = 1.96340427

    R (m)= 0.60195958 Pt= 5.12680854

    T (m)= 4.4673022

    Q (m/s)= 3.99999809 Comprobar

    V (m/s)= 1.29612043 suelo con mamposteriaV max 2 m/s

    D (m)= 0.69082667

    F = 0.49788186 Subcrtico

    Manning- Tramo IIDatos

    b (m)= 1.2

    z= 1.5

    S= 0.03

    n c= 0.02103324

    Q (m/s)= 4

    Manning:

    y (m)= 0.51408199 proponer n1 = 0.025 P1 = 0.92677448

    A (m)= 1.01331882 n2 = 0.014 P2 = 1.2P(m)= 3.05354897 P3 = 0.92677448

    R (m)= 0.33184954 Pt= 3.05354897

    T (m)= 2.74224597

    Q (m/s)= 3.99970584 Comprobar

    V (m/s)= 3.94713466 suelo con mamposteriaV max 2 m/s

    D (m)= 0.36952149

    F = 2.07313502 Supercrtico

    3. El canal del problema 1 se reviste con concreto la base y los lados con mampostera de piedra, el canal ahora recorre 2 tramos, Tramo I con S= 1.7

    y Tramo I con S= 3 %, determinar:

    a) cul es el tirante en los Tramos I y II?

    b) a qu conclusiones llega a partir de los resultados obtenidos?

    c) si detecta algn problema qu solucin planteara?