Download - Shuhua Presentation 2016
Shuhua Presentation ReportFocus on Quality. Pursuit of excellence. Sustainable Development
1/22
ContentsCompany History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
2/22
SHUHUA CO.,LTD.Established in 1996, one of the leading company which is specialized in treadmills and various indoor and outdoor professional fitness equipment, and store fixtures for national and international top brands
3/22
Production plant for store fixtures is located in Quanzhou, Fujian province, which covers an area of 200,000sqm, 140,000sqm has been put into use from 2011, and the remaining area will be built up by end of 2016. We have up to 850 workers in the factory, who made an output of RMB310million in 2015.
4/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
5/22
Y1996 Fujian Shuhua Sports Goods Co., Ltd. . was established
Y2000 Quanzhou Shuhua Rack Industry Co., Ltd. was established, Started supply shop fittings for Anta, Xtep, Lilanz.
Y2007 Group renamed to Shuhua(China) Co., Ltd. And started the oversea business strategy.
Y2009 Started supply shop fittings for adidas and NB.
Y2010 USD80million invested on the construction of 270,000 ㎡ Shuhua new industrial Park. Started the cooperation with IKEA;
Y2014 Another production line in northern China was planned and will be put into use in 2016.
Y2016 IPO in the next half year.
6/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
7/22
More than 30 engineers1) Cost Estimation2) Structure Design3) Industrial Engineering4) Production Technology5) System Programming
More than 40 installation technicians1) Installation Consulting2) Installation Implement
8/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
9/22
Laser Cutting
Accurate Punching Quality Welding
Nice Polishing
Clean EPC
Dipping Pretreating
Safe PackingQC QC QC
QC
QC
QC
2 Metalwork Production Lines
10/22
Accurate Sawing
Cold Pressing Edge Banding
Dust-free Painting
Safe Packaging
Assembling
QC QC QC
QC
QC
1 Woodwork Production Lines
11/22
Laser Cutting
Thermal Bending Vacuum Forming
Flame Polishing
Assembling
Screen Printing
QC QC QC
QC
QC
1 Acrylicwork Production Lines
12/22
13/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
14/22
Supplier
IQCOK
NO
Production IPQCNO
OKOK
ProductNO
OK
FQC
Warehouse
OQCClientNO
Quality Control Flow Chart more than 30 QC people
15/22
Numerical Control Salt Spray Testing Machine to test the rust-resistant capacity of metals.
Loading Test Devicesto test loading capabilities of hanging accessories.
Comprehensive Testing Machineto test the tensile, pressure, strain, stress
and elongation capabilities of various materials.
Electronic Strength Capability Testing Machine
to test the anti-impact and anti-tear capabilities of metallic sheets and
cartoon boxes
Quality Control Equipment
16/22
Ultraviolet Testing Machine to test the yellowing-resistance of the materials and finish like painted products or acrylic products
High and Low Temperature Testing Machine to test the weather resistance of materials
and products.
Hardness Testing Device to test the hardness of metals
17/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
18/22
Our factory is near Xiamen port, which is one of the key ports in China and has a connection with worldwide main ports. As the 2 important economic zones, Xiamen and Quanzhou both have a transportation capacity to cover the nation. Therefore, it makes us possible to provide quick and good transportation proposals for our clients
19/22
Total 22,000.00sqm warehouse in Quanzhou
ERP system to control goods in and out
First in first out All goods are well classified and
neatly piled up and clearly labeled
Separate pick and pack area Photos are taken for each
shipment Fast moving loading platform to
ensure 3 truck to load at one time
20/22
Company History Company Profile
Production Capacity
Quality & Technology
Research & Development
Logistics & Distribution
Business Plan
21/22
To ensure that our client’s demand are totally fulfilled and cater for our growing business, we keep on an 30% annual increase on our production capacity by upgrading our equipment and increasing labor. Here is our plan for recent 3 years
Year Capacity/month EquipmentIncrease
LaborIncrease Remark
2014 USD6millon USD1.6million 5%2015 USD8million USD 0.9million 5%2016 USD12million USD2.7milion 30% new factory in TJ
22/22
Quotation • 10 days for a full concept
Prototype • 25 days for a full set of prototype
First Order• 45 days for first batch order
Repeated Order• 25 days for repeated order
Project Planner and Timeline