Outline of the MissionOutline of the Mission
TimelineTimeline
Conceiving a science investigationSubmitting a request for proposals
Collecting instrument information
Instrument integration and testing
Flight planning
Science flight activity
Reporting of study results
Publication of scientific papers
-
8/14/2019 Shetter SARP Presentation
3/18
-
8/14/2019 Shetter SARP Presentation
4/18
Mission TimelineMission Timeline
12-18 months prior to mission12-18 months prior to missionAnnouncement of opportunity in the annual Research Opportunitiesin Space and Earth Science (ROSES) release. Proposals are thendue 3-6 months after the announcement.
9-12 months before mission9-12 months before mission
Various proposals are submitted to the announcement ofopportunity
Instrument teams propose to make airborne and ground basedmeasurements specified in the white paper and announcement
Investigators propose to perform modeling studies to support the
science goals of the missionScientists propose to lead the mission science team
-
8/14/2019 Shetter SARP Presentation
5/18
Mission TimelineMission Timeline
6-9 months before mission6-9 months before mission
Selection of proposals is made at an expert panel reviewSelection is based on relevance, scientific merit, and cost.
Collection of data from instrument teams by platform operators
Instrument requirements
-
8/14/2019 Shetter SARP Presentation
6/18
Airborne Science ProgramAirborne Science ProgramPayload Information FormPayload Information Form
General Information
1. Principal Investigator & Team Members (if citizenship is not US, please note if they have a green card):
Name
Organization
Citizenship
Role
Phone Number
Fax Number
Email Address
2. Payload Information
Instrument name and acronym
Instrument and/or PI website
What does the instrument measure?
Aircraft type
-
8/14/2019 Shetter SARP Presentation
7/18
Mission TimelineMission Timeline
6-9 months before mission6-9 months before mission
Collection of data from instrument teams PIF (continued)
Logistical requirements
Personnel on aircraft
In flight requirements
Deployment site requirements (probe access, cryogens, gases,internet)
Hazards
Lasers
Compressed gases
Chemicals
Radioactive materials
Material Safety Data Sheets for aircraft and ground hazardous
-
8/14/2019 Shetter SARP Presentation
8/18
Mission TimelineMission Timeline4-6 months before mission4-6 months before mission
Aircraft Payload design
Inlet locations-possible contamination and flowinterferences
Instrument location-possible EMI and vibration interferences
-
8/14/2019 Shetter SARP Presentation
9/18
-
8/14/2019 Shetter SARP Presentation
10/18
WASWhole air sampling using gas chromatography
PI: Don Blake, University of California Irvine
Re-fly of ARCTAS, TC4, INTEX-NA
Probe: FS970L
Racks
FS945L
FS995L
SARP Flight Information
Probe: FS970L
Racks
FS940L C-130 Rack
FS985L C-130 Rack
Power Requirements
115V, 60Hz: 3450W
Hazards
Senior Flexonics Pump
Documentation Status
Drawings and stress analysis are current and on
-
8/14/2019 Shetter SARP Presentation
11/18
Mission TimelineMission Timeline
4-6 weeks before mission4-6 weeks before mission
Instrument integration on the aircraft
Design, analysis, and fabrication of all mounting hardware
Installation of probes and windows
Installation of instruments
-
8/14/2019 Shetter SARP Presentation
12/18
Mission TimelineMission Timeline
-
8/14/2019 Shetter SARP Presentation
13/18
Mission TimelineMission Timeline
1 week before mission1 week before mission
Mission Readiness Review
Presentation of the complete mission plan with deploymentsite information, overflight clearances, hazard mitigation,staffing, general flight plans, etc. for approval from amulticenter review board.
4-6 days before mission4-6 days before mission
Engineering check flight
Better know as Shake, Rattle, and Roll
Flight Planning
Transit flight plan and passenger manifest
Draft Science flight plans
2-4 days before mission start2-4 days before mission start
-
8/14/2019 Shetter SARP Presentation
14/18
Mission TimelineMission Timeline
Start of Science Mission which can last 2 days to 6 weeksStart of Science Mission which can last 2 days to 6 weeks
Transit to deployment siteScience Flights
Power on 2-3 hours before takeoff
Preflight brief 1.5 hours before takeoff
Door Close 30 minutes before takeoff
Takeoff
Landing
Post flight power
Flight debrief to discuss flight performance
Data download from instrument
Preliminary data submission to archive within 24 hours
-
8/14/2019 Shetter SARP Presentation
15/18
Mission TimelineMission Timeline
2 days after mission completion2 days after mission completion
De-integration of instruments from aircraft
6 months after mission completion6 months after mission completion
Data merges on different time bases of preliminary data completed
First science team data meeting
Presentations by investigators of data analysis productsEstablishment of joint relationships for scientific papers
Listing of proposed scientific publications
6-12 months after mission completion6-12 months after mission completion
Submission of final data by all investigators to mission archive
12 months after mission completion12 months after mission completion
Data merge of final data completed
Public release of final data
-
8/14/2019 Shetter SARP Presentation
16/18
Mission TimelineMission Timeline
12-24 months after mission completion12-24 months after mission completion
Presentations at scientific conferences
Preparation of scientific papers for submission to special issues ofjournals
18-36 months after mission completion18-36 months after mission completion
Publication of papers in scientific journals
Total time from conception to completion of anairborne science a mission can be 3-6 years3-6 years
with continuing publication of research resultsfor years.
-
8/14/2019 Shetter SARP Presentation
17/18
Mission TimelineMission Timeline
Questions?Questions?
-
8/14/2019 Shetter SARP Presentation
18/18
Mission TimelineMission Timeline