Download - Proyecto Final Nicanor
COSTOS TOTALES A PRECIOS DE MERCADO
PRE INVERSION E INVERSION CANTIDAD
Perfil del proyecto 1 S/. 5,000.00 Construccion e instalasion del reservorio 1 S/. 40,000.00 bomba centrifuga 10HP 1 S/. 600.00 valvulastubos PVCcemento (bolsa) 200 S/. 20.00
120 S/. 35.00
60 S/. 35.00
5 S/. 35.00 tablas (piezas) 20 S/. 10.00 fierro de 1/2" (barra) 150 S/. 28.00 fierro de 3/8" (barra) 80 S/. 28.00 fierro de 1/4" (kg) 220 S/. 5.00 alambre N° 16 (m) 100 S/. 3.00 herramientas de construccion (paquete) 6 S/. 1,200.00 alquiler de mezcladora 2 S/. 150.00 peones 30 S/. 40.00 ingeniero 1 S/. 3,000.00 diseño de organisacion y administrasion 1 S/. 8,000.00 diseño de capacitasion 1 S/. 5,000.00
SUBTOTALGASTOS GENERALES 6%
IMPREVISTOS 1%TOTAL
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTOPOST INVERSION 2016 2017 2018
insumos y materiales S/. 1,000.00 S/. 1,000.00 S/. 1,000.00remunerasion (600) S/. 7,200.00 S/. 7,200.00 S/. 7,200.00equipo de computo S/. 4,500.00
SUBTOTAL S/. 12,700.00 S/. 8,200.00 S/. 8,200.00GASTOS GENERALES 6% S/. 762.00 S/. 492.00 S/. 492.00
IMPREVISTOS 1% S/. 127.00 S/. 82.00 S/. 82.00TOTAL S/. 13,589.00 S/. 8,774.00 S/. 8,774.00
TOTAL DEL PROYECTO S/. 243,334.05
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
PRE INVERSION E INVERSION 2016
COSTO POR
UNIDAD
hormigon (m3)
arena fina (m3)
piedra grande (m3)
COSTOTOTAL
perfil del proyecto S/. 5,000.00construccion einstalasion del reservorio S/. 40,000.00
bomba centrifuga 10HP S/. 0.00valvulas S/. 0.00
tubos PVC S/. 0.00cemento (bolsa) S/. 4,000.00
S/. 4,200.00
S/. 2,100.00
S/. 175.00tablas (piezas) S/. 200.00
fierro de 1/2" (barra) S/. 4,200.00fierro de 3/8" (barra) S/. 2,240.00
fierro de 1/4" (kg) S/. 1,100.00alambre N° 16 (m) S/. 300.00
herramientas de construccion (paquete) S/. 7,200.00alquiler de mezcladora S/. 300.00
peones S/. 1,200.00ingeniero S/. 3,000.00
diseño de organizacion y administrasion S/. 8,000.00diseño de capacitasion S/. 5,000.00
CAMBIO DE CAPITAL S/. 1,058.00 -S/. 375.00GASTOS GENERALES 6% S/. 5,292.90
IMPREVISTOS 1% S/. 882.15TOTAL S/. 94,390.05
FLUJO DE COSTOS A PRECIO DE MERCADO2015 2016
flujo de pre inversion e inversion S/. 95,032.05 -S/. 375.00flujo de costos de operasion y mantenimiento S/. 13,589.00
flujo de costos apresio de mercado S/. 95,032.05 S/. 13,214.00
FLUJO DE COSTOS Y BENEFICIOS2016 2017
( + )total de ingresos generado por el proyecto( - )flujo de costos a precio de mercado
flujo de costos y beneficios a precio de mercado
POBLACION QUE TENDRA AGUAAÑO 2016 2017
POBBLASION DEMANDADA 264 425
TARIFA 9
hormigon (m3)
arena fina (m3)
piedra grande (m3)
COSTOS TOTALES A PRECIOS DE MERCADO
S/. 5,000.00 S/. 40,000.00 S/. 600.00 S/. - S/. - S/. 4,000.00
S/. 4,200.00
S/. 2,100.00
S/. 175.00 S/. 200.00 S/. 4,200.00 S/. 2,240.00 S/. 1,100.00 S/. 300.00 S/. 7,200.00 S/. 300.00 S/. 1,200.00 S/. 3,000.00 S/. 8,000.00 S/. 5,000.00
S/. 88,815.00S/. 5,328.90
S/. 888.15S/. 95,032.05
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2019 2020 2021 2022 2023
S/. 1,000.00 S/. 1,000.00 S/. 1,100.00 S/. 1,100.00 S/. 1,100.00S/. 7,200.00 S/. 7,200.00 S/. 7,200.00 S/. 7,200.00 S/. 7,200.00S/. 4,500.00 S/. 4,500.00
S/. 12,700.00 S/. 8,200.00 S/. 8,300.00 S/. 12,800.00 S/. 8,300.00S/. 762.00 S/. 492.00 S/. 498.00 S/. 768.00 S/. 498.00S/. 127.00 S/. 82.00 S/. 83.00 S/. 128.00 S/. 83.00
S/. 13,589.00 S/. 8,774.00 S/. 8,881.00 S/. 13,696.00 S/. 8,881.00
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
2017 2018 2019 2020 2021
COSTOTOTAL
S/. 0.00 S/. 375.00 -S/. 375.00 S/. 8.00 S/. 375.00
FLUJO DE COSTOS A PRECIO DE MERCADO2017 2018 2019 2020 2021
S/. 0.00 S/. 375.00 -S/. 375.00 S/. 8.00 S/. 375.00S/. 8,774.00 S/. 8,774.00 S/. 13,589.00 S/. 8,774.00 S/. 8,881.00S/. 8,774.00 S/. 9,149.00 S/. 13,214.00 S/. 8,782.00 S/. 9,256.00
FLUJO DE COSTOS Y BENEFICIOS2018 2019 2020 2021 2022
POBLACION QUE TENDRA AGUA2018 2019 2020 2021 2022591 763 941 1125 1316
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2024 2025 2026 2027 2028
S/. 1,100.00 S/. 1,100.00 S/. 1,200.00 S/. 1,200.00 S/. 1,200.00S/. 7,200.00 S/. 7,200.00 S/. 7,200.00 S/. 7,200.00 S/. 7,200.00
S/. 4,500.00 S/. 4,500.00S/. 8,300.00 S/. 12,800.00 S/. 8,400.00 S/. 8,400.00 S/. 12,900.00
S/. 498.00 S/. 768.00 S/. 504.00 S/. 504.00 S/. 774.00S/. 83.00 S/. 128.00 S/. 84.00 S/. 84.00 S/. 129.00
S/. 8,881.00 S/. 13,696.00 S/. 8,988.00 S/. 8,988.00 S/. 13,803.00
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
2022 2023 2024 2025 2026
-S/. 375.00 S/. 0.00 S/. 375.00 -S/. 367.00 S/. 0.00
FLUJO DE COSTOS A PRECIO DE MERCADO2022 2023 2024 2025 2026
-S/. 375.00 S/. 0.00 S/. 375.00 -S/. 367.00 S/. 0.00S/. 13,696.00 S/. 8,881.00 S/. 8,881.00 S/. 13,696.00 S/. 8,988.00S/. 13,321.00 S/. 8,881.00 S/. 9,256.00 S/. 13,329.00 S/. 8,988.00
FLUJO DE COSTOS Y BENEFICIOS2023 2024 2025 2026 2027
POBLACION QUE TENDRA AGUA2023 2024 2025 2026 20271513 1718 1929 2149 2376
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2029 TOTAL
S/. 1,200.00 S/. 15,300.00S/. 7,200.00 S/. 100,800.00
S/. 22,500.00S/. 8,400.00 S/. 138,600.00
S/. 504.00 S/. 8,316.00S/. 84.00 S/. 1,386.00
S/. 8,988.00 S/. 148,302.00
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
2027 2028 2029
S/. 375.00 -S/. 375.00 -S/. 700.00
FLUJO DE COSTOS A PRECIO DE MERCADO2027 2028 2029
S/. 375.00 -S/. 375.00 -S/. 700.00S/. 8,988.00 S/. 13,803.00 S/. 8,988.00S/. 9,363.00 S/. 13,428.00 S/. 8,288.00
FLUJO DE COSTOS Y BENEFICIOS2028 2029
POBLACION QUE TENDRA AGUA2028 2029
2611 2854
COSTOS TOTALES A PRECIOS DE MERCADO
PRE INVERSION E INVERSION CANTIDAD
perfil del proyecto 1 S/. 4,000.00construccion einstalasion del reservorio 1 S/. 250,000.00aerogenerador 1 S/. 1,500,000.00cables electricos 1020 S/. 4.50postes 11 S/. 200.00materiales de anclaje 1020 S/. 15.00insumos por empalmescimentacion de postes 22 S/. 25.00tecnico electricista 2040 S/. 1.50alquiler de grua 11 S/. 50.00ingeniero 12 S/. 2,200.00diseño de organisacion y administrasiondiseño de capacitasionSUBTOTALGASTOS GENERALES 6%IMPREVISTOS 1%TOTAL
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTOPOST INVERSION 2016 2017 2018
insumos y materiales S/. 1,000.00 S/. 1,000.00 S/. 1,000.00remunerasion (650) S/. 7,800.00 S/. 7,800.00 S/. 7,800.00equipo de computo S/. 4,500.00
SUBTOTAL S/. 13,300.00 S/. 8,800.00 S/. 8,800.00GASTOS GENERALES 6% S/. 798.00 S/. 528.00 S/. 528.00
IMPREVISTOS 1% S/. 133.00 S/. 88.00 S/. 88.00TOTAL S/. 14,231.00 S/. 9,416.00 S/. 9,416.00
TOTAL DEL PROYECTO S/. 2,047,083.34
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
PRE INVERSION E INVERSION 2016
perfil del proyecto S/. 4,000.00construccion einstalasion del reservorio S/. 250,000.00
aerogenerador S/. 1,500,000.00cables electricos S/. 4,590.00
postes S/. 2,200.00materiales de anclaje S/. 15,300.00
insumos por empalmes S/. 612.00cimentacion de postes S/. 550.00
tecnico electricista S/. 3,060.00alquiler de grua S/. 550.00
COSTO POR
UNIDAD
COSTOTOTAL
ingeniero S/. 26,400.00diseño de organisacion y administrasion S/. 8,000.00
diseño de capacitasion S/. 5,000.00CAMBIO DE CAPITAL S/. 1,108.00
GASTOS GENERALES 6% S/. 108,976.00IMPREVISTOS 1% S/. 18,202.62
TOTAL S/. 1,947,680.34 S/. 1,108.00S/. 1,948,548.62
FLUJO DE COSTOS A PRECIO DE MERCADO2015 2016
flujo de pre inversion e inversion S/. 1,947,680.34 S/. 1,108.33flujo de costos de operasion y mantenimiento S/. 14,231.00
flujo de costos apresio de mercado S/. 1,947,680.34 S/. 15,339.33
FLUJO DE COSTOS Y BENEFICIOS2015 2016
( + )total de ingresos generado por el proyecto S/. 43,560.00( - )flujo de costos a precio de mercado S/. 1,947,680.34 S/. 15,339.33
flujo de costos y beneficios a precio de mercado -S/. 1,947,680.34 S/. 28,220.67
POBLACION QUE TENDRA AGUAAÑO 2016 2017
POBBLASION DEMANDADA 242 355
TARIFA 15 LOS 5 PRIMEROS AÑOSDESPUES UN ICREMENTO DE 5%
8712
COSTOS TOTALES A PRECIOS DE MERCADO
S/. 4,000.00 numero de cudras 10S/. 250,000.00 total de cuadras "m" 1000
S/. 1,500,000.00 pandeo 2 "m" por cuadra 20S/. 4,590.00 totala de cable"m" 1020S/. 2,200.00
S/. 15,300.00S/. 612.00 numero de postes 11S/. 550.00 albañiles 2
S/. 3,060.00 total de albañiles 22S/. 550.00
S/. 26,400.00S/. 8,000.00S/. 5,000.00
S/. 1,820,262.00S/. 109,215.72
S/. 18,202.62S/. 1,947,680.34
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2019 2020 2021 2022 2023 2024
S/. 1,000.00 S/. 1,000.00 S/. 1,050.00 S/. 1,050.00 S/. 1,050.00 S/. 1,050.00S/. 7,800.00 S/. 7,800.00 S/. 7,800.00 S/. 7,800.00 S/. 7,800.00 S/. 7,800.00S/. 4,500.00 S/. 4,500.00
S/. 13,300.00 S/. 8,800.00 S/. 8,850.00 S/. 13,350.00 S/. 8,850.00 S/. 8,850.00S/. 798.00 S/. 528.00 S/. 531.00 S/. 801.00 S/. 531.00 S/. 531.00S/. 133.00 S/. 88.00 S/. 88.50 S/. 133.50 S/. 88.50 S/. 88.50
S/. 14,231.00 S/. 9,416.00 S/. 9,469.50 S/. 14,284.50 S/. 9,469.50 S/. 9,469.50
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
2017 2018 2019 2020 2021 2022
COSTOTOTAL
-S/. 375.00 S/. 0.00 S/. 375.00 -S/. 375.00 S/. 4.00 S/. 375.00
-S/. 375.00 S/. 0.00 S/. 375.00 -S/. 375.00 S/. 4.00 S/. 375.00
FLUJO DE COSTOS A PRECIO DE MERCADO2017 2018 2019 2020 2021 2022
-S/. 375.00 S/. 0.00 S/. 375.00 -S/. 375.00 S/. 4.00 S/. 375.00S/. 9,416.00 S/. 9,416.00 S/. 14,231.00 S/. 9,416.00 S/. 9,469.50 S/. 14,284.50S/. 9,041.00 S/. 9,416.00 S/. 14,606.00 S/. 9,041.00 S/. 9,473.50 S/. 14,659.50
FLUJO DE COSTOS Y BENEFICIOS2017 2018 2019 2020 2021 2022
S/. 63,900.00 S/. 84,240.00 S/. 86,760.00 S/. 89,280.00 S/. 96,579.00 S/. 99,414.00S/. 9,041.00 S/. 9,416.00 S/. 14,606.00 S/. 9,041.00 S/. 9,473.50 S/. 14,659.50
S/. 54,859.00 S/. 74,824.00 S/. 72,154.00 S/. 80,239.00 S/. 87,105.50 S/. 84,754.50
POBLACION QUE TENDRA AGUA2018 2019 2020 2021 2022 2023468 482 496 511 526 542
TOTALS/. 9,200.00
S/. 70,200.00S/. 13,500.00S/. 92,900.00
S/. 5,574.00S/. 929.00
S/. 99,403.00
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION
2023 2024
-S/. 375.00 S/. 0.00
-S/. 375.00 S/. 0.00
FLUJO DE COSTOS A PRECIO DE MERCADO2023 2024
-S/. 375.00 S/. 0.00S/. 9,469.50 S/. 9,469.50S/. 9,094.50 S/. 9,469.50
FLUJO DE COSTOS Y BENEFICIOS2023 2024
S/. 102,438.00 S/. 105,462.00S/. 9,094.50 S/. 9,469.50
S/. 93,343.50 S/. 95,992.50
POBLACION QUE TENDRA AGUA2024558
COSTOS TOTALES A PRECIOS DE MERCADO
PRE INVERSION E INVERSION
Perfil del proyectoMaterialesConstruccion de BocatomaConstruccion de un reservorioCompra de una bombaPago por paso de canal por terrenos privadosInsumosMano de obra Alquiler de RetroexcavadoraCosto de Construccion de base del canaldiseño de organizacion y administraciondiseño de capacitacionsesion de asistencia tecnica en riego y agriculturaCompra de teodolito para trazos S/. 50 000
SUBTOTAL AGASTOS GENERALES 6%
IMPREVISTOS 1%TOTAL A
POST INVERSIONGasto de OperaciónGasto de MantenimientoSUBTOTAL B
GASTOS GENERALES 6%IMPREVISTOS 1%
TOTAL BCOSTO TOTAL
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTOPOST INVERSION 2015
insumos y materialesremunerasion (650)
SUBTOTALGASTOS GENERALES 6%
IMPREVISTOS 1%TOTAL S/. 0.00
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION Y VALOR DE RESCATE
PRE INVERSION E INVERSION
Perfil del proyectoMaterialesConstruccion de Bocatoma
Construccion de un reservorioCompra de una bombaPago por paso de canal por terrenos privadosInsumosMano de obra Alquiler de RetroexcavadoraCosto de Construccion de base del canaldiseño de organizacion y administraciondiseño de capacitacionsesion de asistencia tecnica en riego y agriculturaCompra de teodolito para trazos S/. 50 000 con
vida útil de 10 años y valor de rescate de 20%.CAMBIO DE CAPITALGASTOS GENERALES 6%IMPREVISTOS 1%TOTAL
FLUJO DE COSTOS A PRECIO DE MERCADO
flujo de pre inversion e inversion flujo de costos de operasion y mantenimientoflujo de costos apresio de mercado
FLUJO DE COSTOS Y BENEFICIOS
( + )total de ingresos generado por el proyecto( - )flujo de costos a precio de mercado
flujo de costos y beneficios a precio de mercado
Datos Generales
A Tasa de Impuesto General a las Ventas (IGV)
B Tasa de Impuesto a la Renta y a la solidaridad (IR)
C Coeficiente de rotación
D
COSTOS TOTALES A PRECIOS DE MERCADO
CANTIDAD
1 S/. 6,000.00 S/. 6,000.00 1 S/. 1,143,750.00 S/. 1,143,750.00 1 S/. 50,000.00 S/. 50,000.00 1 S/. 300,000.00 S/. 300,000.00 1 S/. 1,500.00 S/. 1,500.00
600 S/. 100.00 S/. 60,000.00 1 S/. 1,200.00 S/. 1,200.00
6000 S/. 35.00 S/. 210,000.00 5000 S/. 50.00 S/. 250,000.00 1000 S/. 120.00 S/. 120,000.00
1 S/. 3,000.00 S/. 12,500.00 1 S/. 8,000.00 S/. 8,000.00
S/. 42,000.00 1 S/. 50,000.00
### S/. 135,297.00 S/. 22,549.50
2412796.5POST INVERSION
440640179550
62019037211.4
6201.9663603.3
###
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2016 2017 2018
S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 S/. 7,800.00 S/. 7,800.00 S/. 7,800.00 S/. 9,800.00 S/. 9,800.00 S/. 9,800.00 S/. 588.00 S/. 588.00 S/. 588.00 S/. 98.00 S/. 98.00 S/. 98.00 S/. 10,486.00 S/. 10,486.00 S/. 10,486.00
COSTO DEL PROYECTO S/. 3,178,617.97
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION Y VALOR DE RESCATE
2016 2017
S/. 6,000.00 S/. 1,143,750.00 S/. 50,000.00
COSTO POR
UNIDAD
COSTOTOTAL
COSTOTOTAL
S/. 300,000.00 S/. 1,500.00 S/. 60,000.00 S/. 1,200.00 S/. 210,000.00 S/. 250,000.00 S/. 120,000.00 S/. 12,500.00 S/. 8,000.00 S/. 42,000.00
S/. 50,000.00 S/. 1,000.00 S/. - S/. 817.00 S/. - S/. 135,297.00 S/. 22,550.00 S/. 2,412,797.00 S/. 1,817.00 S/. -
FLUJO DE COSTOS A PRECIO DE MERCADO2015 2016 2017
S/. 3,076,399.80 S/. 817.00 S/. - S/. - S/. 10,486.00
S/. 3,076,399.80 S/. 817.00 S/. 10,486.00
FLUJO DE COSTOS Y BENEFICIOS2015 2016 2017
S/. 20,580.00 S/. 20,370.00 S/. 3,076,399.80 S/. 817.00 S/. 10,486.00 S/. -3,076,399.80 S/. 19,763.00 S/. 9,884.00
FLUJO DE COSTOS DE INVERSION Y VRDatos Generales Flujo de costos de inversión y VR, POSTA
18% A
12% B
12 C
0.4 D
E
F
G
H
FLUJO DE COSTOS DE OPERACIÓN Y MANTENIMIENTOFlujo de costos de operación y mantenimiento
Operación y mantenimiento del canal
N:Flujo de costos de operación y mantenimiento [ P + Q + R ]
O: Operación y mantenimiento del canal
P: Remuneraciones
R: Gastos generales [ 6% * P ]
S: Gastos por imprevistos [ 1% * P ]
FLUJO DE COSTOS GENERADOS POR EL PROYECTO
Flujo de ingresos generados por el proyecto
N° de Has
m3 x ha
s/. x m3
FLUJO DE COSTOS Y BENEFICIOS A PRECIO DE MERCADOFCBP
A
B
C
VALOR ACTUAL NETO A PRECIOS DE MERCADO VANP
Materialescemento arena gruesaarena confetilladoarena finatotal
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2019 2020 2021 2022
S/. 2,000.00 S/. 2,200.00 S/. 2,420.00 S/. 2,662.00 S/. 7,800.00 S/. 8,580.00 S/. 8,580.00 S/. 8,580.00 S/. 9,800.00 ### ### ### S/. 588.00 S/. 646.80 S/. 660.00 S/. 674.52 S/. 98.00 S/. 107.80 S/. 110.00 S/. 112.42 S/. 10,486.00 ### ### ###
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION Y VALOR DE RESCATE
2018 2019 2020 2021
S/. - S/. - S/. 82.00 S/. 18.00
S/. - S/. - S/. 82.00 S/. 18.00
FLUJO DE COSTOS A PRECIO DE MERCADO2018 2019 2020 2021
S/. - S/. - S/. 82.00 S/. 18.00 S/. 10,486.00 S/. 10,486.00 S/. 10,486.00 S/. 11,534.60 S/. 10,486.00 S/. 10,486.00 S/. 10,568.00 S/. 11,552.60
FLUJO DE COSTOS Y BENEFICIOS2018 2019 2020 2021
S/. 20,160.00 S/. 19,950.00 S/. 19,530.00 S/. 19,320.00 S/. 10,486.00 S/. 10,486.00 S/. 10,568.00 S/. 11,552.60 S/. 9,674.00 S/. 9,464.00 S/. 8,962.00 S/. 7,767.40
FLUJO DE COSTOS DE INVERSION Y VRFlujo de costos de inversión y VR, POSTA 2015 2016
### S/. -2,447.17
Licencias S/. -500.00
Terreno S/. -59,059.00
Construcción S/. -132,165.90
Equipamiento S/. -73,160.00
Capacitación S/. -1,180.00
Cambio en el capital de trabajo S/. -19,626.42 -2,447.17
Gastos generales e imprevistos S/. -18,624.54
FLUJO DE COSTOS DE OPERACIÓN Y MANTENIMIENTOFlujo de costos de operación y mantenimiento Años
2…10
7,538
Operación y mantenimiento del canal 7,045
Total costos inversión y VR (B+C+D+E+F+G+H)
N:Flujo de costos de operación y mantenimiento [ P + Q
O: Operación y mantenimiento del canal 2,114
P: Remuneraciones 4,931
R: Gastos generales [ 6% * P ] 422.7
S: Gastos por imprevistos [ 1% * P ] 70
FLUJO DE COSTOS GENERADOS POR EL PROYECTO
Flujo de ingresos generados por el proyecto 2015 2016 2017
FLUJO DE COSTOS Y BENEFICIOS A PRECIO DE MERCADOFCBP 2002 2003 2004
Total ingresos generados por el proyecto 0.00 0.00
Total costos de operación y mantenimiento -252,003.19 -283,424.81
FCBP, (A+B) -304,315.86 -169,527.11 -172,647.89
VALOR ACTUAL NETO A PRECIOS DE MERCADO VANP
Materialescemento S/. 268,750.00 arena gruesa S/. 400,000.00 arena confetillado S/. 175,000.00 arena fina S/. 300,000.00 total ###
FLUJO DE COSTOS DE OPERASION Y MANTENIMIENTO2023 2024 TOTAL
S/. 2,928.00 S/. 3,221.00 S/. 21,431.00 S/. 8,580.00 S/. 8,580.00 S/. 74,100.00
### S/. 11,801.00 S/. 95,531.00 S/. 690.48 S/. 708.06 S/. 5,731.86 S/. 115.08 S/. 118.01 S/. 955.31
### S/. 12,627.07 ###
FLUJO DE COSTOS DE PREINVERSIONV E INVERSION Y VALOR DE RESCATE
2022 2023 2024
S/. 20.00 S/. 22.00 S/. 1,000.00
S/. 20.00 S/. 22.00 S/. 1,000.00
FLUJO DE COSTOS A PRECIO DE MERCADO2022 2023 2024
S/. 20.00 S/. 22.00 S/. 1,000.00 S/. 11,770.00 S/. 12,028.94 S/. 8,881.00 S/. 11,790.00 S/. 12,050.94 S/. 9,881.00
FLUJO DE COSTOS Y BENEFICIOS2022 2023 2024
S/. 18,900.00 S/. 18,690.00 S/. 18,480.00 S/. 11,790.00 S/. 12,050.94 S/. 9,881.00 S/. 7,110.00 S/. 6,639.06 S/. 8,599.00
FLUJO DE COSTOS DE INVERSION Y VR2017 2018 -2024 LIQ.
S/. -2,447.58 S/. - S/. 110,013.35
59,059.00
26,433.18
-2,447.58 24,521.17
FLUJO DE COSTOS GENERADOS POR EL PROYECTO
2018 2018 -2024
2005-2010 LIQ.
0.00
-314,851.78
-173,320.78 110,013.35
Población de referencia
A Población COMUNA, *2015 5970.00 597.00
B Tasa crecimiento anual* 1.4%
C Población COMUNA, 2015 [ A x ( 1 -B )^9] 525.00
D No. personas promedio en una familia, COMUNA, 2015 * 4.00
E Familias COMUNA, 2015 [ C / D ] 131.00
Fuente: Estimaciones y Proyecciones del INEI - Huancavelica -Churcampa -Churcampa
Población de referencia 2015 2016 2017 2018 2019 2020 2021 2022
F Población COMUNA* 525 518 510 503 496 489 482 475
G Familias COMUNA [ F / D ] 131 129 128 126 124 122 120 119
* Población Referencia (2003) = C * (1 + B). Para los siguientes años: Población Referencia (t) = Población Referencia (t - 1) * (1 + B)
Población demandante sin proyecto 2015 2016 2017 2018 2019 2020 2021 2022
A 131 129 128 126 124 122 120 119
B 98 97 96 95 93 92 90 89
No. Personas Dist. Churcampa(N)
No. Personas Dist. Churcampa Metropolitano 10%N
Población de referencia No. familias [ VER CUADRO 3.2 ]
Población demandante sin proyecto No. familias agricultura [ A * 75% ]
597.00
1.4%
525.00
4.00
131.00
2023 2024
468 462
117 115
* Población Referencia (2003) = C * (1 + B). Para los siguientes años: Población Referencia (t) = Población Referencia (t - 1) * (1 + B)
2023 2024
117 115
88 86
No. Personas Dist. Churcampa Metropolitano 10%N