Download - Dossier Área 3 - Inglés 2015
![Page 1: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/1.jpg)
Comprehensive Solutions / Equipment and interior designHotels, Hospitals, Airports, Offices, Museums, Restaurants, Geriatrics...
January
2015
![Page 2: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/2.jpg)
![Page 3: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/3.jpg)
Parador de Cádiz - Commun zones
Comprehensive Solutions / Equipment and interior designHotels, Hospitals, Airports, Offices, Museums, Restaurants, Geriatrics...
![Page 4: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/4.jpg)
ÁREA 3
Elecnor, through its subsidiary, ÁREA 3, has incorporated Interior Design, Design and Equipment in theGroup’s activities. As a complementary activity to construction it puts all the pieces together, making itpossible to provide a service that is both comprehensive and specialized.In both new construction and renovation projects, ÁREA 3 contributes added value; in its capacity asan interior designer it is able to achieve an extra level of detail, an optimization of space and aestheticharmony with the building’s architecture, placing an emphasis on functionality or end use and subse-quentmaintenance.ÁREA 3 develops projects in collaboration with other work teams in the Elecnor Group, performing allthe interior design activities in global projects, in addition to undertaking projects independently that areexclusively 100% interior design work.The Elecnor Group has been working on interior design projects for over 10 years. The creation ofÁREA 3 brings these professionals together under a distinctive identity and brand.Over the years, we have acquired experience in a variety of activity sectors:
Renovation and adaptation of spaces
Corporate Offices and Buildings
Hospitality, Leisure and Restaurant Industry
Educational Centres and Libraries
Social Centres, Health Care and Hospital Facilities
Airports and Large Public Venues
Museums, Ephemeral Architecture and Interpretation Centres
Services and Solutions
ÁREA 3 specializes in Interior Design and Equipment for all types of undertakings.The company’s main focus is on spaces intended for public use, in both large-scale and small-scaleprojects.
We collaborate with our clients from the moment of decision to undertake a project to cover a specificneed, to the complete implementation of the project.
We also provide solutions regarding: - Use of space - Selection of materials - Design of special and/or standard equipment - Selection of technical equipment - Adaptation or renovation of the above.
All with a clear objective of aesthetic integration and functionality.We are one of the best alternatives for services in the field of interior architecture, design, implementationand the comprehensive equipping of spaces.
Zen garden Malaga Airport
![Page 5: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/5.jpg)
The Team
The ability of a company to contribute added value depends on the choice of its teams. ÁREA 3 hasprofessionals that are prepared to embrace the corporate project, with interests that enrich the work andthe overall outcome.
The team is made up of a variety of technical profiles (design, production and management / administra-tion) and has an organizational structure that is designed and based on ongoing teamwork and a singlegoal. There is a constant interrelationship between design and production, with both areas providingmutual feedback and consequently enriching the project at every stage. The work of the team, inpermanent contact with the client, focuses on providing the best personalized solutions.
We cover all the needs of our clients, providing the necessary experience in global solutions from designto implementation and, in some cases, start-up and subsequent maintenance.
In each job, right from the start, we work closely with both the client and the project planning team,placing the expertise of ÁREA 3 at their disposal to provide the necessary solutions during thedevelopment of any implementation.
Only in this way, with enthusiasm and trust, with teamwork and individuality, is it possible for creativityand innovation to emerge naturally.
Interior Architecture Projects- Personalized proposals
Integration with the environment and the Corporate Identity
- End-use awareness
Comprehensive EquipmentFurniture for all uses:
- Standard- Special customized manufacture
- Accessories- Audiovisual media
- Signs and application of corporate image
ImplementationTraditional construction work:
- Masonry- Installations and lighting
- Stationary and modular partition walls- Ceilings and floors
- Claddings
Decoration- Decorative items
- Single items
Activity Sectors
ÁREA 3 has successfully completed numerous projects, addressing activities related to food service,offices, waiting areas, lockers and dressing rooms, authority rooms, airport equipment, hotels,museums, libraries, geriatrics and all sorts of equipment for public and/or restricted areas.
We are constantly growing, consolidating our presence in multiple sectors, while at the same timediversifying our interior design activities in all aspects and promoting new guidelines for quality andsafety.
![Page 6: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/6.jpg)
Quality and the Environment
ÁREA 3 has sought to infuse its Environmental and Quality policies with maximum rigour and a commonmission: the continuous improvement of the organization.
The Management System is configured in accordance with two sets of criteria:
- A precise knowledge of the nature and magnitude of environmental impact, customer requirements and the occupational risks inherent in the activities and products of ÁREA 3.
- Strict compliance with current applicable legislation and other requirements to which ÁREA 3 subscribes in any market in which it operates.
Based on these common goals, the Management System establishes commitments and specific linesof action per area.
Quality
Quality is a top priority for ÁREA 3. It is the differentiating factor in a highly competitive market.
Within the Elecnor Group, each subsidiary is adapted to the specific characteristics of its business areaand activity, although they all share common lines of action in their quality management systems. The most prevalent are:
- Development of initiatives and actions aimed at improving the quality of service provided.
- Setting of goals with regard to quality and ensuring their fulfilment.
Environment
ÁREA 3 is committed to protecting the environment, a commitment that guides our activity.
The work carried out by Ehisa and ÁREA 3 blends harmoniously and respectfully with the environment,earning us certification under the UNE-EN ISO 14001 standard.
The environmental priorities are identified in each subsidiary and the necessary policies and actions fortheir compliance are put in place.
view of row of check-in counters
![Page 7: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/7.jpg)
![Page 8: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/8.jpg)
overview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
REMODELLING AND EQUIPMENTRESTAURANTE ALABASTER
ALABASTER S.L.
Madrid / 2014
€330,751.49
Project development and complete remodelling of Restaurante Alabaster in Madrid.
Work included new electrical installations, air-conditioning, plumbing and fire protection system. It also involved all vertical and horizontal surfaces, metalwork and woodwork and additional accessories required to make the location serviceable.
![Page 9: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/9.jpg)
RES
TAU
RA
NT
ALA
BA
STE
R
![Page 10: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/10.jpg)
sign
dining room
dining room
wine cellar
dining room
dining room and wine cellar
1
2
3
4
1
3
56
![Page 11: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/11.jpg)
2
5
6
4
![Page 12: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/12.jpg)
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
LAST MINUTE POINT ATOCHA RENFE STATION
RENFE VIAJEROS S.A.
Madrid / 2014
€49,894.00
Renovation of the new boarding area and Last Minute Point at Atocha Station in Madrid.
Work involved flooring and panelling (graphic design included), new backup LED lighting, Last Minute Point equipment/counter, as well as the integration of all ancillary equipment and elements.
overview
![Page 13: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/13.jpg)
LAS
T M
INU
TE P
OIN
T AT
OC
HA
![Page 14: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/14.jpg)
detail seat
overview
detail counter
rest area
detail seat
rest area
1
2
3
4
5
6
1
![Page 15: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/15.jpg)
2 3
4
5 6
![Page 16: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/16.jpg)
overview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
TAX OFFICE SERVICE COUNTERS
TAX OFFICE
Valladolid / 2014
€49,080.90
Manufacture and installation of service cou-nters, consultation lecterns and consultation tables/lecterns for the Tax Office’s New Special Delegation for Castile and León in Valladolid.
![Page 17: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/17.jpg)
AG
ENC
IA T
RIB
UTA
RIA
![Page 18: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/18.jpg)
detail counter
interior counters
rest area
exterior view
counters
1
2
3
4
5
1
44
![Page 19: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/19.jpg)
5
2
3
![Page 20: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/20.jpg)
exterioroverview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
EQUIPMENT FOR THE PORTO DO MOLLE CO-WORKING CENTRE AND BUSINESS INCUBATOR
VIGO FREE ZONE
Nigrán, Pontevedra / 2014
€171,757.92
Renovation of the new co-working centre and office equipment for the business incubator in the Porto do Molle Business Park in Nigrán (Pontevedra).
Work at the co-working centre included supplying and installing new flooring and general lighting. The centre was fitted with both standard and custom-manufactured equipment to make it serviceable.
As for the business incubator, it was fitted with 78 complete workstations.
![Page 21: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/21.jpg)
WO
RK
ING
CEN
TRE
![Page 22: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/22.jpg)
vista terraza habitación
habitación tipo + terraza
habitación tipo + mueble aparador
habitación tipo + terraza
habitación tipo + cama supletoria
habitación tipo + terraza
1
2
3
4
5
1
5
3
6
![Page 23: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/23.jpg)
2
4
6
![Page 24: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/24.jpg)
overview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
ADAPTATION OF SHOPPING PLAZASIN TERMINALS T4 AND T4S AT ADOLFO SUÁREZ-BARAJAS AIRPORT IN MADRID
AENA
Madrid / 2013
Madrid / 2013
Project development and renovation of the new shopping plazas in Terminals T4 and T4S at Adolfo Suárez-Barajas Airport in Madrid.
The project included new installations and supports for monitors and lighting, new flooring and ancillary equipment (special benches, loading tables and accessories).
The content due to be projected and the six-monthly updates were also determined.
![Page 25: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/25.jpg)
SH
OP
PIN
G P
LAZA
S T
4
![Page 26: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/26.jpg)
videowall and structure
overview
detail seats
overview
connecting point
1
2
3
4
5
1
44
![Page 27: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/27.jpg)
5
2
3
![Page 28: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/28.jpg)
view blue space
view green space
view orange space
union spaces
1
2
3
4
1
3
![Page 29: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/29.jpg)
2
4
![Page 30: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/30.jpg)
overview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
EQUIPMENT AND FURNITURE FOR THE BORN CULTURAL CENTRE MUSEUM PROJECT
BIM/SA
BIM/SA
€107,910.91
Supply and installation of equipment for the Born Cultural Centre’s new museum space in Barcelona, including furniture for meeting areas, waiting areas, storerooms and dressing rooms, as well as a mobile stage for events.
![Page 31: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/31.jpg)
CU
LTU
RA
L C
ENTR
E B
OR
N
![Page 32: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/32.jpg)
interior overview
stage and grandstand
bench
folding tables
meeting room
1
2
3
4
5
1
44
![Page 33: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/33.jpg)
5
2
3
![Page 34: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/34.jpg)
overview
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
EQUIPMENT FOR THE TERMINAL 2 EXTENSIONAT VALENCIA AIRPORT
AENA
Valencia / 2012-2013
Valencia / 2012-2013
Manufacture and installation of equipment for the check-in and boarding areas, common areas, offices, signs and accessories for the Terminal 2 extension at Valencia Airport.
Work consisted of supplying and installing:- Check-in and boarding counters, and passport control booths.- Office furniture: operational workstations (tables, chairs, closets and ancillary accessories)- Dressing room furniture: Lockers.- Furniture for public areas: benches, rubbish bins, belt barriers, etc.- Signs: directional signposts.- Check-in area frieze- Roller gates- Vertical gates: glass front and stainless steel.- Special stainless steel items: interior loc king drawers and exterior loading dock.
![Page 35: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/35.jpg)
VALE
NC
IA A
IRP
OR
T
![Page 36: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/36.jpg)
overview
detail gates
detail counter
detail screen
2
3
4
1
1
![Page 37: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/37.jpg)
2
3
4
![Page 38: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/38.jpg)
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
DECORATION OF ROOMS AND COMMONAREAS OF THE PARADOR DE TURISMO HOTELIN CÁDIZ - HOTEL ATLÁNTICO
Paradores de Turismo de España S.A
Cádiz / 2012
€ 2.185.061,87
The new Parador Hotel in Cádiz is a modernseven storey building whose avant-gardedesign has given rise to a new icon in contemporary architecture.
Our involvement consisted of the design,supply and installation of comprehensiveequipment for the common areas and forthe 106 rooms comprising the New Paradorde Cádiz.
The rooms have been equipped with desig-ner furniture and adapted/special woodwork.They have been complemented with built-in,decorative lighting, standard furniture andoutdoor furnishings for terraces.
The common areas are distributed overthe ground floor, the mezzanine and thefirst floor, where we have equipped all theaccess, reception, administrative, GaleríaTierra, snack room, restaurant, conventionhalls, business/client rooms, library,breakfast room, spa, terrace and outdoorpool areas. Modifications were also made tothe lighting system, in order to adapt lightingto the desired design.
overview terrace-pool
![Page 39: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/39.jpg)
PAR
AD
OR
DE
CÁ
DIZ
![Page 40: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/40.jpg)
view room terrace
standard room + terrace
standard room + detail of writing desk
standard room + terrace
standard room + extra bed
standard room + terrace
1
2
3
4
5
1
5
3
6
![Page 41: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/41.jpg)
2
4
6
![Page 42: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/42.jpg)
terrace - restaurant “Bahía de Cádiz”
breakfast room “Balcón del Atlántico”
terrace - bar “La Tacita del Atlántico”
terrace - restaurant “Bahía de Cádiz”
restaurant “Bahía de Cádiz”
terrace - bar “La Tacita del Atlántico”
1
2
3
4
2
5
5
6
![Page 43: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/43.jpg)
1
6
3 4
![Page 44: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/44.jpg)
Spa
reception Parador
treatment booth - spa
equipment terrace
multi-use room
multi-use room
multi-use room
lobby Parador
1
2
3
4
1
3 4
6
5
6
5
6
![Page 45: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/45.jpg)
2
87
5
![Page 46: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/46.jpg)
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
DECORATION OF SUITES FOR THE PARADORDE TURISMO HOTEL IN CÁDIZ -HOTEL ATLÁNTICO
Paradores de Turismo de España S.A
Cádiz / 2012
€ 283.736,81
After the previous facilities were torn downand following 3 years of work, the newParador Hotel in Cádiz, “Hotel Atlántico”, hasbecome a new icon in contemporary archi-tecture, a new and modern seven storeybuilding featuring an avant-garde design.
Our involvement consisted of the design,supply and installation of comprehensiveequipment for the 18 junior suites distributedover the floors of rooms of the Parador.The 18 suites have been equipped with designer furniture and adapted/special woodwork.
They have been complemented withbuilt-in, decorative lighting, standard furniture
and outdoor furnishings for terraces.
interior view of suite room
![Page 47: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/47.jpg)
SU
ITES
PA
RA
DO
R D
E C
ÁD
IZ
![Page 48: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/48.jpg)
equipment room
sofa detail
equipment room
headboard detail
terrace
rest area
1
2
3
4
5
1
3
5
6
![Page 49: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/49.jpg)
2
6
4
![Page 50: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/50.jpg)
interior view of room
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
USP SAGRADO CORAZÓN CLINIC IN SEVILLE
Clínicas Sagrado Corazón SLU
Sevilla / 2012
120.024,93€
Supply and installation of equipment andfurniture for the common areas and rooms of
the USP Sagrado Corazón Clinic.
![Page 51: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/51.jpg)
SA
GR
AD
O C
OR
AZÓ
N C
LIN
IC
![Page 52: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/52.jpg)
reception and waiting area overview
outdoor vertical garden
waiting area
signage
interior view of the reception
2
3
4
2
1
4
5
![Page 53: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/53.jpg)
1
3
5
![Page 54: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/54.jpg)
room furnishings
bathroom
room furnishings
view of the reception
1
2
3
4
2
![Page 55: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/55.jpg)
1
3
4
![Page 56: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/56.jpg)
whole building view
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
SUPPLY AND INSTALLATION OFIMDEA EQUIPMENT SOFTWAREON CAMPUS MONTEGANCEDO
IMDEA Software
Madrid / 2012
€ 178.152,71
Supply and installation of equipment IMDEASoftware facilities located on the campus ofMontegancedo in Madrid.
The equipment is made up of chairs andtables to their different rooms,meeting the needs of use.
![Page 57: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/57.jpg)
IMD
EA S
OFT
WA
RE
MA
DR
ID
![Page 58: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/58.jpg)
office equipment
meeting room
rest area
meeting room
operational positions
1
2
3
4
1
4
5
![Page 59: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/59.jpg)
3
5
2
![Page 60: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/60.jpg)
view entry access
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
PROVISION OF EQUIPMENT ANDMOUNT POWER FOR THE OFFICESMADRID ELECNOR
ELECNOR
Madrid / 2012
€ 446.577,57
Equipment for new energy facilities ofElecnor in Madrid, located in the buildingSollube.
Supply and installation of operational posi-tions, management offices, meeting roomsand office dividing walls.
![Page 61: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/61.jpg)
OFF
ICES
ELE
CN
OR
MA
DR
ID
![Page 62: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/62.jpg)
3
operational positions
glass dividing walls
office
bulkhead blind
operational positions
1
2
3
4
5
1
44
![Page 63: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/63.jpg)
5
2
![Page 64: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/64.jpg)
overviewboarding area
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
EQUIPMENT FOR THE NEW SOUTHTERMINAL OF THE BARCELONAAIRPORT
AENA / Plan Barcelona
Barcelona / 2008 - 2009
€ 11.419.338,00
General and specific equipment for:- Offices of AENA, Guardia Civil, Mossos d´Esquadra and Customs- Storage and dressing rooms- Lockers and lost and found- Airport Health Offices- Employee Lunchroom- Authorities Room- VIP Lounges- Chapels- Public areas- Parking and Access Ways- Terminal Information Points- Employee canteen- Signage for restricted areas
![Page 65: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/65.jpg)
BA
RC
ELO
NA
AIR
PO
RT
![Page 66: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/66.jpg)
AENA information points
view of security filter
public telephone mounting
outdoor equipment
view of electronic lockers
ground zone benches
1
2
3
4
1
3 4
5
5
6
![Page 67: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/67.jpg)
2
6
![Page 68: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/68.jpg)
view of office equipment
general view of CGA (airport management centre)
multi-faith chapel
check-in counters VIP lounge
airport medical ward
view of employee lunchroom
1
2
3
4
5
1
3
5
6
![Page 69: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/69.jpg)
2
4
6
![Page 70: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/70.jpg)
VIP lounge equipment
VIP lounge self service and coffee shop
authorities room
detail of VIP lounge furnishings
press room
1
2
3
4
5
2
![Page 71: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/71.jpg)
1
3 4
5
![Page 72: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/72.jpg)
overviewcommercial modules
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
SUPPLY OF EQUIPMENT FOR THECHECK-IN AND DEPARTURES BUILDINGREUS AIRPORT
AENA
Reus, Tarragona / 2009
€ 1.423.971,00
Supply and Installation of:- Standard furniture for offices and other rooms- Airport Control Centre Console- Restroom equipment- Specially manufactured furniture- Check-in counters- Commercial premises and for Concessions- Equipment for public areas and acces sories- Signage
![Page 73: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/73.jpg)
REU
S A
IRO
PR
T
![Page 74: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/74.jpg)
office area equipment
airport management centre (CGA) equipment
interior view of check-in counters
front view of airline counters
boarding zone equipment
view of row of check-in counters
1
2
3
4
6
1
3
5
![Page 75: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/75.jpg)
6
2
4 5
![Page 76: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/76.jpg)
overview of equipmentboarding area
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
ADAPTATION AND EQUIPMENT FOR THENEW T3 TERMINAL BUILDINGMÁLAGA AIRPORT
AENA
Málaga / 2008 - 2010
€ 14.465.000,00
Construction of the Authorities Room, PressRoom and VIP Lounge.
Architecture: pavements, enclosures, compartmentalization, floors, ceilings, surfacings, wood and metal carpentry and claddings.Installations: electric, sanitation and plumbing, air conditioning, fire detection andextinguishing.Single elements, railings, partition walls, etc.
Specialized carpentry and locksmith work:- Check-in cubicles, tourist information, arrival information- Tour operator stands / Rent a Car- Pat-down booths- Passport Control Booths- Check-in counters, information, security forces and handling- Technical Consoles (Airport Management Centre, Loudspeakers and CECOA - Airport Coordination Centre)
Furniture and equipment:- Offices (management, operations and meeting rooms)- Furniture for public areas- Chapels- Food Service
![Page 77: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/77.jpg)
MÁ
LAG
A T
3 A
IRP
OR
T
![Page 78: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/78.jpg)
view of multi-purpose room
detail of railing
authorities room
pat-down booths
press room
1
2
3
4
5
1
44
![Page 79: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/79.jpg)
5
2
3
![Page 80: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/80.jpg)
passport control area
outdoor equipment
Airport Coordination Centre (CECOA) equipment
view of airline modules
view of row of check-in counters
1
2
3
4
5
5
1
3
![Page 81: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/81.jpg)
6
2
44
5
![Page 82: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/82.jpg)
general view of VIP lounge
VIP lounge working area
Catholic chapel
self-service VIP Lounge
detail of VIP lounge furnishings
indoor Zen garden
1
2
3
4
2
5
5
6
![Page 83: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/83.jpg)
1
6
3 4
![Page 84: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/84.jpg)
view of exterior façade of the building
Diputació de Barcelona. Photos: ago2/Oscar Ferrer
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
FURNITURE FOR THE MUNICIPALLIBRARY OF CASTELLDEFELS
Castelldefels City Council
Castelldefels, Barcelona / 2011
€ 515.706,00
Supply and Installation of:- Specific library equipment- Rest and play area furniture- Customized furniture / special carpentry- Anti-theft system- Specialized locksmith work- Signage and signs
![Page 85: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/85.jpg)
LIB
RAY
OF
CA
STE
LLD
EFEL
LS
![Page 86: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/86.jpg)
children’s area
book storage area
children’s books storage area
detail of book shelf
book storage area
1
2
3
4
5
Diputació de Barcelona. Photos: ago2/Oscar Ferrer
![Page 87: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/87.jpg)
1 2
3 4
5
![Page 88: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/88.jpg)
general view
children’s area
graphic children’s area
book storage area
children’s area
1
2
3
4
2
5
5
Diputació de Barcelona. Photos: ago2/Oscar Ferrer
![Page 89: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/89.jpg)
1
3 4
![Page 90: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/90.jpg)
general view of premises
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
NIÑO DE ORO BUILDINGS, I AND IIIADMINISTRATIVE, TRAINING ANDBUSINESS CONSULTANCY AREAS
Caepionis
Chipiona, Cádiz / 2011
341.763,89 €
Adaptation of new multi-purpose venueNIÑO DE ORO BUILDINGS, I AND III,consisting of:- Trade Fair- Administrative / Office area- Training rooms- Restrooms- Signage
![Page 91: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/91.jpg)
NIÑ
O D
E O
RO
BU
ILD
ING
S
![Page 92: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/92.jpg)
training room
training room
reception desk
administrative area
1
2
3
4
1
3
![Page 93: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/93.jpg)
2
4
![Page 94: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/94.jpg)
detail of display cases
detail of display case and printed graphics
projection room
seating area
general view of coffee shop
detail of coffee shop furniture
1
2
3
4
5
1
3
6
5
![Page 95: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/95.jpg)
2
4
6
![Page 96: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/96.jpg)
interior view of coffee shop
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
EQUIPMENT FOR RESTAURANT SERVICE -CAFETERÍA DE LAS CARACOLAS
Madrid / 2008
Chipiona, Cádiz / 2011
€ 193.183,00
Adaptation of modular building for use asa dining room/coffee shop, for which thefollowing actions were performed:- Analysis of flows and operability- Equipment and food service furniture- Refrigerator chambers- Washing area- Kitchen and food preparation area- Coffee shop counters- Laundry- Self-service- Fire protection system- Adaptation of facilities
![Page 97: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/97.jpg)
EQU
IPM
ENT
SER
VIC
E
![Page 98: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/98.jpg)
interior view barra
view autoservice zone
view wash zone
view cook zone
view autoservice zone
coffe shop view
1
2
3
4
5
6
1
![Page 99: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/99.jpg)
2 3
4
5 6
![Page 100: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/100.jpg)
view of façade
PROJECT:
CLIENT:
LOCATION / YEAR:
AMOUNT:
DESCRIPTION:
RESIDENCE AND DAY CARE CENTREFOR THE ELDERLY
Fundació Sant Joan de Deu
Martorell, Barcelona / 2011
€ 7.000.000,00
Comprehensive implementation of residenceand day care centre for the elderly andsubsequent equipping.
The Sant Joan de Deu Residence andDay Care Centre for the Elderly in Martorellis a healthcare centre with 91 rooms thatis designed to accommodate up to 135residents and to provide service to another35 in the day care centre. It has 47 privaterooms and 44 shared rooms for residents.It is located in the western part of the city ofMartorell, with almost direct access from theA-7 highway.
The new site is a single curved building,consisting of a basement, a ground floor andtwo more floors. The parking and auxiliaryservices of the centre are located in thebasement, the day care centre and commonservices are on ground floor and the roomsfor residents are on the first and secondfloors.
In total, the building is 7,200 m2, built on aplot of 5,247 m2.
![Page 101: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/101.jpg)
MA
RTO
REL
L R
ESID
ENC
E
![Page 102: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/102.jpg)
exterior view of building
interior room
reception
general view of common areas
detail equipment
1
2
3
4
5
1
3
![Page 103: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/103.jpg)
2
4 5
![Page 104: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/104.jpg)
entrance
meeting room
detail equipment
detail equipment
diagram south elevation
1
2
3
4
1
5
3
![Page 105: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/105.jpg)
2
4
5
![Page 106: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/106.jpg)
Corporate Offices and Buildings
o Administrative area, training room and business consultancy area. Niño De Oro Buildings. Chipiona (Cadiz).
o Office equipment for terminal building extension, Reus Airport (Tarragona).
o New office area in Ibiza Airport (Ibiza).
o Office furniture and training rooms, Pamplona Airport (Pamplona).
o Office furniture and multi-purpose rooms, Girona Airport (Girona).
o Office equipment new South Terminal Area (NAT), Barcelona Airport (Barcelona).
o Office equipment New Terminal Area (NAT), Malaga Airport (Malaga).
o Office equipment Deimos, Puertollano (Ciudad Real).
o Office equipment Hipoges, Madrid and Lisbon (Spain - Portugal).
o Office equipment and interior partitions Elecnor-Energy, Sollube Building (Madrid).
o Office equipment new Earth Observation Space Services integration building - Deimos (Puertollano).
o Office equipment and new office facilities, Hipoges (Madrid).
o Office equipment and new office facilities, Incus Capital (Madrid).
o Management office equipment, Elecnor centre (Madrid).
o Equipment for new local police force headquarters in Majadahonda (Madrid).
o Office equipment for Chavarri&Muñoz Lawyers (Madrid).
o Office equipment for Elecnor Engineering (Madrid).
o Remodelling of Elecnor offices, 15th floor of Europa Tower (Madrid).
o Office equipment and interior partitions, 5th floor Chavarri&Muñoz Lawyers (Madrid).
o Equipment for new Finanzauto headquarters in Barberà del Vallès (Barcelona).
o Remodelling of Elecnor Call Centre Getafe (Madrid).
o Equipment for Porto do Molle Co-Working Centre and Business Incubator (Pontevedra).
o Service equipment for Tax Office (Valladolid).
o Equipment for new ICEX Spain headquarters at Paseo de la Castellana, 278 (Madrid).
o Equipment for new COFIDES Spain headquarters at Paseo de la Castellana, 278 (Madrid).
Hospitality, Leisure and Restaurant Industry
o Equipment for restaurant service “Cafetería de las Caracolas” - RENFE (Madrid).
o Decoration of rooms and common areas at Parador de Cádiz (Cadiz).
o Decoration of suites at Parador de Cádiz (Cadiz).
o Food service equipment for new terminal area at Pamplona Airport (Pamplona).
o Self-service food service equipment for Authorities Room at Malaga Airport (Malaga).
o Self-service food service equipment for Authorities Room at Barcelona Airport (Barcelona).
o Remodelling and equipment for Restaurante Alabaster (Madrid).
o Industrial kitchen equipment and accessories (Democratic Republic of Congo).
o Equipment for Restaurant Allard (Madrid).
Educational Centres, Libraries
o Furniture for the Castelldefels Municipal Library (Barcelona).
o Office equipment for IMDEA Software (Madrid).
o Extension of equipment for IMDEA Software Campus in Montegancedo (Madrid).
Social, Residential, Care
and Medical Centres
o Nursing home in Martorell (Barcelona).
o Sagrado Corazón Clinic USP (Seville).
o General furniture for the new Central University Hospital of Asturias - Lot 8 (Oviedo).
o Equipment for Mijas Costa Fuengirola Alzheimers Day Centre (Malaga).
ÁREA 3: References
Barcelona Airport
![Page 107: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/107.jpg)
![Page 108: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/108.jpg)
ÁREA 3: References
Airports and Large Public Venues
o New fire extinguishing building (S.E.I.), Granada Airport (Granada).
o Passport control facilities, Ibiza Airport (Ibiza).
o Relocation of finance and administration division and several interventions at Aena 1, Palma Airport (Palma de Mallorca).
o Equipment check-in and departure building, Reus Airport (Tarragona).
o Equipment new South Terminal Area (NAT), Barcelona Airport (Barcelona).
o Construction commercial areas, Ibiza Airport (Ibiza).
o Furniture and equipment for the remodelling of Girona Airport (Girona).
o Furniture and equipment air bridge VIP lounge and public payphones, Barcelona Airport (Barcelona).
o Supply and installation of counters for the New Terminal Area (NAT), Malaga Airport (Malaga).
o Furniture for public areas at the New Terminal Area (NAT), Malaga Airport (Malaga).
o Furniture and decoration for the New Terminal Area (NAT), Malaga Airport (Malaga).
o Furniture and equipment for the New Terminal Area (NAT), Pamplona Airport (Navare).
o Equipment and furniture for the New Terminal Area (NAT), Algeciras Heliport (Cadiz).
o Furniture and equipment for the New Terminal Area (NAT), La Palma Airport. (Santa Cruz de Tenerife)
o General equipment for the New Terminal Area (NAT), Santiago de Compostela Airport (A Coruña).
o Furniture and equipment for the new fire extinguishing building (S.E.I.), Malaga Airport (Malaga).
o Furniture and equipment for the terminal building, Ibiza Airport (Ibiza).
o Furniture and equipment for the terminal building, Valencia Airport (Valencia).
o Furniture and equipment for the terminal building, Vigo Airport (Pontevedra).
o Furniture and equipment for Gran Canaria Airport (Las Palmas).
o Adaptation of shopping plazas in Terminals T4 and T4S, Adolfo Suárez-Barajas Airport (Madrid).
o Last Minute Point, Atocha Renfe Station (Madrid).
o Last Minute Point, Chamartín Renfe Station (Madrid).
Museums, Ephemeral Architecture and
Special Projects
o Multi-purpose venue for conferences, exhibitions and trade fairs. Niño De Oro Buildings (phase 3).
Rocío Jurado Museum. Chipiona (Cadiz).
o Administrative area, training room and business consultancy area. Niño De Oro Buildings. Chipiona (Cadiz).
o Equipment and furniture for the Born Cultural Centre Museum Project (Barcelona).
o Supply of carts for BIM/SA mobile stage (Barcelona).
VideoWall Madrid T4 Airport
![Page 109: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/109.jpg)
![Page 110: Dossier Área 3 - Inglés 2015](https://reader030.vdocuments.co/reader030/viewer/2022020223/57906cb31a28ab68748caa87/html5/thumbnails/110.jpg)
ÁREA3Equipamiento, Diseño e Interiorismo S.L.
Maestro Alonso 21-2328028 Madrid
T +34 917 260 076F +34 917 130 817