BC/02
BCO. FECHA FECHA TIPO TIPO TRATA- VOLUMEN ESPESOR USOS USO RESTRICC. ASPEC.
NUM. ESTUDIO DE ACT. PROP. MATERIAL MIENTO X 1000 m3 DESPALME (m) PROB. EXPL. ECOLOG. ECONOM.
94LA PUERTA II
32°20´00" N; 115°20´46" O30+800 D 02000 mar-13 nov-17 EJID CONG TPC 300 0.2 5, 6, 10 NR NE REC
14LA PUERTA
32°18´53" N; 115°19´50" O31+500 D 00800 jul-95 nov-17 EJID. CONG. TPC. 78 0.2 2, 5 NR. NE. REC.
66GUSA
32°17¨46" N; 15°19´47" O 36+000 D 00200 mar-10 nov-17 PART CONG TPC 100 0.2 2-5-6-7-8-10 NR NE REC
69
PAVIMENTADORA
TIJUANA
32°17´39" N; 115°19´30" O
36+000 D 00070 jul-95 nov-17 EJID. CONG. TPC. 50 0.2 2,5 NR NE. REC.
70SONY
32°17¨12" N; 115°19¨40" O37+000 D 00300 jul-10 nov-17 PART CONG. TPC 100 0.2 2-5-6-7-8-10 NR NE REC
104CADENA
32°17´02" N; 115°20´13" O 37+100 D. 01800 oct-15 nov-17 PART CONG TPC 60 0.2 5-6-7-8-7-10 NR NE REC
3EL FARO
32°16´54" N; 115°19´55" O37+500 D 00100 jul-95 nov-17 EJID. CONG. TPC. 20 0.2 1-2-5-6-7-8 NR. NE. REC.
21PELAYO
32°16´04" N; 115°20´17" O38+950 D 02000 jul-95 nov-17 EJID. CONG. TPC. 120 0.2 1-2-5-6-7-8 NR. NE. CONVE.
54GALLEGOS
32°14´43" N; 115°20´26" O40+000 D 2500 feb-04 nov-17 EJID. CONG. TTC. 100 0.2 5-6-7-8-10 NR. NE. CONVE
65OSAL
32°14´24" N; 115°20´01" O 40+000 D 04000 ago-10 nov-17 PART CONG TPC 100 0.2 2-5-6-7-8-10 NR NE REC
85LÓPEZ MATEOS
32°14´24" N; 115°20´01" O44+200 D 01300 mar-12 nov-17 EJID CONG TPC 200 0.2 1-2-5-7-8 NR NE REC
23EL MAYOR
32°05´53" N; 115°16´11" O 57+600 D 01600 jul-95 nov-17 PART. CONG. TPC. 6000 0.2 1-2-5-6-7-8-9-10 NR. NE. CONVE.
68ARCON
32°00´45" N; 115°14´08" O 69+650 D 01000 ago-11 nov-17 PART CONG TPC 900 0.2 2,5 NR NE REC
84JOSE SALDAÑA
31°49´53" N; 115°09´35" O 89+900 D 01300 mar-12 nov-17 PART CONG TPC 200 0.2 1-2-5-7-8-10 NR NE REC
87VENTANA II
31°44´24" N; 115°03´55" O105+000 I 00300 abr-12 nov-17 PART CONG TPC 50 0.2 1, 2 NR NE REC
39LA VENTANA
31°43´24" N; 115°03´44" O107+000 D 00100 jul-95 nov-17 EJID. CONG. TPC. 150 0.2 5-6-7-8-10 NR. NE. REC.
16SIN NOMBRE
31°39´38" N; 115°04´13" O115+250 D 00150 jul-95 nov-17 EJID. CONG. TPC. 50 0.2 1-2-5-6-7-8 NR. NE. REC.
88ARCA-TALWIWI
31°34´06" N; 115°04´58" O 125+500 D 00600 abr-12 nov-17 PART CONG TPC 200 0.2 1-2-5-6 NR NE REC
89FLOVA
31°31´19" N; 115°05´01" O130+000 D 00800 abr-12 oct-17 PART CONG TPC 150 0.2 1-2-5-6-7-8-10 NR NE REC
59PLAYA GRANDE
31°11´55" N; 114°57´58" O 168+000 D 02500 oct-09 nov-17 PART. CONG. TPC. 200 0.2 5, 6, 10 NR. NE. REC.
60UNION
31°10´38" N; 114°58´19" O 170+000 D 02500 oct-09 nov-17 PART. CONG. TPC. 150 0.2 5 , 6 NR. NE. REC.
18PLAN AGRARIO
31°03´09" N; 114°52´34" O 187+850 D 01500 oct-94 nov-17 EJID. CONG. TPC. 90 0.2 1-2-5-6-7-8 NR. NE. CONVE.
NOMENCLATURA Y ABREVIATURAS UTILIZADAS:
- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES
(FECHA DE ACT.) 1.- REVESTIMIENTO 10.- CONCRETO HIDRAULICO - ASPECTOS ECONOMICOS
- TIPO DE PROPIEDAD CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 2.- SUB-BASE 11.- ESCOLLERAS
FED.- FEDERAL VOLC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 3.- SUB-BALASTO REC.- RECOMENDABLE
EST.- ESTATAL C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 4.- BALASTO - RESTRICIONES ECOLOGICAS CONVE.- CONVENIENTE
MPL.- MUNICIPAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 5.- BASE ACEP.- ACEPTABLE
PART.- PARTICULAR NR.- NO REQUIERE TT.- TRITURACION TOTAL TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO 6.- CONCRETO ASFALTICO NE.- NO EXISTEN NO REC.- NO RECOMENDABLE
COM.- COMUNAL ACEP.- ACEPTABLE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 7.- MEZCLA ASFALTICA EN EL LUGAR P.- POSIBLESEJID.- EJIDAL SR.- SIN RESTRICCIONES TPC.- TRITURACION PARCIAL ECP.- ESTABILIZACION CON CEMENTO PORTLAND 8.- SELLO CONSIDER.- CONSIDERABLES
Y CRIBADO 9.- MAMPOSTERIA MPOR.- IMPORTANTES
CENTRO SCT BAJA CALIFORNIA
CARRETERA: MEXICALI - SAN FELIPE
NOMBRE KILOMETRO DESVIACION
UNIDAD GENERAL DE SERVICIOS TECNICOS
I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 1 7
BC
/03
L O
C A
L I Z
A C
I O N
D E
B A
N C
O S
D E
M A
T E
R I A
L E
S
628
2
15
29
N
2017
5163
71
92 96
99
106 105
BC/04
BCO. FECHA FECHA TIPO TIPO TRATA- VOLUMEN ESPESOR USOS USO RESTRICC. ASPEC.
NUM. ESTUDIO DE ACT. PROP. MATERIAL MIENTO X 1000 m3 DESPALME (m) PROB. EXPL. ECOLOG. ECONOM.
1EL PROGRESO
32°33´46" N; 115°36´45" O7+500 I 04000 jul-95 nov-17 EJID. CONG. TPC. 200 0.2 2, 5, 7 NR. CONSIDER. ACEP.
105HERIBERTO JARA
32°33´34" N; 115°37´29" O 8+000 I. 06000 jul-15 nov-17 EJID CONG TPC 150 0.2 2, 5, 7 NR. CONSIDER. ACEP.
5EMILIANO ZAPATA
32°34´24" N; 115°28´49" O10+800 I 06000 jul-92 nov-17 EJID. CONG. TPC. 4000 0.2 2, 5, 8 NR. NE. ACEP.
2EL CENTINELA
32°35´03" N; 115°43´26" O21+000 D 00300 jul-95 nov-17 EJID. CONG. TPC. 200 0.2 2-5-7-8 NR. NE. REC.
63CUESTA 2
32°29´27" N; 116°43´39" O148+400 D 01000 sep-09 nov-17 PART. CONG. TPC. 120 0.2 5, 10 NR. NE. ACEPT.
71ROTTER
32°28´46" N; 116°45´12" O150+000 D 00200 feb-10 nov-17 PART CONG TPC 650 0.2 6, 7, 8 NR NE CONVE
6EL CARRICITO 2
32°27´19" N; 116°45´26" O150+100 I 00800 jul-95 nov-17 PART. CONG. TPC. 300 0 1-2-5-6-7-8-10 NR. CONSIDER. CONVE.
51LA ENCANTADA
32°26´13" N; 116°52´34" O161+000 I 01000 mar-02 nov-17 PART. CONG. TPC. 100 0.4 2-5-6-10 NR NE. ACEP.
106ROSARITO
32°18´54" N; 116°58´56" O33+000 I.03500 dic-15 nov-17 PART CONG. TPC 300 0.2 6,10 NR P CONVE.
28EL MORRO
32°16´27" N; 116°58´574" O 38+600 I 00700 feb-99 nov-17 PART. CONG. TPC. 1000 0 1-2-5-6-7-8-10 NR. NE. CONVE.
29LA POSTA
32°11´49" N; 116°52´35" O49+700 I 06000 feb-90 nov-17 EJID. CONG. TPC. 50 0 1-2-5-7-8-10 NR. NE. CONVE.
92LA SALINA
31°59´00" N; 116°45´43" O63+000 D14000 oct-12 nov-17 PART VOL TTC 140 0.2 1,2,5,6,10 NR NE REC.
96SANTA ROSA
31°59´58" N; 116°44´45" O82+000 I 05000 jun-13 nov-17 PART CONG TTC 1 800 0.15 1-2-5-6-10 NR P REC
99SALDAMANDO
32°54´25" N; 116°44´31" O95+000 D 03000 jun-14 nov-17 PAR VOL TT 20 0.2 2, 9, 11 NR NE CONVE.
NOMENCLATURA Y ABREVIATURAS UTILIZADAS:
- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES
(FECHA DE ACT.) 1.- REVESTIMIENTO 10.- CONCRETO HIDRAULICO - ASPECTOS ECONOMICOS
- TIPO DE PROPIEDAD CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 2.- SUB-BASE 11.- ESCOLLERAS
FED.- FEDERAL VOLC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 3.- SUB-BALASTO REC.- RECOMENDABLE
EST.- ESTATAL C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 4.- BALASTO - RESTRICIONES ECOLOGICAS CONVE.- CONVENIENTE
MPL.- MUNICIPAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 5.- BASE ACEP.- ACEPTABLE
PART.- PARTICULAR NR.- NO REQUIERE TT.- TRITURACION TOTAL TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO 6.- CONCRETO ASFALTICO NE.- NO EXISTEN NO REC.- NO RECOMENDABLE
COM.- COMUNAL ACEP.- ACEPTABLE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 7.- MEZCLA ASFALTICA EN EL LUGAR P.- POSIBLESEJID.- EJIDAL SR.- SIN RESTRICCIONES TPC.- TRITURACION PARCIAL ECP.- ESTABILIZACION CON CEMENTO PORTLAND 8.- SELLO CONSIDER.- CONSIDERABLES
Y CRIBADO 9.- MAMPOSTERIA MPOR.- IMPORTANTES
CARRETERA: TIJUANA – ENSENADA
KILOMETRO DESVIACION
CARRETERA: MEXICALI-TIJUANA
NOMBRE
I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 1 7UNIDAD GENERAL DE SERVICIOS TECNICOS
CENTRO SCT BAJA CALIFORNIA
BC
/05
L O
C A
L I Z
A C
I O N
D E
B A
N C
O S
D E
M A
T E
R I A
L E
S
17
19
24
25
26
30
31
32
20
N
201722
49
50
78
75
74
76
77
977
107
BC/06
BCO. FECHA FECHA TIPO TIPO TRATA- VOLUMEN ESPESOR USOS USO RESTRICC. ASPEC.
NUM. ESTUDIO DE ACT. PROP. MATERIAL MIENTO X 1000 m3 DESPALME (m) PROB. EXPL. ECOLOG. ECONOM.
17EL SOCORRO
30°19´24" N; 115°48´41" O24+900 I 00300 feb-98 nov-17 PART. CONG. TPC. 1500 0 2-5-6-7-8-10 NR. NE. REC.
49ARROYO HONDO
30°13´18" N; 115°38´40" O34+850 I 01100 feb-02 nov-17 EJID. CONG. TTP. 100 0.2 2-5-6-7-8-9-10 NR. P. CONVE.
19EL PAREDON
30°06´09" N; 115°38´40 O65+500 I 02300 feb-90 nov-17 PART. CONG. TPC. 500 0.2 1-5-6-7-10 NR. NE. REC.
24EL CRUCE
30°04´10" N; 115°35´43" O73+000 I 00100 feb-86 nov-17 EJID. CONG. TPC. 2000 0.3 1-2-5-6-7-8-9-10 NR. NE. REC.
78BUENOS AIRES
29°57´10" N; 115°09´12" O127+000 D-00500 oct-11 nov-17 PART CONG TPC 2000 0.1 2-5-7-8-10 NR P CONVE
25EL MARMOL
29°55´57" N; 114°59´15" O143+900 I 06000 feb-93 nov-17 EJID. CONG. TPC. 70 0.1 7, 8 NR. NE. CONVE.
26EL PEDREGOSO
29°32´20" N; 114°31´04" O209+800 D 00400 feb-98 nov-17 EJID. CONG. TT. 500 0.2 1-2-5-6-7-8-10 NR. NE. REC.
50PUNTA PRIETA
28°55´39" N; 114°09´47" O 13+000 D 01000 feb-02 nov-17 EJID. CONG. TPC. 500 0.3 2-5-6-7-10 NR. P. CONVE.
30BENITO JUAREZ
28°46´32" N; 114°06´22" O33+100 I 00500 jul-95 nov-17 EJID. CONG. TPC. 40 0.5 1-2-5-6-7-8-10 NR. NE. REC.
31SAN JAVIER
28°31´53" N; 114°02´19" O65+500 I 00300 ene-86 nov-17 PART. CONG. TPC. 20 0.4 1, 2 , 7 NE. CONVE.
32EL MACHUCA
28°24´15" N; 113°58´28" O82+800 I 03000 feb-97 nov-17 PART. CONG. TPC. 100 0.1 1-2-5-6-7-8-9 NR NE. REC.
75VALLE DE LAS PALMAS
32°21´41" N; 116°37´24" O20+300 I 02000 jun-10 nov-17 PART CONG TPC 2000 0.2 2-5-6-7-8-10 NR P CONVE
77EL CHAMIZAL
32°20´39" N; 116°35´48" O32+750 D 00500 jun-10 nov-17 EJID. CONG TPC 2000 0.1 2-5-6-7-8-10 NR NE REC
76TESTERAZO
32°19´04" N; 116°32´34" O47+000 I 00500 jun-10 nov-17 PART CONG TPC 2000 0.2 2-5-6-7-8-10 NR P ACEP
107LAS CALABAZAS
32°17´13" N; 116°31´38" O 50+250 I.00200 jul-15 nov-17 EJID CONG TPC 300 0.2 2, 5 NR P CONV
74ZARAGOZA
32°11´29" N; 116°29´34" O 67+000 D 01000 jun-10 nov-17 EJID CONG TT 2000 0.3 2-5-6-7-8-10 NR P REC
22EL CAÑON DEL BURRO
32°08´54" N; 116°31´08" O70+500 I 00050 mar-90 nov-17 EJID. CONG. TPC. 40 0.1 1-2-5-6-7-8-10 NR. P. CONVE.
20CIENTO VEINTISEIS
29°32´20" N; 114°31´04" O 126+000 I 00100 mar-90 nov-17 COM. CONG. TT. 100 0.3 1-2-5-6-7-8-10 NR. NE. REC.
NOMENCLATURA Y ABREVIATURAS UTILIZADAS:
- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES
(FECHA DE ACT.) 1.- REVESTIMIENTO 10.- CONCRETO HIDRAULICO - ASPECTOS ECONOMICOS
- TIPO DE PROPIEDAD CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 2.- SUB-BASE 11.- ESCOLLERAS
FED.- FEDERAL VOLC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 3.- SUB-BALASTO REC.- RECOMENDABLE
EST.- ESTATAL C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 4.- BALASTO - RESTRICIONES ECOLOGICAS CONVE.- CONVENIENTE
MPL.- MUNICIPAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 5.- BASE ACEP.- ACEPTABLE
PART.- PARTICULAR NR.- NO REQUIERE TT.- TRITURACION TOTAL TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO 6.- CONCRETO ASFALTICO NE.- NO EXISTEN NO REC.- NO RECOMENDABLE
COM.- COMUNAL ACEP.- ACEPTABLE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 7.- MEZCLA ASFALTICA EN EL LUGAR P.- POSIBLESEJID.- EJIDAL SR.- SIN RESTRICCIONES TPC.- TRITURACION PARCIAL Y CRIBADO ECP.- ESTABILIZACION CON CEMENTO PORTLAND 8.- SELLO CONSIDER.- CONSIDERABLES
9.- MAMPOSTERIA MPOR.- IMPORTANTES
CARRETERA: LAZARO CARDENAS - PUNTA PRIETA
KILOMETRO DESVIACION
I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 1 7UNIDAD GENERAL DE SERVICIOS TECNICOS
CENTRO SCT BAJA CALIFORNIA
CARRETERA : ENSENADA – SAN FELIPE
NOMBRE
CARRETERA : PUNTA PRIETA – PARALELO 28
CARRETERA : TECATE – ENSENADA
BC
/07
L O
C A
L I Z
A C
I O N
D E
B A
N C
O S
D E
M A
T E
R I A
L E
S
N
2013
52
7
8
10
12
58
9
11
53
98
81
80
52
2017
108
BCO. FECHA FECHA TIPO TIPO TRATA- VOLUMEN ESPESOR USOS USO RESTRICC. ASPEC.
NUM. ESTUDIO DE ACT. PROP. MATERIAL MIENTO X 1000 m3 DESPALME (m) PROB. EXPL. ECOLOG. ECONOM.
53
CERRO PINTO
(ARROYO SALORIO)
28°58´24" N; 113°34´15" O
52+000 I 00200 may-01 nov-17 FED. CONG. TPC. 100 0.2 2, 5 NR IMPOR. ACEP.
52MIL CUMBRES
28°58´08" N; 113°39´43" O61+000 I 00100 may-01 nov-17 FED. CONG. TPC. 100 0.3 2, 5 NR NE. ACEP.
7EL GALLO
31°50´34" N; 116°33´39" O7+200 I 05000 jul-95 nov-17 PART. CONG. TT. 1000 0.1 2-5-6-7-8-10 NR. CONSIDER. CONVE.
9SAN CARLOS
31°45´53" N; 116°33´02" O17+800 I 03700 jul-95 nov-17 PART. CONG. TT. 2000 0.2 1-2-5-6-7-8-9-10 NR. P. CONVE.
8MANEADERO
31°41´55" N ; 116°34´06" O24+000 D 00800 jul-95 nov-17 PART. CONG. TPC. 100 0.3 1-2-5-6-7-8-10 NR. P. REC.
80LAS FRESAS
31°38´00" N ; 116°30´15" O35+200 D 00200 abr-12 nov-17 PART CONG. TPC 48 0.2 1 ,2 , 5, 6 NR NE REC
108LAS GLUYAS
31°37´40" N; 116°27´25" O40+000 I. 04500 jun-15 nov-17 PART CONG TPC 200 0.3 2,5,6 NR P CONVE
12STO. TOMAS
31°32´20" N; 116°22´09" O56+100 I 00500 jul-95 nov-17 PART. CONG. TPC. 1000 0.1 1-2-5-6-7-8-10 NR. NE. REC.
10ERENDIRA
31°23´26" N; 116°19´22" O78+250 D 00400 feb-98 nov-17 PART. CONG. TPC. 200 0.5 1-2-5-7-8-10 NR. NE. REC.
81LOS ALAMOS
31°21´05" N; 116°15´19" O87+000 I 01500 jun-12 nov-17 PART CONG. TPC 55.8 0.25 1 ,2, 5 ,6, 10 NR NE REC
98LLANO COLORADO
31°13´27" N; 116°09´11" O105+000 I 05000 oct-13 nov-17 PART CONG TTC 800 0.25 1-2-5-6-10 NR P REC
11STO. DOMINGO
31°43´33" N; 116°01´33" O170+100 D 01600 feb-99 nov-17 EJID. CONG. TPC. 2000 0 1-2-5-6-7-8-10 NR. NE. REC.
58ESCOPETAS 3
0°37´39" N; 115°54´54" O 184+000 I 04000 feb-02 nov-17 PART. CONG. TPC 120 0.2 2-5-6-7-8-10 NR. P. REC.
NOMENCLATURA Y ABREVIATURAS UTILIZADAS:
- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES
(FECHA DE ACT.) 1.- REVESTIMIENTO 10.- CONCRETO HIDRAULICO - ASPECTOS ECONOMICOS
- TIPO DE PROPIEDAD CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 2.- SUB-BASE 11.- ESCOLLERAS
FED.- FEDERAL VOLC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 3.- SUB-BALASTO REC.- RECOMENDABLE
EST.- ESTATAL C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 4.- BALASTO - RESTRICIONES ECOLOGICAS CONVE.- CONVENIENTE
MPL.- MUNICIPAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 5.- BASE ACEP.- ACEPTABLE
PART.- PARTICULAR NR.- NO REQUIERE TT.- TRITURACION TOTAL TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO 6.- CONCRETO ASFALTICO NE.- NO EXISTEN NO REC.- NO RECOMENDABLE
COM.- COMUNAL ACEP.- ACEPTABLE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 7.- MEZCLA ASFALTICA EN EL LUGAR P.- POSIBLESEJID.- EJIDAL SR.- SIN RESTRICCIONES TPC.- TRITURACION PARCIAL ECP.- ESTABILIZACION CON CEMENTO PORTLAND 8.- SELLO CONSIDER.- CONSIDERABLES
Y CRIBADO 9.- MAMPOSTERIA MPOR.- IMPORTANTES
UNIDAD GENERAL DE SERVICIOS TECNICOS
I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 1 7
CENTRO SCT BAJA CALIFORNIA
KILOMETRO DESVIACION
CARRETERA: ENSENADA – LAZARO CARDENAS
CARRETERA: PARADOR PUNTA PRIETA – BAHIA DE LOS ANGELES
NOMBRE
BC/08
BC
/09
L O
C A
L I Z
A C
I O N
D E
B A
N C
O S
D E
M A
T E
R I A
L E
S
N
2017
42
83
56
55
45
61
82
44
93
100
101
103
102
111
110
109
CARRETERA: SAN FELIPE – LAGUNA CHAPALA
BCO. FECHA FECHA TIPO TIPO TRATA- VOLUMEN ESPESOR USOS USO RESTRICC. ASPEC.
NUM. ESTUDIO DE ACT. PROP. MATERIAL MIENTO X 1000 m3 DESPALME (m) PROB. EXPL. ECOLOG. ECONOM.
42SANTA MARIA 30°33´41"
N; 114°41´09" O50+560 D 00070 jul-95 nov-17 EJID CONG C 300 0.2 2-5-7-8 NR NE REC
44DELICIAS
30°32´44" N; 114°41´36" O56+600 D 00070 jul-95 nov-17 EJID. CONG. C. 16 0.1 2, 5 , 8 NR. NE. REC.
61LA COSTILLA
30°16´04" N; 114°39´47" O90+700 D 00800 mar-09 nov-17 EJID. CONG. TPC. 150 0.2 5 NR. NE. CONVE.
45CAMPO LAS CHIVAS
30°31´43" N; 114°41´23" O74+700 D 00070 jul-95 nov-17 PART. CONG. C. 40 0.2 5, 6, 10 NR. NE. CONVE.
55SAN FERNANDO
30°56´33" N; 114°46´14" O2+000 D 01400 jun-05 nov-17 PART. CONG. C. 50 0.2 5, 10 NR. NE. REC.
56MATOMI
30°56´33" N; 114°46´14" O63+500 D 00300 abr-06 nov-17 PART. CONG. TTC. 90 0.2 5, 6 , 10 NR. NE. REC.
82CAMPO EL TANO
30°11´31" N; 114°40´15" O106+000 D 00200 mar-12 nov-17 EJID CONG TPC 150 0.2 6, 10 NR NE REC
83PELAYO
30°05´58" N; 114°37´39" O110+000 I 00200 mar-12 nov-17 EJID CONG TPC 100 0.2 1-2-5-7 NR NE REC
93SAN LUIS GONZAGA
29°47´23" N; 114°25´30" O150+500 D 01000 nov-13 nov-17 EJID CONG C 100 0.2 10 NR NE CONV
100WILLER
29°47´40" N; 114°25´25" O146+000 D 00300 sep-14 dic-17 EJID CONG TTC 20 0.2 5-6-7-8-10 NR NE CONV
101SACRIFICIO
29°44´30" N; 114°25´03" O154+500 D 01000 sep-14 dic-17 EJID CONG TTC 50 0.2 5-6-7-8-10 NR NE CONV
102ARRASTRAS 1
29°43´30" N; 114°24´31" O159+900 D 01200 oct-14 dic-17 EJID CONG TTC 50 0.2 5-6-7-8-10 NR NE CONV
103ARRASTRAS 2
29°42´09" N; 114°24´50" O165+300 D 00500 oct-14 dic-17 EJID CONG TTC 50 0.2 5-6-7-8-10 NR NE CONV
109ARRASTRAS 3
29°40´23" N; 114°24´43" O171+800 I. 00100 ago-15 nov-17 EJID CONG TPC 1500 0.2 2, 5 ,6, 7, 10 NR P REC
110EL 189
29°27´43" N; 114°20´17" O189+000 D 00150 nov-15 nov-17 EJID CONG TPC 150 0.2 2, 5, 6, 7, 10 NR P REC
111CHAPALA
29°26´03" N; 114°19´27" O194+000 I. 00150 nov-15 nov-17 EJID CONG TPC 150 0.2 2, 5, 6, 7, 10 NR P REC
NOMENCLATURA Y ABREVIATURAS UTILIZADAS:
- FECHA DE ACTUALIZACION - TIPO DE MATERIAL - TRATAMIENTO - USOS PROBABLES
(FECHA DE ACT.) 1.- REVESTIMIENTO 10.- CONCRETO HIDRAULICO - ASPECTOS ECONOMICOS
- TIPO DE PROPIEDAD CONG.- CONGLOMERADO NR.- NO REQUIERE TTC.- TRITURACION TOTAL Y CRIBADO 2.- SUB-BASE 11.- ESCOLLERAS
FED.- FEDERAL VOLC.- VOLCANICO D.- DISGREGACION CL.- CRIBADO Y LAVADO 3.- SUB-BALASTO REC.- RECOMENDABLE
EST.- ESTATAL C.- CRIBADO TPL.- TRITURACION PARCIAL Y LAVADO 4.- BALASTO - RESTRICIONES ECOLOGICAS CONVE.- CONVENIENTE
MPL.- MUNICIPAL - USO DE EXPLOSIVOS TP.- TRITURACION PARCIAL TTL.- TRITURACION TOTAL Y LAVADO 5.- BASE ACEP.- ACEPTABLE
PART.- PARTICULAR NR.- NO REQUIERE TT.- TRITURACION TOTAL TPCL.- TRITURACION PARCIAL, CRIBADO Y LAVADO 6.- CONCRETO ASFALTICO NE.- NO EXISTEN NO REC.- NO RECOMENDABLE
COM.- COMUNAL ACEP.- ACEPTABLE L.- LAVADO EA.- ESTABILIZACION CON ASFALTO 7.- MEZCLA ASFALTICA EN EL LUGAR P.- POSIBLES
EJID.- EJIDAL SR.- SIN RESTRICCIONES TPC.- TRITURACION PARCIAL ECP.- ESTABILIZACION CON CEMENTO PORTLAND 8.- SELLO CONSIDER.- CONSIDERABLES
Y CRIBADO 9.- MAMPOSTERIA MPOR.- IMPORTANTES
NOMBRE KILOMETRO DESVIACION
I N V E N T A R I O D E B A N C O S D E M A T E R I A L E S 2 0 1 7
UNIDAD GENERAL DE SERVICIOS TECNICOS
CENTRO SCT BAJA CALIFORNIA
BC/10