PROYECTO: AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE ATASPAYA, DISTRITO DE CARUMAS - MARISCAL NIETO - MOQUEGUA FECHA: ABRIL 2011 S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % 01 OBRAS PROVISIONALES S/. 5,875.32 5,875.32 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/. 1,118.52 1,118.52 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 01.02 CAMPAMENTO P/OFICINA, GUARDIANIA Y/O DEPOSITO S/. 4,756.80 4,756.80 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 02 TRABAJOS PRELIMINARES S/. 8,306.27 8,306.27 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/. 206.27 206.27 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 02.02 TRANSPORTE DE MATERIALES S/. 8,100.00 8,100.00 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03 LINEA DE CONDUCCION S/. 843,389.05 45,819.22 5.43% 87,137.59 10.33% 162,885.10 19.31% 175,806.88 20.85% 171,265.71 20.31% 142,257.54 16.87% 5,239.30 0.62% 2,498.75 0.30% 29,634.87 3.51% 20,844.08 2.47% 03.01 TRABAJOS PRELIMINARES S/. 10,997.22 10,997.22 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 10,997.22 10,997.22 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02 MOVIMIENTO DE TIERRAS S/. 596,194.65 34,822.00 5.84% 87,137.59 14.62% 91,895.82 15.41% 132,740.64 22.26% 136,387.89 22.88% 113,210.71 18.99% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.02.01 EXCAVACION DE ZANJAS HMAX <=2.00 M TERRERNO NATURAL S/. 82,722.49 31,927.98 38.60% 37,733.07 45.61% 13,061.45 15.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02.02 EXCAVACION DE ZANJAS HMAX <=2.00 M TERRERNO SEMIROCOSO S/. 107,078.81 2,894.02 2.70% 37,622.28 35.14% 39,069.30 36.49% 27,493.21 25.68% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02.03 EXCAVACION DE ZANJA, TERRENO ROCOSO, TUBERIA 2" S/. 59,290.76 0.00% 0.00% 0.00% 51,879.42 87.50% 7,411.35 12.50% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02.04 PERFILADO DE FONDO DE ZANJAS S/. 6,864.51 0.00% 0.00% 0.00% 6,406.88 93.33% 457.63 6.67% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02.05 CAMA DE APOYO CON MATERIAL DE PRESTAMO S/. 53,655.24 0.00% 0.00% 0.00% 0.00% 0.00% 53,655.24 ####### 0.00% 0.00% 0.00% 0.00% 03.02.06 ZARANDEADO MANUAL DE MATERIAL PROPIO PARA RELLENO S/. 129,604.69 0.00% 11,782.24 9.09% 39,765.08 30.68% 38,292.29 29.55% 35,346.73 27.27% 4,418.34 3.41% 0.00% 0.00% 0.00% 0.00% 03.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 113,720.32 0.00% 0.00% 0.00% 0.00% 58,583.20 51.52% 55,137.12 48.48% 0.00% 0.00% 0.00% 0.00% 03.02.08 ACARREO DE MATERIAL EXCEDENTE D=500 M S/. 26,006.53 0.00% 0.00% 0.00% 8,668.84 33.33% 17,337.69 66.67% 0.00% 0.00% 0.00% 0.00% 0.00% 03.02.09 ELIMINACION DE EXCESO CON MAQUINARIA S/. 17,251.30 0.00% 0.00% 0.00% 0.00% 17,251.30 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 120,708.63 0.00 0.00% 0.00 0.00% 70,989.28 58.81% 34,156.40 28.30% 15,562.95 12.89% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 2" C-10 S/. 96,803.57 0.00% 0.00% 70,989.28 73.33% 25,814.29 26.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.03.02 SUMINISTRO E INSTALACION DE TUBERIA D=3" FIERRO GALVANIZADO S/. 2,891.26 0.00% 0.00% 0.00% 2,891.26 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.03.03 PRUEBA HIDRAULICA EN TUBERIA PVC AGUA S/. 7,494.92 0.00% 0.00% 0.00% 5,450.85 72.73% 2,044.07 27.27% 0.00% 0.00% 0.00% 0.00% 0.00% 03.03.04 PRUEBA DESINFECCION DE TUBERIA S/. 13,518.88 0.00% 0.00% 0.00% 0.00% 13,518.88 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 5,026.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,026.28 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.04.01 SUMINISTRO E INST. DE CODO 90º PVC SAP 2" S/. 159.39 0.00% 0.00% 0.00% 159.39 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.04.02 SUMINISTRO E INST. DE CODO 45º PVC SAP 2" S/. 950.11 0.00% 0.00% 0.00% 950.11 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.04.03 SUMINISTRO E INST. DE CODO 22.5º PVC SAP 2" S/. 2,132.90 0.00% 0.00% 0.00% 2,132.90 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.04.04 SUMINISTRO E INST. DE CODO 11.25º PVC SAP 2" S/. 1,783.88 0.00% 0.00% 0.00% 1,783.88 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.05 VALVULAS Y ACCESORIOS S/. 345.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 345.84 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.05.01 CAJA PARA VALVULA DE FºFº CON TAPA S/. 155.26 0.00% 0.00% 0.00% 155.26 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.05.02 VALVULA COMPUERTA DE 2" S/. 190.58 0.00% 0.00% 0.00% 190.58 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06 CAMARA DE REPARTO S/. 3,587.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,234.22 34.40% 2,353.59 65.60% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.01 TRABAJOS PRELIMINARES S/. 20.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 20.35 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 20.35 0.00% 0.00% 0.00% 20.35 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.02 MOVI MIENTO DE TIERRAS S/. 738.57 0.00 0.00% 0.00 0.00% 0.00 0.00% 428.52 58.02% 310.05 41.98% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.02.01 EXCAVACION PARA CIMENTACION DE CAMARA S/. 428.52 0.00% 0.00% 0.00% 428.52 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 310.05 0.00% 0.00% 0.00% 0.00% 310.05 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.03 CONCRETO SIMPLE S/. 72.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 72.22 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.03.01 SOLADO E=2" MEZCLA 1:10 C:H INC. CURADO S/. 72.22 0.00% 0.00% 0.00% 72.22 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.04 CONCRETO ARMADO S/. 1,511.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 713.13 47.19% 798.02 52.81% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.04.01 CONCRETO F'C= 175 KG/CM2 EN CAMARA S/. 477.01 0.00% 0.00% 0.00% 0.00% 477.01 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.04.02 ENCOFRADO Y DESENCOF MUROS S/. 642.01 0.00% 0.00% 0.00% 321.01 50.00% 321.01 50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.04.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 392.12 0.00% 0.00% 0.00% 392.12 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.05 REVOQUES ENLUCIDOS Y MOLDURAS S/. 427.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 427.87 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.05.01 TARRAJEO MEZCLA 1:5 S/. 427.87 0.00% 0.00% 0.00% 0.00% 427.87 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 817.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 817.65 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.06.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REPARTO S/. 495.83 0.00% 0.00% 0.00% 0.00% 495.83 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.06.02 TAPA DE FºGº ESTRIADA DE 0.60 x 0.60 S/. 178.10 0.00% 0.00% 0.00% 0.00% 178.10 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.06.06.03 TAPA DE FºGº ESTRIADA DE 0.40 x 0.40 S/. 143.72 0.00% 0.00% 0.00% 0.00% 143.72 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.07 CAMARA ROMPE PRESION S/. 50,164.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,923.75 3.83% 16,961.28 33.81% 28,870.56 57.55% 2,409.25 4.80% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.07.01 TRABAJOS PRELIMINARES S/. 267.34 0.00 0.00% 0.00 0.00% 0.00 0.00% 267.34 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.07.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 267.34 0.00% 0.00% 0.00% 267.34 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.07.02 MOVI MIENTO DE TIERRAS S/. 9,647.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,656.41 17.17% 3,975.37 41.21% 1,606.17 16.65% 2,409.25 24.97% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.07.02.01 EXCAVACION PARA CIMENTACION DE CAMARA S/. 5,631.78 0.00% 0.00% 0.00% 1,656.41 29.41% 3,975.37 70.59% 0.00% 0.00% 0.00% 0.00% 0.00% 03.07.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 4,015.42 0.00% 0.00% 0.00% 0.00% 0.00% 1,606.17 40.00% 2,409.25 60.00% 0.00% 0.00% 0.00% 03.07.03 CONCRETO ARMADO S/. 22,618.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,985.91 57.41% 9,632.37 42.59% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.07.03.01 CONCRETO F'C= 175 KG/CM2 EN CAMARA S/. 7,266.54 0.00% 0.00% 0.00% 0.00% 0.00% 7,266.54 ####### 0.00% 0.00% 0.00% 0.00% 03.07.03.02 ENCOFRADO Y DESENCOF MUROS S/. 10,646.25 0.00% 0.00% 0.00% 0.00% 8,280.42 77.78% 2,365.83 22.22% 0.00% 0.00% 0.00% 0.00% 03.07.03.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 4,705.49 0.00% 0.00% 0.00% 0.00% 4,705.49 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 03.07.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 6,680.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,680.22 ####### 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 03.07.04.01 TARRAJEO MEZCLA 1:5 S/. 6,680.22 0.00% 0.00% 0.00% 0.00% 0.00% 6,680.22 ####### 0.00% 0.00% 0.00% 0.00% 03.07.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 10,951.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,951.80 ####### 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% DESCRIPCION ITEM UND CANTIDAD MES 01 CRONOGRAMA VALORIZADO DE OBRA MES 09 MES 10 MES 02 MES 03 MES 04 MES 08 MES 05 MES 06 MES 07

Upload: abrahan

Post on 16-Feb-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: cronograma valorizado FINAL.pdf

PROYECTO: AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE ATASPAYA, DISTRITO DE CARUMAS - MARISCAL NIETO - MOQUEGUAFECHA: ABRIL 2011

S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. %

01 OBRAS PROVISIONALES S/. 5,875.32 5,875.32 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/. 1,118.52 1,118.52 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

01.02 CAMPAMENTO P/OFICINA, GUARDIANIA Y/O DEPOSITO S/. 4,756.80 4,756.80 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

02 TRABAJOS PRELIMINARES S/. 8,306.27 8,306.27 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/. 206.27 206.27 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

02.02 TRANSPORTE DE MATERIALES S/. 8,100.00 8,100.00 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03 LINEA DE CONDUCCION S/. 843,389.05 45,819.22 5.43% 87,137.59 10.33% 162,885.10 19.31% 175,806.88 20.85% 171,265.71 20.31% 142,257.54 16.87% 5,239.30 0.62% 2,498.75 0.30% 29,634.87 3.51% 20,844.08 2.47%

03.01 TRABAJOS PRELIMINARES S/. 10,997.22 10,997.22 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 10,997.22 10,997.22 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02 MOVIMIENTO DE TIERRAS S/. 596,194.65 34,822.00 5.84% 87,137.59 14.62% 91,895.82 15.41% 132,740.64 22.26% 136,387.89 22.88% 113,210.71 18.99% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.02.01 EXCAVACION DE ZANJAS HMAX <=2.00 M TERRERNO NATURAL S/. 82,722.49 31,927.98 38.60% 37,733.07 45.61% 13,061.45 15.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02.02 EXCAVACION DE ZANJAS HMAX <=2.00 M TERRERNO SEMIROCOSO S/. 107,078.81 2,894.02 2.70% 37,622.28 35.14% 39,069.30 36.49% 27,493.21 25.68% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02.03 EXCAVACION DE ZANJA, TERRENO ROCOSO, TUBERIA 2" S/. 59,290.76 0.00% 0.00% 0.00% 51,879.42 87.50% 7,411.35 12.50% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02.04 PERFILADO DE FONDO DE ZANJAS S/. 6,864.51 0.00% 0.00% 0.00% 6,406.88 93.33% 457.63 6.67% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02.05 CAMA DE APOYO CON MATERIAL DE PRESTAMO S/. 53,655.24 0.00% 0.00% 0.00% 0.00% 0.00% 53,655.24 ####### 0.00% 0.00% 0.00% 0.00%

03.02.06 ZARANDEADO MANUAL DE MATERIAL PROPIO PARA RELLENO S/. 129,604.69 0.00% 11,782.24 9.09% 39,765.08 30.68% 38,292.29 29.55% 35,346.73 27.27% 4,418.34 3.41% 0.00% 0.00% 0.00% 0.00%

03.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 113,720.32 0.00% 0.00% 0.00% 0.00% 58,583.20 51.52% 55,137.12 48.48% 0.00% 0.00% 0.00% 0.00%

03.02.08 ACARREO DE MATERIAL EXCEDENTE D=500 M S/. 26,006.53 0.00% 0.00% 0.00% 8,668.84 33.33% 17,337.69 66.67% 0.00% 0.00% 0.00% 0.00% 0.00%

03.02.09 ELIMINACION DE EXCESO CON MAQUINARIA S/. 17,251.30 0.00% 0.00% 0.00% 0.00% 17,251.30 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 120,708.63 0.00 0.00% 0.00 0.00% 70,989.28 58.81% 34,156.40 28.30% 15,562.95 12.89% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 2" C-10 S/. 96,803.57 0.00% 0.00% 70,989.28 73.33% 25,814.29 26.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.03.02 SUMINISTRO E INSTALACION DE TUBERIA D=3" FIERRO GALVANIZADO S/. 2,891.26 0.00% 0.00% 0.00% 2,891.26 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.03.03 PRUEBA HIDRAULICA EN TUBERIA PVC AGUA S/. 7,494.92 0.00% 0.00% 0.00% 5,450.85 72.73% 2,044.07 27.27% 0.00% 0.00% 0.00% 0.00% 0.00%

03.03.04 PRUEBA DESINFECCION DE TUBERIA S/. 13,518.88 0.00% 0.00% 0.00% 0.00% 13,518.88 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 5,026.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,026.28 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.04.01 SUMINISTRO E INST. DE CODO 90º PVC SAP 2" S/. 159.39 0.00% 0.00% 0.00% 159.39 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.04.02 SUMINISTRO E INST. DE CODO 45º PVC SAP 2" S/. 950.11 0.00% 0.00% 0.00% 950.11 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.04.03 SUMINISTRO E INST. DE CODO 22.5º PVC SAP 2" S/. 2,132.90 0.00% 0.00% 0.00% 2,132.90 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.04.04 SUMINISTRO E INST. DE CODO 11.25º PVC SAP 2" S/. 1,783.88 0.00% 0.00% 0.00% 1,783.88 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.05 VALVULAS Y ACCESORIOS S/. 345.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 345.84 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.05.01 CAJA PARA VALVULA DE FºFº CON TAPA S/. 155.26 0.00% 0.00% 0.00% 155.26 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.05.02 VALVULA COMPUERTA DE 2" S/. 190.58 0.00% 0.00% 0.00% 190.58 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06 CAMARA DE REPARTO S/. 3,587.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,234.22 34.40% 2,353.59 65.60% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.01 TRABAJOS PRELIMINARES S/. 20.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 20.35 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 20.35 0.00% 0.00% 0.00% 20.35 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.02 MOVIMIENTO DE TIERRAS S/. 738.57 0.00 0.00% 0.00 0.00% 0.00 0.00% 428.52 58.02% 310.05 41.98% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.02.01 EXCAVACION PARA CIMENTACION DE CAMARA S/. 428.52 0.00% 0.00% 0.00% 428.52 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 310.05 0.00% 0.00% 0.00% 0.00% 310.05 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.03 CONCRETO SIMPLE S/. 72.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 72.22 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.03.01 SOLADO E=2" MEZCLA 1:10 C:H INC. CURADO S/. 72.22 0.00% 0.00% 0.00% 72.22 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.04 CONCRETO ARMADO S/. 1,511.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 713.13 47.19% 798.02 52.81% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.04.01 CONCRETO F'C= 175 KG/CM2 EN CAMARA S/. 477.01 0.00% 0.00% 0.00% 0.00% 477.01 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.04.02 ENCOFRADO Y DESENCOF MUROS S/. 642.01 0.00% 0.00% 0.00% 321.01 50.00% 321.01 50.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.04.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 392.12 0.00% 0.00% 0.00% 392.12 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.05 REVOQUES ENLUCIDOS Y MOLDURAS S/. 427.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 427.87 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.05.01 TARRAJEO MEZCLA 1:5 S/. 427.87 0.00% 0.00% 0.00% 0.00% 427.87 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 817.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 817.65 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.06.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REPARTO S/. 495.83 0.00% 0.00% 0.00% 0.00% 495.83 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.06.02 TAPA DE FºGº ESTRIADA DE 0.60 x 0.60 S/. 178.10 0.00% 0.00% 0.00% 0.00% 178.10 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.06.06.03 TAPA DE FºGº ESTRIADA DE 0.40 x 0.40 S/. 143.72 0.00% 0.00% 0.00% 0.00% 143.72 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.07 CAMARA ROMPE PRESION S/. 50,164.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,923.75 3.83% 16,961.28 33.81% 28,870.56 57.55% 2,409.25 4.80% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.07.01 TRABAJOS PRELIMINARES S/. 267.34 0.00 0.00% 0.00 0.00% 0.00 0.00% 267.34 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.07.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 267.34 0.00% 0.00% 0.00% 267.34 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.07.02 MOVIMIENTO DE TIERRAS S/. 9,647.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,656.41 17.17% 3,975.37 41.21% 1,606.17 16.65% 2,409.25 24.97% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.07.02.01 EXCAVACION PARA CIMENTACION DE CAMARA S/. 5,631.78 0.00% 0.00% 0.00% 1,656.41 29.41% 3,975.37 70.59% 0.00% 0.00% 0.00% 0.00% 0.00%

03.07.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 4,015.42 0.00% 0.00% 0.00% 0.00% 0.00% 1,606.17 40.00% 2,409.25 60.00% 0.00% 0.00% 0.00%

03.07.03 CONCRETO ARMADO S/. 22,618.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,985.91 57.41% 9,632.37 42.59% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.07.03.01 CONCRETO F'C= 175 KG/CM2 EN CAMARA S/. 7,266.54 0.00% 0.00% 0.00% 0.00% 0.00% 7,266.54 ####### 0.00% 0.00% 0.00% 0.00%

03.07.03.02 ENCOFRADO Y DESENCOF MUROS S/. 10,646.25 0.00% 0.00% 0.00% 0.00% 8,280.42 77.78% 2,365.83 22.22% 0.00% 0.00% 0.00% 0.00%

03.07.03.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 4,705.49 0.00% 0.00% 0.00% 0.00% 4,705.49 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.07.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 6,680.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,680.22 ####### 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.07.04.01 TARRAJEO MEZCLA 1:5 S/. 6,680.22 0.00% 0.00% 0.00% 0.00% 0.00% 6,680.22 ####### 0.00% 0.00% 0.00% 0.00%

03.07.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 10,951.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,951.80 ####### 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

DESCRIPCIONITEM UND CANTIDADMES 01

CRONOGRAMA VALORIZADO DE OBRA

MES 09 MES 10MES 02 MES 03 MES 04 MES 08MES 05 MES 06 MES 07

Page 2: cronograma valorizado FINAL.pdf

PROYECTO: AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE ATASPAYA, DISTRITO DE CARUMAS - MARISCAL NIETO - MOQUEGUAFECHA: ABRIL 2011

S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. %DESCRIPCIONITEM UND CANTIDAD

MES 01

CRONOGRAMA VALORIZADO DE OBRA

MES 09 MES 10MES 02 MES 03 MES 04 MES 08MES 05 MES 06 MES 07

03.07.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPEPRESION S/. 7,089.96 0.00% 0.00% 0.00% 0.00% 0.00% 7,089.96 ####### 0.00% 0.00% 0.00% 0.00%

03.07.05.02 TAPA DE FºGº ESTRIADA DE 0.60 x 0.60 S/. 2,137.20 0.00% 0.00% 0.00% 0.00% 0.00% 2,137.20 ####### 0.00% 0.00% 0.00% 0.00%

03.07.05.03 TAPA DE FºGº ESTRIADA DE 0.40 x 0.40 S/. 1,724.64 0.00% 0.00% 0.00% 0.00% 0.00% 1,724.64 ####### 0.00% 0.00% 0.00% 0.00%

03.08 CRUCES DE CANAL S/. 379.77 0.00 0.00% 0.00 0.00% 0.00 0.00% 379.77 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.08.01 OBRAS PRELIMINARES S/. 3.48 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.48 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.08.01.01 TRAZO Y REPLANTEO S/. 3.48 0.00% 0.00% 0.00% 3.48 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.08.02 MOVIMIENTO DE TIERRAS S/. 19.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.45 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.08.02.01 EXCAVACION PARA OBRAS DE ARTES S/. 19.45 0.00% 0.00% 0.00% 19.45 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.08.03 CONCRETO SIMPLE S/. 259.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 259.90 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.08.03.01 DADO DE CONCRETO 1:10 +30% PM S/. 102.09 0.00% 0.00% 0.00% 102.09 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.08.03.02 ENCOFRADO DE MUROS PARA DADOS DE CONCRETOÇ S/. 157.81 0.00% 0.00% 0.00% 157.81 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.08.04 ACCESORIOS Y OTROS S/. 96.94 0.00 0.00% 0.00 0.00% 0.00 0.00% 96.94 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.08.04.01 INSTALACION DE TUBERIA EMPOTRADA EN DADO DE ONCRETO DE FªGª 2" S/. 96.94 0.00% 0.00% 0.00% 96.94 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

03.09 PASE AEREO S/. 55,984.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 176.27 0.31% 2,830.05 5.06% 2,498.75 4.46% 29,634.87 52.93% 20,844.08 37.23%

03.09.01 OBRAS PRELIMINARES S/. 795.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 176.27 22.15% 619.61 77.85% 0.00 0.00% 0.00 0.00% 0.00 0.00%

03.09.01.01 LIMPIEZA DE TERRENO MANUAL S/. 352.54 0.00% 0.00% 0.00% 0.00% 0.00% 176.27 50.00% 176.27 50.00% 0.00% 0.00% 0.00%

03.09.01.02 TRAZO Y REPLANTEO EN PASE AEREO S/. 443.34 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 443.34 100.00% 0.00% 0.00% 0.00%

03.09.02 MOVIMIENTO DE TIERRAS S/. 6,517.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,210.44 33.91% 2,498.75 38.34% 192.21 2.95% 1,616.52 24.80%

03.09.02.01 EXCAVACION PARA OBRAS DE ARTES S/. 4,901.40 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,210.44 45.10% 2,498.75 50.98% 192.21 3.92% 0.00%

03.09.02.02 RELLENO COMPACATDO CON MATERIAL PROPIO S/. 1,616.52 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,616.52 100.00%

03.09.03 CONCRETO SIMPLE S/. 11,573.89 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 11,573.89 100.00% 0.00 0.00%

03.09.03.01 SOLADO E=2" MEZCLA 1:10 C:H INC. CURADO S/. 634.73 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 634.73 100.00% 0.00%

03.09.03.02 DADO DE CONCRETO 1:10 +30% PM S/. 6,962.40 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6,962.40 100.00% 0.00%

03.09.03.03 ENCOFRADO DE MUROS PARA DADOS DE CONCRETOÇ S/. 3,976.76 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 3,976.76 100.00% 0.00%

03.09.04 CONCRETO ARMADO S/. 15,860.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 15,860.32 100.00% 0.00 0.00%

03.09.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS S/. 7,839.99 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 7,839.99 100.00% 0.00%

03.09.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 1,279.83 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,279.83 100.00% 0.00%

03.09.04.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 6,740.50 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6,740.50 100.00% 0.00%

03.09.05 REVESTIMIENTOS S/. 5,021.13 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,008.45 40.00% 3,012.68 60.00%

03.09.05.01 TARRAJEO MEZCLA 1:5 S/. 5,021.13 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,008.45 40.00% 3,012.68 60.00%

03.09.06 SISTEMA DE ANCLAJE S/. 16,214.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 16,214.88 100.00%

03.09.06.01 ANCLAJE EN DADOS DE CONCRETO S/. 2,308.50 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,308.50 100.00%

03.09.06.02 INSTALACION DE TUBERIA EMPOTRADA DE PVC C-10 SAP 2" S/. 323.47 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 323.47 100.00%

03.09.06.03 ANCLAJE DE CABLE DE ACERO TIPO BOA D=1/2" CON TENSORES S/. 1,114.12 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,114.12 100.00%

03.09.06.04 ANCLAJE DE CABLE DE ACERO TIPO BOA D=3/8" CON TENSORES S/. 1,641.18 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,641.18 100.00%

03.09.06.05 TENDIDO DE CABLE DE ACERO TIPO BOA D=1/2" S/. 1,807.98 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,807.98 100.00%

03.09.06.06 TENDIDO DE CABLE DE ACERO TIPO BOA D=3/8" S/. 3,236.47 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 3,236.47 100.00%

03.09.06.07 INSTALACION DE PENDOLAS DE ACERO LISO T-BOA D=1/4 S/. 1,262.95 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,262.95 100.00%

03.09.06.08 ABRAZADERAS P/UNION CABLE CON PENDOLA (INC. ACCESORIOS) S/. 851.01 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 851.01 100.00%

03.09.06.09 ABRAZADERAS P/UNION CABLE CON TUBERIA (INC. ACCESORIOS) S/. 1,362.30 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,362.30 100.00%

03.09.06.10 CARRO DE DILATACION EN SUJECION (INC. ACCESORIOS) S/. 2,306.90 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,306.90 100.00%

04 RESERVORIO DE ALMACENAMIENTO S/. 2,299.67 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,299.67 100.00%

04.01 SUMINISTRO Y COLOCACION DE HIPOCLORADOR S/. 90.88 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 90.88 100.00%

04.02 PICADO DE TARRAJEOS EN PARED EXTERIOR DE RESERVORIO S/. 534.07 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 534.07 100.00%

04.03 TAPA DE INSPECCION DE VALVULA 0.80X0.80 S/. 79.38 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 79.38 100.00%

04.04 TARRAJEO EXTERIOR C/MORTERO 1:5 S/. 1,252.16 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,252.16 100.00%

04.05 DESINFECCION DE RESERVORIOS DE CºAº S/. 175.68 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 175.68 100.00%

04.06 PINTADO INTERIOR DE RESERVORIOS S/. 90.49 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 90.49 100.00%

04.07 MANTENIMIENTO DE VALVULAS S/. 77.01 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 77.01 100.00%

05 LINEA DE ADUCCION Y/O RED DE DISTRIBUCION S/. 395,609.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 28,821.28 7.29% 39,202.88 9.91% 37,750.92 9.54% 45,845.35 11.59% ######### 34.54% 107,333.13 27.13%

05.01 TRABAJOS PRELIMINARES S/. 4,137.99 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 4,137.99 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

05.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 4,137.99 0.00% 0.00% 0.00% 0.00% 4,137.99 100.00% 0.00% 0.00% 0.00% 0.00% 0.00%

05.02 MOVIMIENTO DE TIERRAS S/. 300,827.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,683.29 8.21% 39,202.88 13.03% 37,750.92 12.55% 40,529.55 13.47% 91,589.02 30.45% 67,071.73 22.30%

05.02.01 EXCAVACION DE ZANJAS HMAX <=2.00 M TERRERNO SEMIROCOSO S/. 105,992.97 0.00% 0.00% 0.00% 0.00% 24,683.29 23.29% 39,202.88 36.99% 37,750.92 35.62% 4,355.88 4.11% 0.00% 0.00%

05.02.02 PERFILADO DE FONDO DE ZANJAS S/. 1,713.18 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,713.18 100.00% 0.00% 0.00%

05.02.03 ZARANDEADO MANUAL DE MATERIAL PROPIO PARA RELLENO S/. 16,511.93 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16,511.93 100.00% 0.00% 0.00%

05.02.04 CAMA DE APOYO CON MATERIAL PROPIO S/. 44,858.93 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6,901.37 15.38% 37,957.56 84.62% 0.00%

05.02.05 RELLENO CON MATERIAL DE PRESTAMO S/. 52,084.14 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 32,051.78 61.54% 20,032.36 38.46%

05.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 26,138.22 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 9,091.55 34.78% 17,046.67 65.22%

05.02.07 ACARREO DE MATERIAL EXCEDENTE D=500 M S/. 32,180.96 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 11,047.20 34.33% 12,488.13 38.81% 8,645.63 26.87%

05.02.08 ELIMINACION DE EXCESO CON MAQUINARIA S/. 21,347.07 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 21,347.07 100.00%

05.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 44,331.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 36,424.82 82.16% 7,906.98 17.84%

05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 2" C-10 S/. 36,424.82 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 36,424.82 100.00% 0.00%

05.03.02 PRUEBA HIDRAULICA EN TUBERIA PVC AGUA S/. 2,820.16 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,820.16 100.00%

Page 3: cronograma valorizado FINAL.pdf

PROYECTO: AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE ATASPAYA, DISTRITO DE CARUMAS - MARISCAL NIETO - MOQUEGUAFECHA: ABRIL 2011

S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. %DESCRIPCIONITEM UND CANTIDAD

MES 01

CRONOGRAMA VALORIZADO DE OBRA

MES 09 MES 10MES 02 MES 03 MES 04 MES 08MES 05 MES 06 MES 07

05.03.03 PRUEBA DESINFECCION DE TUBERIA S/. 5,086.82 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5,086.82 100.00%

05.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 2,369.75 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,454.82 61.39% 914.93 38.61%

05.04.01 SUMINISTRO E INST. DE TEE PVC SAP 2" S/. 349.41 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 349.41 100.00% 0.00%

05.04.02 SUMINISTRO E INST. DE CODO 90º PVC SAP 2" S/. 523.71 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 523.71 100.00% 0.00%

05.04.03 SUMINISTRO E INST. DE CODO 45º PVC SAP 2" S/. 407.19 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 407.19 100.00% 0.00%

05.04.04 SUMINISTRO E INST. DE CODO 22.5º PVC SAP 2" S/. 349.02 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 174.51 50.00% 174.51 50.00%

05.04.05 SUMINISTRO E INST. DE CODO 11.25º PVC SAP 2" S/. 349.02 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 349.02 100.00%

05.04.06 SUMINISTRO E INST. DE TAPON PVC 2" S/. 391.40 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 391.40 100.00%

05.05 VALVULAS Y ACCESORIOS S/. 31,439.49 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 31,439.49 100.00%

05.05.01 CAJA PARA VALVULA DE FºFº CON TAPA S/. 310.52 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 310.52 100.00%

05.05.02 VALVULA COMPUERTA DE 2" S/. 381.16 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 381.16 100.00%

05.05.03 CONEXION DOMICILIARIAS DE AGUA S/. 30,747.81 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 30,747.81 100.00%

05.06 CAMARA ROMPE PRESION S/. 12,503.33 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,315.80 42.52% 7,187.53 57.48% 0.00 0.00%

05.06.01 TRABAJOS PRELIMINARES S/. 66.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 66.83 100.00% 0.00 0.00% 0.00 0.00%

05.06.01.01 TRAZO DE NIVELES Y REPLANTEO S/. 66.83 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 66.83 100.00% 0.00% 0.00%

05.06.02 MOVIMIENTO DE TIERRAS S/. 2,411.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,408.09 58.38% 1,003.81 41.62% 0.00 0.00%

05.06.02.01 EXCAVACION PARA CIMENTACION DE CAMARA S/. 1,408.09 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,408.09 100.00% 0.00% 0.00%

05.06.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO S/. 1,003.81 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,003.81 100.00% 0.00%

05.06.03 CONCRETO ARMADO S/. 5,659.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,840.88 67.86% 1,818.86 32.14% 0.00 0.00%

05.06.03.01 CONCRETO F'C= 175 KG/CM2 EN CAMARA S/. 1,818.86 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,818.86 100.00% 0.00%

05.06.03.02 ENCOFRADO Y DESENCOF MUROS S/. 2,661.56 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,661.56 100.00% 0.00% 0.00%

05.06.03.03 ACERO DE REFUERZO FY=4200 Kg/cm2 S/. 1,179.32 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,179.32 100.00% 0.00% 0.00%

05.06.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 1,670.05 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,670.05 100.00% 0.00 0.00%

05.06.04.01 TARRAJEO MEZCLA 1:5 S/. 1,670.05 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,670.05 100.00% 0.00%

05.06.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 2,694.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,694.81 100.00% 0.00 0.00%

05.06.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPEPRESION S/. 1,772.49 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1,772.49 100.00% 0.00%

05.06.05.02 TAPA DE INSPECCION 0.60 x 0.60 M METALICO S/. 491.16 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 491.16 100.00% 0.00%

05.06.05.03 TAPA DE INSPECCION 0.40 x 0.40 M METALICO S/. 431.16 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 431.16 100.00% 0.00%

06 MITIGACION AMBIENTAL S/. 2,954.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,954.00 100.00%

06.01 REACONDICIONAMIENTO MDE CAMPAMENTO S/. 19.40 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 19.40 100.00%

06.02 REACONDICIONAMIENTO DE CANTERAS S/. 37.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 37.00 100.00%

06.03 REFORESTACION S/. 2,897.60 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2,897.60 100.00%

07 CAPACITACION S/. 4,264.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 4,264.80 100.00%

07.01 CAPACITACION DEL MANTENIMIENTO S/. 4,264.80 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 4,264.80 100.00%