CRONOGRAMA DE AVANCE DE OBRA VALORIZADO OBRA: ENTIDAD: GOREU FECHA: ITEM PARTIDA PARCIAL DIAS CALENDARIOS 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 01 OBRAS PROVICIONALES, PRELIMINARES, DEMOLICION, SEGURIDAD Y SALUD 419,349.05 419,349.05 02 CONSTRUCCION DE CERCO PERIMETRICO ( L=280.50 ML) - MATERIAL NOBLE 243,510.46 97,404.18 97,404.18 48,702.09 03 CONSTRUCCION DE 01 PORTICO PRINCIPAL (23.60) - MATERIAL NOBLE 32,772.68 13,109.07 13,109.07 6,554.54 4 CONSTRUCCION DE 02 PORTICOS SECUNDARIOS (12.80M2) - MATERIAL NOBLE 22,401.82 22,401.82 5 586,250.51 175,875.15 175,875.15 117,250.10 117,250.10 6 PAB. Nº 01: SALA DE USOS MULT.(88.23M2), DEPOSITO MAT.(25.80M2), 02 SS.HH.(6.03M2C/U), 321,213.44 128,485.38 128,485.38 64,242.69 7 CONSTRUCCION DE RAMPA DE C°A°: L=00.00ML. 93,881.53 46,940.77 46,940.77 8 PABELLON N° 02: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6. 258,534.21 103,413.68 103,413.68 51,706.84 9 PABELLON N° 03: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6. 258,534.21 103,413.68 103,413.68 51,706.84 10 PABELLÓN Nº 04 : CONSTRUCCION DE COMEDOR (60.00M2) + COCINA (10.60M2) + DEPOSITO (8.95 M2) + 185,563.81 55,669.14 74,225.52 55,669.14 11 PABELLON N° 05: CONTRUCCION DE 04 AULAS (45.00M2 C/U) C/SS.HH. (6.35M2 C/U) - MATERIAL 351,643.18 105,492.95 105,492.95 70,328.64 70,328.64 12 PABELLON N° 06: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIAL SEM 224,170.64 112,085.32 112,085.32 13 PABELLON N° 07: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIA 224,170.64 112,085.32 112,085.32 14 TANQUE ELEVADO DE CºAº CAP: (8.00 m3.) 48,216.46 24,108.23 24,108.23 15 CONSTRUCCION DE CISTERNA DE CONCRETO ARMADO CAP: (32.00 m3.) 18,409.17 9,204.59 9,204.59 16 CONSTRUCCION DE COBERTURA ( 150.00 M2 ) 59,670.63 59,670.63 17 CONSTRUCCION DE PERGOLA DE MADERA CON COBERTURA (40.50M2) 5,917.72 5,917.72 18 CONSTRUCCION DE OBRAS EXTERIORES: VEREDAS, PISOS Y CANALETAS (375.71 M2) 254,278.10 101,711.24 101,711.24 19 CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES SANITARIAS - CANALETAS) 47,722.67 23,861.34 20 CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES ELECTRICAS) 25,917.99 12,959.00 21 MITIGACION AMBIENTAL 4,400.00 22 MOBILIARIO Y EQUIPAMIENTO 682,433.60 "MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA Y COMPLEMENTARIA EN LA I.E. ESPECIAL N°01 REVERENDO PADRE SANTIAGO CASTRO LUCINI - DISTRITO DE CORONEL PORTILLO - REGION UCAYALI" PAB. Nº 01: DIREC.+SS.HH (14.35M2),SECTRIA (11.98M2), SALA DE ASE. SOCIAL+SS.HH(15.05M2), TOPICO+SS.HH(20.98M2),PSICOMOTRICIDAD+DEP.+SS.HH. (45.25M2),HIDROTERAPIA (23.42M2), TERAPIA FIS.+SS.HH(97.13M2), DEP. MAT.(16.50M2), 02

Upload: lidninbardalessevillano

Post on 09-Nov-2015

216 views

Category:

Documents


1 download

DESCRIPTION

tic tic

TRANSCRIPT

CRONG.CRONOGRAMA DE AVANCE DE OBRA VALORIZADOOBRA:"MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA Y COMPLEMENTARIA EN LA I.E. ESPECIAL N01 REVERENDO PADRE SANTIAGO CASTRO LUCINI - DISTRITO DE CALLERIA - PROVINCIA DE CORONEL PORTILLO - REGION UCAYALI"ENTIDAD:GOREUFECHA:MARZO - 2014HECHO POR: P.P.CITEMPARTIDAPARCIALDIAS CALENDARIOSTOTAL1 MES2 MES3 MES4 MES5 MES6 MES7 MES01OBRAS PROVICIONALES, PRELIMINARES, DEMOLICION, SEGURIDAD Y SALUD419,349.05419,349.05419,349.0502CONSTRUCCION DE CERCO PERIMETRICO ( L=280.50 ML) - MATERIAL NOBLE243,510.4697,404.1897,404.1848,702.09243,510.4603CONSTRUCCION DE 01 PORTICO PRINCIPAL (23.60) - MATERIAL NOBLE32,772.6813,109.0713,109.076,554.5432,772.684CONSTRUCCION DE 02 PORTICOS SECUNDARIOS (12.80M2) - MATERIAL NOBLE22,401.8222,401.8222,401.825PAB. N 01: DIREC.+SS.HH (14.35M2),SECTRIA (11.98M2), SALA DE ASE. SOCIAL+SS.HH(15.05M2), TOPICO+SS.HH(20.98M2),PSICOMOTRICIDAD+DEP.+SS.HH.(45.25M2),HIDROTERAPIA (23.42M2), TERAPIA FIS.+SS.HH(97.13M2), DEP. MAT.(16.50M2), 02 SS.HH(5.96M2C/U)Y 01 ESC.586,250.51175,875.15175,875.15117,250.10117,250.10586,250.516PAB. N 01: SALA DE USOS MULT.(88.23M2), DEPOSITO MAT.(25.80M2), 02 SS.HH.(6.03M2C/U), SALA EQUIPO SAANEE(67.00M2) DEP.(8.22M2) 02 SS.HH.(2.48C/U), CREC. CREEBE - MATERIAL SEMI-NOBLE321,213.44128,485.38128,485.3864,242.69321,213.447CONSTRUCCION DE RAMPA DE CA: L=00.00ML.93,881.5346,940.7746,940.7793,881.538PABELLON N 02: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6.35M2 C/U) + AREA DE CUNAS (10.45M2 C/U) + COCINA (8.65M2 C/U) - MATERIAL SEMINOBLE258,534.21103,413.68103,413.6851,706.84258,534.219PABELLON N 03: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6.35M2 C/U) + AREA DE CUNAS (10.45M2 C/U) + COCINA (8.65M2 C/U) - MATERIAL SEMINOBLE258,534.21103,413.68103,413.6851,706.84258,534.2110PABELLN N 04 : CONSTRUCCION DE COMEDOR (60.00M2) + COCINA (10.60M2) + DEPOSITO (8.95 M2) + 01 AULA (45.00M2) + DEPOSITO (6.00M2) Y SS.HH. (7.00M2) - MATERIAL SEMINOBLE185,563.8155,669.1474,225.5255,669.14185,563.8111PABELLON N 05: CONTRUCCION DE 04 AULAS (45.00M2 C/U) C/SS.HH. (6.35M2 C/U) - MATERIAL SEMINOBLE351,643.18105,492.95105,492.9570,328.6470,328.64351,643.1812PABELLON N 06: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIAL SEMINOBLE224,170.64112,085.32112,085.32224,170.6413PABELLON N 07: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIAL SEMINOBLE224,170.64112,085.32112,085.32224,170.6414TANQUE ELEVADO DE CA CAP: (8.00 m3.)48,216.4624,108.2324,108.2348,216.4615CONSTRUCCION DE CISTERNA DE CONCRETO ARMADO CAP: (32.00 m3.)18,409.179,204.599,204.5918,409.1716CONSTRUCCION DE COBERTURA ( 150.00 M2 )59,670.6359,670.6359,670.6317CONSTRUCCION DE PERGOLA DE MADERA CON COBERTURA (40.50M2)5,917.725,917.725,917.7218CONSTRUCCION DE OBRAS EXTERIORES: VEREDAS, PISOS Y CANALETAS (375.71 M2)254,278.10101,711.24101,711.2450,855.62254,278.1019CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES SANITARIAS - CANALETAS)47,722.6723,861.3423,861.3447,722.6720CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES ELECTRICAS)25,917.9912,959.0012,959.0025,917.9921MITIGACION AMBIENTAL4,400.004,400.004,400.0022MOBILIARIO Y EQUIPAMIENTO682,433.60682,433.60682,433.60Costo Directo4,368,962.52705,737.46542,768.56715,922.34803,985.72654,194.51171,844.39774,509.554,368,962.52Gastos Generales 10%436,896.2570,573.7554,276.8671,592.2380,398.5765,419.4517,184.4477,450.96436,896.25Utilidad 10%436,896.2570,573.7554,276.8671,592.2380,398.5765,419.4517,184.4477,450.96436,896.25Sub Total5,242,755.02846,884.95651,322.27859,106.80964,782.87785,033.41206,213.26929,411.465,242,755.02IGV 18%943,695.90152,439.29117,238.01154,639.22173,660.92141,306.0137,118.39167,294.06943,695.90Valor Total Referencial6,186,450.93999,324.24768,560.281,013,746.031,138,443.78926,339.42243,331.651,096,705.526,186,450.93

Hoja1OBRAS PROVICIONALES, PRELIMINARES, DEMOLICION, SEGURIDAD Y SALUD419,349.051CONSTRUCCION DE CERCO PERIMETRICO ( L=280.50 ML) - MATERIAL NOBLE243,510.462CONSTRUCCION DE 01 PORTICO PRINCIPAL (23.60) - MATERIAL NOBLE32,772.683CONSTRUCCION DE 02 PORTICOS SECUNDARIOS (12.80M2) - MATERIAL NOBLE22,401.824PAB. N 01: DIREC.+SS.HH (14.35M2),SECTRIA (11.98M2), SALA DE ASE. SOCIAL+SS.HH(15.05M2), TOPICO+SS.HH(20.98M2),PSICOMOTRICIDAD+DEP.+SS.HH.(45.25M2),HIDROTERAPIA (23.42M2), TERAPIA FIS.+SS.HH(97.13M2), DEP. MAT.(16.50M2), 02 SS.HH(5.96M2C/U)Y 01 ESC.586,250.515PAB. N 01: SALA DE USOS MULT.(88.23M2), DEPOSITO MAT.(25.80M2), 02 SS.HH.(6.03M2C/U), SALA EQUIPO SAANEE(67.00M2) DEP.(8.22M2) 02 SS.HH.(2.48C/U), CREC. CREEBE - MATERIAL SEMI-NOBLE321,213.446CONSTRUCCION DE RAMPA DE CA: L=00.00ML.93,881.537PABELLON N 02: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6.35M2 C/U) + AREA DE CUNAS (10.45M2 C/U) + COCINA (8.65M2 C/U) - MATERIAL SEMINOBLE258,534.218PABELLON N 03: CONTRUCCION DE 02 AULAS (48.00M2 C/U) + DEPOSITO (12.00M2) + SS.HH. (6.35M2 C/U) + AREA DE CUNAS (10.45M2 C/U) + COCINA (8.65M2 C/U) - MATERIAL SEMINOBLE258,534.219PABELLN N 04 : CONSTRUCCION DE COMEDOR (60.00M2) + COCINA (10.60M2) + DEPOSITO (8.95 M2) + 01 AULA (45.00M2) + DEPOSITO (6.00M2) Y SS.HH. (7.00M2) - MATERIAL SEMINOBLE185,563.8110PABELLON N 05: CONTRUCCION DE 04 AULAS (45.00M2 C/U) C/SS.HH. (6.35M2 C/U) - MATERIAL SEMINOBLE351,643.1811PABELLON N 06: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIAL SEMINOBLE224,170.6412PABELLON N 07: CONTRUCCION DE 02 AULAS (45.00M2 C/U) + SS.HH. (6.50M2 C/U) - MATERIAL SEMINOBLE224,170.6413TANQUE ELEVADO DE CA CAP: (8.00 m3.)48,216.4614CONSTRUCCION DE CISTERNA DE CONCRETO ARMADO CAP: (32.00 m3.)18,409.1715CONSTRUCCION DE COBERTURA ( 150.00 M2 )59,670.6316CONSTRUCCION DE PERGOLA DE MADERA CON COBERTURA (40.50M2)5,917.7217CONSTRUCCION DE OBRAS EXTERIORES: VEREDAS, PISOS Y CANALETAS (375.71 M2)254,278.1018CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES SANITARIAS - CANALETAS)47,722.6719CONSTRUCCION DE OBRAS EXTERIORES (INSTALACIONES ELECTRICAS)25,917.9920MITIGACION AMBIENTAL4,400.0021MOBILIARIO Y EQUIPAMIENTO682,433.60154,368,962.523,686,528.92618398