cronograma antaccocha

7

Click here to load reader

Upload: saulo-palomino-munoz

Post on 15-Sep-2015

226 views

Category:

Documents


1 download

DESCRIPTION

cronograma valorizada

TRANSCRIPT

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    01 ESTRUCTURAS (I.E.P. N 432-147/Mx-U PATAHUASI) 612,278.29

    01.01 OBRAS PROVISIONALES 65,909.21

    01.01.01 CONSTRUCCIONES PROVISIONALES 8,629.61

    01.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE3.60Mx2.40M GLB 1.00 1,375.94 1,375.94 1375.94 100.00

    01.01.01.02 ALMACEN GLB 1.00 1,288.69 1,288.69 1288.69 100.00

    01.01.01.03 OFICINA GLB 1.00 1,040.00 1,040.00 1040.00 100.00

    01.01.01.04 CASETA DE GUARDIANIA GLB 1.00 997.62 997.62 997.62 100.00

    01.01.01.05 ALQUILER DE LOCAL PARA EL FUNCIONAMIENTO DE LA I.E. DURANTE SU EJECUCIONmes 1.00 300.00 300.00 300.00 100.00

    01.01.01.06 CERCO PROVISIONAL DE OBRA m 169.30 16.42 2,779.91 2779.91 100.00

    01.01.01.07 SERVICIOS HIGUIENICOS GLB 1.00 847.45 847.45 847.45 100.00

    01.01.02 INSTALACIONES PROVISIONALES 3,084.09

    01.01.02.01 POZA DE AGUA PARA LA CONSTRUCCION GLB 1.00 506.63 506.63 506.63 100.00

    01.01.02.02 INSTALACION PROVISIONAL DE ELECTRICIDAD GLB 1.00 2,577.46 2,577.46 2577.46 100.00

    01.01.03 MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS 39,210.17

    01.01.03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 5,084.75 5,084.75 5084.75 100.00

    01.01.03.02 FLETE TERRESTRE GLB 1.00 34,125.42 34,125.42 34125.42 100.00

    01.01.04 CONTROL DE CALIDAD EN OBRA 1,101.65

    01.01.04.01 DISEO DE MEZCLA DE CONCRETO und 1.00 423.72 423.72 423.72 100.00

    01.01.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)und 10.00 25.42 254.20 254.20 100.00

    01.01.04.03 ENSAYO DE DENSIDAD DE CAMPO und 1.00 423.73 423.73 423.73 100.00

    01.01.05 SEGURIDAD Y SALUD 13,883.69

    01.01.05.01 ELABORACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJOGLB 1.00 1,694.92 1,694.92 1694.92 100.00

    01.01.05.02 EQUIPO DE PROTECCION INDIVIDUAL und 15.00 169.50 2,542.50 2542.50 100.00

    01.01.05.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 677.97 677.97 677.97 100.00

    01.01.05.04 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 423.72 423.72 423.72 100.00

    01.01.05.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 7,697.12 7,697.12 7697.12 100.00

    01.01.05.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJOGLB 1.00 847.46 847.46 847.46 100.00

    01.02 TRABAJOS PRELIMINARES 2,266.03

    01.02.01 DESBROCE, DEFORESTACION Y LIMPIEZA DEL TERRENO MANUALm2 572.24 0.65 371.96 371.96 100.00

    01.02.02 TALA Y RETIRO DE ARBOLES und 2.00 48.55 97.10 97.10 100.00

    01.02.03 TRAZO Y REPLANTEO PRELIMINAR m2 572.24 2.05 1,173.09 1173.09 100.00

    01.02.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION m2 304.33 2.05 623.88 143.42 22.99 174.97 28.05 174.97 28.05 130.52 20.92

    01.03 MOVIMIENTO DE TIERRAS 67,888.38

    01.03.01 EXCAVACIONES 33,191.54

    01.03.01.01 EXCAVACION MASIVA C/ MAQUINARIA EN TERRENO NORMALm3 791.04 4.90 3,876.10 3876.10 100.00

    01.03.01.02 EXCAVACION MASIVA C/ MAQUINARIA EN ROCA FIJA m3 1.00 75.70 75.70 75.70 100.00

    01.03.01.03 EXCAVACION MASIVA C/ MAQUINARIA EN ROCA SUELTA m 1.00 62.86 62.86 62.86 100.00

    01.03.01.04 EXCAVACION DE ZANJA PARA CIMIENTOS HASTA H=1.70M EN TERRENO NORMALm3 156.42 44.03 6,887.17 5509.73 80.00 1377.44 20.00

    01.03.01.05 EXCAVACION DE ZANJA PARA CIMIENTOS HASTA H=1.70M EN ROCA FIJAm3 1.00 58.86 58.86 50.45 85.71 8.41 14.29

    01.03.01.06 EXCAVACION DE ZANJA PARA CIMIENTOS HASTA H=1.70M EN ROCA SUELTAm3 1.00 49.17 49.17 29.50 60.00 19.67 40.00

    01.03.01.07 EXCAVACION PARA ZAPATA DE 1.50M DE PROFUNDIDAD EN TERRENO NORMALm3 187.42 79.02 14,809.93 11847.96 80.00 2961.97 20.00

    01.03.01.08 EXCAVACION PARA ZAPATA DE 1.50M DE PROFUNDIDAD EN ROCA FIJAm3 1.00 66.96 66.96 47.83 71.43 19.13 28.57

    01.03.01.09 EXCAVACION PARA ZAPATA DE 1.50M DE PROFUNDIDAD EN ROCA SUELTAm3 1.00 58.86 58.86 29.43 50.00 29.43 50.00

    01.03.01.10 EXCAVACION PARA ESTRUCTURAS m3 94.66 37.41 3,541.23 3541.23 100.00

    01.03.01.11 PERFILADO Y COMPACTADO DE SUBRASANTE m2 659.20 5.62 3,704.70 3704.70 100.00

    01.03.02 RELLENOS 14,548.26

    01.03.02.01 EXTRACCION, CARGUIO Y TRANSPORTE DE MATERIAL CLASIFICADO PARA RELLENOm3 266.39 18.66 4,970.84 4970.84 100.00

    01.03.02.02 RELLENO Y COMPACTADO MANUAL CON MAT. PROPIO m3 41.94 10.69 448.34 149.45 33.33 298.89 66.67

    01.03.02.03 RELLENO Y COMPACTADO MANUAL CON MAT. DE PRESTAMOm3 93.72 23.63 2,214.60 2214.60 100.00

    01.03.02.04 AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES m2 486.58 14.19 6,904.57 5346.67 77.44 1557.90 22.56

    01.03.02.05 AFIRMADO DE 6" PARA LOSA m2 1.00 9.91 9.91 9.91 100.00

    01.03.03 ELIMINACION DE MATERIAL EXCEDENTE 16,037.11

    01.03.03.01 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. m3 1,412.45 4.97 7,019.88 4697.71 66.92 2322.17 33.08

    01.03.03.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 1,362.12 6.62 9,017.23 3005.74 33.33 6011.49 66.67

    01.03.04 NIVELACION INTERIOR Y APISONADO 4,111.47

    01.03.04.01 NIVELACION Y COMPACTACION DE FONDO DE ZANJAS m2 364.87 4.98 1,817.05 545.11 30.00 1271.94 70.00

    01.03.04.02 NIVELACION INTERIOR Y APISONADO m2 613.48 3.74 2,294.42 2294.42 100.00

    01.04 OBRAS DE CONCRETO SIMPLE 73,808.75

    01.04.01 SOLADOS 6,007.27

    01.04.01.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 185.01 32.47 6,007.27 6007.27 100.00

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    01.04.02 CIMIENTOS PARA CARTEL DE OBRA 176.43

    01.04.02.01 CONCRETO 1:8 m3 0.59 299.03 176.43 176.43 100.00

    01.04.03 CIMIENTOS CORRIDOS 31,563.18

    01.04.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% PGm3 134.34 234.95 31,563.18 31563.18 100.00

    01.04.04 SOBRECIMIENTOS 13,876.80

    01.04.04.01 SOBRECIMIENTO CONCRETO 1:8 + 25% P.M. m3 49.41 280.85 13,876.80 13876.80 100.00

    01.04.05 FALSO PISO 5,625.10

    01.04.05.01 FALSO PISO DE 2" DE CONCRETO 1:12 m2 277.92 20.24 5,625.10 5625.10 100.00

    01.04.06 PISOS Y PAVIMENTOS 10,039.57

    01.04.06.01 CONCRETO F'C=175KG/CM2 m3 20.71 357.49 7,403.62 7403.62 100.00

    01.04.06.02 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO m2 23.89 67.34 1,608.75 1608.75 100.00

    01.04.06.03 CURADO DE PAVIMENTO m2 138.06 2.44 336.87 336.87 100.00

    01.04.06.04 BRUAS SEGUN DETALLE m 45.15 7.44 335.92 335.92 100.00

    01.04.06.05 JUNTA DE DILATACION CON ASFALTO E=1" m 58.10 6.10 354.41 354.41 100.00

    01.04.07 SARDINEL 301.18

    01.04.07.01 SARDINEL, CONCRETO F'C=140 KG/CM2 m3 0.19 373.23 70.91 70.91 100.00

    01.04.07.02 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 3.84 55.20 211.97 211.97 100.00

    01.04.07.03 JUNTA DE DILATACION CON ASFALTO E=1" m 3.00 6.10 18.30 18.30 100.00

    01.04.08 CANAL DE DRENAJE PLUVIAL 6,123.11

    01.04.08.01 CANAL DE DRENAJE PLUVIAL, CONCRETO F'C=175KG/CM2 m3 8.93 377.85 3,374.20 3374.20 100.00

    01.04.08.02 CANAL DE DRENAJE PLUVIAL, ENCOFRADO Y DESENCOFRADOm2 39.68 67.34 2,672.05 2672.05 100.00

    01.04.08.03 JUNTA DE DILATACION CON ASFALTO E=1" m 12.60 6.10 76.86 76.86 100.00

    01.04.09 BASES 96.11

    01.04.09.01 CONCRETO F'C=175 KG/CM2 PARA CIMENTACION DE TACHOS DE BASURAm3 0.25 384.45 96.11 96.11 100.00

    01.05 OBRAS DE CONCRETO ARMADO 379,593.54

    01.05.01 ZAPATAS 47,969.21

    01.05.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3 110.55 373.26 41,263.89 41263.89 100.00

    01.05.01.02 ZAPATAS, ACERO FY=4200 KG/CM2 kg 1,493.39 4.49 6,705.32 6705.32 100.00

    01.05.02 VIGA CONECTADA 15,606.38

    01.05.02.01 VIGA CONECTADA, CONCRETO F'C=210 KG/CM2 m3 12.44 373.26 4,643.35 4643.35 100.00

    01.05.02.02 VIGA CONECTADA, ENCOFRADO Y DESENCOFRADO m2 61.90 57.36 3,550.58 3550.58 100.00

    01.05.02.03 VIGA CONECTADA, ACERO FY=4200 KG/CM2 kg 1,650.88 4.49 7,412.45 7412.45 100.00

    01.05.03 SOBRECIMIENTOS 40,287.99

    01.05.03.01 SOBRECIMIENTOS, CONCRETO F'C=175 KG/CM2 m3 17.07 350.82 5,988.50 4390.30 73.31 1598.20 26.69

    01.05.03.02 SOBRECIMIENTOS, ENCOFRADO Y DESENCOFRADO m2 493.88 57.36 28,328.96 27239.23 96.15 1089.73 3.85

    01.05.03.03 SOBRECIMIENTOS, ACERO FY=4200 KG/CM2 kg 1,329.74 4.49 5,970.53 5970.53 100.00

    01.05.04 COLUMNAS 75,530.30

    01.05.04.01 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 35.08 445.79 15,638.31 8879.74 56.78 6758.57 43.22

    01.05.04.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 466.33 85.71 39,969.14 31010.89 77.59 8958.25 22.41

    01.05.04.03 COLUMNAS, ACERO FY=4200 KG/CM2 kg 4,437.16 4.49 19,922.85 19306.45 96.91 616.40 3.09

    01.05.05 VIGAS 85,514.84

    01.05.05.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 36.39 423.88 15,424.99 6083.70 39.44 9341.29 60.56

    01.05.05.02 VIGAS, ENCOFRADO Y DESENCOFRADO m2 465.74 107.68 50,150.88 31068.33 61.95 19082.55 38.05

    01.05.05.03 VIGAS, ACERO FY=4200 KG/CM2 kg 4,440.75 4.49 19,938.97 14499.66 72.72 5439.31 27.28

    01.05.06 LOSAS ALIGERADAS 91,727.80

    01.05.06.01 LOSAS ALIGERADAS, CONCRETO F'C=210 KG/CM2 m3 31.18 447.51 13,953.36 12389.73 88.79 1563.63 11.21

    01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASm2 732.71 74.29 54,433.03 54433.03 100.00

    01.05.06.03 LOSAS ALIGERADAS ACERO FY=4200 KG/CM2 kg 1,643.23 4.49 7,378.10 7378.10 100.00

    01.05.06.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund 3,271.17 4.88 15,963.31 15963.31 100.00

    01.05.07 CANALETA DE CONCRETO ADOSADA A LOSA ALIGERADA 8,548.08

    01.05.07.01 CANALETA DE CONCRETO ADOSADA A LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2m3 4.84 423.88 2,051.58 1640.84 79.98 410.74 20.02

    01.05.07.02 CANALETA DE CONCRETO ADOSADA A LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADOm2 49.78 107.68 5,360.31 5360.31 100.00

    01.05.07.03 CANALETA DE CONCRETO ADOSADA A LOSA ALIGERADA, ACERO FY=4200 KG/CM2kg 253.05 4.49 1,136.19 1136.19 100.00

    01.05.08 MARCO PARA VENTANA 6,439.35

    01.05.08.01 MARCO PARA VENTANA, CONCRETO F'C= 175KG/CM2 m3 4.49 425.03 1,908.38 1908.38 100.00

    01.05.08.02 MARCO PARA VENTANA, ENCOFRADO Y DESENCOFRADO m2 38.21 99.71 3,809.92 3809.92 100.00

    01.05.08.03 MARCO PARA VENTANA, ACERO FY=4200 KG/CM2 kg 160.59 4.49 721.05 721.05 100.00

    01.05.09 MESA DE CONCRETO PARA LAVADERO 2,716.08

    01.05.09.01 MESA DE CONCRETO PARA LAVADERO, CONCRETO F'C= 175KG/CM2m3 1.78 394.37 701.98 701.98 100.00

    01.05.09.02 MESA DE CONCRETO PARA LAVADERO, ENCOFRADO Y DESENCOFRADOm2 29.68 58.02 1,722.03 1722.03 100.00

    01.05.09.03 MESA DE CONCRETO PARA LAVADERO, ACERO FY=4200 KG/CM2kg 65.05 4.49 292.07 292.07 100.00

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    01.05.10 MURO CONTRAPLACADO 3,606.48

    01.05.10.01 MURO CONTRAPLACADO, CONCRETO F'C=210KG/CM2 m3 2.07 476.22 985.78 985.78 100.00

    01.05.10.02 MURO CONTRAPLACADO, ENCOFRADO Y DESENCOFRADO m2 27.56 80.64 2,222.44 2222.44 100.00

    01.05.10.03 MURO CONTRAPLACADO, ACERO FY=4200 KG/CM2 kg 88.70 4.49 398.26 398.26 100.00

    01.05.11 BANCA DE ESPERA 208.79

    01.05.11.01 BANCA DE ESPERA, CONCRETO F'C=175 KG/CM2 m3 0.11 384.45 42.29 42.29 100.00

    01.05.11.02 BANCA DE ESPERA, ENCOFRADO Y DESENCOFRADO m2 1.72 60.33 103.77 103.77 100.00

    01.05.11.03 BANCA DE ESPERA, ACERO FY=4200 KG/CM2 kg 13.97 4.49 62.73 62.73 100.00

    01.05.12 ASTA PARA BANDERA 381.49

    01.05.12.01 ASTA PARA BANDERA, CONCRETO F'C=175 KG/CM2 m3 0.63 384.45 242.20 242.20 100.00

    01.05.12.02 ASTA PARA BANDERA, ENCOFRADO Y DESENCOFRADO m2 1.70 60.33 102.56 102.56 100.00

    01.05.12.03 ASTA PARA BANDERA, ACERO FY=4200 KG/CM2 kg 8.18 4.49 36.73 36.73 100.00

    01.05.13 POZO DE LODOS EN BIODIGESTOR 177.88

    01.05.13.01 POZO DE LODOS EN BIODIGESTOR, CONCRETO F'C=175 KG/CM2m3 0.12 430.63 51.68 51.68 100.00

    01.05.13.02 POZO DE LODOS EN BIODIGESTOR, ENCOFRADO Y DESENCOFRADOm2 1.78 58.36 103.88 103.88 100.00

    01.05.13.03 POZO DE LODOS EN BIODIGESTOR, ACERO FY=4200 KG/CM2 kg 4.97 4.49 22.32 22.32 100.00

    01.05.14 POZO PERCOLADOR 878.87

    01.05.14.01 POZO PERCOLADOR, CONCRETO F'C= 210KG/CM2 m3 0.94 402.37 378.23 378.23 100.00

    01.05.14.02 POZO PERCOLADOR, ENCOFRADO Y DESENCOFRADO m2 7.81 58.02 453.14 453.14 100.00

    01.05.14.03 POZO PERCOLADOR, ACERO FY=4200 KG/CM2 kg 10.58 4.49 47.50 47.50 100.00

    01.06 ESTRUCTURAS METALICAS 22,812.38

    01.06.01 COBERTURA EN PATIO DE FORMACION 20,921.38

    01.06.01.01 BRIDA SUPERIOR BS m 62.80 68.02 4,271.66 4271.66 100.00

    01.06.01.02 BRIDA INFERIOR BI m 21.15 70.27 1,486.21 1486.21 100.00

    01.06.01.03 DIAGONAL DI m 24.00 65.93 1,582.32 1582.32 100.00

    01.06.01.04 MONTANTE MO m 8.10 65.93 534.03 534.03 100.00

    01.06.01.05 MONTANTE MO1 m 2.10 92.81 194.90 194.90 100.00

    01.06.01.06 CORREAS m 127.20 68.02 8,652.14 8652.14 100.00

    01.06.01.07 APOYO DE ESTRUCTURA DE TECHO EN COLUMNA und 6.00 700.02 4,200.12 4200.12 100.00

    01.06.02 COBERTURA EN BANCA DE ESPERA 1,891.00

    01.06.02.01 SOPORTE VERTICAL m 4.40 74.39 327.32 327.32 100.00

    01.06.02.02 DIAGONAL EN ARCO m 2.00 67.27 134.54 134.54 100.00

    01.06.02.03 SOPORTE EN ARCO PARA TECHO m 4.80 67.27 322.90 322.90 100.00

    01.06.02.04 ARRIOSTRE m 6.05 62.81 380.00 380.00 100.00

    01.06.02.05 TUBO Fe CUADRADO PARA ESPALDAR DE BANCA m 7.65 66.74 510.56 510.56 100.00

    01.06.02.06 ANCLAJE DE SOPORTE VERTICAL und 2.00 107.84 215.68 178.32 82.68 37.36 17.32

    02 ARQUITECTURA (I.E.P. N 432-147/Mx-U PATAHUASI) 355,504.26

    02.01 MUROS Y TABIQUES DE ALBAILERIA 69,739.37

    02.01.01 MURO DE CABEZA LADRILLO KING KONG TIPO IV 9x13x24 m2 57.65 131.09 7,557.34 7257.06 96.03 300.28 3.97

    02.01.02 MURO DE SOGA LADRILLO KING KING TIPO IV 9x13x24 m2 718.46 86.46 62,118.05 52257.13 84.13 9244.61 14.88 616.30 0.99

    02.01.03 BASE DE SOGA LADRILLO KING KONG TIPO IV 9x13x24 PARA BANCA DE ESPERAm2 0.74 86.46 63.98 63.98 100.00

    02.02 COBERTURAS 33,944.61

    02.02.01 COBERTURA CON TEJA ANDINA ETERNIT DE 1.14Mx0.72Mx5MMm2 369.88 60.04 22,207.60 22207.60 100.00

    02.02.02 CUMBRERA CON TEJA ANDINA DE 0.72Mx0.35M m 36.30 58.62 2,127.91 2127.91 100.00

    02.02.03 COBERTURA CON PLANCHAS DE POLICARBONATO E=10MM PARA PATIO DE FORMACIONm2 85.07 105.04 8,935.75 8935.75 100.00

    02.02.04 COBERTURA CON PLANCHAS DE POLICARBONATO E=6MM PARA BANCA DE ESPERAm2 4.81 139.99 673.35 673.35 100.00

    02.03 REVOQUES ENLUCIDOS Y MOLDURAS 86,660.39

    02.03.01 TARRAJEO EN INTERIORES C:A 1:5 E=1.5cm m2 532.74 28.69 15,284.31 12962.10 84.81 2322.21 15.19

    02.03.02 TARRAJEO EN EXTERIORES C:A 1:5 E=1.5cm m2 269.71 42.37 11,427.61 10314.15 90.26 1113.46 9.74

    02.03.03 TARRAJEO DE COLUMNAS C:A 1:5 E=1.5CM m2 312.43 41.54 12,978.34 8484.94 65.38 4493.40 34.62

    02.03.04 TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5 E=1.5CM m2 485.55 48.41 23,505.48 23505.48 100.00

    02.03.05 TARRAJEO C:A 1:5 E=1.5cm Y PULIDO CON OCRE ROJO PARA BANCA DE ESPERAm2 4.10 47.45 194.55 194.55 100.00

    02.03.06 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 337.06 57.51 19,384.32 19384.32 100.00

    02.03.07 DERRAME DE VANOS m 210.84 18.43 3,885.78 3885.78 100.00

    02.04 PISOS Y PAVIMENTOS 47,188.86

    02.04.01 PISO DE MACHIEHEMBRADO DE MADERA m2 111.80 200.46 22,411.43 22411.43 100.00

    02.04.02 PISO CERAMICO DE 40CMx40CM m2 95.30 78.66 7,496.30 7496.30 100.00

    02.04.03 PISO DE CEMENTO PULIDO COLOREADO m2 5.95 34.28 203.97 203.97 100.00

    02.04.04 CONTRAPISO PARA CERAMICO m2 207.10 33.73 6,985.48 6985.48 100.00

    02.04.05 VEREDA DE CONCRETO 140KG/CM2 E=4" m2 131.52 45.67 6,006.52 6006.52 100.00

    02.04.06 VEREDAS, ENCOFRADO Y DESENCOFRADO m2 17.34 67.34 1,167.68 1167.68 100.00

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    02.04.07 CURADO DE VEREDAS m2 131.52 2.44 320.91 320.91 100.00

    02.04.08 BRUAS SEGUN DETALLE m 316.00 7.44 2,351.04 2351.04 100.00

    02.04.09 JUNTA DE DILATACION CON ASFALTO E=1" m 40.25 6.10 245.53 245.53 100.00

    02.05 CONTRAZOCALOS 6,023.17

    02.05.01 CONTRAZOCALO DE CEDRO 3/4"x2" RODON DE 3/4" (H=10CM) m 76.32 27.13 2,070.56 1382.16 66.75 688.40 33.25

    02.05.02 CONTRAZOCALO DE CERAMICO DE 10x30 CM m 81.87 24.20 1,981.25 1981.25 100.00

    02.05.03 CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CMx0.20M (INTERIOR)m 10.05 11.40 114.57 114.57 100.00

    02.05.04 CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CMx0.30M (EXTERIOR)m 115.60 13.92 1,609.15 1609.15 100.00

    02.05.05 CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CMx0.60M (EXTERIOR)m 11.90 20.81 247.64 247.64 100.00

    02.06 ZOCALOS 6,391.60

    02.06.01 ZOCALO DE MAYOLICA 20x30 CM (H=1.50M) m2 66.76 95.74 6,391.60 6391.60 100.00

    02.07 CARPINTERIA DE MADERA 10,336.31

    02.07.01 PUERTA CN C/TABLEROS MADERA CEDRO m2 24.93 273.54 6,819.35 6734.80 98.76 84.55 1.24

    02.07.02 CUBICULO DE BAOS DE MELAMINE / INC. PUERTA 0.60Mx1.45MGLB 2.00 1,694.92 3,389.84 3389.84 100.00

    02.07.03 MADERA TORNILLO BARNIZADO EMPOTRADO PARA BANCA DE ESPERAGLB 1.00 127.12 127.12 127.12 100.00

    02.08 CARPINTERIA METALICA Y HERRERIA 34,512.37

    02.08.01 VENTANA V-1 (1.90Mx1.60M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 3.00 843.22 2,529.66 710.40 28.08 1777.49 70.27 41.77 1.65

    02.08.02 VENTANA V-2 (0.70Mx1.60M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 2.00 237.39 474.78 474.78 100.00

    02.08.03 VENTANA V-3 (1.00Mx0.70M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 1.00 177.97 177.97 177.97 100.00

    02.08.04 VENTANA V-4 (0.40Mx0.70M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 1.00 67.80 67.80 67.80 100.00

    02.08.05 VENTANA V-5 (0.50Mx1.40M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 4.00 161.02 644.08 644.08 100.00

    02.08.06 VENTANA V-6 (1.90Mx1.40M) CON MARCOS DE ALUMINIO PARA 01 AULA + SUMund 5.00 754.24 3,771.20 3771.20 100.00

    02.08.07 VENTANA V-1 (0.60Mx1.60M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 4.00 203.39 813.56 813.56 100.00

    02.08.08 VENTANA V-2 (2.00Mx1.60M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 2.00 887.60 1,775.20 1775.20 100.00

    02.08.09 VENTANA V-3 (1.20Mx0.70M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 1.00 213.56 213.56 213.56 100.00

    02.08.10 VENTANA V-4 (1.35Mx0.70M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 1.00 240.26 240.26 240.26 100.00

    02.08.11 MAMPARA M-1 (3.425Mx4.57M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 1.00 3,714.09 3,714.09 3714.09 100.00

    02.08.12 MAMPARA M-2 (4.125Mx3.25M) CON MARCOS DE ALUMINIO PARA ADMINISTRACIONund 1.00 3,181.15 3,181.15 3181.15 100.00

    02.08.13 VENTANA V-1 (1.02Mx1.44M) CON MARCOS DE ALUMINIO PARA VIVIENDA DOCENTEund 1.00 338.14 338.14 338.14 100.00

    02.08.14 VENTANA V-2 (1.40Mx1.05M) CON MARCOS DE ALUMINIO PARA VIVIENDA DOCENTEund 1.00 338.14 338.14 338.14 100.00

    02.08.15 VENTANA V-2' (1.40Mx1.44M) CON MARCOS DE ALUMINIO PARA VIVIENDA DOCENTEund 1.00 473.86 473.86 473.86 100.00

    02.08.16 VENTANA V-3 (1.12Mx0.40M) CON MARCOS DE ALUMINIO PARA VIVIENDA DOCENTEund 1.00 103.52 103.52 103.52 100.00

    02.08.17 CONFECCION E INSTALACION DE LA PUERTA METALICA PM-1 (3.00Mx2.98M) PARA INGRESO PRINCIPALund 1.00 2,542.37 2,542.37 2542.37 100.00

    02.08.18 CONFECCION E INSTALACION DE LA PUERTA METALICA PM-2 (1.00Mx2.98M) PARA INGRESO PRINCIPALund 1.00 847.46 847.46 847.46 100.00

    02.08.19 REJILLA METALICA EN MURO CONTRAPLACADO PARA INGRESO PRINCIPALm 36.80 27.92 1,027.46 1027.46 100.00

    02.08.20 BARANDA METALICA CON TUBO DE FG DE 3" PARA INGRESO PRINCIPALGLB 1.00 211.86 211.86 211.86 100.00

    02.08.21 ASTA PARA BANDERA, INC. INSTALACION Y ACCESORIOS und 1.00 1,294.60 1,294.60 1294.60 100.00

    02.08.22 TACHO PARA BASURA und 2.00 423.72 847.44 474.39 55.98 373.05 44.02

    02.08.23 TUBO FG 2" PARA CERCO PERIMETRICO m 168.00 40.37 6,782.16 6782.16 100.00

    02.08.24 CONFECCION DE REJILLA PARA CANAL DE DRENAJE PLUVIAL m 99.20 21.19 2,102.05 2102.05 100.00

    02.09 CERRAJERIA 2,905.14

    02.09.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 57.00 19.19 1,093.83 1093.83 100.00

    02.09.02 CERRADURA PARA PUERTA DOS GOLPES pza 11.00 100.79 1,108.69 1108.69 100.00

    02.09.03 CERRADURA DE PERILLA CILINDRICA / USO MULTIPLE pza 6.00 66.89 401.34 401.34 100.00

    02.09.04 CERROJO DE 3" ALUMINIZADA EN PUERTA und 9.00 7.22 64.98 64.98 100.00

    02.09.05 MANIJA DE BRONCE 4" PARA PUERTAS und 34.00 6.95 236.30 236.30 100.00

    02.10 VIDRIOS, CRISTALES Y SIMILARES 22,122.94

    02.10.01 VIDRIOS SEMIDOBLES p2 711.12 31.11 22,122.94 22122.94 100.00

    02.11 PINTURA 22,640.88

    02.11.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 23.24 14.76 343.02 64.53 18.81 253.84 74.00 24.65 7.19

    02.11.02 PINTURA LATEX EN CIELO RASO m2 356.23 13.28 4,730.73 4730.73 100.00

    02.11.03 PINTURA LATEX EN INTERIORES m2 1,205.19 7.80 9,400.48 6106.14 64.96 3294.34 35.04

    02.11.04 PINTURA OLEO MATE EN EXTERIORES m2 324.76 9.02 2,929.34 2759.73 94.21 169.61 5.79

    02.11.05 PINTURA ANTICORROSIVA EN ESTRUCTURAS METALICAS m2 13.69 11.02 150.86 122.67 81.31 28.19 18.69

    02.11.06 PINTURA SEGUN DISEO m2 115.00 44.23 5,086.45 5086.45 100.00

    02.12 JUNTAS 6,767.06

    02.12.01 JUNTA DE DILATACION CON ASFALTO E=1" m 132.11 6.10 805.87 805.87 100.00

    02.12.02 JUNTA DE DILATACION VERTICAL m 144.90 6.93 1,004.16 1004.16 100.00

    02.12.03 TAPAJUNTAS METALICA EN JUNTAS m 144.90 34.21 4,957.03 4957.03 100.00

    02.13 AREAS VERDES 2,861.19

    02.13.01 PREPARACION DE TIERRA PARA SEMBRIO DE PLANTAS ORNAMENTALESm3 11.37 36.75 417.85 417.85 100.00

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    02.13.02 SEMBRIO DE PLANTAS ORNAMENTALES und 36.00 23.18 834.48 834.48 100.00

    02.13.03 PREPARADO Y SEMBRADO DE GRASS AMERICANO m2 113.70 14.15 1,608.86 1608.86 100.00

    02.14 VARIOS 3,410.37

    02.14.01 SEALES PREVENTIVAS, DE EVACUACION Y EMERGENCIA GLB 1.00 847.46 847.46 847.46 100.00

    02.14.02 PLACA RECORDATORIA DE BRONCE und 1.00 169.50 169.50 169.50 100.00

    02.14.03 LIMPIEZA FINAL DE OBRA GLB 1.00 2,393.41 2,393.41 2393.41 100.00

    03 INSTALACIONES SANITARIAS (I.E.P. N 432-147/Mx-U PATAHUASI) 24,841.34

    03.01 SISTEMA DE DRENAJE PLUVIAL 3,128.51

    03.01.01 TUBERIA DE PVC SAP 4" P/LLUVIAS m 39.48 25.29 998.45 998.45 100.00

    03.01.02 ACCES. EN TUB. BAJADA DE EVAC. PLUVIAL pto 10.00 183.62 1,836.20 1836.20 100.00

    03.01.03 MOCHETA DE PROTECCION m3 0.74 397.11 293.86 293.86 100.00

    03.02 INSTALACIONES SANITARIAS 14,452.63

    03.02.01 MOVIMIENTO DE TIERRAS 3,117.19

    03.02.01.01 EXCAVACION MANUAL DE ZANJAS PARA TUBERIAS m3 50.81 37.41 1,900.80 1900.80 100.00

    03.02.01.02 RELLENO Y APISONADO MANUAL EN ZANJAS DE TUBERIAS m3 50.81 23.94 1,216.39 1216.39 100.00

    03.02.02 SISTEMA DE DESAGE Y VENTILACION 1,738.26

    03.02.02.01 SALIDA DE DESAGE EN PVC SAL 2" pto 13.00 73.19 951.47 951.47 100.00

    03.02.02.02 SALIDA DE DESAGE EN PVC SAL 4" pto 5.00 72.23 361.15 361.15 100.00

    03.02.02.03 SALIDA PARA VENTILACION DE 2" pto 6.00 70.94 425.64 425.64 100.00

    03.02.03 REDES DE DISTRIBUCION DE DESAGE 1,711.94

    03.02.03.01 TUBERIA DE PVC SAL 2" m 46.60 8.34 388.64 388.64 100.00

    03.02.03.02 TUBERIA DE PVC SAL 4" m 66.00 20.05 1,323.30 1323.30 100.00

    03.02.04 ACCESORIOS PARA REDES 182.41

    03.02.04.01 YEE PVC SAL SP RAMAL CON REDUCCION 4"-2" pza 17.00 10.73 182.41 182.41 100.00

    03.02.05 ADITAMENTOS VARIOS 561.31

    03.02.05.01 TRAMPA "P" DE P.V.C. SAL PARA DESAGE DE 2" und 12.00 12.52 150.24 150.24 100.00

    03.02.05.02 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 7.00 18.70 130.90 130.90 100.00

    03.02.05.03 REGISTRO DE BRONCE 4", PROVISION Y COLOCACION und 5.00 39.81 199.05 199.05 100.00

    03.02.05.04 SOMBREROS DE VENTILACION DE P.V.C. DE 2" und 8.00 10.14 81.12 81.12 100.00

    03.02.06 CAMARAS DE INSPECCION 1,654.66

    03.02.06.01 CAJA DE REG. ALB. 12"x24" TAPA DE CONCRETO pza 7.00 236.38 1,654.66 1654.66 100.00

    03.02.07 SISTEMA DE AGUA FRIA 2,780.22

    03.02.07.01 SALIDAS DE AGUA FRIA 1,372.92

    03.02.07.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP 1/2" pto 17.00 80.76 1,372.92 1372.92 100.00

    03.02.07.02 REDES DE DISTRIBUCION DE AGUA FRIA 1,277.95

    03.02.07.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 124.80 10.24 1,277.95 1277.95 100.00

    03.02.07.03 ACCESORIOS PARA REDES 129.35

    03.02.07.03.01 CODO PVC SAP 1/2"X90 pza 13.00 5.36 69.68 69.68 100.00

    03.02.07.03.02 TEE PVC SAP 1/2" pza 9.00 6.63 59.67 59.67 100.00

    03.02.08 LLAVES, VALVULAS Y CAJAS 496.00

    03.02.08.01 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 4.00 68.23 272.92 272.92 100.00

    03.02.08.02 CAJA P/VALVULAS 30x30CM (NICHO PARED) pza 4.00 55.77 223.08 223.08 100.00

    03.02.09 APARATOS Y ACCESORIOS SANITARIOS 2,210.64

    03.02.09.01 INODORO TANQUE BAJO NORMAL pza 2.00 144.06 288.12 288.12 100.00

    03.02.09.02 INODORO BABY pza 2.00 135.60 271.20 271.20 100.00

    03.02.09.03 LAVATORIO OVALIN MODELO MIMBELL pza 3.00 80.55 241.65 241.65 100.00

    03.02.09.04 LAVATORIO DE PARED DE COLOR BLANCO pza 2.00 67.80 135.60 135.60 100.00

    03.02.09.05 URINARIO MODELO BAMBI pza 1.00 110.17 110.17 110.17 100.00

    03.02.09.06 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und 1.00 63.60 63.60 63.60 100.00

    03.02.09.07 LAVADEROS DE LOSA pza 1.00 235.80 235.80 235.80 100.00

    03.02.09.08 JABONERA DE LOZA DE SOBREPONER pza 5.00 12.71 63.55 63.55 100.00

    03.02.09.09 PAPELERA DE LOZA DE SOBREPONER pza 5.00 18.64 93.20 93.20 100.00

    03.02.09.10 ESPEJOS pza 5.00 76.27 381.35 381.35 100.00

    03.02.09.11 COLOCACION DE APARATOS SANITARIOS pza 10.00 32.64 326.40 326.40 100.00

    03.03 BIODIGESTOR 7,260.20

    03.03.01 INSTALACIONES SANITARIAS 7,260.20

    03.03.01.01 SUMINISTRO E INSTALACION DE BIODIGESTOR AUTOLIMPIABLE 3000Lt - 5000Ltund 1.00 5,571.42 5,571.42 5571.42 100.00

    03.03.01.02 CAJA DE CONCRETO PREFABRICADO ESTANDART DE 0.30X0.60M C/TAPA DE CONCRETOund 1.00 101.69 101.69 101.69 100.00

    03.03.01.03 INSTALACION DE TUBERIA PVC SAL 4" m 20.00 11.83 236.60 236.60 100.00

    03.03.01.04 INSTALACION DE TUBERIA PVC SAL 2" m 150.00 4.73 709.50 709.50 100.00

    03.03.01.05 CODO PVC SAL 2"X45 pza 2.00 15.15 30.30 30.30 100.00

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    03.03.01.06 CODO PVC SAL 2"X90 pza 2.00 15.53 31.06 31.06 100.00

    03.03.01.07 YEE PVC SAL 2" pza 2.00 9.64 19.28 19.28 100.00

    03.03.01.08 VALVULA DE PURGA PVC DE 2" pza 1.00 20.22 20.22 20.22 100.00

    03.03.01.09 FILTRO DE GRAVA m3 4.60 117.42 540.13 540.13 100.00

    04 INSTALACIONES ELECTRICAS (I.E.P. N 432-147/Mx-U PATAHUASI) 30,658.03

    04.01 MOVIMIENTO DE TIERRAS 3,158.65

    04.01.01 EXCAVACION DE ZANJA HASTA H=1.00M m3 53.15 37.41 1,988.34 1988.34 100.00

    04.01.02 RELLENO MANUAL CON MATERIAL PROPIO m3 63.26 18.50 1,170.31 1170.31 100.00

    04.02 POSTES 1,271.16

    04.02.01 POSTE METALICO und 3.00 423.72 1,271.16 1271.16 100.00

    04.03 SALIDAS PARA ALUMBRADO 3,101.45

    04.03.01 SALIDA DE TECHO C/PVC-L 15 MM (TW 2.5 MM2) pto 55.00 56.39 3,101.45 3101.45 100.00

    04.04 SALIDAS PARA INTERRUPTORES 1,003.04

    04.04.01 INTERRUPTOR UNIPOLAR SIMPLE C/PVC-L 15 MM (TW 2.5 MM2)pto 16.00 37.84 605.44 605.44 100.00

    04.04.02 INTERRUPTOR UNIPOLAR TRIPLE C/PVC-L 15 MM (TW 2.5 MM2) pto 5.00 39.76 198.80 198.80 100.00

    04.04.03 INTERRUPTOR UNIPOLAR TRIPLE C/PVC-L 15 MM (TW 2.5 MM2) pto 5.00 39.76 198.80 198.80 100.00

    04.05 SALIDAS PARA TOMACORRIENTES 869.08

    04.05.01 TOMACORRIENTE BIPOLAR SIMPLE 20A C/TIERRA PVC-L 15 MMpto 10.00 72.07 720.70 720.70 100.00

    04.05.02 TOMACORRIENTE BIPOLAR DOBLE 20A C/TIERRA PVC-L 15 MM pto 2.00 74.19 148.38 148.38 100.00

    04.06 CAJAS DE PASE 257.30

    04.06.01 CAJA DE PASE CON TAPA CIEGA pza 5.00 51.46 257.30 257.30 100.00

    04.07 SISTEMA DE PUESTA A TIERRA 582.84

    04.07.01 POZO DE PROTECCION A TIERRA und 1.00 582.84 582.84 582.84 100.00

    04.08 CAJAS Y/O MEDIDORES 451.10

    04.08.01 CAJA TOMA - MEDIDOR und 1.00 451.10 451.10 451.10 100.00

    04.09 TABLEROS 1,078.44

    04.09.01 TABLERO GENERAL und 1.00 492.06 492.06 492.06 100.00

    04.09.02 TABLERO DE DISTRIBUCION und 3.00 195.46 586.38 586.38 100.00

    04.10 INTERRUPTORES TERMOMAGNETICOS 217.87

    04.10.01 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x30A pza 1.00 56.59 56.59 56.59 100.00

    04.10.02 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2x20A pza 3.00 53.76 161.28 161.28 100.00

    04.11 ARTEFACTOS 4,952.30

    04.11.01 LUMINARIA LED-TUBO, 2x20W, CON CUBIERTA TRANSPARENTEund 10.00 74.04 740.40 740.40 100.00

    04.11.02 LUMINARIA LED-TUBO, 1x20W, CON CUBIERTA TRANSPARENTEund 36.00 69.80 2,512.80 2512.80 100.00

    04.11.03 LUMINARIA LED PARA ADOSAR EN TECHO 10W und 8.00 65.56 524.48 524.48 100.00

    04.11.04 FAROL CON VAPOR DE SODIO DE 70W und 6.00 146.07 876.42 876.42 100.00

    04.11.05 COLOCACION DE ARTEFACTOS DE ALUMBRADO und 60.00 4.97 298.20 298.20 100.00

    04.12 CONDUCTOS 9,637.40

    04.12.01 TUBERIA PVC-L (ELECTRICAS) D=35MM m 30.00 13.69 410.70 410.70 100.00

    04.12.02 TUBERIA PVC-L (ELECTRICAS) D=20MM m 95.00 12.18 1,157.10 1157.10 100.00

    04.12.03 TUBERIA PVC-L (ELECTRICAS) D=15MM m 770.00 10.48 8,069.60 4374.19 54.21 3695.41 45.79

    04.13 CABLES Y CONDUCTORES 4,077.40

    04.13.01 CABLE ELECTRICO CONCENTRICO 2x6 MM2 m 60.00 3.40 204.00 204.00 100.00

    04.13.02 CABLE ELECTRICO THW 10.0 MM2 m 80.00 4.60 368.00 368.00 100.00

    04.13.03 CABLE ELECTRICO THW 6.0 MM2 m 150.00 3.93 589.50 589.50 100.00

    04.13.04 CABLE ELECTRICO THW 4.0 MM2 m 120.00 3.40 408.00 408.00 100.00

    04.13.05 CABLE ELECTRICO TW 2.5 MM2 m 650.00 2.88 1,872.00 1872.00 100.00

    04.13.06 CABLE ELECTRICO DESNUDO 35.0 MM2 m 10.00 63.59 635.90 635.90 100.00

    05 IMPLEMENTACION (I.E.P. N 432-147/Mx-U PATAHUASI) 74,038.98

    05.01 MOBILIARIO Y EQUIPAMIENTO 29,369.49

    05.01.01 MOBILIARIO DE AULA GLB 1.00 6,906.78 6,906.78 6906.78 100.00

    05.01.02 MOBILIARIO DE COCINA GLB 1.00 1,822.03 1,822.03 1822.03 100.00

    05.01.03 MOBILIARIO DE SECRETARIA Y DIRECCION GLB 1.00 8,135.59 8,135.59 8135.59 100.00

    05.01.04 MOBILIARIO DE SALA DE USOS MULTIPLES GLB 1.00 8,174.58 8,174.58 8174.58 100.00

    05.01.05 MOBILIARIO DE TOPICO GLB 1.00 1,652.54 1,652.54 1652.54 100.00

    05.01.06 MOBILIARIO DE VIVIENDA DOCENTE GLB 1.00 2,677.97 2,677.97 2677.97 100.00

    05.02 MATERIAL DIDACTICO O MODULO EDUCATIVO 29,669.49

    05.02.01 AREA DE DRAMATIZACION GLB 1.00 11,754.24 11,754.24 11754.24 100.00

    05.02.02 AREA DE ARTE Y MUSICA GLB 1.00 3,305.08 3,305.08 3305.08 100.00

    05.02.03 AREA DE JUEGOS GLB 1.00 5,288.14 5,288.14 5288.14 100.00

    05.02.04 AREA DE CONSTRUCCION GLB 1.00 9,322.03 9,322.03 9322.03 100.00

  • PROYECTO:

    UBICACION: ANTACOCHA - VILCANCHOS - VICTOR FAJARDO - AYACUCHO

    FECHA: MAYO DE 2015

    CRONOGRAMA VALORIZADO DE OBRA

    ItemMes 01 Mes 02 Mes 03

    Descripcin Precio (S/.)Mes 05Mes 04 Mes 06 %

    Avance Fisico - Valorizado

    Parcial (S/.)%%

    "INSTALACION DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADO EN 08 INSTITUCIONES EDUCATIVAS EN EL AMBITO DE LOS DISTRITOS DE VINCHOS, TOTOS Y VILCANCHOS, PROVINCIAS DE HUAMANGA, CANGALLO Y VICTOR FAJARDO - REGION

    AYACUCHO"

    %% %MetradoUnd.

    05.03 JUEGOS INFANTILES 15,000.00

    05.03.01 JUEGO INFANTIL MODULAR GLB 1.00 15,000.00 15,000.00 15000.00 100.00

    06 CAPACITACION (I.E.P. N 432-147/Mx-U PATAHUASI) 9,173.52

    06.01 CAPACITACION PEDAGOGICA A DOCENTES SOBRE NUEVO ENFOQUE ''LAS RUTAS DEL APRENDIZAJE''GLB 1.00 4,586.76 4,586.76 4586.76 100.00

    06.02 SENSIBILIZACION Y CAPACITACION A PADRES DE FAMILIA SOBRE LA IMPORTANCIA Y TRASCENDENCIA DE LA EDUCACION INICIALGLB 1.00 4,586.76 4,586.76 4586.76 100.00

    07 PLAN DE GESTION DE RIESGOS (I.E.P. N 432-147/Mx-U PATAHUASI) 5,424.16

    07.01 PLAN DE GESTION DE RIESGOS GLB 1.00 5,424.16 5,424.16 5424.16 100.00

    08 PLAN DE GESTION AMBIENTAL (I.E.P. N 432-147/Mx-U PATAHUASI) 7,088.13

    08.01 PLAN DE GESTION AMBIENTAL GLB 1.00 7,088.13 7,088.13 7088.13 100.00

    COSTO DIRECTO S/. 1,119,006.71 S/. 116,000.96 10.37% S/. 195,438.83 17.47% S/. 305,168.28 27.27% S/. 207,335.67 18.53% S/. 171,135.03 15.29% S/. 123,927.94 11.07%

    GASTOS GENERALES (10% CD) S/. 111,900.67 S/. 11,600.10 10.37% S/. 19,543.88 17.47% S/. 30,516.83 27.27% S/. 20,733.57 18.53% S/. 17,113.50 15.29% S/. 12,392.79 11.07%

    UTILIDAD (5% CD) S/. 55,950.34 S/. 5,800.05 10.37% S/. 9,771.94 17.47% S/. 15,258.41 27.27% S/. 10,366.78 18.53% S/. 8,556.75 15.29% S/. 6,196.40 11.07%

    SUB TOTAL (GG+UTI) S/. 1,286,857.72 S/. 133,401.10 10.37% S/. 224,754.65 17.47% S/. 350,943.53 27.27% S/. 238,436.02 18.53% S/. 196,805.28 15.29% S/. 142,517.14 11.07%

    IGV(18% ST) S/. 231,634.39 S/. 24,012.20 10.37% S/. 40,455.84 17.47% S/. 63,169.84 27.27% S/. 42,918.49 18.53% S/. 35,424.96 15.29% S/. 25,653.09 11.07%

    PRESUPUESTO OBRA (ST+IGV) S/. 1,518,492.11 S/. 157,413.30 10.37% S/. 265,210.50 17.47% S/. 414,113.37 27.27% S/. 281,354.50 18.53% S/. 232,230.24 15.29% S/. 168,170.23 11.07%

    GASTO DE SUPERVISION (5% PO) S/. 75,924.61 S/. 7,870.67 10.37% S/. 13,260.52 17.47% S/. 20,705.67 27.27% S/. 14,067.73 18.53% S/. 11,611.51 15.29% S/. 8,408.51 11.07%

    VALOR REFERENCIAL (PO+GS) S/. 1,594,416.72 S/. 165,283.97 10.37% S/. 278,471.02 17.47% S/. 434,819.03 27.27% S/. 295,422.23 18.53% S/. 243,841.75 15.29% S/. 176,578.74 11.07%

    APORTE COMUNAL (10% MO) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00

    GOBIERNO REGIONAL S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00

    MINISTERIO DE EDUCACION S/. 1,594,416.72 S/. 165,283.97 S/. 278,471.02 S/. 434,819.03 S/. 295,422.23 S/. 243,841.75 S/. 176,578.74

    PRESUPUESTO TOTAL PARA FINANCIAMIENTO S/. 1,594,416.72 S/. 165,283.97 S/. 278,471.02 S/. 434,819.03 S/. 295,422.23 S/. 243,841.75 S/. 176,578.74

    AVANCE TOTAL ACUMULADO 10.37% 27.83% 55.10% 73.63% 88.93% 100.00%