copia de valorizacion febrero 04

22
DATOS GENERALES - VALO ENTIDAD : OBRA : PROCESO : MODALIDAD DE CONCURSO : MONTO VALOR REFERENCIAL : FECHA VALOR REFERENCIAL : CONTRATISTA : PRESUPUESTO CONTRATADO CON I.G.V. : PRESUPUESTO CONTRATADO SIN I.G.V. : FACTOR DE RELACION : PLAZO DE EJECUCION : FIRMA DE CONTRATO : ENTREGA DEL TERRENO : ENTREGA DEL EXPEDIENTE TECNICO : FECHA DE INICIO DE OBRA : FECHA TERMINO CONTRACT. DE OBRA : MONTO DEL ADELANTO DIRECTO : FECHA PAGO DEL ADELANTO DIRECTO : MONTO DEL ADELANTO DE MATERIALES 1 : MONTO DEL ADELANTO DE MATERIALES 2 : FECHA PAGO DEL ADELANTO MATERIALES : RESIDENTE DE OBRA : SUPERVISION DE OBRA : AVANCE REAL : AVANCE REAL ACUMULADO : AVANCE PROGRAMADO : AVANCE PROGRAMADO ACUMULADO : SITUACION DE LA OBRA :

Upload: conejovv

Post on 03-Nov-2014

27 views

Category:

Documents


6 download

TRANSCRIPT

DATOS GENERALES - VALORIZACION DE OBRA Nº 04 (FEBRERO-2013)

ENTIDAD : MUNICIPALIDAD DISTRITAL DE UCHUMARCA

OBRA :

PROCESO : LP-001-2012-MDU/CE

MODALIDAD DE CONCURSO : A SUMA ALZADA

MONTO VALOR REFERENCIAL : S/. 6,367,339.46

FECHA VALOR REFERENCIAL : JUNIO 2012

CONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"

PRESUPUESTO CONTRATADO CON I.G.V. : S/. 6,367,339.46

PRESUPUESTO CONTRATADO SIN I.G.V. : S/. 5,396,050.39

FACTOR DE RELACION : 1.00000

PLAZO DE EJECUCION : 210 DIAS CALENDARIO

FIRMA DE CONTRATO : 27 DE SETIEMBRE 2012

ENTREGA DEL TERRENO : 15 DE OCTUBRE 2012

ENTREGA DEL EXPEDIENTE TECNICO :

FECHA DE INICIO DE OBRA : 18 DE OCTUBRE 2012

FECHA TERMINO CONTRACT. DE OBRA : 16 DE MAYO DEL 2013

MONTO DEL ADELANTO DIRECTO : S/. 1,273,467.89

FECHA PAGO DEL ADELANTO DIRECTO : 17 DE OCTUBRE DEL 2012

MONTO DEL ADELANTO DE MATERIALES 1 : S/. 1,910,201.84

MONTO DEL ADELANTO DE MATERIALES 2 : NO

FECHA PAGO DEL ADELANTO MATERIALES : 25 DE OCTUBRE DEL 2012

RESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP : 96127

SUPERVISION DE OBRA : ING. MANUEL LORENZO ROMERO ZARATE - CIP : 54581

AVANCE REAL : 7.21%

AVANCE REAL ACUMULADO : 77.55%

AVANCE PROGRAMADO : 18.55%

AVANCE PROGRAMADO ACUMULADO : 66.44%

SITUACION DE LA OBRA : OBRA ADELANTADA

"MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

RESUMEN CRONOGRAMA VALORIZADO DE OBRA - CONCORDADO A LA FECHA DE INICIO DE OBRA

OBRA:

PROCESO LP -002-2012-MPSCH/CEP PLAZO CONTRACTUAL 210 DIAS CALENDARIO

UBICACIÓN UCHUMARCA - BOLIVAR - LA LIBERTAD FECHA INICIO PLAZO CONTRACTUAL 18-Oct-12

CONTRATISTA CONSORCIO VALLE VERDE - UCHUMARCA FECHA TERMINO PLAZO CONTRACTUAL : 16-May-13

MTO CONTRATO S/. 6,367,339.46

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS S/. (SIN/ IGV) PORCENTAJES MONTOS S/. (SIN/ IGV) PORCENTAJES

MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %

Sep-12 0 0 0 0 Sep-12 0.00 0.00 0.00% 0.00%

Oct-12 228,252.94 228,252.94 4.23% 4.23% Oct-12 0.00 0.00 0.00% 0.00%

Nov-12 850,957.15 1,079,210.09 15.77% 20.00% Nov-12 1,109,812.36 1,109,812.36 20.57% 20.57%

Dec-12 1,230,299.49 2,309,509.58 22.80% 42.80% Dec-12 1,617,067.22 2,726,879.58 29.97% 50.53%

Jan-13 766,239.15 3,075,748.73 14.20% 57.00% Jan-13 1,068,759.68 3,795,639.26 19.81% 70.34%

Feb-13 929,739.48 4,005,488.21 17.23% 74.23% Feb-13 388,983.27 4,184,622.53 7.21% 77.55%

Mar-13 850,957.14 4,856,445.35 15.77% 90.00% Mar-13 0.00 4,184,622.53 0.00% 77.55%

"MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA

LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

9/1/2012 10/1/2012 11/1/2012 12/1/2012 1/1/2013 2/1/2013 3/1/2013 4/1/2013

0.0000E+00

1.0000E+06

2.0000E+06

3.0000E+06

4.0000E+06

5.0000E+06

6.0000E+06

0228,252.94

1,079,210.09

2,309,509.58

3,075,748.73

4,005,488.21

4,856,445.35

5,396,050.39

10/1/2012

11/1/2012

12/1/2012

3,795,639.264,184,622.53

GRAFICO DE AVANCE FINANCIEROREPROGRAMADO VS EJECUTADO ACUMULADO

PLAZO DE EJECUCIÓN (07 MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(S

/.)

Apr-13 539,605.04 5,396,050.39 10.00% 100.00% Apr-13 0.00 4,184,622.53 0.00% 77.55%

TOTAL 5,396,050.39 - 100.00% - TOTAL 4,184,622.53 - 0.00% -

RESUMEN DE VALORIZACION DE OBRA Nº 04 (FEBRERO-2013)

OBRA : "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

CONTRATISTA : CONSORCIO VALLE VERDE - UCHUMARCA

RESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127SUPERVISOR : " CONSORCIO UCHUMARCA " MANUEL LORENZO ROMERO ZARATE - CIP : 54581FECHA : 28 DE FEBRERO DEL 2013MONTO REFERENCIAL: S/. 6,367,339.46MONTO CONTRATO: S/. 6,367,339.46

ITEM DESCRIPCIONFEBRERO

A VALORIZACION CONTRACTUAL001 CAPTACION S/. 14,862.12 S/. 14,752.04 S/. 110.11 S/. 0.00 S/. 0.00 S/. 14,862.15 100.00% -0.03002 LINEA DE CONDUCCION S/. 698,112.11 S/. 656,605.91 S/. 0.00 S/. 41,506.18 S/. 0.00 S/. 698,112.09 100.00% 0.02003 CAMARA ROMPE PRESION T-06 S/. 22,896.83 S/. 11,549.28 S/. 0.00 S/. 11,347.56 S/. 0.00 S/. 22,896.84 100.00% -0.01004 POZA DE FILTRACION S/. 140,580.50 S/. 52,475.37 S/. 33,708.24 S/. 46,697.97 S/. 7,699.57 S/. 140,581.15 100.00% -0.65005 REDES DE DISTRIBUCION S/. 483,543.95 S/. 48,580.32 S/. 195,117.76 S/. 137,231.59 S/. 100,600.16 S/. 481,529.84 99.58% 2,014.11006 CONEXCIONES DOMICILIARIAS DE AGUA S/. 252,864.21 S/. 64,362.96 S/. 77,216.09 S/. 94,661.89 S/. 16,550.16 S/. 252,791.11 99.97% 73.10007 MEJORAMIENTO DE RESERVORIOS APOYADOS S/. 32,149.49 S/. 1,457.92 S/. 9,788.92 S/. 20,902.65 S/. 0.00 S/. 32,149.49 100.00% 0.00008 CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO S/. 2,544,763.38 S/. 260,028.56 S/. 1,301,126.10 S/. 716,411.83 S/. 264,133.38 S/. 2,541,699.87 99.88% 3,063.51

009 LAGUNAS DE OXIDACION FACULTATIVAS S/. 1,206,277.80 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.00% 1,206,277.80

S/. 5,396,050.39 S/. 1,109,812.36 S/. 1,617,067.22 S/. 1,068,759.68 S/. 388,983.27 S/. 4,184,622.53 77.55% 1,211,427.86

CONTROL DE AVANCE DE OBRA AVANCE FISICO REAL 100.00% 20.57% 29.97% 19.81% 7.21% 77.55% 22.45%AVANCE FISICO PROGRAMADO 100.00% 20.00% 10.66% 18.55% 17.23% 66.44% 33.56%

B REAJUSTES DEL MESFORMULA PRESUP A.DIRECTO A. X MATERIAL TOTAL

Reintegro por formula polinomica -15,776.20 -15,776.20 -46,237.89 -15,776.20 -15,776.20 -15,776.20 -93,566.49

Deducciones 0.00 280.14 3,110.44 -3,390.58 -26963.74 -3390.58 -3390.58 -3390.58 -37,135.48

TOTAL (B) -73,201.63 -19,166.78 -19,166.78 -19,166.78 -130,701.97

Valorización Bruta (VB=A+B) S/. 5,396,050.39 S/. 1,036,610.73 S/. 1,597,900.44 S/. 1,049,592.90 S/. 369,816.49 S/. 4,053,920.56

C AMORTIZACIONAmortización del Adelanto Directo:

S/. 1,079,210.08 S/. 221,962.47 S/. 323,413.45 S/. 216,190.00 S/. 77,796.65 S/. 839,362.57 S/. 239,847.51

ADELANTO DIRECTO 273048.59 S/. 221,962.47 S/. 323,413.45 S/. 216,190.00 S/. 77,796.65 S/. 839,362.57

Amortización del Adelanto para Materiales:ADELANTO DE MATERIALES 1 S/. 1,618,815.12 S/. 350,005.93 S/. 273,048.59 S/. 273,048.59 S/. 136,524.29 S/. 1,032,627.40 S/. 586,187.72

TOTAL (C ) S/. 571,968.40 S/. 596,462.04 S/. 489,238.59 S/. 214,320.94 S/. 1,871,989.97

Valorización Neta (VN=VB-C) S/. 464,642.33 S/. 1,001,438.40 S/. 560,354.31 S/. 155,495.55 S/. 2,181,930.59

D RETENCIONESPor fiel cumplimiento 0.00 0.00 0.00 0.00 0.00

Multa por atraso de obra 0.00 0.00 0.00 0.00 0.00

TOTAL (D) 0.00 0.00 0.00 0.00 0.00

E MONTO A PAGAR AL CONTRATISTA ( SIN I.G.V. ) S/. 464,642.33 S/. 1,001,438.40 S/. 560,354.31 S/. 155,495.55 S/. 2,181,930.59

IGV (18.00%) S/. 83,635.62 S/. 180,258.91 S/. 100,863.78 S/. 27,989.20 S/. 392,747.51

MONTO A PAGAR AL CONTRATISTA ( CON I.G.V. ) S/. 548,277.95 S/. 1,181,697.31 S/. 661,218.09 S/. 183,484.75 S/. 2,574,678.10

MONTO CONTR. SIN IGV

VALORIZACION NOVIEMBRE

VALORIZACION DICIEMBRE

VALORIZACION ENERO

VALORIZACION ENERO VALORIZACION

ACUMULADA

% AVANCE ACUMULA

DO

SALDO POR VALORIZAR

SON : VEINTE Y DOS MIL TRECIENTOS OCHENTA Y SEIS CON 07/100 NUEVOS SOLES

OBRA

ENTIDAD : MUNICIPALIDAD DISTRITAL DE UCHUMARCA

LUGAR : UCHUMARCA - BOLIVAR - LA LIBERTAD

RESIDENTE DE OBRA: ING. KEYKO SUMIKO RAMIREZ CHUMAN-CIP :35689

SUPERVISION : ING. MANUEL LORENZO ROMERO- CIP: 54581

MES : FEBRERO 2013

A) VALORIZACION N°01

ITEM Monto Valorizado (v) SUB TOTAL TOTAL

TOTAL VALORIZADO S/. 388,983.27

001 CAPTACION 0.00

002 LINEA DE CONDUCCION 0.00

003 CAMARA ROMPE PRESION T-06 0.00

004 POZA DE FILTRACION 7,699.57

005 REDES DE DISTRIBUCION 100,600.16

006 CONEXCIONES DOMICILIARIAS DE AGUA 16,550.16

007 MEJORAMIENTO DE RESERVORIOS APOYADOS 0.00

008 CONSTRUCCION DEL SISTEMA DE ALCANTARILLA 264,133.38

009 LAGUNAS DE OXIDACION FACULTATIVAS 0.00

Intereses (i) 0.00

Reintegros y Otros (s) -19,166.78

Reajuste -15,776.20

Deducciones -3 390.58

VALORIZACION BRUTA VB=(v+i+s) 369,816.49

Amortización de los Adelantos (D) 214,320.94

Directo 77 796.65

Materiales 136,524.29

VALORIZACION NETA VN= ( VB - D ) S/. 155,495.55MONTO A PAGAR AL CONTRATISTA

- En Efectivo : ( VN) 155,495.55

- IGV CONTRATADO= ( VN x 0.18 ) 27,989.20

MONTO A FACTURAR POR EL CONTRATISTA

VN + IGV S/. 183,484.75

TOTAL CALENDARIO: ( VN + IGV ) S/. 183,484.75

RESUMEN DE VALORIZACIÓN DE OBRA Nº 04: "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

6

VALORIZACION N° 04 - FEBRERO2013

OBRA

PROCESO : LP -001-2012-MDU/CECONTRATISTA : CONSORCIO VALLE VERDE - UCHUMARCARESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127REPRESENT. SUPERVISION : "CONSORCIO UCHUMARCA" MANUEL LORENZO ROMERO ZARATE -CIP: 54581VALOR REFERENCIAL : S/. 6'367,339.49PRESUPUESTO CONTRATADO : S/. 6'367,339.49

FECHA : 28 DE FEBRERO DEL 2013

PRESUPUESTO : : PRESUPUESTO GENERAL DE LA OBRA

Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)

VALORIZACION

ANTERIOR (NOVIEMBRE) ANTERIOR (DICIEMBRE) ENERO FEBRERO (ACTUAL) ACUMULADO SALDO

Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %

CAPTACION S/. 12,923.58 S/. 12,827.83 S/. 95.75 S/. 0.00 0.00 S/. 0.00 S/. 12,923.58 S/. 0.00

01 OBRAS PROVISIONALES 3,950.00 3,950.00 0.00 0.00 0.00 3,950.00 0.00

01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 7.20 X 3.60 m. und 2.00 850.00 1,700.00 2.00 1,700.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,700.00 100.00 0.00 0.00 0.00

01.02 CASETA ADICIONAL P/ALMACEN Y GUARDIANIA GLB 1.00 750.00 750.00 1.00 750.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00 0.00 0.00 0.00

01.03 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 1,500.00 1,500.00 1.00 1,500.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00 0.00 0.00

02 TRABAJOS PRELIMINARES 81.00 81.00 0.00 0.00 0.00 81.00 0.00

02.01 LIMPIEZA, DESBROCE Y ELIMINACION DE VEGETACION MANUAL m2 20.00 1.89 37.80 20.00 37.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 37.80 100.00 0.00 0.00 0.00

02.02 TRAZO, NIVELACION Y REPLANTEO m2 20.00 2.16 43.20 20.00 43.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 43.20 100.00 0.00 0.00 0.00

03 MOVIMIENTO DE TIERRAS 321.23 319.43 1.80 0.00 0.00 321.23 0.00

03.01 m3 2.13 33.00 70.29 2.13 70.21 99.89 0.00 0.08 0.11 0.00 0.00 0.00 0.00 0.00 0.00 2.13 70.29 100.00 0.00 0.00 0.00

03.02 REFINE Y NIVELACION DE FONDO DE ZANJA m2 4.39 3.37 14.79 4.23 14.26 96.42 0.16 0.53 3.58 0.00 0.00 0.00 0.00 0.00 0.00 4.39 14.79 100.00 0.00 0.00 0.00

03.03 RELLENO CON MATERIAL FILTRO DE ARENA m3 1.30 59.33 77.13 1.28 75.94 98.46 0.02 1.19 1.54 0.00 0.00 0.00 0.00 0.00 0.00 1.30 77.13 100.00 0.00 0.00 0.00

03.04 RELLENO CON MATERIAL FILTRO DE GRAVA m3 1.00 118.96 118.96 1.00 118.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 118.96 100.00 0.00 0.00 0.00

03.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=30 MTS. MANUAL C/CARRETILLA m3 3.20 12.52 40.06 3.20 40.06 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.20 40.06 100.00 0.00 0.00 0.00

04 OBRAS DE CONCRETO SIMPLE 54.51 54.51 0.00 0.00 0.00 54.51 0.00

04.01 SOLADOS CONCRETO DE 4" (C:H - 1:12) m2 2.06 26.46 54.51 2.06 54.51 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.06 54.51 100.00 0.00 0.00 0.00

05 OBRAS DE CONCRETO ARMADO 2,198.41 2,168.48 29.93 0.00 0.00 2,198.41 0.00

05.01 CONCRETO F'c=210 kg/cm2 PARA OBRAS DE ARTE m3 2.70 364.73 984.77 2.65 965.62 98.06 0.05 19.15 1.94 0.00 0.00 0.00 0.00 0.00 0.00 2.70 984.77 100.00 0.00 0.00 0.00

05.02 ENCOFRADO Y DESENCOFRADO DE CANAL Y OBRAS DE ARTE m2 25.46 32.56 828.98 25.46 828.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.46 828.98 100.00 0.00 0.00 0.00

05.03 ACERO ESTRUCTURAL TRABAJADO PARA OBRAS DE ARTE kg 70.45 5.46 384.66 68.45 373.72 97.16 2.00 10.94 2.84 0.00 0.00 0.00 0.00 0.00 0.00 70.45 384.66 100.00 0.00 0.00 0.00

06 REVOQUES Y ENLUCIDOS 418.80 406.45 12.35 0.00 0.00 418.80 0.00

06.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS (CAPTACION) m2 5.61 32.07 179.91 5.61 179.83 99.96 0.00 0.08 0.04 0.00 0.00 0.00 0.00 0.00 0.00 5.61 179.91 100.00 0.00 0.00 0.00

06.02 TARRAJEO EN EXTERIORES CON CEMENTO-CAL-ARENA m2 10.17 23.49 238.89 9.65 226.62 94.86 0.52 12.27 5.14 0.00 0.00 0.00 0.00 0.00 0.00 10.17 238.89 100.00 0.00 0.00 0.00

07 TUBERIAS Y ACCESORIOS 2,517.74 2,517.74 0.00 0.00 0.00 2,517.74 0.00

07.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP UF=110 MM, C-7.5 NPT-ISO 1452-2011 m 10.00 52.42 524.20 10.00 524.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 524.20 100.00 0.00 0.00 0.00

07.02 SUMINISTRO E INSTALACION DE VALVULA DE FIERRO FUNDIDO DE 6" und 1.00 1,562.46 1,562.46 1.00 1,562.46 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,562.46 100.00 0.00 0.00 0.00

07.03 SUMINISTRO E INSTALACION DE TAPA PRE FABRICADA P/TOMA und 2.00 215.54 431.08 2.00 431.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 431.08 100.00 0.00 0.00 0.00

08 DOBLE PRUEBA HIDRAULICA 51.80 0.00 51.80 0.00 0.00 51.80 0.00

08.01 PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC 4" (110 MM) m 1.00 51.80 51.80 0.00 0.00 0.00 1.00 51.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 51.80 100.00 0.00 0.00 0.00

09 FLETE 3,330.09 3,330.09 0.00 0.00 0.00 3,330.09 0.00

09.01 FLETE TERRESTRE DE MATERIALES PARA EL DISTRITO DE UCHUMARCA (OBRA:CAPTACION) est 1.00 3,100.09 3,100.09 1.00 3,100.09 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,100.09 100.00 0.00 0.00 0.00

09.02 est 1.00 230.00 230.00 1.00 230.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 230.00 100.00 0.00 0.00 0.00

LINEA DE CONDUCCION S/. 607,054.01 S/. 570,961.68 S/. 0.00 S/. 36,092.33 S/. 0.00 S/. 607,054.01 S/. 0.00

10 OBRAS PROVISIONALES 1,500.00 1,500.00 0.00 0.00 0.00 0.00 0.00 1,500.00 100.00 0.00 0.00 0.00

10.01 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 1,500.00 1,500.00 1.00 1,500.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00 0.00 0.00

11 TRABAJOS PRELIMINARES 25,290.35 25,290.35 0.00 0.00 0.00 25,290.35 0.00

11.01 LIMPIEZA, DESBROCE Y ELIMINACION DE VEGETACION MANUAL m2 8,573.00 1.12 9,601.76 8,573.00 9,601.76 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 9,601.76 100.00 0.00 0.00 0.00

11.02 TRAZO, NIVELACION Y REPLANTEO m2 8,573.00 1.83 15,688.59 8,573.00 15,688.59 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 15,688.59 100.00 0.00 0.00 0.00

12 MOVIMIENTO DE TIERRAS 213,823.68 213,823.68 100.00 0.00 0.00 0.00 213,823.68 0.00

12.01 EXCAVACION DE ZANJA PARA TUBERIA DE AGUA POTABLE / TERRENO SEMIROCOSO m 8,573.00 8.25 70,727.25 8,573.00 70,727.25 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 70,727.25 100.00 0.00 0.00 0.00

12.02 REFINE, NIVELACION DE FONDO DE TUBERIA DE 4" m 8,573.00 1.84 15,774.32 8,573.00 15,774.32 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 15,774.32 100.00 0.00 0.00 0.00

12.03 CONFORMACION DE CAMA DE APOYO PARA TUBERIAS DE 4" m 8,573.00 3.69 31,634.37 8,573.00 31,634.37 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 31,634.37 100.00 0.00 0.00 0.00

12.04 RELLENO DE ZANJA CON MATERIAL PROPIO, INC. COMPACTACION m 8,573.00 3.95 33,863.35 8,573.00 33,863.35 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 33,863.35 100.00 0.00 0.00 0.00

12.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=30 MTS. MANUAL C/CARRETILLA m3 4,938.05 12.52 61,824.39 4,938.05 61,824.39 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,938.05 61,824.39 100.00 0.00 0.00 0.00

13 TUBERIAS Y ACCESORIOS 260,362.01 260,362.01 0.00 0.00 0.00 260,362.01 0.00

13.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP UF=110 MM, C-7.5 NPT-ISO 1452-2011 m 8,573.00 30.37 260,362.01 8,573.00 260,362.01 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,573.00 260,362.01 100.00 0.00 0.00 0.00

14 DOBLE PRUEBA HIDRAULICA 72,184.66 36,092.33 0.00 36,092.33 0.00 72,184.66 0.00

14.01 PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC (110 MM) A ZANJA TAPADA m 17,146.00 4.21 72,184.66 8,573.00 36,092.33 50.00 0.00 0.00 0.00 8,573.00 36,092.33 50.00 0.00 0.00 0.00 17,146.00 72,184.66 100.00 0.00 0.00 0.00

15 FLETE 33,893.31 33,893.31 0.00 0.00 0.00 33,893.31 0.00

15.01 est 1.00 31,786.81 31,786.81 1.00 31,786.81 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 31,786.81 100.00 0.00 0.00 0.00

15.02 est 1.00 2,106.50 2,106.50 1.00 2,106.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,106.50 100.00 0.00 0.00 0.00

CAMARA ROMPE PRESION T-06 S/. 19,910.29 S/. 10,042.85 S/. 0.00 S/. 9,867.44 S/. 0.00 S/. 19,910.29 S/. 0.00 0.00

16 TRABAJOS PRELIMINARES 24.30 12.15 0.00 12.15 0.00 24.30 0.00 0.00

16.01 TRAZO, NIVELACION Y REPLANTEO m2 6.00 2.16 12.96 3.00 6.48 50.00 0.00 0.00 0.00 3.00 6.48 50.00 0.00 12.96 0.00

16.02 LIMPIEZA, DESBROCE Y ELIMINACION DE VEGETACION MANUAL m2 6.00 1.89 11.34 3.00 5.67 50.00 0.00 0.00 0.00 3.00 5.67 50.00 0.00 0.00 0.00 6.00 11.34 100.00 0.00 0.00 0.00

17 MOVIMIENTO DE TIERRAS 863.84 432.49 0.00 431.35 0.00 863.84 0.00

17.01 EXCAVACION DE ZANJA PARA ESTRUCTURAS EN TERRENO SEMI-ROCOSO m3 6.60 114.10 753.06 3.30 377.10 50.08 0.00 0.00 0.00 3.30 375.96 49.92 0.00 0.00 0.00 6.60 753.06 100.00 0.00 0.00 0.00

17.02 REFINE Y NIVELACION EN TERRENO SEMI ROCOSO m2 6.00 3.44 20.64 3.00 10.32 50.00 0.00 0.00 0.00 3.00 10.32 50.00 0.00 0.00 0.00 6.00 20.64 100.00 0.00 0.00 0.00

17.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=30 MTS. MANUAL C/CARRETILLA m3 7.20 12.52 90.14 3.60 45.07 50.00 0.00 0.00 0.00 3.60 45.07 50.00 0.00 0.00 0.00 7.20 90.14 100.00 0.00 0.00 0.00

18 OBRAS DE CONCRETO SIMPLE 158.76 79.38 0.00 79.38 0.00 158.76 0.00

18.01 SOLADOS CONCRETO DE 4" (C:H - 1:12) m2 6.00 26.46 158.76 3.00 79.38 50.00 0.00 0.00 0.00 3.00 79.38 50.00 0.00 0.00 0.00 6.00 158.76 100.00 0.00 0.00 0.00

: "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

EXCAVACION MANUAL ZANJAS PARA ESTRUCTURAS DE CONCRETO EN TERRENO CONGLOMERADO

FLETE TERRESTRE RURAL DE MATERIALES PARA LA EJECUCION DE OBRA (CONST. DE CAPTACION)

FLETE TERRESTRE DE MATERIALES PARA EL DISTRITO DE UCHUMARCA (OBRA:LINEA DE CONDUCCION)

FLETE TERRESTRE RURAL DE MATERIALES PARA LA EJECUCION DE OBRA (CONST. DE LINEA DE CONDUCCION)

7

VALORIZACION N° 04 - FEBRERO2013

OBRA

PROCESO : LP -001-2012-MDU/CECONTRATISTA : CONSORCIO VALLE VERDE - UCHUMARCARESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127REPRESENT. SUPERVISION : "CONSORCIO UCHUMARCA" MANUEL LORENZO ROMERO ZARATE -CIP: 54581VALOR REFERENCIAL : S/. 6'367,339.49PRESUPUESTO CONTRATADO : S/. 6'367,339.49

FECHA : 28 DE FEBRERO DEL 2013

PRESUPUESTO : : PRESUPUESTO GENERAL DE LA OBRA

: "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

19 OBRAS DE CONCRETO ARMADO 3,365.45 1,769.86 0.00 1,595.59 0.00 3,365.45 0.00

19.01 CONCRETO F'c=175 kg/cm2 PARA CRP-6 EN MUROS, TECHO Y LOSA DE FONDO m3 2.55 305.67 779.46 1.56 476.85 61.18 0.00 0.00 0.00 0.99 302.61 38.82 0.00 0.00 2.55 779.46 100.00 0.00 0.00 0.00

19.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CRP-6 m2 44.64 32.56 1,453.48 22.32 726.74 50.00 0.00 0.00 0.00 22.32 726.74 50.00 0.00 0.00 0.00 44.64 1,453.48 100.00 0.00 0.00 0.00

19.03 ACERO ESTRUCTURAL TRABAJADO PARA CRP-6 kg 207.42 5.46 1,132.51 103.71 566.27 50.00 0.00 0.00 0.00 103.71 566.24 50.00 0.00 0.00 0.00 207.42 1,132.51 100.00 0.00 0.00 0.00

20 REVOQUES Y ENLUCIDOS 1,759.98 879.99 0.00 879.99 0.00 1,759.98 0.00

20.01 TARRAJEO CON IMPERMEABILIZANTE PARA CRP-6 m2 19.68 52.19 1,027.10 9.84 513.55 50.00 0.00 0.00 0.00 9.84 513.55 50.00 0.00 0.00 0.00 19.68 1,027.10 100.00 0.00 0.00 0.00

20.02 TARRAJEO EN INTERIORES / EXTERIORES CON CEMENTO-CAL-ARENA m2 23.52 31.16 732.88 11.76 366.44 50.00 0.00 0.00 0.00 11.76 366.44 50.00 0.00 0.00 0.00 23.52 732.88 100.00 0.00 0.00 0.00

21 TUBERIAS Y ACCESORIOS 13,737.96 6,868.98 0.00 6,868.98 0.00 13,737.96 0.00

21.01 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP-6 und 6.00 2,289.66 13,737.96 3.00 6,868.98 50.00 0.00 0.00 0.00 3.00 6,868.98 50.00 0.00 0.00 0.00 6.00 13,737.96 100.00 0.00 0.00 0.00

POZA DE FILTRACION S/. 122,243.91 S/. 45,630.19 S/. 29,311.51 S/. 40,606.93 S/. 6,695.28 5.48 0.00 S/. 122,243.91 100.00 0.00 S/. 0.00 0.00

22 TRABAJOS PRELIMINARES 358.02 358.02 0.00 0.00 0.00 358.02 100.00 0.00 0.00

22.01 TRAZO, NIVELACION Y REPLANTEO m2 88.40 2.16 190.94 88.40 190.94 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.40 190.94 100.00 0.00 0.00 0.00

22.02 LIMPIEZA, DESBROCE Y ELIMINACION DE VEGETACION MANUAL m2 88.40 1.89 167.08 88.40 167.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.40 167.08 100.00 0.00 0.00 0.00

23 MOVIMIENTO DE TIERRAS 43,479.86 36,784.58 0.00 0.00 6,695.28 43,479.86 0.00

23.01 EXCAVACION DE ZANJA PARA ESTRUCTURAS EN TERRENO SEMI-ROCOSO m3 282.54 114.10 32,237.81 282.54 32,237.81 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 282.54 32,237.81 100.00 0.00 0.00 0.00

23.02 REFINE Y NIVELACION EN TERRENO SEMI ROCOSO m2 87.75 3.44 301.86 87.75 301.86 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.75 301.86 100.00 0.00 0.00 0.00

23.03 FILTROS DE GRAVA DE 3/4" A 1 1/2" m3 72.00 92.99 6,695.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 6,695.28 100.00 72.00 6,695.28 100.00 0.00 0.00 0.00

23.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=30 MTS. MANUAL C/CARRETILLA m3 339.05 12.52 4,244.91 339.05 4,244.91 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 339.05 4,244.91 100.00 0.00 0.00 0.00

24 OBRAS DE CONCRETO SIMPLE 3,096.26 2,717.66 378.60 0.00 0.00 3,096.26 0.00

24.01 SOLADOS CONCRETO DE 4" (C:H - 1:12) m2 88.40 26.46 2,339.06 88.40 2,339.06 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.40 2,339.06 100.00 0.00 0.00 0.00

24.02 DADO DE CONCRETO SIMPLE DE 0.40 x 0.40 x 0.60, INCLUYE COLOCACION DE MADERA 4" x 8" m 40.00 18.93 757.20 20.00 378.60 50.00 20.00 378.60 50.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 757.20 100.00 0.00 0.00 0.00

25 OBRAS DE CONCRETO ARMADO 75,309.77 5,769.93 28,932.91 40,606.93 0.00 75,309.77 0.00

25.01 LOSA DE FONDO 12,824.36 5,769.93 7,054.43 0.00 0.00 12,824.36 0.00

25.01.01 CONCRETO F 'c=210 kg/cm2 - PARA LOSA DE FONDO m3 19.52 337.73 6,592.49 0.00 0.00 0.00 19.52 6,592.49 100.00 0.00 0.00 0.00 0.00 0.00 0.00 19.52 6,592.49 100.00 0.00 0.00 0.00

25.01.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO m2 24.48 37.74 923.88 12.24 461.94 50.00 12.24 461.94 50.00 0.00 0.00 0.00 0.00 0.00 0.00 24.48 923.88 100.00 0.00 0.00 0.00

25.01.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSA DE FONDO kg 972.16 5.46 5,307.99 972.16 5,307.99 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 972.16 5,307.99 100.00 0.00 0.00 0.00

25.02 MUROS REFORZADOS 30,119.66 0.00 15,061.79 15,057.87 0.00 30,119.66 0.00

25.02.01 CONCRETO f'c=210 kg/cm2 PARA MUROS REFORZADOS m3 39.13 391.72 15,328.00 0.00 0.00 0.00 19.57 7,665.96 50.01 19.56 7,662.04 49.99 0.00 0.00 0.00 39.13 15,328.00 100.00 0.00 0.00 0.00

25.02.02 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 321.16 37.19 11,943.94 0.00 0.00 0.00 160.58 5,971.97 50.00 160.58 5,971.97 50.00 0.00 0.00 0.00 321.16 11,943.94 100.00 0.00 0.00 0.00

25.02.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS REFORZADOS kg 521.56 5.46 2,847.72 0.00 0.00 0.00 260.78 1,423.86 50.00 260.78 1,423.86 50.00 0.00 0.00 0.00 521.56 2,847.72 100.00 0.00 0.00 0.00

25.03 COLUMNAS 5,339.51 0.00 2,096.37 3,243.14 0.00 5,339.51 0.00

25.03.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNAS m3 4.29 339.97 1,458.47 0.00 0.00 0.00 0.00 0.00 0.00 4.29 1,458.47 100.00 0.00 0.00 0.00 4.29 1,458.47 100.00 0.00 0.00 0.00

25.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS m2 42.88 41.62 1,784.67 0.00 0.00 0.00 0.00 0.00 0.00 42.88 1,784.67 100.00 0.00 0.00 0.00 42.88 1,784.67 100.00 0.00 0.00 0.00

25.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 383.95 5.46 2,096.37 0.00 0.00 0.00 383.95 2,096.37 100.00 0.00 0.00 0.00 0.00 0.00 0.00 383.95 2,096.37 100.00 0.00 0.00 0.00

25.04 VIGAS 5,493.89 0.00 0.00 5,493.89 0.00 5,493.89 0.00

25.04.01 CONCRETO f'c=175 kg/cm2 PARA VIGAS m3 3.58 296.00 1,059.68 0.00 0.00 0.00 0.00 0.00 0.00 3.58 1,059.68 100.00 0.00 0.00 0.00 3.58 1,059.68 100.00 0.00 0.00 0.00

25.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS m2 71.68 41.62 2,983.32 0.00 0.00 0.00 0.00 0.00 0.00 71.68 2,983.32 100.00 0.00 0.00 0.00 71.68 2,983.32 100.00 0.00 0.00 0.00

25.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 265.73 5.46 1,450.89 0.00 0.00 0.00 0.00 0.00 0.00 265.73 1,450.89 100.00 0.00 0.00 0.00 265.73 1,450.89 100.00 0.00 0.00 0.00

25.05 MURO DE ALBAÑILERIA 3,166.46 0.00 0.00 3,166.46 0.00 3,166.46 0.00

25.05.01 MURO DE CABEZA LADRILLO KING-KONG DE ARCILLA CON CEMENTO-ARENA m2 33.60 94.24 3,166.46 0.00 0.00 0.00 0.00 0.00 0.00 33.60 3,166.46 100.00 0.00 0.00 0.00 33.60 3,166.46 100.00 0.00 0.00 0.00

25.06 REVOQUES Y ENLUCIDOS 13,645.57 0.00 0.00 13,645.57 0.00 13,645.57 0.00

25.06.01 TARRAJEO CON IMPERMEABILIZANTE PARA MUROS DE POZA DE FILTRACION m2 212.40 52.19 11,085.16 0.00 0.00 0.00 0.00 0.00 0.00 212.40 11,085.16 100.00 0.00 0.00 0.00 212.40 11,085.16 100.00 0.00 0.00 0.00

25.06.02 TARRAJEO EN EXTERIORES CON CEMENTO-CAL-ARENA m2 109.00 23.49 2,560.41 0.00 0.00 0.00 0.00 0.00 0.00 109.00 2,560.41 100.00 0.00 0.00 0.00 109.00 2,560.41 100.00 0.00 0.00 0.00

25.07 TUBERIAS Y ACCESORIOS 4,720.32 0.00 4,720.32 0.00 0.00 4,720.32 0.00

25.07.01 COMPUERTA MANUAL DE MADERA 0.30 x 0.60 M und 2.00 962.34 1,924.68 0.00 0.00 0.00 2.00 1,924.68 100.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,924.68 100.00 0.00 0.00 0.00

25.07.02 EQUIPO CON TUBOS Y VALVULAS GLB 1.00 2,795.64 2,795.64 0.00 0.00 0.00 1.00 2,795.64 100.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,795.64 100.00 0.00 0.00 0.00

REDES DE DISTRIBUCION S/. 420,473.00 S/. 42,243.76 S/. 169,667.62 S/. 119,331.82 S/. 87,478.40 S/. 418,721.60 S/. 0.00

26 TRABAJOS PRELIMINARES 15,793.46 0.00 1,689.66 14,103.80 0.00 15,793.46 0.00

26.01 TRAZO, NIVELACION Y REPLANTEO m 7,380.12 2.14 15,793.46 0.00 0.00 0.00 789.56 1,689.66 10.70 6,590.56 14,103.80 89.30 0.00 0.00 0.00 7,380.12 15,793.46 100.00 0.00 0.00 0.00

27 MOVIMIENTO DE TIERRAS 99,853.02 0.00 0.00 29,766.00 69,408.90 99,174.90 0.00

27.01 EXCAVACION DE ZANJA PARA TUBERIA DE AGUA POTABLE / TERRENO CONGLOMERADO m 7,380.12 4.01 29,594.28 0.00 0.00 0.00 0.00 0.00 0.00 2,200.00 8,822.00 29.81 5,130.00 20,571.30 69.51 7,330.00 29,393.30 99.32 50.12 200.98 0.68

27.02 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6" m 7,380.12 1.84 13,579.42 0.00 0.00 0.00 0.00 0.00 0.00 2,200.00 4,048.00 29.81 5,130.00 9,439.20 69.51 7,330.00 13,487.20 99.32 50.12 92.22 0.68

27.03 CAMA DE APOYO PARA TUBERIAS MENORES A 6" m 7,380.12 3.59 26,494.63 0.00 0.00 0.00 0.00 0.00 0.00 2,200.00 7,898.00 29.81 5,130.00 18,416.70 69.51 7,330.00 26,314.70 99.32 50.12 179.93 0.68

27.04 RELLENO COMPACTADO INC. MATERIAL SELECCIONADO - MATERIAL PROPIO m 7,380.12 4.09 30,184.69 0.00 0.00 0.00 0.00 0.00 0.00 2,200.00 8,998.00 29.81 5,130.00 20,981.70 69.51 7,330.00 29,979.70 99.32 50.12 204.99 0.68

28 TUBERIAS Y ACCESORIOS 228,925.78 27,701.85 150,084.00 43,347.15 7,060.00 228,193.00 0.00

28.01 m 1,089.00 35.99 39,193.11 120.79 4,347.05 11.09 828.12 29,803.86 76.04 0.00 0.00 0.00 140.10 5,042.20 12.87 1,089.00 39,193.11 100.00 0.00 0.00 0.00

28.02 m 353.00 23.21 8,193.13 59.48 1,380.53 16.85 155.06 3,598.94 43.93 138.46 3,213.66 39.22 0.00 0.00 0.00 353.00 8,193.13 100.00 0.00 0.00 0.00

28.03 m 817.00 109.06 89,102.02 97.84 10,670.43 11.98 614.01 66,963.93 75.15 105.15 11,467.66 12.87 0.00 0.00 0.00 817.00 89,102.02 100.00 0.00 0.00 0.00

28.04 m 368.00 21.24 7,816.32 47.72 1,013.57 12.97 190.78 4,052.17 51.84 0.00 0.00 0.00 95.00 2,017.80 25.82 333.50 7,083.54 90.63 34.50 732.78 9.38

28.05 m 4,754.00 17.80 84,621.20 578.11 10,290.27 12.16 2,565.46 45,665.10 53.96 1,610.44 28,665.83 33.88 0.00 0.00 0.00 4,754.00 84,621.20 100.00 0.00 0.00 0.00

29 ACCESORIOS Y VALVULAS 27,923.40 4,543.57 13,424.70 9,955.13 0.00 27,923.40 0.00

29.01 ACCESORIOS RED DE DISTRIBUCION: CRUZ PVC SAP CLASE 7.5 GLB 1.00 638.32 638.32 0.19 122.40 19.18 0.68 432.94 67.82 0.13 82.98 13.00 0.00 0.00 0.00 1.00 638.32 100.00 0.00 0.00 0.00

29.02 ACCESORIOS RED DE DISTRIBUCION: TEE PVC SAP CLASE 7.5 GLB 1.00 2,500.92 2,500.92 0.17 420.78 16.83 0.65 1,629.97 65.17 0.18 450.17 18.00 0.00 0.00 0.00 1.00 2,500.92 100.00 0.00 0.00 0.00

29.03 ACCESORIOS RED DE DISTRIBUCION: CURVAS 90º PVC SAP CLASE 7.5 GLB 1.00 688.32 688.32 0.12 81.05 11.78 0.68 469.61 68.23 0.20 137.66 20.00 0.00 0.00 0.00 1.00 688.32 100.00 0.00 0.00 0.00

SUMINISTRO E INSTALACION DE TUBERIA PVC SAP CLASE 7.5, NTP ISO 1452-2011 DN 160 MM (6")

SUMINISTRO E INSTALACION DE TUBERIA PVC SAP CLASE 7.5, NTP ISO 1452-2011 DN 110 MM (4")

SUMINISTRO E INSTALACION DE TUBERIA PVC SAP CLASE 7.5, NTP ISO 1452-2011 DN 90 MM (3")

SUMINISTRO E INSTALACION DE TUBERIA PVC SAP CLASE 7.5, NTP ISO 1452-2011 DN 75 MM (2 1/2")

SUMINISTRO E INSTALACION DE TUBERIA PVC SAP CLASE 7.5, NTP ISO 1452-2011 DN 63 MM (2")

8

VALORIZACION N° 04 - FEBRERO2013

OBRA

PROCESO : LP -001-2012-MDU/CECONTRATISTA : CONSORCIO VALLE VERDE - UCHUMARCARESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127REPRESENT. SUPERVISION : "CONSORCIO UCHUMARCA" MANUEL LORENZO ROMERO ZARATE -CIP: 54581VALOR REFERENCIAL : S/. 6'367,339.49PRESUPUESTO CONTRATADO : S/. 6'367,339.49

FECHA : 28 DE FEBRERO DEL 2013

PRESUPUESTO : : PRESUPUESTO GENERAL DE LA OBRA

: "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

29.04 ACCESORIOS RED DE DISTRIBUCION: CURVAS 45º PVC SAP CLASE 7.5 GLB 1.00 503.32 503.32 0.24 120.80 24.00 0.58 291.92 58.00 0.18 90.60 18.00 0.00 0.00 0.00 1.00 503.32 100.00 0.00 0.00 0.00

29.05 ACCESORIOS RED DE DISTRIBUCION: CURVAS 22.5º PVC SAP CLASE 7.5 GLB 1.00 1,388.32 1,388.32 0.16 224.21 16.15 0.65 900.33 64.85 0.19 263.78 19.00 0.00 0.00 0.00 1.00 1,388.32 100.00 0.00 0.00 0.00

29.06 ACCESORIOS RED DE DISTRIBUCION: TAPON PVC SAP CLASE 7.5 GLB 1.00 588.92 588.92 0.11 62.87 10.68 0.64 378.82 64.32 0.25 147.23 25.00 0.00 0.00 0.00 1.00 588.92 100.00 0.00 0.00 0.00

29.07 ACCESORIOS RED DE DISTRIBUCION: REDUCCIONES PVC SAP CLASE 7.5 GLB 1.00 2,928.32 2,928.32 0.13 368.77 12.59 0.67 1,973.89 67.41 0.20 585.66 20.00 0.00 0.00 0.00 1.00 2,928.32 100.00 0.00 0.00 0.00

29.08 ACCESORIOS RED DE DISTRIBUCION: TEES CON REDUCCION PVC SAP CLASE 7.5 GLB 1.00 1,990.92 1,990.92 0.21 424.97 21.35 0.63 1,247.40 62.65 0.16 318.55 16.00 0.00 0.00 0.00 1.00 1,990.92 100.00 0.00 0.00 0.00

29.09 ACCESORIOS RED DE DISTRIBUCION: CODOS PRE FABRICADOS PVC SAP CLASE 7.5 GLB 1.00 1,603.32 1,603.32 0.15 244.16 15.23 0.65 1,038.50 64.77 0.20 320.66 20.00 0.00 0.00 0.00 1.00 1,603.32 100.00 0.00 0.00 0.00

29.10 SUMINISTRO E INSTALACION DE VALVULAS GLB 1.00 7,767.92 7,767.92 0.32 2,473.56 31.84 0.65 5,061.32 65.16 0.03 233.04 3.00 0.00 0.00 0.00 1.00 7,767.92 100.00 0.00 0.00 0.00

29.11 CAJA PARA VALVULAS und 64.00 114.45 7,324.80 0.00 0.00 0.00 0.00 0.00 0.00 64.00 7,324.80 100.00 0.00 0.00 0.00 64.00 7,324.80 100.00 0.00 0.00 0.00

30 DOBLE PRUEBA HIDRAULICA 33,509.74 0.00 0.00 22,159.74 11,009.50 33,169.24 0.00

30.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 14,762.00 2.27 33,509.74 0.00 0.00 0.00 0.00 0.00 0.00 9,762.00 22,159.74 66.13 4,850.00 11,009.50 32.85 14,612.00 33,169.24 98.98 150.00 340.50 1.02

31 FLETE 14,467.60 9,998.34 4,469.26 0.00 0.00 14,467.60 0.00

31.01 est 1.00 14,467.60 14,467.60 0.69 9,998.34 69.11 0.31 4,469.26 30.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 14,467.60 100.00 0.00 0.00 0.00

CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 219,881.92 S/. 55,967.80 S/. 67,144.43 S/. 82,314.69 S/. 14,391.44 6.55 0.00 S/. 219,818.36 99.97 0.00 S/. 0.00 0.00

32 TRABAJOS PRELIMINARES 3,152.03 0.00 0.00 2,082.03 1,070.00 3,152.03 0.00

32.01 TRAZO, NIVELACION Y REPLANTEO m 1,472.91 2.14 3,152.03 0.00 0.00 0.00 0.00 0.00 0.00 972.91 2,082.03 66.05 500.00 1,070.00 33.95 1,472.91 3,152.03 100.00 0.00 0.00 0.00

33 MOVIMIENTO DE TIERRAS 32,742.79 0.00 0.00 21,627.79 11,115.00 32,742.79 0.00

33.01 EXCAVACION DE ZANJA PARA TUBERIA DE AGUA POTABLE / TERRENO CONGLOMERADO m 1,472.91 4.01 5,906.37 0.00 0.00 0.00 0.00 0.00 0.00 972.91 3,901.37 66.05 500.00 2,005.00 33.95 1,472.91 5,906.37 100.00 0.00 0.00 0.00

33.02 RELLENO COMPACTADO INC. MATERIAL SELECCIONADO - MATERIAL PROPIO m 1,472.91 4.09 6,024.20 0.00 0.00 0.00 0.00 0.00 0.00 972.91 3,979.20 66.05 500.00 2,045.00 33.95 1,472.91 6,024.20 100.00 0.00 0.00 0.00

33.03 REFINE Y NIVELACIÓN DE ZANJAS - CONEXIÓN DOMICILIARIA m 1,472.91 10.54 15,524.47 0.00 0.00 0.00 0.00 0.00 0.00 972.91 10,254.47 66.05 500.00 5,270.00 33.95 1,472.91 15,524.47 100.00 0.00 0.00 0.00

33.04 CAMA DE APOYO PARA TUBERIAS MENORES A 6" m 1,472.91 3.59 5,287.75 0.00 0.00 0.00 0.00 0.00 0.00 972.91 3,492.75 66.05 500.00 1,795.00 33.95 1,472.91 5,287.75 100.00 0.00 0.00 0.00

34 TUBERIAS Y ACCESORIOS 125,073.00 43,927.92 53,067.06 28,078.02 0.00 125,073.00 0.00

34.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10, PARA CONEXION DOMICILIARIA m 4,500.00 5.92 26,640.00 1,694.31 10,030.33 37.65 1,845.65 10,926.25 41.01 960.04 5,683.42 21.33 0.00 0.00 0.00 4,500.00 26,640.00 100.00 0.00 0.00 0.00

34.02 CONEXION AGUA 1/2" TERENO NORMAL, INCLUYE LOSA 1 X 1 X 0.1m und 450.00 218.74 98,433.00 154.97 33,897.59 34.44 192.65 42,140.81 42.81 102.38 22,394.60 22.75 0.00 0.00 0.00 450.00 98,433.00 100.00 0.00 0.00 0.00

35 ACCESORIOS DE CONEXIONES DOMICILIARIAS 52,226.68 12,039.88 14,077.37 26,109.43 0.00 52,226.68 0.00

35.01 ACCESORIOS DE CONEXIONES DOMICILIARIAS: TEE C/REDUCCION PVC SAP CLASE 7.5 GLB 1.00 22,867.92 22,867.92 0.27 6,284.68 27.48 0.23 5,149.28 22.52 0.50 11,433.96 50.00 0.00 0.00 0.00 1.00 22,867.92 100.00 0.00 0.00 0.00

35.02 ACCESORIOS DE CONEXIONES DOMICILIARIAS: TEE PVC SAP CLASE 7.5 GLB 1.00 22,882.92 22,882.92 0.19 4,317.61 18.87 0.31 7,123.85 31.13 0.50 11,441.46 50.00 0.00 0.00 0.00 1.00 22,882.92 100.00 0.00 0.00 0.00

35.03 ACCESORIOS DE CONEXIONES DOMICILIARIAS: REDUCCIONES PVC SAP CLASE 10 GLB 1.00 6,084.62 6,084.62 0.23 1,412.16 23.21 0.27 1,630.15 26.79 0.50 3,042.31 50.00 0.00 0.00 0.00 1.00 6,084.62 100.00 0.00 0.00 0.00

35.04 ACCESORIOS DE CONEXIONES DOMICILIARIAS: CODOS PVC SAP CLASE 10 GLB 1.00 391.22 391.22 0.07 25.43 6.50 0.45 174.09 44.50 0.49 191.70 49.00 0.00 0.00 0.00 1.00 391.22 100.00 0.00 0.00 0.00

36 DOBLE PRUEBA HIDRAULICA 6,687.42 0.00 0.00 4,417.42 2,206.44 6,623.86 0.00

36.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 2,946.00 2.27 6,687.42 0.00 0.00 0.00 0.00 0.00 0.00 1,946.00 4,417.42 66.06 972.00 2,206.44 32.99 2,918.00 6,623.86 99.05 28.00 63.56 0.95

MEJORAMIENTO DE RESERVORIOS APOYADOS S/. 27,956.08 S/. 1,267.76 S/. 8,512.10 S/. 18,176.22 S/. 0.00 0.00 0.00 S/. 27,956.08 100.00 0.00 S/. 0.00 0.00

37 MEJORAMIENTO DE RESERVORIOS EXISTENTES 27,956.08 1,267.76 8,512.10 18,176.22 0.00 27,956.08 0.00

37.01 MEJORAMIENTO DE RESERVORIO DE 50 M3 GLB 1.00 12,073.90 12,073.90 0.11 1,267.76 10.50 0.71 8,512.10 70.50 0.19 2,294.04 19.00 0.00 0.00 0.00 1.00 12,073.90 100.00 0.00 0.00 0.00

37.02 MEJORAMIENTO DE RESERVORIO DE 100 M3 GLB 1.00 15,882.18 15,882.18 0.00 0.00 0.00 0.00 0.00 0.00 1.00 15,882.18 100.00 0.00 0.00 0.00 1.00 15,882.18 100.00 0.00 0.00 0.00

CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO S/. 2,212,837.72 S/. 226,111.79 S/. 1,131,414.00 S/. 622,966.81 S/. 229,681.20 10.38 0.00 S/. 2,210,173.80 99.88 0.00 S/. 2,663.93 0.12

38 OBRAS PROVISIONALES 3,100.00 2,657.50 442.50 0.00 0.00 3,100.00 0.00

38.01 CASETA ADICIONAL P/ALMACEN Y GUARDIANIA GLB 1.00 750.00 750.00 1.00 750.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00 100.00 0.00 0.00 0.00

38.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 7.20 X 3.60 m. und 1.00 850.00 850.00 1.00 850.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 850.00 100.00 0.00 0.00 0.00

38.03 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS PARA OBRAS DE ALCANTARILLADO GLB 1.00 1,500.00 1,500.00 0.70 1,057.50 70.50 0.30 442.50 29.50 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00 0.00 0.00

39 TRABAJOS PRELIMINARES 43,325.96 18,267.80 15,224.14 8,724.02 1,110.00 43,325.96 0.00

39.01 LIMPIEZA DE TERRENO MANUAL m2 13,080.43 1.10 14,388.47 6,540.23 7,194.25 50.00 3,560.21 3,916.23 27.22 2,980.00 3,277.99 22.78 0.00 0.00 0.00 13,080.43 14,388.47 100.00 0.00 0.00 0.00

39.02 TRAZO Y REPLANTEO PARA ALCANTARILLADO m 8,901.14 1.11 9,880.27 4,450.57 4,940.13 50.00 2,480.57 2,753.44 27.87 970.00 1,076.70 10.90 1,000.00 1,110.00 11.23 8,901.14 9,880.27 100.00 0.00 0.00 0.00

39.03 PARANTES DE H=1.00 M PROV. P/SEÑALIZACION Y PROTECCION und 60.00 52.51 3,150.60 20.00 1,050.20 33.33 40.00 2,100.40 66.67 0.00 0.00 0.00 0.00 0.00 0.00 60.00 3,150.60 100.00 0.00 0.00 0.00

39.04 CONO DE VIDRIO FOSFORECENTE und 40.00 50.00 2,000.00 20.00 1,000.00 50.00 20.00 1,000.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 2,000.00 100.00 0.00 0.00 0.00

39.05 CINTA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m 5,751.00 1.42 8,166.42 2,875.51 4,083.22 50.00 1,145.97 1,627.27 19.93 1,729.53 2,455.93 30.07 0.00 0.00 0.00 5,751.00 8,166.42 100.00 0.00 0.00 0.00

39.06 PUENTE DE MADERA PROVISIONAL, PASE VEHICULAR Y PEATONAL SOBRE ZANJAS und 60.00 95.67 5,740.20 0.00 0.00 0.00 40.00 3,826.80 66.67 20.00 1,913.40 33.33 0.00 0.00 0.00 60.00 5,740.20 100.00 0.00 0.00 0.00

40 MOVIMIENTO DE TIERRAS 760,605.13 6,385.87 242,707.33 380,351.54 128,595.20 758,039.94 2,565.20

40.01 EXCAVACION DE ZANJA 262,642.65 6,385.87 47,402.96 115,053.43 92,542.80 261,385.06 1,257.60

40.01.01 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SEMI ROCOSO m3 11,912.48 12.88 153,432.74 0.00 0.00 0.00 1,034.84 13,328.74 8.69 4,870.00 62,725.60 40.88 5,910.00 76,120.80 49.61 11,814.84 152,175.14 99.18 97.64 1,257.60 0.82

40.01.02 EXCAVACION DE ZANJAS MANUAL EN TERRENO CONGLOMERADO m3 1,518.29 41.39 62,842.02 0.00 0.00 0.00 256.12 10,600.81 16.87 962.17 39,824.22 63.37 300.00 12,417.00 19.76 1,518.29 62,842.03 100.00 0.00 0.00 0.00

40.01.03 EXCAVACION DE ZANJAS MANUAL PARA BUZONES HASTA 2.00 DE PROFUNDIDAD PROM. m3 1,157.75 40.05 46,367.89 159.45 6,385.87 13.77 586.10 23,473.41 50.62 312.20 12,503.61 26.97 100.00 4,005.00 8.64 1,157.75 46,367.89 100.00 0.00 0.00 0.00

40.02 ENTIBADO Y DESENTIBADO 7,136.91 0.00 0.00 7,136.91 0.00 7,136.91 471.80

40.02.01 ENTIBADO Y DESENTIBADO DE ZANJA HASTA 6.00 M DE PROFUNDIDAD m 44.55 160.20 7,136.91 0.00 0.00 0.00 0.00 0.00 0.00 44.55 7,136.91 100.00 0.00 0.00 0.00 44.55 7,136.91 100.00 0.00 0.00 0.00

40.03 NIVELACION Y REFINE 36,616.36 0.00 8,569.10 14,567.26 13,008.20 36,144.56 0.00

40.03.01 REFINE Y NIVELACION DE FONDO DE ZANJA m2 10,865.39 3.37 36,616.36 0.00 0.00 0.00 2,542.76 8,569.10 23.40 4,322.63 14,567.26 39.78 3,860.00 13,008.20 35.53 10,725.39 36,144.56 98.71 140.00 471.80 1.29

40.04 CONFORMACION DE CAMA DE APOYO 64,866.38 0.00 15,180.28 25,806.10 23,044.20 64,030.58 835.80

40.04.01 CONFORMACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO, H= 10 CM m2 10,865.39 5.97 64,866.38 0.00 0.00 0.00 2,542.76 15,180.28 23.40 4,322.63 25,806.10 39.78 3,860.00 23,044.20 35.53 10,725.39 64,030.58 98.71 140.00 835.80 1.29

40.05 RELLENO DE ZANJA 166,494.71 0.00 47,980.08 118,514.63 0.00 166,494.71 0.00

40.05.01 m3 5,290.31 24.40 129,083.56 0.00 0.00 0.00 1,797.23 43,852.41 33.97 3,493.08 85,231.15 66.03 0.00 0.00 0.00 5,290.31 129,083.56 100.00 0.00 0.00 0.00

40.05.02 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ. HASTA 2.00 M DE PROFUNDIDAD m3 2,708.99 13.81 37,411.15 0.00 0.00 0.00 298.89 4,127.67 11.03 2,410.10 33,283.48 88.97 0.00 0.00 0.00 2,708.99 37,411.15 100.00 0.00 0.00 0.00

40.06 ELIMINACION DE MATERIAL EXCEDENTE 222,848.12 0.00 123,574.91 99,273.21 0.00 222,848.12 0.00

40.06.01 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA PROMEDIO 15 KM. C/MAQ. m3 15,443.39 14.43 222,848.12 0.00 0.00 0.00 8,563.75 123,574.91 55.45 6,879.64 99,273.21 44.55 0.00 0.00 0.00 15,443.39 222,848.12 100.00 0.00 0.00 0.00

41 TUBERIAS 493,830.17 46,335.95 379,807.30 67,686.93 0.00 493,830.18 0.00

41.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM EMISOR m 758.09 45.02 34,129.21 114.65 5,161.43 15.12 585.85 26,375.08 77.28 57.59 2,592.70 7.60 0.00 0.00 0.00 758.09 34,129.21 100.00 0.00 0.00 0.00

41.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM COLECTOR m 9,626.33 43.68 420,478.09 942.64 41,174.52 9.79 7,652.96 334,281.29 79.50 1,030.73 45,022.29 10.71 0.00 0.00 0.00 9,626.33 420,478.10 100.00 0.00 0.00 0.00

41.03 DRENAJE DE ZANJA C/BOMBEO PARA TUBERIA DN 200 MM. 2.00 M DE PROFUNDIDAD m 2,520.75 9.49 23,921.92 0.00 0.00 0.00 1,230.78 11,680.10 48.83 1,289.97 12,241.82 51.17 0.00 0.00 0.00 2,520.75 23,921.92 100.00 0.00 0.00 0.00

FLETE TERRESTRE DE MATERIALES PARA EL DISTRITO DE UCHUMARCA (REDES Y CONEXIONES)

RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/MAQ. HASTA 0.50 M DE PROFUNDIDAD

9

VALORIZACION N° 04 - FEBRERO2013

OBRA

PROCESO : LP -001-2012-MDU/CECONTRATISTA : CONSORCIO VALLE VERDE - UCHUMARCARESIDENTE DE OBRA : KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127REPRESENT. SUPERVISION : "CONSORCIO UCHUMARCA" MANUEL LORENZO ROMERO ZARATE -CIP: 54581VALOR REFERENCIAL : S/. 6'367,339.49PRESUPUESTO CONTRATADO : S/. 6'367,339.49

FECHA : 28 DE FEBRERO DEL 2013

PRESUPUESTO : : PRESUPUESTO GENERAL DE LA OBRA

: "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

41.04 m 2,520.75 6.07 15,300.95 0.00 0.00 0.00 1,230.78 7,470.83 48.83 1,289.97 7,830.12 51.17 0.00 0.00 0.00 2,520.75 15,300.95 100.00 0.00 0.00 0.00

42 CONCRETO SIMPLE 41,416.75 0.00 10,435.77 17,841.97 13,139.00 41,416.74 0.00

42.01 MEDIAS CAÑAS 23,308.75 0.00 4,100.54 11,214.60 7,993.60 34.29 0.00 23,308.74 100.00 0.00 0.00 0.00

42.01.01 CONCRETO f'c=140 kg/cm2 PARA MEDIAS CAÑAS m3 56.64 217.18 12,301.08 0.00 0.00 0.00 11.56 2,510.60 20.41 25.08 5,446.87 44.28 20.00 4,343.60 35.31 56.64 12,301.07 100.00 0.00 0.00 0.00

42.01.02 ENCOFRADO Y DESENCOFRADO PARA MEDIAS CAÑAS m2 150.79 73.00 11,007.67 0.00 0.00 0.00 21.78 1,589.94 14.44 79.01 5,767.73 52.40 50.00 3,650.00 33.16 150.79 11,007.67 100.00 0.00 0.00 0.00

42.02 DADOS DE CONCRETO 18,108.00 0.00 6,335.23 6,627.37 5,145.40 28.42 0.00 18,108.00 100.00 0.00 0.00 0.00

42.02.01 CONCRETO f'c=140 kg/cm2 PARA DADOS DE EMPALME A BUZONES m3 40.00 267.18 10,687.20 0.00 0.00 0.00 12.56 3,355.78 31.40 17.44 4,659.62 43.60 10.00 2,671.80 25.00 40.00 10,687.20 100.00 0.00 0.00 0.00

42.02.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE EMPALME A BUZON m2 240.00 30.92 7,420.80 0.00 0.00 0.00 96.36 2,979.45 40.15 63.64 1,967.75 26.52 80.00 2,473.60 33.33 240.00 7,420.80 100.00 0.00 0.00 0.00

43 CONCRETO ARMADO 461,654.89 70,186.71 236,955.10 79,571.08 74,942.00 461,654.89 0.00

43.01 BUZONES 461,654.89 70,186.71 236,955.10 79,571.08 74,942.00 461,654.89 0.00

43.01.01 CONCRETO f'c=175 kg/cm2 PARA BUZONES m3 200.47 474.05 95,032.80 15.04 7,129.71 7.50 101.49 48,111.33 50.63 43.94 20,829.76 21.92 40.00 18,962.00 19.95 200.47 95,032.80 100.00 0.00 0.00 0.00

43.01.02 ENCOFRADO Y DESENCOFRADO DE BUZONES m2 2,672.89 83.10 222,117.16 200.47 16,659.26 7.50 1,553.15 129,066.56 58.11 319.27 26,531.34 11.94 600.00 49,860.00 22.45 2,672.89 222,117.16 100.00 0.00 0.00 0.00

43.01.03 ACERO DE REFUERZO fy=4200 kg/cm2 PARA BUZONES kg 2,893.17 6.12 17,706.20 578.63 3,541.23 20.00 315.17 1,928.83 10.89 999.37 6,116.14 34.54 1,000.00 6,120.00 34.56 2,893.17 17,706.20 100.00 0.00 0.00 0.00

43.01.04 CONCRETO f 'c=210 kg/cm2 PARA TECHO DE BUZONES m3 56.55 393.96 22,278.44 0.00 0.00 0.00 29.75 11,720.31 52.61 26.80 10,558.13 47.39 0.00 0.00 0.00 56.55 22,278.44 100.00 0.00 0.00 0.00

43.01.05 ENCOFRADO Y DESENCOFRADO DE TECHO DE BUZONES m2 150.80 80.76 12,178.61 0.00 0.00 0.00 51.66 4,172.06 34.26 99.14 8,006.55 65.74 0.00 0.00 0.00 150.80 12,178.61 100.00 0.00 0.00 0.00

43.01.06 ACERO DE REFUERZO fy=4200 kg/cm2 PARA TECHO DE BUZONES kg 5,608.00 5.91 33,143.28 2,243.20 13,257.31 40.00 2,090.83 12,356.81 37.28 1,273.97 7,529.16 22.72 0.00 0.00 0.00 5,608.00 33,143.28 100.00 0.00 0.00 0.00

43.01.07 SUMINISTRO Y COLOCACION DE MARCO DE FºFº Y TAPA DE CºAº PARA BUZONES und 160.00 369.99 59,198.40 80.00 29,599.20 50.00 80.00 29,599.20 50.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00 59,198.40 100.00 0.00 0.00 0.00

44 CONEXIONES DOMICILIARIAS 253,323.00 0.00 184,531.73 68,791.27 0.00 253,323.00 0.00

44.01 CONEXION DOMICILIARIA TUBERIA DN 160 MM A TUB. CON DN 200 MM. und 450.00 562.94 253,323.00 0.00 0.00 0.00 327.80 184,531.73 72.84 122.20 68,791.27 27.16 0.00 0.00 0.00 450.00 253,323.00 100.00 0.00 0.00 0.00

45 PRUEBA HIDRAULICA 18,451.89 0.00 6,458.16 0.00 11,895.00 18,353.16 98.73

45.01 PRUEBA HIDRAULICA DE TUBERIA PVC DN 200 MM m 10,083.00 1.83 18,451.89 0.00 0.00 0.00 3,529.05 6,458.16 35.00 0.00 0.00 0.00 6,500.00 11,895.00 64.46 10,029.05 18,353.16 99.46 53.95 98.73 0.54

46 FLETE 137,129.93 82,277.96 54,851.97 0.00 0.00 137,129.93 0.00

46.01 FLETE TERRESTRE DE MATERIALES PARA EL DISTRITO DE UCHUMARCA est 1.00 136,719.93 136,719.93 0.60 82,031.96 60.00 0.40 54,687.97 40.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 136,719.93 100.00 0.00 0.00 0.00

46.02 est 1.00 410.00 410.00 0.60 246.00 60.00 0.40 164.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 410.00 100.00 0.00 0.00 0.00

CONSTRUCCION DE LAGUNAS DE OXIDACION FACULTATIVAS S/. 1,048,937.22 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.00 0.00 S/. 0.00 0.00 0.00 S/. 1,048,937.22 100.00

47 OBRAS PRELIMINARES 17,080.64 0.00 0.00 0.00 0.00 0.00 17,080.64

47.01 LIMPIEZA DE TERRENO MANUAL m2 5,239.46 1.10 5,763.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,239.46 5,763.41 100.00

47.02 TRAZO, NIVELACION Y REPLANTEO m2 5,239.46 2.16 11,317.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,239.46 11,317.23 100.00

48 MOVIMIENTO DE TIERRAS 783,308.40 0.00 0.00 0.00 0.00 0.00 783,308.40

48.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 10,920.00 33.00 360,360.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,920.00 360,360.00 100.00

48.02 m3 7,560.00 48.99 370,364.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,560.00 370,364.40 100.00

48.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=30 MTS. MANUAL C/CARRETILLA m3 4,200.00 12.52 52,584.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,200.00 52,584.00 100.00

49 OBRAS DE ARTE (LAGUNA DE OXIDACION) 245,031.53 0.00 0.00 0.00 0.00 0.00 245,031.53

49.01 PERFILADO Y COMPACTACION DE SUBRASANTE m2 2,878.51 3.35 9,643.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,878.51 9,643.01 100.00

49.02 BASE DE AFIRMADO E=0.15 m2 2,878.51 7.61 21,905.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,878.51 21,905.46 100.00

49.03 BASE DE AFIRMADO PARA TALUDES E=0.15 m2 2,683.30 8.52 22,861.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,683.30 22,861.72 100.00

49.04 MAMPOSTERIA DE PIEDRA m2 42.60 20.66 880.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.60 880.12 100.00

49.05 IMPERMEABILIZACION m2 5,561.80 4.14 23,025.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,561.80 23,025.85 100.00

49.06 GEOMEMBRANA IMPERMEABILIZANTE E=1.5MM m2 5,561.80 26.51 147,443.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,561.80 147,443.32 100.00

49.07 CAJA DE CONCRETO F'c=175 KG/CM2 DE REUNION Y DISTRIBUCION und 3.00 965.73 2,897.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,897.19 100.00

49.08 COMPUERTAS FIERRO CON VOLANTE DE 0.60*0.60 M und 5.00 1,422.62 7,113.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 7,113.10 100.00

49.09 TUBERIA PVC UF DN 250 MM. INC. ANILLOS m 56.20 164.80 9,261.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.20 9,261.76 100.00

50 CAMARA DE REJAS 3,516.65 0.00 0.00 0.00 0.00 0.00 3,516.65

50.01 TRAZO, NIVELACION Y REPLANTEO m2 3.52 2.16 7.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.52 7.60 100.00

50.02 CORTE SUPERFICIAL LATERAL MANUAL m3 5.81 17.25 100.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.81 100.22 100.00

50.03 SOLADO EN CAMARA DE REJAS, E=4" F'c = 100 Kg/cm2 m2 3.52 22.96 80.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.52 80.82 100.00

50.04 CONCRETO EN LOSA DE FONDO F'C= 175 KG/CM2 m3 0.53 419.90 222.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.53 222.55 100.00

50.05 ACERO DE REFUERZO Fy=4200Kg/cm2, EN LOSA DE FONDO kg 16.91 5.81 98.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.91 98.25 100.00

50.06 CONCRETO EN MUROS F'C= 175 KG/CM2 m3 1.76 419.90 739.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.76 739.02 100.00

50.07 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS m2 9.70 49.42 479.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.70 479.37 100.00

50.08 ACERO DE REFUERZO Fy=4200Kg/cm2, EN MUROS kg 73.68 5.81 428.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.68 428.08 100.00

50.09 CONCRETO EN LOSA DE PLATAFORMA Y REMOVIBLES, F'C= 175 KG/CM2 m3 0.17 419.90 71.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.17 71.38 100.00

50.10 ENCOFRADO Y DESENCOFRADO EN LOSA DE PLATAFORMA Y REMOVIBLES m2 3.03 108.13 327.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.03 327.63 100.00

50.11 ACERO DE REFUERZO Fy=4200Kg/cm2, EN LOSA DE PLATAFORMA Y LOSAS REMOVIBLES kg 30.92 5.81 179.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.92 179.65 100.00

50.12 TARRAJEO CON IMPERMEABILIZANTES m2 11.42 29.87 341.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.42 341.12 100.00

50.13 SISTEMA DE REJAS DE ACERO INOXIDABLE und 1.00 440.96 440.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 440.96 100.00

TOTAL COSTO DIRECTO 4,692,217.73 965,054.16 1,406,145.41 929,356.24 338,246.32 3,638,801.63 S/. 1,051,601.15

GASTOS GENERALES 10% 10% 469,221.77 96,505.42 140,614.54 92,935.62 33,824.63 363,880.16 105160.12

UTILIDAD 5% 5% 234,610.89 48,252.71 70,307.27 46,467.81 16,912.32 181,940.08 52580.06

SUB TOTAL 01 5,396,050.39 1,109,812.29 1,617,067.22 1,068,759.67 388,983.27 4,184,621.87 S/. 1,209,341.33

FACTOR DE RELACION 1.00 5,396,050.39 1,109,812.29 1,617,067.22 1,068,759.67 388,983.27 4,184,621.87 S/. 1,209,341.33

IGV. 18% 18% 971,289.07 199,766.21 291,072.10 192,376.74 70,016.99 753,231.94 217681.44

COSTO TOTAL 6,367,339.46 1,309,578.50 20.57 1,908,139.32 29.97 1,261,136.41 19.81 459,000.26 7.21 4,937,853.81 77.55 1427022.77 22.41

DESVIO DE AGUAS SERVIDAS HASTA Q=60 L/S C/MOTOBOMBA 12 HP 6" (INC. MANGUERA, ACCESORIOS Y TUBERIA)

FLETE TERRESTRE RURAL DE MATERIALES PARA LA EJECUCION DE OBRA (EMISOR ALCANTARILLADO)

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO AFIRMADO (INC. PROVISION) / CONFORMACION TALUDES (FONDO Y TALUDES)

VALORIZACION N° 04 - FEBRERO2013

ENTIDAD MUNICIPALIDAD DISTRITAL DE UCHUMARCA

OBRA

: LP -001-2012-MDU/CECONSORCIO VALLE VERDE - UCHUMARCA: KEYKO SUMIKO RAMIREZ CHUMAN - CIP :96127

FORMULA POLINOMICA :

K = 0.082*(Ar / Ao) + 0.200*(TAr / TAo) + 0.065*(CMr / CMo) + 0.149*(Mr / Mo) + 0.214*(Mr / Mo) + 0.290*(Ir / Io)

SIMB. INDICE ELEMENTOCOEF. PARTICIP. INDICE UNIFICADO (IU) INEIINCID. PORCENT. Io Ir

Jun-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13

J 47 MANO DE OBRA INC. LEYES SOCIALES 0.214 100.00% 448.25 470.79 470.79 470.79 470.79 471.44 0.225 0.225 0.225 0.225 0.225

C 21 CEMENTO PORTLAND 0.065 93.846% 419.05 438.98 438.98 438.98 438.98 452.44 0.068 0.068 0.068 0.068 0.070

44 MADERA TERCIADA PARA CARPINTERIA 6.154% 343.84 342.65 344.06 344.64 344.640 347.060

AGB 5 AGREGADO GRUESO 0.082 100.000% 430.70 428.01 429.98 435.45 435.45 435.13 0.081 0.082 0.083 0.083 0.083

GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.290 100.000% 377.16 381.48 380.86 380.33 380.33 381.76 0.293 0.293 0.292 0.292 0.294

AC 72 TUBERIA DE PVC PARA AGUA 0.200 92.500% 490.10 347.79 354.66 355.50 355.50 350.98 0.144 0.147 0.147 0.147 0.145

3 ACERO DE CONSTRUCCION CORRUGAOD 7.500% 486.71 429.12 427.77 428.87 428.870 422.640

F 49 MAQUINARIA Y EQUIPO IMPORTADO 0.149 100.000% 234.94 229.22 227.56 228.18 228.18 224.22 0.145 0.144 0.145 0.145 0.142

FACTOR DE REAJUSTE "K" 1.000 0.956 0.959 0.960 0.960 0.959 0.000

"MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

PROCESO

CONTRATISTA

RESIDENTE

CALCULO DE REINTEGRO: VALORIZACION N° 04 - FEBRERO 2013ENTIDAD : MUNICIPALIDAD DISTRITAL DE UCHUMARCA

OBRA: MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA - BOLIVAR - LA LIBERTAD

PROCESO : LICITACION PUBLICA-001-2012-MDU/CE

CONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"

RESIDENTE : ING. KEYKO SUMIKO RAMIREZ CHUMAN - CIP :35689

CALCULO DE REINTEGRO: VALORIZACION N° 04 - FEBRERO 2013

FORMULA : PRESUPUESTO GENERAL DE OBRA

Nº DE VAL MESVALORIZ. PROGRAMADA VALORIZ. EJECUTADA REINT. PROGRAMADO REINTEGRO EJECUTADO REINTEGRO AUTORIZADO

MES ACUM. MES ACUM. K-1 MES ACUM. MES ACUM. MES ACUM.

VAL. 2 Dec-12 919,373.78 1,858,036.27 1,617,067.22 2,726,879.59 -0.040 -36,466.28 -75,480.50 -64,139.78 -110,377.67 -64,139.78 -110,377.67

VAL. 3 Jan-13870,615.05 2,728,651.32 1,068,759.67 3,795,639.26

-0.040 -34,532.31 -110,012.81 -42,391.57 -152,769.24 -42,391.57 -152,769.24

VAL. 4 Feb-13929,739.48 3,658,390.80 388,983.27 4,184,622.53

-0.041 -37,707.94 -147,720.75 -15,776.20 -168,545.44 -15,776.20 -168,545.44

VAL. 5 Mar-13

CALCULO DE REINTEGRO: VALORIZACION N° 04 - FEBRERO 2013

FORMULA MES VALORIZ. PROGRAMADA VALORIZ. EJECUTADA REINT. PROGRAMADO REINTEGRO EJECUTADO REINTEGRO AUTORIZADO

MES ACUM. MES ACUM. K-1 MES ACUM. MES ACUM. MES ACUM.

PRESUPUESTO Feb-13 929,739.48 3,658,390.80 388983.27 4,184,622.53 -0.041 -37,707.94 -147,720.75 -15,776.20 -168,545.44 -15,776.20 -168,545.44

TOTAL REINTEGROS VALORIZACION N° 04 : S/. -15,776.20

SUPERVISOR : ING. MANUEL LORENZO ROMERO ZARATE -CIP- 54581

FECHA: 31/01/2013

PROYECTO :

UBICACIÓN ; UCHUMARCA - BOLIVAR - LA LIBERTADPROCESO : LP -001-2012-MDU/CECONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"

ZONA: PRESUPUESTO

MONTO CONTRATO CON I.G.V. : S/. 6,367,339.46 MONTO ADELANTO DIRECTO CON I.G.V. : S/. 1,273,467.89MONTO CONTRATO SIN I.G.V. : S/. 5,396,050.39 MONTO ADELANTO DIRECTO SIN I.G.V. : S/. 1,079,210.08

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) ( 6 ) ( 7 ) ( 8 ) ( 9 )

VALORIZACION MONTO CONTRATO ADELANTO OTORGADO AMORTIZ. DEDUCCION DEDUCCION

Nº PERIODO SIN I.G.V. MONTO FECHA D=(7)-(8)

04 Feb-13 388,983.27 5,396,050.39 JUN-2013 1,079,210.08 OCT-2012 0.956 77,796.65 0.959 280.14 404.92 -124.78

05 Mar-13

06 Apr-13

07 May-13

08 Jun-13

T O T A L E S : 388,983.27 77,796.65 280.14 -124.78

AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO (VALORIZACION Nº 04 - FEBRERO.2013)

MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA - BOLIVAR - LA LIBERTAD

COEFIC. REAJUSTE

REGULARIZ DEDUCCION

MONTO VALORIZ. (VB)

FECHA VALOR REFER.

KA (OCT-11)

A=(3)x(1)/(2)

K(VAL.)

D=A x (K-KA)/KA VALORIZ. ANTERIOR

MUNICIPALIDAD DISTRITAL DE UCHUMARCA

AMORTIZACION POR ADELANTO DE MATERIALES (VAL. Nº 04)

PROYECTO : MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA - BOLIVAR - LA LIBERTAD

UBICACIÓN ; UCHUMARCA - BOLIVAR - LA LIBERTAD ADELANTO OTORGADO CON I.G.V. S/. : 1,910,201.84

PROCESO : LP -001-2012-MDU/CE ADELANTO OTORGADO SIN I.G.V. S/. : 1,618,815.12

CONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"

RESIDENTE: ING. KEYKO SUMIKO RAMIREZ CHUMAN

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) ( 6 ) ( 7 )

VALORIZACION MATERIAL ADELANTO OTORGADO

PERIODO DESCRIPCION COD. MONTO

5 DOC-2012 0.00 AGREGADO GRUESO 5 232,492.87 JUN-2012 0.00 428.01 430.70 0.00 0.00 0.00 232,492.870.00

5 DOC-2012 0.00 ACERO DE CONSTRUCC 3 37,441.54 JUN-2012 0.00 429.12 486.71 0.00 0.00 0.00 37,441.540.00

5 DOC-20121,068,759.67

TUBERIA PVC PARA AGU 72 1,618,815.12 JUN-2012 137,646.98 347.79 350.65 136,524.29 981,601.41 1,118,125.70 500,689.42

0.005 DOC-2012 0.00 CEMENTO PORTLAND TIP 21 206,568.97 JUN-2012 0.00 438.98 419.05 0.00 0.00 0.00 206,568.97

0.005 DOC-2012 0.00 MADERA TERCIADA PARA 44 14,389.82 JUN-2012 0.00 342.65 343.84 0.00 0.00 0.00 14,389.82

TOTALES : 2,109,708.32 137,646.98 136,524.29 981,601.41 1,118,125.70 991,582.62

PRESUPUESTO: MONTO CONTRATADO : S/. 5,396,050.39 ( SIN I.G.V. ) MONTO OTORGADO: S/. 2,109,708.32 ( SIN I.G.V. )

708552.82

DESCRIPCION CODIGO COEFICIENTEPORCENTAJE MONTO DE Imo Ima MTO. OTORG MONTO OTORGADO

INCIDENCIA CONTRATO JUN/2012 OCT/2012 SIN I.G.V. CON I.G.V.

AGREGADO GRUESO 5 0.082 100.000% 5,396,050.39 430.70 429.98 232,492.87 274,341.59

ACERO DE CONSTRUCCION CORRUG 3 0.200 7.500% 5,396,050.39 486.71 427.77 37,441.54 44,181.02

TUBERIA PVC PARA AGUA 72 0.200 92.500% 5,396,050.39 350.65 432.20 1,618,815.12 1,910,201.84

CEMENTO PORTLAND TIPO 1 21 0.065 93.846% 5,396,050.39 419.05 438.98 206,568.97 243,751.38

MADERA TERCIADA PARA CARPINTER 44 0.065 6.154% 5,396,050.39 343.84 343.84 14,389.82 16,979.99

2,109,708.32 2,489,455.82

FORMULA : PRESUPUESTO GENERAL DE LA OBRA

MATERIAL UTILIZADO

Ima (OCT-2012)

Imo (JUN-2011)

AMORT. = (1)*Ima/Imo

AMORTIZ. ANTERIOR

AMORTIZ. ACUMULADA

SALDO POR AMORTIZARMONTO

VALORIZADO

FECHA

PAGO

MUNICIPALIDAD DISTRITAL DE UCHUMARCA

DEDUCCION DEL REAJUSTE POR ADELANTO DE MATERIALES (VAL. Nº 04 - FEBRERO2013)

PROYECTO : MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA - BOLIVAR - LA LIBERTAD

UBICACIÓN ; UCHUMARCA - BOLIVAR - LA LIBERTAD ADELANTO OTORGADO CON I.G.V.: S/. : 1,910,201.84

PROCESO : LP -001-2012-MDU/CE ADELANTO OTORGADO SIN I.G.V.: S/. : 1,618,815.12

CONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"

BASE MES

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 ) ( 13 )

VALORIZACION MATERIAL ADELANTO OTORGADOCOEFIC.

Imr Ima Imo DEDUCCION

Nº PERIODO DESCRIP. COD. MONTO FECHA/PAGO DIC-2012 OCT-2012 JUN-2012 A=(1)x(3)x(4) SU=MU-A

5 DOC - 2012 0.00 AGREGADO GRUESO 5 232,492.87 OCT-2012 0.082 100.000% 435.45 428.01 430.70 0.00 0.00 0.00 233,954.06 233,954.06 0.00

5 DOC - 2012 0.00 ACERO DECONSTRUCCIO 3 37,441.54 OCT-2012 0.200 7.500% 428.87 429.12 486.71 0.00 0.00 0.00 42,466.38 42,466.38 0.00

5 DOC - 2012 1,068,759.67 TUBERIA PVC PARA AGUA 72 1,618,815.12 OCT-2012 0.200 92.500% 355.50 347.79 490.10 197,720.54 453,120.13 650,840.67 2,281,207.88 1,630,367.21 3,110.44

5 DOC - 2012 0.00 CEMENTO PORTLAND TIP 21 206,568.97 OCT-2012 0.065 93.846% 438.98 438.98 419.05 0.00 0.00 0.00 197,190.59 197,190.59 0.00

5 DOC - 2012 0.00 MADERA TERCIADA PARA 44 14,389.82 OCT-2012 0.065 6.154% 344.64 342.65 343.84 0.00 0.00 0.00 14,439.79 14,439.79 0.00

TOTALES : 2,109,708.32 197,720.54 453,120.13 650,840.67 2,769,258.70 2,118,418.03 3,110.44

FORMULA : PRESUPUESTO GENERAL DE LA OBRA

% INCIDENCIA

ADELANTO UTILIZADO

ADELANTO UTILIZADO

ADELANTO UTILIZADO

MONTO UTILIZABLE

SALDO POR UTILIZAR

MONTO VALORIZ.

ACUM. ANTERIOR

ACUM. ACTUAL

MU=(2)*Imo/Ima

D=A(Imr-Ima)/Imo

MUNICIPALIDAD DISTRITAL DE HUAYLLAY

GERENCIA DE OBRAS Y DESARROLLO URBANO

MUNICIPALIDAD DISTRITAL DE HUAYLLAY

EJECUCIÓN PRESUPUESTAL 2012E - 4 INFORME MENSUAL DE VALORIZACIONES

(PARA CONTRATOS CUYO PRESUPUESTO BASE NO CONTIENE I.G.V.) SUSTENTACIÓN DEL CALENDARIO DE COMPROMISOS

EJECUCIÓN MENSUAL 1/

PROGRAMA CONTRATO: PPTO. BASES/. 6,367,339.46

PROYECTO CONTRATISTA : CONSORCIO "VALLE VERDE - UCHUMARCA"TOTALFUENTE FINANCIAMIENTO MUNICIPALIDAD DISTRITAL DE UCHUMARCA

OBRA

REAJUSTE DE VALORIZACIONES POR FÓRMULA POLINÓMICA PAGADO

ESCALAMIENTOREINTEGROS

AMORTIZACIÓN DEL ADELANTOI.G.V. (18%)

EFECTIVO EFECTIVO

MES K MONTO DIRECTO MATERIALES DIRECTO MATERIALES (19%) S/. S/.

5,396,050.391,273,467.89 1,910,201.84 2,698,025.20 485,644.53

388,983.27 Feb-13 0.960 -15,776.20 0.00 280.14 3,110.44 369,816.49 77,796.65 136,524.29 155,495.55 27,989.20 0.00 0.00 183,484.75 183,484.75 0.00 183,484.75

5,396,050.39 388,983.27 -15,776.20 0.00 280.14 3,110.44 369,816.49 77,796.65 136,524.29 155,495.55 27,989.20 0.00 0.00 183,484.75 183,484.75 0.00 183,484.75

5,007,067.12 4,181,031.89 752,585.74 4,933,617.63

239,847.51 586,187.72

FECHA DE INICIO DE OBRA : 18 DE OCTUBRE 2012 FECHA DE TÉRMINO DE OBRA: 16 DE MAYO DEL 2013

REVISADO POR : APROBADO POR :

JEFE DE PROYECTO : DIRECTOR DE ADMINISTRACIÓ:

"MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE SANEAMIENTO DE LA LOCALIDAD DE UCHUMARCA, DISTRITO DE UCHUMARCA - BOLIVAR - LA LIBERTAD"

TOTAL CALENDARIO

A CANCELAR AL CONTRATISTA

PENDIENTE DE PAGO

PRESUPUESTO BASE

CONTRATADO

VALORIZACIÓN DEL MES

DEDUCCIÓN DEL REAJUSTE QUE NO CORRESPONDE DEL ADELANTO VALORIZACIÓN

BRUTA REAJUSTADA

VALORIZACIÓN NETA

ADELANTOS SIN IGV

IGV DEL ADELANTO VN + IGV

+ADELANTOEFECTIVO = (VN

- Fg) + IGV