COMPARATIVO DE COSTOS ADQUISICION ARENA FINA MATERIAL UND METRADO PARCIAL SUBTOTAL EXPEDIENTE TECNICO MATERIALES 8,850.00 Arena Fina M3 150.00 59.00 8,850.00 TOTAL 8,850.00 MATERIAL UND METRADO PARCIAL SUBTOTAL COTIZACIÓN DISTRIBUIDOR "EL CHORRILLANO" MATERIALES 7,500.00 Arena Fina (Inc. Transporte y Puesta en O M3 150.00 50.00 7,500.00 TOTAL 7,500.00 DESCRIPCION UND METRADO PARCIAL SUBTOTAL CON MAQUINARIA DE OBRA MANO DE OBRA 970.00 Operador HH 15.00 20.00 300.00 Peon HH 15.00 18.00 270.00 Administrativos GLB 1.00 400.00 400.00 MATERIALES 382.73 Arena Fina M3 150.00 0.00 0.00 Combustible Cargador Frontal GAL 20.25 10.50 212.63 Combustible Volquete Placa F4K-774 GAL 8.10 10.50 85.05 Combustible Volquete Placa V74-846 GAL 8.10 10.50 85.05 EQUIPO 1,665.00 Cargador Frontal HM 4.50 130.00 585.00 Volquete Placa F4K-774 HM 4.50 120.00 540.00 Volquete Placa V74-846 HM 4.50 120.00 540.00 TOTAL S/. 3,017.73 Costo Unitario S/. / M3 20.12 Nota: Los Volquetes realizaron el trabajo en 5 viajes c/u RESUMEN COMPARATIVO DE COSTOS (Inc. IGV): CANTIDIDAD TOTAL S/. AHORRO S/. EXPEDIENTE TECNICO 150.00 59.00 8,850.00 - COTIZACIÓN DISTRIBUIDOR "EL CHORRILLANO" 150.00 50.00 7,500.00 1,350.00 CON MAQUINARIA DE OBRA 150.00 20.12 3,017.73 5,832.27 P.U. (S/.) INC IGV P.U. (S/.) INC IGV P.U. (S/.) INC IGV CU (INC IGV)

Upload: fernando-pizarro

Post on 01-Feb-2016

6 views

Category:

Documents


0 download

DESCRIPTION

Comparativo de Costos Arena Fina

TRANSCRIPT

Page 1: Comparativo de Costos Arena Fina

COMPARATIVO DE COSTOS ADQUISICION ARENA FINA

MATERIAL UND METRADO PARCIAL SUBTOTAL

EXPEDIENTE TECNICOMATERIALES 8,850.00

Arena Fina M3 150.00 59.00 8,850.00

TOTAL 8,850.00

MATERIAL UND METRADO PARCIAL SUBTOTAL

COTIZACIÓN DISTRIBUIDOR "EL CHORRILLANO"MATERIALES 7,500.00

Arena Fina (Inc. Transporte y Puesta en Obra) M3 150.00 50.00 7,500.00

TOTAL 7,500.00

DESCRIPCION UND METRADO PARCIAL SUBTOTAL

CON MAQUINARIA DE OBRAMANO DE OBRA 970.00

Operador HH 15.00 20.00 300.00Peon HH 15.00 18.00 270.00Administrativos GLB 1.00 400.00 400.00

MATERIALES 382.73Arena Fina M3 150.00 0.00 0.00Combustible Cargador Frontal GAL 20.25 10.50 212.63Combustible Volquete Placa F4K-774 GAL 8.10 10.50 85.05Combustible Volquete Placa V74-846 GAL 8.10 10.50 85.05

EQUIPO 1,665.00Cargador Frontal HM 4.50 130.00 585.00Volquete Placa F4K-774 HM 4.50 120.00 540.00Volquete Placa V74-846 HM 4.50 120.00 540.00

TOTAL S/. 3,017.73Costo Unitario S/. / M3 20.12

Nota: Los Volquetes realizaron el trabajo en 5 viajes c/u

RESUMEN COMPARATIVO DE COSTOS (Inc. IGV): CANTIDIDAD TOTAL S/. AHORRO S/.

EXPEDIENTE TECNICO 150.00 59.00 8,850.00 -COTIZACIÓN DISTRIBUIDOR "EL CHORRILLANO" 150.00 50.00 7,500.00 1,350.00CON MAQUINARIA DE OBRA 150.00 20.12 3,017.73 5,832.27

P.U. (S/.) INC IGV

P.U. (S/.) INC IGV

P.U. (S/.) INC IGV

CU (INC IGV)