Página :S10 1Fecha : 24/10/2009 11:34:02p.m.MUNICIPALIDAD DE IMPERIAL

Presu uesto0316018Obra RECONSTRUCCION DE LA INFRAESTRUCTURA DEL COLISEO MUNICIPAL DE IMPERIAL - CAÑETE

07Fórmula TIJERAL Y COBERTURA

Costo al0001Tarjeta 23/09/2009MUNICIPALIDAD DISTRITAL DE IMPERIALCliente

Provincia DistritoLIMADepartamento CAÑETE IMPERIAL

TotalSubtotalParcialPrecioMetradoUnidadItem Des cri pc ión

01.00.00 OBRAS PRELIMINARES

01.01.00 1.25 593.78M2 475.02TRAZO Y REPLANTEO01.02.00 158.90 179.56M3 1.13DEMOLICION DE COLUMNA EXISTENTE01.04.00 0.69 327.76M2 475.02LIMPIEZA DE TERRENO EN GENERAL01.05.00 5,500.00 5,500.00GLB 1.00MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y

MAQUINARIAS01.06.00 4,500.00 4,500.00 11,101.10GLB 1.00ENERGIA ELECTRICA PARA TRABAJOS EN OBRA

02.00.00 MOVIMIENTO DE TIERRAS

02.01.00 17.09 22.05M3 1.29 ACARREO DE MATERIAL EXCEDENTE02.02.01 16.44 21.21 43.26M3 1.29ELIMINACION DE MATERIAL EXCEDENTE DE OBRA

03.00.00 OBRAS DE CONCRETO ARMADO

03.01.00 COLUMNAS

03.01.01 389.67 2,252.29M3 5.78CONCRETO EN COLUMNAS F'C=210 kg/cm203.01.02 37.68 2,611.22M2 69.30ENCOFRADO Y DESENCOFRADO EN COLUMNAS03.01.03 3.19 2,485.20 7,348.71 7,348.71KG 779.06 ACERO fy = 4200 kg/cm2 PARA COLUMNAS

04.00.00 ESTRUCTURAS Y COBERTURAS

04.01.00 4,053.11 117,540.19UND 29.00COLUMNA PARABOLICO PRINCIPAL04.02.00 8.73 1,414.26M 162.00TEMPLADORES Ø 3/8"04.03.00 24.34 14,734.22M 605.35 ARRIOSTRE DE VIGUETAS Y TIJERALES04.04.00 45.59 33,098.34 166,787.01M2 726.00COBERTURA CON CALAMINA GALVANIZADA

05.00.00 REVOQUES ENLUCIDOS Y MOLDURAS

05.01.00 19.57 1,356.20 1,356.20M2 69.30TARRAJEO DE COLUMNAS - SUPERFICIE CONCEMENTO-ARENA

06.00.00 PINTURA

06.01.00 6.09 422.04M2 69.30PINTURAALLATEX 2 MANOS ENENCOLUMNAS Y VIGAS2MANOS

06.02.00 1.82 1,702.34 2,124.38M 935.35PINTURA EN CARPINTERIA METALICA

07.00.00. INSTALACIONES ELECTRICAS

07.01.00 CANALIZACION Y/O TUBERIAS

07.01.01 2.58 318.37 318.37M 123.40PROVISION DE TUBERIA PVC SAP DE 19 MM. (3/4")

07.02.00 CONDUCTORES

07.02.01 0.92 128.16 128.16M 139.30CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.

07.03.00 ILUMINACION

07.03.01 260.98 1,565.88 1,565.88 2,012.41UND 6.00PANTALLA INCORPORADA

190,773.07COSTO DIRECTO13,354.11GASTOS GENERALES (7%)9,538.65UTILIDAD (5%)

--------------------213,665.83SUBTOTAL40,596.50IGV (19%)

254,262.33TOTAL PRESUPUESTO