DISEÑO DE CIMENTACIÓN LINEA DE TRITURACIÓN PROYECTO: Línea de trituración 150 T/H FECHA: 2-Mar-15 DISEÑO: Ing. Jinson Romero EQUIPOS EQUIPOS A USAR RENDIMIENTO [m3/H] USO ELECTRICO [Kw/H] Largo [mm] Ancho [mm] Largo [mm] Ancho [mm] PESO [T] carga/columna TRITURADORA PRIMARIA 2305 1800 2206 2190 17 4.25 TRITURADORA DE CONO 1800 1800 2790 1870 25.3 6.325 TRITURADORA SECUNDARIA 1800 1800 2720 1950 16 4 TRITURADORA PRIMARIA PLINTOS CANTIDADES DE OBRA D [Kips] 13.9403 MD [T.m] 0.002375 MD [T.m] 0.002375 L [Kips] 4.18209 ML [T.m] 0.00 ML [T.m] 0.00 HORMIGON Sx [Kips] 0.48488 ME [T.m] 0.37 PU=1,2D+1,6L [Kips] 23.90 MU [T.m] 0.37 MU [T.m] 0.002850 PLINTOS TIPO 1 PLINTOS TIPO 2 COLUMNAS KL/rmin 133.68 PD [T] 6.46 PD [T] 6.46 a 1.20 a 1.00 a 0.50 KL [in] 82.68 PL [T] 2.81 PL [T] 2.81 b 1.20 b 1.00 b 0.50 r[in] 2.42 PE [T] 0.22 h 0.30 h 0.30 LONGITUD 0.80 r[in] 2.79 PU [T] 9.38 PU [T] 12.25 VOLUMEN 0.432 VOLUMEN 0.300 VOLUMEN 2.40 KL/rmin 29.61 CANTIDAD 1.000 CANTIDAD 8.000 Fe 326.50 10.00 10.00 TOTAL 0.43 TOTAL 2.40 Fcr 34.38 A requerida [m2] 0.71 A requerida [m2] 1.22 Ag 5.65 Lx [m] 1.20 RIOSTRAS SOBREPISO PCR 174.80 Ly [m] 1.20 b 0.20 A 10.00 A disponible [m2] 1.44 h 0.30 B 10.00 e [m] 0.0395 e [m] 0.0002 AREA 0.06 e 0.10 emax [m] 0.20 emax [m] 0.20 LONGITUD 26.90 VOLUMEN 10.00 ok ok VOLUMEN 1.61 qmax [T/m2] 8.52 qmax [T/m2] 7.80 qmin [T/m2] 8.50 qmin [T/m2] 5.22 ACERO qu [T/m2] 8.51 PLINTOS TIPO 1 PLINTOS TIPO 2 COLUMNAS CORTE Y PUNZONAMIENTO FLEXION a 0.50 a 1.20 a 1.00 b 0.50 a [m] 0.50 qmed [T/m2] 8.52 b 1.20 b 1.00 AS [cm2] 25 b [m] 0.50 A2 0.35 CANTIDAD 28.00 CANTIDAD 56.00 LONGITUD 17280.00 d [m] 0.25 Mdiseño [T.m] 0.63 LONGITUD 61.60 100.80 VOLUMEN 0.432 Vu [T] 7.46 0.0145714 AREA 0.00015 0.00015 DENSIDAD 7850 0.75 0.0096255 VOLUMEN 0.27 0.87 PESO 3391.200 vu [T/m2] 11.71 As [cm2] 0.70 DENSIDAD 7850.00 7850.00 Vc [T/m2] 154.92 As min[cm2] 10.00 PESO 2084.27 6821.25 As 14mm 1.54 MALLA 8*15 # Varillas 6.50 RESUMEN 66.667 CANTIDAD 7.00 COSTO / UNIDAD 67.000 Separacion [cm] 18.33 HORMIGON 16.85 200.00 $ 3,369.25 $ 1340.000 SEPARACION [cm] 15.00 ACERO DE REFUERZO 12880.68 2.50 $ 32,201.70 $ 0.067 ACERO ESTRUCTURAL 299.09 4.00 $ 1,196.34 $ 525.950 TOTAL 36,767.29 $ MANO DE OBRA 11,030.19 $ σ ADM [T/m2] σ ADM [T/m2] b0d [m2]

Upload: jinson-romero-duran

Post on 26-Sep-2015

218 views

Category:

Documents


1 download

DESCRIPTION

cimiento

TRANSCRIPT

Hoja1DISEO DE CIMENTACIN LINEA DE TRITURACINPROYECTO:Lnea de trituracin 150 T/HFECHA:2-Mar-15DISEO:Ing. Jinson Romero

EQUIPOSEQUIPOS A USARRENDIMIENTO [m3/H]USO ELECTRICO [Kw/H]Largo [mm]Ancho [mm]Largo [mm]Ancho [mm]PESO [T]carga/columna

TRITURADORA PRIMARIA2305180022062190174.25TRITURADORA DE CONO180018002790187025.36.325TRITURADORA SECUNDARIA1800180027201950164

TRITURADORA PRIMARIA

PLINTOSCANTIDADES DE OBRAD [Kips]13.9403MD [T.m]0.002375MD [T.m]0.002375L [Kips]4.18209ML [T.m]0.00ML [T.m]0.00HORMIGONSx [Kips]0.48488ME [T.m]0.37PU=1,2D+1,6L [Kips]23.90MU [T.m]0.37MU [T.m]0.002850PLINTOS TIPO 1PLINTOS TIPO 2COLUMNASKL/rmin133.68PD [T]6.46PD [T]6.46a1.20a1.00a0.50KL [in]82.68PL [T]2.81PL [T]2.81b1.20b1.00b0.50r[in]2.42PE [T]0.22h0.30h0.30LONGITUD0.80r[in]2.79PU [T]9.38PU [T]12.25VOLUMEN0.432VOLUMEN0.300VOLUMEN2.40KL/rmin29.61CANTIDAD1.000CANTIDAD8.000Fe326.50 ADM [T/m2]10.00 ADM [T/m2]10.00TOTAL0.43TOTAL2.40Fcr34.38A requerida [m2]0.71A requerida [m2]1.22Ag5.65Lx [m]1.20RIOSTRASSOBREPISOPCR174.80Ly [m]1.20b0.20A10.00A disponible [m2]1.44h0.30B10.00e [m]0.0395e [m]0.0002AREA0.06e0.10emax [m]0.20emax [m]0.20LONGITUD26.90VOLUMEN10.00okokVOLUMEN1.61qmax [T/m2]8.52qmax [T/m2]7.80qmin [T/m2]8.50qmin [T/m2]5.22ACEROqu [T/m2]8.51PLINTOS TIPO 1PLINTOS TIPO 2COLUMNASCORTE Y PUNZONAMIENTOFLEXIONa0.50a1.20a1.00b0.50a [m]0.50qmed [T/m2]8.52b1.20b1.00AS [cm2]25b [m]0.50A20.35CANTIDAD28.00CANTIDAD56.00LONGITUD17280.00d [m]0.25Mdiseo [T.m]0.63LONGITUD61.60100.80VOLUMEN0.432Vu [T]7.460.0145714AREA0.000150.00015DENSIDAD7850b0d [m2]0.750.0096255VOLUMEN0.270.87PESO3391.200vu [T/m2]11.71As [cm2]0.70DENSIDAD7850.007850.00Vc [T/m2]154.92As min[cm2]10.00PESO2084.276821.25As 14mm1.54MALLA 8*15PLACASVARRILLAS PLACAS# Varillas6.50RESUMEN66.6670.0030.007CANTIDAD7.00COSTO / UNIDAD67.000299.08558.004Separacion [cm]18.33HORMIGON16.85200.00 $3,369.25 $1340.000SEPARACION [cm]15.00ACERO DE REFUERZO12880.682.50 $32,201.70 $0.067ACERO ESTRUCTURAL299.094.00 $1,196.34 $525.950TOTAL36,767.29 $MANO DE OBRA11,030.19 $