ALCANTARILLAS M C A Método del CºCº f´c=175Kg/cm 2 +30%PM(4”max) En cabezal. Alas y Cajas Receptoras CABEZAL CASO 1 Altura = 0.30 Elemento 1 Paradero Ancho = 0.20 Volumen :0.09 m 3 Longitud = A+0.50 H 1 = 1.35 Elemento 2 Alas H 2 = 0.60 Volumen: 0.49 m 3 Altura = (1.5A) 2 +4 Espesor = 0.20 Volumen = (H1+H2)*Altura *Espesor Volumen = (1.35+0.6 )*2.5*0.20 2 Volumen = 0.49m 3 Por una Ala H 1 = 1.35

Upload: mijael-quispe-bernaldo

Post on 01-May-2017

226 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Calculo de Las Alcantarillas Mca

ALCANTARILLAS M C A

Método del CºCº f´c=175Kg/cm2 +30%PM(4”max)En cabezal. Alas y Cajas Receptoras

CABEZAL CASO 1

Altura = 0.30Elemento 1 Paradero Ancho = 0.20Volumen :0.09 m3 Longitud = A+0.50

H1 = 1.35Elemento 2 Alas H2 = 0.60Volumen: 0.49 m3 Altura = (1.5A)2+4

Espesor = 0.20

Volumen = (H1+H2)*Altura *Espesor Volumen = (1.35+0.6)*2.5*0.20 2 Volumen = 0.49m3 Por una Ala

H1 = 1.35Elemento 3 Alas H2 = 0.60Volumen: 0.49 m3 Altura = (1.5A)2+4

Espesor = 0.20

Volumen = (H1+H2)*Altura *Espesor Volumen = (1.35+0.6)*2.5*0.20 2 Volumen = 0.49m3

Elemento 4 Losa Volumen: 2.345

Page 2: Calculo de Las Alcantarillas Mca

CALCULO DE AREAS

A + A + 200Area 1 = 2 2 *1.5A

2 Area 2 = [ (1.5A)2 +22 – 0.7ctg ] + [ (1.5A)2 + 22 +0.7ctg ] * 0.70= (1.5 A)2 + 4 *0.70

2

Area 3 = [ (0.7 csc - 0.25)csc ] * [ 0.7csc - 0.25] 2

REEMPLAZANDO VALORRES

= 37ºA = 1B = 0.8

Area 1 = 2.25 Area 2 = 1.75 Area 3 = 0.692770559

Area total de un Cabezal = 1+2+3+1+2+3 = 2.25 +1.75 +0.69 +2.25 +1.75 +0.69Volumen de una losa por un cabezal = 9.38*0.25= 2.345 m3

Elemento 5 Pantalla del cabezal: Volumen = 1.056 m3 Longitud = A+4+1.4 Volumen = (1.4+4+A)*0.30 * 0.55

Ancho = 0.30 Volumen = 1.056 m3

Altura = 0.55

Elemento 6 Solado: Volumen = 0.373 m3 Area 4 = 0.30*(Longitud)=0.30*(0.70+A+4+0.70)

Area 4 = 1.92 m2 Area Solado = Area Losa – Area 4=9.38-1.92=7.46Volumen Solado = 7.46*0.05=0.373 m3

Page 3: Calculo de Las Alcantarillas Mca

ANALISIS DE CºCº POR UN CABEZAL

Un Cabezal = 1 Parapeto + 2 Alas + 1 Losa + 1 Pantalla del Cabezal + 1 Solado Un Cabezal = 0.09 + 2 (0.49) + 2.345 + 1.06 + 0.93 = 4.8m 3

CASO 2 A = 1.5

B = 1.5

Altura =0.30Elemento 1 Parapeto Ancho =0.20Volumen = 0.12m3 Longitud =A+0.50

H1 =2.05Elemento 2 Alas H2 =0.75Volumen = 0.84m3 Altura = (1.5 A)2+4

Espesor =0.20

Volumen = (H1+H2)*Altura*Espesor2 Volumen = (2.05+0.75)*3.01*0.20

2Volumen = 0.843

H1 =2.05Elemento 3 Alas H2 =0.75Volumen = 0.84m3 Altura = (1.5 A)2+4

Espesor =0.20

Volumen = (H1+H2)*Altura*Espesor2 Volumen = (2.05+0.75)*3.01*0.20

2Volumen = 0.843

Reemplazando Valores:Elemento 4 Losa Area 1 = 3.94Volumen = 3.78m3 Area 2 = 2.11

Area 3 = 0.69 Area Total = (Area 1+2+3) * 2 = 13.48 m2

Volumen = 0.25 * 13.48 = 3.37 m3

Elemento 5 Pantalla de Cabezal Volumen = 1.14m3 Longitud 1 = A+4+1.4 = 1.5+4+1.4 = 6.9

Ancho = 0.30 Altura = 0.55

Volumen = (6.9) * (0.30) * (0.55) = 1.14 m3

Elemento 6 Solado Volumen = 0.57m3 Area 4 = 0.30 * Longitud=0.30*(0.70+A+4+0.70)

Area 4 = 2.07m2 Area Solado = Area Losa – Area 4 = 13.48-2.07=11.41m2

Volumen Solado = 11.41 * 0.05 = 0.5705

VOLUMEN POR CABEZAL 6.8726

Page 4: Calculo de Las Alcantarillas Mca

CASO 3

A = 2.0 B = 2.0

Altura =0.30Elemento 1 Parapeto Ancho =0.20Volumen = 0.15m3 Longitud =A+0.50

H1 =2.55Elemento 2 Alas H2 = 1.05Volumen = 1.30m3 Altura = (1.5 A)2+4

Espesor =0.20

Volumen = (H1+H2)*Altura*Espesor2 Volumen = (2.55+1.05)*3.61*0.20

2Volumen = 0.954m3

H1 =2.55Elemento 3 Alas H2 =1.05Volumen = 0.954m3 Altura = (1.5 A)2+4

Espesor =0.20

Volumen = (H1+H2)*Altura*Espesor2 Volumen = (2.55+1.05)*2.65*0.20

2Volumen = 0.954

Reemplazando Valores:Elemento 4 Losa Area 1 = 6Volumen = 5.15m3 Area 2 = 2.52

Area 3 = 0.69 Area Total = (Area 1+2+3) * 2 = 18.42 m2

Volumen = 0.25 * 18.42 = 4.61 m3

Elemento 5 Pantalla de Cabezal Volumen = 1.221m3 Longitud 1 = A+4+1.4 = 2.0+4+1.4 = 7.4

Ancho = 0.30 Altura = 0.55

Volumen = (7.4) * (0.30) * (0.55) = 1.221 m3

Elemento 6 Solado Volumen = 0.919m3 Area 4 = 0.30 * Longitud=0.30*(0.70+A+4+0.70)

Area 4 = 2.22m2

Area Solado = Area Losa – Area 4 = 20.6 -2.22=18.38m2

Volumen Solado = 18.38 * 0.05 = 0.919

VOLUMEN POR CABEZAL 9.15m3

Page 5: Calculo de Las Alcantarillas Mca

CASO 4 A = 2.5 B = 2.5

Elemento 1 Paradero Altura = 0.30 Volumen = 0.18 m3 Ancho = 0.20

Longitud = A+0.50

Elemento 2 Alas H1 = 3.05 Volumen = 1.96 H2 = 1.55

Altura= (1.5A)2 +4 Volumen=(H1+H2)* Altura*Espesor Espesor =0.20 2

Volumen=(3.05+1.55)* 4.25*0.2 2

Volumen=1.96

Elemento 3 Alas Volumen = 1.96

Elemento 4 Losa Reemplazando ValoresVolumen = 6,0 55 Area 1 = 8.44

Area 2 = 2.98 Area 3 = 0.69

Area Total = 12.11 * 2 = 24.22 Volúmen = 0.25 * 24.22 = 6.055

Elemento 5 Pantalla de Cabezal Long. : A + 4 + 1.4 = 2.5 + 4 + 1.4= 7.9Volumen = 1.30 Ancho : 0.30

Altura : 0.55 Volumen : (7.9)(0.55)(0.3) = 1.30m3

Elemento 6 Solado Area 4 = 0.30 * Longitud = 0.30 * 7.9 = 2.37 Area Solado = Area Losa – Area 4 = 24.22 – 2.37

Area Solado = 21.85 m Volumen Solado = 21.85 * 0.05 = 1.0925

VOLUMEN POR CABEZAL = 12.54 m3

Page 6: Calculo de Las Alcantarillas Mca

METRADO DE PREPARACION DE TERRENO P / FUNDACION DE ESTRUCTURA

CASO 1 A=1B=0.8

Cabezal = Conducto por ml =

CASO 2 A = 1.5B = 1.5

Cabezal = Conducto por ml =

CASO 3 A = 2B = 2

Cabezal = Conducto por ml =

CASO 4 A = 2.5B = 2.5

Cabezal = Conducto por ml =

9.38 m2

A+ 0.25 + 0.25 + 0.25 + 0.25 = A +1 = 2 m2

13.48 m2

A + 0.25 + 0.25 + 0.25 + 0.25 = A + 1 = 2.5 m2

18.42 m2

3 m2

24.22 m2

3.5 m2

Page 7: Calculo de Las Alcantarillas Mca

METRADO DE SOLADO f’c = 175 Kg/cm 2 + 30%PM (4” Max)

CASO 1 = 0.373 m3 A= 1 ; B = 0.80Conducto = (A + 0.25 + 0.25) * 0.05 = 0.075 m2 (por ml)

CASO 2 Cabezal = 0.5705 m3 A = 1.5 ; B = 1.5Conducto = 0.100 m2 (por ml)

CASO 3 Cabezal = 0.919 m3 A = 2 ; B = 2Conducto = 0.125 m2 (por ml)

CASO 4 Cabezal = 1.093 m3 A = 2.5 ; B = 2.5Conducto = 0.15 m2 (por ml)

Page 8: Calculo de Las Alcantarillas Mca

METRADO DE ENCOFRADO Y DESENCOFRADO DE UN CABEZAL DE ALCANTARILLA TIPO MARCO DE CONCRETO ARMADO

AREA 1 = Parapeto

[(0.30 (0.25 + 0.25 + A)] 2 + (0.25 + 0.25 + A) (B + 0.25)

AREA 2 = Alas

(H1 + H2) (1.5A)2 + 4 = (H1 + H2) (1.5A)2 + 4 + 0.2 H2

AREA 3 = Alas

(H1 + H2) (1.5A)2 + 4 + 0.20 H2

AREA 4 = Losa

[0.70 +(A+4) +0.7+2[ (1.5A)2 + 4 – 0.7 ctg + 0.7cscd.sec 0.30

CASO 1 A = 1 Area 1 = 0.9 m2 + 1.575 = 2.475B = 0.8 Area 2 = 4.995 m2

Area 3 = 4.995 m2

Area 4 = 3.736----------------------------Total = 16.201 m2

CASO 2 A = 1.5 Area 1 =4.7B = 1.5 Area 2 = 8.60

Area 3 = 8.60Area 4 = 4.19----------------------------Total = 26.09

CASO 3 A = 2.0 Area 1 = 7.095B = 1.0 Area 2 = 13.19

Area 3 = 13.19Area 4 = 4.69----------------------------Total = 38.17

CASO 4 A = 2.5 Area 1 = 10.05B = 2.5 Area 2 = 19.86

Area 3 = 19.86Area 4 = 5.23----------------------------Total = 55