CALCULO DE FLETE TERRESTRE

TRANSCRIPT

FLETECALCULO DE FLETE

PROYECTO: Construccion Sistema de Riego Huaccraccasa-El Chorro-Pampapuquio-Huayrapata-Paccha - Provincia de Churcampa - Huancavelica

A.- FLETE TRANSPORTE TERRESTRE REGIONAL (HUANCAYO - CHURCAMPA)A1.- MATERIALES ATRANSPORTAR POR PESO

MATERIALESUNIDADCANTIDADPESO.UNIT. PROM. (KG)PESO.TOTAL (KG)CementoBOLSA1,831.1442.5077,823.45Tapas metalicasUNID.761.0015.0011,415.00MaderaP2264.001.50396.00ValvulasUNID.160.001.00160.00Acero de refuerzo + ClavosKG847.381.00847.38Alambre de amarreKG88.991.0088.99Geomembrana 1mm + GeotextilM23,288.602.207,234.92Manguera PE 25mmM8,080.000.504,040.00Otros (Valvulas, accesorios PVC, tripodes, aspersores, etc)GLB1.00200.00200.00PESO TOTAL 102,205.74FLETE X KG (DE HUANCAYO A CHURCAMPA) S/.0.3FLETE TRANSPORTE POR PESO S/30,661.72A2.- MATERIALES A TRANSPORTAR POR VOLUMEN

MATERIALESUNIDADCANTIDADVOLUMEN OCUPADOx MATERIAL (M3)VOLUMEN TOTAL OCUPADO (M3)ACCESORIOS DIVERSOS PARA RESERVORIOUNID.3.000.5200001.56UNION DOBLE DE POLIETILENO 25MM X 3/4"UNID.112.000.0129001.44TUB. PVC UF 250 MM C-7.5UNID.1,890.000.0050009.45TUB. PVC UF 200 MM C-7.5UNID.3,963.780.00320012.68TUB. PVC UF 3" MM C-7.5UNID.2,611.350.00500013.06TUB. PVC UF 4" MM C-7.5UNID.861.000.0032002.76TUB. PVC 2" MM C-7.5UNID.3,591.000.00500017.96TUB. PVC UF 6" MM C-7.5UNID.45.900.0032000.15VOLUMEN TOTAL 59.05CAPACIDAD DE CAMION CARROCERIA 3x2x6m38 M3(CARGA SEMIBOMBEADO)N DE VIAJES NECESARIOS A CHURCAMPA2VIAJEFLETE POR VIAJE S/.2,300.00FLETE TRANSPORTE POR VOLUMEN4,600.00

FLETE TRANSPORTE TERRESTRE REG. TOTAL (S/.)35,261.72B.- FLETE TRANSPORTE RURAL CHURCAMPA - ZONA DE PROYECTOB1.- MATERIALES A TRANSPORTAR POR PESO

MATERIALESUNIDADCANTIDADPESO.UNIT. PROM. (KG)PESO.TOTAL (KG)CementoBOLSA1,831.1442.5077,823.45Tapas metalicasUNID.761.0015.0011,415.00MaderaP2264.001.50396.00ValvulasUNID.160.001.00160.00Acero de refuerzo + ClavosKG847.381.00847.38Alambre de amarreKG88.991.0088.99Geomembrana 1mm + GeotextilM23,288.602.207,234.92Manguera PE 25mmM8,080.000.504,040.00Otros (Valvulas, accesorios PVC, tripodes, aspersores, etc)GLB1.00200.00200.00PESO TOTAL 102,205.74FLETE X KG (DE CHURCAMPA A OBRA) S/.0.15FLETE TRANSPORTE POR PESO S/15,330.86B2.- MATERIALES A TRANSPORTAR POR VOLUMEN

MATERIALESUNIDADCANTIDADPAGO X TRANSPORTE UNITARIO S/. PAGO TOTAL S/.ACCESORIOS DIVERSOS PARA RESERVORIOUNID.3.000.702.10UNION DOBLE DE POLIETILENO 25MM X 3/4"UNID.112.000.7078.40TUB. PVC UF 250 MM C-7.5UNID.1,890.000.901,701.00TUB. PVC UF 200 MM C-7.5UNID.3,963.780.90TUB. PVC UF 3" MM C-7.5UNID.2,611.350.60TUB. PVC UF 4" MM C-7.5UNID.861.000.60516.60TUB. PVC 2" MM C-7.5UNID.3,591.000.60TUB. PVC UF 6" MM C-7.5UNID.45.900.6027.54FLETE TRANSPORTE POR VOLUMEN S/. 2,325.64

FLETE RURAL TOTAL (S/.)17,656.50

Hoja3S10Pgina :1MUNICIPALIDAD PROVINCIAL DE ACOBAMBAPrecios y cantidades de recursos requeridos por tipoObra1802001CONSTRUCCION SISTEMA DE RIEGO PRESURIZADO LLACCE II ETAPASubpresupuesto001CONSTRUCCION SISTEMA DE RIEGO PRESURIZADO LLACCE - II ETAPAFecha09/08/2008Lugar090201HUANCAVELICA - ACOBAMBA - ACOBAMBACdigoRecursoUnidadCantidadPrecio S/.Parcial S/.Presupuestado S/.MANO DE OBRA0147010002OPERARIOhh187.88704.42830.47830.000147010003OFICIALhh194.86013.83746.31746.850147010004PEONhh645.58542.251,452.581,451.793,029.373,028.64MATERIALES0201000012LUBRICANTE PARA TUBERIA PVCgln0.157638.006.086.180201010002ACCESORIOS DIVERSOS PARA RESERVORIOund1.00001,000.001,000.001,000.000201030002MANGUERA P.E BAJA DENSIDAD C-4m161.10005.00805.50805.500201030003MANGUERA P.E BAJA DENSIDAD 32MM C-6m56.67006.00340.02340.020201050001UNION DOBLE DE POLIETILENO 25MM X 3/4"und9.990012.00119.88119.880201050002UNION DOBLE DE POLIETILENO 32MM X 32MMund3.330014.0046.6246.620201060001TEE POLIETILENO 25MM X 3/4"m6.000011.0066.0066.000201060002TEE POLIETILENO 32MM X 1"und1.000015.0015.0015.000201070001CODO DE POLIETILENO 32MM X 1"und2.000011.0022.0022.000202010005CLAVOS PARA MADERA C/C 3"kg9.74718.0078.0077.950202040010ALAMBRE NEGRO N8kg6.78908.0054.3254.310203020003ACERO CORRUGADO # 3/8"var0.199850.0010.0010.020204000000ARENA FINA (PUESTA EN OBRA)m31.345890.00121.50121.120204180001PRUEBA (DISEO DE MEZCLA)est2.0000250.00500.00500.000204180002PRUEBAS DE CALIDAD DE CONCRETO ROTURAund5.000015.0075.0075.000204190001NIPLE PVC. 1"X2", C-15, ROSCADOund1.00006.006.006.000204200001INSTALACIONm2158.90007.001,112.301,112.300205000003PIEDRA CHANCADA DE 1/2" - 3/4" (PUESTA EN OBRA)m32.768085.00235.45235.280205010016ARENA GRUESA (PUESTA EN OBRA)m31.730085.00147.05147.050207030001TRIPODE METALICO FLEXIBLE 3/4"und9.000050.00450.00450.000207030002TRIPODE METALICO FLEXIBLE 1"und2.000065.00130.00130.000209040001ASPERSOR VYR 60 3/4", BRONCE, SECTORIALund9.0000120.001,080.001,080.000209040002ASPERSOR VYR 65 1", BRONCE, SECTORIALund2.0000200.00400.00400.000209050001SOLVENTE PVC THFgln1.1123250.00277.50278.080213520004TAPA METALICA 0.80X0.80 E= 1/8"und1.0000250.00250.00250.000213540001MATERIAL PROPIO SELECCIONADO A MANOm38.160015.00122.40122.400221000000CEMENTO PORTLAND TIPO I (42.5KG)BOL40.908520.00818.20818.170226030001DEPOSITO DE MATERIALES FUERA DE LA OBRAmes2.000080.00160.00160.000229030002YESO EN BOLSAS DE 25 KG.BOL5.486018.0098.8298.740229130012CINTA TEFLONrll18.40002.5046.0046.000230510080ANILLO DE JEBE 160 mmund1.020024.0024.4824.480230510083ANILLO DE JEBE P/TUBOS DE PVC 3"und1.035024.0024.7224.840230990080WINCHAund0.600065.0039.0039.000232000034FLETE RURALGLB1.00002,000.002,000.002,000.000232000035FLETE TERRESTREGLB1.00005,000.005,000.005,000.000232010001CARTEL DE OBRA INC/INSTALACION Y TRANS.GLB1.0000350.00350.00350.000238000000HORMIGONm30.997585.0085.0084.790239050000AGUAm30.71041.000.710.690243010003MADERA TORNILLOp21.83724.007.367.350243010099PUERTA ENMALLADA CON MARCO DE MADERAund1.0000500.00500.00500.000243510014ESTACAp21.67445.008.358.380243600020ROLLIZO DE EUCALIPTO DE 5"m45.000020.00900.00900.000245010001MADERA TORNILLO INC.CORTE P/ENCOFRADOp2196.90805.00984.55984.540246910004ALAMBRE DE PUAS # 16m200.85005.501,104.681,105.650249880006NIPLE PVC 3/4"x20 CM C-15, ROSCADO NIPLE PVC 3/4"x20 CM C-15, ROSCADO NIPLE PVC 3/4"x20 CM C-15, ROSCAund24.00006.00144.00144.000249880008NIPLE PVC 1/2"x20 CM C-15, ROSCADO NIPLE PVC 3/4"x20 CM C-15, ROSCADO NIPLE PVC 3/4"x20 CM C-15, ROSCAund24.00006.00144.00144.000265890005TAPA METALICA 0.45 X 0.45 X1/8" ESTRIADAund24.000080.001,920.001,920.000266230001LLAVE BAYONETA P.E 3/4"und3.000013.0039.0039.000266230002LLAVE BAYONETA P.E 1"und1.000015.0015.0015.000272000087TUB. PVC PRESION UNION FLEXIBLE 160MM C-5 (Serie 20)m6.18007.0043.2643.260272000090TUB. PVC PRESION UNION FLEXIBLE 90MM C-5 (Serie 20)m7.10705.2036.9736.980272010016VALVULA DE COMPUERTA DE BRONCE 3"und2.000060.00120.00120.000272310012ADAPTADOR PVC SAP 3"und4.00006.0024.0024.000272530093CODO DE 90 PVC SAP 3"und4.000015.0060.0060.000273010039TUBERIA PVC SAP CLASE 7.5 2" x6.00mm103.00006.50669.50670.000273250013ABRAZADERA DE P.E. 63 MM X 3/4und24.00007.00168.00168.000273250015ABRAZADERA DE P.E. 1/2"und24.00007.00168.00168.000277000034UNION UNIVERSAL DE F. GALV.DE 3"und4.000012.0048.0048.000277000035VALVULA ESFERICA DE 1"und2.00007.0014.0014.000277000038VALVULA ESFERICA DE 3/4"und24.000018.00432.00432.000277000040VALVULA ESFERICA DE 1/2"und24.000016.00384.00384.000277040016VALVULA DE ACOPLE RAPIDO 3/4" P.Eund24.000019.00456.00456.000277040018VALVULA DE ACOPLE RAPIDO 1/2" P.Eund24.000019.00456.00456.000277060001GEOMEMBRENA PVC f.e. e= 1mmm2166.845020.003,336.803,336.900293010002UNION PVC SAP ROSCADO 3/4" UNION PVC SAP ROSCADO 3/4" UNION PVC SAP ROSCADO 3/4"pza33.00002.0066.0066.000293010003UNION PVC SAP ROSCADO 1/2" UNION PVC SAP ROSCADO 3/4" UNION PVC SAP ROSCADO 3/4"pza24.00002.0048.0048.0028,415.0228,416.48EQUIPOS0337010001HERRAMIENTAS MANUALES%MO113.53113.530337540001MIRAS Y JALONEShm4.494210.0044.9045.440348330093BOMBA MANUAL PARA PRUEBA DE TUBERIAGLB1.0000200.00200.00200.000349190001TEODOLITOhm4.404245.00198.00198.190349880002NIVEL TOPOGRAFICOhm3.000050.00150.00150.000399010001PLANCHA COMPACTADORAhm15.453218.00278.10278.21984.53985.37TotalS/.32,428.9132,430.49S/.32,430.49La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizandoFecha : 16/10/2008" "07":"45":"49 PM