tarea 2 c

Post on 07-Dec-2015

214 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

tarea 2 c

TRANSCRIPT

PROYECTO:

UBICACIÓN:

PROPIETARIO.

ESTIMACION No. 02 DEL 20 DE MARZO AL 30 DE ABRIL DE 2013

FECHA 6 DE MAYO DE 2013

ELABORO:

No. DESCRIPCION UNIDAD CANT.

1.0 PRELIMINARES GLOBAL 1.002.0 EXCAVACIONES Y RELLENOS GLOBAL 1.003.0 CIMENTACION AISLADA GLOBAL 1.004.1 COLUMNAS PRIMER NIVEL/ LOCALES EXISTENTES ML 14.254.2 REFUERZO DE LOSA DE ENTREPISO/ JOIST METALICOS ML 35.604.3 COLUMNAS SEGUNDO NIVEL / DE METAL Y MADERA ML 128.504.4 COLUMNAS TERCER NIVEL ML 64.255.1 ESTRUCTURA DE CONCRETO PRIMER NIVEL ML 55.005.2 ESTRUCTURA DE CONCRETO SEGUNDO NIVEL ML 211.525.3 ESTRUCTURA DE CONCRETO TERCER NIVEL ML 177.726.1 VIGAS EN PUENTE ML 61.606.2 LOSA EN PUENTE M2 59.156.3 NIVELACION DE LOSA EN SEGUNDO NIVEL M2 671.42

TOTALES

PROPIETARIO

DEL 20 DE MARZO AL 30 DE ABRIL DE 2013

PRECIO TOTAL AVANCE EJECUTADO AVANCE EJECUTADO UNITARIO LPS. ACUMULADO % PERIODO

CANT. TOTAL CANT.

104,892.08 104,892.08 1.00 104,892.08 100.00 0.00 40,016.40 40,016.40 0.65 26,010.66 65.00 0.35 41,907.03 41,907.03 0.25 10,476.76 25.00 0.45

871.78 12,422.87 7.45 6,494.76 52.28 6.80 2,099.73 74,750.39 0.00 - - 21.45 3,574.01 459,260.29 30.00 107,220.30 23.35 63.20 3,574.01 229,630.14 14.00 50,036.14 21.79 0.00 3,729.01 205,095.72 15.00 55,935.20 27.27 20.00 201.62 42,646.66 0.00 - - 0.00 221.72 39,404.08 0.00 - - 0.00 2,818.58 173,624.53 11.00 31,004.38 17.86 23.45 2,237.92 132,372.97 0.00 - - 0.00 411.97 276,604.90 55.30 22,781.94 8.24 100.00

1,832,628.04 414,852.21 22.64

ELABORO : REVISO Y APROBO :

Pagina 01

AVANCE EJECUTADO POR EJECUTAR PERIODO % EJECUTADO FINAL %

TOTAL CANT TOTAL - - 0.00 - - 14,005.74 35.00 0.00 - - 18,858.16 45.00 0.30 12,572.11 30.00 5,928.10 47.72 0.00 - - 45,039.21 60.25 14.15 29,711.18 39.75

225,877.43 49.18 35.30 126,162.55 27.47

- - 50.25 179,594.00 78.21

74,580.26 36.36 20.00 74,580.26 36.36

- - 211.52 42,646.66 100.00

- - 177.72 39,404.08 100.00

66,095.70 38.07 27.15 76,524.45 44.07

- - 59.15 132,372.97 100.00

41,197.00 14.89 516.12 212,625.96 76.87

491,581.61 26.82 926,194.22 50.54

REVISO Y APROBO :

top related