t001 2014 · contrataciÓn de estudios y proyectos t001-2014 . informe n° 3 . evaluacion del...
Post on 30-Oct-2020
4 Views
Preview:
TRANSCRIPT
CCCOOONNNTTTRRRAAATTTAAACCCIIIÓÓÓNNN DDDEEE EEESSSTTTUUUDDDIIIOOOSSS YYY PPPRRROOOYYYEEECCCTTTOOOSSS TTT000000111---222000111444
EEETTTAAAPPPAAA 333
MMMOOODDDEEELLLAAACCCIIIOOONNN HHHIIIDDDRRROOOLLLÓÓÓGGGIIICCCAAA MMMOOODDDEEELLLAAACCCIIIOOONNN HHHIIIDDDRRRAAAUUULLLIIICCCAAA
PPPLLLAAANNN PPPRRREEELLLIIIMMMIIINNNAAARRR DDDEEE OOOBBBRRRAAASSS
IIINNNGGG... EEEDDDUUUAAARRRDDDOOO RRROOOUUUDDDEEE
NNNOOOVVVIIIEEEMMMBBBRRREEE 222000111444
T001
2014
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014
INFORME N° 3
EVALUACION DEL FUNCIONAMIENTO DEL SISTEMA DE
ESCURRIMIENTO, PROPUESTA DE PLAN DE OBRAS Y
DISEÑOS HIDRAULICOS PRELIMINARES
Ing. Eduardo A. Roude
NOVIEMBRE 2014
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
2
TABLA DE CONTENIDOS
1 INTRODUCCIÓN .................................................................................................................... 3
2 CONTENIDO DEL PRESENTE INFORME......................................................................... 4
3 MODELACION HIDROLÓGICA ........................................................................................... 4
4 MODELACION HIDRAULICA CANALES SALTO GRANDE Y TOTORAS .................... 6
5 PROPUESTA DE PLAN DE OBRAS ................................................................................... 8
6 ANÁLISIS DE LA INFLUENCIA DEL PROYECTO DE DEFENSA DE BUSTINZA ..... 13
ANEXO I: Modelación Hidrológica
ANEXO II: Modelación Hidráulica
ANEXO III: Análisis de transfluencia canal Totoras al canal Salto Grande
ANEXO IV: Diseño hidráulico preliminar derivación canal Lassaga
ANEXO V: Computo de excavación ampliación canal Totoras
ANEXO VI: Resultados numéricos de la simulación hidrológica e hidráulica
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
3
1 INTRODUCCIÓN
El Comité de Cuencas Arroyo Totoras, Canales Salto Grande y Serodino ha
contratado la realización del presente trabajo con el objeto de identificar obras que
permitan minimizar los impactos negativos generados por las lluvias en la cuenca,
mitigando el anegamiento de áreas rurales y disminuyendo el riesgo de
inundación en las localidades de la jurisdicción del Comité de Cuencas.
Durante la Etapa 1 se realizó un reconocimiento de las zonas vulnerables que
fueron identificadas previamente mediante la interpretación de imágenes
satelitales. Con estos elementos, se formuló un diagnóstico inicial descriptivo de
las zonas de mayor vulnerabilidad a partir del cual se definieron las prioridades en
materia de relevamientos topográficos a realizar para la definición de acciones
destinadas a mejorar el funcionamiento del sistema de escurrimiento superficial.
Durante la Etapa 2 se recopilaron antecedentes de proyectos existentes, se
realizaron observaciones puntuales de campo en algunos de los lugares donde se
verifican problemas de anegamiento relevantes y se formuló un diagnóstico del
comportamiento del sistema de escurrimiento de toda la cuenca, con especial
atención en los sectores con problemas de inundación más frecuentes e
identificando el origen de la problemática de cada sector.
De acuerdo con los términos de referencia de la contratación, durante esta
Tercera Etapa del trabajo corresponde evaluar la respuesta del sistema de
escurrimiento frente a lluvias de distintas recurrencias, determinando los caudales
que circularán por diferentes puntos de la cuenca, estimar las condiciones
hidráulicas en que circularían esos caudales por los principales canales que
componen la red de escurrimiento en su estado actual, desarrollar proyectos
hidráulicos destinados a mejorar la capacidad de conducción de los canales
analizados y proponer al Comité un plan preliminar de obras destinadas a mejorar
la eficiencia hidráulica de la red de drenaje principal del área de su jurisdicción.
Finalmente, en la última etapa del trabajo, se identificarán las áreas que por su
pendiente topográfica, características edafológicas y modalidades de uso
presenten riesgos de erosión, resultando prioritarias para la aplicación de medidas
agro hidrológicas de manejo.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
4
2 CONTENIDO DEL PRESENTE INFORME
En este tercer informe se presentan:
a) La modelación hidrológica de la cuenca mediante la cual que se han estimado
los caudales posibles de generar por lluvias de diferentes intensidades en
distintos puntos de interés de las cuencas de los canales Totoras y sus afluentes,
Salto Grande y Serodino en su estado actual;
b) La modelación hidráulica de los canales Salto Grande y Totoras en su estado
actual, estimando su comportamiento frente a los caudales determinados
mediante la modelación hidrológica indicada en el punto anterior;
c) Una propuesta de plan de obras destinadas a atenuar la intensidad y
frecuencia de inundaciones en los sectores más vulnerables identificados con sus
correspondientes diseños hidráulicos preliminares basados en la información de
campo disponible;
d) Un análisis del proyecto de control de inundaciones de la localidad de Bustinza
preparado por la Dirección de Protección Urbana contra inundaciones de la
Secretaría de Aguas y formulación de propuesta de obras complementarias.
3 MODELACION HIDROLÓGICA
3.1 Modelo Utilizado
Se utilizó el modelo Hydrologic Modeling System del Hydrologic Engineering
Center (HEC-HMS) desarrollado por el US Army Corps of Engineers, software de
uso libre y de probada capacidad para modelar cuencas del tipo de la estudiada.
Esta herramienta computacional permite simular la respuesta hidrológica de una
cuenca determinando los caudales que circularán en los puntos de interés luego
de producirse lluvias de diferente intensidad y distribución temporal.
Para implementar el modelo, se definieron las subcuencas interiores mediante el
análisis de las cartas IGM de la zona, el análisis de imágenes satelitales
obtenidas con posterioridad a episodios de lluvia de diferentes intensidades y la
interpretación de información de campo suministrada por referentes locales que
aportaron abundantes datos sobre el comportamiento del agua en superficie.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
5
Con esta información se implementó un Sistema de Información Geográfico de
toda la cuenca, en el que se demarcaron las líneas de escurrimiento principales y
secundarias y los límites que definen las áreas de aporte a cada punto de interés.
3.2 Escenarios y situaciones modeladas
El sector modelado comprende las cuencas de los canales Totoras y sus
tributarios (Las Parejas Norte, Las Parejas Sur, Los Leones, Lassaga y Larguía),
Salto Grande y Serodino. En el Plano N°1 se presenta el esquema de división en
subcuencas utilizado para la modelación hidrológica.
Mediante el modelo se estimó la respuesta hidrológica de las tres cuencas
analizadas frente a episodios de lluvia correspondientes a las recurrencias de 2, 5
y 10 años. Las tormentas fueron sintetizadas a partir de las curvas IDF utilizando
el método de bloques alternos y las duraciones fueron adoptadas en base a los
tiempos de concentración de cada una de las cuencas modeladas.
3.3 Parámetros y métodos de cálculo utilizados
Los parámetros empleados para la resolución de las subrutinas de cálculo que se
componen el modelo fueron estimados en base a características físio-
morfológicas de la cuenca, deducidas de cartas IGN, cartas de suelos y datos
geométricos obtenidos de proyectos de canalizaciones ejecutadas con
anterioridad por diferentes reparticiones provinciales. A fin de compatibilizar y
hacer comparables los resultados con otros estudios existentes, se utilizaron los
valores de rugosidad de canales e infiltración usualmente aplicados en los
cálculos que realiza la Secretaría de Aguas del MASPyMA en la zona centro sur
de la Provincia de Santa Fe.
Los métodos y rutinas de cálculo incorporadas al modelo utilizados para la
modelación fueron los siguientes:
Precipitaciones
Se utilizaron curvas IDF interpoladas a partir de curvas datos de las estaciones
Marcos Juárez y Oliveros aplicando los valores de abatimiento recomendados por
V.T.Chow en función del tamaño de la cuenca.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
6
Infiltración y escorrentía
Para el cálculo de las perdidas por infiltración y determinación de la lluvia neta
que genera escurrimientos en cada evento se utilizó el método de Curva Número,
del Servicio de Conservación de Suelos de los EEUU.
Transformación lluvia caudal
Se utilizó la rutina del hidrograma unitario del Servicio de Conservación de Suelos
de los EEUU, método generalmente aceptado cuando no se dispone de
mediciones para calibración del modelo.
Tiempo de concentración
Para el cálculo del tiempo de concentración se utilizó la fórmula de Onda
Cinemática desarrollado por Morgali y Linsley.
En el Anexo I se presentan las curvas de intensidad – frecuencia y duración
empleadas para sintetizar las tormentas utilizadas en las diferentes simulaciones
realizadas, los parámetros de cálculo y los resultados obtenidos de la modelación
hidrológica.
3.4 Resultados presentados
En el Anexo I se presentan los resultados obtenidos de las siguientes
simulaciones realizadas con el modelo hidrológico:
Cuenca del Canal Totoras y tributarios para las recurrencias de 2, 5 y 10
años.
Cuenca del Canal Salto Grande para las recurrencias de 2, 5 y 10 años.
Cuenca del Canal Serodino para las recurrencias de 2, 5 y 10 años.
4 MODELACION HIDRAULICA CANALES SALTO GRANDE Y TOTORAS
4.1 Modelo Utilizado
Se utilizó el modelo River Analysis System, del Hydrologic Engineering Center
(HEC-RAS) desarrollado por el US Army Corps of Engineers, software de uso
libre de amplia aceptación y probada eficiencia. Esta herramienta computacional
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
7
permite simular el comportamiento hidráulico del agua que circula en canales y
superficies inundadas y obtener los niveles que se alcanzarán para diferentes
caudales.
4.2 Escenarios y situaciones modeladas
El modelo hidráulico se utilizó para analizar el comportamiento de los canales
Totoras y Salto Grande en la situación en que circularían de los caudales
máximos calculados mediante la modelación hidrológica descripta en el capítulo
anterior, para episodios de lluvia correspondientes a lluvias de 2, 5 y 10 años de
recurrencia.
En base a los niveles de agua determinados de esta forma se establecieron las
zonas de la red de escurrimiento que presentan mayores deficiencias frente a un
mismo evento meteorológico. Posteriormente, se simularon modificaciones de los
canales y sus obras de arte a fin de determinar el impacto posible de generar
mediante diferentes alternativas de sección, obteniendo así los diseños
hidráulicos preliminares necesarios para la formulación de los proyectos
ejecutivos de las obras que se decida ejecutar. Para la preparación de los
proyectos ejecutivos de las obras que se decida ejecutar resultará recomendable
realizar estudios topográficos actualizados de secciones de canal y estado de
conservación de las alcantarillas existentes.
4.3 Información básica utilizada
Para la implementación del modelo hidráulico, se utilizó la siguiente información:
Canal Totoras, tramo Cañada Carrizales – Ruta 34: Relevamiento
topográfico realizado por el Comité de Cuenca durante el presente año.
Canal Totoras, tramo Ruta 34 – Km 40: Proyecto de obras ejecutadas por
la ex Dirección Provincial de Obras Hidráulicas en el año 1998.
Canal Salto Grande: Estudio topográfico realizado por la Secretaría de
Aguas durante el año 2006 y proyecto de ampliación de puentes año 2012.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
8
4.4 Resultados presentados
En el Anexo II se presentan los resultados obtenidos de las simulaciones
realizadas para las siguientes situaciones:
Canal Totoras, tramo Cañada Carrizales – Ruta 34:
Situación actual con secciones de relevamiento topográfico reciente.
Base del canal ampliada en 2 metros.
Base del canal ampliada en 4 metros.
Canal Salto Grande
Secciones hidráulicas y de alcantarillas según relevamiento 2006
Secciones hidráulicas de base 5 metros, con alcantarillas y rasantes de
fondo de canal definidas en el proyecto licitado en 2012.
5 PROPUESTA DE PLAN DE OBRAS
En base al diagnóstico presentado en el informe N° 2, en el que se identificaron
las zonas que presentan problemas generados por deficiencias de la red de
drenaje conformada por los canales principales y los resultados de la modelación
hidrológica e hidráulica de la cuenca presentados en este informe, se propone un
plan de obras, a ejecutar en el corto plazo, que permitirá mejorar la capacidad de
escurrimiento general de toda el área comprendida por la jurisdicción del Comité.
Aunque las obras que se proponen no constituyen una solución definitiva a todos
los problemas de drenaje del área atendida por el Comité, han sido seleccionadas
por las mejoras que generarán en la situación del escurrimiento de toda el área.
En los sectores ubicados en las partes inferiores de las cuencas la situación se
verá mejorada debido a que se incrementará la capacidad de conducción de los
canales que las atraviesan, disminuyendo la frecuencia de los desbordes que
generan anegamientos y transfluencias, que afectan a algunas poblaciones como
Salto Grande y Serodino y a amplias superficies aledañas a los canales.
Las áreas superiores de las cuencas también se verán mejoradas con las obras
propuestas para esta primera etapa debido a que con ellas se establecerán las
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
9
condiciones necesarias para la realización de otras obras mediante las que se
podrá dar solución a problemas puntuales de anegamiento de establecimientos
rurales y disminuir el riesgo de inundación de localidades como Bustinza y
Colonia Médici.
En el apartado siguiente se presentan los fundamentos y objetivos en que se basa
la selección de las obras que integran el plan propuesto.
5.1 Rectificación del tramo de salida del canal Lassaga
Consiste en la modificación de la traza del tramo final del canal Lassaga, a fin de
darle salida directa a la Cañada Carrizales, desvinculándolo del canal Secundario
Totoras. En el Plano N° 2 se presenta un plano de ubicación de la traza
propuesta.
La ejecución de esta obra mejorará las condiciones de circulación de todo el canal
Lassaga - Bajo del Árbol, debido a que su salida se independizará de los niveles
de agua que presente el canal Totoras, evitando la obstrucción que se produce
cuando su sección está colmada con el agua que proviene de su amplia cuenca,
de más de 100.000 Ha. Al mismo tiempo, se mejorarán las condiciones de
escurrimiento del Canal Totoras debido a que su tramo final dejará de recibir el
aporte liquido generado en las casi 20.000 hectáreas drenadas por el canal
Lassaga.
Para la preparación del proyecto ejecutivo de esta obra será necesario realizar
estudios topográficos que permitan determinar la traza más conveniente y acordar
con los propietarios las correspondientes autorizaciones de paso y cesiones de
los espacios necesarios. No obstante, en el Anexo V se presenta un diseño
preliminar de la sección de canal necesaria para evacuar un caudal equivalente al
calculado mediante la modelación hidrológica para eventos de recurrencia 2 años,
que ha sido realizado en basado a geométricos obtenidos de imágenes
satelitales.
5.2 Ampliación del canal Totoras
En el Anexo IV se presenta un análisis de la dinámica del escurrimiento superficial
del tramo comprendido entre la Ruta Nac. N° 34 y la Ruta Prov. N° 91 que ha sido
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
10
realizado mediante el procesamiento de imágenes que muestran el
comportamiento del sistema luego de producidas lluvias normales y altas. En el
mismo se observa que en situaciones de aguas altas se produce una derivación
de los caudales que exceden la capacidad del canal Totoras hacia las cuencas de
los canales Salto Grande y Serodino.
Aunque la falta de mediciones y de topografía de detalle del sector analizado
impide cuantificar la magnitud de estas transfluencias entre cuencas, el tiempo de
llegada de los picos de caudal que inundan la localidad de Salto Grande resulta
indicativo de que ambos fenómenos se encuentran altamente relacionados.
A fin de comprobar esta hipótesis, utilizando los resultados de la modelación
hidrológica de ambas cuencas se ha realizado una comparación entre los tiempos
de ocurrencia del máximo de caudal del canal Totoras en el cruce de la Ruta 34 y
el máximo de caudal del canal Salto Grande a la altura de la localidad. El
resultado indica que para el ensayo correspondiente a la recurrencia de 10 años
el pico del Totoras se produce entre las 24 y 36 horas posteriores al pico
calculado por modelación del canal Salto Grande.
El desfasaje temporal entre ambos hidrogramas resulta significativamente
coincidente con el comportamiento observado en el canal Salto Grande que
según comentarios de observadores locales generalmente presenta un primer
pico (que sería generado por el agua proveniente de la cuenca propia del canal) y
luego un segundo pico de mayor intensidad que sería el generado por las aguas
provenientes de la alta cuenca que ingresan a través de las cunetas de la Ruta
Prov. N° 27. En el Anexo IV se presenta la superposición de hidrogramas que
explicaría el fenómeno.
En consecuencia, a fin de mejorar las condiciones generales de drenaje del
sistema se considera conveniente ampliar la capacidad de conducción del Canal
Totoras en el tramo comprendido entre su desembocadura y la confluencia del
canal Bajo Los Leones. Para ello, se propone incrementar la sección del canal
hasta dotarlo de la capacidad necesaria para conducir sin desbordes caudales
equivalentes a los que pueden circular por las alcantarillas en su condición de
diseño, es decir con niveles de agua que no superen el dintel de los pórticos.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
11
Los resultados de la simulación indican que el incremento de secciones propuesto
no generará impactos significativos aguas abajo debido a que las alcantarillas
actuarán como estructuras de control, limitando el caudal que circulará a lo largo
del canal.
Mediante el modelo hidráulico se simuló el comportamiento del canal Totoras con
dos alternativas diferentes de ampliación de la base de fondo, manteniendo la
cota de rasante actual y con el alcantarillado existente. Los resultados de la
modelación indican que con esta modificación será posible incrementar la
capacidad de conducción del canal provocando los siguientes efectos favorables:
Disminución de la frecuencia de los desbordes que anegan las zonas
aledañas durante episodios de lluvia de mediana intensidad.
Mejora de la capacidad de incorporación de caudales a lo largo de su
recorrido. mejorando la circulación en bajos afluentes que normalmente no
pueden descargar al canal principal por estar colmada su capacidad de
conducción.
Disminución de la magnitud de las transfluencias de caudal que fluyen
hacia el canal Salto Grande causando inundaciones en la localidad
homónima.
5.3 Movimiento de suelo y ampliación de puentes canal Salto Grande
La modelación hidráulica del canal Salto Grande fue utilizada para verificar las
condiciones de escurrimiento de dos escenarios geométricos y tres situaciones de
lluvia diferentes. El primer escenario utilizó la geometría obtenida del relevamiento
realizado en el año 2006 y el segundo simuló la condición que podría lograrse
mediante la ampliación de los puentes propuesta en el proyecto licitado en 2012,
a la que se sumó una ampliación a 5 metros de la base de fondo del canal. El
comportamiento hidráulico de las dos geometrías fue evaluado para los caudales
calculados mediante el modelo hidrológico para las recurrencias de 2, 5 y 10
años.
Los resultados de la verificación indican que en la situación actual, el canal es
capaz de conducir caudales aproximadamente iguales a los generados en la
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
12
cuenca propia para la recurrencia 2 años, sin aportes adicionales por
transfluencias. En la segunda condición, es decir con ampliación de puentes y
secciones hidráulicas, se logra una significativa mejora de la capacidad de
conducción, con disminuciones del nivel del pelo de agua que permiten la
conducción de caudales comprendidos entre las recurrencias 5 y 10 años según
los resultados de la modelación hidrológica
Para la ejecución de esta obra se recomienda reformular el proyecto ejecutivo
licitado en el año 2012, para lo cual será necesario realizar un nuevo relevamiento
topográfico que permita determinar el volumen de excavación a ejecutar debido a
que la sección relevada en 2006 fue modificada por obras realizadas por
administración por la Comuna de Salto Grande.
Complementariamente a la ampliación de la sección y los puentes deberá
readecuarse el terraplén que bordea el canal por su margen este, incrementando
su nivel hasta hacerlo capaz de contener los desbordes que se producirían con la
nueva configuración hidráulica en caso de producirse lluvias de recurrencias
mayores y construir protecciones de talud coincidentes con las acometidas de los
bajos que ingresan por el oeste a fin de evitar procesos erosivos que puedan
comprometan la estabilidad del terraplén.
5.4 Mitigación de riesgo de inundaciones en Colonia Médici
El área urbana y sectores rurales aledaños a Colonia Médici resultan
frecuentemente anegados luego de la ocurrencia de lluvias de mediana
intensidad. Debido a que el origen del problema se encuentra estrechamente
relacionado con la modificación del escurrimiento superficial causada por rutas
provinciales se suscribió un acuerdo entre el M.A.S.P.yM.A. y la Dirección
Provincial de Vialidad en la que se acordaron las características técnicas de una
propuesta de obras destinadas a mitigar el problema de inundaciones en Colonia
Médici y a mejorar la transitabilidad de las Rutas Provinciales N° 19S y 28S.
La propuesta fue analizada a solicitud del Comité, concluyendo que el proyecto
resulta factible y que no causará impactos aguas abajo. Por este motivo se
recomienda su ejecución con las modificaciones de sección de alcantarillado
propuestas en el documento presentado oportunamente.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
13
6 ANÁLISIS DE LA INFLUENCIA DEL PROYECTO BUSTINZA
6.1 Antecedentes
En cumplimiento de lo indicado en la nota aclaratoria complementaria enviada en
oportunidad de realizarse el concurso para la contratación T001/2014, en este trabajo se
incluye una evaluación de la influencia que tendrá el proyecto formulado por el
MASPyMA con el objeto de disminuir la intensidad y frecuencia de las inundaciones que
afectan a la localidad de Bustinza. El análisis que se presenta a continuación fue
formulado en base a los siguientes elementos:
Documentación del proyecto formulado por el MASPyMA, aportada por el Comité.
Observaciones in situ realizadas en compañía de integrantes del Comité.
Análisis de dinámica hídrica general de la cuenca del Arroyo Totoras realizado
como parte de la contratación de estudios T001/2014
Estudio hidráulico del comportamiento del canal Totoras en su situación actual y
con las ampliaciones de sección propuestas.
6.2 Origen del problema
La planta urbana de la localidad de Bustinza, ubicada al norte de la Ruta Provincial N°91,
se encuentra en las proximidades de la unión de dos bajos naturales que escurren en
dirección general sudoeste – noreste y que una vez unificados continúa paralelo al canal
Totoras, hasta incorporarse al Canal Salto Grande a través de la cuneta de un camino
transversal a la Ruta 27. Debido al tamaño de la cuenca de aporte que colectan ambos
bajos y la relativamente elevada pendiente que presentan, el agua aportada genera
frecuentes anegamientos en la localidad de Bustinza.
Solución propuesta por el MASPyMA
A fin de reducir el riesgo de inundaciones a la planta urbana de Bustinza, el MASPyMA
formuló un proyecto consistente en la construcción de un sistema de canales
interceptores mediante los cuales sería posible derivar el agua conducida por los bajos
indicados al canal Totoras, evitando que ingresen al casco urbano. El sistema está
compuesto por tres canales transversales al escurrimiento, con dirección sur – norte, que
de acuerdo con los cálculos incluidos en el proyecto analizado ha sido diseñado para
transportar un caudal de 16 m3/seg.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
14
Se plantea la ejecución de una primera etapa, en la cual se construiría una canalización
de 9.180m de longitud, que requiere un volumen de excavación: 76.600m3 y un relleno y
alteo de caminos de 25.000m3.
6.3 Impacto sobre el sistema Canal Totoras – Canal Salto Grande.
Mediante los estudios de dinámica hídrica, la modelación hidrológica realizada y la
modelación hidráulica, se estableció que el canal Salto Grande recibe un caudal mayor
del que está en condiciones de transportar luego de producirse lluvias que superan la
intensidad correspondiente a TR 2 años. Dado que el proyecto propuesto por el
MASPyMA permite la reducción del aporte de un sector de cuenca de aproximadamente
23,8 Km2, que representan el 11 % de la cuenca total del Canal Salto Grande, se
considera que la ejecución del proyecto significará una mejora para la cuenca drenada
por este último.
En cuanto a los efectos que generará la obra sobre el Canal Totoras, el análisis
hidrológico indica que el caudal a derivar para la recurrencia de 10 años es del orden de
los 9 m3/seg. Este incremento de caudal podrá ser conducido sin inconvenientes
mediante la ampliación de base propuesta.
6.4 Conclusiones
En base a lo expuesto, se considera que el proyecto de mitigación de inundaciones de
Bustinza propuesto por el MASPyMA resultará viable, estableciendo como condición la
ejecución de la ampliación de la sección del canal Totoras propuesta en otros capítulos
de este informe. Asimismo, la ejecución de esta obra generará un impacto favorable
sobre la cuenca del Canal Salto Grande, disminuyendo el riesgo de inundaciones en la
localidad homónima.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
15
ANEXO I
MODELACION HIDROLOGICA
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
16
PRECIPITACIONES y TORMENTAS DE DISEÑO
Se utilizaron curvas IDF interpoladas a partir de curvas datos de las estaciones Marcos Juárez y
Oliveros (Ing. Ricardo Giacossa para el INTA)
Polinomio de interpolación:
PCDG = 0,41 * POLI + 0,59 * PMJZ Valores de curvas IDF:
Grafica de curvas IDF:
Duracionmin. TR 2 TR 5 TR 10 TR 25 TR 50 TR 10010 94.9 114.8 126.7 136.9 149.1 157.615 80.9 99.4 110.5 121.4 135 145.420 74.3 92.6 104 115 129.7 141.330 59.9 77.1 88.4 99.4 114 125.845 45.5 60.7 70.8 80.4 93 102.560 37.7 50.3 54.3 65.6 75.1 82.190 28.2 37.1 42.8 47.8 53.7 58.2
120 22.4 29.7 34.3 38.4 43.5 47.2180 16.3 21.7 25 27.9 31.6 34.1360 9.9 13.3 15.6 17.6 20.3 22.2720 5.8 8.1 9.6 11 12.8 14.21440 3.5 4.4 5.2 5.8 6.7 7.42880 1.9 2.5 2.9 3.3 3.9 4.34320 1.3 1.8 2.1 2.4 2.8 3.2
Intensidad (mm/h) para Recurrencia
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
17
TORMENTAS DURACIÓN 24 HORAS – TR 2 AÑOS
P (mm) Pa (mm) Δ P B.Alt
2.0 40.9 32.6 32.6 1.8
4.0 49.6 39.6 6.9 2.1
6.0 55.5 44.3 4.7 2.6
8.0 60.1 47.9 3.7 3.7
10.0 63.9 51.0 3.1 6.9
12.0 67.2 53.6 2.6 32.6
14.0 70.2 56.0 2.3 4.7
16.0 72.8 58.1 2.1 3.1
18.0 75.2 60.0 1.9 2.3
20.0 77.4 61.8 1.8 1.9
22.0 79.5 63.4 1.7 1.7
24.0 81.5 65.0 1.5 1.5
65.0
T(Hs)TR 2
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
18
TORMENTAS DURACIÓN 24 HORAS – TR 5 AÑOS
P (mm) Pa (mm) Δ P B.Alt
2.0 53.5 42.6 42.6 2.5
4.0 65.4 52.2 9.5 3.0
6.0 73.6 58.7 6.5 3.7
8.0 80.0 63.8 5.1 5.1
10.0 85.4 68.1 4.3 9.5
12.0 90.0 71.8 3.7 42.6
14.0 94.2 75.1 3.3 6.5
16.0 97.9 78.1 3.0 4.3
18.0 101.3 80.8 2.7 3.3
20.0 104.5 83.3 2.5 2.7
22.0 107.4 85.7 2.3 2.3
24.0 110.2 87.9 2.2 2.2
87.9
T(Hs)TR 5
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
19
TORMENTAS DURACIÓN 24 HORAS – TR 10 AÑOS
T(Hs)
P (mm) Pa (mm) Δ P B.Alt
2.0 61.3 48.9 48.9 3.1
4.0 75.5 60.3 11.3 3.6
6.0 85.3 68.1 7.8 4.5
8.0 93.1 74.2 6.2 6.2
10.0 99.5 79.4 5.2 11.3
12.0 105.1 83.9 4.5 48.9
14.0 110.1 87.9 4.0 7.8
16.0 114.6 91.5 3.6 5.2
18.0 118.8 94.8 3.3 4.0
20.0 122.6 97.8 3.1 3.3
22.0 126.2 100.7 2.8 2.8
24.0 129.5 103.3 2.7 2.7
103.3
TR 10
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
20
FORMULAS Y PARAMETROS UTILIZADOS PARA LA MODELACION
Pérdidas por infiltración
Se utilizó el método del SCS (Número de Curva)
Se adoptó un valor uniforme para toda la cuenca CN = 69 al que le corresponde una abstracción
inicial de Ia = 22.8 mm.
Factor de Rugosidad de Manning
Flujo en cuneta y/o canales no revestidos: n= 0.035
Flujo en praderas y campos cultivados: n= 0.30
Flujo en bajos con sección rectificadas: 0.06
Cálculo del Tiempo de Concentración
Método de Onda Cinemática desarrollado por Morgali y Linsley:
L = Longitud del recorrido desde el punto más alejado de la cuenca
n = Factor de rugosidad de Manning ponderado según superficie recorrida
S = Pendiente del recorrido desde el punto más alejado de la cuenca.
I = Intensidad de lluvia correspondiente al tiempo de concentración.
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
21
DIAGRAMA TOPOLOGICO CUENCA CANALES TOTORAS – LASSAGA – LARGUIA – LAS PAREJAS – LOS LEONES
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
22
Superficie, longitudes de cauce y pendientes de las sub-cuencas analizadas
N-HMS S (KM2) Nodo Salida L Pradera L.Cauce L C.P (m) C.Max C.Min HT (m) I (m/m)
LSN-F C099 23.7 J099 2.7 5.4 8.1 36.0 24.0 12.0 0.00148LSN-100 C100 25.9 J100 8.0 8.0 46.0 36.0 10.0 0.00125LSN-101 C101 51.8 J101 5.7 4.8 10.5 56.0 46.0 10.0 0.00095LSN-102 C102 9.0 J102 2.5 1.5 4.0 73.0 58.0 15.0 0.00375LSN-103 C103 12.8 J103 3.7 1.6 5.3 87.0 67.0 20.0 0.00377LSN-104 C104 13.4 J104 5.1 3.0 8.1 108.0 80.0 28.0 0.00346LSN-105 C105 14.1 J106 8.3 0.0 8.3 106.0 76.0 30.0 0.00359LSN-106 C106 9.4 J106 6.8 0.0 6.8 104.0 76.0 28.0 0.00412LSN-107 C107 10.2 J107 6.8 1.1 7.8 97.0 76.0 21.0 0.00268LSN-108 C108 6.4 J108 3.1 3.5 6.6 98.0 77.0 21.0 0.00320LSN-109 C109 15.2 J102 6.6 2.0 8.6 86.0 59.0 27.0 0.00314LSN-110 C110 24.4 J102 11.6 0.8 12.4 90.0 58.0 32.0 0.00258LSN-111 C111 3.7 J111 2.2 1.2 3.4 98.0 87.0 11.0 0.00323LSS-201 C201 23.3 J201 10.0 3.2 13.2 45.0 24.0 21.0 0.00159LRG-301 C301 41.7 J401 10.1 1.8 11.9 45.0 25.0 20.0 0.00168LRG-302 C302 14.9 J302 5.9 5.9 58.0 43.0 15.0 0.00254LRG-303 C303 13.2 J303 7.2 7.2 70.0 58.0 12.0 0.00167LRG-304 C304 29.1 J304 12.1 12.1 75.0 53.0 22.0 0.00182LRG-305 C305 24.5 J305 4.9 7.1 12.0 75.0 48.0 27.0 0.00225TTF-001 T400 40.4 J400 2.0 4.7 6.7 28.0 23.0 5.0 0.00075TTR-401 C401 28.9 J401 8.7 8.7 42.0 25.0 17.0 0.00197TTR-402 C402 14.9 J402 1.9 1.9 3.8 48.0 42.0 6.0 0.00158TTR-403 C403 61.6 J403 4.9 3.1 8.0 59.0 48.0 11.0 0.00138TTR-404 C404 68.1 J404 4.2 1.8 6.0 73.0 59.0 14.0 0.00233TTR-405 C405 20.4 J404 10.5 10.5 76.0 59.0 17.0 0.00162TTR-406 C406 21.3 J406 5.1 0.8 5.9 86.0 73.0 13.0 0.00220TTR-407 C407 7.5 J407 3.1 3.1 98.0 79.0 19.0 0.00613TTR-408 C408 37.6 J408 3.8 5.7 9.5 104.0 80.0 24.0 0.00253TTR-410 C410 31.6 J410 9.7 9.7 107.0 86.0 21.0 0.00216TTR-411 C411 19.1 J411 7.1 7.1 107.0 86.0 21.0 0.00296TTR-412 C412 11.9 J412 9.1 9.1 106.0 79.0 27.0 0.00297TTR-413 C413 22.5 J413 10.2 10.2 103.0 76.0 27.0 0.00265LPN501 C501 23.0 J501 5.6 5.6 108.0 89.0 19.0 0.00339LPN502 C502 16.2 J502 4.0 4.0 107.0 96.0 11.0 0.00275LPN503 C503 32.6 J503 15.1 15.1 114.0 98.0 16.0 0.00106LPN504 C504 35.9 J503 11.5 2.4 13.9 115.0 102.0 13.0 0.00094LPS601 C601 7.5 J501 2.3 3.7 6.0 108.0 89.0 19.0 0.00317LPS602 C602 7.3 J602 4.5 1.1 5.6 112.0 95.0 17.0 0.00304LPS603 C603 33.8 J603 11.3 11.3 117.0 97.0 20.0 0.00177LPS604 C604 27.3 J604 7.7 7.7 118.0 107.0 11.0 0.00143LLN701 C701 27.7 J408 3.2 5.5 8.7 108.0 80.0 28.0 0.00322LLN702 C702 19.5 J702 13.4 13.4 118.0 107.0 11.0 0.00082LLN703 C703 12.7 J702 6.4 6.4 114.0 99.0 15.0 0.00234LLN704 C704 27.4 J702 8.6 8.6 116.0 98.0 18.0 0.00209LLN705 C705 37.5 J705 4.3 4.8 9.1 121.0 104.0 17.0 0.00187
SUBCUENCAIdentificación Longitud del recorrido Pendiente
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
23
Valores de Rugosidad, Tiempo de Concentración y Lag SCS utilizados
L Pradera L.Cauce L C.P (m) n ponderado TC Linsley Lag=0.6 TC
LSN-F 2.7 5.4 8.1 0.123 556 334LSN-100 8.0 8.0 0.300 990 594LSN-101 5.7 4.8 10.5 0.179 927 556LSN-102 2.5 1.5 4.0 0.201 369 221LSN-103 3.7 1.6 5.3 0.218 459 275LSN-104 5.1 3.0 8.1 0.203 582 349LSN-105 8.3 0.0 8.3 0.300 740 444LSN-106 6.8 0.0 6.8 0.300 627 376LSN-107 6.8 1.1 7.8 0.264 722 433LSN-108 3.1 3.5 6.6 0.158 452 271LSN-109 6.6 2.0 8.6 0.238 683 410LSN-110 11.6 0.8 12.4 0.282 1001 601LSN-111 2.2 1.2 3.4 0.205 355 213LSS-201 10.0 3.2 13.2 0.236 1077 646LRG-301 10.1 1.8 11.9 0.260 1055 633LRG-302 5.9 5.9 0.300 667 400LRG-303 7.2 7.2 0.300 853 512LRG-304 12.1 12.1 0.300 1134 681LRG-305 4.9 7.1 12.0 0.143 679 408TTF-001 2.0 4.7 6.7 0.114 582 349TTR-401 8.7 8.7 0.300 906 544TTR-402 1.9 1.9 3.8 0.168 416 250TTR-403 4.9 3.1 8.0 0.197 748 449TTR-404 4.2 1.8 6.0 0.221 574 345TTR-405 10.5 10.5 0.300 1079 647TTR-406 5.1 0.8 5.9 0.264 645 387TTR-407 3.1 3.1 0.300 348 209TTR-408 3.8 5.7 9.5 0.141 565 339TTR-410 9.7 9.7 0.300 943 566TTR-411 7.1 7.1 0.300 712 427TTR-412 9.1 9.1 0.300 826 495TTR-413 10.2 10.2 0.300 915 549LPN501 5.6 5.6 0.300 593 356LPN502 4.0 4.0 0.300 516 309LPN503 15.1 15.1 0.300 1524 914LPN504 11.5 2.4 13.9 0.254 1363 818LPS601 2.3 3.7 6.0 0.137 393 236LPS602 4.5 1.1 5.6 0.248 546 328LPS603 11.3 11.3 0.300 1098 659LPS604 7.7 7.7 0.300 930 558LLN701 3.2 5.5 8.7 0.132 480 288LLN702 13.4 13.4 0.300 1531 919LLN703 6.4 6.4 0.300 717 430LLN704 8.6 8.6 0.300 886 532LLN705 4.3 4.8 9.1 0.160 651 391
SUBCUENCAParametros SCSRugosidad
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
24
CUENCA TOTORAS– LASSAGA – LARGUIA – LAS PAREJAS – LOS LEONES
Salida Totoras -TR 2 años
Salida Lassaga -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
25
Salida Colonia Médici en Ruta P 28 S -TR 2 años
Totoras en salida Larguia -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
26
Totoras en salida Las Los Leones -TR 2 años
Totoras en confluencia Las Parejas Norte y Las Parejas Sur -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
27
Canal Totoras – Salida TR 5 años
Canal Totoras – Salida TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
28
DIAGRAMA TOPOLOGICO CUENCA CANAL SALTO GRANDE
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
29
Superficie, longitudes de cauce y pendientes de las sub-cuencas analizadas
Valores de Rugosidad, Tiempo de Concentración y Lag SCS utilizados
N-HMS S (KM2) Nodo Salida L Pradera L.Cauce L C.P (m) C.Max C.Min HT (m) I (m/m)
SGD801 C801 5.4 J801 1.0 6.6 7.6 41.0 34.0 7.0 0.00092SGD802 C802 10.1 J802 10.2 10.2 48.0 38.0 10.0 0.00098SGD803 C803 4.6 J803 2.8 2.8 49.0 47.0 2.0 0.00072SGD804 C804 5.1 J804 3.4 3.4 47.0 41.0 6.0 0.00175SGD805 C805 14.3 J805 7.5 7.5 60.0 42.0 18.0 0.00240SGD806 C806 25.7 J806 12.0 12.0 66.0 44.0 22.0 0.00184SGD807 C807 6.7 J807 6.2 6.2 56.0 45.0 11.0 0.00179SGD808 C808 22.1 J808 6.5 6.5 53.0 46.0 7.0 0.00108SGD809 C809 33.3 J809 9.5 9.5 67.0 48.0 19.0 0.00199SGD810 C810 9.4 J810 7.7 7.7 67.0 53.0 14.0 0.00182SGD811 C811 26.7 J811 7.6 7.6 67.0 53.0 14.0 0.00185SGD812 C812 17.1 J812 8.6 8.6 81.0 67.0 14.0 0.00163SGD813 C813 10.4 J813 10.4 10.4 81.0 68.0 13.0 0.00174SGD814 C814 23.8 J814 11.4 11.4 85.0 80.0 5.0 0.00098SGD815 C815 5.6 J815 3.6 3.6 83.0 81.0 2.0 0.00056
SUBCUENCAIdentificación Longitud del recorrido Pendiente
L Pradera L.Cauce L C.P (m) n ponderado TC Linsley Lag=0.6 TC
SGD801 1.0 6.6 7.6 0.070 439 263SGD802 10.2 10.2 0.035 340 204SGD803 2.8 2.8 0.300 622 373SGD804 3.4 3.4 0.300 538 323SGD805 7.5 7.5 0.300 784 471SGD806 12.0 12.0 0.300 1124 674SGD807 6.2 6.2 0.300 761 456SGD808 6.5 6.5 0.300 913 548SGD809 9.5 9.5 0.300 958 575SGD810 7.7 7.7 0.300 865 519SGD811 7.6 7.6 0.300 852 511SGD812 8.6 8.6 0.300 954 572SGD813 10.4 10.4 0.127 319 191SGD814 11.4 11.4 0.300 1676 1005SGD815 3.6 3.6 0.300 773 464
SUBCUENCARugosidad Parametros SCS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
30
Canal Salto Grande – Salida Carcarañá -TR 2 años
Canal Salto Grande – Cruce Ruta 34 -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
31
Canal Salto Grande – Aguas abajo Localidad de Salto Grande -TR 2 años
Canal Salto Grande – Aguas arriba Localidad de Salto Grande -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
32
Canal Salto Grande – Salida TR 5 años
Canal Salto Grande – Salida TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
33
DIAGRAMA TOPOLOGICO CUENCA CANAL SERODINO
Superficie, longitudes de cauce y pendientes de las sub-cuencas analizadas
Valores de Rugosidad, Tiempo de Concentración y Lag SCS utilizados
Canal Serodino – Salida -TR 2 años
N-HMS S (KM2) Nodo Salida L Pradera L.Cauce L C.P (m) C.Max C.Min HT (m) I (m/m)
SRD901 C901 14.0 J901 8.6 8.6 29.0 25.0 4.0 0.00046SRD902 C902 21.5 J902 8.7 1.8 10.6 34.0 29.0 5.0 0.00047SRD903 C903 36.0 J903 12.1 2.2 14.3 44.0 30.0 14.0 0.00098SRD904 C904 19.0 J904 12.0 1.0 13.0 44.0 32.0 12.0 0.00092SRD905 C905 27.8 J905 11.9 1.7 13.6 45.0 33.0 12.0 0.00089SRD906 C906 26.2 J906 8.4 8.4 47.0 39.0 8.0 0.00095SRD907 C907 15.2 J907 6.2 6.2 49.0 42.0 7.0 0.00113
SUBCUENCAIdentificación Longitud del recorrido Pendiente
L Pradera L.Cauce L C.P (m) n ponderado TC Linsley Lag=0.6 TC
SRD901 8.6 8.6 0.035 385 231SRD902 8.7 1.8 10.6 0.254 1418 851SRD903 12.1 2.2 14.3 0.259 1387 832SRD904 12.0 1.0 13.0 0.280 1395 837SRD905 11.9 1.7 13.6 0.267 1406 844SRD906 8.4 8.4 0.300 1108 665SRD907 6.2 6.2 0.300 873 524
Rugosidad Parametros SCSSUBCUENCA
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
35
Canal Serodino – Cruce FFCC -TR 2 años
Canal Serodino – Cruce Ruta 91 -TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
36
Canal Serodino – Salida TR 5 años
Canal Serodino – Salida TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
37
ANEXO II
MODELACION HIDRAULICA
SIMULACIONES CANAL TOTORAS
GEOMETRIA PROYECTO AÑO 1992 Comparación TR 2, 5 Y 10 años
GEOMETRIA PROYECTO AÑO 1992 NIVELES TR 2 años
GEOMETRIA PROYECTO AÑO 1992 NIVELES TR 5 años
GEOMETRIA PROYECTO AÑO 1992 NIVELES TR 10 años
BASE AMPLIADA 2 METROS NIVELES Comparación TR 2, 5 Y 10 años
BASE AMPLIADA 2 METROS NIVELES TR 2 años
BASE AMPLIADA 2 METROS NIVELES TR 5 años
BASE AMPLIADA 2 METROS NIVELES TR 10 años
BASE AMPLIADA 4 METROS TR 2, 5 Y 10 años Derivación Lassaga
BASE AMPLIADA 4 METROS NIVELES TR 2 años con Derivación Lassaga
BASE AMPLIADA 4 METROS NIVELES TR 2 años con Derivación Lassaga
BASE AMPLIADA 4 METROS NIVELES TR 2 años con Derivación Lassaga
COMPARACION BASE + 4 METROS CON DERIVACIÓN LASSAGA TR 5
COMPARACION BASE + 4 METROS CON DERIVACIÓN LASSAGA TR 10
CANAL TOTORAS – GEOMETRIA PROYECTO AÑO 1992
NIVELES TR 2, 5 Y 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
41
CANAL TOTORAS – GEOMETRIA PROYECTO AÑO 1992
NIVELES TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
42
CANAL TOTORAS – GEOMETRIA PROYECTO AÑO 1992
NIVELES TR 5 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
43
CANAL TOTORAS – GEOMETRIA PROYECTO AÑO 1992
NIVELES TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
44
CANAL TOTORAS – BASE AMPLIADA 2 METROS
NIVELES TR 2, 5 Y 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
45
CANAL TOTORAS – BASE AMPLIADA 2 METROS
NIVELES TR 2 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
46
CANAL TOTORAS – BASE AMPLIADA 2 METROS
NIVELES TR 5 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
47
CANAL TOTORAS – BASE AMPLIADA 2 METROS
NIVELES TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
48
CANAL TOTORAS – COMPARACION ACTUAL Vs BASE AMPLIADA 2 METROS
NIVELES TR 02 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
49
CANAL TOTORAS – COMPARACION ACTUAL Vs BASE AMPLIADA 2 METROS
NIVELES TR 05 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
50
CANAL TOTORAS – COMPARACION ACTUAL Vs BASE AMPLIADA 2 METROS
NIVELES TR 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
51
CANAL TOTORAS – BASE AMPLIADA 4 METROS y DERIVACION LASSAGA
NIVELES TR 2, 5 Y 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
52
CANAL TOTORAS – BASE AMPLIADA 4 METROS y DERIVACION LASSAGA
NIVELES TR 2 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
53
CANAL TOTORAS – BASE AMPLIADA 4 METROS y DERIVACION LASSAGA
NIVELES TR 5 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
54
CANAL TOTORAS – BASE AMPLIADA 4 METROS y DERIVACION LASSAGA
NIVELES TR 10 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
55
CANAL TOTORAS
COMPARACION GEOMETRIA ACTUAL Vs BASE +4m CON DERIVACIÓN LASSAGA - TR 5
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
56
CANAL TOTORAS
COMPARACION GEOMETRIA ACTUAL Vs BASE +4m CON DERIVACIÓN LASSAGA - TR 10
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
57
CANAL TOTORAS – Tramo Ruta Nac 34 – Ruta Prov. 91
COMPARACION GEOMETRIA ACTUAL Vs BASE +4m CON DERIVACIÓN LASSAGA - TR 5
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
58
CANAL TOTORAS – Tramo Ruta Nac 34 – Ruta Prov. 91
COMPARACION GEOMETRIA ACTUAL Vs BASE +4m CON DERIVACIÓN LASSAGA - TR 10
SIMULACIONES CANAL SALTO GRANDE
GEOMETRIA ESTUDIO AÑO 2006 - Comparación TR 2, 5 Y 10 años
GEOMETRIA ESTUDIO AÑO 2006 - TR 2 años
GEOMETRIA ESTUDIO AÑO 2006 - TR 5 años
GEOMETRIA ESTUDIO AÑO 2006 - TR 10 años
PUENTES PROYECTO 2012 Y BASE 5 metros TR 2, 5 Y 10 años
PUENTES PROYECTO 2012 Y BASE 5 metros TR 2 años
PUENTES PROYECTO 2012 Y BASE 5 metros TR 5 años
PUENTES PROYECTO 2012 Y BASE 5 metros TR 10 años
COMPARACION SECCION 2006 Vs PUENTES PROYECTO 2012 + BASE 5
metros y RASANTE MODIFICADA – TR 5 AÑOS
COMPARACION SECCION 2006 Vs PUENTES PROYECTO 2012 + BASE 5
metros y RASANTE MODIFICADA – TR 10 AÑOS
CANAL SALTO GRANDE – GEOMETRIA ESTUDIO AÑO 2006
NIVELES TR 2, 5 Y 10 años
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
61
CANAL SALTO GRANDE – GEOMETRIA ESTUDIO AÑO 2006
NIVELES TR 2 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
62
CANAL SALTO GRANDE – GEOMETRIA ESTUDIO AÑO 2006
NIVELES TR 5 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
63
CANAL SALTO GRANDE – GEOMETRIA ESTUDIO AÑO 2006
NIVELES TR 10 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
64
CANAL SALTO GRANDE – SECCIONES Y PUENTES AMPLIADOS
NIVELES TR 2, 5 Y 10 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
65
CANAL SALTO GRANDE – SECCIONES Y PUENTES AMPLIADOS
NIVELES TR 2 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
66
CANAL SALTO GRANDE – SECCIONES Y PUENTES AMPLIADOS
NIVELES TR 5 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
67
CANAL SALTO GRANDE – SECCIONES Y PUENTES AMPLIADOS
NIVELES TR 10 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
68
CANAL SALTO GRANDE
COMPARACION SECCION 2006 Vs PUENTES PROYECTO 2012 + BASE 5 M Y RASANTE MODIFICADA– TR 5 AÑOS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
69
CANAL SALTO GRANDE
COMPARACION SECCION 2006 Vs PUENTES PROYECTO 2012 + BASE 5 M Y RASANTE MODIFICADA– TR 10 AÑOS
ANEXO III
ANALISIS DE TRANSFLUENCIA CANAL TOTORAS AL SALTO GRANDE
DINAMICA HIDRICA SUPERFICIAL CON AGUAS BAJAS Y MEDIAS
DINAMICA HIDRICA SUPERFICIAL CON AGUAS ALTAS
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
71
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
72
ANEXO IV
DISEÑO HIDRAULICO DERIVACION CANAL LASSAGA
Caudal de diseño TR 2 años: 21 m3/seg
Caudal de verificación TR 5 años: 33 m3/seg
Longitud de la traza propuesta: 7800 m
Pendiente del terreno: 0.0015 (0.15 %)
Base de fondo: 4 metros
Inclinación Talud Z= 1 (h/v=1)
Profundidad media: 2.5 m
Sección promedio: 16.25 m2
Volumen de excavación estimado: 126.650 m3
Verificación hidráulica:
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
73
ANEXO V
AMPLIACION BASE CANAL TOTORAS
COMPUTOS ESTIMATIVOS EXCAVACION
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
74
Prog. Prof. B. Actual S. Exist B. Proy. S.Ampl S.Exc Volumen V. Acum
0 4,65 9 63,5 11 72,8 9,3
300 4,57 9 62,0 11 71,2 9,1 2766 2766
900 4,64 9 63,3 11 72,6 9,3 5526 8292
1500 3,87 9 49,8 11 57,5 7,7 5106 13398
2100 3,53 9 44,2 11 51,3 7,1 4440 17838
2700 4,4 9 59,0 11 67,8 8,8 4758 22596
3500 4,06 9 53,0 11 61,1 8,1 6768 29364
4300 3,83 9 49,1 11 56,8 7,7 6312 35676
4500 4,32 9 57,5 11 66,2 8,6 1630 37306
4800 3,92 9 50,6 11 58,5 7,8 2472 39778
5200 4,21 9 55,6 11 64,0 8,4 3252 43030
5600 4,19 9 55,3 11 63,6 8,4 3360 46390
6000 4,44 9 59,7 11 68,6 8,9 3452 49842
6100 4,27 8 52,4 10 60,9 8,5 871 50713
6400 4,16 8 50,6 10 58,9 8,3 2529 53242
6800 4,15 8 50,4 10 58,7 8,3 3324 56566
7200 3,96 8 47,4 10 55,3 7,9 3244 59810
7600 4,15 8 50,4 10 58,7 8,3 3244 63054
7800 3,96 8 47,4 10 55,3 7,9 1622 64676
8000 3,93 8 46,9 10 54,7 7,9 1578 66254
8400 4,05 8 48,8 10 56,9 8,1 3192 69446
8800 4,4 8 54,6 10 63,4 8,8 3380 72826
9200 3,52 8 40,6 10 47,6 7,0 3168 75994
9600 3,31 8 37,4 10 44,1 6,6 2732 78726
10000 3,19 8 35,7 10 42,1 6,4 2600 81326
10500 3,37 8 38,3 10 45,1 6,7 3280 84606
10800 3,22 8 36,1 10 42,6 6,4 1977 86583
11200 3,1 8 34,4 10 40,6 6,2 2528 89111
11600 3,38 8 38,5 10 45,2 6,8 2592 91703
12500 3,79 8 44,7 10 52,3 7,6 6453 98156
13000 3,98 7 43,7 9 51,7 8,0 3885 102041
13500 4,22 7 47,3 9 55,8 8,4 4100 106141
14000 4,26 7 48,0 9 56,5 8,5 4240 110381
14500 4,95 7 59,2 9 69,1 9,9 4605 114986
15000 5,18 7 63,1 9 73,5 10,4 5065 120051
15500 4,99 7 59,8 9 69,8 10,0 5085 125136
16000 4,64 7 54,0 9 63,3 9,3 4815 129951
16500 3,35 7 34,7 9 41,4 6,7 3995 133946
17000 3,37 7 34,9 9 41,7 6,7 3360 137306
17500 3,41 7 35,5 9 42,3 6,8 3390 140696
18000 3,53 7 37,2 9 44,2 7,1 3470 144166
Continua
AMPLIACION CANAL TOTORAS - TRAMO PROG 0+000 - 40+000 ANCHO DE BASE ACTUAL +2 m
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
75
Prog. Prof. B. Actual S. Exist B. Proy. S.Ampl S.Exc Volumen V. Acum
18500 3,48 7 36,5 9 43,4 7,0 3505 147671
19000 3,81 7 41,2 9 48,8 7,6 3645 151316
19500 4,01 7 44,2 9 52,2 8,0 3910 155226
20000 3,7 7 39,6 9 47,0 7,4 3855 159081
20500 3,99 7 43,9 9 51,8 8,0 3845 162926
21000 3,91 7 42,7 9 50,5 7,8 3950 166876
21500 3,84 7 41,6 9 49,3 7,7 3875 170751
22000 3,82 7 41,3 9 49,0 7,6 3830 174581
22500 3,43 6 32,3 8 39,2 6,9 3625 178206
23000 3,8 6 37,2 8 44,8 7,6 3615 181821
23500 3,4 6 32,0 8 38,8 6,8 3600 185421
24000 4,05 6 40,7 8 48,8 8,1 3725 189146
24500 3,92 6 38,9 8 46,7 7,8 3985 193131
25000 4,16 6 42,3 8 50,6 8,3 4040 197171
25500 3,71 6 36,0 8 43,4 7,4 3935 201106
26000 3,77 6 36,8 8 44,4 7,5 3740 204846
26500 3,57 6 34,2 8 41,3 7,1 3670 208516
27000 3,21 6 29,6 8 36,0 6,4 3390 211906
27500 4,37 6 45,3 8 54,1 8,7 3790 215696
28000 4,53 6 47,7 8 56,8 9,1 4450 220146
28500 3,89 6 38,5 8 46,3 7,8 4210 224356
29000 3,91 6 38,7 8 46,6 7,8 3900 228256
29500 3,56 6 34,0 8 41,2 7,1 3735 231991
30000 4,06 6 40,8 8 49,0 8,1 3810 235801
30500 4,61 6 48,9 8 58,1 9,2 4335 240136
31000 4,52 6 47,6 8 56,6 9,0 4565 244701
31500 4,57 6 48,3 8 57,4 9,1 4545 249246
32000 4,42 6 46,1 8 54,9 8,8 4495 253741
32500 4,39 6 45,6 8 54,4 8,8 4405 258146
33000 4,62 6 49,1 8 58,3 9,2 4505 262651
33500 3,98 6 39,7 8 47,7 8,0 4300 266951
34000 4,29 6 44,1 8 52,7 8,6 4135 271086
34500 4,36 6 45,2 8 53,9 8,7 4325 275411
35000 4,23 6 43,3 8 51,7 8,5 4295 279706
35500 4,21 6 43,0 8 51,4 8,4 4220 283926
36000 3,93 6 39,0 8 46,9 7,9 4070 287996
36500 3,62 6 34,8 8 42,1 7,2 3775 291771
37000 3,67 6 35,5 8 42,8 7,3 3645 295416
37500 3,66 6 35,4 8 42,7 7,3 3665 299081
38000 3,86 6 38,1 8 45,8 7,7 3760 302841
38500 4,13 6 41,8 8 50,1 8,3 3995 306836
39000 3,36 6 31,4 8 38,2 6,7 3745 310581
39500 3,26 6 30,2 8 36,7 6,5 3310 313891
40000 3,37 6 31,6 8 38,3 6,7 3315 317206
Total a excavar ampliacion de base = 2 m: 317206
AMPLIACION CANAL TOTORAS - TRAMO PROG 0+000 - 40+000 ANCHO DE BASE ACTUAL +2 m
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
76
Prog. Prof. B. Actual S. Exist B. Proy. S.Ampl S.Exc Volumen V. Acum
0 4.65 9.3 64.9 13.3 83.5 18.6
300 4.57 9.14 62.7 13.14 80.9 18.3 5532 5532
900 4.64 9.28 64.6 13.28 83.1 18.6 11052 16584
1500 3.87 7.74 44.9 11.74 60.4 15.5 10212 26796
2100 3.53 7.06 37.4 11.06 51.5 14.1 8880 35676
2700 4.4 8.8 58.1 12.8 75.7 17.6 9516 45192
3500 4.06 8.12 49.5 12.12 65.7 16.2 13536 58728
4300 3.83 7.66 44.0 11.66 59.3 15.3 12624 71352
4500 4.32 8.64 56.0 12.64 73.3 17.3 3260 74612
4800 3.92 7.84 46.1 11.84 61.8 15.7 4944 79556
5200 4.21 8.42 53.2 12.42 70.0 16.8 6504 86060
5600 4.19 8.38 52.7 12.38 69.4 16.8 6720 92780
6000 4.44 8.88 59.1 12.88 76.9 17.8 6904 99684
6100 4.27 8.54 54.7 12.54 71.8 17.1 1742 101426
6400 4.16 8.32 51.9 12.32 68.6 16.6 5058 106484
6800 4.15 8.3 51.7 12.3 68.3 16.6 6648 113132
7200 3.96 7.92 47.0 11.92 62.9 15.8 6488 119620
7600 4.15 8.3 51.7 12.3 68.3 16.6 6488 126108
7800 3.96 7.92 47.0 11.92 62.9 15.8 3244 129352
8000 3.93 7.86 46.3 11.86 62.1 15.7 3156 132508
8400 4.05 8.1 49.2 12.1 65.4 16.2 6384 138892
8800 4.4 8.8 58.1 12.8 75.7 17.6 6760 145652
9200 3.52 7.04 37.2 11.04 51.3 14.1 6336 151988
9600 3.31 6.62 32.9 10.62 46.1 13.2 5464 157452
10000 3.19 6.38 30.5 10.38 43.3 12.8 5200 162652
10500 3.37 6.74 34.1 10.74 47.6 13.5 6560 169212
10800 3.22 6.44 31.1 10.44 44.0 12.9 3954 173166
11200 3.1 6.2 28.8 10.2 41.2 12.4 5056 178222
11600 3.38 6.76 34.3 10.76 47.8 13.5 5184 183406
12500 3.79 7.58 43.1 11.58 58.3 15.2 12906 196312
13000 3.98 7.96 47.5 11.96 63.4 15.9 7770 204082
13500 4.22 8.44 53.4 12.44 70.3 16.9 8200 212282
14000 4.26 8.52 54.4 12.52 71.5 17.0 8480 220762
14500 4.95 9.9 73.5 13.9 93.3 19.8 9210 229972
15000 5.18 10.36 80.5 14.36 101.2 20.7 10130 240102
15500 4.99 9.98 74.7 13.98 94.7 20.0 10170 250272
16000 4.64 9.28 64.6 13.28 83.1 18.6 9630 259902
16500 3.35 6.7 33.7 10.7 47.1 13.4 7990 267892
17000 3.37 6.74 34.1 10.74 47.6 13.5 6720 274612
17500 3.41 6.82 34.9 10.82 48.5 13.6 6780 281392
18000 3.53 7.06 37.4 11.06 51.5 14.1 6940 288332
Cont inua
AMPLIACION CANAL TOTORAS - TRAMO PROG 0+000 - 40+000 ANCHO DE BASE ACTUAL +4 m
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
77
Prog. Prof. B. Actual S. Exist B. Proy. S.Ampl S.Exc Volumen V. Acum
18500 3.48 6.96 36.3 10.96 50.3 13.9 7010 295342
19000 3.81 7.62 43.5 11.62 58.8 15.2 7290 302632
19500 4.01 8.02 48.2 12.02 64.3 16.0 7820 310452
20000 3.7 7.4 41.1 11.4 55.9 14.8 7710 318162
20500 3.99 7.98 47.8 11.98 63.7 16.0 7690 325852
21000 3.91 7.82 45.9 11.82 61.5 15.6 7900 333752
21500 3.84 7.68 44.2 11.68 59.6 15.4 7750 341502
22000 3.82 7.64 43.8 11.64 59.1 15.3 7660 349162
22500 3.43 6.86 35.3 10.86 49.0 13.7 7250 356412
23000 3.8 7.6 43.3 11.6 58.5 15.2 7230 363642
23500 3.4 6.8 34.7 10.8 48.3 13.6 7200 370842
24000 4.05 8.1 49.2 12.1 65.4 16.2 7450 378292
24500 3.92 7.84 46.1 11.84 61.8 15.7 7970 386262
25000 4.16 8.32 51.9 12.32 68.6 16.6 8080 394342
25500 3.71 7.42 41.3 11.42 56.1 14.8 7870 402212
26000 3.77 7.54 42.6 11.54 57.7 15.1 7480 409692
26500 3.57 7.14 38.2 11.14 52.5 14.3 7340 417032
27000 3.21 6.42 30.9 10.42 43.8 12.8 6780 423812
27500 4.37 8.74 57.3 12.74 74.8 17.5 7580 431392
28000 4.53 9.06 61.6 13.06 79.7 18.1 8900 440292
28500 3.89 7.78 45.4 11.78 61.0 15.6 8420 448712
29000 3.91 7.82 45.9 11.82 61.5 15.6 7800 456512
29500 3.56 7.12 38.0 11.12 52.3 14.2 7470 463982
30000 4.06 8.12 49.5 12.12 65.7 16.2 7620 471602
30500 4.61 9.22 63.8 13.22 82.2 18.4 8670 480272
31000 4.52 9.04 61.3 13.04 79.4 18.1 9130 489402
31500 4.57 9.14 62.7 13.14 80.9 18.3 9090 498492
32000 4.42 8.84 58.6 12.84 76.3 17.7 8990 507482
32500 4.39 8.78 57.8 12.78 75.4 17.6 8810 516292
33000 4.62 9.24 64.0 13.24 82.5 18.5 9010 525302
33500 3.98 7.96 47.5 11.96 63.4 15.9 8600 533902
34000 4.29 8.58 55.2 12.58 72.4 17.2 8270 542172
34500 4.36 8.72 57.0 12.72 74.5 17.4 8650 550822
35000 4.23 8.46 53.7 12.46 70.6 16.9 8590 559412
35500 4.21 8.42 53.2 12.42 70.0 16.8 8440 567852
36000 3.93 7.86 46.3 11.86 62.1 15.7 8140 575992
36500 3.62 7.24 39.3 11.24 53.8 14.5 7550 583542
37000 3.67 7.34 40.4 11.34 55.1 14.7 7290 590832
37500 3.66 7.32 40.2 11.32 54.8 14.6 7330 598162
38000 3.86 7.72 44.7 11.72 60.1 15.4 7520 605682
38500 4.13 8.26 51.2 12.26 67.7 16.5 7990 613672
39000 3.36 6.72 33.9 10.72 47.3 13.4 7490 621162
39500 3.26 6.52 31.9 10.52 44.9 13.0 6620 627782
40000 3.37 6.74 34.1 10.74 47.6 13.5 6630 634412
Total a excavar: 634412
AMPLIACION CANAL TOTORAS - TRAMO PROG 0+000 - 40+000 ANCHO DE BASE ACTUAL +4 m
COMITÉ DE CUENCAS ARROYO TOTORAS, CANALES SALTO GRANDE Y SERODINO
CONTRATACIÓN DE ESTUDIOS Y PROYECTOS T001-2014 – INFORME Nº 3
78
ANEXO VI
RESULTADOS NUMERICOS DE LA
SIMULACION HIDROLÓGICA E HIDRAULICA
Project: TTR+SGD+SRD Simulation Run: TTR-TR02-D24
Start of Run: 01ene2000, 00:00 Basin Model: TTR_completoEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR02Compute Time: 10nov2014, 14:14:51 Control Specifications:TTR-TR02-D24
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
504 35.9 5.3 02ene2000, 04:30 11.35
J504 35.9 5.3 02ene2000, 04:30 11.35
9504 35.9 5.3 02ene2000, 05:00 11.36
503 32.6 4.4 02ene2000, 06:00 11.35
J503 68.5 9.6 02ene2000, 05:30 11.35
9503 68.5 9.4 02ene2000, 09:00 10.91
502 16.2 4.5 01ene2000, 17:30 11.35
J502 84.7 9.9 02ene2000, 08:30 10.99
9502 84.7 9.5 02ene2000, 21:30 10.86
603 33.8 5.7 02ene2000, 01:30 11.35
604 27.3 5.1 01ene2000, 23:00 11.35
J604 27.3 5.1 01ene2000, 23:00 11.35
9604 27.3 4.8 02ene2000, 17:30 11.21
J603 61.1 8.3 02ene2000, 01:30 11.29
9603 61.1 8.3 02ene2000, 02:30 11.28
602 7.3 1.9 01ene2000, 18:00 11.35
J602 68.4 9.2 02ene2000, 01:00 11.28
9602 68.4 9.1 02ene2000, 08:00 11.21
501 23.0 5.8 01ene2000, 18:30 11.35
601 7.5 2.5 01ene2000, 16:00 11.35
J501 183.6 20.8 01ene2000, 21:00 11.07
9501 183.6 20.2 02ene2000, 07:00 10.69
705 37.5 8.9 01ene2000, 19:30 11.35
J705 37.5 8.9 01ene2000, 19:30 11.35
9705 37.5 7.8 02ene2000, 09:30 11.00
704 27.4 5.3 01ene2000, 22:30 11.35
J704 64.9 10.5 01ene2000, 22:30 11.15
9704 64.9 10.5 01ene2000, 23:00 11.16
702 19.5 2.6 02ene2000, 06:00 11.35
Page 1
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
703 12.7 2.8 01ene2000, 20:30 11.35
J702 97.1 14.8 01ene2000, 23:00 11.22
9702 97.1 14.8 02ene2000, 00:00 11.25
408 37.6 9.8 01ene2000, 18:30 11.35
701 27.7 8.0 01ene2000, 17:00 11.35
J408 346.0 37.1 02ene2000, 05:30 10.97
9408 346.0 35.0 02ene2000, 11:00 10.83
407 7.5 2.7 01ene2000, 15:30 11.35
J407 353.5 35.0 02ene2000, 11:00 10.84
9407 353.5 34.7 02ene2000, 18:30 10.59
410 31.3 5.9 01ene2000, 23:30 11.35
J410 31.3 5.9 01ene2000, 23:30 11.35
9410 31.3 5.7 02ene2000, 15:00 11.67
406 21.3 5.1 01ene2000, 19:30 11.35
411 19.1 4.3 01ene2000, 20:30 11.35
J411 19.1 4.3 01ene2000, 20:30 11.35
9411 19.1 4.2 02ene2000, 03:30 11.49
J406 425.2 40.7 02ene2000, 17:00 10.75
9406 425.2 39.4 02ene2000, 23:00 10.71
404 68.1 17.5 01ene2000, 18:30 11.35
405 20.4 3.5 02ene2000, 01:00 11.35
412 11.9 2.4 01ene2000, 22:00 11.35
J412 11.9 2.4 01ene2000, 22:00 11.35
9412 11.9 2.0 02ene2000, 19:30 10.53
J404 525.6 41.9 02ene2000, 19:00 10.81
413 22.5 4.3 01ene2000, 23:00 11.35
J413 22.5 4.3 01ene2000, 23:00 11.35
9413 22.5 4.0 02ene2000, 14:30 11.71
J415 22.5 4.0 02ene2000, 14:30 11.71
9415 22.5 3.6 03ene2000, 14:30 11.75
9404 548.1 42.3 03ene2000, 01:00 10.80
403 61.6 13.3 01ene2000, 21:00 11.35
J403 609.7 49.0 01ene2000, 22:30 10.86
9403 609.7 48.9 01ene2000, 23:00 10.86
Page 2
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
402 14.9 4.7 01ene2000, 16:30 11.35
J402 624.6 51.2 01ene2000, 23:00 10.87
9402 624.6 51.1 02ene2000, 00:00 10.90
304 29.1 4.8 02ene2000, 02:00 11.35
303 13.2 2.6 01ene2000, 22:00 11.35
J303 13.2 2.6 01ene2000, 22:00 11.35
9303 13.2 2.6 01ene2000, 22:30 11.35
J304 42.3 7.3 02ene2000, 00:30 11.35
9304 42.3 7.3 02ene2000, 00:30 11.35
305 24.5 5.6 01ene2000, 20:00 11.35
J305 66.8 12.0 01ene2000, 22:00 11.35
9305 66.8 11.9 01ene2000, 22:00 11.35
302 14.9 3.5 01ene2000, 19:30 11.35
J302 14.9 3.5 01ene2000, 19:30 11.35
9302 81.7 15.1 02ene2000, 00:00 11.51
301 41.7 7.3 02ene2000, 01:00 11.35
401 28.9 5.5 01ene2000, 23:00 11.35
J401 776.9 78.9 02ene2000, 00:00 11.00
9401 776.9 78.5 02ene2000, 00:30 11.01
105 14.1 3.1 01ene2000, 20:30 11.35
104 13.4 3.4 01ene2000, 18:30 11.35
J104 27.5 6.4 01ene2000, 19:30 11.35
9104 27.5 6.3 01ene2000, 20:00 11.35
106 9.4 2.3 01ene2000, 19:00 11.35
J106 36.9 8.6 01ene2000, 20:00 11.35
9106 36.9 6.2 01ene2000, 23:30 10.93
107 10.2 2.3 01ene2000, 20:30 11.35
108 6.4 1.9 01ene2000, 17:00 11.35
111 3.7 1.3 01ene2000, 15:30 11.35
J111 3.7 1.3 01ene2000, 15:30 11.35
9111 3.7 1.3 01ene2000, 17:30 11.44
J108 10.1 3.2 01ene2000, 17:00 11.38
9108 10.1 3.2 01ene2000, 17:30 11.42
J107 57.2 10.7 01ene2000, 18:30 11.09
Page 3
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
9107 57.2 10.5 01ene2000, 20:30 10.96
103 12.8 3.8 01ene2000, 17:00 11.35
J103 70.0 13.3 01ene2000, 20:00 11.03
9103 70.0 12.2 01ene2000, 20:30 10.64
110 24.4 4.4 02ene2000, 00:00 11.35
109 15.2 3.5 01ene2000, 20:00 11.35
102 9.0 3.1 01ene2000, 16:00 11.35
J102 118.6 21.1 01ene2000, 20:30 10.93
9102 118.6 19.5 02ene2000, 18:30 13.39
101 51.8 9.8 01ene2000, 23:00 11.35
J101 170.4 21.5 01ene2000, 23:30 12.77
9101 170.4 19.9 02ene2000, 17:00 12.78
100 25.9 4.7 02ene2000, 00:00 11.35
J100 196.3 20.7 02ene2000, 17:00 12.59
9100 196.3 20.0 03ene2000, 02:00 12.37
201 23.3 4.0 02ene2000, 01:00 11.35
J201 996.5 102.1 02ene2000, 00:30 11.28
9201 996.5 85.4 02ene2000, 11:30 10.85
099 23.7 6.2 01ene2000, 18:00 11.35
J099 23.7 6.2 01ene2000, 18:00 11.35
9099 23.7 6.1 01ene2000, 20:00 11.50
400 40.4 10.3 01ene2000, 18:30 11.35
J400 1060.6 87.0 02ene2000, 11:30 10.89
9400 1060.6 86.4 02ene2000, 12:00 10.90
S0000 1060.6 86.4 02ene2000, 12:00 10.90
Page 4
Project: TTR+SGD+SRD Simulation Run: TTR-TR05-D24
Start of Run: 01ene2000, 00:00 Basin Model: TTR_completoEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR05Compute Time: 10nov2014, 14:19:29 Control Specifications:TTR-TR05-D24
504 35.9 10.9 02ene2000, 03:30 23.53
J504 35.9 10.9 02ene2000, 03:30 23.53
9504 35.9 10.9 02ene2000, 04:30 23.54
503 32.6 9.1 02ene2000, 05:30 23.53
J503 68.5 20.1 02ene2000, 04:30 23.54
9503 68.5 20.0 02ene2000, 07:30 23.55
502 16.2 9.6 01ene2000, 17:30 23.53
J502 84.7 21.5 02ene2000, 05:30 23.55
9502 84.7 21.3 02ene2000, 13:30 22.94
603 33.8 12.0 02ene2000, 00:30 23.53
604 27.3 10.9 01ene2000, 22:30 23.53
J604 27.3 10.9 01ene2000, 22:30 23.53
9604 27.3 10.6 02ene2000, 11:30 23.22
J603 61.1 16.5 02ene2000, 10:30 23.39
9603 61.1 15.8 02ene2000, 13:30 23.39
602 7.3 4.2 01ene2000, 18:00 23.53
J602 68.4 16.1 02ene2000, 02:30 23.40
9602 68.4 15.8 02ene2000, 11:00 23.14
501 23.0 12.4 01ene2000, 18:30 23.53
601 7.5 5.4 01ene2000, 16:00 23.53
J501 183.6 37.3 02ene2000, 12:30 23.11
9501 183.6 36.9 02ene2000, 20:00 23.23
705 37.5 19.0 01ene2000, 19:00 23.53
J705 37.5 19.0 01ene2000, 19:00 23.53
9705 37.5 17.6 02ene2000, 05:30 22.48
704 27.4 11.3 01ene2000, 22:00 23.53
J704 64.9 24.9 02ene2000, 04:30 22.92
9704 64.9 24.2 02ene2000, 10:00 22.23
702 19.5 5.4 02ene2000, 05:30 23.53
Page 1
703 12.7 6.0 01ene2000, 20:00 23.53
J702 97.1 30.2 02ene2000, 10:00 22.66
9702 97.1 28.3 02ene2000, 21:30 23.55
408 37.6 21.0 01ene2000, 18:00 23.53
701 27.7 17.3 01ene2000, 17:00 23.53
J408 346.0 65.0 02ene2000, 21:00 23.38
9408 346.0 63.3 02ene2000, 23:30 23.39
407 7.5 5.8 01ene2000, 15:30 23.53
J407 353.5 63.3 02ene2000, 23:30 23.40
9407 353.5 62.2 03ene2000, 05:00 23.19
410 31.3 12.3 01ene2000, 22:30 23.53
J410 31.3 12.3 01ene2000, 22:30 23.53
9410 31.3 12.2 02ene2000, 09:30 24.69
406 21.3 10.9 01ene2000, 19:00 23.53
411 19.1 9.1 01ene2000, 20:00 23.53
J411 19.1 9.1 01ene2000, 20:00 23.53
9411 19.1 9.1 02ene2000, 01:00 23.87
J406 425.2 71.7 02ene2000, 08:00 23.35
9406 425.2 68.0 03ene2000, 06:30 24.00
404 68.1 37.6 01ene2000, 18:00 23.53
405 20.4 7.3 02ene2000, 00:30 23.53
412 11.9 5.1 01ene2000, 21:00 23.53
J412 11.9 5.1 01ene2000, 21:00 23.53
9412 11.9 4.5 03ene2000, 06:30 24.10
J404 525.6 72.7 03ene2000, 06:30 23.92
413 22.5 9.0 01ene2000, 22:30 23.53
J413 22.5 9.0 01ene2000, 22:30 23.53
9413 22.5 8.8 02ene2000, 08:30 24.83
J415 22.5 8.8 02ene2000, 08:30 24.83
9415 22.5 8.3 02ene2000, 23:30 26.63
9404 548.1 77.0 03ene2000, 17:30 24.48
403 61.6 28.4 01ene2000, 20:00 23.53
J403 609.7 77.0 03ene2000, 17:30 24.38
9403 609.7 75.9 03ene2000, 23:30 23.71
Page 2
402 14.9 10.2 01ene2000, 16:00 23.53
J402 624.6 75.9 03ene2000, 23:30 23.71
9402 624.6 75.8 04ene2000, 00:30 23.72
304 29.1 10.1 02ene2000, 01:00 23.53
303 13.2 5.6 01ene2000, 21:30 23.53
J303 13.2 5.6 01ene2000, 21:30 23.53
9303 13.2 5.6 01ene2000, 22:00 23.54
J304 42.3 15.3 02ene2000, 00:00 23.53
9304 42.3 15.2 02ene2000, 00:00 23.53
305 24.5 5.6 01ene2000, 20:00 11.35
J305 66.8 19.9 01ene2000, 22:30 19.06
9305 66.8 19.8 01ene2000, 23:00 19.07
302 14.9 7.4 01ene2000, 19:00 23.53
J302 14.9 7.4 01ene2000, 19:00 23.53
9302 81.7 26.1 01ene2000, 23:30 20.06
301 41.7 15.2 02ene2000, 00:00 23.53
401 28.9 11.7 01ene2000, 22:00 23.53
J401 776.9 117.5 02ene2000, 02:30 23.32
9401 776.9 116.8 02ene2000, 03:00 23.32
105 14.1 6.6 01ene2000, 20:00 23.53
104 13.4 7.3 01ene2000, 18:00 23.53
J104 27.5 13.6 01ene2000, 19:00 23.53
9104 27.5 11.4 02ene2000, 03:00 21.66
106 9.4 4.9 01ene2000, 18:30 23.53
J106 36.9 13.8 02ene2000, 03:00 22.13
9106 36.9 13.0 02ene2000, 05:00 21.38
107 10.2 4.8 01ene2000, 20:00 23.53
108 6.4 4.2 01ene2000, 16:30 23.53
111 3.7 2.8 01ene2000, 15:30 23.53
J111 3.7 2.8 01ene2000, 15:30 23.53
9111 3.7 2.8 01ene2000, 17:00 23.65
J108 10.1 6.9 01ene2000, 16:30 23.57
9108 10.1 6.9 01ene2000, 17:00 23.62
J107 57.2 18.8 01ene2000, 22:00 22.16
Page 3
9107 57.2 18.7 02ene2000, 04:30 23.71
103 12.8 8.2 01ene2000, 16:30 23.53
J103 70.0 20.8 02ene2000, 02:00 23.68
9103 70.0 20.4 02ene2000, 10:00 23.11
110 24.4 9.2 01ene2000, 23:30 23.53
109 15.2 7.5 01ene2000, 19:30 23.53
102 9.0 6.7 01ene2000, 15:30 23.53
J102 118.6 30.8 01ene2000, 20:00 23.28
9102 118.6 29.9 02ene2000, 14:00 21.51
101 51.8 20.6 01ene2000, 22:30 23.53
J101 170.4 34.7 02ene2000, 12:00 22.12
9101 170.4 33.2 03ene2000, 03:30 20.61
100 25.9 9.9 01ene2000, 23:30 23.53
J100 196.3 33.5 03ene2000, 03:00 20.99
9100 196.3 33.1 03ene2000, 11:30 23.51
201 23.3 8.4 02ene2000, 00:30 23.53
J201 996.5 143.2 02ene2000, 03:00 23.36
9201 996.5 136.5 02ene2000, 09:00 23.37
099 23.7 13.4 01ene2000, 18:00 23.53
J099 23.7 13.4 01ene2000, 18:00 23.53
9099 23.7 13.1 01ene2000, 19:00 23.71
400 40.4 22.1 01ene2000, 18:00 23.53
J400 1060.6 142.3 02ene2000, 08:00 23.39
9400 1060.6 141.9 02ene2000, 09:00 23.39
S0000 1060.6 141.9 02ene2000, 09:00 23.39
Page 4
Project: TTR+SGD+SRD Simulation Run: TTR-TR10-D24
Start of Run: 01ene2000, 00:00 Basin Model: TTR_completoEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR10Compute Time: 10nov2014, 14:20:55 Control Specifications:TTR-TR10-D24
504 35.9 15.5 02ene2000, 03:30 33.36
J504 35.9 15.5 02ene2000, 03:30 33.36
9504 35.9 15.3 02ene2000, 07:30 33.23
503 32.6 13.0 02ene2000, 05:00 33.36
J503 68.5 28.2 02ene2000, 06:00 33.29
9503 68.5 28.1 02ene2000, 08:30 33.34
502 16.2 13.8 01ene2000, 17:30 33.36
J502 84.7 29.9 02ene2000, 05:00 33.34
9502 84.7 29.8 02ene2000, 12:30 32.82
603 33.8 17.1 02ene2000, 00:30 33.36
604 27.3 15.5 01ene2000, 22:00 33.36
J604 27.3 15.5 01ene2000, 22:00 33.36
9604 27.3 15.1 02ene2000, 10:00 33.67
J603 61.1 25.1 02ene2000, 08:30 33.50
9603 61.1 24.5 02ene2000, 11:00 33.52
602 7.3 6.0 01ene2000, 17:30 33.36
J602 68.4 24.8 02ene2000, 11:00 33.50
9602 68.4 23.8 02ene2000, 18:30 32.90
501 23.0 17.8 01ene2000, 18:00 33.36
601 7.5 7.7 01ene2000, 16:00 33.36
J501 183.6 52.2 02ene2000, 10:00 32.94
9501 183.6 51.7 02ene2000, 17:30 33.10
705 37.5 27.2 01ene2000, 19:00 33.36
J705 37.5 27.2 01ene2000, 19:00 33.36
9705 37.5 25.4 02ene2000, 04:00 32.93
704 27.4 16.0 01ene2000, 21:30 33.36
J704 64.9 36.8 02ene2000, 03:30 33.11
9704 64.9 36.0 02ene2000, 08:00 32.35
702 19.5 7.7 02ene2000, 05:00 33.36
Page 1
703 12.7 8.6 01ene2000, 19:30 33.36
J702 97.1 45.8 02ene2000, 08:00 32.69
9702 97.1 43.3 02ene2000, 18:00 30.98
408 37.6 30.1 01ene2000, 18:00 33.36
701 27.7 24.8 01ene2000, 17:00 33.36
J408 346.0 95.3 02ene2000, 17:30 32.55
9408 346.0 92.7 02ene2000, 20:30 32.63
407 7.5 8.3 01ene2000, 15:00 33.36
J407 353.5 92.7 02ene2000, 20:30 32.65
9407 353.5 92.0 03ene2000, 01:00 32.62
410 31.3 17.6 01ene2000, 22:30 33.36
J410 31.3 17.6 01ene2000, 22:30 33.36
9410 31.3 17.4 02ene2000, 08:00 35.06
406 21.3 15.5 01ene2000, 19:00 33.36
411 19.1 13.0 01ene2000, 19:30 33.36
J411 19.1 13.0 01ene2000, 19:30 33.36
9411 19.1 13.0 02ene2000, 00:00 34.19
J406 425.2 98.6 03ene2000, 00:30 32.91
9406 425.2 95.6 03ene2000, 14:30 32.15
404 68.1 53.8 01ene2000, 18:00 33.36
405 20.4 10.4 02ene2000, 00:00 33.36
412 11.9 7.3 01ene2000, 21:00 33.36
J412 11.9 7.3 01ene2000, 21:00 33.36
9412 11.9 6.6 03ene2000, 00:00 36.71
J404 525.6 100.7 02ene2000, 23:30 32.46
413 22.5 12.9 01ene2000, 22:00 33.36
J413 22.5 12.9 01ene2000, 22:00 33.36
9413 22.5 12.6 02ene2000, 07:00 35.01
J415 22.5 12.6 02ene2000, 07:00 35.01
9415 22.5 12.1 02ene2000, 20:00 37.65
9404 548.1 108.3 03ene2000, 09:00 31.97
403 61.6 40.6 01ene2000, 20:00 33.36
J403 609.7 108.3 03ene2000, 09:00 32.11
9403 609.7 105.7 03ene2000, 15:00 31.71
Page 2
402 14.9 14.7 01ene2000, 16:00 33.36
J402 624.6 105.7 03ene2000, 15:00 31.75
9402 624.6 104.7 03ene2000, 17:30 31.75
304 29.1 14.4 02ene2000, 01:00 33.36
303 13.2 7.9 01ene2000, 21:30 33.36
J303 13.2 7.9 01ene2000, 21:30 33.36
9303 13.2 7.9 01ene2000, 21:30 33.37
J304 42.3 21.7 01ene2000, 23:30 33.37
9304 42.3 21.7 01ene2000, 23:30 33.37
305 24.5 17.2 01ene2000, 19:30 33.36
J305 66.8 36.1 01ene2000, 21:00 33.37
9305 66.8 35.2 01ene2000, 23:00 33.09
302 14.9 10.6 01ene2000, 19:00 33.36
J302 14.9 10.6 01ene2000, 19:00 33.36
9302 81.7 42.6 02ene2000, 01:00 33.36
301 41.7 21.6 02ene2000, 00:00 33.36
401 28.9 16.7 01ene2000, 22:00 33.36
J401 776.9 160.7 02ene2000, 02:00 32.06
9401 776.9 151.0 02ene2000, 03:00 31.94
105 14.1 9.4 01ene2000, 20:00 33.36
104 13.4 10.5 01ene2000, 18:00 33.36
J104 27.5 19.4 01ene2000, 19:00 33.36
9104 27.5 18.4 01ene2000, 23:30 33.13
106 9.4 7.0 01ene2000, 18:30 33.36
J106 36.9 23.1 01ene2000, 23:00 33.19
9106 36.9 21.7 02ene2000, 03:00 33.05
107 10.2 6.9 01ene2000, 20:00 33.36
108 6.4 6.0 01ene2000, 16:30 33.36
111 3.7 4.1 01ene2000, 15:30 33.36
J111 3.7 4.1 01ene2000, 15:30 33.36
9111 3.7 4.0 01ene2000, 16:30 33.50
J108 10.1 10.0 01ene2000, 16:30 33.41
9108 10.1 9.9 01ene2000, 17:00 33.50
J107 57.2 28.7 02ene2000, 02:00 33.19
Page 3
9107 57.2 28.4 02ene2000, 07:00 32.38
103 12.8 11.8 01ene2000, 16:30 33.36
J103 70.0 29.7 02ene2000, 06:00 32.56
9103 70.0 29.6 02ene2000, 11:00 32.61
110 24.4 13.1 01ene2000, 23:00 33.36
109 15.2 10.6 01ene2000, 19:30 33.36
102 9.0 9.6 01ene2000, 15:30 33.36
J102 118.6 46.1 01ene2000, 22:30 32.92
9102 118.6 43.1 02ene2000, 13:30 32.76
101 51.8 29.4 01ene2000, 22:00 33.36
J101 170.4 50.3 02ene2000, 11:30 32.94
9101 170.4 48.6 03ene2000, 00:30 32.44
100 25.9 14.0 01ene2000, 23:00 33.36
J100 196.3 49.2 03ene2000, 00:30 32.56
9100 196.3 48.8 03ene2000, 07:30 32.62
201 23.3 11.9 02ene2000, 00:00 33.36
J201 996.5 185.1 02ene2000, 05:30 32.10
9201 996.5 179.5 02ene2000, 09:30 31.70
099 23.7 19.1 01ene2000, 18:00 33.36
J099 23.7 19.1 01ene2000, 18:00 33.36
9099 23.7 18.8 01ene2000, 19:00 33.59
400 40.4 31.7 01ene2000, 18:00 33.36
J400 1060.6 186.8 02ene2000, 08:00 31.81
9400 1060.6 186.4 02ene2000, 09:00 31.80
S0000 1060.6 186.4 02ene2000, 09:00 31.80
Page 4
Project: TTR+SGD+SRD Simulation Run: SGD-TR02
Start of Run: 01ene2000, 00:00 Basin Model: SGD_actualEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR02Compute Time: 10nov2014, 14:33:40 Control Specifications:TTR-TR02-D24
814 23.8 2.8 02ene2000, 02:30 9.93
J814 23.8 2.8 02ene2000, 02:30 9.93
R9814 23.8 2.3 03ene2000, 00:00 9.47
812 17.1 3.3 01ene2000, 19:00 9.93
J812 40.9 3.3 01ene2000, 19:00 9.67
R9812 40.9 2.4 02ene2000, 15:00 9.27
809 33.3 6.3 01ene2000, 19:30 9.93
813 10.4 4.0 01ene2000, 11:30 9.93
815 5.6 1.2 01ene2000, 17:30 9.93
J815 5.6 1.2 01ene2000, 17:30 9.93
R9815 5.6 1.2 01ene2000, 19:30 9.94
J813 16.0 4.1 01ene2000, 12:00 9.94
R9813 16.0 4.0 01ene2000, 14:30 9.92
J809 90.2 9.4 01ene2000, 18:30 9.63
R9809 90.2 9.4 01ene2000, 19:00 9.63
803 4.6 1.2 01ene2000, 15:30 9.93
J803 94.8 10.3 01ene2000, 18:30 9.64
R9803 94.8 10.3 01ene2000, 19:00 9.64
811 26.7 5.3 01ene2000, 22:00 11.35
810 9.4 1.9 01ene2000, 18:30 9.93
J810 9.4 1.9 01ene2000, 18:30 9.93
R9810 9.4 1.9 01ene2000, 18:30 9.93
J811 36.1 6.9 01ene2000, 21:00 10.98
R9811 36.1 6.5 02ene2000, 13:30 11.85
808 22.1 4.3 01ene2000, 19:00 9.93
J808 153.0 14.6 01ene2000, 19:00 10.20
R9808 153.0 14.6 01ene2000, 19:00 10.20
807 6.7 1.5 01ene2000, 17:00 9.93
J807 159.7 16.0 01ene2000, 19:00 10.19
Page 1
R9807 159.7 15.9 01ene2000, 19:00 10.18
806 25.7 4.3 01ene2000, 21:00 9.93
J806 185.4 20.1 01ene2000, 19:30 10.15
R9806 185.4 20.1 01ene2000, 20:00 10.15
805 14.3 3.1 01ene2000, 17:30 9.93
J805 199.7 22.9 01ene2000, 19:30 10.13
R9805 199.7 22.8 01ene2000, 20:00 10.13
804 5.1 1.4 01ene2000, 14:30 9.93
J804 204.8 23.6 01ene2000, 19:30 10.12
R9804 204.8 23.5 01ene2000, 20:00 10.12
802 10.1 3.8 01ene2000, 12:00 9.93
J802 214.9 24.2 01ene2000, 19:30 10.11
R9802 214.9 24.1 01ene2000, 20:30 10.11
801 5.4 1.7 01ene2000, 13:30 9.93
J801 220.3 24.6 01ene2000, 20:00 10.11
R9801 220.3 24.6 01ene2000, 20:30 10.11
SINK_SGD 220.3 24.6 01ene2000, 20:30 10.11
Page 2
Project: TTR+SGD+SRD Simulation Run: SGD-TR05
Start of Run: 01ene2000, 00:00 Basin Model: SGD_actualEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR05Compute Time: 10nov2014, 14:34:59 Control Specifications:TTR-TR05-D24
814 23.8 5.8 02ene2000, 02:00 20.62
J814 23.8 5.8 02ene2000, 02:00 20.62
R9814 23.8 5.7 02ene2000, 21:30 21.46
812 17.1 6.8 01ene2000, 19:00 20.62
J812 40.9 6.8 01ene2000, 19:00 21.11
R9812 40.9 6.5 02ene2000, 16:30 22.41
809 33.3 13.2 01ene2000, 19:00 20.62
813 10.4 8.7 01ene2000, 11:30 20.62
815 5.6 2.6 01ene2000, 17:00 20.62
J815 5.6 2.6 01ene2000, 17:00 20.62
R9815 5.6 2.6 01ene2000, 18:30 20.63
J813 16.0 8.9 01ene2000, 11:30 20.62
R9813 16.0 8.7 01ene2000, 14:00 20.57
J809 90.2 19.5 01ene2000, 18:00 21.42
R9809 90.2 19.4 01ene2000, 18:30 21.41
803 4.6 2.5 01ene2000, 15:30 20.62
J803 94.8 21.4 01ene2000, 18:00 21.38
R9803 94.8 21.4 01ene2000, 18:00 21.36
811 26.7 11.6 01ene2000, 18:00 20.62
810 9.4 4.0 01ene2000, 18:00 20.62
J810 9.4 4.0 01ene2000, 18:00 20.62
R9810 9.4 4.0 01ene2000, 18:00 20.62
J811 36.1 15.6 01ene2000, 18:00 20.62
R9811 36.1 14.7 02ene2000, 06:30 22.05
808 22.1 9.1 01ene2000, 18:30 20.62
J808 153.0 30.4 01ene2000, 18:00 21.42
R9808 153.0 29.1 01ene2000, 20:30 21.30
807 6.7 3.2 01ene2000, 17:00 20.62
J807 159.7 31.7 01ene2000, 19:30 21.27
Page 1
R9807 159.7 31.7 01ene2000, 20:00 21.26
806 25.7 8.9 01ene2000, 20:30 20.62
J806 185.4 40.6 01ene2000, 20:00 21.18
R9806 185.4 40.5 01ene2000, 20:30 21.17
805 14.3 6.6 01ene2000, 17:00 20.62
J805 199.7 45.9 01ene2000, 20:00 21.13
R9805 199.7 45.8 01ene2000, 20:00 21.12
804 5.1 3.0 01ene2000, 14:00 20.62
J804 204.8 47.2 01ene2000, 20:00 21.11
R9804 204.8 47.1 01ene2000, 20:00 21.11
802 10.1 8.1 01ene2000, 11:30 20.62
J802 214.9 48.3 01ene2000, 19:30 21.08
R9802 214.9 48.2 01ene2000, 20:30 21.08
801 5.4 3.7 01ene2000, 13:00 20.62
J801 220.3 49.3 01ene2000, 20:00 21.06
R9801 220.3 49.3 01ene2000, 20:00 21.06
SINK_SGD 220.3 49.3 01ene2000, 20:00 21.06
Page 2
Project: TTR+SGD+SRD Simulation Run: SGD-TR10
Start of Run: 01ene2000, 00:00 Basin Model: SGD_actualEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR10Compute Time: 10nov2014, 14:36:50 Control Specifications:TTR-TR10-D24
814 23.8 8.8 02ene2000, 06:30 33.36
J814 23.8 8.8 02ene2000, 06:30 33.36
R9814 23.8 8.7 02ene2000, 22:00 34.51
812 17.1 9.5 01ene2000, 22:30 33.36
J812 40.9 9.5 01ene2000, 22:30 34.03
R9812 40.9 9.3 02ene2000, 16:00 35.12
809 33.3 18.5 01ene2000, 22:30 33.36
813 10.4 12.3 01ene2000, 15:00 33.36
815 5.6 3.6 01ene2000, 20:30 33.36
J815 5.6 3.6 01ene2000, 20:30 33.36
R9815 5.6 3.6 01ene2000, 22:00 33.37
J813 16.0 12.6 01ene2000, 15:00 33.36
R9813 16.0 12.3 01ene2000, 17:00 33.29
J809 90.2 26.8 01ene2000, 21:30 34.15
R9809 90.2 26.2 01ene2000, 23:30 34.01
803 4.6 3.4 01ene2000, 18:30 33.36
J803 94.8 28.5 01ene2000, 23:00 33.97
R9803 94.8 28.5 01ene2000, 23:30 33.97
811 26.7 16.1 01ene2000, 21:30 33.36
810 9.4 5.6 01ene2000, 21:30 33.36
J810 9.4 5.6 01ene2000, 21:30 33.36
R9810 9.4 5.6 01ene2000, 21:30 33.36
J811 36.1 21.7 01ene2000, 21:30 33.36
R9811 36.1 20.7 02ene2000, 09:00 34.92
808 22.1 12.7 01ene2000, 22:00 33.36
J808 153.0 41.6 02ene2000, 07:00 34.11
R9808 153.0 40.6 02ene2000, 00:00 34.17
807 6.7 4.4 01ene2000, 20:00 33.36
J807 159.7 44.2 01ene2000, 23:30 34.14
Page 1
R9807 159.7 44.1 02ene2000, 00:00 34.13
806 25.7 12.8 02ene2000, 00:30 33.36
J806 185.4 56.8 02ene2000, 00:00 34.03
R9806 185.4 56.2 02ene2000, 01:30 34.00
805 14.3 9.1 01ene2000, 20:30 33.36
J805 199.7 63.7 01ene2000, 23:30 33.95
R9805 199.7 62.1 02ene2000, 02:30 33.99
804 5.1 4.2 01ene2000, 17:30 33.36
J804 204.8 63.8 02ene2000, 02:00 33.98
R9804 204.8 63.7 02ene2000, 02:30 33.98
802 10.1 11.4 01ene2000, 15:00 33.36
J802 214.9 66.1 02ene2000, 02:00 33.95
R9802 214.9 64.5 02ene2000, 05:00 33.84
801 5.4 5.1 01ene2000, 16:30 33.36
J801 220.3 65.4 02ene2000, 04:30 33.83
R9801 220.3 65.4 02ene2000, 04:30 33.83
SINK_SGD 220.3 65.4 02ene2000, 04:30 33.83
Page 2
Project: TTR+SGD+SRD Simulation Run: SRD-TR02
Start of Run: 01ene2000, 00:00 Basin Model: SRDEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR02Compute Time: 07nov2014, 13:22:31 Control Specifications:TTR-TR02-D24
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
906 26.2 4.4 02ene2000, 01:30 11.35
J906 26.2 4.4 02ene2000, 01:30 11.35
907 15.2 3.1 01ene2000, 18:30 9.93
J907 15.2 3.1 01ene2000, 18:30 9.93
R9907 15.2 3.1 01ene2000, 19:30 9.93
R9906 41.4 6.7 02ene2000, 00:30 10.79
905 27.8 3.8 01ene2000, 23:30 9.93
J905 69.2 10.5 02ene2000, 00:30 10.45
R9905 69.2 10.4 02ene2000, 01:00 10.44
904 19.0 2.6 01ene2000, 23:30 9.93
J904 88.2 13.0 02ene2000, 01:00 10.33
R9904 88.2 13.0 02ene2000, 01:30 10.32
903 36.0 5.0 01ene2000, 23:30 9.93
J903 124.2 17.8 02ene2000, 01:00 10.21
R9903 124.2 17.7 02ene2000, 02:00 10.20
902 21.5 2.9 01ene2000, 23:30 9.93
J902 145.7 20.6 02ene2000, 01:30 10.16
R9902 145.7 20.3 02ene2000, 03:30 10.13
901 14.0 4.8 01ene2000, 12:30 9.93
J901 159.7 20.4 02ene2000, 03:30 10.12
R9901 159.7 20.4 02ene2000, 03:30 10.12
SIND_SRD 159.7 20.4 02ene2000, 03:30 10.12
Project: TTR+SGD+SRD Simulation Run: SRD-TR05
Start of Run: 01ene2000, 00:00 Basin Model: SRDEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR05Compute Time: 07nov2014, 13:35:32 Control Specifications:TTR-TR05-D24
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
906 26.2 9.2 01ene2000, 20:30 20.62
J906 26.2 9.2 01ene2000, 20:30 20.62
907 15.2 6.5 01ene2000, 18:00 20.62
J907 15.2 6.5 01ene2000, 18:00 20.62
R9907 15.2 6.4 01ene2000, 19:00 20.61
R9906 41.4 15.3 01ene2000, 21:30 20.54
905 27.8 8.0 01ene2000, 23:30 20.62
J905 69.2 23.1 01ene2000, 22:00 20.57
R9905 69.2 23.0 01ene2000, 22:30 20.55
904 19.0 5.5 01ene2000, 23:00 20.62
J904 88.2 28.4 01ene2000, 23:00 20.56
R9904 88.2 28.3 01ene2000, 23:30 20.54
903 36.0 10.5 01ene2000, 23:00 20.62
J903 124.2 38.7 01ene2000, 23:30 20.56
R9903 124.2 36.1 02ene2000, 02:30 20.18
902 21.5 6.1 01ene2000, 23:30 20.62
J902 145.7 41.9 02ene2000, 02:00 20.25
R9902 145.7 37.0 02ene2000, 09:30 19.09
901 14.0 10.4 01ene2000, 12:00 20.62
J901 159.7 37.0 02ene2000, 09:30 19.22
R9901 159.7 37.0 02ene2000, 09:30 19.22
SIND_SRD 159.7 37.0 02ene2000, 09:30 19.22
Project: TTR+SGD+SRD Simulation Run: SRD-TR10
Start of Run: 01ene2000, 00:00 Basin Model: SRDEnd of Run: 09ene2000, 00:00 Meteorologic Model: TR10Compute Time: 07nov2014, 13:36:42 Control Specifications:TTR-TR10-D24
HydrologicElement
Drainage Area(KM2)
Peak Discharge(M3/S)
Time of Peak Volume(MM)
906 26.2 13.1 02ene2000, 00:30 33.36
J906 26.2 13.1 02ene2000, 00:30 33.36
907 15.2 9.0 01ene2000, 21:30 33.36
J907 15.2 9.0 01ene2000, 21:30 33.36
R9907 15.2 9.0 01ene2000, 22:30 33.35
R9906 41.4 21.6 02ene2000, 01:30 33.25
905 27.8 11.8 02ene2000, 04:00 33.36
J905 69.2 33.0 02ene2000, 02:00 33.29
R9905 69.2 31.6 02ene2000, 04:30 32.97
904 19.0 8.1 02ene2000, 03:30 33.36
J904 88.2 39.6 02ene2000, 04:30 33.06
R9904 88.2 39.2 02ene2000, 06:00 32.97
903 36.0 15.4 02ene2000, 03:30 33.36
J903 124.2 54.2 02ene2000, 05:30 33.09
R9903 124.2 53.1 02ene2000, 07:30 33.04
902 21.5 9.0 02ene2000, 04:00 33.36
J902 145.7 61.6 02ene2000, 07:00 33.09
R9902 145.7 51.6 02ene2000, 20:30 29.73
901 14.0 14.5 01ene2000, 15:30 33.36
J901 159.7 51.6 02ene2000, 20:30 30.05
R9901 159.7 51.5 02ene2000, 20:30 30.05
SIND_SRD 159.7 51.5 02ene2000, 20:30 30.05
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 1
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 102.10 19.00 23.90 21.20 24.00 0.000600 1.47 102.87 200.00 0.24
Principal 300 102.10 19.15 24.08 24.17 0.000543 1.42 123.79 200.00 0.23
Principal 900 102.10 19.46 24.41 24.51 0.000557 1.43 114.66 200.00 0.24
Principal 1500 102.10 19.76 24.71 24.75 0.000269 1.06 255.39 200.00 0.17
Principal 2100 102.10 20.07 24.87 24.90 0.000236 0.99 287.79 200.00 0.16
Principal 2700 102.10 20.38 25.07 25.19 0.000675 1.54 107.94 200.00 0.26
Principal 3500 102.10 20.78 25.55 25.62 0.000437 1.29 185.10 200.00 0.21
Principal 4300 102.10 21.18 25.89 25.95 0.000378 1.21 215.28 200.00 0.20
Principal 4500 102.10 21.29 25.95 26.07 0.000664 1.53 116.51 200.00 0.26
Principal 4800 102.10 21.44 26.16 26.23 0.000407 1.25 201.55 200.00 0.20
Principal 5200 102.10 21.65 26.34 26.43 0.000579 1.45 141.53 200.00 0.24
Principal 5600 78.90 21.85 26.52 26.58 0.000348 1.12 142.02 200.00 0.19
Principal 6000 78.90 22.05 26.67 26.75 0.000459 1.25 86.24 200.00 0.21
Principal 6070 78.90 22.14 26.75 26.77 0.000098 0.66 178.03 200.00 0.11
Principal 6093 Bridge
Principal 6110 78.90 22.14 26.78 23.29 26.80 0.000095 0.65 183.44 200.00 0.10
Principal 6400 78.90 22.39 26.80 26.89 0.000628 1.41 90.11 200.00 0.25
Principal 6800 78.90 22.73 27.06 27.16 0.000706 1.47 76.04 200.00 0.26
Principal 7200 78.90 23.07 27.34 27.44 0.000657 1.43 100.48 200.00 0.25
Principal 7600 51.20 23.41 27.53 27.59 0.000382 1.04 49.40 16.15 0.19
Principal 7800 51.20 23.50 27.61 27.66 0.000364 1.03 67.96 200.00 0.19
Principal 8000 51.20 23.75 27.69 27.75 0.000452 1.10 46.46 29.26 0.21
Principal 8400 51.20 24.09 27.88 27.95 0.000522 1.16 44.07 15.48 0.22
Principal 8800 51.20 24.43 28.10 28.17 0.000589 1.21 42.19 15.23 0.23
Principal 9200 51.20 24.86 28.35 28.43 0.000706 1.30 39.51 14.87 0.25
Principal 9270 51.20 24.86 28.44 28.46 0.000183 0.75 96.16 200.00 0.14
Principal 9295 Bridge
Principal 9310 51.20 24.86 28.46 25.90 28.49 0.000176 0.74 101.05 200.00 0.13
Principal 9600 51.20 25.11 28.53 28.61 0.000733 1.32 48.75 200.00 0.26
Principal 10000 51.20 25.45 28.82 28.91 0.000718 1.31 62.38 200.00 0.26
Principal 10480 51.20 25.88 29.08 29.12 0.000284 0.87 58.92 21.71 0.17
Principal 10500 Bridge
Principal 10520 51.20 25.88 29.12 26.93 29.16 0.000272 0.86 60.52 75.89 0.17
Principal 10800 51.20 26.13 29.22 29.34 0.001088 1.51 33.82 14.09 0.31
Principal 11200 51.20 26.47 29.64 28.00 29.75 0.000969 1.46 40.17 153.14 0.30
Principal 11600 51.20 26.81 30.03 30.14 0.000940 1.44 35.64 14.34 0.29
Principal 12500 51.20 27.42 30.81 30.90 0.000784 1.35 38.04 14.68 0.27
Principal 13000 51.20 28.00 31.23 31.33 0.000932 1.43 35.75 14.36 0.29
Principal 13500 51.20 28.81 31.81 31.97 0.001530 1.73 29.59 12.91 0.36
Principal 13830 51.20 29.36 32.21 32.27 0.000552 1.12 45.88 19.09 0.23
Principal 13851 Bridge
Principal 13870 51.20 29.36 32.25 30.49 32.31 0.000521 1.09 46.80 19.19 0.22
Principal 14000 51.20 29.72 32.30 32.52 0.002660 2.11 24.26 12.06 0.47
Principal 14500 51.20 30.63 33.44 33.62 0.001958 1.89 27.08 12.51 0.41
Principal 15000 51.20 33.54 35.61 36.00 0.005803 2.78 18.39 11.04 0.69
Principal 15140 51.20 34.60 36.34 36.53 0.002784 1.91 26.74 17.29 0.49
Principal 15169 Bridge
Principal 15180 51.20 34.60 36.55 35.71 36.69 0.001910 1.69 30.31 17.69 0.41
Principal 15500 51.20 35.63 37.71 38.10 0.005695 2.77 18.51 11.06 0.68
Principal 15930 51.20 36.10 38.75 38.83 0.000671 1.19 43.08 19.01 0.25
Principal 15950 Bridge
Principal 15970 51.20 36.10 38.81 37.21 38.88 0.000622 1.16 44.21 19.13 0.24
Principal 16000 51.20 36.49 38.66 39.01 0.004941 2.63 19.46 11.23 0.64
Principal 16500 51.20 37.34 40.14 40.33 0.001966 1.89 27.03 12.51 0.41
Principal 17000 51.20 37.98 41.01 41.16 0.001483 1.71 29.92 12.96 0.36
Principal 17340 51.20 38.38 41.37 41.41 0.000363 0.94 54.22 21.27 0.19
Principal 17369 Bridge
Principal 17380 51.20 38.38 41.40 39.42 41.44 0.000349 0.93 54.91 21.34 0.19
Principal 17500 51.20 38.48 41.41 41.57 0.001678 1.79 28.62 12.76 0.38
Principal 18000 49.00 38.98 42.11 42.24 0.001202 1.57 31.28 13.17 0.32
Principal 18080 49.00 39.08 42.26 42.29 0.000269 0.84 58.30 21.65 0.16
Principal 18106 Bridge
Principal 18120 49.00 39.08 42.28 40.09 42.32 0.000261 0.83 58.87 21.70 0.16
Principal 18500 49.00 39.49 42.46 42.60 0.001461 1.68 29.15 12.84 0.36
Principal 19000 49.00 39.99 43.13 43.26 0.001192 1.56 31.37 13.18 0.32
Principal 19460 49.00 40.49 43.52 43.56 0.000386 0.97 50.59 19.85 0.19
Principal 19486 Bridge
Principal 19500 49.00 40.49 43.51 42.10 43.65 0.001374 1.64 29.80 12.94 0.35
Principal 20000 49.00 40.99 44.15 44.27 0.001163 1.55 31.65 13.22 0.32
Principal 20500 49.00 41.59 44.74 44.86 0.001182 1.56 31.46 13.20 0.32
Principal 20560 49.00 41.59 44.87 44.90 0.000241 0.81 60.53 21.86 0.16
Principal 20581 Bridge
Principal 20600 49.00 41.59 44.89 42.60 44.93 0.000235 0.80 61.05 21.90 0.15
Principal 21000 49.00 41.99 45.06 45.19 0.001293 1.61 30.47 13.04 0.34
Principal 21090 49.00 42.09 45.22 45.25 0.000171 0.69 71.30 26.06 0.13
Principal 21110 Bridge
Principal 21130 49.00 42.09 45.25 42.95 45.27 0.000166 0.68 72.07 26.12 0.13
Principal 21500 49.00 42.59 45.39 45.55 0.001820 1.82 26.93 12.49 0.40
Principal 21510 49.00 42.49 45.55 45.57 0.000186 0.71 69.38 25.91 0.14
Principal 21531 Bridge
Principal 21550 49.00 42.49 45.56 43.35 45.59 0.000183 0.70 69.76 25.94 0.14
Principal 22000 49.00 43.00 45.77 45.94 0.001884 1.84 26.60 12.44 0.40
Principal 22100 41.90 43.10 45.99 46.02 0.000272 0.80 52.15 21.08 0.16
Principal 22140 41.90 43.10 46.00 46.03 0.000268 0.80 52.39 21.10 0.16
Principal 22500 41.90 43.50 46.18 46.32 0.001549 1.64 25.50 12.26 0.36
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 1 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 41.90 43.60 46.35 46.37 0.000193 0.68 61.71 25.39 0.14
Principal 22600 Culvert
Principal 22620 41.90 43.60 46.91 44.38 46.93 0.000102 0.55 78.48 113.05 0.10
Principal 22630 41.90 43.98 46.91 46.93 0.000173 0.66 63.40 24.75 0.13
Principal 22659 Bridge
Principal 22670 41.90 43.98 46.93 44.78 46.95 0.000168 0.66 63.94 24.80 0.13
Principal 23000 41.90 44.10 47.03 47.17 0.001463 1.63 25.73 11.76 0.35
Principal 23500 41.90 44.73 47.73 47.86 0.001337 1.58 26.59 11.91 0.34
Principal 23700 41.90 44.98 47.95 47.98 0.000247 0.78 53.89 21.24 0.16
Principal 23726 Bridge
Principal 23740 41.90 44.98 47.97 45.90 48.00 0.000241 0.77 54.37 21.29 0.15
Principal 24000 41.90 45.35 48.08 48.24 0.001905 1.79 23.38 11.35 0.40
Principal 24500 41.90 45.98 48.92 49.05 0.001450 1.62 25.82 11.78 0.35
Principal 25000 41.90 46.60 49.61 49.74 0.001320 1.57 26.71 11.93 0.33
Principal 25500 41.90 47.23 50.27 50.39 0.001285 1.55 26.97 11.97 0.33
Principal 25860 41.90 47.72 50.57 50.61 0.000284 0.82 51.40 21.01 0.17
Principal 25882 Bridge
Principal 25900 41.90 47.72 50.59 48.64 50.62 0.000278 0.81 51.75 21.04 0.16
Principal 26000 41.90 47.85 50.57 50.73 0.001925 1.80 23.30 11.34 0.40
Principal 26500 41.90 48.48 51.42 51.55 0.001454 1.62 25.79 11.77 0.35
Principal 26910 41.90 48.98 51.78 51.82 0.000301 0.83 50.40 20.91 0.17
Principal 26932 Bridge
Principal 26950 41.90 48.98 51.80 49.90 51.84 0.000294 0.83 50.76 20.94 0.17
Principal 27000 41.90 49.10 51.73 51.91 0.002167 1.88 22.32 11.17 0.42
Principal 27500 41.90 49.75 52.65 52.79 0.001519 1.65 25.38 11.70 0.36
Principal 27710 41.90 49.85 52.90 52.92 0.000216 0.74 56.70 21.79 0.15
Principal 27736 Bridge
Principal 27750 41.90 49.85 52.92 50.75 52.94 0.000211 0.73 57.18 21.83 0.14
Principal 28000 41.90 50.16 53.00 53.14 0.001647 1.70 24.65 11.58 0.37
Principal 28500 41.90 50.76 53.75 53.88 0.001354 1.58 26.46 11.88 0.34
Principal 29000 41.90 51.17 54.37 54.47 0.001061 1.45 28.92 12.29 0.30
Principal 29500 41.90 51.67 54.89 55.00 0.001032 1.43 29.22 12.34 0.30
Principal 30000 41.90 52.18 55.40 55.51 0.001027 1.43 29.28 12.35 0.30
Principal 30500 41.90 52.80 55.94 56.05 0.001132 1.48 28.26 12.18 0.31
Principal 31000 41.90 53.41 56.52 56.63 0.001177 1.50 27.85 12.12 0.32
Principal 31500 40.70 54.04 57.10 57.21 0.001182 1.49 27.23 12.01 0.32
Principal 31520 40.70 54.11 57.20 57.23 0.000203 0.72 56.46 21.48 0.14
Principal 31543 Bridge
Principal 31560 40.70 54.11 57.22 55.01 57.24 0.000199 0.72 56.85 21.52 0.14
Principal 32000 40.70 54.67 57.43 57.58 0.001712 1.71 23.80 11.43 0.38
Principal 32500 40.70 55.30 58.22 58.35 0.001404 1.59 25.57 11.73 0.34
Principal 33000 40.70 55.92 58.90 59.02 0.001304 1.55 26.27 11.85 0.33
Principal 33500 40.70 56.54 59.54 59.66 0.001267 1.53 26.55 11.90 0.33
Principal 33710 40.70 56.79 59.75 59.78 0.000235 0.76 53.73 21.23 0.15
Principal 33730 Bridge
Principal 33750 40.70 56.79 59.77 57.69 59.80 0.000230 0.75 54.17 21.27 0.15
Principal 34000 40.70 57.16 59.87 60.02 0.001850 1.76 23.14 11.31 0.39
Principal 34500 40.70 57.79 60.69 60.82 0.001436 1.60 25.37 11.70 0.35
Principal 35000 40.70 58.41 61.38 61.50 0.001314 1.55 26.20 11.84 0.33
Principal 35360 40.70 58.91 61.70 61.73 0.000291 0.81 49.99 20.87 0.17
Principal 35385 Bridge
Principal 35400 40.70 58.91 61.72 59.81 61.75 0.000282 0.81 50.51 20.92 0.17
Principal 35500 40.70 59.03 61.70 61.87 0.001935 1.79 22.77 11.25 0.40
Principal 36000 40.70 59.66 62.55 62.68 0.001453 1.61 25.25 11.68 0.35
Principal 36500 40.70 60.28 63.25 63.37 0.001320 1.56 26.15 11.83 0.33
Principal 37000 40.70 60.90 63.90 64.02 0.001272 1.54 26.51 11.89 0.33
Principal 37500 40.70 61.53 64.53 64.65 0.001265 1.53 26.57 11.90 0.33
Principal 38000 40.70 62.15 65.16 65.28 0.001251 1.53 26.67 11.92 0.33
Principal 38240 40.70 62.45 65.39 65.42 0.000242 0.76 53.22 21.18 0.15
Principal 38262 Bridge
Principal 38280 40.70 62.45 65.41 63.35 65.44 0.000236 0.76 53.67 21.22 0.15
Principal 38500 40.70 62.72 65.48 65.63 0.001719 1.71 23.76 11.42 0.38
Principal 39000 40.70 63.39 66.28 66.41 0.001458 1.61 25.23 11.68 0.35
Principal 39500 40.70 64.01 66.98 67.10 0.001322 1.56 26.14 11.83 0.33
Principal 40000 40.70 64.04 67.50 67.58 0.000715 1.25 40.50 187.90 0.25
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 2
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 143.70 19.00 24.37 21.70 24.48 0.000600 1.60 197.14 200.00 0.25
Principal 300 143.70 19.15 24.55 24.65 0.000532 1.52 218.42 200.00 0.24
Principal 900 143.70 19.46 24.87 24.98 0.000556 1.55 208.34 200.00 0.24
Principal 1500 143.70 19.76 25.17 25.21 0.000271 1.14 348.54 200.00 0.17
Principal 2100 143.70 20.07 25.33 25.37 0.000240 1.07 381.22 200.00 0.16
Principal 2700 143.70 20.38 25.53 25.65 0.000660 1.65 199.52 200.00 0.26
Principal 3500 143.70 20.78 26.00 26.06 0.000429 1.38 274.58 200.00 0.21
Principal 4300 143.70 21.18 26.33 26.39 0.000375 1.29 303.67 200.00 0.20
Principal 4500 143.70 21.29 26.39 26.50 0.000658 1.64 204.49 200.00 0.26
Principal 4800 143.70 21.44 26.60 26.66 0.000405 1.34 289.16 200.00 0.21
Principal 5200 143.70 21.65 26.77 26.87 0.000572 1.55 228.71 200.00 0.24
Principal 5600 117.80 21.85 26.96 27.03 0.000383 1.27 230.41 200.00 0.20
Principal 6000 117.80 22.05 27.13 27.22 0.000516 1.43 177.13 200.00 0.23
Principal 6070 117.80 22.14 27.21 27.24 0.000127 0.81 270.40 200.00 0.12
Principal 6093 Bridge
Principal 6110 117.80 22.14 27.24 23.62 27.26 0.000124 0.80 275.50 200.00 0.12
Principal 6400 117.80 22.39 27.27 27.37 0.000621 1.53 185.31 200.00 0.25
Principal 6800 117.80 22.73 27.53 27.64 0.000707 1.61 170.66 200.00 0.27
Principal 7200 117.80 23.07 27.82 27.91 0.000627 1.52 195.03 200.00 0.25
Principal 7600 79.80 23.41 28.00 28.07 0.000466 1.26 128.80 200.00 0.21
Principal 7800 79.80 23.50 28.10 28.16 0.000371 1.14 166.17 200.00 0.19
Principal 8000 79.80 23.75 28.18 28.25 0.000494 1.28 136.39 200.00 0.22
Principal 8400 79.80 24.09 28.39 28.50 0.000694 1.46 89.70 200.00 0.26
Principal 8800 79.80 24.43 28.70 28.82 0.000818 1.54 51.71 16.43 0.28
Principal 9200 79.80 24.86 29.04 29.10 0.000478 1.24 163.49 200.00 0.22
Principal 9270 79.80 24.86 29.10 29.13 0.000153 0.78 229.47 200.00 0.13
Principal 9295 Bridge
Principal 9310 79.80 24.86 29.12 26.25 29.14 0.000149 0.78 233.06 200.00 0.13
Principal 9600 79.80 25.11 29.18 29.23 0.000455 1.21 178.96 200.00 0.21
Principal 10000 79.80 25.45 29.37 29.43 0.000522 1.27 171.61 200.00 0.23
Principal 10480 79.80 25.88 29.57 29.62 0.000322 1.03 146.93 200.00 0.18
Principal 10500 Bridge
Principal 10520 79.80 25.88 29.66 27.27 29.70 0.000279 0.98 164.21 200.00 0.17
Principal 10800 79.80 26.13 29.76 29.88 0.001025 1.66 108.59 200.00 0.31
Principal 11200 79.80 26.47 30.15 30.23 0.000776 1.48 139.86 200.00 0.27
Principal 11600 79.80 26.81 30.50 30.64 0.001114 1.73 90.39 200.00 0.32
Principal 12500 79.80 27.42 31.41 31.54 0.000949 1.64 74.95 200.00 0.30
Principal 13000 79.80 28.00 31.93 32.08 0.001110 1.72 46.27 15.76 0.32
Principal 13500 79.80 28.81 32.58 32.78 0.001617 1.99 40.04 14.44 0.38
Principal 13830 79.80 29.36 33.01 33.10 0.000564 1.29 61.96 20.71 0.24
Principal 13851 Bridge
Principal 13870 79.80 29.36 33.08 30.85 33.16 0.000531 1.26 63.26 20.83 0.23
Principal 14000 79.80 29.72 33.09 33.37 0.002434 2.31 34.49 13.65 0.46
Principal 14500 79.80 30.63 34.20 34.44 0.001971 2.14 37.25 14.05 0.42
Principal 15000 79.80 33.54 36.20 36.71 0.005751 3.16 25.29 12.23 0.70
Principal 15140 79.80 34.60 36.98 37.20 0.002350 2.09 38.09 18.55 0.47
Principal 15169 Bridge
Principal 15180 79.80 34.60 37.19 36.07 37.38 0.001738 1.89 42.20 18.99 0.40
Principal 15500 79.80 35.63 38.25 38.78 0.006135 3.23 24.71 12.13 0.72
Principal 15930 79.80 36.10 39.47 39.57 0.000719 1.40 57.11 20.43 0.27
Principal 15950 Bridge
Principal 15970 79.80 36.10 39.55 37.58 39.64 0.000663 1.36 58.74 20.59 0.26
Principal 16000 79.80 36.49 39.36 39.78 0.004384 2.86 27.88 12.64 0.62
Principal 16500 79.80 37.34 40.91 39.50 41.11 0.001714 2.04 68.31 200.00 0.39
Principal 17000 79.80 37.98 41.67 41.83 0.001337 1.86 89.41 200.00 0.35
Principal 17340 79.80 38.38 42.00 42.06 0.000366 1.08 131.30 200.00 0.20
Principal 17369 Bridge
Principal 17380 79.80 38.38 42.08 39.76 42.13 0.000324 1.04 145.50 200.00 0.18
Principal 17500 79.80 38.48 42.05 40.64 42.27 0.001810 2.09 58.04 200.00 0.41
Principal 18000 80.80 38.98 42.82 42.97 0.001221 1.81 89.21 200.00 0.34
Principal 18080 80.80 39.08 42.97 43.03 0.000352 1.08 87.15 200.00 0.19
Principal 18106 Bridge
Principal 18120 80.80 39.08 43.02 40.47 43.07 0.000332 1.06 96.13 200.00 0.19
Principal 18500 80.80 39.49 43.22 41.66 43.40 0.001451 1.93 76.47 200.00 0.37
Principal 19000 80.80 39.99 43.92 42.16 44.10 0.001358 1.89 55.24 200.00 0.35
Principal 19460 80.80 40.49 44.37 44.44 0.000423 1.17 88.99 200.00 0.21
Principal 19486 Bridge
Principal 19500 80.80 40.49 44.35 42.66 44.54 0.001521 1.96 41.32 14.61 0.37
Principal 20000 80.80 40.99 45.05 45.17 0.000953 1.65 101.47 200.00 0.30
Principal 20500 80.80 41.59 45.61 45.78 0.001296 1.85 44.48 68.29 0.34
Principal 20560 80.80 41.59 45.78 45.83 0.000264 0.98 107.99 200.00 0.17
Principal 20581 Bridge
Principal 20600 80.80 41.59 45.84 42.99 45.88 0.000246 0.96 118.76 200.00 0.16
Principal 21000 80.80 41.99 45.99 44.16 46.16 0.001295 1.85 50.64 178.58 0.34
Principal 21090 80.80 42.09 46.18 46.22 0.000181 0.83 115.08 200.00 0.14
Principal 21110 Bridge
Principal 21130 80.80 42.09 46.23 43.28 46.27 0.000171 0.81 124.93 200.00 0.14
Principal 21500 80.80 42.59 46.33 46.54 0.001700 2.04 39.67 14.39 0.39
Principal 21510 80.80 42.49 46.53 46.57 0.000187 0.83 118.48 200.00 0.14
Principal 21531 Bridge
Principal 21550 80.80 42.49 46.55 43.68 46.59 0.000182 0.83 122.55 200.00 0.14
Principal 22000 80.80 43.00 46.72 46.93 0.001748 2.06 39.27 14.33 0.40
Principal 22100 72.70 43.10 46.97 47.01 0.000271 0.96 112.19 200.00 0.17
Principal 22140 72.70 43.10 46.98 47.02 0.000267 0.95 114.50 200.00 0.17
Principal 22500 72.70 43.50 47.13 45.54 47.29 0.001367 1.84 65.74 200.00 0.35
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 2 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 72.70 43.60 47.31 47.34 0.000172 0.78 157.27 200.00 0.14
Principal 22600 Culvert
Principal 22620 72.70 43.60 48.72 44.71 48.73 0.000027 0.39 438.43 200.00 0.06
Principal 22630 72.70 43.98 48.72 48.73 0.000054 0.51 313.20 200.00 0.08
Principal 22659 Bridge
Principal 22670 72.70 43.98 48.76 45.13 48.77 0.000051 0.50 321.20 200.00 0.08
Principal 23000 72.70 44.10 48.78 48.82 0.000298 1.01 203.81 200.00 0.17
Principal 23500 72.70 44.73 48.96 49.00 0.000420 1.14 187.14 200.00 0.20
Principal 23700 72.70 44.98 49.03 49.07 0.000249 0.93 91.62 200.00 0.16
Principal 23726 Bridge
Principal 23740 72.70 44.98 49.08 46.28 49.12 0.000233 0.91 101.82 200.00 0.16
Principal 24000 72.70 45.35 49.15 49.35 0.001674 1.98 36.66 13.49 0.38
Principal 24500 72.70 45.98 49.93 50.11 0.001421 1.87 39.93 78.05 0.36
Principal 25000 72.70 46.60 50.63 50.80 0.001332 1.82 39.89 13.96 0.34
Principal 25500 72.70 47.23 51.29 51.41 0.000970 1.62 95.73 200.00 0.30
Principal 25860 72.70 47.72 51.56 51.61 0.000306 0.99 73.18 22.99 0.18
Principal 25882 Bridge
Principal 25900 72.70 47.72 51.58 49.02 51.63 0.000301 0.99 73.61 23.02 0.18
Principal 26000 72.70 47.85 51.54 51.75 0.001869 2.06 35.21 13.28 0.40
Principal 26500 72.70 48.48 52.37 52.50 0.001175 1.74 87.34 200.00 0.33
Principal 26910 72.70 48.98 52.70 52.76 0.000334 1.03 80.02 200.00 0.19
Principal 26932 Bridge
Principal 26950 72.70 48.98 52.74 50.28 52.79 0.000318 1.01 87.70 200.00 0.18
Principal 27000 72.70 49.10 52.71 52.85 0.001303 1.79 100.13 200.00 0.34
Principal 27500 72.70 49.75 53.57 53.77 0.001636 1.97 36.98 13.54 0.38
Principal 27710 72.70 49.85 53.87 53.92 0.000249 0.92 78.97 23.75 0.16
Principal 27736 Bridge
Principal 27750 72.70 49.85 53.91 51.13 53.95 0.000242 0.91 79.75 23.81 0.16
Principal 28000 72.70 50.16 53.97 54.17 0.001656 1.97 36.81 13.51 0.38
Principal 28500 72.70 50.76 54.74 52.96 54.92 0.001351 1.84 47.46 188.85 0.35
Principal 29000 72.70 51.17 55.35 55.47 0.000969 1.63 82.30 200.00 0.30
Principal 29500 72.70 51.67 55.80 55.87 0.000668 1.39 137.56 200.00 0.25
Principal 30000 72.70 52.18 56.27 56.43 0.001257 1.79 41.29 62.47 0.34
Principal 30500 72.70 52.80 56.90 57.06 0.001254 1.78 40.79 14.09 0.33
Principal 31000 72.70 53.41 57.52 57.68 0.001238 1.77 40.98 14.12 0.33
Principal 31500 71.70 54.04 58.13 58.29 0.001225 1.76 40.72 14.08 0.33
Principal 31520 71.70 54.11 58.27 58.31 0.000226 0.89 80.55 23.62 0.15
Principal 31543 Bridge
Principal 31560 71.70 54.11 58.30 55.40 58.34 0.000221 0.88 81.19 23.67 0.15
Principal 32000 71.70 54.67 58.48 58.67 0.001605 1.95 36.86 13.52 0.38
Principal 32500 71.70 55.30 59.24 59.42 0.001408 1.85 38.69 13.79 0.35
Principal 33000 71.70 55.92 59.93 60.10 0.001320 1.81 39.61 13.92 0.34
Principal 33500 71.70 56.54 60.58 58.72 60.75 0.001258 1.79 43.88 132.91 0.34
Principal 33710 71.70 56.79 60.83 60.88 0.000250 0.92 77.79 23.38 0.16
Principal 33730 Bridge
Principal 33750 71.70 56.79 60.86 58.08 60.90 0.000244 0.91 78.49 23.44 0.16
Principal 34000 71.70 57.16 60.92 61.12 0.001683 1.98 36.22 13.43 0.38
Principal 34500 71.70 57.79 61.72 61.89 0.001435 1.87 38.42 13.75 0.36
Principal 35000 71.70 58.41 62.41 62.58 0.001331 1.82 39.49 13.90 0.34
Principal 35360 71.70 58.91 62.76 62.81 0.000295 0.98 73.44 23.01 0.17
Principal 35385 Bridge
Principal 35400 71.70 58.91 62.80 60.20 62.85 0.000286 0.97 74.23 23.08 0.17
Principal 35500 71.70 59.03 62.76 62.96 0.001745 2.01 35.74 13.36 0.39
Principal 36000 71.70 59.66 63.57 63.75 0.001455 1.88 38.21 13.72 0.36
Principal 36500 71.70 60.28 64.25 64.37 0.001012 1.64 95.00 200.00 0.30
Principal 37000 71.70 60.90 64.81 63.08 64.96 0.001238 1.78 73.05 200.00 0.33
Principal 37500 71.70 61.53 65.43 63.71 65.58 0.001242 1.78 73.49 200.00 0.33
Principal 38000 71.70 62.15 66.09 64.33 66.26 0.001384 1.85 44.25 158.86 0.35
Principal 38240 71.70 62.45 66.37 66.42 0.000274 0.96 79.43 148.51 0.17
Principal 38262 Bridge
Principal 38280 71.70 62.45 66.42 63.74 66.46 0.000260 0.94 87.67 200.00 0.16
Principal 38500 71.70 62.72 66.46 66.67 0.001716 1.99 35.96 13.39 0.39
Principal 39000 71.70 63.39 67.28 67.37 0.000824 1.49 127.11 200.00 0.28
Principal 39500 71.70 64.01 67.74 67.85 0.001034 1.63 113.61 200.00 0.31
Principal 40000 71.70 64.04 68.14 68.19 0.000514 1.23 167.36 200.00 0.22
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 3
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 185.10 19.00 24.73 22.13 24.83 0.000601 1.69 268.73 200.00 0.25
Principal 300 185.10 19.15 24.91 25.00 0.000535 1.61 289.95 200.00 0.24
Principal 900 185.10 19.46 25.23 25.33 0.000558 1.64 280.19 200.00 0.24
Principal 1500 185.10 19.76 25.53 25.58 0.000285 1.23 420.96 200.00 0.18
Principal 2100 185.10 20.07 25.70 25.74 0.000252 1.16 455.20 200.00 0.17
Principal 2700 185.10 20.38 25.90 26.01 0.000634 1.71 273.90 200.00 0.26
Principal 3500 185.10 20.78 26.36 26.43 0.000431 1.46 346.70 200.00 0.22
Principal 4300 185.10 21.18 26.69 26.75 0.000379 1.37 376.13 200.00 0.20
Principal 4500 185.10 21.29 26.76 26.86 0.000637 1.71 277.35 200.00 0.26
Principal 4800 185.10 21.44 26.96 27.02 0.000409 1.42 360.61 200.00 0.21
Principal 5200 185.10 21.65 27.13 27.22 0.000563 1.62 300.28 200.00 0.25
Principal 5600 160.70 21.85 27.33 27.40 0.000419 1.40 303.20 200.00 0.21
Principal 6000 160.70 22.05 27.50 27.60 0.000548 1.57 252.61 200.00 0.24
Principal 6070 160.70 22.14 27.59 27.62 0.000156 0.95 345.73 200.00 0.14
Principal 6093 Bridge
Principal 6110 160.70 22.14 27.61 23.94 27.64 0.000153 0.94 349.97 200.00 0.14
Principal 6400 160.70 22.39 27.66 27.75 0.000619 1.63 262.88 200.00 0.25
Principal 6800 160.70 22.73 27.92 28.02 0.000697 1.71 247.91 200.00 0.27
Principal 7200 160.70 23.07 28.20 28.29 0.000623 1.62 271.28 200.00 0.25
Principal 7600 113.50 23.41 28.39 28.46 0.000488 1.38 205.85 200.00 0.22
Principal 7800 113.50 23.50 28.49 28.55 0.000385 1.25 244.15 200.00 0.20
Principal 8000 113.50 23.75 28.57 28.64 0.000496 1.38 215.01 200.00 0.22
Principal 8400 113.50 24.09 28.79 28.89 0.000705 1.59 168.19 200.00 0.27
Principal 8800 113.50 24.43 29.10 29.27 0.001040 1.86 98.40 200.00 0.32
Principal 9200 113.50 24.86 29.49 29.54 0.000421 1.27 253.21 200.00 0.21
Principal 9270 113.50 24.86 29.54 29.57 0.000166 0.88 316.63 200.00 0.14
Principal 9295 Bridge
Principal 9310 113.50 24.86 29.56 26.59 29.58 0.000162 0.87 320.40 200.00 0.14
Principal 9600 113.50 25.11 29.62 29.67 0.000403 1.23 267.30 200.00 0.20
Principal 10000 113.50 25.45 29.79 29.84 0.000466 1.30 255.65 200.00 0.22
Principal 10480 113.50 25.88 29.98 30.03 0.000336 1.14 227.47 200.00 0.19
Principal 10500 Bridge
Principal 10520 113.50 25.88 30.03 27.61 30.08 0.000311 1.11 237.46 200.00 0.18
Principal 10800 113.50 26.13 30.14 30.25 0.000907 1.70 184.70 200.00 0.30
Principal 11200 113.50 26.47 30.49 30.57 0.000749 1.56 209.01 200.00 0.27
Principal 11600 113.50 26.81 30.83 30.97 0.001110 1.85 157.18 200.00 0.33
Principal 12500 113.50 27.42 31.76 31.90 0.000996 1.81 145.29 200.00 0.31
Principal 13000 113.50 28.00 32.31 30.48 32.51 0.001291 2.01 104.84 200.00 0.35
Principal 13500 113.50 28.81 33.11 31.46 33.39 0.001961 2.36 53.46 158.13 0.43
Principal 13830 113.50 29.36 33.64 33.75 0.000635 1.50 90.68 200.00 0.26
Principal 13851 Bridge
Principal 13870 113.50 29.36 33.77 31.23 33.87 0.000533 1.41 117.91 200.00 0.24
Principal 14000 113.50 29.72 33.76 34.10 0.002513 2.57 44.09 14.99 0.48
Principal 14500 113.50 30.63 34.92 35.20 0.002019 2.38 47.78 15.47 0.43
Principal 15000 113.50 33.54 36.79 37.40 0.005664 3.46 32.78 13.40 0.71
Principal 15140 113.50 34.60 37.61 37.87 0.002112 2.26 50.25 19.82 0.45
Principal 15169 Bridge
Principal 15180 113.50 34.60 37.86 36.44 38.07 0.001611 2.06 55.18 20.31 0.40
Principal 15500 113.50 35.63 38.77 39.44 0.006371 3.61 31.41 13.19 0.75
Principal 15930 113.50 36.10 40.15 40.28 0.000763 1.59 71.57 21.80 0.28
Principal 15950 Bridge
Principal 15970 113.50 36.10 40.26 37.94 40.38 0.000698 1.54 73.85 22.01 0.27
Principal 16000 113.50 36.49 40.05 40.53 0.004057 3.07 37.01 14.01 0.60
Principal 16500 113.50 37.34 41.58 41.67 0.000797 1.61 202.27 200.00 0.28
Principal 17000 113.50 37.98 42.05 42.18 0.001166 1.88 164.69 200.00 0.33
Principal 17340 113.50 38.38 42.35 42.41 0.000416 1.24 199.99 200.00 0.21
Principal 17369 Bridge
Principal 17380 113.50 38.38 42.49 40.11 42.54 0.000331 1.14 228.63 200.00 0.19
Principal 17500 113.50 38.48 42.50 42.66 0.001380 2.02 147.11 200.00 0.36
Principal 18000 115.40 38.98 43.16 43.30 0.001211 1.93 156.35 200.00 0.34
Principal 18080 115.40 39.08 43.28 43.37 0.000466 1.32 149.46 200.00 0.22
Principal 18106 Bridge
Principal 18120 115.40 39.08 43.37 40.82 43.44 0.000410 1.26 166.78 200.00 0.21
Principal 18500 115.40 39.49 43.61 43.76 0.001260 1.96 155.12 200.00 0.35
Principal 19000 115.40 39.99 44.27 44.46 0.001422 2.08 125.47 200.00 0.37
Principal 19460 115.40 40.49 44.74 44.82 0.000492 1.36 163.83 200.00 0.23
Principal 19486 Bridge
Principal 19500 115.40 40.49 44.81 43.17 45.05 0.001652 2.22 96.87 200.00 0.39
Principal 20000 115.40 40.99 45.49 45.59 0.000801 1.65 189.21 200.00 0.28
Principal 20500 115.40 41.59 45.99 46.19 0.001396 2.08 116.17 200.00 0.36
Principal 20560 115.40 41.59 46.18 46.24 0.000315 1.15 187.44 200.00 0.19
Principal 20581 Bridge
Principal 20600 115.40 41.59 46.26 43.34 46.32 0.000280 1.10 204.29 200.00 0.18
Principal 21000 115.40 41.99 46.43 46.59 0.001168 1.93 139.54 200.00 0.34
Principal 21090 115.40 42.09 46.60 46.65 0.000220 0.98 199.04 200.00 0.16
Principal 21110 Bridge
Principal 21130 115.40 42.09 46.68 43.58 46.72 0.000199 0.95 214.30 200.00 0.15
Principal 21500 115.40 42.59 46.79 45.26 47.02 0.001746 2.26 102.93 200.00 0.41
Principal 21510 115.40 42.49 47.00 47.05 0.000210 0.96 212.92 200.00 0.15
Principal 21531 Bridge
Principal 21550 115.40 42.49 47.05 43.98 47.09 0.000197 0.94 222.38 200.00 0.15
Principal 22000 115.40 43.00 47.21 45.67 47.44 0.001647 2.21 110.15 200.00 0.39
Principal 22100 100.70 43.10 47.47 47.51 0.000245 1.00 211.98 200.00 0.16
Principal 22140 100.70 43.10 47.48 47.52 0.000242 0.99 214.09 200.00 0.16
Principal 22500 100.70 43.50 47.61 47.72 0.000914 1.67 162.17 200.00 0.30
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 3 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 100.70 43.60 47.72 47.76 0.000180 0.86 239.19 200.00 0.14
Principal 22600 Culvert
Principal 22620 100.70 43.60 48.89 44.96 48.90 0.000044 0.51 472.83 200.00 0.07
Principal 22630 100.70 43.98 48.89 48.90 0.000084 0.66 347.27 200.00 0.10
Principal 22659 Bridge
Principal 22670 100.70 43.98 48.94 45.39 48.96 0.000078 0.64 358.51 200.00 0.10
Principal 23000 100.70 44.10 48.98 49.03 0.000395 1.20 244.00 200.00 0.20
Principal 23500 100.70 44.73 49.20 49.25 0.000489 1.29 236.48 200.00 0.22
Principal 23700 100.70 44.98 49.28 49.34 0.000342 1.14 141.97 200.00 0.19
Principal 23726 Bridge
Principal 23740 100.70 44.98 49.36 46.58 49.42 0.000304 1.09 158.73 200.00 0.18
Principal 24000 100.70 45.35 49.43 48.00 49.75 0.002417 2.48 41.56 73.77 0.46
Principal 24500 100.70 45.98 50.38 50.53 0.001201 1.90 124.36 200.00 0.33
Principal 25000 100.70 46.60 51.04 49.25 51.24 0.001484 2.08 87.66 200.00 0.37
Principal 25500 100.70 47.23 51.67 51.77 0.000809 1.60 173.14 200.00 0.28
Principal 25860 100.70 47.72 51.91 51.98 0.000401 1.21 117.73 200.00 0.21
Principal 25882 Bridge
Principal 25900 100.70 47.72 51.96 49.32 52.02 0.000375 1.18 127.49 200.00 0.20
Principal 26000 100.70 47.85 51.91 50.51 52.16 0.001987 2.31 85.67 200.00 0.43
Principal 26500 100.70 48.48 52.70 52.82 0.001059 1.78 154.28 200.00 0.32
Principal 26910 100.70 48.98 53.02 53.09 0.000409 1.21 142.62 200.00 0.21
Principal 26932 Bridge
Principal 26950 100.70 48.98 53.08 50.58 53.15 0.000370 1.17 155.85 200.00 0.20
Principal 27000 100.70 49.10 53.09 53.19 0.001001 1.70 175.26 200.00 0.31
Principal 27500 100.70 49.75 54.01 54.29 0.002067 2.33 43.14 14.42 0.43
Principal 27710 100.70 49.85 54.41 54.47 0.000291 1.08 120.92 200.00 0.18
Principal 27736 Bridge
Principal 27750 100.70 49.85 54.48 51.43 54.54 0.000267 1.05 134.99 200.00 0.17
Principal 28000 100.70 50.16 54.54 54.79 0.001863 2.25 44.83 14.65 0.41
Principal 28500 100.70 50.76 55.35 55.45 0.000774 1.59 168.99 200.00 0.27
Principal 29000 100.70 51.17 55.75 55.85 0.000818 1.62 162.54 200.00 0.28
Principal 29500 100.70 51.67 56.14 56.21 0.000621 1.43 205.71 200.00 0.24
Principal 30000 100.70 52.18 56.58 54.84 56.77 0.001427 2.04 98.78 200.00 0.36
Principal 30500 100.70 52.80 57.36 57.59 0.001583 2.11 47.63 15.03 0.38
Principal 31000 100.70 53.41 58.12 56.07 58.31 0.001294 1.98 74.88 200.00 0.35
Principal 31500 98.60 54.04 58.75 56.66 58.94 0.001277 1.96 66.47 200.00 0.34
Principal 31520 98.60 54.11 58.92 58.97 0.000233 0.99 143.15 200.00 0.16
Principal 31543 Bridge
Principal 31560 98.60 54.11 58.97 55.69 59.01 0.000219 0.97 153.35 200.00 0.15
Principal 32000 98.60 54.67 59.14 57.30 59.37 0.001636 2.14 48.01 98.26 0.39
Principal 32500 98.60 55.30 59.90 57.93 60.09 0.001326 1.98 77.75 200.00 0.35
Principal 33000 98.60 55.92 60.58 60.79 0.001386 2.01 50.69 92.12 0.36
Principal 33500 98.60 56.54 61.21 61.30 0.000717 1.54 168.07 200.00 0.26
Principal 33710 98.60 56.79 61.35 61.40 0.000275 1.05 142.28 200.00 0.17
Principal 33730 Bridge
Principal 33750 98.60 56.79 61.42 58.37 61.47 0.000251 1.02 156.21 200.00 0.17
Principal 34000 98.60 57.16 61.46 59.78 61.72 0.001909 2.26 43.80 32.54 0.41
Principal 34500 98.60 57.79 62.32 60.41 62.53 0.001445 2.05 69.82 200.00 0.36
Principal 35000 98.60 58.41 63.00 63.16 0.001151 1.87 105.43 200.00 0.33
Principal 35360 98.60 58.91 63.32 63.39 0.000330 1.12 113.38 200.00 0.19
Principal 35385 Bridge
Principal 35400 98.60 58.91 63.40 60.49 63.46 0.000300 1.09 128.86 200.00 0.18
Principal 35500 98.60 59.03 63.33 61.66 63.59 0.001851 2.24 52.04 189.63 0.41
Principal 36000 98.60 59.66 64.12 64.25 0.001026 1.77 135.07 200.00 0.31
Principal 36500 98.60 60.28 64.62 64.71 0.000850 1.62 168.43 200.00 0.28
Principal 37000 98.60 60.90 65.11 65.26 0.001199 1.87 134.14 200.00 0.33
Principal 37500 98.60 61.53 65.72 65.87 0.001231 1.89 132.30 200.00 0.34
Principal 38000 98.60 62.15 66.39 66.58 0.001472 2.04 104.40 200.00 0.37
Principal 38240 98.60 62.45 66.69 66.75 0.000340 1.13 142.62 200.00 0.19
Principal 38262 Bridge
Principal 38280 98.60 62.45 66.78 64.03 66.83 0.000299 1.08 160.49 200.00 0.18
Principal 38500 98.60 62.72 66.81 67.11 0.002309 2.42 40.77 14.09 0.45
Principal 39000 98.60 63.39 67.66 67.73 0.000658 1.44 203.92 200.00 0.25
Principal 39500 98.60 64.01 68.05 68.14 0.000933 1.65 175.62 200.00 0.30
Principal 40000 98.60 64.04 68.43 68.48 0.000530 1.32 224.89 200.00 0.23
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 1
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 102.10 19.00 23.58 20.97 23.69 0.000600 1.45 70.64 20.06 0.25
Principal 300 102.10 19.15 23.76 23.86 0.000583 1.43 72.69 92.34 0.24
Principal 900 102.10 19.46 24.11 24.21 0.000569 1.42 72.05 34.21 0.24
Principal 1500 102.10 19.76 24.43 24.48 0.000325 1.14 208.12 200.00 0.19
Principal 2100 102.10 20.07 24.63 24.67 0.000277 1.06 247.02 200.00 0.17
Principal 2700 102.10 20.38 24.86 24.97 0.000639 1.48 74.80 168.43 0.25
Principal 3500 102.10 20.78 25.33 25.41 0.000466 1.32 150.02 200.00 0.22
Principal 4300 102.10 21.18 25.70 25.76 0.000400 1.23 184.50 200.00 0.20
Principal 4500 102.10 21.29 25.77 25.88 0.000620 1.47 88.57 200.00 0.25
Principal 4800 102.10 21.44 25.96 26.04 0.000430 1.27 169.77 200.00 0.21
Principal 5200 102.10 21.65 26.15 26.25 0.000568 1.42 111.90 200.00 0.24
Principal 5600 78.90 21.85 26.33 26.39 0.000344 1.11 111.72 200.00 0.19
Principal 6000 78.90 22.05 26.48 26.55 0.000406 1.17 67.56 19.75 0.20
Principal 6070 78.90 22.14 26.54 26.57 0.000124 0.72 136.30 200.00 0.12
Principal 6093 Bridge
Principal 6110 78.90 22.14 26.56 23.29 26.59 0.000121 0.71 140.92 200.00 0.12
Principal 6400 78.90 22.39 26.60 26.69 0.000571 1.33 61.09 103.43 0.24
Principal 6800 78.90 22.73 26.83 26.93 0.000630 1.38 57.24 18.11 0.25
Principal 7200 78.90 23.07 27.09 27.19 0.000668 1.41 59.35 132.23 0.26
Principal 7600 51.20 23.41 27.28 27.33 0.000328 0.97 53.00 17.64 0.18
Principal 7800 51.20 23.50 27.34 27.39 0.000336 0.97 52.58 17.59 0.18
Principal 8000 51.20 23.75 27.41 27.47 0.000399 1.04 49.43 17.23 0.20
Principal 8400 51.20 24.09 27.58 27.64 0.000473 1.10 46.52 16.88 0.21
Principal 8800 51.20 24.43 27.78 27.85 0.000547 1.16 44.18 16.60 0.23
Principal 9200 51.20 24.86 28.02 28.10 0.000675 1.25 41.00 16.22 0.25
Principal 9270 51.20 24.86 28.09 28.13 0.000279 0.86 59.25 21.67 0.17
Principal 9295 Bridge
Principal 9310 51.20 24.86 28.12 25.90 28.16 0.000272 0.86 59.78 21.72 0.16
Principal 9600 51.20 25.11 28.22 28.30 0.000714 1.27 40.19 16.12 0.26
Principal 10000 51.20 25.45 28.51 28.60 0.000754 1.30 39.43 16.02 0.26
Principal 10480 51.20 25.88 28.81 28.86 0.000388 0.97 52.98 21.16 0.19
Principal 10500 Bridge
Principal 10520 51.20 25.88 28.84 26.93 28.89 0.000373 0.95 53.71 21.22 0.19
Principal 10800 51.20 26.13 28.98 29.08 0.000974 1.42 36.03 15.59 0.30
Principal 11200 51.20 26.47 29.36 29.46 0.000925 1.40 36.69 15.68 0.29
Principal 11600 51.20 26.81 29.72 29.82 0.000897 1.38 37.10 15.73 0.29
Principal 12500 51.20 27.42 30.47 30.56 0.000764 1.30 39.25 16.00 0.27
Principal 13000 51.20 28.00 30.89 30.99 0.000927 1.40 36.67 15.67 0.29
Principal 13500 51.20 28.81 31.47 31.61 0.001503 1.68 30.52 14.22 0.37
Principal 13830 51.20 29.36 31.89 31.97 0.000825 1.28 39.99 18.46 0.28
Principal 13851 Bridge
Principal 13870 51.20 29.36 31.96 30.49 32.04 0.000754 1.24 41.23 18.60 0.27
Principal 14000 51.20 29.72 32.06 32.25 0.002365 1.97 26.04 13.57 0.45
Principal 14500 51.20 30.63 33.11 33.28 0.001909 1.82 28.06 13.87 0.41
Principal 15000 51.20 33.54 35.34 35.71 0.005805 2.68 19.09 12.51 0.69
Principal 15140 51.20 34.60 36.13 36.38 0.004354 2.22 23.08 16.86 0.61
Principal 15169 Bridge
Principal 15180 51.20 34.60 36.43 35.71 36.60 0.002370 1.81 28.21 17.45 0.46
Principal 15500 51.20 35.63 37.55 37.87 0.004666 2.49 20.58 12.74 0.63
Principal 15930 51.20 36.10 38.54 38.63 0.000897 1.31 39.02 18.58 0.29
Principal 15950 Bridge
Principal 15970 51.20 36.10 38.61 37.21 38.70 0.000808 1.27 40.43 18.73 0.28
Principal 16000 51.20 36.49 38.53 38.81 0.003776 2.31 22.13 12.99 0.57
Principal 16500 51.20 37.34 39.83 40.00 0.001901 1.82 28.11 13.88 0.41
Principal 17000 51.20 37.98 40.67 40.81 0.001453 1.66 30.89 14.27 0.36
Principal 17340 51.20 38.38 41.04 41.10 0.000536 1.08 47.48 20.63 0.23
Principal 17369 Bridge
Principal 17380 51.20 38.38 41.09 39.42 41.15 0.000506 1.06 48.39 20.72 0.22
Principal 17500 51.20 38.48 41.14 41.28 0.001513 1.68 30.46 14.21 0.37
Principal 18000 49.00 38.98 41.78 41.90 0.001145 1.50 32.58 14.50 0.32
Principal 18080 49.00 39.08 41.91 41.96 0.000398 0.96 50.95 20.96 0.20
Principal 18106 Bridge
Principal 18120 49.00 39.08 41.95 40.09 41.99 0.000382 0.95 51.70 21.03 0.19
Principal 18500 49.00 39.49 42.18 42.30 0.001329 1.59 30.91 14.27 0.34
Principal 19000 49.00 39.99 42.80 42.91 0.001138 1.50 32.65 14.52 0.32
Principal 19460 49.00 40.49 43.21 43.27 0.000556 1.10 44.62 19.24 0.23
Principal 19486 Bridge
Principal 19500 49.00 40.49 43.23 41.89 43.35 0.001246 1.55 31.61 14.37 0.33
Principal 20000 49.00 40.99 43.82 43.93 0.001109 1.49 32.95 14.56 0.32
Principal 20500 49.00 41.59 44.38 44.50 0.001156 1.51 32.46 14.49 0.32
Principal 20560 49.00 41.59 44.50 44.55 0.000361 0.93 52.67 21.13 0.19
Principal 20581 Bridge
Principal 20600 49.00 41.59 44.54 42.60 44.58 0.000348 0.92 53.35 21.19 0.18
Principal 21000 49.00 41.99 44.76 44.88 0.001199 1.53 32.05 14.43 0.33
Principal 21090 49.00 42.09 44.90 44.93 0.000246 0.78 63.11 25.43 0.16
Principal 21110 Bridge
Principal 21130 49.00 42.09 44.94 42.95 44.97 0.000235 0.76 64.15 25.51 0.15
Principal 21500 49.00 42.59 45.12 45.27 0.001640 1.71 28.71 13.96 0.38
Principal 21510 49.00 42.49 45.25 45.29 0.000262 0.79 61.88 25.33 0.16
Principal 21531 Bridge
Principal 21550 49.00 42.49 45.27 43.35 45.31 0.000255 0.79 62.37 25.37 0.16
Principal 22000 49.00 43.00 45.52 45.67 0.001653 1.71 28.62 13.95 0.38
Principal 22100 41.90 43.10 45.71 45.76 0.000383 0.90 46.44 20.53 0.19
Principal 22140 41.90 43.10 45.73 45.77 0.000375 0.90 46.77 20.56 0.19
Principal 22500 41.90 43.50 45.95 46.07 0.001345 1.52 27.57 13.80 0.34
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 1 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 41.90 43.60 46.09 46.12 0.000268 0.76 55.37 24.89 0.16
Principal 22600 Culvert
Principal 22620 41.90 43.60 46.63 44.38 46.65 0.000138 0.61 69.10 25.97 0.12
Principal 22630 41.90 43.98 46.63 46.66 0.000242 0.74 56.64 24.20 0.15
Principal 22659 Bridge
Principal 22670 41.90 43.98 46.66 44.78 46.69 0.000233 0.73 57.32 24.26 0.15
Principal 23000 41.90 44.10 46.79 46.90 0.001205 1.48 28.26 13.28 0.32
Principal 23500 41.90 44.73 47.40 47.51 0.001237 1.50 28.00 13.24 0.33
Principal 23700 41.90 44.98 47.61 47.65 0.000374 0.90 46.81 20.56 0.19
Principal 23726 Bridge
Principal 23740 41.90 44.98 47.64 45.90 47.68 0.000359 0.88 47.44 20.62 0.19
Principal 24000 41.90 45.35 47.79 47.93 0.001692 1.67 25.06 12.78 0.38
Principal 24500 41.90 45.98 48.56 48.69 0.001389 1.56 26.87 13.06 0.35
Principal 25000 41.90 46.60 49.23 49.35 0.001294 1.52 27.56 13.17 0.34
Principal 25500 41.90 47.23 49.88 49.99 0.001274 1.51 27.71 13.19 0.33
Principal 25860 41.90 47.72 50.21 50.26 0.000449 0.95 44.00 20.29 0.21
Principal 25882 Bridge
Principal 25900 41.90 47.72 50.24 48.64 50.29 0.000434 0.94 44.53 20.34 0.20
Principal 26000 41.90 47.85 50.26 50.41 0.001775 1.70 24.64 12.72 0.39
Principal 26500 41.90 48.48 51.05 51.18 0.001407 1.57 26.75 13.05 0.35
Principal 26910 41.90 48.98 51.45 51.50 0.000462 0.96 43.59 20.25 0.21
Principal 26932 Bridge
Principal 26950 41.90 48.98 51.48 49.90 51.53 0.000445 0.95 44.13 20.30 0.21
Principal 27000 41.90 49.10 51.45 51.61 0.001940 1.75 23.88 12.60 0.41
Principal 27500 41.90 49.75 52.30 52.42 0.001460 1.59 26.40 12.99 0.36
Principal 27710 41.90 49.85 52.54 52.58 0.000329 0.85 49.13 21.09 0.18
Principal 27736 Bridge
Principal 27750 41.90 49.85 52.57 50.75 52.61 0.000317 0.84 49.78 21.15 0.18
Principal 28000 41.90 50.16 52.69 52.82 0.001485 1.60 26.24 12.97 0.36
Principal 28500 41.90 50.76 53.39 53.51 0.001298 1.52 27.52 13.16 0.34
Principal 29000 41.90 51.17 53.98 54.08 0.001029 1.40 29.89 13.52 0.30
Principal 29500 41.90 51.67 54.49 54.59 0.001015 1.39 30.04 13.54 0.30
Principal 30000 41.90 52.18 55.00 55.10 0.001018 1.40 30.01 13.54 0.30
Principal 30500 41.90 52.80 55.53 55.64 0.001133 1.45 28.88 13.37 0.32
Principal 31000 41.90 53.41 56.11 56.22 0.001180 1.47 28.47 13.31 0.32
Principal 31500 40.70 54.04 56.69 56.80 0.001188 1.46 27.82 13.21 0.32
Principal 31520 40.70 54.11 56.79 56.82 0.000334 0.85 47.71 20.65 0.18
Principal 31543 Bridge
Principal 31560 40.70 54.11 56.81 55.01 56.85 0.000322 0.84 48.26 20.70 0.18
Principal 32000 40.70 54.67 57.10 57.24 0.001619 1.63 24.93 12.76 0.37
Principal 32500 40.70 55.30 57.85 57.97 0.001369 1.54 26.46 13.00 0.34
Principal 33000 40.70 55.92 58.52 58.63 0.001287 1.51 27.04 13.09 0.33
Principal 33500 40.70 56.54 59.15 59.27 0.001259 1.49 27.26 13.12 0.33
Principal 33710 40.70 56.79 59.37 59.41 0.000375 0.89 45.85 20.47 0.19
Principal 33730 Bridge
Principal 33750 40.70 56.79 59.40 57.69 59.44 0.000361 0.88 46.46 20.53 0.19
Principal 34000 40.70 57.16 59.55 59.69 0.001726 1.67 24.38 12.68 0.38
Principal 34500 40.70 57.79 60.33 60.45 0.001394 1.55 26.29 12.98 0.35
Principal 35000 40.70 58.41 61.00 61.12 0.001295 1.51 26.99 13.08 0.34
Principal 35360 40.70 58.91 61.35 61.39 0.000459 0.95 42.83 20.17 0.21
Principal 35385 Bridge
Principal 35400 40.70 58.91 61.38 59.81 61.43 0.000437 0.93 43.55 20.24 0.20
Principal 35500 40.70 59.03 61.40 61.55 0.001765 1.68 24.19 12.65 0.39
Principal 36000 40.70 59.66 62.19 62.32 0.001402 1.55 26.23 12.97 0.35
Principal 36500 40.70 60.28 62.87 62.99 0.001298 1.51 26.96 13.08 0.34
Principal 37000 40.70 60.90 63.51 63.62 0.001262 1.49 27.23 13.12 0.33
Principal 37500 40.70 61.53 64.14 64.26 0.001259 1.49 27.25 13.12 0.33
Principal 38000 40.70 62.15 64.77 64.88 0.001248 1.49 27.34 13.14 0.33
Principal 38240 40.70 62.72 65.11 65.25 0.001733 1.67 24.34 12.67 0.39
Principal 38262 Bridge
Principal 38280 40.70 62.45 65.28 63.35 65.31 0.000275 0.80 50.97 20.96 0.16
Principal 38500 40.70 62.72 65.36 65.47 0.001207 1.47 27.66 13.19 0.32
Principal 39000 40.70 63.39 65.99 66.10 0.001284 1.50 27.06 13.09 0.33
Principal 39500 40.70 64.01 66.62 66.74 0.001257 1.49 27.27 13.13 0.33
Principal 40000 40.70 64.04 67.12 67.19 0.000699 1.21 33.62 14.06 0.25
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 2
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 143.70 19.00 24.17 21.42 24.28 0.000600 1.59 166.24 200.00 0.25
Principal 300 143.70 19.15 24.35 24.45 0.000540 1.53 187.31 200.00 0.24
Principal 900 143.70 19.46 24.68 24.79 0.000557 1.55 178.06 200.00 0.24
Principal 1500 143.70 19.76 24.98 25.03 0.000287 1.17 318.65 200.00 0.18
Principal 2100 143.70 20.07 25.16 25.20 0.000254 1.10 353.25 200.00 0.17
Principal 2700 143.70 20.38 25.36 25.48 0.000642 1.63 174.62 200.00 0.26
Principal 3500 143.70 20.78 25.82 25.90 0.000438 1.39 248.40 200.00 0.22
Principal 4300 143.70 21.18 26.17 26.23 0.000383 1.31 279.26 200.00 0.20
Principal 4500 143.70 21.29 26.23 26.35 0.000636 1.62 181.40 200.00 0.26
Principal 4800 143.70 21.44 26.44 26.51 0.000412 1.35 264.40 200.00 0.21
Principal 5200 143.70 21.65 26.61 26.71 0.000564 1.54 204.82 200.00 0.24
Principal 5600 117.80 21.85 26.80 26.87 0.000378 1.26 206.38 200.00 0.20
Principal 6000 117.80 22.05 26.96 27.05 0.000493 1.40 153.11 200.00 0.23
Principal 6070 117.80 22.14 27.04 27.08 0.000154 0.87 237.15 200.00 0.13
Principal 6093 Bridge
Principal 6110 117.80 22.14 27.08 23.62 27.11 0.000148 0.85 244.53 200.00 0.13
Principal 6400 117.80 22.39 27.12 27.22 0.000589 1.50 163.71 200.00 0.25
Principal 6800 117.80 22.73 27.37 27.48 0.000676 1.58 146.97 200.00 0.26
Principal 7200 117.80 23.07 27.65 27.75 0.000625 1.52 169.34 200.00 0.25
Principal 7600 79.80 23.41 27.83 27.91 0.000435 1.22 103.57 200.00 0.21
Principal 7800 79.80 23.50 27.93 27.99 0.000369 1.14 138.98 200.00 0.19
Principal 8000 79.80 23.75 28.00 28.08 0.000481 1.26 108.99 200.00 0.22
Principal 8400 79.80 24.09 28.21 28.31 0.000625 1.38 62.10 147.04 0.25
Principal 8800 79.80 24.43 28.47 28.57 0.000681 1.42 56.09 17.98 0.26
Principal 9200 79.80 24.86 28.77 28.86 0.000589 1.35 116.64 200.00 0.24
Principal 9270 79.80 24.86 28.85 28.89 0.000227 0.91 179.35 200.00 0.16
Principal 9295 Bridge
Principal 9310 79.80 24.86 28.89 26.25 28.92 0.000214 0.89 186.64 200.00 0.15
Principal 9600 79.80 25.11 28.96 29.03 0.000524 1.28 142.74 200.00 0.23
Principal 10000 79.80 25.45 29.18 29.26 0.000573 1.32 141.14 200.00 0.24
Principal 10480 79.80 25.88 29.43 29.49 0.000413 1.13 117.92 200.00 0.21
Principal 10500 Bridge
Principal 10520 79.80 25.88 29.52 27.26 29.57 0.000354 1.07 135.92 200.00 0.19
Principal 10800 79.80 26.13 29.64 29.76 0.000939 1.60 90.69 200.00 0.30
Principal 11200 79.80 26.47 30.00 30.10 0.000779 1.48 117.27 200.00 0.28
Principal 11600 79.80 26.81 30.35 28.59 30.48 0.001029 1.66 66.90 200.00 0.31
Principal 12500 79.80 27.42 31.20 31.33 0.000863 1.55 51.53 17.47 0.29
Principal 13000 79.80 28.00 31.66 31.79 0.000974 1.62 49.35 17.22 0.30
Principal 13500 79.80 28.81 32.24 32.42 0.001480 1.90 42.08 15.76 0.37
Principal 13830 79.80 29.36 32.67 32.78 0.000793 1.45 55.02 20.02 0.28
Principal 13851 Bridge
Principal 13870 79.80 29.36 32.75 30.86 32.86 0.000728 1.41 56.66 20.19 0.27
Principal 14000 79.80 29.72 32.83 33.06 0.002111 2.15 37.06 15.11 0.44
Principal 14500 79.80 30.63 33.83 34.05 0.001896 2.07 38.51 15.30 0.42
Principal 15000 79.80 33.54 35.87 36.35 0.005763 3.07 26.01 13.57 0.71
Principal 15140 79.80 34.60 36.67 36.97 0.003786 2.46 32.44 17.93 0.58
Principal 15169 Bridge
Principal 15180 79.80 34.60 37.00 36.07 37.22 0.002267 2.07 38.56 18.60 0.46
Principal 15500 79.80 35.63 38.07 38.50 0.004924 2.90 27.48 13.78 0.66
Principal 15930 79.80 36.10 39.20 39.32 0.000955 1.54 51.76 19.90 0.31
Principal 15950 Bridge
Principal 15970 79.80 36.10 39.30 37.58 39.41 0.000856 1.48 53.76 20.10 0.29
Principal 16000 79.80 36.49 39.20 39.53 0.003428 2.56 31.21 14.32 0.55
Principal 16500 79.80 37.34 40.51 40.73 0.001969 2.10 37.99 15.23 0.42
Principal 17000 79.80 37.98 41.39 41.57 0.001502 1.91 43.06 85.79 0.37
Principal 17340 79.80 38.38 41.80 41.87 0.000517 1.23 89.55 200.00 0.23
Principal 17369 Bridge
Principal 17380 79.80 38.38 41.86 39.76 41.93 0.000468 1.19 101.86 200.00 0.22
Principal 17500 79.80 38.48 41.88 42.07 0.001527 1.92 41.60 15.70 0.38
Principal 18000 80.80 38.98 42.59 40.88 42.75 0.001236 1.79 50.80 162.90 0.34
Principal 18080 80.80 39.08 42.75 42.82 0.000443 1.17 69.28 22.64 0.21
Principal 18106 Bridge
Principal 18120 80.80 39.08 42.80 40.47 42.87 0.000422 1.15 70.44 22.75 0.21
Principal 18500 80.80 39.49 43.03 41.39 43.20 0.001338 1.84 46.95 123.73 0.35
Principal 19000 80.80 39.99 43.67 43.83 0.001178 1.75 46.08 16.26 0.33
Principal 19460 80.80 40.49 44.12 44.20 0.000562 1.29 62.83 21.05 0.24
Principal 19486 Bridge
Principal 19500 80.80 40.49 44.13 42.39 44.29 0.001229 1.78 45.38 16.17 0.34
Principal 20000 80.80 40.99 44.72 44.87 0.001114 1.72 47.79 73.39 0.32
Principal 20500 80.80 41.59 45.29 45.44 0.001155 1.74 46.40 16.30 0.33
Principal 20560 80.80 41.59 45.43 45.49 0.000379 1.10 73.14 22.98 0.20
Principal 20581 Bridge
Principal 20600 80.80 41.59 45.48 42.98 45.54 0.000364 1.09 74.16 23.07 0.19
Principal 21000 80.80 41.99 45.68 45.84 0.001166 1.75 46.25 16.28 0.33
Principal 21090 80.80 42.09 45.85 45.90 0.000249 0.92 88.18 27.33 0.16
Principal 21110 Bridge
Principal 21130 80.80 42.09 45.90 43.28 45.94 0.000238 0.90 89.47 27.42 0.16
Principal 21500 80.80 42.59 46.04 46.23 0.001487 1.91 42.38 15.80 0.37
Principal 21510 80.80 42.49 46.20 46.24 0.000261 0.93 86.73 27.22 0.17
Principal 21531 Bridge
Principal 21550 80.80 42.49 46.22 43.68 46.27 0.000255 0.92 87.40 27.27 0.16
Principal 22000 80.80 43.00 46.43 46.62 0.001516 1.92 42.08 15.76 0.38
Principal 22100 72.70 43.10 46.64 46.70 0.000406 1.10 66.36 22.38 0.20
Principal 22140 72.70 43.10 46.66 46.72 0.000399 1.09 66.74 22.42 0.20
Principal 22500 72.70 43.50 46.86 47.02 0.001319 1.77 41.01 15.63 0.35
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 2 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 72.70 43.60 47.04 47.08 0.000258 0.90 102.49 200.00 0.17
Principal 22600 Culvert
Principal 22620 72.70 43.60 48.68 44.71 48.69 0.000028 0.40 430.84 200.00 0.06
Principal 22630 72.70 43.98 48.68 48.69 0.000056 0.52 305.58 200.00 0.08
Principal 22659 Bridge
Principal 22670 72.70 43.98 48.72 45.13 48.73 0.000053 0.51 314.06 200.00 0.08
Principal 23000 72.70 44.10 48.74 48.78 0.000237 0.93 203.99 200.00 0.15
Principal 23500 72.70 44.73 48.88 48.93 0.000358 1.08 179.79 200.00 0.19
Principal 23700 72.70 44.98 48.95 49.00 0.000271 0.95 78.48 113.99 0.17
Principal 23726 Bridge
Principal 23740 72.70 44.98 49.00 46.28 49.05 0.000256 0.94 86.51 200.00 0.16
Principal 24000 72.70 45.35 49.08 49.22 0.001115 1.68 43.17 15.36 0.32
Principal 24500 72.70 45.98 49.65 49.80 0.001179 1.72 42.30 15.24 0.33
Principal 25000 72.70 46.60 50.25 50.40 0.001207 1.73 41.94 15.20 0.33
Principal 25500 72.70 47.23 50.86 51.01 0.001232 1.75 41.63 15.16 0.34
Principal 25860 72.70 47.72 51.21 51.28 0.000426 1.11 65.25 22.28 0.21
Principal 25882 Bridge
Principal 25900 72.70 47.72 51.24 49.02 51.30 0.000416 1.10 65.83 22.34 0.21
Principal 26000 72.70 47.85 51.23 51.42 0.001588 1.91 37.99 14.67 0.38
Principal 26500 72.70 48.48 51.99 52.16 0.001395 1.83 39.81 14.91 0.36
Principal 26910 72.70 48.98 52.42 52.48 0.000451 1.14 63.97 22.17 0.21
Principal 26932 Bridge
Principal 26950 72.70 48.98 52.44 50.28 52.51 0.000439 1.13 64.59 22.23 0.21
Principal 27000 72.70 49.10 52.39 51.00 52.59 0.001709 1.98 42.89 166.63 0.39
Principal 27500 72.70 49.75 53.21 53.38 0.001470 1.86 39.06 14.81 0.37
Principal 27710 72.70 49.85 53.49 53.55 0.000352 1.04 70.03 22.98 0.19
Principal 27736 Bridge
Principal 27750 72.70 49.85 53.53 51.13 53.59 0.000338 1.02 71.01 23.07 0.19
Principal 28000 72.70 50.16 53.63 53.81 0.001444 1.85 39.31 14.85 0.36
Principal 28500 72.70 50.76 54.33 54.49 0.001310 1.79 40.73 15.04 0.35
Principal 29000 72.70 51.17 54.94 55.08 0.001074 1.66 43.75 15.43 0.32
Principal 29500 72.70 51.67 55.47 55.59 0.000903 1.57 79.19 200.00 0.29
Principal 30000 72.70 52.18 55.97 56.11 0.001048 1.65 44.15 15.49 0.31
Principal 30500 72.70 52.80 56.51 56.66 0.001131 1.69 42.95 15.33 0.32
Principal 31000 72.70 53.41 57.09 57.24 0.001170 1.71 42.42 15.26 0.33
Principal 31500 71.70 54.04 57.68 57.83 0.001190 1.72 41.74 15.17 0.33
Principal 31520 71.70 54.11 57.79 57.85 0.000345 1.03 69.54 22.67 0.19
Principal 31543 Bridge
Principal 31560 71.70 54.11 57.83 55.40 57.88 0.000333 1.02 70.38 22.74 0.18
Principal 32000 71.70 54.67 58.08 58.26 0.001501 1.87 38.38 14.72 0.37
Principal 32500 71.70 55.30 58.80 58.97 0.001362 1.80 39.75 14.91 0.35
Principal 33000 71.70 55.92 59.47 59.63 0.001297 1.77 40.46 15.00 0.34
Principal 33500 71.70 56.54 60.11 60.27 0.001268 1.76 40.79 15.05 0.34
Principal 33710 71.70 56.79 60.37 60.42 0.000382 1.07 67.13 22.45 0.20
Principal 33730 Bridge
Principal 33750 71.70 56.79 60.41 58.08 60.46 0.000367 1.05 68.04 22.53 0.19
Principal 34000 71.70 57.16 60.52 60.70 0.001586 1.91 37.63 14.62 0.38
Principal 34500 71.70 57.79 61.27 61.44 0.001393 1.82 39.43 14.86 0.36
Principal 35000 71.70 58.41 61.95 62.11 0.001309 1.78 40.32 14.98 0.35
Principal 35360 71.70 58.91 62.33 62.39 0.000448 1.13 63.53 22.13 0.21
Principal 35385 Bridge
Principal 35400 71.70 58.91 62.37 60.20 62.43 0.000427 1.11 64.57 22.22 0.21
Principal 35500 71.70 59.03 62.37 62.56 0.001620 1.92 37.34 14.58 0.38
Principal 36000 71.70 59.66 63.13 63.30 0.001405 1.82 39.31 14.85 0.36
Principal 36500 71.70 60.28 63.82 63.98 0.001315 1.78 40.26 14.98 0.35
Principal 37000 71.70 60.90 64.47 64.63 0.001275 1.76 40.71 15.03 0.34
Principal 37500 71.70 61.53 65.10 65.26 0.001267 1.76 40.81 15.05 0.34
Principal 38000 71.70 62.15 65.73 65.89 0.001253 1.75 40.97 15.07 0.34
Principal 38240 71.70 62.72 66.06 66.25 0.001624 1.92 37.30 14.57 0.38
Principal 38262 Bridge
Principal 38280 71.70 62.45 66.27 63.74 66.32 0.000304 0.99 72.62 22.94 0.18
Principal 38500 71.70 62.72 66.34 66.49 0.001213 1.73 41.45 15.13 0.33
Principal 39000 71.70 63.39 66.97 67.11 0.001100 1.68 72.42 200.00 0.32
Principal 39500 71.70 64.01 67.54 67.67 0.001095 1.67 80.58 200.00 0.32
Principal 40000 71.70 64.04 67.97 68.03 0.000534 1.26 139.92 200.00 0.23
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 3
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 185.10 19.00 24.54 21.83 24.66 0.000601 1.69 241.45 200.00 0.26
Principal 300 185.10 19.15 24.73 24.83 0.000540 1.62 262.54 200.00 0.24
Principal 900 185.10 19.46 25.05 25.16 0.000558 1.64 253.25 200.00 0.25
Principal 1500 185.10 19.76 25.36 25.41 0.000295 1.25 394.17 200.00 0.18
Principal 2100 185.10 20.07 25.54 25.58 0.000261 1.18 429.61 200.00 0.17
Principal 2700 185.10 20.38 25.74 25.86 0.000624 1.71 250.59 200.00 0.26
Principal 3500 185.10 20.78 26.20 26.27 0.000436 1.47 322.67 200.00 0.22
Principal 4300 185.10 21.18 26.54 26.60 0.000384 1.39 353.30 200.00 0.21
Principal 4500 185.10 21.29 26.60 26.72 0.000623 1.70 255.46 200.00 0.26
Principal 4800 185.10 21.44 26.80 26.87 0.000414 1.43 337.68 200.00 0.21
Principal 5200 185.10 21.65 26.98 27.08 0.000557 1.62 278.00 200.00 0.25
Principal 5600 160.70 21.85 27.18 27.25 0.000414 1.40 281.08 200.00 0.21
Principal 6000 160.70 22.05 27.35 27.45 0.000531 1.55 230.44 200.00 0.24
Principal 6070 160.70 22.14 27.43 27.48 0.000184 1.01 314.98 200.00 0.15
Principal 6093 Bridge
Principal 6110 160.70 22.14 27.46 23.95 27.50 0.000179 0.99 320.87 200.00 0.15
Principal 6400 160.70 22.39 27.52 27.62 0.000597 1.61 242.88 200.00 0.25
Principal 6800 160.70 22.73 27.77 27.88 0.000677 1.69 226.59 200.00 0.27
Principal 7200 160.70 23.07 28.05 28.15 0.000618 1.62 248.98 200.00 0.26
Principal 7600 113.50 23.41 28.23 28.31 0.000469 1.36 183.73 200.00 0.22
Principal 7800 113.50 23.50 28.34 28.40 0.000383 1.25 220.89 200.00 0.20
Principal 8000 113.50 23.75 28.41 28.49 0.000491 1.37 191.38 200.00 0.23
Principal 8400 113.50 24.09 28.63 28.74 0.000678 1.56 144.34 200.00 0.26
Principal 8800 113.50 24.43 28.92 26.64 29.08 0.000918 1.76 72.51 189.80 0.30
Principal 9200 113.50 24.86 29.30 29.36 0.000462 1.32 221.43 200.00 0.22
Principal 9270 113.50 24.86 29.35 29.39 0.000214 0.97 279.52 200.00 0.16
Principal 9295 Bridge
Principal 9310 113.50 24.86 29.38 26.60 29.41 0.000207 0.95 284.41 200.00 0.15
Principal 9600 113.50 25.11 29.45 29.51 0.000431 1.27 240.07 200.00 0.21
Principal 10000 113.50 25.45 29.63 29.69 0.000493 1.33 230.36 200.00 0.23
Principal 10480 113.50 25.88 29.84 29.91 0.000415 1.24 200.97 200.00 0.21
Principal 10500 Bridge
Principal 10520 113.50 25.88 29.92 27.61 29.98 0.000367 1.18 216.38 200.00 0.20
Principal 10800 113.50 26.13 30.05 30.15 0.000837 1.65 172.04 200.00 0.29
Principal 11200 113.50 26.47 30.38 30.47 0.000730 1.55 192.48 200.00 0.27
Principal 11600 113.50 26.81 30.71 30.85 0.001056 1.82 138.70 200.00 0.32
Principal 12500 113.50 27.42 31.60 31.75 0.000963 1.78 120.87 200.00 0.31
Principal 13000 113.50 28.00 32.13 30.21 32.32 0.001209 1.94 76.37 200.00 0.34
Principal 13500 113.50 28.81 32.84 33.08 0.001677 2.19 51.84 16.95 0.40
Principal 13830 113.50 29.36 33.34 33.47 0.000848 1.65 68.75 21.35 0.29
Principal 13851 Bridge
Principal 13870 113.50 29.36 33.46 31.23 33.58 0.000765 1.59 71.31 21.59 0.28
Principal 14000 113.50 29.72 33.51 33.80 0.002083 2.37 47.93 16.49 0.44
Principal 14500 113.50 30.63 34.52 34.79 0.001906 2.29 49.50 16.68 0.42
Principal 15000 113.50 33.54 36.40 36.99 0.005695 3.39 33.46 14.63 0.72
Principal 15140 113.50 34.60 37.22 37.58 0.003404 2.66 42.67 19.04 0.57
Principal 15169 Bridge
Principal 15180 113.50 34.60 37.60 36.43 37.86 0.002141 2.27 50.01 19.80 0.46
Principal 15500 113.50 35.63 38.59 39.13 0.005058 3.25 34.90 14.82 0.68
Principal 15930 113.50 36.10 39.84 40.00 0.001006 1.75 64.93 21.18 0.32
Principal 15950 Bridge
Principal 15970 113.50 36.10 39.97 37.94 40.12 0.000893 1.68 67.71 21.44 0.30
Principal 16000 113.50 36.49 39.85 40.24 0.003225 2.77 40.97 15.62 0.55
Principal 16500 113.50 37.34 41.25 41.40 0.001161 1.89 142.78 200.00 0.34
Principal 17000 113.50 37.98 41.85 42.02 0.001270 1.96 132.69 200.00 0.35
Principal 17340 113.50 38.38 42.21 42.29 0.000524 1.35 172.26 200.00 0.24
Principal 17369 Bridge
Principal 17380 113.50 38.38 42.36 40.11 42.42 0.000410 1.23 201.84 200.00 0.21
Principal 17500 113.50 38.48 42.37 42.54 0.001288 1.97 128.91 200.00 0.36
Principal 18000 115.40 38.98 43.00 43.16 0.001191 1.93 132.62 200.00 0.34
Principal 18080 115.40 39.08 43.13 43.24 0.000577 1.43 119.65 200.00 0.25
Principal 18106 Bridge
Principal 18120 115.40 39.08 43.23 40.82 43.32 0.000505 1.36 138.25 200.00 0.23
Principal 18500 115.40 39.49 43.49 43.65 0.001167 1.91 137.79 200.00 0.34
Principal 19000 115.40 39.99 44.11 42.35 44.31 0.001342 2.04 100.32 200.00 0.36
Principal 19460 115.40 40.49 44.60 44.71 0.000608 1.47 136.23 200.00 0.25
Principal 19486 Bridge
Principal 19500 115.40 40.49 44.65 42.85 44.87 0.001458 2.10 72.71 200.00 0.38
Principal 20000 115.40 40.99 45.29 45.41 0.000852 1.70 157.64 200.00 0.29
Principal 20500 115.40 41.59 45.80 43.95 46.01 0.001325 2.03 87.02 200.00 0.36
Principal 20560 115.40 41.59 45.99 46.06 0.000409 1.27 149.20 200.00 0.21
Principal 20581 Bridge
Principal 20600 115.40 41.59 46.11 43.33 46.18 0.000346 1.19 173.80 200.00 0.19
Principal 21000 115.40 41.99 46.30 46.46 0.001055 1.86 120.43 200.00 0.32
Principal 21090 115.40 42.09 46.46 46.52 0.000262 1.04 171.17 200.00 0.17
Principal 21110 Bridge
Principal 21130 115.40 42.09 46.57 43.58 46.62 0.000228 0.99 193.30 200.00 0.16
Principal 21500 115.40 42.59 46.69 44.96 46.90 0.001422 2.08 91.24 200.00 0.37
Principal 21510 115.40 42.49 46.87 46.92 0.000248 1.02 186.39 200.00 0.17
Principal 21531 Bridge
Principal 21550 115.40 42.49 46.92 43.99 46.97 0.000234 1.00 195.77 200.00 0.16
Principal 22000 115.40 43.00 47.09 45.37 47.30 0.001418 2.08 93.23 200.00 0.37
Principal 22100 100.70 43.10 47.32 47.37 0.000305 1.09 182.70 200.00 0.18
Principal 22140 100.70 43.10 47.33 47.38 0.000299 1.08 185.34 200.00 0.18
Principal 22500 100.70 43.50 47.48 47.60 0.000870 1.65 142.94 200.00 0.29
HEC-RAS Plan: Plan 03 River: Totoras Reach: Principal Profile: PF 3 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 100.70 43.60 47.60 47.64 0.000216 0.92 214.32 200.00 0.16
Principal 22600 Culvert
Principal 22620 100.70 43.60 48.88 44.96 48.89 0.000044 0.51 470.63 200.00 0.07
Principal 22630 100.70 43.98 48.88 48.89 0.000085 0.66 345.06 200.00 0.10
Principal 22659 Bridge
Principal 22670 100.70 43.98 48.93 45.39 48.95 0.000079 0.64 356.57 200.00 0.10
Principal 23000 100.70 44.10 48.97 49.01 0.000310 1.11 248.90 200.00 0.18
Principal 23500 100.70 44.73 49.15 49.20 0.000418 1.23 232.00 200.00 0.21
Principal 23700 100.70 44.98 49.22 49.28 0.000373 1.18 129.18 200.00 0.20
Principal 23726 Bridge
Principal 23740 100.70 44.98 49.32 46.58 49.38 0.000325 1.12 149.18 200.00 0.19
Principal 24000 100.70 45.35 49.40 49.63 0.001572 2.09 48.29 23.92 0.38
Principal 24500 100.70 45.98 50.14 48.30 50.32 0.001258 1.93 85.22 200.00 0.35
Principal 25000 100.70 46.60 50.80 51.00 0.001368 1.99 52.17 91.30 0.36
Principal 25500 100.70 47.23 51.45 51.57 0.000905 1.69 135.17 200.00 0.30
Principal 25860 100.70 47.72 51.73 51.82 0.000499 1.30 83.06 168.50 0.23
Principal 25882 Bridge
Principal 25900 100.70 47.72 51.78 49.32 51.86 0.000472 1.28 92.04 200.00 0.22
Principal 26000 100.70 47.85 51.76 50.16 52.00 0.001693 2.16 63.29 200.00 0.40
Principal 26500 100.70 48.48 52.51 52.65 0.001114 1.83 122.79 200.00 0.33
Principal 26910 100.70 48.98 52.87 52.96 0.000508 1.31 113.66 200.00 0.23
Principal 26932 Bridge
Principal 26950 100.70 48.98 52.96 50.58 53.04 0.000444 1.25 131.70 200.00 0.22
Principal 27000 100.70 49.10 52.97 53.08 0.000945 1.68 158.48 200.00 0.30
Principal 27500 100.70 49.75 53.73 53.96 0.001683 2.14 47.10 15.86 0.40
Principal 27710 100.70 49.85 54.08 54.15 0.000402 1.20 83.87 24.16 0.21
Principal 27736 Bridge
Principal 27750 100.70 49.85 54.14 51.43 54.21 0.000383 1.18 85.26 24.27 0.20
Principal 28000 100.70 50.16 54.23 54.45 0.001546 2.07 48.58 16.05 0.38
Principal 28500 100.70 50.76 54.99 55.15 0.001080 1.82 104.67 200.00 0.32
Principal 29000 100.70 51.17 55.50 55.64 0.000917 1.71 121.11 200.00 0.30
Principal 29500 100.70 51.67 55.94 56.03 0.000671 1.49 174.21 200.00 0.26
Principal 30000 100.70 52.18 56.39 54.50 56.58 0.001290 1.95 69.61 200.00 0.35
Principal 30500 100.70 52.80 57.06 57.25 0.001312 1.95 51.57 16.42 0.35
Principal 31000 100.70 53.41 57.71 57.90 0.001269 1.93 52.20 16.49 0.35
Principal 31500 98.60 54.04 58.33 58.51 0.001228 1.90 52.02 16.47 0.34
Principal 31520 98.60 54.11 58.46 58.53 0.000365 1.16 85.19 24.01 0.20
Principal 31543 Bridge
Principal 31560 98.60 54.11 58.51 55.69 58.58 0.000351 1.14 86.34 24.10 0.19
Principal 32000 98.60 54.67 58.75 58.96 0.001474 2.03 48.68 16.06 0.37
Principal 32500 98.60 55.30 59.47 59.66 0.001363 1.97 50.08 16.23 0.36
Principal 33000 98.60 55.92 60.14 60.33 0.001304 1.94 50.91 16.34 0.35
Principal 33500 98.60 56.54 60.80 60.96 0.001080 1.82 93.18 200.00 0.32
Principal 33710 98.60 56.79 61.03 61.10 0.000399 1.20 83.15 74.11 0.20
Principal 33730 Bridge
Principal 33750 98.60 56.79 61.10 58.37 61.17 0.000373 1.17 92.17 193.10 0.20
Principal 34000 98.60 57.16 61.19 61.41 0.001537 2.06 47.94 15.97 0.38
Principal 34500 98.60 57.79 61.93 62.14 0.001390 1.98 49.73 16.19 0.36
Principal 35000 98.60 58.41 62.62 62.81 0.001316 1.94 50.73 16.31 0.35
Principal 35360 98.60 58.91 63.01 63.09 0.000449 1.25 79.18 23.50 0.22
Principal 35385 Bridge
Principal 35400 98.60 58.91 63.09 60.49 63.16 0.000422 1.22 80.97 23.65 0.21
Principal 35500 98.60 59.03 63.07 63.29 0.001527 2.05 48.06 15.98 0.38
Principal 36000 98.60 59.66 63.81 61.94 63.99 0.001245 1.92 80.66 200.00 0.34
Principal 36500 98.60 60.28 64.40 64.53 0.000934 1.70 133.02 200.00 0.30
Principal 37000 98.60 60.90 64.93 65.09 0.001197 1.88 104.79 200.00 0.34
Principal 37500 98.60 61.53 65.54 65.71 0.001229 1.90 102.75 200.00 0.34
Principal 38000 98.60 62.15 66.19 64.43 66.39 0.001405 2.00 72.36 200.00 0.36
Principal 38240 98.60 62.72 66.56 66.81 0.001838 2.19 44.92 15.58 0.41
Principal 38262 Bridge
Principal 38280 98.60 62.45 66.92 64.03 66.96 0.000246 1.00 187.96 200.00 0.16
Principal 38500 98.60 62.72 66.95 65.01 67.14 0.001255 1.92 60.19 199.03 0.34
Principal 39000 98.60 63.39 67.52 67.60 0.000649 1.45 183.23 200.00 0.25
Principal 39500 98.60 64.01 67.90 68.01 0.000932 1.67 153.33 200.00 0.30
Principal 40000 98.60 64.04 68.29 68.35 0.000529 1.34 203.66 200.00 0.23
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 1
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 82.50 19.00 22.73 20.56 22.82 0.000601 1.34 61.73 20.36 0.24
Principal 300 82.50 19.15 22.91 23.00 0.000584 1.32 62.33 20.42 0.24
Principal 900 82.50 19.46 23.26 23.34 0.000565 1.31 63.08 20.49 0.24
Principal 1500 82.50 19.76 23.59 23.68 0.000547 1.29 63.80 20.56 0.23
Principal 2100 82.50 20.07 23.91 23.99 0.000465 1.22 111.64 200.00 0.22
Principal 2700 82.50 20.38 24.23 24.31 0.000540 1.29 64.09 20.59 0.23
Principal 3500 82.50 20.78 24.65 24.74 0.000527 1.28 64.66 20.65 0.23
Principal 4300 82.50 21.18 25.07 25.15 0.000512 1.27 68.45 131.50 0.23
Principal 4500 82.50 21.29 25.18 25.26 0.000521 1.27 64.90 20.67 0.23
Principal 4800 82.50 21.44 25.33 25.41 0.000518 1.27 65.02 20.68 0.23
Principal 5200 82.50 21.65 25.54 25.62 0.000519 1.27 64.97 20.68 0.23
Principal 5600 78.50 21.85 25.74 25.81 0.000472 1.21 64.91 20.67 0.22
Principal 6000 78.50 22.05 25.93 26.00 0.000476 1.21 64.69 20.65 0.22
Principal 6070 78.50 22.14 25.99 26.03 0.000203 0.84 93.23 28.20 0.15
Principal 6093 Bridge
Principal 6110 78.50 22.14 26.01 23.28 26.05 0.000199 0.84 93.86 28.24 0.15
Principal 6400 78.50 22.39 26.08 26.17 0.000657 1.37 57.19 19.28 0.25
Principal 6800 78.50 22.73 26.35 26.45 0.000703 1.41 55.84 19.14 0.26
Principal 7200 78.50 23.07 26.64 26.74 0.000740 1.43 54.84 19.03 0.27
Principal 7600 51.10 23.41 26.83 26.88 0.000361 0.98 52.17 18.75 0.19
Principal 7800 51.10 23.50 26.91 26.96 0.000368 0.99 51.85 18.71 0.19
Principal 8000 51.10 23.75 26.98 27.04 0.000442 1.05 48.62 18.37 0.21
Principal 8400 51.10 24.09 27.17 27.23 0.000522 1.11 45.86 18.06 0.22
Principal 8800 51.10 24.43 27.39 27.46 0.000599 1.17 43.73 17.82 0.24
Principal 9200 51.10 24.86 27.65 27.73 0.000735 1.25 40.72 17.48 0.26
Principal 9270 51.10 24.86 27.72 27.77 0.000422 1.00 51.34 20.93 0.20
Principal 9295 Bridge
Principal 9310 51.10 24.86 27.75 25.90 27.80 0.000410 0.99 51.87 20.98 0.20
Principal 9600 51.10 25.11 27.89 27.97 0.000747 1.26 40.50 17.46 0.26
Principal 10000 51.10 25.45 28.19 28.28 0.000780 1.28 39.90 17.39 0.27
Principal 10480 51.10 25.88 28.53 28.59 0.000543 1.08 47.18 20.60 0.23
Principal 10500 Bridge
Principal 10520 51.10 25.88 28.57 26.92 28.63 0.000513 1.06 48.11 20.69 0.22
Principal 10800 51.10 26.13 28.75 28.84 0.000921 1.36 37.67 17.13 0.29
Principal 11200 51.10 26.47 29.11 29.20 0.000893 1.34 38.08 17.18 0.29
Principal 11600 51.10 26.81 29.46 29.55 0.000876 1.33 38.33 17.21 0.29
Principal 12500 51.10 27.42 30.19 30.28 0.000752 1.26 40.41 17.45 0.27
Principal 13000 51.10 28.00 30.61 30.70 0.000930 1.36 37.56 17.12 0.29
Principal 13500 51.10 28.81 31.20 31.33 0.001496 1.63 31.42 15.67 0.37
Principal 13830 51.10 29.36 31.66 31.76 0.001148 1.43 35.69 17.99 0.32
Principal 13851 Bridge
Principal 13870 51.10 29.36 31.74 30.49 31.84 0.001009 1.37 37.29 18.17 0.31
Principal 14000 51.10 29.72 31.89 32.06 0.002088 1.82 28.03 15.23 0.43
Principal 14500 51.10 30.63 32.87 33.03 0.001863 1.75 29.14 15.38 0.41
Principal 15000 51.10 33.54 35.15 35.49 0.005810 2.58 19.83 14.11 0.69
Principal 15140 51.10 34.60 36.00 36.30 0.005857 2.44 20.92 16.60 0.69
Principal 15169 Bridge
Principal 15180 51.10 34.60 36.38 35.71 36.55 0.002601 1.87 27.32 17.35 0.48
Principal 15500 51.10 35.63 37.43 37.69 0.003938 2.26 22.60 14.50 0.58
Principal 15930 51.10 36.10 38.38 38.48 0.001129 1.42 36.06 18.26 0.32
Principal 15950 Bridge
Principal 15970 51.10 36.10 38.47 37.21 38.56 0.000986 1.35 37.74 18.44 0.30
Principal 16000 51.10 36.49 38.43 38.65 0.003024 2.07 24.71 14.79 0.51
Principal 16500 51.10 37.34 39.59 39.74 0.001839 1.75 29.28 15.40 0.40
Principal 17000 51.10 37.98 40.40 40.53 0.001424 1.60 31.96 15.74 0.36
Principal 17340 51.10 38.38 40.80 40.87 0.000740 1.20 42.52 20.14 0.26
Principal 17369 Bridge
Principal 17380 51.10 38.38 40.86 39.42 40.93 0.000682 1.17 43.69 20.26 0.25
Principal 17500 51.10 38.48 40.94 41.06 0.001352 1.57 32.54 15.81 0.35
Principal 18000 49.00 38.98 41.53 41.64 0.001090 1.44 34.05 16.00 0.31
Principal 18080 49.00 39.08 41.64 41.70 0.000559 1.08 45.43 20.43 0.23
Principal 18106 Bridge
Principal 18120 49.00 39.08 41.69 40.09 41.75 0.000525 1.06 46.39 20.52 0.22
Principal 18500 49.00 39.49 41.97 42.08 0.001208 1.49 32.86 15.85 0.33
Principal 19000 49.00 39.99 42.54 42.65 0.001088 1.44 34.08 16.01 0.31
Principal 19460 49.00 40.49 42.98 43.06 0.000750 1.22 40.31 18.79 0.26
Principal 19486 Bridge
Principal 19500 49.00 40.49 43.02 41.73 43.13 0.001118 1.45 33.76 15.97 0.32
Principal 20000 49.00 40.99 43.57 43.67 0.001053 1.42 34.47 16.06 0.31
Principal 20500 49.00 41.59 44.11 44.22 0.001132 1.46 33.61 15.95 0.32
Principal 20560 49.00 41.59 44.22 44.27 0.000515 1.05 46.72 20.55 0.22
Principal 20581 Bridge
Principal 20600 49.00 41.59 44.26 42.60 44.31 0.000487 1.03 47.60 20.64 0.22
Principal 21000 49.00 41.99 44.53 44.64 0.001109 1.45 33.85 15.98 0.32
Principal 21090 49.00 42.09 44.66 44.70 0.000335 0.86 56.99 24.94 0.18
Principal 21110 Bridge
Principal 21130 49.00 42.09 44.71 42.95 44.75 0.000312 0.84 58.33 25.05 0.18
Principal 21500 49.00 42.59 44.92 45.06 0.001482 1.60 30.63 15.57 0.36
Principal 21510 49.00 42.49 45.03 45.07 0.000347 0.87 56.30 24.88 0.18
Principal 21531 Bridge
Principal 21550 49.00 42.49 45.06 43.35 45.09 0.000336 0.86 56.91 24.93 0.18
Principal 22000 49.00 43.00 45.34 45.47 0.001465 1.59 30.75 15.59 0.36
Principal 22100 41.90 43.10 45.51 45.56 0.000508 0.99 42.21 20.11 0.22
Principal 22140 41.90 43.10 45.53 45.58 0.000493 0.98 42.64 20.15 0.22
Principal 22500 41.90 43.50 45.78 45.88 0.001181 1.41 29.74 15.46 0.32
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 1 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 41.90 43.60 45.90 45.94 0.000352 0.83 50.60 24.50 0.18
Principal 22600 Culvert
Principal 22620 41.90 43.60 46.50 44.38 46.52 0.000161 0.64 65.67 25.70 0.13
Principal 22630 41.90 43.98 46.50 46.53 0.000288 0.78 53.43 23.93 0.17
Principal 22659 Bridge
Principal 22670 41.90 43.98 46.53 44.78 46.56 0.000276 0.77 54.20 24.00 0.16
Principal 23000 41.90 44.10 46.66 46.75 0.000939 1.32 31.72 15.03 0.29
Principal 23500 41.90 44.73 47.17 47.27 0.001110 1.40 29.92 14.79 0.31
Principal 23700 41.90 44.98 47.38 47.43 0.000515 1.00 42.02 20.09 0.22
Principal 23726 Bridge
Principal 23740 41.90 44.98 47.42 45.90 47.46 0.000487 0.98 42.83 20.17 0.21
Principal 24000 41.90 45.35 47.60 47.72 0.001481 1.55 27.08 14.40 0.36
Principal 24500 41.90 45.98 48.30 48.41 0.001327 1.49 28.12 14.54 0.34
Principal 25000 41.90 46.60 48.95 49.06 0.001270 1.47 28.56 14.60 0.33
Principal 25500 41.90 47.23 49.58 49.69 0.001264 1.46 28.60 14.61 0.33
Principal 25860 41.90 47.72 49.95 50.01 0.000654 1.08 38.79 19.77 0.25
Principal 25882 Bridge
Principal 25900 41.90 47.72 49.99 48.64 50.05 0.000618 1.06 39.53 19.84 0.24
Principal 26000 41.90 47.85 50.04 50.17 0.001618 1.60 26.27 14.29 0.38
Principal 26500 41.90 48.48 50.79 50.90 0.001360 1.50 27.89 14.51 0.35
Principal 26910 41.90 48.98 51.22 51.28 0.000651 1.08 38.84 19.77 0.25
Principal 26932 Bridge
Principal 26950 41.90 48.98 51.25 49.90 51.31 0.000616 1.06 39.58 19.85 0.24
Principal 27000 41.90 49.10 51.25 51.39 0.001731 1.63 25.66 14.20 0.39
Principal 27500 41.90 49.75 52.03 52.15 0.001405 1.52 27.58 14.47 0.35
Principal 27710 41.90 49.85 52.28 52.33 0.000467 0.96 43.66 20.56 0.21
Principal 27736 Bridge
Principal 27750 41.90 49.85 52.32 50.75 52.37 0.000442 0.94 44.49 20.64 0.20
Principal 28000 41.90 50.16 52.48 52.59 0.001339 1.49 28.04 14.53 0.34
Principal 28500 41.90 50.76 53.12 53.23 0.001248 1.46 28.73 14.63 0.33
Principal 29000 41.90 51.17 53.69 53.78 0.001000 1.35 31.03 14.94 0.30
Principal 29500 41.90 51.67 54.19 54.28 0.001000 1.35 31.03 14.94 0.30
Principal 30000 41.90 52.18 54.69 54.78 0.001010 1.36 30.92 14.92 0.30
Principal 30500 41.90 52.80 55.23 55.33 0.001137 1.41 29.67 14.75 0.32
Principal 31000 41.90 53.41 55.81 55.91 0.001185 1.43 29.25 14.70 0.32
Principal 31500 40.70 54.04 56.39 56.50 0.001196 1.42 28.58 14.61 0.32
Principal 31520 40.70 54.11 56.47 56.52 0.000514 0.99 41.23 20.01 0.22
Principal 31543 Bridge
Principal 31560 40.70 54.11 56.51 55.01 56.55 0.000487 0.97 42.00 20.09 0.21
Principal 32000 40.70 54.67 56.87 56.99 0.001517 1.55 26.32 14.29 0.36
Principal 32500 40.70 55.30 57.58 57.69 0.001334 1.48 27.51 14.46 0.34
Principal 33000 40.70 55.92 58.23 58.34 0.001272 1.46 27.97 14.52 0.33
Principal 33500 40.70 56.54 58.86 58.97 0.001252 1.45 28.13 14.54 0.33
Principal 33710 40.70 56.79 59.09 59.15 0.000556 1.01 40.16 19.91 0.23
Principal 33730 Bridge
Principal 33750 40.70 56.79 59.13 57.69 59.19 0.000523 0.99 40.99 19.99 0.22
Principal 34000 40.70 57.16 59.32 59.45 0.001595 1.57 25.87 14.23 0.37
Principal 34500 40.70 57.79 60.06 60.17 0.001353 1.49 27.38 14.44 0.34
Principal 35000 40.70 58.41 60.72 60.83 0.001277 1.46 27.93 14.52 0.34
Principal 35360 40.70 58.91 61.09 61.15 0.000667 1.08 37.80 19.67 0.25
Principal 35385 Bridge
Principal 35400 40.70 58.91 61.14 59.81 61.20 0.000618 1.05 38.77 19.77 0.24
Principal 35500 40.70 59.03 61.20 61.32 0.001594 1.57 25.88 14.23 0.37
Principal 36000 40.70 59.66 61.93 62.04 0.001353 1.49 27.38 14.44 0.34
Principal 36500 40.70 60.28 62.59 62.70 0.001278 1.46 27.93 14.52 0.34
Principal 37000 40.70 60.90 63.22 63.33 0.001253 1.45 28.12 14.54 0.33
Principal 37500 40.70 61.53 63.85 63.96 0.001256 1.45 28.10 14.54 0.33
Principal 38000 40.70 62.15 64.47 64.58 0.001246 1.44 28.17 14.55 0.33
Principal 38240 40.70 62.72 64.87 65.05 0.002507 1.90 21.38 12.20 0.46
Principal 38262 Bridge
Principal 38280 40.70 62.45 65.10 63.35 65.14 0.000343 0.86 47.25 20.61 0.18
Principal 38500 40.70 62.72 65.20 65.29 0.000996 1.34 30.45 14.86 0.30
Principal 39000 40.70 63.39 65.74 65.85 0.001192 1.42 28.61 14.61 0.32
Principal 39500 40.70 64.01 66.35 66.45 0.001221 1.43 28.37 14.58 0.33
Principal 40000 40.70 64.04 66.82 66.89 0.000665 1.16 35.07 15.47 0.25
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 2
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 125.10 19.00 23.71 21.03 23.83 0.000600 1.51 85.93 130.50 0.25
Principal 300 125.10 19.15 23.89 24.00 0.000567 1.49 104.88 200.00 0.24
Principal 900 125.10 19.46 24.23 24.34 0.000563 1.48 98.33 200.00 0.24
Principal 1500 125.10 19.76 24.55 24.61 0.000325 1.19 239.99 200.00 0.19
Principal 2100 125.10 20.07 24.75 24.80 0.000283 1.11 278.52 200.00 0.18
Principal 2700 125.10 20.38 24.98 25.09 0.000626 1.54 106.03 200.00 0.26
Principal 3500 125.10 20.78 25.44 25.52 0.000461 1.37 179.32 200.00 0.22
Principal 4300 125.10 21.18 25.80 25.87 0.000403 1.29 213.14 200.00 0.21
Principal 4500 125.10 21.29 25.87 25.99 0.000611 1.53 117.80 200.00 0.25
Principal 4800 125.10 21.44 26.07 26.14 0.000431 1.33 198.05 200.00 0.22
Principal 5200 125.10 21.65 26.25 26.35 0.000560 1.48 140.41 200.00 0.24
Principal 5600 117.20 21.85 26.46 26.55 0.000478 1.37 146.10 200.00 0.23
Principal 6000 117.20 22.05 26.66 26.76 0.000552 1.45 100.94 200.00 0.24
Principal 6070 117.20 22.14 26.74 26.79 0.000216 0.98 177.25 200.00 0.16
Principal 6093 Bridge
Principal 6110 117.20 22.14 26.80 23.62 26.84 0.000203 0.96 187.88 200.00 0.15
Principal 6400 117.20 22.39 26.86 26.97 0.000655 1.55 118.63 200.00 0.26
Principal 6800 117.20 22.73 27.13 27.25 0.000717 1.60 106.63 200.00 0.27
Principal 7200 117.20 23.07 27.42 27.54 0.000671 1.56 132.07 200.00 0.26
Principal 7600 79.60 23.41 27.62 27.69 0.000416 1.18 71.34 136.04 0.21
Principal 7800 79.60 23.50 27.71 27.78 0.000383 1.14 103.77 200.00 0.20
Principal 8000 79.60 23.75 27.79 27.87 0.000478 1.24 74.53 200.00 0.22
Principal 8400 79.60 24.09 27.99 28.08 0.000554 1.30 61.36 19.70 0.23
Principal 8800 79.60 24.43 28.22 28.31 0.000613 1.34 59.20 19.48 0.25
Principal 9200 79.60 24.86 28.48 28.58 0.000702 1.42 65.22 200.00 0.26
Principal 9270 79.60 24.86 28.57 28.62 0.000358 1.08 122.50 200.00 0.19
Principal 9295 Bridge
Principal 9310 79.60 24.86 28.64 26.25 28.69 0.000319 1.03 136.91 200.00 0.18
Principal 9600 79.60 25.11 28.74 28.83 0.000594 1.33 105.64 200.00 0.24
Principal 10000 79.60 25.45 28.99 29.08 0.000628 1.35 109.03 200.00 0.25
Principal 10480 79.60 25.88 29.28 29.36 0.000523 1.23 88.42 200.00 0.23
Principal 10500 Bridge
Principal 10520 79.60 25.88 29.37 27.26 29.44 0.000451 1.17 106.63 200.00 0.22
Principal 10800 79.60 26.13 29.52 29.63 0.000853 1.52 72.74 200.00 0.29
Principal 11200 79.60 26.47 29.86 29.96 0.000774 1.46 94.29 200.00 0.28
Principal 11600 79.60 26.81 30.19 30.31 0.000916 1.55 51.38 21.31 0.30
Principal 12500 79.60 27.42 30.96 31.07 0.000782 1.47 54.32 18.98 0.28
Principal 13000 79.60 28.00 31.38 31.50 0.000920 1.55 51.30 18.65 0.30
Principal 13500 79.60 28.81 31.93 32.10 0.001423 1.83 43.52 17.15 0.37
Principal 13830 79.60 29.36 32.38 32.51 0.001087 1.62 49.24 19.44 0.32
Principal 13851 Bridge
Principal 13870 79.60 29.36 32.48 30.86 32.61 0.000965 1.55 51.30 19.65 0.31
Principal 14000 79.60 29.72 32.60 32.81 0.001881 2.02 39.47 16.67 0.42
Principal 14500 79.60 30.63 33.53 33.74 0.001837 2.00 39.80 16.71 0.41
Principal 15000 79.60 33.54 35.62 36.07 0.005783 2.97 26.79 15.07 0.71
Principal 15140 79.60 34.60 36.46 36.85 0.005434 2.77 28.71 17.51 0.69
Principal 15169 Bridge
Principal 15180 79.60 34.60 36.91 36.07 37.15 0.002571 2.16 36.89 18.42 0.49
Principal 15500 79.60 35.63 37.94 38.29 0.004045 2.63 30.28 15.52 0.60
Principal 15930 79.60 36.10 39.00 39.14 0.001200 1.67 47.76 19.50 0.34
Principal 15950 Bridge
Principal 15970 79.60 36.10 39.12 37.57 39.25 0.001043 1.59 50.13 19.74 0.32
Principal 16000 79.60 36.49 39.07 39.34 0.002769 2.31 34.51 16.06 0.50
Principal 16500 79.60 37.34 40.22 40.43 0.001887 2.02 39.43 16.66 0.42
Principal 17000 79.60 37.98 41.07 41.25 0.001477 1.85 42.96 17.08 0.37
Principal 17340 79.60 38.38 41.50 41.60 0.000752 1.39 57.14 21.55 0.27
Principal 17369 Bridge
Principal 17380 79.60 38.38 41.58 39.76 41.67 0.000694 1.36 58.72 21.69 0.26
Principal 17500 79.60 38.48 41.64 41.81 0.001360 1.80 44.22 17.23 0.36
Principal 18000 80.80 38.98 42.30 42.45 0.001186 1.72 46.90 17.54 0.34
Principal 18080 80.80 39.08 42.44 42.52 0.000604 1.30 62.24 22.01 0.25
Principal 18106 Bridge
Principal 18120 80.80 39.08 42.50 40.47 42.58 0.000565 1.27 63.66 22.14 0.24
Principal 18500 80.80 39.49 42.78 42.93 0.001227 1.74 46.35 17.47 0.34
Principal 19000 80.80 39.99 43.37 43.51 0.001114 1.69 47.95 17.65 0.33
Principal 19460 80.80 40.49 43.83 43.93 0.000749 1.42 56.84 20.47 0.27
Principal 19486 Bridge
Principal 19500 80.80 40.49 43.87 42.19 44.02 0.001106 1.68 48.07 17.67 0.33
Principal 20000 80.80 40.99 44.42 44.56 0.001058 1.65 48.84 17.76 0.32
Principal 20500 80.80 41.59 44.96 45.11 0.001121 1.69 47.85 17.64 0.33
Principal 20560 80.80 41.59 45.08 45.16 0.000527 1.24 65.23 22.28 0.23
Principal 20581 Bridge
Principal 20600 80.80 41.59 45.14 42.99 45.21 0.000499 1.22 66.49 22.40 0.23
Principal 21000 80.80 41.99 45.39 45.54 0.001084 1.67 48.42 17.71 0.32
Principal 21090 80.80 42.09 45.55 45.60 0.000333 1.01 79.89 26.71 0.19
Principal 21110 Bridge
Principal 21130 80.80 42.09 45.61 43.28 45.66 0.000313 0.99 81.54 26.84 0.18
Principal 21500 80.80 42.59 45.78 45.95 0.001355 1.81 44.75 17.29 0.36
Principal 21510 80.80 42.49 45.91 45.97 0.000343 1.02 79.03 26.65 0.19
Principal 21531 Bridge
Principal 21550 80.80 42.49 45.94 43.68 46.00 0.000333 1.01 79.85 26.71 0.19
Principal 22000 80.80 43.00 46.19 46.36 0.001361 1.81 44.68 17.28 0.36
Principal 22100 72.70 43.10 46.37 46.44 0.000535 1.20 60.34 21.84 0.23
Principal 22140 72.70 43.10 46.39 46.47 0.000522 1.20 60.83 21.88 0.23
Principal 22500 72.70 43.50 46.64 46.78 0.001172 1.66 43.73 17.17 0.33
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 2 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 72.70 43.60 46.79 46.84 0.000352 1.00 73.04 26.27 0.19
Principal 22600 Culvert
Principal 22620 72.70 43.60 48.64 44.71 48.64 0.000030 0.41 421.47 200.00 0.06
Principal 22630 72.70 43.98 48.63 48.64 0.000060 0.53 296.16 200.00 0.08
Principal 22659 Bridge
Principal 22670 72.70 43.98 48.67 45.13 48.68 0.000057 0.52 303.48 200.00 0.08
Principal 23000 72.70 44.10 48.69 48.72 0.000198 0.87 200.96 200.00 0.14
Principal 23500 72.70 44.73 48.81 48.85 0.000313 1.03 171.50 200.00 0.18
Principal 23700 72.70 44.98 48.87 48.92 0.000293 0.98 74.30 23.08 0.17
Principal 23726 Bridge
Principal 23740 72.70 44.98 48.92 46.28 48.97 0.000279 0.96 75.89 61.92 0.17
Principal 24000 72.70 45.35 49.01 49.12 0.000811 1.47 49.30 17.21 0.28
Principal 24500 72.70 45.98 49.44 49.57 0.000981 1.58 46.05 16.83 0.30
Principal 25000 72.70 46.60 49.96 50.10 0.001094 1.64 44.30 16.62 0.32
Principal 25500 72.70 47.23 50.52 50.67 0.001172 1.68 43.23 16.49 0.33
Principal 25860 72.70 47.72 50.89 50.97 0.000596 1.25 58.13 21.64 0.24
Principal 25882 Bridge
Principal 25900 72.70 47.72 50.92 49.02 51.00 0.000573 1.23 58.92 21.71 0.24
Principal 26000 72.70 47.85 50.95 51.12 0.001448 1.81 40.12 16.11 0.37
Principal 26500 72.70 48.48 51.65 51.81 0.001338 1.76 41.25 16.25 0.35
Principal 26910 72.70 48.98 52.10 52.18 0.000628 1.27 57.11 21.54 0.25
Principal 26932 Bridge
Principal 26950 72.70 48.98 52.14 50.28 52.22 0.000602 1.25 57.94 21.62 0.24
Principal 27000 72.70 49.10 52.12 52.30 0.001597 1.88 38.75 15.94 0.38
Principal 27500 72.70 49.75 52.88 53.04 0.001410 1.80 40.50 16.15 0.36
Principal 27710 72.70 49.85 53.15 53.22 0.000491 1.16 62.41 22.31 0.22
Principal 27736 Bridge
Principal 27750 72.70 49.85 53.21 51.13 53.28 0.000464 1.14 63.65 22.42 0.22
Principal 28000 72.70 50.16 53.35 53.51 0.001315 1.75 41.50 16.28 0.35
Principal 28500 72.70 50.76 53.99 54.14 0.001252 1.72 42.23 16.37 0.34
Principal 29000 72.70 51.17 54.58 54.71 0.001040 1.61 45.10 16.72 0.31
Principal 29500 72.70 51.67 55.09 55.23 0.001023 1.60 45.38 16.75 0.31
Principal 30000 72.70 52.18 55.61 55.74 0.001022 1.60 45.40 16.75 0.31
Principal 30500 72.70 52.80 56.14 56.28 0.001120 1.65 43.94 16.58 0.32
Principal 31000 72.70 53.41 56.71 56.85 0.001166 1.68 43.31 16.50 0.33
Principal 31500 71.70 54.04 57.29 57.44 0.001191 1.68 42.57 16.41 0.33
Principal 31520 71.70 54.11 57.39 57.46 0.000515 1.18 60.56 21.86 0.23
Principal 31543 Bridge
Principal 31560 71.70 54.11 57.44 55.40 57.51 0.000488 1.16 61.67 21.96 0.22
Principal 32000 71.70 54.67 57.76 57.93 0.001426 1.80 39.94 16.09 0.36
Principal 32500 71.70 55.30 58.46 58.61 0.001328 1.75 40.95 16.21 0.35
Principal 33000 71.70 55.92 59.11 59.26 0.001280 1.73 41.50 16.28 0.35
Principal 33500 71.70 56.54 59.74 59.89 0.001259 1.72 41.74 16.31 0.34
Principal 33710 71.70 56.79 60.00 60.07 0.000555 1.21 59.02 21.72 0.24
Principal 33730 Bridge
Principal 33750 71.70 56.79 60.05 58.08 60.13 0.000524 1.19 60.21 21.83 0.23
Principal 34000 71.70 57.16 60.22 60.38 0.001489 1.82 39.34 16.01 0.37
Principal 34500 71.70 57.79 60.93 61.09 0.001351 1.76 40.70 16.18 0.35
Principal 35000 71.70 58.41 61.59 61.75 0.001289 1.73 41.40 16.27 0.35
Principal 35360 71.70 58.91 61.99 62.07 0.000641 1.28 56.18 21.46 0.25
Principal 35385 Bridge
Principal 35400 71.70 58.91 62.05 60.20 62.13 0.000598 1.25 57.52 21.58 0.24
Principal 35500 71.70 59.03 62.08 62.25 0.001494 1.83 39.28 16.00 0.37
Principal 36000 71.70 59.66 62.80 62.96 0.001354 1.76 40.68 16.18 0.35
Principal 36500 71.70 60.28 63.46 63.62 0.001290 1.73 41.38 16.26 0.35
Principal 37000 71.70 60.90 64.10 64.25 0.001262 1.72 41.70 16.30 0.34
Principal 37500 71.70 61.53 64.73 64.88 0.001260 1.72 41.73 16.31 0.34
Principal 38000 71.70 62.15 65.36 65.51 0.001250 1.71 41.85 16.32 0.34
Principal 38240 71.70 62.72 65.72 65.97 0.002381 2.21 32.52 13.90 0.46
Principal 38262 Bridge
Principal 38280 71.70 62.45 66.01 63.74 66.07 0.000389 1.07 66.73 22.42 0.20
Principal 38500 71.70 62.72 66.10 66.23 0.001040 1.61 44.67 16.66 0.31
Principal 39000 71.70 63.39 66.65 66.80 0.001181 1.68 42.70 16.43 0.33
Principal 39500 71.70 64.01 67.25 67.40 0.001210 1.69 42.33 16.38 0.34
Principal 40000 71.70 64.04 67.74 67.82 0.000610 1.33 101.34 200.00 0.24
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 3
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 00000 162.10 19.00 24.15 21.38 24.28 0.000600 1.63 172.56 200.00 0.25
Principal 300 162.10 19.15 24.33 24.45 0.000546 1.57 193.46 200.00 0.24
Principal 900 162.10 19.46 24.66 24.78 0.000558 1.59 184.83 200.00 0.25
Principal 1500 162.10 19.76 24.98 25.03 0.000306 1.23 325.36 200.00 0.19
Principal 2100 162.10 20.07 25.16 25.21 0.000271 1.16 361.66 200.00 0.18
Principal 2700 162.10 20.38 25.37 25.50 0.000624 1.65 185.59 200.00 0.26
Principal 3500 162.10 20.78 25.83 25.91 0.000445 1.43 257.88 200.00 0.22
Principal 4300 162.10 21.18 26.18 26.25 0.000393 1.36 289.61 200.00 0.21
Principal 4500 162.10 21.29 26.25 26.37 0.000617 1.64 192.99 200.00 0.26
Principal 4800 162.10 21.44 26.45 26.52 0.000420 1.40 274.43 200.00 0.22
Principal 5200 162.10 21.65 26.62 26.73 0.000557 1.57 215.68 200.00 0.25
Principal 5600 150.90 21.85 26.83 26.92 0.000469 1.44 221.06 200.00 0.23
Principal 6000 150.90 22.05 27.03 27.14 0.000569 1.56 175.01 200.00 0.25
Principal 6070 150.90 22.14 27.12 27.17 0.000232 1.08 252.13 200.00 0.16
Principal 6093 Bridge
Principal 6110 150.90 22.14 27.17 23.87 27.22 0.000218 1.05 262.72 200.00 0.16
Principal 6400 150.90 22.39 27.24 27.35 0.000625 1.62 194.74 200.00 0.26
Principal 6800 150.90 22.73 27.50 27.62 0.000697 1.68 180.40 200.00 0.27
Principal 7200 150.90 23.07 27.78 27.90 0.000641 1.62 204.31 200.00 0.26
Principal 7600 109.70 23.41 27.98 28.07 0.000487 1.36 142.25 200.00 0.23
Principal 7800 109.70 23.50 28.09 28.16 0.000408 1.27 179.67 200.00 0.21
Principal 8000 109.70 23.75 28.17 28.26 0.000517 1.39 151.03 200.00 0.23
Principal 8400 109.70 24.09 28.39 28.51 0.000673 1.53 106.07 200.00 0.26
Principal 8800 109.70 24.43 28.68 28.81 0.000775 1.60 68.41 20.41 0.28
Principal 9200 109.70 24.86 29.02 29.11 0.000541 1.39 173.58 200.00 0.24
Principal 9270 109.70 24.86 29.09 29.14 0.000295 1.08 226.95 200.00 0.18
Principal 9295 Bridge
Principal 9310 109.70 24.86 29.12 26.56 29.17 0.000279 1.06 234.09 200.00 0.18
Principal 9600 109.70 25.11 29.22 29.29 0.000481 1.32 200.15 200.00 0.22
Principal 10000 109.70 25.45 29.42 29.49 0.000537 1.37 194.46 200.00 0.24
Principal 10480 109.70 25.88 29.67 29.75 0.000518 1.34 166.03 200.00 0.23
Principal 10500 Bridge
Principal 10520 109.70 25.88 29.81 27.57 29.87 0.000413 1.22 193.41 200.00 0.21
Principal 10800 109.70 26.13 29.94 30.04 0.000745 1.56 156.76 200.00 0.28
Principal 11200 109.70 26.47 30.24 30.34 0.000696 1.51 171.51 200.00 0.27
Principal 11600 109.70 26.81 30.55 30.70 0.000989 1.75 114.64 200.00 0.32
Principal 12500 109.70 27.42 31.40 31.55 0.000914 1.71 88.58 200.00 0.30
Principal 13000 109.70 28.00 31.90 32.06 0.001057 1.79 61.26 19.69 0.32
Principal 13500 109.70 28.81 32.50 32.72 0.001495 2.04 53.65 18.29 0.38
Principal 13830 109.70 29.36 32.98 33.14 0.001102 1.79 61.24 20.64 0.33
Principal 13851 Bridge
Principal 13870 109.70 29.36 33.11 31.19 33.26 0.000974 1.72 63.93 20.90 0.31
Principal 14000 109.70 29.72 33.22 33.46 0.001817 2.19 50.07 17.89 0.42
Principal 14500 109.70 30.63 34.13 34.37 0.001819 2.19 50.05 17.89 0.42
Principal 15000 109.70 33.54 36.06 36.60 0.005737 3.28 33.48 15.93 0.72
Principal 15140 109.70 34.60 36.88 37.35 0.005103 3.02 36.35 18.36 0.68
Principal 15169 Bridge
Principal 15180 109.70 34.60 37.41 36.39 37.70 0.002490 2.36 46.39 19.43 0.49
Principal 15500 109.70 35.63 38.40 38.84 0.004092 2.91 37.65 16.45 0.61
Principal 15930 109.70 36.10 39.54 39.72 0.001256 1.87 58.69 20.59 0.35
Principal 15950 Bridge
Principal 15970 109.70 36.10 39.70 37.90 39.86 0.001080 1.77 61.85 20.89 0.33
Principal 16000 109.70 36.49 39.64 39.95 0.002634 2.50 43.92 17.19 0.50
Principal 16500 109.70 37.34 40.79 39.39 41.04 0.001862 2.22 57.78 194.85 0.42
Principal 17000 109.70 37.98 41.61 40.03 41.80 0.001385 2.00 90.98 200.00 0.37
Principal 17340 109.70 38.38 42.02 42.13 0.000669 1.47 135.23 200.00 0.26
Principal 17369 Bridge
Principal 17380 109.70 38.38 42.17 40.07 42.25 0.000524 1.34 163.96 200.00 0.24
Principal 17500 109.70 38.48 42.20 42.37 0.001222 1.91 101.48 200.00 0.35
Principal 18000 115.40 38.98 42.83 43.01 0.001190 1.92 106.26 200.00 0.34
Principal 18080 115.40 39.08 42.97 43.09 0.000724 1.55 85.91 200.00 0.27
Principal 18106 Bridge
Principal 18120 115.40 39.08 43.07 40.83 43.18 0.000634 1.48 105.92 200.00 0.26
Principal 18500 115.40 39.49 43.36 43.52 0.001097 1.85 119.17 200.00 0.33
Principal 19000 115.40 39.99 43.94 42.11 44.13 0.001247 1.96 74.97 200.00 0.35
Principal 19460 115.40 40.49 44.45 44.58 0.000768 1.60 105.42 200.00 0.28
Principal 19486 Bridge
Principal 19500 115.40 40.49 44.50 42.61 44.70 0.001230 1.94 59.63 27.67 0.35
Principal 20000 115.40 40.99 45.09 45.23 0.000911 1.74 124.08 200.00 0.30
Principal 20500 115.40 41.59 45.61 45.80 0.001218 1.93 60.58 74.56 0.35
Principal 20560 115.40 41.59 45.76 45.86 0.000554 1.41 103.45 200.00 0.24
Principal 20581 Bridge
Principal 20600 115.40 41.59 45.87 43.34 45.96 0.000477 1.34 126.55 200.00 0.23
Principal 21000 115.40 41.99 46.11 44.11 46.28 0.001033 1.83 90.76 200.00 0.32
Principal 21090 115.40 42.09 46.27 46.34 0.000331 1.14 133.37 200.00 0.19
Principal 21110 Bridge
Principal 21130 115.40 42.09 46.38 43.59 46.44 0.000291 1.09 154.00 200.00 0.18
Principal 21500 115.40 42.59 46.52 44.71 46.72 0.001297 1.98 65.84 186.69 0.36
Principal 21510 115.40 42.49 46.68 46.74 0.000317 1.12 148.15 200.00 0.19
Principal 21531 Bridge
Principal 21550 115.40 42.49 46.72 43.99 46.78 0.000301 1.10 156.29 200.00 0.18
Principal 22000 115.40 43.00 46.93 45.12 47.13 0.001297 1.98 68.19 200.00 0.36
Principal 22100 100.70 43.10 47.13 47.20 0.000405 1.21 145.53 200.00 0.21
Principal 22140 100.70 43.10 47.15 47.22 0.000394 1.20 149.09 200.00 0.21
Principal 22500 100.70 43.50 47.33 47.45 0.000862 1.64 119.41 200.00 0.29
HEC-RAS Plan: 07 River: Totoras Reach: Principal Profile: PF 3 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Principal 22580 100.70 43.60 47.45 47.50 0.000268 1.00 184.76 200.00 0.17
Principal 22600 Culvert
Principal 22620 100.70 43.60 48.87 44.97 48.88 0.000045 0.51 468.29 200.00 0.07
Principal 22630 100.70 43.98 48.86 48.88 0.000086 0.66 342.69 200.00 0.10
Principal 22659 Bridge
Principal 22670 100.70 43.98 48.92 45.39 48.94 0.000080 0.65 354.52 200.00 0.10
Principal 23000 100.70 44.10 48.96 48.99 0.000249 1.02 253.94 200.00 0.16
Principal 23500 100.70 44.73 49.10 49.15 0.000357 1.16 229.66 200.00 0.19
Principal 23700 100.70 44.98 49.16 49.23 0.000402 1.21 118.30 200.00 0.21
Principal 23726 Bridge
Principal 23740 100.70 44.98 49.27 46.58 49.34 0.000344 1.14 140.97 200.00 0.19
Principal 24000 100.70 45.35 49.37 49.54 0.001103 1.81 55.76 17.95 0.33
Principal 24500 100.70 45.98 49.94 50.11 0.001161 1.84 55.93 87.20 0.34
Principal 25000 100.70 46.60 50.53 50.71 0.001200 1.86 54.10 17.76 0.34
Principal 25500 100.70 47.23 51.14 49.29 51.31 0.001118 1.83 81.43 200.00 0.33
Principal 25860 100.70 47.72 51.51 51.61 0.000615 1.40 72.03 22.89 0.25
Principal 25882 Bridge
Principal 25900 100.70 47.72 51.55 49.32 51.65 0.000594 1.38 72.92 22.96 0.25
Principal 26000 100.70 47.85 51.57 51.77 0.001459 2.00 50.44 17.34 0.37
Principal 26500 100.70 48.48 52.27 50.54 52.45 0.001223 1.88 83.28 200.00 0.35
Principal 26910 100.70 48.98 52.70 52.81 0.000642 1.43 79.78 200.00 0.26
Principal 26932 Bridge
Principal 26950 100.70 48.98 52.78 50.58 52.88 0.000579 1.38 95.25 200.00 0.25
Principal 27000 100.70 49.10 52.79 52.92 0.001016 1.73 129.37 200.00 0.32
Principal 27500 100.70 49.75 53.47 53.68 0.001454 1.99 50.50 17.35 0.37
Principal 27710 100.70 49.85 53.78 53.87 0.000517 1.31 76.78 23.56 0.23
Principal 27736 Bridge
Principal 27750 100.70 49.85 53.85 51.43 53.93 0.000487 1.28 78.42 23.70 0.23
Principal 28000 100.70 50.16 53.98 54.17 0.001324 1.93 52.22 17.55 0.36
Principal 28500 100.70 50.76 54.63 54.82 0.001263 1.90 53.11 17.65 0.35
Principal 29000 100.70 51.17 55.22 53.23 55.38 0.001023 1.77 73.53 200.00 0.32
Principal 29500 100.70 51.67 55.72 55.83 0.000761 1.57 136.46 200.00 0.28
Principal 30000 100.70 52.18 56.19 56.36 0.001117 1.81 55.51 17.92 0.33
Principal 30500 100.70 52.80 56.76 56.93 0.001168 1.84 54.63 17.82 0.34
Principal 31000 100.70 53.41 57.35 57.52 0.001190 1.86 54.26 17.78 0.34
Principal 31500 98.60 54.04 57.94 58.11 0.001185 1.84 53.52 17.69 0.34
Principal 31520 98.60 54.11 58.05 58.13 0.000518 1.31 75.34 23.17 0.23
Principal 31543 Bridge
Principal 31560 98.60 54.11 58.11 55.69 58.19 0.000491 1.28 76.76 23.30 0.23
Principal 32000 98.60 54.67 58.41 58.60 0.001373 1.94 50.77 17.38 0.36
Principal 32500 98.60 55.30 59.09 59.27 0.001314 1.91 51.57 17.47 0.36
Principal 33000 98.60 55.92 59.74 59.92 0.001278 1.89 52.10 17.53 0.35
Principal 33500 98.60 56.54 60.37 60.55 0.001260 1.88 52.36 17.56 0.35
Principal 33710 98.60 56.79 60.64 60.73 0.000558 1.34 73.40 23.01 0.24
Principal 33730 Bridge
Principal 33750 98.60 56.79 60.71 58.37 60.80 0.000526 1.32 74.93 23.14 0.23
Principal 34000 98.60 57.16 60.86 61.05 0.001434 1.97 50.00 17.29 0.37
Principal 34500 98.60 57.79 61.56 61.74 0.001341 1.93 51.20 17.43 0.36
Principal 35000 98.60 58.41 62.22 62.40 0.001290 1.90 51.92 17.51 0.35
Principal 35360 98.60 58.91 62.63 62.73 0.000633 1.40 70.26 22.73 0.25
Principal 35385 Bridge
Principal 35400 98.60 58.91 62.70 60.49 62.79 0.000591 1.37 71.95 22.88 0.25
Principal 35500 98.60 59.03 62.72 62.92 0.001441 1.98 49.90 17.28 0.37
Principal 36000 98.60 59.66 63.42 63.61 0.001345 1.93 51.15 17.42 0.36
Principal 36500 98.60 60.28 64.09 62.31 64.26 0.001193 1.86 76.68 200.00 0.34
Principal 37000 98.60 60.90 64.70 62.93 64.88 0.001252 1.89 65.49 200.00 0.35
Principal 37500 98.60 61.53 65.32 63.56 65.50 0.001250 1.89 66.85 200.00 0.35
Principal 38000 98.60 62.15 65.96 66.15 0.001283 1.90 52.03 17.52 0.35
Principal 38240 98.60 62.72 66.31 66.61 0.002349 2.40 41.10 15.09 0.46
Principal 38262 Bridge
Principal 38280 98.60 62.45 66.69 64.03 66.75 0.000340 1.13 142.77 200.00 0.19
Principal 38500 98.60 62.72 66.76 66.92 0.001037 1.76 56.15 17.99 0.32
Principal 39000 98.60 63.39 67.31 67.41 0.000748 1.54 146.52 200.00 0.27
Principal 39500 98.60 64.01 67.73 67.86 0.000984 1.71 125.19 200.00 0.31
Principal 40000 98.60 64.04 68.13 68.21 0.000540 1.36 180.17 200.00 0.23
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 1
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 24.10 29.63 31.77 30.78 31.86 0.001500 1.30 18.48 13.07 0.35
Unico 00010 Bridge
Unico 00020 24.10 29.83 31.90 30.98 32.00 0.001696 1.36 17.66 12.83 0.37
Unico 00200 24.10 29.87 32.63 32.70 0.000913 1.12 21.54 12.77 0.27
Unico 00550 24.10 30.71 32.99 33.06 0.001147 1.20 20.07 13.16 0.31
Unico 00576 Bridge
Unico 00600 24.10 30.83 33.07 31.95 33.14 0.001192 1.20 20.02 13.44 0.31
Unico 01000 23.80 31.12 34.43 34.45 0.000226 0.63 37.65 19.41 0.14
Unico 01400 23.80 31.64 34.85 34.88 0.000368 0.81 29.50 14.64 0.18
Unico 02000 23.80 32.31 35.14 35.19 0.000589 0.97 24.43 13.02 0.23
Unico 2050 23.80 32.35 35.17 35.22 0.000604 0.98 24.29 13.14 0.23
Unico 02073 Bridge
Unico 2100 23.80 32.39 35.21 33.68 35.26 0.000603 0.98 24.40 13.34 0.23
Unico 02600 23.80 32.77 35.52 35.58 0.000701 1.05 22.58 11.33 0.24
Unico 03200 23.80 33.00 35.84 35.88 0.000444 0.89 26.60 12.07 0.19
Unico 3250 23.80 33.04 35.86 35.90 0.000438 0.89 26.67 12.14 0.19
Unico 03253 Bridge
Unico 3300 23.80 33.07 35.89 34.14 35.93 0.000430 0.89 26.80 12.21 0.19
Unico 03800 23.80 33.40 36.12 36.16 0.000507 0.94 25.40 12.16 0.21
Unico 4250 23.80 33.93 36.41 36.48 0.000887 1.16 20.59 11.12 0.27
Unico 04278 Bridge
Unico 4300 23.80 33.99 36.47 35.20 36.54 0.000913 1.17 20.36 11.02 0.27
Unico 04400 23.80 34.11 36.57 36.64 0.001001 1.21 19.69 10.85 0.29
Unico 4750 23.80 34.50 36.90 36.96 0.000836 1.12 21.30 11.81 0.27
Unico 04782 Bridge
Unico 4800 23.80 34.56 36.95 35.70 37.02 0.000802 1.10 21.66 11.94 0.26
Unico 05000 23.80 34.79 37.12 37.17 0.000757 1.05 22.62 12.82 0.25
Unico 5250 23.40 35.18 37.34 37.42 0.001161 1.20 19.42 12.67 0.31
Unico 05268 Bridge
Unico 5300 23.40 35.26 37.40 36.37 37.48 0.001237 1.23 19.05 12.71 0.32
Unico 05326 Bridge
Unico 5350 23.40 35.34 37.50 36.46 37.57 0.001227 1.23 19.09 12.70 0.32
Unico 05600 23.40 35.74 37.84 37.93 0.001543 1.32 17.68 12.62 0.36
Unico 05621 Bridge
Unico 5650 23.40 35.76 37.94 36.97 38.02 0.001333 1.26 18.58 12.87 0.33
Unico 6100 23.40 35.95 38.49 38.56 0.001077 1.19 19.68 11.67 0.29
Unico 06146 Bridge
Unico 6150 23.40 35.97 38.56 37.19 38.63 0.001011 1.16 20.19 11.77 0.28
Unico 06200 23.40 35.99 38.61 38.68 0.000885 1.14 20.47 10.93 0.27
Unico 6600 23.40 36.34 39.03 39.08 0.000930 1.07 21.81 14.50 0.28
Unico 06634 Bridge
Unico 6650 23.40 36.39 39.10 37.97 39.15 0.000850 1.04 22.57 14.82 0.27
Unico 06800 23.40 36.52 39.22 39.27 0.000723 0.97 24.01 15.35 0.25
Unico 7150 23.40 37.33 39.62 39.71 0.001811 1.33 17.65 14.46 0.38
Unico 07153 Bridge
Unico 7200 23.40 37.44 39.74 38.91 39.83 0.001768 1.32 17.76 14.65 0.38
Unico 07400 23.40 37.90 40.11 40.22 0.002036 1.47 15.88 11.96 0.41
Unico 7500 22.80 37.94 40.30 40.39 0.001482 1.30 17.52 12.56 0.35
Unico 07549 Bridge
Unico 7550 22.80 37.96 40.40 39.38 40.48 0.001320 1.25 18.27 12.75 0.33
Unico 7750 22.80 38.03 40.63 40.69 0.000918 1.14 20.00 12.32 0.28
Unico 07773 Bridge
Unico 7800 22.80 38.05 40.69 39.43 40.75 0.000831 1.11 20.62 12.08 0.27
Unico 08000 22.80 38.12 40.85 40.90 0.000687 1.02 22.26 12.34 0.24
Unico 08600 22.80 38.44 41.19 41.22 0.000425 0.84 27.17 14.38 0.19
Unico 9050 22.80 39.15 41.49 41.55 0.000973 1.12 20.34 13.11 0.29
Unico 09071 Bridge
Unico 9100 22.80 39.23 41.57 40.43 41.63 0.000955 1.11 20.52 13.13 0.28
Unico 09200 22.80 39.39 41.66 41.73 0.000985 1.12 20.36 12.99 0.29
Unico 09800 20.20 39.65 42.05 42.09 0.000482 0.86 23.45 13.83 0.20
Unico 9900 20.20 39.71 42.10 42.14 0.000506 0.88 23.05 12.93 0.21
Unico 09903 Bridge
Unico 9950 20.20 39.74 42.14 40.71 42.18 0.000506 0.88 22.99 12.84 0.21
Unico 10150 20.20 39.86 42.24 42.29 0.000558 0.91 22.20 12.73 0.22
Unico 10187 Bridge
Unico 10200 20.20 39.89 42.29 40.90 42.33 0.000557 0.91 22.25 14.72 0.22
Unico 10400 20.20 40.01 42.40 42.45 0.000620 0.94 21.48 12.60 0.23
Unico 10450 20.20 40.03 42.43 42.48 0.000602 0.93 21.65 13.72 0.23
Unico 10466 Bridge
Unico 10500 20.20 40.04 42.48 41.09 42.52 0.000580 0.92 21.90 14.95 0.22
Unico 11000 20.20 40.22 42.74 42.78 0.000470 0.86 23.65 18.93 0.20
Unico 11500 20.20 40.75 43.18 43.27 0.001518 1.32 15.30 10.64 0.35
Unico 11546 Bridge
Unico 11550 20.20 40.80 43.25 42.33 43.34 0.001647 1.35 14.93 10.63 0.36
Unico 11600 20.20 40.86 43.33 43.43 0.001752 1.38 14.60 10.51 0.37
Unico 12150 20.20 41.30 44.12 44.21 0.001347 1.31 15.40 9.00 0.32
Unico 12187 Bridge
Unico 12200 20.20 41.34 44.25 42.98 44.34 0.001294 1.31 15.45 9.41 0.31
Unico 12800 16.00 42.17 44.70 44.75 0.000607 0.92 17.40 12.07 0.22
Unico 13050 16.00 42.25 44.85 44.89 0.000538 0.87 18.47 10.72 0.21
Unico 13079 Bridge
Unico 13100 16.00 42.27 44.90 43.38 44.93 0.000509 0.85 18.81 10.73 0.21
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 1 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 13400 16.00 42.37 45.04 45.07 0.000443 0.82 19.58 10.57 0.19
Unico 13650 14.80 42.63 45.16 45.20 0.000571 0.89 16.72 9.63 0.21
Unico 13696 Bridge
Unico 13700 14.80 42.68 45.20 43.81 45.24 0.000606 0.91 16.34 9.48 0.22
Unico 14000 14.80 43.00 45.42 45.48 0.000927 1.07 13.86 9.96 0.27
Unico 14600 14.80 43.58 46.01 46.07 0.001061 1.07 13.78 9.60 0.29
Unico 14750 14.80 43.78 46.18 46.24 0.001101 1.10 13.49 9.44 0.29
Unico 14779 Bridge
Unico 14800 14.80 43.85 46.27 45.23 46.33 0.001035 1.08 13.76 9.60 0.28
Unico 15400 14.80 44.68 46.92 46.99 0.001079 1.11 13.28 8.94 0.29
Unico 15750 10.50 44.91 47.20 47.25 0.000991 1.00 10.54 10.17 0.27
Unico 15770 Bridge
Unico 15800 10.50 44.94 47.34 46.18 47.38 0.000779 0.96 13.71 26.31 0.24
Unico 16000 10.50 45.07 47.51 47.56 0.001011 1.07 14.72 27.95 0.27
Unico 16400 10.50 45.24 47.77 47.79 0.000366 0.70 17.34 28.41 0.18
Unico 16800 10.50 45.59 47.93 47.96 0.000462 0.77 16.60 19.75 0.20
Unico 17200 10.50 46.00 48.14 48.17 0.000551 0.82 19.05 20.80 0.22
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 2
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 48.30 29.63 32.56 31.38 32.70 0.001500 1.63 29.73 15.82 0.37
Unico 00010 Bridge
Unico 00020 48.30 29.83 32.83 31.58 32.96 0.001445 1.56 30.98 16.74 0.36
Unico 00200 48.30 29.87 33.52 33.62 0.000918 1.40 39.66 34.14 0.29
Unico 00550 48.30 30.71 33.88 33.99 0.001168 1.45 33.26 17.03 0.33
Unico 00576 Bridge
Unico 00600 48.30 30.83 33.98 32.55 34.08 0.001176 1.44 33.53 16.85 0.33
Unico 01000 47.60 31.12 35.44 35.47 0.000247 0.79 61.55 33.90 0.16
Unico 01400 47.60 31.64 35.85 35.89 0.000459 0.91 59.13 49.70 0.21
Unico 02000 47.60 32.31 36.14 36.22 0.000661 1.22 39.80 31.23 0.25
Unico 2050 47.60 32.35 36.18 36.25 0.000658 1.22 39.41 23.02 0.25
Unico 02073 Bridge
Unico 2100 47.60 32.39 36.24 34.27 36.32 0.000626 1.20 41.48 32.42 0.24
Unico 02600 47.60 32.77 36.56 36.65 0.000739 1.32 41.11 42.25 0.26
Unico 03200 47.60 33.00 36.93 37.00 0.000543 1.16 41.46 22.90 0.22
Unico 3250 47.60 33.04 36.95 37.02 0.000531 1.16 41.49 21.69 0.22
Unico 03253 Bridge
Unico 3300 47.60 33.07 37.00 34.67 37.07 0.000512 1.15 41.88 21.77 0.21
Unico 03800 47.60 33.40 37.26 37.33 0.000556 1.18 40.49 14.79 0.22
Unico 4250 47.60 33.93 37.56 37.65 0.000847 1.38 34.53 13.55 0.27
Unico 04278 Bridge
Unico 4300 47.60 33.99 37.62 35.76 37.72 0.000863 1.39 34.27 13.22 0.27
Unico 04400 47.60 34.11 37.71 37.81 0.000935 1.43 33.33 13.04 0.29
Unico 4750 47.60 34.50 38.03 38.12 0.000829 1.30 36.72 16.00 0.27
Unico 04782 Bridge
Unico 4800 47.60 34.56 38.10 36.22 38.18 0.000781 1.26 37.70 16.39 0.27
Unico 05000 47.60 34.79 38.26 38.33 0.000685 1.19 40.09 17.48 0.25
Unico 5250 46.70 35.18 38.44 38.53 0.000864 1.34 34.91 16.22 0.28
Unico 05268 Bridge
Unico 5300 46.70 35.26 38.50 36.89 38.60 0.000907 1.37 34.21 15.32 0.29
Unico 05326 Bridge
Unico 5350 46.70 35.34 38.59 36.98 38.68 0.000914 1.35 34.65 16.68 0.29
Unico 05600 46.70 35.74 38.84 38.95 0.001146 1.44 32.76 24.28 0.33
Unico 05621 Bridge
Unico 5650 46.70 35.76 39.01 37.52 39.10 0.000946 1.35 34.82 18.29 0.30
Unico 6100 46.70 35.95 39.45 39.56 0.001053 1.46 32.06 14.05 0.30
Unico 06146 Bridge
Unico 6150 46.70 35.97 39.58 37.87 39.68 0.000906 1.40 33.65 14.52 0.28
Unico 06200 46.70 35.99 39.62 39.72 0.000904 1.42 33.08 14.11 0.28
Unico 6600 46.70 36.34 39.99 40.07 0.000704 1.25 43.64 39.76 0.26
Unico 06634 Bridge
Unico 6650 46.70 36.39 40.15 38.47 40.21 0.000552 1.15 51.45 39.95 0.23
Unico 06800 46.70 36.52 40.24 40.29 0.000477 1.08 58.03 40.00 0.22
Unico 7150 46.70 37.33 40.48 40.59 0.001198 1.50 34.46 28.92 0.34
Unico 07153 Bridge
Unico 7200 46.70 37.44 40.66 39.45 40.77 0.001051 1.47 35.94 27.33 0.32
Unico 07400 46.70 37.90 40.90 41.06 0.001695 1.82 27.44 18.05 0.40
Unico 7500 45.60 37.94 41.07 41.21 0.001351 1.66 29.59 19.82 0.36
Unico 07549 Bridge
Unico 7550 45.60 37.96 41.28 39.94 41.40 0.001035 1.52 33.31 21.43 0.32
Unico 7750 45.60 38.03 41.48 41.59 0.000912 1.47 35.05 21.99 0.30
Unico 07773 Bridge
Unico 7800 45.60 38.05 41.55 39.99 41.66 0.000834 1.44 36.00 22.13 0.29
Unico 08000 45.60 38.12 41.72 41.81 0.000714 1.34 38.69 22.70 0.26
Unico 08600 45.60 38.44 42.09 42.15 0.000455 1.12 44.93 25.00 0.21
Unico 9050 45.60 39.15 42.37 42.46 0.000838 1.39 38.54 27.18 0.29
Unico 09071 Bridge
Unico 9100 45.60 39.23 42.53 40.97 42.61 0.000725 1.32 41.53 27.44 0.27
Unico 09200 45.60 39.39 42.60 42.69 0.000769 1.35 41.30 27.89 0.27
Unico 09800 40.60 39.65 42.95 43.01 0.000486 1.12 41.34 21.00 0.22
Unico 9900 40.60 39.71 43.00 43.06 0.000501 1.14 40.78 20.83 0.22
Unico 09903 Bridge
Unico 9950 40.60 39.74 43.06 41.20 43.12 0.000489 1.13 41.20 20.75 0.22
Unico 10150 40.60 39.86 43.16 43.23 0.000526 1.16 40.19 20.42 0.23
Unico 10187 Bridge
Unico 10200 40.60 39.89 43.26 41.40 43.33 0.000481 1.13 41.66 20.33 0.22
Unico 10400 40.60 40.01 43.36 43.43 0.000530 1.17 40.43 20.00 0.23
Unico 10450 40.60 40.03 43.39 43.46 0.000519 1.16 41.14 20.50 0.23
Unico 10466 Bridge
Unico 10500 40.60 40.04 43.49 41.59 43.55 0.000473 1.13 43.06 21.00 0.22
Unico 11000 40.60 40.22 43.71 43.75 0.000358 0.99 66.32 47.66 0.19
Unico 11500 40.60 40.75 44.02 44.14 0.001221 1.56 32.29 22.86 0.34
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 2 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 11546 Bridge
Unico 11550 40.60 40.80 44.18 42.91 44.30 0.001086 1.53 33.85 22.55 0.32
Unico 11600 40.60 40.86 44.24 44.35 0.001180 1.57 33.19 22.23 0.33
Unico 12150 40.60 41.30 44.93 45.07 0.001415 1.72 28.51 19.06 0.35
Unico 12187 Bridge
Unico 12200 40.60 41.34 45.14 43.66 45.28 0.001242 1.68 30.36 18.76 0.33
Unico 12800 31.70 42.17 45.60 45.66 0.000550 1.16 34.61 20.87 0.23
Unico 13050 31.70 42.25 45.73 45.79 0.000494 1.09 35.21 20.57 0.22
Unico 13079 Bridge
Unico 13100 31.70 42.27 45.85 43.90 45.90 0.000434 1.05 36.93 20.50 0.20
Unico 13400 31.70 42.37 45.98 46.03 0.000425 1.03 36.21 20.02 0.20
Unico 13650 31.10 42.63 46.09 46.15 0.000555 1.15 33.64 20.43 0.23
Unico 13696 Bridge
Unico 13700 31.10 42.68 46.19 44.36 46.25 0.000532 1.14 34.76 20.51 0.22
Unico 14000 31.10 43.00 46.37 46.45 0.000754 1.30 32.88 21.03 0.26
Unico 14600 31.10 43.58 46.88 46.97 0.000938 1.36 25.83 15.00 0.29
Unico 14750 31.10 43.78 47.02 47.12 0.000983 1.39 26.10 16.50 0.30
Unico 14779 Bridge
Unico 14800 31.10 43.85 47.21 45.76 47.29 0.000801 1.31 28.60 17.01 0.27
Unico 15400 31.10 44.68 47.75 47.85 0.000989 1.42 29.06 23.14 0.30
Unico 15750 22.10 44.91 48.01 48.07 0.000737 1.16 30.31 26.03 0.25
Unico 15770 Bridge
Unico 15800 22.10 44.94 48.11 46.72 48.16 0.000647 1.13 33.94 26.31 0.23
Unico 16000 22.10 45.07 48.25 48.31 0.000799 1.22 35.37 27.95 0.25
Unico 16400 22.10 45.24 48.47 48.49 0.000315 0.82 53.65 55.00 0.17
Unico 16800 22.10 45.59 48.61 48.66 0.000512 1.03 32.01 23.17 0.22
Unico 17200 22.10 46.00 48.83 48.88 0.000573 1.08 33.42 20.80 0.23
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 3
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 64.90 29.63 32.95 31.70 33.12 0.001502 1.83 37.77 30.00 0.38
Unico 00010 Bridge
Unico 00020 64.90 29.83 33.35 31.90 33.48 0.001200 1.62 44.47 30.00 0.33
Unico 00200 64.90 29.87 33.94 34.06 0.000899 1.55 53.90 34.14 0.30
Unico 00550 64.90 30.71 34.28 34.42 0.001137 1.62 42.91 28.56 0.33
Unico 00576 Bridge
Unico 00600 64.90 30.83 34.40 32.88 34.52 0.001154 1.59 42.91 27.48 0.33
Unico 01000 65.80 31.12 35.90 35.94 0.000276 0.92 79.26 40.00 0.17
Unico 01400 65.80 31.64 36.29 36.34 0.000417 1.00 81.24 49.70 0.21
Unico 02000 65.80 32.31 36.58 36.67 0.000718 1.39 56.76 43.43 0.27
Unico 2050 65.80 32.35 36.61 36.71 0.000697 1.40 56.15 42.33 0.26
Unico 02073 Bridge
Unico 2100 65.80 32.39 36.74 34.62 36.83 0.000619 1.34 61.02 41.77 0.25
Unico 02600 65.80 32.77 37.06 37.16 0.000719 1.46 65.18 49.00 0.26
Unico 03200 65.80 33.00 37.43 37.51 0.000582 1.34 60.06 44.50 0.23
Unico 3250 65.80 33.04 37.45 37.54 0.000571 1.34 60.02 45.13 0.23
Unico 03253 Bridge
Unico 3300 65.80 33.07 37.55 35.01 37.63 0.000521 1.30 62.97 45.75 0.22
Unico 03800 65.80 33.40 37.81 37.90 0.000566 1.34 58.47 47.05 0.23
Unico 4250 65.80 33.93 38.11 38.23 0.000842 1.56 46.20 30.13 0.28
Unico 04278 Bridge
Unico 4300 65.80 33.99 38.19 36.12 38.31 0.000847 1.56 45.29 25.83 0.28
Unico 04400 65.80 34.11 38.28 38.40 0.000911 1.60 44.83 27.18 0.29
Unico 4750 65.80 34.50 38.60 38.70 0.000768 1.42 49.49 32.13 0.27
Unico 04782 Bridge
Unico 4800 65.80 34.56 38.68 36.55 38.78 0.000705 1.38 51.44 31.00 0.26
Unico 05000 65.80 34.79 38.83 38.91 0.000625 1.31 53.26 26.50 0.25
Unico 5250 63.60 35.18 38.98 39.09 0.000778 1.46 47.96 32.22 0.28
Unico 05268 Bridge
Unico 5300 63.60 35.26 39.09 37.23 39.20 0.000771 1.46 49.38 33.28 0.27
Unico 05326 Bridge
Unico 5350 63.60 35.34 39.18 37.33 39.29 0.000743 1.42 51.25 34.29 0.27
Unico 05600 63.60 35.74 39.39 39.49 0.000854 1.46 60.47 60.00 0.29
Unico 05621 Bridge
Unico 5650 63.60 35.76 39.56 37.83 39.66 0.000773 1.42 53.27 41.83 0.28
Unico 6100 63.60 35.95 39.94 40.08 0.001037 1.64 40.13 23.66 0.31
Unico 06146 Bridge
Unico 6150 63.60 35.97 40.13 38.23 40.25 0.000849 1.55 43.09 20.84 0.28
Unico 06200 63.60 35.99 40.17 40.30 0.000870 1.59 42.20 20.19 0.29
Unico 6600 63.60 36.34 40.52 40.61 0.000598 1.32 64.97 39.76 0.25
Unico 06634 Bridge
Unico 6650 63.60 36.39 40.63 38.76 40.70 0.000521 1.25 70.44 39.95 0.23
Unico 06800 63.60 36.52 40.71 40.78 0.000458 1.19 76.91 40.00 0.22
Unico 7150 63.60 37.33 40.92 41.05 0.001081 1.63 47.30 28.92 0.33
Unico 07153 Bridge
Unico 7200 63.60 37.44 41.16 39.76 41.28 0.000920 1.58 49.49 27.33 0.31
Unico 07400 63.60 37.90 41.35 41.55 0.001577 2.00 36.73 21.00 0.40
Unico 7500 63.60 37.94 41.52 41.69 0.001354 1.88 39.09 21.28 0.37
Unico 07549 Bridge
Unico 7550 63.60 37.96 41.77 40.31 41.91 0.001029 1.72 43.66 21.43 0.33
Unico 7750 63.60 38.03 41.97 42.11 0.000938 1.68 45.73 21.99 0.31
Unico 07773 Bridge
Unico 7800 63.60 38.05 42.13 40.33 42.26 0.000789 1.60 48.73 22.13 0.29
Unico 08000 63.60 38.12 42.29 42.40 0.000688 1.50 51.62 22.70 0.27
Unico 08600 63.60 38.44 42.66 42.74 0.000456 1.27 59.12 25.00 0.22
Unico 9050 63.60 39.15 42.91 43.03 0.000767 1.53 53.48 27.18 0.28
Unico 09071 Bridge
Unico 9100 63.60 39.23 43.03 41.30 43.14 0.000719 1.49 55.38 27.44 0.27
Unico 09200 63.60 39.39 43.11 43.21 0.000757 1.51 55.37 27.89 0.28
Unico 09800 57.40 39.65 43.47 43.55 0.000524 1.31 52.19 21.00 0.23
Unico 9900 57.40 39.71 43.52 43.61 0.000535 1.32 51.62 20.83 0.24
Unico 09903 Bridge
Unico 9950 57.40 39.74 43.65 41.52 43.73 0.000487 1.29 53.45 20.75 0.23
Unico 10150 57.40 39.86 43.75 43.83 0.000520 1.32 52.22 20.42 0.23
Unico 10187 Bridge
Unico 10200 57.40 39.89 43.86 41.73 43.94 0.000480 1.29 53.77 20.33 0.23
Unico 10400 57.40 40.01 43.96 44.04 0.000523 1.33 52.32 20.00 0.24
Unico 10450 57.40 40.03 43.98 44.07 0.000513 1.32 53.33 20.50 0.23
Unico 10466 Bridge
Unico 10500 57.40 40.04 44.10 41.93 44.18 0.000465 1.28 55.98 21.00 0.22
Unico 11000 57.40 40.22 44.32 44.37 0.000311 1.05 95.67 47.66 0.18
Unico 11500 57.40 40.75 44.57 44.71 0.001067 1.70 44.94 22.86 0.33
HEC-RAS Plan: SGD_CPA-SMS River: C_SGD Reach: Unico Profile: PF 3 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 11546 Bridge
Unico 11550 57.40 40.80 44.69 43.28 44.83 0.001042 1.71 45.35 22.55 0.33
Unico 11600 57.40 40.86 44.74 44.89 0.001123 1.75 44.46 22.23 0.34
Unico 12150 57.40 41.30 45.42 45.60 0.001448 1.96 38.15 20.10 0.36
Unico 12187 Bridge
Unico 12200 57.40 41.34 45.60 44.09 45.79 0.001376 1.96 39.30 19.98 0.35
Unico 12800 44.60 42.17 46.11 46.19 0.000568 1.32 45.30 20.87 0.24
Unico 13050 44.60 42.25 46.25 46.33 0.000506 1.25 45.85 20.57 0.23
Unico 13079 Bridge
Unico 13100 44.60 42.27 46.35 44.23 46.42 0.000464 1.21 47.18 20.50 0.22
Unico 13400 44.60 42.37 46.49 46.56 0.000454 1.20 46.41 20.02 0.21
Unico 13650 42.50 42.63 46.60 46.68 0.000539 1.27 44.10 20.43 0.23
Unico 13696 Bridge
Unico 13700 42.50 42.68 46.73 44.66 46.80 0.000505 1.25 45.86 20.51 0.22
Unico 14000 42.50 43.00 46.90 46.99 0.000696 1.42 44.00 21.03 0.26
Unico 14600 42.50 43.58 47.37 47.48 0.000884 1.51 33.17 15.00 0.29
Unico 14750 42.50 43.78 47.50 47.61 0.000920 1.53 34.04 16.50 0.30
Unico 14779 Bridge
Unico 14800 42.50 43.85 47.79 46.05 47.89 0.000685 1.40 38.50 17.01 0.26
Unico 15400 42.50 44.68 48.26 48.36 0.000859 1.51 40.78 23.14 0.29
Unico 15750 29.40 44.91 48.48 48.54 0.000584 1.17 42.70 26.03 0.23
Unico 15770 Bridge
Unico 15800 29.40 44.94 48.55 46.98 48.61 0.000557 1.18 45.67 26.31 0.22
Unico 16000 29.40 45.07 48.67 48.73 0.000683 1.26 47.28 27.95 0.24
Unico 16400 29.40 45.24 48.87 48.89 0.000260 0.83 75.63 55.00 0.16
Unico 16800 29.40 45.59 48.99 49.04 0.000499 1.13 40.74 23.17 0.22
Unico 17200 29.40 46.00 49.20 49.26 0.000569 1.20 41.14 20.80 0.24
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 1
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 24.10 29.27 31.61 30.52 31.72 0.001500 1.43 16.86 9.59 0.34
Unico 200 24.10 29.47 31.90 32.00 0.001309 1.36 17.72 9.77 0.32
Unico 400 24.10 29.67 32.16 32.25 0.001204 1.32 18.27 9.88 0.31
Unico 500 24.10 29.77 32.28 32.37 0.001168 1.30 18.47 9.92 0.31
Unico 554 Bridge
Unico 600 24.10 29.90 32.43 31.15 32.51 0.001136 1.29 18.66 9.96 0.30
Unico 800 24.10 30.14 32.66 32.74 0.001155 1.30 18.55 9.93 0.30
Unico 1200 23.80 30.62 33.12 33.20 0.001160 1.30 18.35 9.89 0.30
Unico 1600 23.80 31.10 33.59 33.67 0.001181 1.31 18.23 9.87 0.31
Unico 2000 23.80 31.59 34.06 34.15 0.001185 1.30 18.24 9.97 0.31
Unico 2004 Bridge
Unico 2100 23.80 31.66 34.21 32.90 34.29 0.001072 1.26 18.88 10.00 0.29
Unico 2400 23.80 31.86 34.52 34.59 0.000923 1.19 19.95 10.21 0.27
Unico 2800 23.80 32.13 34.87 34.94 0.000823 1.14 20.80 10.38 0.26
Unico 3200 23.80 32.40 35.19 35.25 0.000752 1.10 21.54 10.65 0.25
Unico 3206 Bridge
Unico 3300 23.80 32.51 35.28 33.75 35.35 0.000785 1.12 21.16 10.45 0.25
Unico 3600 23.80 32.81 35.53 35.60 0.000846 1.16 20.59 10.34 0.26
Unico 4000 23.80 33.22 35.88 35.95 0.000916 1.19 20.00 10.22 0.27
Unico 4300 23.80 33.54 36.17 36.25 0.001051 1.25 19.07 10.27 0.29
Unico 4307 Bridge
Unico 4400 23.80 33.59 36.31 34.83 36.38 0.000846 1.16 20.58 10.34 0.26
Unico 4800 23.80 33.79 36.63 36.68 0.000710 1.08 21.98 10.70 0.24
Unico 4812 Bridge
Unico 4900 23.80 33.85 36.72 35.09 36.78 0.000694 1.07 22.14 10.63 0.24
Unico 5200 23.40 34.00 36.92 36.97 0.000627 1.03 22.69 10.74 0.23
Unico 5280 23.40 34.04 36.97 37.02 0.000609 1.02 22.96 10.87 0.22
Unico 5300 23.40 34.05 37.02 37.03 0.000071 0.42 55.88 21.98 0.08
Unico 5302 Culvert
Unico 5320 23.40 34.06 37.15 34.68 37.15 0.000062 0.40 58.41 22.22 0.08
Unico 5340 23.40 34.07 37.15 37.16 0.000063 0.40 58.21 22.20 0.08
Unico 5350 Culvert
Unico 5360 23.40 34.08 37.19 34.70 37.20 0.000061 0.40 58.97 22.27 0.08
Unico 5380 23.40 34.09 37.17 37.21 0.000511 0.96 24.47 11.08 0.21
Unico 5400 23.40 34.10 37.18 37.22 0.000513 0.96 24.43 11.06 0.21
Unico 5600 23.40 34.15 37.28 37.32 0.000469 0.92 25.31 11.36 0.20
Unico 5664 Bridge
Unico 5700 23.40 34.29 37.34 35.52 37.38 0.000533 0.97 24.09 10.99 0.21
Unico 6000 23.40 34.72 37.52 37.58 0.000733 1.09 21.43 10.50 0.24
Unico 6200 23.40 35.01 37.67 37.74 0.000853 1.15 20.33 10.46 0.26
Unico 6203 Bridge
Unico 6300 23.40 35.02 37.78 36.25 37.85 0.000769 1.11 21.05 10.43 0.25
Unico 6400 23.40 35.04 37.86 37.92 0.000712 1.08 21.66 10.54 0.24
Unico 6600 23.40 34.96 38.00 38.04 0.000530 0.97 24.17 11.11 0.21
Unico 6674 Bridge
Unico 6700 23.40 35.11 38.06 36.34 38.11 0.000602 1.02 23.03 10.80 0.22
Unico 6800 23.40 35.26 38.12 38.18 0.000675 1.06 22.09 10.62 0.23
Unico 7200 23.40 35.85 38.44 38.51 0.000962 1.20 19.44 10.21 0.28
Unico 7204 Bridge
Unico 7300 23.40 35.96 38.56 37.19 38.64 0.000963 1.21 19.39 10.10 0.28
Unico 7600 22.80 36.28 38.85 38.92 0.000931 1.18 19.32 10.24 0.27
Unico 7612 Bridge
Unico 7700 22.80 36.69 38.95 37.90 39.05 0.001532 1.42 16.08 9.42 0.35
Unico 7800 22.80 37.18 39.12 39.27 0.002613 1.72 13.29 8.92 0.45
Unico 7825 Bridge
Unico 7900 22.80 37.26 39.48 38.47 39.59 0.001630 1.45 15.72 9.35 0.36
Unico 8000 22.80 37.35 39.65 39.74 0.001449 1.39 16.40 9.49 0.34
Unico 8400 22.80 37.68 40.16 40.24 0.001093 1.25 18.17 9.86 0.30
Unico 8800 22.80 38.01 40.57 40.65 0.000965 1.20 19.02 10.03 0.28
Unico 9100 22.80 38.27 40.86 40.93 0.000908 1.17 19.50 10.26 0.27
Unico 9123 Bridge
Unico 9200 22.80 38.32 40.97 39.53 41.04 0.000853 1.15 19.89 10.20 0.26
Unico 9600 20.20 38.53 41.24 41.29 0.000614 0.98 20.54 10.33 0.22
Unico 9900 20.20 38.72 41.43 41.47 0.000599 0.97 20.79 10.56 0.22
Unico 9951 Bridge
Unico 10000 20.20 38.72 41.50 39.84 41.55 0.000559 0.95 21.25 10.46 0.21
Unico 10200 20.20 38.72 41.61 41.65 0.000465 0.89 22.81 10.97 0.20
Unico 10238 Bridge
Unico 10300 20.20 38.72 41.67 39.84 41.71 0.000449 0.88 23.03 10.80 0.19
Unico 10400 20.20 38.73 41.72 41.75 0.000429 0.86 23.42 10.87 0.19
Unico 10500 20.20 38.72 41.72 41.76 0.000405 0.84 23.99 11.17 0.18
Unico 10520 Bridge
Unico 10600 20.20 38.76 41.77 39.88 41.81 0.000414 0.85 23.72 10.93 0.18
Unico 10800 20.20 38.83 41.86 41.89 0.000407 0.85 23.86 10.95 0.18
Unico 11200 20.20 38.98 42.02 42.05 0.000401 0.84 23.99 10.98 0.18
Unico 11600 20.20 39.13 42.18 42.21 0.000397 0.84 24.10 11.00 0.18
Unico 12000 20.20 39.28 42.34 42.37 0.000393 0.84 24.19 11.01 0.18
Unico 12200 20.20 39.28 42.41 42.45 0.000346 0.80 25.40 11.40 0.17
Unico 12252 Bridge
Unico 12300 16.00 39.45 42.44 40.43 42.46 0.000268 0.68 23.47 10.88 0.15
Unico 12400 16.00 39.61 42.47 42.49 0.000318 0.73 22.04 10.61 0.16
Unico 12800 16.00 40.27 42.64 42.68 0.000637 0.94 17.09 9.64 0.22
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 1 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 13000 16.00 40.57 42.78 42.83 0.000801 1.01 15.78 9.51 0.25
Unico 13094 Bridge
Unico 13100 16.00 40.77 42.87 41.75 42.93 0.000987 1.10 14.59 9.10 0.28
Unico 13200 16.00 40.98 42.97 43.04 0.001194 1.17 13.62 8.89 0.30
Unico 13600 14.80 41.80 43.55 43.63 0.001646 1.29 11.49 8.39 0.35
Unico 13700 14.80 42.02 43.72 43.81 0.001798 1.33 11.15 8.39 0.37
Unico 13709 Bridge
Unico 13800 14.80 42.12 43.93 43.05 44.00 0.001460 1.23 11.99 8.51 0.33
Unico 14000 14.80 42.31 44.20 44.27 0.001236 1.16 12.72 8.68 0.31
Unico 14400 14.80 42.68 44.66 44.72 0.001048 1.10 13.50 8.86 0.28
Unico 14700 14.80 42.97 44.97 45.02 0.000988 1.07 13.84 9.09 0.28
Unico 14777 Bridge
Unico 14800 14.80 43.06 45.08 43.99 45.14 0.000967 1.06 13.90 8.95 0.27
Unico 15200 14.80 43.44 45.47 45.53 0.000958 1.06 13.94 8.96 0.27
Unico 15600 10.50 43.82 45.79 45.82 0.000534 0.78 13.44 8.85 0.20
Unico 15700 10.50 43.99 45.85 45.88 0.000644 0.83 12.62 8.81 0.22
Unico 15786 Bridge
Unico 15800 10.50 44.00 45.93 44.76 45.96 0.000580 0.80 13.05 8.76 0.21
Unico 16200 10.50 44.07 46.14 46.17 0.000451 0.74 14.28 9.03 0.19
Unico 16600 10.50 44.14 46.31 46.33 0.000381 0.69 15.18 9.23 0.17
Unico 17000 10.50 44.21 46.45 46.47 0.000336 0.66 15.88 9.38 0.16
Unico 17400 10.50 44.21 46.57 46.59 0.000268 0.61 17.29 9.83 0.15
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 2
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 48.30 29.27 32.67 31.16 32.82 0.001502 1.72 28.05 11.69 0.35
Unico 200 48.30 29.47 32.96 33.10 0.001351 1.66 29.17 13.84 0.34
Unico 400 48.30 29.67 33.23 33.36 0.001256 1.61 29.97 12.02 0.33
Unico 500 48.30 29.77 33.35 33.48 0.001220 1.59 30.29 12.07 0.32
Unico 554 Bridge
Unico 600 48.30 29.90 33.51 31.79 33.64 0.001182 1.58 30.65 12.13 0.32
Unico 800 48.30 30.14 33.75 33.88 0.001187 1.58 30.60 12.12 0.32
Unico 1200 47.60 30.62 34.22 34.34 0.001168 1.56 30.46 12.10 0.31
Unico 1600 47.60 31.10 34.69 34.81 0.001181 1.57 30.33 12.08 0.32
Unico 2000 47.60 31.59 35.16 35.29 0.001172 1.56 30.47 12.24 0.32
Unico 2004 Bridge
Unico 2100 47.60 31.66 35.31 33.54 35.43 0.001099 1.53 31.15 12.21 0.31
Unico 2400 47.60 31.86 35.63 35.74 0.000970 1.46 32.62 12.45 0.29
Unico 2800 47.60 32.13 36.01 36.11 0.000872 1.40 33.94 12.66 0.27
Unico 3200 47.60 32.40 36.35 36.44 0.000789 1.35 35.30 13.05 0.26
Unico 3206 Bridge
Unico 3300 47.60 32.51 36.45 34.38 36.55 0.000819 1.37 34.73 12.78 0.27
Unico 3600 47.60 32.81 36.70 36.80 0.000860 1.40 34.12 12.69 0.27
Unico 4000 47.60 33.22 37.06 37.16 0.000910 1.42 33.41 12.58 0.28
Unico 4300 47.60 33.54 37.34 37.45 0.000987 1.46 32.53 12.80 0.29
Unico 4307 Bridge
Unico 4400 47.60 33.59 37.47 35.47 37.57 0.000868 1.40 34.00 12.67 0.27
Unico 4800 47.60 33.79 37.81 37.89 0.000745 1.32 36.04 13.11 0.25
Unico 4812 Bridge
Unico 4900 47.60 33.85 37.90 35.72 37.99 0.000733 1.32 36.19 13.01 0.25
Unico 5200 46.70 34.00 38.12 38.20 0.000663 1.26 37.04 13.14 0.24
Unico 5280 46.70 34.04 38.17 38.25 0.000641 1.24 37.55 13.32 0.24
Unico 5300 46.70 34.05 38.25 38.26 0.000086 0.55 84.40 24.49 0.10
Unico 5302 Culvert
Unico 5320 46.70 34.06 38.76 35.02 38.77 0.000049 0.46 167.21 200.00 0.07
Unico 5340 46.70 34.07 38.76 38.77 0.000049 0.46 165.38 200.00 0.07
Unico 5350 Culvert
Unico 5360 46.70 34.08 38.94 35.04 38.94 0.000040 0.42 197.87 200.00 0.07
Unico 5380 46.70 34.09 38.93 38.95 0.000170 0.74 169.47 200.00 0.13
Unico 5400 46.70 34.10 38.93 38.95 0.000166 0.73 173.89 200.00 0.12
Unico 5600 46.70 34.15 38.97 38.98 0.000149 0.70 186.29 200.00 0.12
Unico 5664 Bridge
Unico 5700 46.70 34.29 39.02 36.14 39.05 0.000205 0.80 152.56 200.00 0.14
Unico 6000 46.70 34.72 39.10 39.17 0.000512 1.15 44.08 128.43 0.21
Unico 6200 46.70 35.01 39.21 39.28 0.000508 1.15 70.97 200.00 0.21
Unico 6203 Bridge
Unico 6300 46.70 35.02 39.30 36.88 39.36 0.000463 1.11 81.96 200.00 0.20
Unico 6400 46.70 35.04 39.35 39.40 0.000436 1.08 87.65 200.00 0.20
Unico 6600 46.70 34.96 39.43 39.50 0.000464 1.10 42.84 59.86 0.20
Unico 6674 Bridge
Unico 6700 46.70 35.11 39.50 36.96 39.57 0.000516 1.15 40.65 13.68 0.21
Unico 6800 46.70 35.26 39.55 39.62 0.000565 1.19 39.31 13.48 0.22
Unico 7200 46.70 35.85 39.81 39.89 0.000759 1.32 35.29 13.01 0.26
Unico 7204 Bridge
Unico 7300 46.70 35.96 39.91 37.82 40.00 0.000784 1.34 34.80 12.80 0.26
Unico 7600 45.60 36.28 40.15 40.24 0.000780 1.33 34.36 12.94 0.26
Unico 7612 Bridge
Unico 7700 45.60 36.69 40.23 38.52 40.35 0.001136 1.53 29.80 11.99 0.31
Unico 7800 45.60 37.18 40.35 40.51 0.001701 1.77 25.74 11.45 0.38
Unico 7825 Bridge
Unico 7900 45.60 37.26 40.62 39.09 40.76 0.001399 1.65 27.60 11.61 0.34
Unico 8000 45.60 37.35 40.76 40.89 0.001319 1.62 28.20 11.72 0.33
Unico 8400 45.60 37.68 41.25 41.37 0.001100 1.51 30.16 12.05 0.31
Unico 8800 45.60 38.01 41.68 41.79 0.000994 1.46 31.32 12.24 0.29
Unico 9100 45.60 38.27 41.97 42.07 0.000927 1.42 32.22 12.58 0.28
Unico 9123 Bridge
Unico 9200 45.60 38.32 42.10 40.15 42.20 0.000878 1.39 32.93 39.07 0.27
Unico 9600 40.60 38.53 42.39 42.47 0.000638 1.20 34.88 77.69 0.23
Unico 9900 40.60 38.72 42.58 42.65 0.000599 1.17 41.03 170.42 0.23
Unico 9951 Bridge
Unico 10000 40.60 38.72 42.67 40.43 42.74 0.000569 1.16 43.17 188.90 0.22
Unico 10200 40.60 38.72 42.79 42.84 0.000382 0.99 85.99 200.00 0.19
Unico 10238 Bridge
Unico 10300 40.60 38.72 42.87 40.43 42.91 0.000345 0.95 97.03 200.00 0.18
Unico 10400 40.60 38.73 42.91 42.94 0.000294 0.89 114.10 200.00 0.16
Unico 10500 40.60 38.72 42.91 42.95 0.000299 0.90 106.68 200.00 0.16
Unico 10520 Bridge
Unico 10600 40.60 38.76 42.98 40.47 43.02 0.000322 0.93 99.47 200.00 0.17
Unico 10800 40.60 38.83 43.04 43.09 0.000359 0.97 85.37 200.00 0.18
Unico 11200 40.60 38.98 43.18 43.20 0.000222 0.79 144.65 200.00 0.14
Unico 11600 40.60 39.13 43.32 43.38 0.000470 1.07 37.95 13.28 0.20
Unico 12000 40.60 39.28 43.50 43.56 0.000454 1.06 38.43 13.35 0.20
Unico 12200 40.60 39.28 43.60 43.65 0.000401 1.01 40.33 13.85 0.19
Unico 12252 Bridge
Unico 12300 31.70 39.45 43.63 40.93 43.67 0.000288 0.84 37.86 13.26 0.16
Unico 12400 31.70 39.61 43.66 43.70 0.000327 0.88 36.12 13.00 0.17
Unico 12800 31.70 40.27 43.82 43.88 0.000546 1.06 29.86 12.00 0.21
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 2 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 13000 31.70 40.57 43.93 44.00 0.000645 1.13 28.16 11.92 0.23
Unico 13094 Bridge
Unico 13100 31.70 40.77 44.01 42.24 44.09 0.000770 1.21 26.30 11.39 0.25
Unico 13200 31.70 40.98 44.09 44.17 0.000903 1.28 24.81 11.12 0.27
Unico 13600 31.10 41.80 44.54 44.65 0.001409 1.50 20.78 10.37 0.34
Unico 13700 31.10 42.02 44.68 44.80 0.001530 1.54 20.21 10.38 0.35
Unico 13709 Bridge
Unico 13800 31.10 42.12 44.87 43.58 44.98 0.001385 1.49 20.91 10.40 0.33
Unico 14000 31.10 42.31 45.14 45.24 0.001243 1.43 21.75 10.56 0.32
Unico 14400 31.10 42.68 45.61 45.71 0.001088 1.36 22.84 10.76 0.30
Unico 14700 31.10 42.97 45.93 46.02 0.001008 1.32 23.58 11.12 0.29
Unico 14777 Bridge
Unico 14800 31.10 43.06 46.06 44.52 46.14 0.001004 1.32 23.53 10.89 0.29
Unico 15200 31.10 43.44 46.45 46.54 0.000981 1.31 23.72 10.93 0.28
Unico 15600 22.10 43.82 46.80 46.84 0.000518 0.95 23.33 10.86 0.21
Unico 15700 22.10 43.99 46.85 46.90 0.000579 0.98 22.49 10.92 0.22
Unico 15786 Bridge
Unico 15800 22.10 44.00 46.92 45.19 46.97 0.000556 0.97 22.75 10.75 0.21
Unico 16200 22.10 44.07 47.13 47.17 0.000466 0.91 24.26 11.02 0.20
Unico 16600 22.10 44.14 47.31 47.34 0.000331 0.80 55.98 200.00 0.17
Unico 17000 22.10 44.21 47.45 47.48 0.000346 0.82 42.35 200.00 0.17
Unico 17400 22.10 44.21 47.58 47.62 0.000310 0.78 28.28 11.94 0.16
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 3
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 00000 64.90 29.27 33.15 31.51 33.32 0.001501 1.87 52.01 200.00 0.36
Unico 200 64.90 29.47 33.45 33.54 0.000823 1.46 118.17 200.00 0.27
Unico 400 64.90 29.67 33.63 31.91 33.80 0.001401 1.82 50.39 200.00 0.35
Unico 500 64.90 29.77 33.77 32.01 33.94 0.001404 1.82 40.33 147.30 0.35
Unico 554 Bridge
Unico 600 64.90 29.90 33.97 32.14 34.13 0.001344 1.79 36.42 27.79 0.34
Unico 800 64.90 30.14 34.24 34.40 0.001310 1.77 36.73 13.09 0.34
Unico 1200 65.80 30.62 34.76 34.92 0.001286 1.76 37.37 13.19 0.33
Unico 1600 65.80 31.10 35.27 35.43 0.001250 1.74 37.76 13.25 0.33
Unico 2000 65.80 31.59 35.77 35.92 0.001208 1.72 38.31 13.49 0.33
Unico 2004 Bridge
Unico 2100 65.80 31.66 35.94 33.92 36.09 0.001130 1.68 39.20 13.47 0.31
Unico 2400 65.80 31.86 36.27 36.41 0.001003 1.61 40.98 13.73 0.30
Unico 2800 65.80 32.13 36.66 36.78 0.000902 1.54 42.64 13.97 0.28
Unico 3200 65.80 32.40 37.01 37.13 0.000811 1.48 44.45 14.42 0.27
Unico 3206 Bridge
Unico 3300 65.80 32.51 37.12 34.76 37.24 0.000825 1.50 48.63 148.79 0.27
Unico 3600 65.80 32.81 37.38 35.07 37.49 0.000857 1.52 48.58 156.62 0.28
Unico 4000 65.80 33.22 37.73 37.84 0.000806 1.49 74.31 200.00 0.27
Unico 4300 65.80 33.54 38.00 38.13 0.000981 1.59 41.49 14.23 0.30
Unico 4307 Bridge
Unico 4400 65.80 33.59 38.15 35.85 38.27 0.000852 1.52 52.59 200.00 0.28
Unico 4800 65.80 33.79 38.47 38.57 0.000674 1.39 79.57 200.00 0.25
Unico 4812 Bridge
Unico 4900 65.80 33.85 38.58 36.10 38.67 0.000635 1.36 88.34 200.00 0.24
Unico 5200 63.60 34.00 38.77 38.85 0.000560 1.29 93.84 200.00 0.23
Unico 5280 63.60 34.04 38.83 38.88 0.000431 1.15 129.46 200.00 0.20
Unico 5300 63.60 34.05 38.88 38.89 0.000077 0.58 192.19 200.00 0.09
Unico 5302 Culvert
Unico 5320 63.60 34.06 39.84 35.23 39.85 0.000025 0.38 383.01 200.00 0.05
Unico 5340 63.60 34.07 39.84 39.85 0.000025 0.38 381.09 200.00 0.05
Unico 5350 Culvert
Unico 5360 63.60 34.08 40.17 35.25 40.18 0.000018 0.34 445.35 200.00 0.05
Unico 5380 63.60 34.09 40.17 40.18 0.000042 0.45 418.36 200.00 0.07
Unico 5400 63.60 34.10 40.17 40.18 0.000042 0.45 422.10 200.00 0.07
Unico 5600 63.60 34.15 40.18 40.19 0.000040 0.44 429.24 200.00 0.06
Unico 5664 Bridge
Unico 5700 63.60 34.29 40.19 36.50 40.20 0.000053 0.49 385.83 200.00 0.07
Unico 6000 63.60 34.72 40.21 40.22 0.000124 0.70 264.27 200.00 0.11
Unico 6200 63.60 35.01 40.24 40.25 0.000123 0.69 275.68 200.00 0.11
Unico 6203 Bridge
Unico 6300 63.60 35.02 40.29 37.24 40.31 0.000119 0.68 280.89 200.00 0.11
Unico 6400 63.60 35.04 40.31 40.32 0.000121 0.68 279.27 200.00 0.11
Unico 6600 63.60 34.96 40.32 40.35 0.000177 0.81 215.33 200.00 0.13
Unico 6674 Bridge
Unico 6700 63.60 35.11 40.38 37.33 40.40 0.000212 0.87 197.15 200.00 0.14
Unico 6800 63.60 35.26 40.40 40.43 0.000237 0.91 189.91 200.00 0.15
Unico 7200 63.60 35.85 40.52 40.61 0.000637 1.35 78.82 200.00 0.24
Unico 7204 Bridge
Unico 7300 63.60 35.96 40.66 38.18 40.75 0.000669 1.38 69.23 200.00 0.24
Unico 7600 63.60 36.28 40.87 40.97 0.000733 1.42 57.49 200.00 0.26
Unico 7612 Bridge
Unico 7700 63.60 36.69 41.02 38.91 41.14 0.000971 1.58 52.10 200.00 0.29
Unico 7800 63.60 37.18 41.10 39.39 41.27 0.001383 1.80 45.05 200.00 0.35
Unico 7825 Bridge
Unico 7900 63.60 37.26 41.33 39.47 41.49 0.001271 1.75 38.86 108.86 0.33
Unico 8000 63.60 37.35 41.46 39.57 41.61 0.001202 1.71 44.72 183.82 0.32
Unico 8400 63.60 37.68 41.91 42.02 0.000929 1.55 75.71 200.00 0.29
Unico 8800 63.60 38.01 42.28 42.39 0.000920 1.55 72.38 200.00 0.29
Unico 9100 63.60 38.27 42.55 42.62 0.000634 1.33 118.34 200.00 0.24
Unico 9123 Bridge
Unico 9200 63.60 38.32 42.72 40.54 42.78 0.000465 1.17 149.96 200.00 0.21
Unico 9600 57.40 38.53 42.90 42.95 0.000452 1.13 131.21 200.00 0.20
Unico 9900 57.40 38.72 43.04 43.09 0.000450 1.13 131.61 200.00 0.20
Unico 9951 Bridge
Unico 10000 57.40 38.72 43.16 40.81 43.21 0.000402 1.08 140.30 200.00 0.19
Unico 10200 57.40 38.72 43.24 43.27 0.000277 0.93 176.34 200.00 0.16
Unico 10238 Bridge
Unico 10300 57.40 38.72 43.38 40.81 43.40 0.000224 0.85 198.80 200.00 0.14
Unico 10400 57.40 38.73 43.40 43.42 0.000198 0.81 212.97 200.00 0.14
Unico 10500 57.40 38.72 43.41 43.43 0.000203 0.82 205.92 200.00 0.14
Unico 10520 Bridge
Unico 10600 57.40 38.76 43.52 40.85 43.54 0.000201 0.82 207.10 200.00 0.14
Unico 10800 57.40 38.83 43.56 43.58 0.000236 0.87 188.26 200.00 0.15
Unico 11200 57.40 38.98 43.65 43.66 0.000162 0.74 238.51 200.00 0.12
Unico 11600 57.40 39.13 43.75 43.84 0.000615 1.30 53.50 200.00 0.23
Unico 12000 57.40 39.28 43.99 44.08 0.000576 1.27 50.24 150.93 0.23
Unico 12200 57.40 39.28 44.11 44.18 0.000510 1.20 47.74 14.92 0.21
Unico 12252 Bridge
Unico 12300 44.60 39.45 44.19 41.26 44.23 0.000348 0.98 45.51 14.37 0.18
Unico 12400 44.60 39.61 44.22 44.27 0.000388 1.02 43.72 14.12 0.19
Unico 12800 44.60 40.27 44.40 44.47 0.000599 1.20 37.18 13.16 0.23
HEC-RAS Plan: SGD_Nuevo+Alc River: C_SGD Reach: Unico Profile: PF 3 (Continued)
Reach River Sta Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m)
Unico 13000 44.60 40.57 44.53 44.61 0.000680 1.25 35.58 13.16 0.24
Unico 13094 Bridge
Unico 13100 44.60 40.77 44.62 42.58 44.71 0.000789 1.33 33.56 12.60 0.26
Unico 13200 44.60 40.98 44.70 44.80 0.000904 1.40 31.91 12.33 0.28
Unico 13600 42.50 41.80 45.12 45.24 0.001270 1.57 27.15 11.54 0.33
Unico 13700 42.50 42.02 45.25 45.38 0.001378 1.61 26.40 11.55 0.34
Unico 13709 Bridge
Unico 13800 42.50 42.12 45.43 43.87 45.55 0.001288 1.57 27.01 11.51 0.33
Unico 14000 42.50 42.31 45.69 44.07 45.80 0.001036 1.46 50.97 200.00 0.30
Unico 14400 42.50 42.68 46.09 46.19 0.000943 1.41 59.14 200.00 0.28
Unico 14700 42.50 42.97 46.39 46.50 0.001063 1.47 30.74 94.04 0.30
Unico 14777 Bridge
Unico 14800 42.50 43.06 46.54 44.81 46.64 0.001060 1.47 29.21 40.70 0.30
Unico 15200 42.50 43.44 46.93 47.00 0.000727 1.26 80.18 200.00 0.25
Unico 15600 29.40 43.82 47.20 47.25 0.000474 0.99 56.74 200.00 0.20
Unico 15700 29.40 43.99 47.25 47.30 0.000546 1.04 49.54 200.00 0.22
Unico 15786 Bridge
Unico 15800 29.40 44.00 47.33 45.41 47.38 0.000518 1.03 52.03 200.00 0.21
Unico 16200 29.40 44.07 47.52 47.57 0.000418 0.94 63.56 200.00 0.19
Unico 16600 29.40 44.14 47.67 47.69 0.000206 0.70 127.22 200.00 0.13
Unico 17000 29.40 44.21 47.76 47.78 0.000260 0.77 104.51 200.00 0.15
Unico 17400 29.40 44.21 47.89 47.93 0.000394 0.92 31.98 12.57 0.18