NOMBRE DEL PROPONENTE : FORMULARIO # 16

OBRA: HOJA 1 DE 1

categoria/cargo Cat. I Peón

Salario Diario Unificado Nominal ( 1 ) 3.65 3.708 3.753 3.849 4.202 4.027 3.876 4.209

Mensual Nominal ( 2 ) 109.42 111.24 112.60 115.47 126.06 120.81 116.28 126.26

1,313.04 1,334.88 1,351.20 1,385.64 1,512.72 1,449.72 1,395.36 1,515.12

288.00 288.00 288.00 288.00 288.00 288.00 288.00

Transporte

13er. Sueldo 109.42 111.24 112.60 115.47 126.06 120.81 116.28 126.26

14to. Sueldo 8.08 8.08 8.08 8.08 8.08 8.08 8.08 8.08

Aporte Patronal ( 3 ) 194.53 197.17 199.16 203.35 218.78 211.14 204.52 219.07

Fondo de Reserva 109.42 111.24 112.60 115.47 126.06 120.81 116.28 126.26

Otros Codigos de Trabajo ( 4 )

Total Anual 2,022.49 2,050.61 2,071.64 2,116.01 2,279.70 2,198.56 2,128.52 2,282.79

Total Mensual 168.54 170.88 172.64 176.33 189.98 183.21 177.38 190.23

Factor del Salario Real 2.39 2.39 2.35 2.37 2.34 2.36 2.37 2.34

Mensual Real 261.51 265.86 267.99 273.66 294.98 285.11 275.58 295.45

Costo Horario 1.09 1.11 1.12 1.14 1.23 1.19 1.15 1.23

LUGAR Y FECHA :

FIRMA

NOTAS : ( 1 ) El Salario Unificado será mayor o igual que al minimo legal

( 2 ) Se tomará meses de treinta días

Cat. II Ayudantes

Cat. III Alabañiles Carpinteros Eléctricistas

Fierreros Gasfiteros Pintores

Cat. IV Maestros de Eléctricidad Estructuras Gasfitería Pinturas

OP. Grupo I Cargadora

Excavadora, Grua Motoniveladora Planta Asfalto

Retroexcavadora

OP. Grupo II Barredora Compresor Distribuidor

Finisher Rodillos

Chofer Tipo E

Sección B Mecánicos Soldador Eléctrico

Anual Nominal Componestes Salariales en Proceso de Incorporación

( 3 ) El Aporte Patronal incluye IECE, SECAP, etc.

( 4 ) Detallar Conceptos

FSR Factor de Salario real = Días pagados / Días trabajados

COMPUTO METRICO DE COLUMNAS HOJA N°OBRA ELABORADO POR:

FECHA :

COLUMNAS DIMENSIONES AREA ( m 2 ) VOLUMEN ENCOFRADO ( mINDICE DE

TIPO NUMERO CANTIDAD a b 2(a+b) h a x b 2(a+b)h Vp VT Ep ET ENCOFRADO COLUMNAA 1-2-3-4-6-7-9-10 10 0.3 0.3 1.2 3.2 0.09 7.68 0.288 2.88 3.84 28.8 10 P.BB 5-8 2 0.3 0.3 1.2 3.2 0.09 7.68 0.288 0.576 3.84 1.152 2 P.BC 1-2-3-4-6-7-9-10 10 0.25 0.25 1 3 0.0625 6.00 0.1875 1.875 3 18.75 10 P.AD 5-8 2 0.25 0.25 1 3 0.0625 6.00 0.1875 0.375 3 0.75 2 P.A

- - - - - - - #DIV/0!

SUMAN 24 12.4 28.8 49.452 1.71708333

Vp = a* b* h Ep = 2 ( a+b )h IE = AE/VT IE ( Promedio ) = m2/m3Vt = n* Vp Et = n * VtVh = e Vt AE = EET

h b

a

a

AREA HORIZONTA

L

SUMAN = Sh VOLUMEN = SVT SET =

COMPUTO METRICO DE ESCALERAOBRA

ESCALERA DIMENSIONES AREAS VOLUMEN EN m3 ENCOFRADO ( m2 )TIPO NUMEROS HUELLAS CONTRAHUELLA CANTIDAD B1 B2 B3 B4 CH H d1 d2 d3 L S1 S2 S3 S4 V1 V2 V3 V4 VU VT EU ET

A 1 8 7 1 1.1 2 2.2 1 0.19 0.3 0.12 0.12 0.15 1 0.13 0.55 0.26 0.15 ### ### ### ### ### 0.55 2.016 2.016 3.69 B 1 9 8 1 0 2.4 2.62 0 0.19 0.3 0 0.12 0 1 0 0.67 0.31 0 - ### - ### ### 0.31 3.137 3.137 9.98

-

SUMAN 0.86 5.154 IE (PROMEDIO ) = m2/m3

H D3 V1 = B1* D1 * L IE = AE / VHV2 = B3* D2 * LV3 = B4* D3 * L

CH V4 = ( H * CH ) / 2*LVu = V1 + V2 + V3

D2 B3 Vt = n Vu

D1 L= ancho de la escalera

B1 B2 B4

INDICE DE ENCOFRAD

O

VOLUMEN DE HORMIGON VH = S VT SET

COMPUTO METRICO DE CIMIENTO / ZAPATASOBRA

VIGAS DIMENSIONES AREA ( m2 ) VOLUMEN ENCOFRADO (m2)OBSERVACIONES

TIPO NUMERO CANTIDAD a b h1 h2 2(h1 + h2) + a L a*h1 b*h2 2(h1+h2)+ a Vp Vt Ep Et

SUMAN Set =IE PROMEDIO =

b

Vp = ( a*h1 + b*h2 ) *L Ep = ( 2 ( h1 + h2 ) + a ) * L IE = AE / Vt

h2 Vt = n Vp Et = n * Vt

h1

a

INDICE DE ENCOFRADO

SUMAN = SH VOLUMEN = SH

Vh = S Vt AE = S Et

COMPUTO METRICO DE RI0STRAS DE CIMIENTOSOBRA

RIOSTRAS AREAS ( m2 ) VOLUMEN ( m3 ) ENCOFRADO ( m2 )

TIPO NUMEROS CANTIDAD b H 2H L b*H 2H*L b*L Vp Vt Eu Et

A 1-4,7-10 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

A 4-7- 1.00 0.20 0.20 0.40 3.70 0.04 1.48 0.74 0.15 0.15 1.48 1.48 10.00

B 2-5,8-11 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

B 5-8- 1.00 0.20 0.20 0.40 3.70 0.04 1.48 0.74 0.15 0.15 1.48 1.48 10.00

C 3-6,9-12 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

C 6-9- 1.00 0.20 0.20 0.40 3.70 0.04 1.48 0.74 0.15 0.15 1.48 1.48 10.00

1 1-2,2-3 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

2 4-5,5-6 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

3 7-8,8-9 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

4 10-11,11-12 2.00 0.20 0.20 0.40 3.55 0.04 1.42 0.71 0.14 0.28 1.42 2.84 10.00

SUMAN 17.00 SUMAN 4.00 SUMAN 14.38 SUMAN 2.43 24.32

IE ( PROMEDIO ) = 10 m2 / m3

AREA DE SELLADOS DE VIGAS AS =

h

Vp = b*h*L Ep = 2h*L

Vt = nVp Et = n*Ep

L b

INDICE DE ENCOFRADO

S Et

AREA DEL REPLANTILLO AE = Sb*L

S 2*h*L + AR

Vh = SVp AE = S Et

COMPUTO METRICO DE PLINTOSOBRA: OBRA: OBRA:

PLINTOS DIMENSIONES AREAS VOLUMEN ( m3 )

TIPO NUMEROS CANTIDAD a b c d H1 H2 H3 2(a+b) 2(c+d) B B' B1 E1 E3 BB1 B+B1+ BB1 V1 V2 V3 Vu Vt Eu Et

A 1-3-10-12 4 1 1.2 0.3 0.3 0.15 0.05 4.40 1.20 0.02 1.20 0.36 4.40 - 0.66 2.22 0.18 2.23 - 2.41 0.06 4.40 17.60 293.33

B 2-5-8-11 4 1.5 1.5 0.3 0.3 0.15 0.05 6.00 1.20 0.02 2.25 0.45 6.00 - 1.01 3.71 0.34 3.72 - 4.06 0.11 6.00 24.00 213.33

C 4-6-7-9 4 1 1.5 0.3 0.3 0.15 0.05 5.00 1.20 0.02 1.50 0.45 5.00 - 0.82 2.77 0.22 2.79 - 3.01 0.08 5.00 20.00 266.67

SUMAN 12.00 4.95 - 0.2 61.60 773.33

IE ( PROMEDIO ) = m3 / m2

IE = AE / VH

B = a*b V1 = B*H1 E1 = 2 ( a + b )

BL = c*b V2 = 1/3H2 ( B + B1 + ( B*B1 ) ) E3 = 2 ( c + d ) * h3

V3 = B* H3 Eu = E1 + E3

V3 Vu = V1 + V2 + V3 Et = n Eu

b d h3 Vt = n * Vu

V2 h2

h1

c V1

a

INDICE DE ENCOFRADO

H2 / 3

AREA DE REPLANTILLO EN m2 = SB*N VOLUMEN DE HORMIGON VH TOTAL = SVt S Et

COMPUTO DE ACERO

OBRA

ORDEN PLANO ELEMENTO CANTIDAD

Plintos 1-1- 1-3-10-12 4 f 12

Plintos 1-1- 2-5-8-11 f 12

Viga 1-1 5 5 14

Viga 1-1- 6 7 14

Viga 1-1- 7 5 14

Nervos de Losa 1-1- N-L 2 12

VIGA 1-1- V-6 3 14

Traslapes 1-1- V-6 2 14

Traslapes

f

f

f

f

f

f

f F8

f

f

f

f

FECHA :

ELABORACIÓN:

F

L.D.F RETAZO A USAR RETAZO SOBRANTE

X9 X12 CANT. LONG. MARCA CANT.

1.2 1 36.6

3 10117

0 0

0 0

14.95 1 6 #N/A 6.25

14.95 1 8 6.6 6.01 0.35

13.25 1 5 #N/A 2.75

176 1 14 #N/A -175

14.75 4 #N/A #N/A

2.4 1 #N/A #N/A

21.2 2 0 2.8

0 -

0 -

0 -

-

-

-

-

-

-

-

-

-

-

-

-

3.2

RETAZO SOBRANTE l u v

MARCA 12 5.5 1.00

1 9 8 2.00

6 9 3.00

10 4.00

12 5.00

14 6.00

16 7.00

18 8.00

20 9.00

6.01 6.6

6.02 0.35

6.03 2.75

6.04 -175

6.05 #N/AA los que no son refuerzos borrar la última parte de la formula,y colocar cero y el parentecis

6.06 #N/A

0.03 2.8176 cantidad total

0177 10 12 120

1 0 9 0

013.25 suma 120

01.08361204013

0

0

0

0

0

0

0

0

0

0

0

0

0

A los que no son refuerzos borrar la última parte de la formula,y colocar cero y el parentecis

necesaria sobrante

120 0

COMPUTO DE ACERO FECHA :

OBRA ELABORACIÓN:

ORDEN PLANO ELEMENTO CANTIDAD L.D. F RETAZO A USAR RETAZO SOBRANTE

X9 X12 CANT. LONG. MARCA CANT. MARCA

Plintos 1-1- 1-3-10-12 4 f 12 1.2 1 3 6.6 5

Plintos 1-1- 2-5-8-11 10 f 12 3 10

Plintos 1-1- 3-6-9-12 11 f 12 2.7 1 10 0.6 6.6 5 6 5.01

Riostras 1-1- (1-4), (4-7), (7-10) 4 f 10 4 4 -

Riostras 1-1- (2-5), (5-8), (8-11) 4 f 10 4 4

Riostras 1-1- (3-6),(6-9),(9-12) 4 f 10 4 4

Riostras 1-1- (1-2), (2-3) 3 f 10 4 1 2 1 4

Riostras 1-1- (4-5), (5-6) 3 f 10 4 1 2 1 4.01

Riostras 1-1 (7-8), (8-9) 3 10 4 1 2 1 4.02

Riostras 1-1- (10-11), (11-12) 3 10 4 1 2 1 4.03

R. Estribos 1-1- (1-4), (4-7), (7-10) 10 8 0.68 2 8 3.8 2

R. Estribos 1-1- (2-5), (5-8), (8-11) 10 8 0.68 2 8 3.8 2.01

R. Estribos 1-1- (3-6),(6-9),(9-12) 9 8 0.68 1 8 5.16 7.6 2-2,01 2.4 2.02

R. Estribos 1-1- (1-2), (2-3) 4 8 0.68 4 1 2.4 2.02 1.4 2.03

R. Estribos 1-1- (4-5), (5-6) 4 8 0.68 4 1 1.4 2.03 0.4 2.04

R. Estribos 1-1- (7-8), (8-9) 5 8 0.68 3 2 2 2.05

R. Estribos 1-1- (10-11), (11-12) 5 8 0.68 3 2 2 2.06

Columnas 1-1- 13 16 3.7 2 11 2 7

C. Estribos 1-1- 25 f 8 1 4 21 2 2 2.05 0

Chicotes 1-1- 4 f 8 1 2 2 2 2.07

1-1- 5-8- 5 f 16 3.7 5 0.8 7.01

C. Estribos 1-1- 5-8- 5 f 8 1 2 3 4 4 2,05-2,06 0

Chicotes 1-1- 5-8- 1 f 8 1 1 1 2.08

1-1- 5 7 f 14 14.9 2 5 3.5 6

V. Refuerzos 1-1- 5 1 f 14 7.8 1 1.2 6.01

V. Estribos 1-1 5 15 f 8 1.48 15 0.6 1 2.08 0.4 2.09

1-1- 6 7 14 14.9 2 5 7.8 3.5 6.02

V. Refuerzos 1-1- 6 0 14 7.8 8 8.2 6-6,01-6,02 0.2 6.03

V. Estribos 1-1- 6 16 8 1.48 3 13 2.4 2.09

Viga 1-1- 7 7 14 9.6 2 5 3.5 6.04

Viga Refuerzos 1-1- 7 1 14 7.8 1 1.2 6.05

Viga VE 1-1- 7 2 14 4 2 0

V. Estribos 1-1- 7 15 8 1.48 5 10 0.76 2.4 2.09 1.6 2.10

1-1- 1-4- 9 12 8.6 3 6 4.2 6 5.01 1.8 5.02

f

f

f

f

f

f

f

f

f

1-2-3-4-6-7-9-10-11-12

f

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

Columnas

Viga

Viga f

f

f

f

f

f

f

Viga f

V. Estribos 1-1- 1-4- 18 8 1.48 4 14 2.7 2.11

Viga 1-1- 2-3- 10 12 8.6 5 5 1.8 5.03

V. Estribos 1-1- 2-3- 9 f 8 1.48 2 7 1.2 1.6 2.10 0.4 2.12

Nervios 1-1- A-B 17 f 12 3.945 2 15 0.8 5.04

1-1- A-B 9 f 8 0.2 2 7 2.0 2.13

Nervios 1-1- B-C 12 f 12 3.945 1 11 1.02 1.8 5.02 0.8 5.05

1-1- B-C 6 f 8 0.2 6

Columnas 1-1 20 f 12 3 20

C. estribos 1-1- 21 f 8 0.88 6 15 3.6 4.7 2,11-2,13 1.1 2.14

Chicotes 1-1- 4 f 8 1 3 1 1 1.1 2.14 0.1 2.15

Columnas 1-1- 5-8- 2 f 14 3 2

Columnas 1-1- 5-8- 2 f 12 3 2

C. estribos 1-1- 5-8- 4 8 0.88 1 3 2.2 2.4 0.2 2.16

Chicotes 1-1- 5-8- 1 8 1 1 1 2.17

Vigas de cubierta 1-1- 5-6- 10 12 14.9 1 9 2.2 2.2 5.06

V. Cub. Estribo 1-1- 5-6- 17 8 0.8 3 14 0.2 1 2.17 0.8 2.18

Viga de Cubierta 1-1- 7- 4 12 9.6 3 1 0.6 0.6 5.07

V. Cub. Estribo 1-1- 7- 8 8 0.8 2 6 0.4 0.4 2.19

Viga de Cubierta 1-1- 1-4- 6 12 8.6 2 4 2.8 3 5,04-5,06 0.2 5.08

V. Cub. Estribo 1-1- 1-4- 18 8 1.48 5 13 0.3 0.8 2.18 0.5 2.18

Viga de Cubierta 1-1- 2-3- 6 12 8.6 1 5 0.2 0.2 5.09

V. Cub. Estribo 1-1- 2-3- 17 8 1.48 1 16 0.3 0.4 5.07 0.1 5.10

f

f

Vinchas de Nervios

Vinchas de Nervios

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

f

f

f

f

f

f

f

f

f

f

tipo de varilla

12 5.5 1.00

9 8 2.00

6 9 3.00

10 4.00

12 5.00

14 6.00

16 7.00

18 8.00

20 9.00

cantidad tipò de varillas total sobrante

4 12 48 68.8 -2.8

2 9 18

suma 66

Cuando el sobrante sale negativo debo compensarlo con los retazos sobrantes de la tabla y haì utilizar

la formula, pero si sale positivo debo de ignorarlay colocar el valor del retazo sobrante

diametro de varrillas

còdigo de varillas

cantidad necesaria

1.2 38.4

3 120 Plintos

2.7 129.6 Plintos

4 48 Riostras

4 48 Riostras

4 48 Riostras

4 32 Riostras

4 32 Riostras

4 32 Riostras

4 32 Riostras

0.68 110.16

0.68 110.16 R. Estribos

0.68 110.16

0.68 48.96 R. Estribos

0.68 48.96 R. Estribos

0.68 48.96

0.68 48.96 R.Estribos

3.7 148 Columnas

1 290 C. Estribos

1 40 Chicotes

3.7 59.2

1 58 C. Estribos

1 8 Chicotes

14.9 74.5

7.8 7.8 V. Refuerzos

1.48 180.56 V. Estribos

14.9 74.5

7.8 7.8 V. Refuerzos

1.48 180.56 V. Estribos

9.6 48 Viga

7.8 7.8 Viga Refuerzos

4 24 Viga VE

1.48 165.76 V. Estribos

8.6 103.2

1.48 201.28 V. EstribosC. estribos

8.6 103.2 Viga

1.48 201.28 V. Estribos

3.945 197.25 Nervios

0.2 100 Vinchas de nervios

3.945 142.02 Nervios

0.2 72 Vinchas de nervios

3 240 Columnas

0.88 237.6 C. estribos

1 40 Chicotes

3 24 Columnas

3 24 Columnas

0.88 47.52 C. estribos

1 8 Chicotes14.9 119.2 Vigas de cubierta

0.8 195.2 V. Cub. Estribo

9.6 38.4 Viga de Cubierta

0.8 89.6 V. Cub. Estribo

8.6 68.8 Viga de Cubierta

1.48 201.28 V. Cub. Estribo

8.6 68.8 Viga de Cubierta

1.48 201.28 V. Cub. Estribo

Plintos

R. Estribos

R. Estribos

R. Estribos

Columnas

Viga

Viga

Viga

MEMORIA DE CALCULO DE ACERO EN BARRASOBRA

ELEMENTO UBIC. a b c d e f g h i N° ELEMENTO N° BARRAS LONG. BARRAS LONG. TOTAL OBSERVACIONES

1-3-10-12 1.2 1.2 4 6 2.4 57.6

Plintos 2-5-8-11 1.5 1.5 4 9 3 108

Plintos 3-6-9-12 1.2 1.5 4 7 2.7 75.6

Riostras (1-4), (4-7), (7-10) 4 3 4 4 48

Riostras (2-5), (5-8), (8-11) 4 3 4 4 48

Riostras (3-6),(6-9),(9-12) 4 3 4 4 48

Riostras (1-2), (2-3) 4 2 4 4 32

Riostras (4-5), (5-6) 4 2 4 4 32

Riostras (7-8), (8-9) 4 2 4 4 32

Riostras (10-11), (11-12) 4 2 4 4 32

(1-4), (4-7), (7-10) 0.16 0.16 0.16 0.16 0.02 0.02 3 54 0.68 110.16

R. Estribos (2-5), (5-8), (8-11) 0.16 0.16 0.16 0.16 0.02 0.02 3 54 0.68 110.16

(3-6),(6-9),(9-12) 0.16 0.16 0.16 0.16 0.02 0.02 3 54 0.68 110.16

R. Estribos (1-2), (2-3) 0.16 0.16 0.16 0.16 0.02 0.02 2 36 0.68 48.96

R. Estribos (4-5), (5-6) 0.16 0.16 0.16 0.16 0.02 0.02 2 36 0.68 48.96

(7-8), (8-9) 0.16 0.16 0.16 0.16 0.02 0.02 2 36 0.68 48.96

R.Estribos (10-11), (11-12) 0.16 0.16 0.16 0.16 0.02 0.02 2 36 0.68 48.96

Columnas 1-2-3-4-6-7-9-10-11-12 0.5 3.2 10 4 3.7 148

C. Estribos 1-2-3-4-6-7-9-10-11-12 0.24 0.24 0.24 0.24 0.02 0.02 10 29 1 290

Chicotes 1-2-3-4-6-7-9-10-11-12 0.8 0.2 10 4 1 40

5-8- 0.5 3.2 2 8 3.7 59.2

C. Estribos 5-8- 0.24 0.24 0.24 0.24 0.02 0.02 2 29 1 58

Chicotes 5-8- 0.8 0.2 2 4 1 8

5 14.3 0.3 0.3 1 5 14.9 74.5

V. Refuerzos 5 1.2 0.3 2.4 2.4 1.2 0.3 1 1 7.8 7.8

V. Estribos 5 0.36 0.36 0.36 0.36 0.02 0.02 1 122 1.48 180.56

6 14.3 0.3 0.3 1 5 14.9 74.5

V. Refuerzos 6 1.2 0.3 2.4 2.4 1.2 0.3 1 1 7.8 7.8

V. Estribos 6 0.36 0.36 0.36 0.36 0.02 0.02 1 122 1.48 180.56

Viga 7 9 0.3 0.3 1 5 9.6 48

Viga Refuerzos 7 1.2 0.3 2.4 2.4 1.2 0.3 1 1 7.8 7.8

Viga VE 7 4 1 6 4 24

V. Estribos 7 0.36 0.36 0.36 0.36 0.02 0.02 1 112 1.48 165.76

1-4- 8 0.3 0.3 2 6 8.6 103.2

V. Estribos 1-4- 0.36 0.36 0.36 0.36 0.02 0.02 2 68 1.48 201.28

Viga 2-3- 8 0.3 0.3 2 6 8.6 103.2

V. Estribos 2-3- 0.36 0.36 0.36 0.36 0.02 0.02 2 68 1.48 201.28

Nervios A-B 3.625 0.16 0.16 25 2 3.945 197.25

Vinchas de nervios A-B 0.16 0.02 0.02 25 20 0.2 100

Nervios B-C 3.625 0.16 0.16 18 2 3.945 142.02

Vinchas de nervios B-C 0.16 0.02 0.02 18 20 0.2 72

Columnas 1-2-3-4-6-7-9-10-11-12 3 10 8 3 240

C. estribos 1-2-3-4-6-7-9-10-11-12 0.21 0.21 0.21 0.21 0.02 0.02 10 27 0.88 237.6

Chicotes 1-2-3-4-6-7-9-10-11-12 0.8 0.2 10 4 1 40

Columnas 5-8- 3 2 4 3 24

Columnas 5-8- 3 2 4 3 24

C. estribos 5-8- 0.21 0.21 0.21 0.21 0.02 0.02 2 27 0.88 47.52

Chicotes 5-8- 0.8 0.2 2 4 1 8

Vigas de cubierta 5-6- 14.3 0.3 0.3 2 4 14.9 119.2

V. Cub. Estribo 5-6- 0.19 0.19 0.19 0.19 0.02 0.02 2 122 0.8 195.2

Viga de Cubierta 7- 9 0.3 0.3 1 4 9.6 38.4

V. Cub. Estribo 7- 0.19 0.19 0.19 0.19 0.02 0.02 1 112 0.8 89.6

Viga de Cubierta 1-4- 8 0.3 0.3 2 4 8.6 68.8

V. Cub. Estribo 1-4- 0.36 0.36 0.36 0.36 0.02 0.02 2 68 1.48 201.28

Viga de Cubierta 2-3- 8 0.3 0.3 2 4 8.6 68.8

V. Cub. Estribo 2-3- 0.36 0.36 0.36 0.36 0.02 0.02 2 68 1.48 201.28

LONGITUD 2468.68 272 1346.07 441.16 438

DIAMETRO 8 10 12 14 16 18 20 22

Kg / ml 0.395 0.617 0.888 1.208 1.578 1.998 2.466 2.984

Kg 975.1286 167.824 1195.31016 532.92128 691.164

TOTALES

Kg. 3,562.35

Q.Q. 79.16

b f

c e g i

a d

h

Plintos f 12 mm

f 12 mm

f 12 mm

f 10 mm

f 10 mm

f 10 mm

f 10 mm

f 10 mm

f 10 mm

f 10 mm

R. Estribos f 8 mm

f 8 mm

R. Estribos f 8 mm

f 8 mm

f 8 mm

R. Estribos f 8 mm

f 8 mm

f 16 mm Planta Baja

f 8 mm Planta Baja

f 8 mm

Columnas f 16 mm Planta Baja

f 8 mm Planta Baja

f 8 mm

Viga f 14 mm

f 14 mm

f 8 mm

Viga f 14 mm

f 14mm

f 8 mm

f 14 mm

f 14 mm

f 14 mm

f 8 mm

Viga f 12 mm

f 8 mm

f 12 mm

f 8 mm

f 12 mm para todo el tramo

f 8 mm

f 12 mm para todo el tramo

f 8 mm

f 12 Planta Alta

f 8 mm

f 8 mm

f 14 Planta Alta

f 12 Planta Alta

f 8 mm

f 8 mm

f 12 mm

f 8 mm

f 12 mm

f 8 mm

f 12 mm

f 8 mm

f 12 mm

f 8 mm

COMPUTO METRICO DE VIGAS OBRA

RIOSTRAS AREAS ( m2 ) VOLUMEN ( m3 ) ENCOFRADO ( m2 )

TIPO NUMEROS CANTIDAD b H 2H L b*H 2H*L b*L Vp Vt Eu Et

A 1-4,4-7,7-10 3.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.45 2.00 6.00 13.33

B 2-5,5-8,8-11 3.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.45 2.00 6.00 13.33

C 3-6,6-9,9-12 3.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.45 2.00 6.00 13.33

1 1-2,2-3 2.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.30 2.00 4.00 13.33

2 4-5,5-6 2.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.30 2.00 4.00 13.33

3 7-8,8-9 2.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.30 2.00 4.00 13.33

4 10-11,11-12 2.00 0.15 0.25 0.50 4.00 0.04 2.00 0.60 0.15 0.30 2.00 4.00 13.33

SUMAN 17.00 SUMAN 3.50 SUMAN 14.00 SUMAN 2.55 34.00

IE ( PROMEDIO ) = 13.33 m2 / m3

AREA DE SELLADOS DE VIGAS AS =

h

Vp = b*h*L Ep = 2h*L

Vt = nVp Et = n*Ep

L b

INDICE DE ENCOFRADO

S Et

AREA DEL REPLANTILLO AE = Sb*L

S 2*h*L + AR

Vh = SVp AE = S Et

COMPUTO METRICO DE VIGAS

OBRA

RIOSTRAS AREAS ( m2 ) VOLUMEN ( m3 ) ENCOFRADO ( m2 )

TIPO NUMEROS CANTIDAD b H 2H L b*H 2H*L b*L Vp Vt Eu Et

A 1-4,7-10 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

A 4-7- 1.00 0.20 0.20 0.40 3.75 0.04 1.50 0.75 0.15 0.15 1.50 1.50 10.00

B 2-5,8-11 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

B 5-8- 1.00 0.20 0.20 0.40 3.75 0.04 1.50 0.75 0.15 0.15 1.50 1.50 10.00

C 3-6,9-12 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

C 6-9- 1.00 0.20 0.20 0.40 3.75 0.04 1.50 0.75 0.15 0.15 1.50 1.50 10.00

1 1-2,2-3 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

2 4-5,5-6 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

3 7-8,8-9 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

4 10-11,11-12 2.00 0.20 0.20 0.40 3.63 0.04 1.45 0.73 0.15 0.29 1.45 2.90 10.00

SUMAN 17.00 SUMAN 4.00 SUMAN 14.66 SUMAN 2.48 24.83

IE ( PROMEDIO ) = 10 m2 / m3

AREA DE SELLADOS DE VIGAS AS =

h

Vp = b*h*L Ep = 2h*L

Vt = nVp Et = n*Ep

L b

INDICE DE ENCOFRADO

S Et

AREA DEL REPLANTILLO AE = Sb*L

S 2*h*L + AR

Vh = SVp AE = S Et

COMPUTO DE ACERO

OBRA

ORDEN PLANO ELEMENTO CANTIDAD L.D.

R. Estribos 1-1- 4 f 16 0.68

R. Estribos 1-1- 10 f 16 0.68

R. Estribos 1-1- 11 f 16 0.68

R. Estribos 1-1- (1-2), (2-3) 4 f 16 0.68

R. Estribos 1-1- (4-5), (5-6) 4 f 16 0.68

R. Estribos 1-1- (7-8), (8-9) 4 f 16 0.68

R.Estribos 1-1- (10-11), (11-12) 3 f 16 0.68

C. Estribos 1-1- 3 f 16 1

Chicotes 1-1 3 16 1

C. Estribos 1-1- 5-8- 3 16 1

Chicotes 1-1- 5-8- 10 16 1

V. Estribos 1-1- 5 10 16 1.48

V. Estribos 1-1- 6 9 16 1.48

V. Estribos 1-1- 7 4 16 1.48

V. Estribos 1-1- 1-4- 4 16 1.48

V. Estribos 1-1- 2-3- 5 16 1.48

1-1- A-B 5 16 0.2

1-1- B-C 13 16 0.2

C. estribos 1-1- 25 f 16 0.88

Chicotes 1-1- 4 f 16 1

C. estribos 1-1- 5-8- 5 f 16 0.88

Chicotes 1-1- 5-8- 5 f 16 1

(1-4), (4-7), (7-10)

(2-5), (5-8), (8-11)

(3-6),(6-9),(9-12)

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

f

f

f

f

f

f

f

f

Vinchas de nervios

f

Vinchas de nervios

f

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

V. Cub. Estribo 1-1- 5-6- 1 f 16 0.8

V. Cub. Estribo 1-1- 7- 7 f 16 0.8

V. Cub. Estribo 1-1- 1-4- 1 f 16 1.48

V. Cub. Estribo 1-1 2-3- 15 f 16 1.48

FECHA :

ELABORACIÓN:

F RETAZO A USAR RETAZO SOBRANTE

X9 X12 CANT. LONG. MARCA CANT. MARCA

1 3 6.6 5

10

1 10 0.6 6.6 5 6 5.01

4

4

4

1 2 1 4

1 2 1 4.01

1 2 1 4.02

1 2 1 4.03

2 8 3.8 2

2 8 3.8 2.01

1 8 5.16 7.6 2-2,01 2.44 2.02

4 1 2.4 2.02 1.4 2.03

4 1 1.4 2.03 0.4 2.04

3 2 2 2.05

3 2 2 2.06

2 11 2 7

4 21 2 2 2.05 0

2 2 2 2.07

5 0.8 7.01

2 3 4 4 2,05-2,06 0

1 1 2.08

2 5 3.5 6

1 1.2 6.01

15 0.6 1 2.08 0.4 2.09

tipo de varilla

12 5.5 1.00

9 8 2.00

6 9 3.00

10 4.00

12 5.00

14 6.00

16 7.00

18 8.00

20 9.00

cantidad tipò de varillas total sobrante

4 12 48 68.8 -2.8

2 9 18

suma 66

diametro de varrillas

còdigo de varillas

cantidad necesaria

COMPUTO DE ACERO

OBRA

ORDEN PLANO ELEMENTO CANTIDAD L.D.

R. Estribos 1-1- 4 f 12 0.68

R. Estribos 1-1- 10 f 12 0.68

R. Estribos 1-1- 11 f 12 0.68

R. Estribos 1-1- (1-2), (2-3) 4 f 12 0.68

R. Estribos 1-1- (4-5), (5-6) 4 f 12 0.68

R. Estribos 1-1- (7-8), (8-9) 4 f 12 0.68

R.Estribos 1-1- (10-11), (11-12) 3 f 12 0.68

C. Estribos 1-1- 3 f 12 1

Chicotes 1-1 3 12 1

C. Estribos 1-1- 5-8- 3 12 1

Chicotes 1-1- 5-8- 10 12 1

V. Estribos 1-1- 5 10 12 1.48

V. Estribos 1-1- 6 9 12 1.48

V. Estribos 1-1- 7 4 12 1.48

V. Estribos 1-1- 1-4- 4 12 1.48

V. Estribos 1-1- 2-3- 5 12 1.48

1-1- A-B 5 12 0.2

1-1- B-C 13 12 0.2

C. estribos 1-1- 25 f 12 0.88

Chicotes 1-1- 4 f 12 1

C. estribos 1-1- 5-8- 5 f 12 0.88

Chicotes 1-1- 5-8- 5 f 12 1

(1-4), (4-7), (7-10)

(2-5), (5-8), (8-11)

(3-6),(6-9),(9-12)

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

f

f

f

f

f

f

f

f

Vinchas de nervios

f

Vinchas de nervios

f

1-2-3-4-6-7-9-10-11-12

1-2-3-4-6-7-9-10-11-12

V. Cub. Estribo 1-1- 5-6- 1 f 12 0.8

V. Cub. Estribo 1-1- 7- 7 f 12 0.8

V. Cub. Estribo 1-1- 1-4- 1 f 12 1.48

V. Cub. Estribo 1-1 2-3- 15 f 12 1.48

FECHA :

ELABORACIÓN:

F RETAZO A USAR RETAZO SOBRANTE

X9 X12 CANT. LONG. MARCA CANT. MARCA

1 3 6.6 5

10

1 10 0.6 6.6 5 6 5.01

4

4

4

1 2 1 4

1 2 1 4.01

1 2 1 4.02

1 2 1 4.03

2 8 3.8 2

2 8 3.8 2.01

1 8 5.16 7.6 2-2,01 2.44 2.02

4 1 2.4 2.02 1.4 2.03

4 1 1.4 2.03 0.4 2.04

3 2 2 2.05

3 2 2 2.06

2 11 2 7

4 21 2 2 2.05 0

2 2 2 2.07

5 0.8 7.01

2 3 4 4 2,05-2,06 0

1 1 2.08

2 5 3.5 6

1 1.2 6.01

15 0.6 1 2.08 0.4 2.09

tipo de varilla

12 5.5 1.00

9 8 2.00

6 9 3.00

10 4.00

12 5.00

14 6.00

16 7.00

18 8.00

20 9.00

cantidad tipò de varillas total sobrante

4 12 48 68.8 -2.8

2 9 18

suma 66

diametro de varrillas

còdigo de varillas

cantidad necesaria

COMPUTO DE ACERO

OBRA

ORDEN PLANO ELEMENTO CANTIDAD L.D. F

X9

R. Estribos 1-1- (1-4), (4-7), (7-10) 4 f 8 0.68 1

R. Estribos 1-1- (2-5), (5-8), (8-11) 10 f 8 0.68

R. Estribos 1-1- (3-6),(6-9),(9-12) 11 f 8 0.68 1

R. Estribos 1-1- (1-2), (2-3) 4 f 8 0.68

R. Estribos 1-1- (4-5), (5-6) 4 f 8 0.68

R. Estribos 1-1- (7-8), (8-9) 4 f 8 0.68

R.Estribos 1-1- (10-11), (11-12) 3 f 8 0.68 1

C. Estribos 1-1- 1-2-3-4-6-7-9-10-11-12 3 f 8 1 1

Chicotes 1-1 1-2-3-4-6-7-9-10-11-12 3 8 1 1

C. Estribos 1-1- 5-8- 3 8 1 1

Chicotes 1-1- 5-8- 10 8 1 2

V. Estribos 1-1- 5 10 8 1.48 2

V. Estribos 1-1- 6 9 8 1.48 1

V. Estribos 1-1- 7 4 8 1.48

V. Estribos 1-1- 1-4- 4 8 1.48

V. Estribos 1-1- 2-3- 5 8 1.48 3

1-1- A-B 5 8 0.2 3

1-1- B-C 13 8 0.2 2

C. estribos 1-1- 1-2-3-4-6-7-9-10-11-12 25 f 8 0.88 4

Chicotes 1-1- 1-2-3-4-6-7-9-10-11-12 4 f 8 1 2

C. estribos 1-1- 5-8- 5 f 8 0.88

Chicotes 1-1- 5-8- 5 f 8 1 2

f

f

f

f

f

f

f

f

Vinchas de nervios

f

Vinchas de nervios

f

V. Cub. Estribo 1-1- 5-6- 1 f 8 0.8 1

V. Cub. Estribo 1-1- 7- 7 f 8 0.8 2

V. Cub. Estribo 1-1- 1-4- 1 f 8 1.48 1

V. Cub. Estribo 1-1 2-3- 15 f 8 1.48

FECHA :

ELABORACIÓN:

F RETAZO A USAR RETAZO SOBRANTE

X12 CANT. LONG. MARCA CANT. MARCA

3 6.6 5

10

10 0.6 6.6 5 6 5.01

4

4

4

2 1 4

2 1 4.01

2 1 4.02

2 1 4.03

8 3.8 2

8 3.8 2.01

8 5.16 7.6 2-2,01 2.44 2.02

4 1 2.4 2.02 1.4 2.03

4 1 1.4 2.03 0.4 2.04

2 2 2.05

2 2 2.06

11 2 7

21 2 2 2.05 0

2 2 2.07

5 0.8 7.01

3 4 4 2,05-2,06 0

1 2.08

5 3.5 6

1.2 6.01

15 0.6 1 2.08 0.4 2.09

tipo de varilla

12 5.5 1.00

9 8 2.00

6 9 3.00

10 4.00

12 5.00

14 6.00

16 7.00

18 8.00

20 9.00

cantidad tipò de varillas total sobrante

4 12 48 68.8 -2.8

2 9 18

suma 66

diametro de varrillas

còdigo de varillas

cantidad necesaria

COMPUTO METRICO DE LOSAS PLANAS NERVADASOBRA

MEDIDAS ALIVIANADOS CANTIDAD DE CAJONETAS AREAS VOLUMEN

LONGITUD ANCHO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SUMAN UNITARIO TOTAL

3.625 0.4 2 2 6 6 7 2 6 6 2 39 1.45 56.55

3.625 0.3 2 2 1 1 1 7 1.0875 7.6125

3.625 0.2 1 1 1 1 1 1 6 0.725 4.35

- - -

- - -

3.2625 68.5125

CALCULOS DE AREAS DE LOSA ( m2 )3.2625 m2

VOLUMEN DE ALIVIANADO = VA = AA * h2 = 0.489375 m3DIMENSIONES ( ml ) AREAS ( m2 ) ALTURA h2 = 0.15 m h1

L1 L2 L3 L4 L5 L6 L1 x L2 L3 x L4 L5 x L6 AREA DE LOSA AL = ( L1 * L2 ) - ( L3 * L4 ) = 108 m2 0.05

14.3 8 3.2 2 13 8 114.4 6.4 104 ALTURA DE LOSA TOTAL h = 0.2 m - - - VOLUMEN TOTAL VT = AL * h = 0.6525 m3 - - - VOLUMEN DE HORMIGÓN VH = VT - VA = 0.489375 m3 - - - ALTURAS EQUIVALENTES:

- - - HORMIGÓN h H = VH / AL = 0.005 m - - - ALIVIANADO Ha = VA / AL = 0.004531 m - - - AREAS DE ENCOFRADO: = - - - HORIZONTAL = ( L5 x L6 ) * ( L3 x L4 ) = 97.6 m2 - - - VERTICAL = 2 ( L1 + L2 + L3 + L4 ) h = 11 m2 - - - INDICES DE ENCOFRADO: = - - - HORIZONTAL IEH = AEH / AL = 0.903704 m2/m2 - - - HORIZONTAL IEH = AEH / VH = 199.4381 m2/m3

SUMAN 114.4 6.4 104VERTICAL IEV = AEV / AL = 0.101852 m2/m2VERTICAL IEV = AEV / VH = 22.47765 m2/m3

AREA TOTAL DE ALIVIANADO = AA = m2