Presupuesto Alternativa 01Presupuesto CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1
DISTRITO DE ATE LIMA LIMA
Cliente MUNICIPALIDAD DISTRITAL DE ATE Costo alLugar LIMA - LIMA - ATE
Item Descripción Und. Metrado Precio S/.
01 PAVIMENTOS
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA 5.60M X 3.6M und 1.00 1,647.11
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS est 1.00 7,245.20
01.01.03 CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN glb 1.00 1,200.00
01.01.04 INSTALACION DE SS.HH. PROVISIONALES und 3.00 510.00
01.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL mes 2.00 1,978.28
01.02 OBRAS PRELIMINARES
01.02.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m2 3,167.57 1.53
01.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL m3 1,091.73 9.80
01.03.02 EXCAVACION MANUAL DE ZANJA PARA SARDINELES SUMERGIDOS m 1,056.68 1.92
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1,542.88 24.86
01.04 CARPETA ASFALTICA EN CALIENTE
01.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE m2 3,167.57 3.38
01.04.02 SUB BASE GRANULAR e=0.15 m m2 3,167.57 10.74
01.04.03 BASE GRANULAR E=0.15 m m2 3,167.57 12.15
01.04.04 IMPRIMACION ASFALTICA C/CAMION IMPRIMADOR m2 3,167.57 3.80
01.04.05 CARPETA ASFALTICA EN CALIENTE DE 2" m2 3,167.57 30.87
01.05 SARDINELES
01.05.01 SARDINEL SUMERGIDO DE CONCRETO F'c=175 KG/CM2 m 959.70 29.77
01.05.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 28.20 7.35
01.06 PINTURA
01.06.01 PINTURA LINEAL DISCONTINUA E= 0.10 m m 228.00 5.98
01.06.02 PINTURA LINEAL CONTINUA E= 0.10 m m 1,056.68 5.98
01.06.03 PINTURA DE LETRAS Y SIMBOLOS m2 55.00 9.22
01.07 VARIOS
01.07.01 NIVELACION DE BUZONES EN GENERAL und 8.00 158.59
01.07.02 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) und 60.00 35.37
02 VEREDAS Y SARDINELES
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m2 1,640.35 1.53
02.01.02 DEMOLICION DE VEREDAS DE e= 0.10M m2 198.60 15.71
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE A NIVEL DE SUBRASANTE EN VEREDAS m3 328.07 31.64
02.02.02 EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS m 1,206.83 2.64
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 591.51 24.86
02.03 VEREDAS DE CONCRETO
02.03.01 AFIRMADO DE 4" PARA VEREDAS m2 1,640.83 10.83
02.03.02 VEREDA DE CONCRETO DE 4" m2 1,640.83 46.02
02.03.03 SARDINELES DE CONCRETO f'c=175 kg/cm2 m 1,206.83 28.60
02.03.04 ENCOFRADO Y DESENCOFRADO PARA SARDINEL m2 120.68 41.21
02.03.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 432.00 7.35
02.04 VARIOS
02.04.01 NIVELACION DE DE CAJAS DOMICILIARIAS DE AGUA und 92.00 23.63
02.04.02 NIVELACION DE DE TAPAS DE DESAGUE DOMICILIARIAS und 92.00 36.21
02.04.03 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) und 10.00 35.37
03 MITIGACION DE IMPACTO AMBIENTAL
03.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 4,962.84
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 10%
SUBTOTAL
IMPUESTO (IGV 18%)
PRESUPUESTO DE LA OBRA
EXPEDIENTE TECNICO
SUPERVISION DE LA OBRA
PRESUPUESTO TOTAL DEL PROYECTO
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1
DISTRITO DE ATE LIMA LIMA
Sep-13
Parcial S/.
304,898.9515,578.871,647.11
7,245.20
1,200.00
1,530.00
3,956.56
4,846.394,846.39
51,083.7910,698.95
2,028.83
38,356.01
193,031.9610,706.40
34,019.74
38,486.02
12,036.78
97,783.01
28,777.5428,570.27
207.27
8,189.491,363.44
6,318.95
507.10
3,390.921,268.72
2,122.20
175,704.775,629.742,509.74
3,120.01
28,271.1010,380.13
3,186.03
14,704.94
135,944.9517,770.19
75,511.00
34,515.34
4,973.22
3,175.20
5,858.982,173.96
3,331.32
353.70
4,962.84
4,962.84
485,566.57
48,556.6648,556.66
582,679.89104,882.38
687,562.27
13,751.25
13,751.25
715,064.76
Presupuesto Alternativa 02
Presupuesto CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA
Cliente MUNICIPALIDAD DISTRITAL DE ATE Costo al
Lugar LIMA - LIMA - ATE
Item Descripción Und. Metrado Precio S/.
O1 PAVIMENTO 01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA 5.60M X 3.6M und 1.00 1,647.1101.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS est 1.00 7,245.2001.01.03 CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN glb 1.00 1,200.0001.01.04 INSTALACION DE SS.HH. PROVISIONALES und 3.00 510.0001.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL mes 2.00 1,978.2801.02 OBRAS PRELIMINARES
01.02.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m2 3,167.57 1.5301.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL m3 1,267.03 9.8001.03.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1,647.14 24.8601.04 PAVIMENTO DE CONCRETO
01.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE m2 3,167.57 3.3801.04.02 BASE GRANULAR E=0.20 m m2 3,167.57 15.2401.04.03 CONCRETO EN PISTAS f'c=210 kg/cm2 H=0.20M m2 3,167.57 89.9801.04.04 COLOCACION DE DOWELL kg 3,959.47 5.8201.04.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 1,425.41 7.3501.05 PINTURA
01.05.01 PINTURA LINEAL DISCONTINUA E= 0.10 m m 228.00 5.9801.05.02 PINTURA LINEAL CONTINUA E= 0.10 m m 1,056.68 5.9801.05.03 PINTURA DE LETRAS Y SIMBOLOS m2 55.00 9.2201.06 VARIOS
01.06.01 NIVELACION DE BUZONES EN GENERAL und 8.00 158.5901.06.02 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) und 60.00 35.37
02 VEREDAS
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m2 1,640.35 1.5302.01.02 DEMOLICION DE VEREDAS DE e= 0.10M m2 198.60 15.7102.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE A NIVEL DE SUBRASANTE EN VEREDAS m3 328.07 31.6402.02.02 EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS m 1,206.83 2.6402.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 591.51 24.8602.03 VEREDAS DE CONCRETO
02.03.01 AFIRMADO DE 4" PARA VEREDAS m2 1,640.83 10.8302.03.02 VEREDA DE CONCRETO DE 4" m2 1,640.83 46.0202.03.03 SARDINELES DE CONCRETO f'c=175 kg/cm2 m 1,206.83 28.6002.03.04 ENCOFRADO Y DESENCOFRADO PARA SARDINEL m2 120.68 41.21
02.03.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m 432.00 7.3502.04 VARIOS
02.04.01 NIVELACION DE DE CAJAS DOMICILIARIAS DE AGUA und 92.00 23.6302.04.02 NIVELACION DE DE TAPAS DE DESAGUE DOMICILIARIAS und 92.00 36.2102.04.03 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) und 10.00 35.37
03 MITIGACION DE IMPACTO AMBIENTAL
03.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 4,962.84
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 10%
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
EXPEDIENTE
SUPERVISION DE OBRA
PRESUPUESTO TOTAL DEL PROYECTO
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA
Sep-12
Parcial S/.
462,889.8115,578.871,647.11
7,245.20
1,200.00
1,530.00
3,956.56
4,846.394,846.39
53,364.7512,416.89
40,947.86
377,519.3910,706.40
48,273.83
285,018.31
23,044.10
10,476.75
8,189.491,363.44
6,318.95
507.10
3,390.921,268.72
2,122.20
175,704.77
5,629.742,509.74
3,120.01
28,271.1010,380.13
3,186.03
14,704.94
135,944.9517,770.19
75,511.00
34,515.34
4,973.22
3,175.20
5,858.982,173.96
3,331.32
353.70
4,962.84
4,962.84
643,557.42
64,355.7464,355.74
772,268.90139,008.40911,277.30
18225.54608
18225.54608
947,728.40
PRESUPUESTO DE LA ALTERNATIVA N° 1 A PRECIO DE MERCADO
ITEM PARTIDAS UNIDAD CANTIDAD
1.00 PAVIMENTO
OBRAS PRELIMINARES Glb 1
OBRAS PROVISIONALES Glb 1
MOVIMIENTO DE TIERRAS Glb 1
PAVIMENTO DE ASFALTO Glb 1
SARDINELES SUMERGIDOS Glb 1
SEÑALIZACIONES Glb 1
VARIOS Glb 1
2.00 VEREDAS DE CONCRETO
OBRAS PRELIMINARES Glb 1
MOVIMIENTO DE TIERRAS Glb 1
VEREDAS DE CONCRETO Glb 1
VARIOS Glb 1
3.00 MITIGACION DE IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL Glb 1
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
PRESUPUESTO DE OBRA
EXPEDIENTE TECNICO
SUPERVISION
COSTO TOTAL DEL PROYECTO
PRESUPUESTO DE LA ALTERNATIVA N° 2 A PRECIO DE MERCADO
ITEM PARTIDAS UNIDAD CANTIDAD
1.00 PAVIMENTO
OBRAS PRELIMINARES Glb 1
OBRAS PROVISIONALES Glb 1
MOVIMIENTO DE TIERRAS Glb 1
PAVIMENTO CONCRETO Glb 1
SEÑALIZACIONES Glb 1
VARIOS Glb 1
2 VEREDAS DE CONCRETO
OBRAS PRELIMINARES Glb 1
MOVIMIENTO DE TIERRAS Glb 1
VEREDAS DE CONCRETO Glb 1
VARIOS Glb 1
3 MITIGACION DE IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL Glb 1
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
PRESUPUESTO DE OBRA
EXPEDIENTE TECNICO
SUPERVISION
COSTO TOTAL DEL PROYECTO
PRESUPUESTO DE LA ALTERNATIVA N° 1 A PRECIO DE MERCADO PRESUPUESTO DE LA ALTERNATIVA N° 1 A PRECIO SOCIAL
ITEM PARTIDAS
359,780.77 1.00 PAVIMENTO
18,383.07 OBRAS PRELIMINARES
5,718.74 OBRAS PROVISIONALES
60,278.87 MOVIMIENTO DE TIERRAS
227,777.71 PAVIMENTO DE ASFALTO
33,957.50 SARDINELES SUMERGIDOS
9,663.59 SEÑALIZACIONES
4,001.29 VARIOS
207,331.63 2.00 VEREDAS DE CONCRETO
6,643.09 OBRAS PRELIMINARES
33,359.90 MOVIMIENTO DE TIERRAS
160,415.04 VEREDAS DE CONCRETO
6,913.60 VARIOS
5,856.15 3.00 MITIGACION DE IMPACTO AMBIENTAL
5,856.15 MITIGACION DE IMPACTO AMBIENTAL
572,968.55 COSTO DIRECTO
57296.85 GASTOS GENERALES
57296.85 UTILIDADES
687562.26 PRESUPUESTO DE OBRA
13,751.25 EXPEDIENTE TECNICO
13,751.25 SUPERVISION
715,064.75 715,064.76 COSTO TOTAL DEL PROYECTO
PRESUPUESTO DE LA ALTERNATIVA N° 2 A PRECIO DE MERCADO PRESUPUESTO DE LA ALTERNATIVA N° 2 A PRECIO DE MERCADO
ITEM PARTIDAS
546,209.97 1.00 PAVIMENTO
18,383.07 OBRAS PRELIMINARES
5,718.74 OBRAS PROVISIONALES
62,970.41 MOVIMIENTO DE TIERRAS
COSTO A PRECIO DE MERCADO
COSTO A PRECIO DE MERCADO
445,472.88 PAVIMENTO DE ASFALTO
9,663.59 SEÑALIZACIONES
4,001.29 VARIOS
207,331.63 2.00 VEREDAS DE CONCRETO
6,643.09 OBRAS PRELIMINARES
33,359.90 MOVIMIENTO DE TIERRAS
160,415.04 VEREDAS DE CONCRETO
6,913.60 VARIOS
5,856.15 3.00 MITIGACION DE IMPACTO AMBIENTAL
5,856.15 MITIGACION DE IMPACTO AMBIENTAL
759,397.75 COSTO DIRECTO
75,939.78 GASTOS GENERALES
75939.78 UTILIDADES
911277.30 PRESUPUESTO DE OBRA
18225.55 EXPEDIENTE TECNICO
18,225.55 SUPERVISION
947,728.40 947,728.40 COSTO TOTAL DEL PROYECTO
PRESUPUESTO DE LA ALTERNATIVA N° 1 A PRECIO SOCIAL
284,226.80
18,383.07 0.79 14,522.62
5,718.74 0.79 4,517.80
60,278.87 0.79 47,620.31
227,777.71 0.79 179,944.39
33,957.50 0.79 26,826.42
9,663.59 0.79 7,634.24
4,001.29 0.79 3,161.02
163,791.99
6,643.09 0.79 5,248.05
33,359.90 0.79 26,354.32
160,415.04 0.79 126,727.88
6,913.60 0.79 5,461.74
5,459.10
5,856.15 0.79 4,626.36
453,477.90
57296.85 0.79 45264.52
57296.85 0.79 45264.52
PRESUPUESTO DE OBRA 544006.93
13,751.25 0.79 10863.48
13,751.25 0.79 10863.48
COSTO TOTAL DEL PROYECTO 565,733.90
PRESUPUESTO DE LA ALTERNATIVA N° 2 A PRECIO DE MERCADO
UNIDAD CANTIDAD
431,505.88
18,383.07 0.79 14,522.62
5,718.74 0.79 4,517.80
62,970.41 0.79 49,746.62
COSTO A PRECIO DE MERCADO
FACTOR DE CORRECION
COSTO A PRECIO SOCIAL
COSTO A PRECIO SOCIAL
445,472.88 0.79 351,923.57
9,663.59 0.79 7,634.24
4,001.29 0.79 3,161.02
163,791.99
6,643.09 0.79 5,248.05
33,359.90 0.79 26,354.32
160,415.04 0.79 126,727.88
6,913.60 0.79 5,461.74
4,626.36
5,856.15 0.79 4,626.36
599,924.23
75939.78 0.79 59992.42
75939.78 0.79 59992.42
PRESUPUESTO DE OBRA 719909.07
18,225.55 0.79 14398.18
18,225.55 0.79 14398.18
COSTO TOTAL DEL PROYECTO 748,705.43
Costo de Mantenimiento Sin Proyecto
Precio Privado
ITEM PARTIDA UNID CANTIDADCOSTO
UNITARIO PARCIAL
1.00 PISTA
1.01 Bacheos para pavimentos M2 0.00 0.00 0.00
1.01 Pintura Lineal Continua ML 0.00 0.00 0.00
1.01 Pintura Lineal Discontinua ML 0.00 0.00 0.00
2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 0.00 0.00 0.00
Costos Directos
IGV 18%
Costo Total
Costo de Mantenimiento Rutinario Global - Alternativa 01 (Pistas y Veredas)
Precio Privado
ITEM PARTIDA UNID CANTIDADCOSTO
UNITARIO PARCIAL
1.00 PISTA
1.01 Bacheos para pavimentos M2 158.38 30.87 4889.15
1.01 Pintura Lineal Continua ML 52.83 5.98 315.95
1.01 Pintura Lineal Discontinua ML 11.40 5.98 68.17
2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 82.04 46.02 3775.55
Costos Directos
IGV 18%
Costo Total
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 5%
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Costo de Mantenimiento Periodico Global - Alternativa 01 (Pistas y Veredas)
Precio Privado
ITEM PARTIDA UNID CANTIDADCOSTO
UNITARIO PARCIAL
1.00 PISTA
1.01 Bacheos para pavimentos M2 316.76 32.00 10136.24
1.01 Pintura Lineal Continua ML 105.67 7.00 739.68
1.01 Pintura Lineal Discontinua ML 22.80 7.00 159.60
2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 164.08 50.00 8204.15
Costos Directos
IGV 18%
Costo Total
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 5%
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Mantenimiento Rutinario Global - Alternativa 02 (Pistas y Veredas)
Precio Privado
ITEM PARTIDA UNID CANTIDADCOSTO
UNITARIO PARCIAL
1.00 PISTA
1.01 Bacheos para pavimentos M2 158.38 89.98 14250.92
1.01 Pintura Lineal Continua ML 52.83 5.98 315.95
1.01 Pintura Lineal Discontinua ML 11.40 5.98 68.17
2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 82.04 46.02 3775.55
Costos Directos
IGV 18%
Costo Total
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 10%
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Mantenimiento Periodico Global - Alternativa 02 (Pistas y Veredas)
Precio Privado
ITEM PARTIDA UNID CANTIDADCOSTO
UNITARIO PARCIAL
1.00 PISTA
1.01 Bacheos para pavimentos M2 316.76 90.00 28508.17
1.01 Pintura Lineal Continua ML 105.67 7.00 739.68
1.01 Pintura Lineal Discontinua ML 22.80 7.00 159.60
2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 164.08 50.00 8204.15
Costos Directos
IGV 18%
Costo Total
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 10%
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Analisis de Mantenimiento a Precio Privado
RubroCon Proyecto
Alt1 Alt2
Mantenimiento Rutinario 0.00 10,677.61 21,724.49
Mantenimiento Periodico 22,702.80 44,381.68
Analisis de Mantenimiento a Precio Social
RubroCon Proyecto
Alt1 Alt2
Mantenimiento Rutinario 0.00 8,008.21 16,293.37
Mantenimiento Periodico 17,868.09 34,687.91
Sin Proyecto
Sin Proyecto
0.00
0.00
0.00
0.00
0.00
Costo de Mantenimiento Rutinario Global - Alternativa 01 (Pistas y Veredas)
Precio Social
ITEM PARTIDA UNID CANTIDAD
5,273.27 1.00 PISTA
1.01 Bacheos para pavimentos M2 158.38
1.01 Pintura Lineal Continua ML 52.83
1.01 Pintura Lineal Discontinua ML 11.40
3,775.55 2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 82.04
9,048.82 Costos Directos
1,628.79 IGV 18%
10,677.61 Costo Social
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 5% el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Costo de Mantenimiento Periodico Global - Alternativa 01 (Pistas y Veredas)
Precio Social
ITEM PARTIDA UNID CANTIDAD
11,035.51 1.00 PISTA
COSTO TOTAL
COSTO TOTAL
COSTO TOTAL
1.01 Bacheos para pavimentos M2 316.76
1.01 Pintura Lineal Continua ML 105.67
1.01 Pintura Lineal Discontinua ML 22.80
8,204.15 2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 164.08
19,239.66 Costos Directos
3,463.14 IGV 18%
22,702.80 Costo Social
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 5% el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Mantenimiento Rutinario Global - Alternativa 02 (Pistas y Veredas)
Precio Social
ITEM PARTIDA UNID CANTIDAD
14,635.03 1.00 PISTA
1.01 Bacheos para pavimentos M2 158.38
1.01 Pintura Lineal Continua ML 52.83
1.01 Pintura Lineal Discontinua ML 11.40
3,775.55 2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 82.04
18,410.58 Costos Directos
3,313.91 IGV 18%
21,724.49 Costo Social
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 10% el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Mantenimiento Periodico Global - Alternativa 02 (Pistas y Veredas)
Precio Social
ITEM PARTIDA UNID CANTIDAD
29,407.44 1.00 PISTA
1.01 Bacheos para pavimentos M2 316.76
COSTO TOTAL
COSTO TOTAL
1.01 Pintura Lineal Continua ML 105.67
1.01 Pintura Lineal Discontinua ML 22.80
8,204.15 2.00 VEREDAS
2.01 Rehabilitacion de Vereda de concreto M2 164.08
37,611.59 Costos Directos
6,770.09 IGV 18%
44,381.68 Costo Social
El Costo de cada una de las partidas se consideradas para la Operación Y Mantenimiento se estiman en 10% el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
de las partidas en funcion de los costos de las actividades principales y necesarias para reponer y/o conservar
las pistas y veredas
Costo de Mantenimiento Rutinario Global - Alternativa 01 (Pistas y Veredas)
Precio Social
COSTOCOSTO TOTAL
UNITARIO F.S PARCIAL
3,954.95
30.87 0.75 3666.86
5.98 0.75 236.96
5.98 0.75 51.13
2,831.66
46.02 0.75 2831.66
Costos Directos 6,786.61
IGV 18% 1,221.59
Costo Social 8,008.21
el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
Costo de Mantenimiento Periodico Global - Alternativa 01 (Pistas y Veredas)
Precio Social
COSTOCOSTO TOTAL
UNITARIO F.S PARCIAL
8,989.34
35.00 0.75 8314.88
7.00 0.75 554.76
7.00 0.75 119.70
6,153.11
50.00 0.75 6153.11
Costos Directos 15,142.45
IGV 18% 2,725.64
Costo Social 17,868.09
el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
Mantenimiento Rutinario Global - Alternativa 02 (Pistas y Veredas)
Precio Social
COSTOCOSTO TOTAL
UNITARIO F.S PARCIAL
10,976.28
89.98 0.75 10688.19
5.98 0.75 236.96
5.98 0.75 51.13
2,831.66
46.02 0.75 2831.66
Costos Directos 13,807.94
IGV 18% 2,485.43
Costo Social 16,293.37
el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
Mantenimiento Periodico Global - Alternativa 02 (Pistas y Veredas)
Precio Social
COSTOCOSTO TOTAL
UNITARIO F.S PARCIAL
23,243.42
95.00 0.75 22568.96
7.00 0.75 554.76
7.00 0.75 119.70
6,153.11
50.00 0.75 6153.11
Costos Directos 29,396.53
IGV 18% 5,291.38
Costo Social 34,687.91
el Costo de Cada una de las alternativas se la multiplicado por factor de Correcion (f.s) de 0.75
AÑOMZS LOTES HAB X LOTE POBLACION
MZ A 30 5 150 0MZ B 30 5 150 1MZ C 14 5 70 2MZ D 12 5 60 3
TOTAL 86 430 45678910
Pob. TotalPob. PromedioTasa Poblac.
POB. DIRECT. IMDBENEFICIARIA
430 45448 47468 49487 51508 53530 55553 58576 60601 63626 65653 685450545
4.27% (Fuente: INEI)
CARACTERISTICA DE PISTA A INTERVENIR
DESCRIPCIÓN Pista (vehicular) Situación actualLargo (ml) Ancho (m) Area (m2)CALLE A 256.05 5.4 1,382.65
CALLE 1 124.18 5.4 670.57
CALLE 2 118.6 5.4 640.44
CALLE 4 87.76 5.4 473.90
TOTAL 540.83 -- 3,167.57
Superficie de rodadura de tierra de condiciones inadecuadas para el
acceso vehicular, con secciones transversales y longitudinales irregulares.
Demanda
Servicio Descripcion Umedida Año 1 Año 2 Año 3 Año 4 Año 5
Servicio 1 Pista M2 3,167.57 3,167.57 3,167.57 3,167.57 3,167.57
Servicio 2 Veredas M2 1,640.83 1,640.83 1,640.83 1,640.83 1,640.83
Oferta
Servicio Descripcion Umedida Año 1 Año 2 Año 3 Año 4 Año 5
Servicio 1 Pista M2 0.00 0.00 0.00 0.00 0.00
Servicio 2 Veredas M2 0.00 0.00 0.00 0.00 0.00
Balance Oferta - Demanda
Servicio Descripcion Umedida Año 1 Año 2 Año 3 Año 4 Año 5Servicio 1 Pista M2 -3,167.57 -3,167.57 -3,167.57 -3,167.57 -3,167.57Servicio 2 Veredas M2 -1,640.83 -1,640.83 -1,640.83 -1,640.83 -1,640.83
Año 6 Año 7 Año 8 Año 9 Año 10
3,167.57 3,167.57 3,167.57 3,167.57 3,167.57
1,640.83 1,640.83 1,640.83 1,640.83 1,640.83
Año 6 Año 7 Año 8 Año 9 Año 10
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Año 6 Año 7 Año 8 Año 9 Año 10-3,167.57 -3,167.57 -3,167.57 -3,167.57 -3,167.57-1,640.83 -1,640.83 -1,640.83 -1,640.83 -1,640.83
EVALUACION ECONOMICA ALTERNATIVA 1 : A PRECIO DE MERCADO
Concepto Periodos por Años0 1 2 3
A.- Total de Costo del Proyecto 715,064.75COSTO DE INVERSION 715,064.75 715,064.751.- Intangibles Expediente Tecnico 13,751.252.- Obras Civiles 572,968.55Mano de Obra Calificada 52,694.30Mano de Obra No Calificada 75,083.03Insumo de Origen Nacional 445,191.22
3.- Gasto Generales 57,296.854.- Utilidades 57,296.855.- Supervision deObra 13,751.25
B.- Costo de Operación y Mantenimiento 10,677.61 10,677.61 10,677.61Sin Proyecto 0.00 0.00 0.00Con Proyecto 10,677.61 10,677.61 10,677.61
C.- Costos Incrementales 715,064.75 10,677.61 10,677.61 10,677.61D.- TEA 9% 1.00 0.92 0.84 0.77
715,064.75 11,638.59 12,686.07 13,827.81
VAC 938,859.32
COSTO/EFECTIVIDAD =
COSTO/EFECTIVIDAD =
EVALUACION ECONOMICA ALTERNATIVA 1 : A PRECIO SOCIAL
Concepto Periodos por Años0 1 2 3
A.- Total de Costo del Proyecto 565,733.90COSTO DE INVERSION 565,733.901.- Intangibles Expediente Tecnico 10,863.482.- Obras Civiles 453,477.90Mano de Obra CalificadaMano de Obra No Calificada
Insumo de Origen Nacional3.- Gasto Generales 45,264.524.- Utilidades 45,264.525.- Supervision deObra 10,863.48
B.- Costo de Operación y Mantenimiento 8,008.21 8,008.21 8,008.21Sin Proyecto 0.00 0.00 0.00Con Proyecto 8,008.21 8,008.21 8,008.21
C.- Costos Incrementales 565,733.90 8,008.21 8,008.21 8,008.21D.- TEA
9% 1.00 0.92 0.84 0.77
565,733.90 8,728.94 9,514.55 10,370.86
VAC 736,864.72
COSTO/EFECTIVIDAD =
COSTO/EFECTIVIDAD =
EVALUACION ECONOMICA ALTERNATIVA 2 : A PRECIO DE MERCADO
Concepto Periodos por Años0 1 2 3
A.- Total de Costo del Proyecto 947,728.40 947,728.40COSTO DE INVERSION 947,728.401.- Intangibles Expediente Tecnico 18,225.552.- Obras Civiles 759,397.76Mano de Obra Calificada 81,713.14Mano de Obra No Calificada 168,102.51Insumo de Origen Nacional 393,741.773.- Gasto Generales 75,939.784.- Utilidades 75,939.78
5.- Supervision deObra 18,225.55
B.- Costo de Operación y Mantenimiento 21,724.49 21,724.49 21,724.49Sin Proyecto 0.00 0.00 0.00Con Proyecto 21,724.49 21,724.49 21,724.49
C.- Costos Incrementales 947,728.40 21,724.49 21,724.49 21,724.49D.- TEA
9% 1.00 0.92 0.84 0.77947,728.40 23,679.69 25,810.87 28,133.84
VAC 1,395,991.02
COSTO/EFECTIVIDAD =
COSTO/EFECTIVIDAD =
EVALUACION ECONOMICA ALTERNATIVA 2 : A PRECIO SOCIAL
Concepto Periodos por Años0 1 2 3
A.- Total de Costo del Proyecto 748,705.43COSTO DE INVERSION 748,705.431.- Intangibles Expediente Tecnico 14,398.182.- Obras Civiles 599,924.23Mano de Obra Calificada 64,553.38Mano de Obra No Calificada 132,800.98
Insumo de Origen Nacional 311,056.003.- Gasto Generales 59,992.424.- Utilidades 59,992.425.- Supervision deObra 14,398.18
B.- Costo de Operación y Mantenimiento 16,293.37 16,293.37 16,293.37Sin Proyecto 0.00 0.00 0.00
Con Proyecto 16,293.37 16,293.37 16,293.37
C.- Costos Incrementales 748,705.43 16,293.37 16,293.37 16,293.37D.- TEA 9% 1.00 0.92 0.84 0.77
748,705.43 17,759.77 19,358.15 21,100.38
VAC 1,090,377.24
COSTO/EFECTIVIDAD =
COSTO/EFECTIVIDAD =
DESCRIPCION ALT 1 ALT 2
Monto de la Inversion Precio Social 565,733.90 748,705.43Costo de Mantenimiento Rutinario 8,008.21 16,293.37Costo de Mantenimiento Periodico 17,868.09 34,687.91VAC Social 736,864.72 1,090,377.24ICE (S/.x Poblacion Beneficiaria) 1352.05 2000.69ICE 1 < ICE 2 SI NO
Sostenible SI SI
EVALUACION ECONOMICA ALTERNATIVA 1 : A PRECIO DE MERCADO
Periodos por Años4 5 6 7 8 9 10
10,677.61 22,702.80 10,677.61 10,677.61 10,677.61 10,677.61 22,702.800.00 0.00 0.00 0.00 0.00 0.00 0.00
10,677.61 22,702.80 10,677.61 10,677.61 10,677.61 10,677.61 22,702.80
10,677.61 22,702.80 10,677.61 10,677.61 10,677.61 10,677.61 22,702.80
0.71 0.65 0.60 0.55 0.50 0.46 0.42
15,072.31 34,931.08 17,907.42 19,519.08 21,275.80 23,190.62 53,745.79
VAC 938,859.32Beneficiarios 545.00
1722.68
EVALUACION ECONOMICA ALTERNATIVA 1 : A PRECIO SOCIAL
Periodos por Años4 5 6 7 8 9 10
8,008.21 17,868.09 8,008.21 8,008.21 8,008.21 8,008.21 17,868.090.00 0.00 0.00 0.00 0.00 0.00 0.00
8,008.21 17,868.09 8,008.21 8,008.21 8,008.21 8,008.21 17,868.09
8,008.21 17,868.09 8,008.21 8,008.21 8,008.21 8,008.21 17,868.09
0.71 0.65 0.60 0.55 0.50 0.46 0.42
11,304.24 27,492.28 13,430.56 14,639.31 15,956.85 17,392.97 42,300.27
VAC 736,864.72Beneficio 545.00
1352.05
EVALUACION ECONOMICA ALTERNATIVA 2 : A PRECIO DE MERCADO
Periodos por Años4 5 6 7 8 9 10
21,724.49 44,381.68 21,724.49 21,724.49 21,724.49 21,724.49 44,381.680.00 0.00 0.00 0.00 0.00 0.00 0.00
21,724.49 44,381.68 21,724.49 21,724.49 21,724.49 21,724.49 44,381.68
21,724.49 44,381.68 21,724.49 21,724.49 21,724.49 21,724.49 44,381.68
0.71 0.65 0.60 0.55 0.50 0.46 0.4230,665.89 68,286.71 36,434.14 39,713.22 43,287.41 47,183.27 105,067.57
VAC 1,395,991.02Beneficiarios 545.00
2561.45
EVALUACION ECONOMICA ALTERNATIVA 2 : A PRECIO SOCIAL
Periodos por Años4 5 6 7 8 9 10
16,293.37 34,687.91 16,293.37 16,293.37 16,293.37 16,293.37 34,687.910.00 0.00 0.00 0.00 0.00 0.00 0.00
16,293.37 34,687.91 16,293.37 16,293.37 16,293.37 16,293.37 34,687.91
16,293.37 34,687.91 16,293.37 16,293.37 16,293.37 16,293.37 34,687.91
0.71 0.65 0.60 0.55 0.50 0.46 0.4222,999.42 53,371.65 27,325.61 29,784.91 32,465.56 35,387.46 82,118.90
VAC 1,090,377.24Beneficio 545.00
2000.69
ANALISIS DE SOSTENIBILIDADALTERNATIVA 1
Costo de Inversion VACT Precio Social
-20% 572,051.80 751,087.46 589,491.78 436.00 1,378.14
-15% 607,805.04 798,030.42 626,335.01 463.25 1,464.28
-10% 643,558.28 844,973.39 663,178.25 490.50 1,550.41
-5% 679,311.51 891,916.35 700,021.49 517.75 1,636.54
0% 715,064.75 938,859.32 736,864.72 545.00 1,722.68
5% 750,817.99 985,802.29 773,707.96 572.25 1,808.81
10% 786,571.23 1,032,745.25 810,551.20 599.50 1,894.95
15% 822,324.46 1,079,688.22 847,394.43 626.75 1,981.08
20% 858,077.70 1,126,631.18 884,237.67 654.00 2,067.21
25% 893,830.94 1,173,574.15 921,080.90 681.25 2,153.35
30% 929,584.18 1,220,517.12 957,924.14 708.50 2,239.48
ANALISIS DE SOSTENIBILIDADALTERNATIVA 2
Costo de Inversion VACT Precio Social
-20% 758,182.72 589,491.78 872,301.79 436.00 2,049.16
-15% 805,569.14 626,335.01 926,820.65 463.25 2,177.23
-10% 852,955.56 663,178.25 981,339.51 490.50 2,305.31
-5% 900,341.98 700,021.49 1,035,858.37 517.75 2,433.38
0% 947,728.40 736,864.72 1,090,377.24 545.00 2,561.45
5% 995,114.82 773,707.96 1,144,896.10 572.25 2,689.52
10% 1,042,501.24 810,551.20 1,199,414.96 599.50 2,817.60
15% 1,089,887.66 847,394.43 1,253,933.82 626.75 2,945.67
20% 1,137,274.08 884,237.67 1,308,452.68 654.00 3,073.74
25% 1,184,660.50 921,080.90 1,362,971.54 681.25 3,201.81
30% 1,232,046.92 957,924.14 1,417,490.41 708.50 3,329.89
-20% 1,000.23 1,523.70-15% 1,062.75 1,618.93-10% 1,125.26 1,714.16
Porcentaje de Variacion
VACT Precio Privado
N° de Beneficiarios
C/E Precio Privado
Porcentaje de Variacion
VACT Precio Privado
N° de Beneficiarios
C/E Precio Privado
Porcentaje de Variacion
C/E Precio Privado ALT 1
C/E Precio Privado ATL 2
-0.3 -0.2 -0.1 0 0.1 0.2 0.3 0.40
500
1000
1500
2000
2500
3000
C/E Precio Privado ALT 1 C/E Precio Privado ATL 2
-5% 1,187.77 1,809.39
0% 1,250.29 1,904.63
5% 1,312.80 1,999.8610% 1,375.32 2,095.0915% 1,437.83 2,190.32
20% 1,500.35 2,285.5525% 1,562.86 2,380.7830% 1,625.37 2,476.01
-0.3 -0.2 -0.1 0 0.1 0.2 0.3 0.40
500
1000
1500
2000
2500
3000
C/E Precio Privado ALT 1 C/E Precio Privado ATL 2
ANALISIS DE SOSTENIBILIDADALTERNATIVA 1
C/E Precio Social
1,081.64
1,149.24
1,216.84
1,284.44
1,352.05
1,419.65
1,487.25
1,554.85
1,622.45
1,690.06
1,757.66
ANALISIS DE SOSTENIBILIDADALTERNATIVA 2
C/E Precio Social
1,600.55
1,700.59
1,800.62
1,900.66
2,000.69
2,100.73
2,200.76
2,300.80
2,400.83
2,500.87
2,600.90
-0.3 -0.2 -0.1 0 0.1 0.2 0.3 0.40
500
1000
1500
2000
2500
3000
C/E Precio Privado ALT 1 C/E Precio Privado ATL 2
-0.3 -0.2 -0.1 0 0.1 0.2 0.3 0.40
500
1000
1500
2000
2500
3000
C/E Precio Privado ALT 1 C/E Precio Privado ATL 2
Cronograma de Metas Fisicas
METASMESES
1 2 3 4
Expediente Tecnico 100%
PAVIMENTOSObras Preliminares 100%
Obras Provisionales 100%
Movimiento de Tierra 100%
Pavimento Flexible 100%
Sardineles 100%
Señalizaciones 100%
Varios 100%
VEREDASObras Provisionales 100%
Movimiento de Tierra 100%
Veredas de Concreto 100%
Varios 100%
MITIGACION AMBIENTALMitigacion Ambiental 30% 30% 40%
Gastos Generales 20% 40% 40%
Utilidades 20% 40% 40%
Supervision de Obra 20% 40% 40%
Costo total de Inversion 100% 100% 100%
Cronograma de Metas Financiera
METASMESES
1 2 3 4
Expediente Tecnico 13,751.25
PAVIMENTOSObras Preliminares 18,383.07
Obras Provisionales 5,718.74
Movimiento de Tierra 60,278.87
Pavimento Flexible 227,777.71
Sardineles 33,957.50
Señalizaciones 9,663.59
Varios 4,001.29
VEREDASObras Provisionales 6,643.09
Movimiento de Tierra 33,359.90
Veredas de Concreto 160,415.04
Varios 6,913.60
MITIGACION AMBIENTALMitigacion Ambiental 1,756.85 1,756.85 2,342.46
Gastos Generales 11459.37 22918.74 22918.74
Utilidades 11459.37 22918.74 22918.74
Supervision de Obra 2,750.25 5,500.50 5,500.50
Costo total de Inversion 13,751.25 159974.144948 241966.861835 285621.250534
Total Por Metas
100%
100%100%100%100%100%
100%100%
100%100%100%100%
100%100%100%100%
100%
Total Por Metas
13,751.25
18,383.075,718.74
60,278.87227,777.7133,957.509,663.594,001.29
6,643.0933,359.90
160,415.046,913.60
5,856.1557,296.8557,296.8513,751.25
715,064.75 715,064.76
S10
Análisis de precios unitarios
Presupuesto CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMASubpresupuesto
Partida 01.01.01 CARTEL DE IDENTIFICACION DE OBRA 5.60M X 3.6M
Rendimiento und/DIA 0.5000 EQ. 0.5000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 16.0000
0101010005 PEON hh 1.0000 16.0000
Materiales02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 1.9400
0207030001 HORMIGON m3 0.6700
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1.0000
0218020001 PERNO HEXAGONAL und 10.0000
0231010001 MADERA TORNILLO p2 150.0000
0231220005 GIGANTOGRAFIA TIPO BANNER DE 5.6M X 3.6M und 1.0000
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
Rendimiento est/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : est
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03012200010002 CAMION PLATAFORMA 4 X 2 122 HP hm 2.0000 16.0000
03012200040001 CAMION VOLQUETE DE 15 m3 hm 1.0000 8.0000
Partida 01.01.03 CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN
Rendimiento glb/DIA EQ. Costo unitario directo por : glb
Código Descripción Recurso Unidad Cuadrilla CantidadMateriales
02902400010031 CASETA DE GUARDIANIA Y ALMACEN DE OBRA glb 1.0000
Partida 01.01.04 INSTALACION DE SS.HH. PROVISIONALES
Rendimiento und/DIA EQ. Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03013500010007 CONTENEDOR DE DUCHAS día 60.0000
Partida 01.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL
Rendimiento mes/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : mes
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 2.0000 16.0000
0101010005 PEON hh 2.0000 16.0000
Materiales02670100010008 CASCOS CON CINTAS REFLECTIVAS und 4.0000
0267060018 CHALECO REFLECTIVO und 4.0000
0267110013 CONOS REFLECTANTES und 4.0000
02671100140002 TRANQUERA DE MADERA DE 1.20 X 1.20 m und 4.0000
02671100140003 TRANQUERA DE MADERA DE 2.40 X 1.20 m und 4.0000
02671100160005 SEÑALIZACION PREVENTIVAS und 2.0000
Equipos0301150001 RADIO TRANSMISOR día 2.0000 2.0000
Partida 01.02.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA
Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0400
01010300000005 OPERARIO TOPOGRAFO hh 1.0000 0.0200
Materiales02130400010001 TIZA BOLSA DE 40 kg und 0.0200
0240020001 PINTURA ESMALTE gal 0.0050
Equipos03010000020002 NIVEL TOPOGRAFICO hm 1.0000 0.0200
0301000011 TEODOLITO hm 1.0000 0.0200
03014900010001 CORDEL rll 0.0015
Partida 01.03.01 EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL
Rendimiento m3/DIA 300.0000 EQ. 300.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0533
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 1.0000 0.0267
Partida 01.03.02 EXCAVACION MANUAL DE ZANJA PARA SARDINELES SUMERGIDOS
Rendimiento m/DIA 55.0000 EQ. 55.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0145
0101010005 PEON hh 1.0000 0.1455
Partida 01.03.03 ELIMINACION DE MATERIAL EXCEDENTE
Rendimiento m3/DIA 220.0000 EQ. 220.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0364
03012200040001 CAMION VOLQUETE DE 15 m3 hm 2.0000 0.0727
Partida 01.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE
Rendimiento m2/DIA 1,200.0000 EQ. 1,200.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0007
0101010004 OFICIAL hh 1.0000 0.0067
0101010005 PEON hh 4.0000 0.0267
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPhm 1.0000 0.0067
03012000010001 MOTONIVELADORA 130 - 135 HP hm 1.0000 0.0067
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 1.0000 0.0067
Partida 01.04.02 SUB BASE GRANULAR e=0.15 m
Rendimiento m2/DIA 900.0000 EQ. 900.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0009
0101010005 PEON hh 4.0000 0.0356
Materiales0207040001 MATERIAL GRANULAR m3 0.1950
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPhm 0.9975 0.0089
03012000010001 MOTONIVELADORA 130 - 135 HP hm 0.9975 0.0089
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 0.9975 0.0089
Partida 01.04.03 BASE GRANULAR E=0.15 m
Rendimiento m2/DIA 700.0000 EQ. 700.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.2000 0.0023
0101010004 OFICIAL hh 1.0000 0.0114
0101010005 PEON hh 4.0000 0.0457
Materiales0207040001 MATERIAL GRANULAR m3 0.1950
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPhm 0.9975 0.0114
03012000010001 MOTONIVELADORA 130 - 135 HP hm 0.9975 0.0114
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 1.0000 0.0114
Partida 01.04.04 IMPRIMACION ASFALTICA C/CAMION IMPRIMADOR
Rendimiento m2/DIA 3,500.0000 EQ. 3,500.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 1.0000 0.0023
0101010004 OFICIAL hh 1.0000 0.0023
0101010005 PEON hh 6.0000 0.0137
Materiales0201040002 KEROSENE INDUSTRIAL gal 0.0500
02010500010001 ASFALTO RC-250 gal 0.2500
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03012200080002 CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl hm 1.0000 0.0023
03013900050001 BARREDORA MECANICA 10-20 HP 7 P.LONG. hm 1.0000 0.0023
Partida 01.04.05 CARPETA ASFALTICA EN CALIENTE DE 2"
Rendimiento m2/DIA 1,800.0000 EQ. 1,800.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 1.0000 0.0044
0101010003 OPERARIO hh 2.0000 0.0089
0101010005 PEON hh 8.0000 0.0356
Materiales0201050005 MEZCLA ASFALTICA m3 0.0700
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011000040001 RODILLO NEUMATICO AUTOPREPULSADO 5.5 - 20 ton hm 1.0000 0.0044
03011000050001 RODILLO TANDEM EST 8-10 ton hm 1.0000 0.0044
03013900020002 PAVIMENTADORA SOBRE ORUGAS 69 HP 10-16' hm 1.0000 0.0044
Partida 01.05.01 SARDINEL SUMERGIDO DE CONCRETO F'c=175 KG/CM2
Rendimiento m/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0320
0101010003 OPERARIO hh 1.0000 0.3200
0101010004 OFICIAL hh 1.0000 0.3200
0101010005 PEON hh 1.0000 0.3200
Materiales02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.1000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.0700
02190100010010 CONCRETO PREMEZCLADO F'C=210 kg/cm2 m3 0.0450
0231010001 MADERA TORNILLO p2 1.2500
Equipos03012900010004 VIBRADOR A GASOLINA día 0.2000 0.0080
Partida 01.05.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2667
0101010005 PEON hh 1.0000 0.2667
Materiales0201050002 EMULSION ASFALTICA gal 0.0375
02070200010001 ARENA FINA m3 0.0020
Partida 01.06.01 PINTURA LINEAL DISCONTINUA E= 0.10 m
Rendimiento m/DIA 450.0000 EQ. 450.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.0178
0101010005 PEON hh 2.0000 0.0356
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0200
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011200020001 EQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO hm 1.0000 0.0178
Partida 01.06.02 PINTURA LINEAL CONTINUA E= 0.10 m
Rendimiento m/DIA 450.0000 EQ. 450.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra0101010003 OPERARIO hh 1.0000 0.0178
0101010005 PEON hh 2.0000 0.0356
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0200
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011200020001 EQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO hm 1.0000 0.0178
Partida 01.06.03 PINTURA DE LETRAS Y SIMBOLOS
Rendimiento m2/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0133
0101010003 OPERARIO hh 1.0000 0.1333
0101010005 PEON hh 1.0000 0.1333
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0600
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Partida 01.07.01 NIVELACION DE BUZONES EN GENERAL
Rendimiento und/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 2.0000
0101010005 PEON hh 2.0000 4.0000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.6250
02070200010002 ARENA GRUESA m3 0.5230
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.9000
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 01.07.02 COSTO DE OPERACION (INC. BASE Y SUB RASANTE)
Rendimiento und/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2000
Materiales02902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 1.0000
Partida 02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA
Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0400
01010300000005 OPERARIO TOPOGRAFO hh 1.0000 0.0200
Materiales02130400010001 TIZA BOLSA DE 40 kg und 0.0200
0240020001 PINTURA ESMALTE gal 0.0050
Equipos03010000020002 NIVEL TOPOGRAFICO hm 1.0000 0.0200
0301000011 TEODOLITO hm 1.0000 0.0200
03014900010001 CORDEL rll 0.0015
Partida 02.01.02 DEMOLICION DE VEREDAS DE e= 0.10M
Rendimiento m2/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.2667
Equipos03011400020003 MARTILLO HIDRAULICO (para minicargador) hm 1.0000 0.1333
03011600020001 MINI CARGADOR BOB CAT 953 hm 1.0000 0.1333
Partida 02.02.01 CORTE A NIVEL DE SUBRASANTE EN VEREDAS
Rendimiento m3/DIA 3.5000 EQ. 3.5000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.2286
0101010005 PEON hh 1.0000 2.2857
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.02.02 EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS
Rendimiento m/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0200
0101010005 PEON hh 1.0000 0.2000
Partida 02.02.03 ELIMINACION DE MATERIAL EXCEDENTE
Rendimiento m3/DIA 220.0000 EQ. 220.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0364
03012200040001 CAMION VOLQUETE DE 15 m3 hm 2.0000 0.0727
Partida 02.03.01 AFIRMADO DE 4" PARA VEREDAS
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0080
0101010004 OFICIAL hh 1.0000 0.0800
0101010005 PEON hh 4.0000 0.3200
Materiales02070400010002 MATERIAL GRANULAR PARA BASE m3 0.1300
0290130022 AGUA m3 0.0150
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 1.0000 0.0800
Partida 02.03.02 VEREDA DE CONCRETO DE 4"
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0080
0101010003 OPERARIO hh 8.0000 0.6400
0101010004 OFICIAL hh 1.0000 0.0800
0101010005 PEON hh 6.0000 0.4800
Materiales02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.0500
02070100010002 PIEDRA CHANCADA 1/2" m3 0.0500
02070200010001 ARENA FINA m3 0.0200
02070200010002 ARENA GRUESA m3 0.0500
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1.0900
0231010001 MADERA TORNILLO p2 1.1000
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0100
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.0800
Partida 02.03.03 SARDINELES DE CONCRETO f'c=175 kg/cm2
Rendimiento m/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.1333
0101010004 OFICIAL hh 1.0000 0.1333
0101010005 PEON hh 9.0000 1.2000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.0250
02070200010002 ARENA GRUESA m3 0.0200
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3600
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0167
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.1333
Partida 02.03.04 ENCOFRADO Y DESENCOFRADO PARA SARDINEL
Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.6667
0101010005 PEON hh 1.0000 0.6667
Materiales02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.2600
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1300
0231010001 MADERA TORNILLO p2 4.8200
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.03.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2667
0101010005 PEON hh 1.0000 0.2667
Materiales0201050002 EMULSION ASFALTICA gal 0.0375
02070200010001 ARENA FINA m3 0.0020
Partida 02.04.01 NIVELACION DE DE CAJAS DOMICILIARIAS DE AGUA
Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.4000
0101010005 PEON hh 2.0000 0.8000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.0600
02070200010002 ARENA GRUESA m3 0.0520
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0900
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.04.02 NIVELACION DE DE TAPAS DE DESAGUE DOMICILIARIAS
Rendimiento und/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.6667
0101010005 PEON hh 1.0000 0.6667
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.1560
02070200010002 ARENA GRUESA m3 0.1000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1800
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.04.03 COSTO DE OPERACION (INC. BASE Y SUB RASANTE)
Rendimiento und/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2000
Materiales02902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 1.0000
Partida 03.01 MITIGACION DEL IMPACTO AMBIENTAL
Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb
Código Descripción Recurso Unidad Cuadrilla CantidadMateriales
0267100001 EXTINTOR DE POLVO QUIMICO SECO (PQS) und 1.0000
0267100005 BOTIQUIN (equipado segun lista de materiales) und 1.0000
0267110022 ACONDICIONAMIENTO DE BOTADEROS glb 1.0000
0291030001 PROGRAMA DE CONTINGENCIA glb 1.0000
Fecha :
Página : 1
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMAFecha presupuesto Dec-12
1,647.11
Precio S/. Parcial S/.
14.37 229.92
11.40 182.40
412.32
3.80 7.37
38.14 25.55
15.25 15.25
3.50 35.00
4.50 675.00
456.00 456.00
1,214.17
412.32 20.62
20.62
7,245.20
Precio S/. Parcial S/.
325.65 5,210.40
254.35 2,034.80
7,245.20
1,200.00
Precio S/. Parcial S/.
1,200.00 1,200.00
1,200.00
510.00
Precio S/. Parcial S/.
8.50 510.00
510.00
1,978.28
Precio S/. Parcial S/.
17.80 284.80
11.40 182.40
467.20
12.00 48.00
28.50 114.00
36.50 146.00
65.00 260.00
95.00 380.00
268.00 536.00
1,484.00
13.54 27.08
27.08
1.53
Precio S/. Parcial S/.
11.40 0.46
16.44 0.33
0.79
15.00 0.30
28.50 0.14
0.44
4.50 0.09
8.65 0.17
25.00 0.04
0.30
EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL
9.80
Precio S/. Parcial S/.
11.40 0.61
0.61
0.61 0.03
342.97 9.16
9.19
1.92
Precio S/. Parcial S/.
17.80 0.26
11.40 1.66
1.92
24.86
Precio S/. Parcial S/.
174.94 6.37
254.35 18.49
24.86
3.38
Precio S/. Parcial S/.
17.80 0.01
12.61 0.08
11.40 0.30
0.39
0.39 0.01
89.70 0.60
175.06 1.17
180.15 1.21
2.99
10.74
Precio S/. Parcial S/.
17.80 0.02
11.40 0.41
0.43
32.50 6.34
6.34
0.43 0.01
89.70 0.80
175.06 1.56
180.15 1.60
3.97
12.15
Precio S/. Parcial S/.
17.80 0.04
12.61 0.14
11.40 0.52
0.70
32.50 6.34
6.34
0.70 0.04
89.70 1.02
175.06 2.00
180.15 2.05
5.11
3.80
Precio S/. Parcial S/.
17.80 0.04
12.61 0.03
11.40 0.16
0.23
12.85 0.64
10.02 2.51
3.15
0.23 0.01
131.28 0.30
45.96 0.11
0.42
30.87
Precio S/. Parcial S/.
17.80 0.08
14.37 0.13
11.40 0.41
0.62
412.00 28.84
28.84
0.62 0.02
89.70 0.39
94.72 0.42
130.92 0.58
1.41
29.77
Precio S/. Parcial S/.
17.80 0.57
14.37 4.60
12.61 4.04
11.40 3.65
12.86
3.80 0.38
3.80 0.27
235.00 10.58
4.50 5.63
16.86
5.65 0.05
0.05
7.35
Precio S/. Parcial S/.
14.37 3.83
11.40 3.04
6.87
10.55 0.40
42.37 0.08
0.48
5.98
Precio S/. Parcial S/.
14.37 0.26
11.40 0.41
0.67
48.50 2.91
42.00 0.84
3.75
0.67 0.02
86.49 1.54
1.56
5.98
Precio S/. Parcial S/.
14.37 0.26
11.40 0.41
0.67
48.50 2.91
42.00 0.84
3.75
0.67 0.02
86.49 1.54
1.56
9.22
Precio S/. Parcial S/.
17.80 0.24
14.37 1.92
11.40 1.52
3.68
48.50 2.91
42.00 2.52
5.43
3.68 0.11
0.11
158.59
Precio S/. Parcial S/.
14.37 28.74
11.40 45.60
74.34
68.75 42.97
45.24 23.66
15.25 13.73
8.00 0.17
80.53
74.34 3.72
3.72
35.37
Precio S/. Parcial S/.
14.37 2.87
2.87
32.50 32.50
32.50
1.53
Precio S/. Parcial S/.
11.40 0.46
16.44 0.33
0.79
15.00 0.30
28.50 0.14
0.44
4.50 0.09
8.65 0.17
25.00 0.04
0.30
15.71
Precio S/. Parcial S/.
11.40 3.04
3.04
12.56 1.67
82.50 11.00
12.67
31.64
Precio S/. Parcial S/.
17.80 4.07
11.40 26.06
30.13
30.13 1.51
1.51
2.64
Precio S/. Parcial S/.
17.80 0.36
11.40 2.28
2.64
24.86
Precio S/. Parcial S/.
174.94 6.37
254.35 18.49
24.86
10.83
Precio S/. Parcial S/.
17.80 0.14
12.61 1.01
11.40 3.65
4.80
32.50 4.23
8.00 0.12
4.35
4.80 0.24
18.00 1.44
1.68
46.02
Precio S/. Parcial S/.
17.80 0.14
14.37 9.20
12.61 1.01
11.40 5.47
15.82
3.80 0.19
68.75 3.44
42.37 0.85
45.24 2.26
15.25 16.62
4.50 4.95
28.31
15.82 0.47
5.65 0.06
16.95 1.36
1.89
28.60
Precio S/. Parcial S/.
14.37 1.92
12.61 1.68
11.40 13.68
17.28
68.75 1.72
45.24 0.90
15.25 5.49
8.11
17.28 0.86
5.65 0.09
16.95 2.26
3.21
41.21
Precio S/. Parcial S/.
14.37 9.58
11.40 7.60
17.18
3.80 0.99
3.80 0.49
4.50 21.69
23.17
17.18 0.86
0.86
7.35
Precio S/. Parcial S/.
14.37 3.83
11.40 3.04
6.87
10.55 0.40
42.37 0.08
0.48
23.63
Precio S/. Parcial S/.
14.37 5.75
11.40 9.12
14.87
68.75 4.13
45.24 2.35
15.25 1.37
8.00 0.17
8.02
14.87 0.74
0.74
36.21
Precio S/. Parcial S/.
14.37 9.58
11.40 7.60
17.18
68.75 10.73
45.24 4.52
15.25 2.75
8.00 0.17
18.17
17.18 0.86
0.86
35.37
Precio S/. Parcial S/.
14.37 2.87
2.87
32.50 32.50
32.50
4,962.84
Precio S/. Parcial S/.
168.00 168.00
105.00 105.00
2,500.00 2,500.00
2,189.84 2,189.84
4,962.84
01/12/2012 12:00:00 AM
S10
Análisis de precios unitarios
Presupuesto CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA ALT 02Subpresupuesto
Partida 01.01.01 CARTEL DE IDENTIFICACION DE OBRA 5.60M X 3.6M
Rendimiento und/DIA 0.5000 EQ. 0.5000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 16.0000
0101010005 PEON hh 1.0000 16.0000
Materiales02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 1.9400
0207030001 HORMIGON m3 0.6700
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1.0000
0218020001 PERNO HEXAGONAL und 10.0000
0231010001 MADERA TORNILLO p2 150.0000
0231220005 GIGANTOGRAFIA TIPO BANNER DE 5.6M X 3.6M und 1.0000
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
Rendimiento est/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : est
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03012200010002 CAMION PLATAFORMA 4 X 2 122 HP hm 2.0000 16.0000
03012200040001 CAMION VOLQUETE DE 15 m3 hm 1.0000 8.0000
Partida 01.01.03 CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN
Rendimiento glb/DIA EQ. Costo unitario directo por : glb
Código Descripción Recurso Unidad Cuadrilla CantidadMateriales
02902400010031 CASETA DE GUARDIANIA Y ALMACEN DE OBRA glb 1.0000
Partida 01.01.04 INSTALACION DE SS.HH. PROVISIONALES
Rendimiento und/DIA EQ. Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03013500010007 CONTENEDOR DE DUCHAS día 60.0000
Partida 01.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL
Rendimiento mes/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : mes
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 2.0000 16.0000
0101010005 PEON hh 2.0000 16.0000
Materiales02670100010008 CASCOS CON CINTAS REFLECTIVAS und 4.0000
0267060018 CHALECO REFLECTIVO und 4.0000
0267110013 CONOS REFLECTANTES und 4.0000
02671100140002 TRANQUERA DE MADERA DE 1.20 X 1.20 m und 4.0000
02671100140003 TRANQUERA DE MADERA DE 2.40 X 1.20 m und 4.0000
02671100160005 SEÑALIZACION PREVENTIVAS und 2.0000
Equipos0301150001 RADIO TRANSMISOR día 2.0000 2.0000
Partida 01.02.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA
Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0400
01010300000005 OPERARIO TOPOGRAFO hh 1.0000 0.0200
Materiales02130400010001 TIZA BOLSA DE 40 kg und 0.0200
0240020001 PINTURA ESMALTE gal 0.0050
Equipos03010000020002 NIVEL TOPOGRAFICO hm 1.0000 0.0200
0301000011 TEODOLITO hm 1.0000 0.0200
03014900010001 CORDEL rll 0.0015
Partida 01.03.01 EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL
Rendimiento m3/DIA 300.0000 EQ. 300.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0533
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 1.0000 0.0267
Partida 01.03.02 ELIMINACION DE MATERIAL EXCEDENTE
Rendimiento m3/DIA 220.0000 EQ. 220.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0364
03012200040001 CAMION VOLQUETE DE 15 m3 hm 2.0000 0.0727
Partida 01.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE
Rendimiento m2/DIA 1,200.0000 EQ. 1,200.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0007
0101010004 OFICIAL hh 1.0000 0.0067
0101010005 PEON hh 4.0000 0.0267
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPhm 1.0000 0.0067
03012000010001 MOTONIVELADORA 130 - 135 HP hm 1.0000 0.0067
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 1.0000 0.0067
Partida 01.04.02 BASE GRANULAR E=0.20 m
Rendimiento m2/DIA 600.0000 EQ. 600.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.2000 0.0027
0101010004 OFICIAL hh 1.0000 0.0133
0101010005 PEON hh 4.0000 0.0533
Materiales0207040001 MATERIAL GRANULAR m3 0.2600
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPhm 0.9975 0.0133
03012000010001 MOTONIVELADORA 130 - 135 HP hm 0.9975 0.0133
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 1.0000 0.0133
Partida 01.04.03 CONCRETO EN PISTAS f'c=210 kg/cm2 H=0.20M
Rendimiento m2/DIA 24.0000 EQ. 24.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0333
0101010003 OPERARIO hh 1.0000 0.3333
0101010004 OFICIAL hh 1.0000 0.3333
0101010005 PEON hh 8.0000 2.6667
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.1800
02070200010002 ARENA GRUESA m3 0.0800
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1.8000
0231010001 MADERA TORNILLO p2 0.0833
0290130022 AGUA m3 0.0360
Equipos03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0417
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.3333
Partida 01.04.04 COLOCACION DE DOWELL
Rendimiento kg/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : kg
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 2.0000 0.0800
0101010004 OFICIAL hh 1.0000 0.0400
0101010005 PEON hh 1.0000 0.0400
Materiales02040600010003 ACERO LISO EN VARILLAS DE 5/8" X 6 m var 0.0800
02052700010006 TUBERIA DE PVC 3/4" m 0.2000
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 01.04.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2667
0101010005 PEON hh 1.0000 0.2667
Materiales0201050002 EMULSION ASFALTICA gal 0.0375
02070200010001 ARENA FINA m3 0.0020
Partida 01.05.01 PINTURA LINEAL DISCONTINUA E= 0.10 m
Rendimiento m/DIA 450.0000 EQ. 450.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.0178
0101010005 PEON hh 2.0000 0.0356
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0200
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011200020001 EQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO hm 1.0000 0.0178
Partida 01.05.02 PINTURA LINEAL CONTINUA E= 0.10 m
Rendimiento m/DIA 450.0000 EQ. 450.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.0178
0101010005 PEON hh 2.0000 0.0356
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0200
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03011200020001 EQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO hm 1.0000 0.0178
Partida 01.05.03 PINTURA DE LETRAS Y SIMBOLOS
Rendimiento m2/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0133
0101010003 OPERARIO hh 1.0000 0.1333
0101010005 PEON hh 1.0000 0.1333
Materiales0240060001 PINTURA PARA TRAFICO gal 0.0600
02400800150001 SOLVENTE XILOL gal 0.0600
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Partida 01.06.01 NIVELACION DE BUZONES EN GENERAL
Rendimiento und/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 2.0000
0101010005 PEON hh 2.0000 4.0000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.6250
02070200010002 ARENA GRUESA m3 0.5230
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.9000
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 01.06.02 COSTO DE OPERACION (INC. BASE Y SUB RASANTE)
Rendimiento und/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2000
Materiales02902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 1.0000
Partida 02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA
Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.0400
01010300000005 OPERARIO TOPOGRAFO hh 1.0000 0.0200
Materiales02130400010001 TIZA BOLSA DE 40 kg und 0.0200
0240020001 PINTURA ESMALTE gal 0.0050
Equipos03010000020002 NIVEL TOPOGRAFICO hm 1.0000 0.0200
0301000011 TEODOLITO hm 1.0000 0.0200
03014900010001 CORDEL rll 0.0015
Partida 02.01.02 DEMOLICION DE VEREDAS DE e= 0.10M
Rendimiento m2/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010005 PEON hh 2.0000 0.2667
Equipos03011400020003 MARTILLO HIDRAULICO (para minicargador) hm 1.0000 0.1333
03011600020001 MINI CARGADOR BOB CAT 953 hm 1.0000 0.1333
Partida 02.02.01 CORTE A NIVEL DE SUBRASANTE EN VEREDAS
Rendimiento m3/DIA 3.5000 EQ. 3.5000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.2286
0101010005 PEON hh 1.0000 2.2857
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.02.02 AFIRMADO DE 4" PARA VEREDAS
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0080
0101010004 OFICIAL hh 1.0000 0.0800
0101010005 PEON hh 4.0000 0.3200
Materiales02070400010002 MATERIAL GRANULAR PARA BASE m3 0.1300
0290130022 AGUA m3 0.0150
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 1.0000 0.0800
Partida 02.02.03 VEREDA DE CONCRETO DE 4"
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0080
0101010003 OPERARIO hh 8.0000 0.6400
0101010004 OFICIAL hh 1.0000 0.0800
0101010005 PEON hh 6.0000 0.4800
Materiales02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.0500
02070100010002 PIEDRA CHANCADA 1/2" m3 0.0500
02070200010001 ARENA FINA m3 0.0200
02070200010002 ARENA GRUESA m3 0.0500
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1.0900
0231010001 MADERA TORNILLO p2 1.1000
Equipos0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0100
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.0800
Partida 02.02.04 EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS
Rendimiento m/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010002 CAPATAZ hh 0.1000 0.0200
0101010005 PEON hh 1.0000 0.2000
Partida 02.02.05 ELIMINACION DE MATERIAL EXCEDENTE
Rendimiento m3/DIA 220.0000 EQ. 220.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla CantidadEquipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0364
03012200040001 CAMION VOLQUETE DE 15 m3 hm 2.0000 0.0727
Partida 02.03.01 SARDINELES DE CONCRETO f'c=175 kg/cm2
Rendimiento m/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.1333
0101010004 OFICIAL hh 1.0000 0.1333
0101010005 PEON hh 9.0000 1.2000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.0250
02070200010002 ARENA GRUESA m3 0.0200
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3600
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0167
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.1333
Partida 02.03.02 ENCOFRADO Y DESENCOFRADO PARA SARDINEL
Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.6667
0101010005 PEON hh 1.0000 0.6667
Materiales02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.2600
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1300
0231010001 MADERA TORNILLO p2 4.8200
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.03.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2667
0101010005 PEON hh 1.0000 0.2667
Materiales0201050002 EMULSION ASFALTICA gal 0.0375
02070200010001 ARENA FINA m3 0.0020
Partida 02.04.01 NIVELACION DE DE CAJAS DOMICILIARIAS DE AGUA
Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.4000
0101010005 PEON hh 2.0000 0.8000
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.0600
02070200010002 ARENA GRUESA m3 0.0520
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0900
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.04.02 NIVELACION DE DE TAPAS DE DESAGUE DOMICILIARIAS
Rendimiento und/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.6667
0101010005 PEON hh 1.0000 0.6667
Materiales02070100010002 PIEDRA CHANCADA 1/2" m3 0.1560
02070200010002 ARENA GRUESA m3 0.1000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1800
0290130022 AGUA m3 0.0216
Equipos0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Partida 02.04.03 COSTO DE OPERACION (INC. BASE Y SUB RASANTE)
Rendimiento und/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla CantidadMano de Obra
0101010003 OPERARIO hh 1.0000 0.2000
Materiales02902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 1.0000
Partida 03.01 MITIGACION DEL IMPACTO AMBIENTAL
Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb
Código Descripción Recurso Unidad Cuadrilla CantidadMateriales
0267100001 EXTINTOR DE POLVO QUIMICO SECO (PQS) und 1.0000
0267100005 BOTIQUIN (equipado segun lista de materiales) und 1.0000
0267110022 ACONDICIONAMIENTO DE BOTADEROS glb 1.0000
0291030001 PROGRAMA DE CONTINGENCIA glb 1.0000
Fecha :
Página : 1
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA ALT 02Fecha presupuesto Dec-12
1,647.11
Precio S/. Parcial S/.
14.37 229.92
11.40 182.40
412.32
3.80 7.37
38.14 25.55
15.25 15.25
3.50 35.00
4.50 675.00
456.00 456.00
1,214.17
412.32 20.62
20.62
7,245.20
Precio S/. Parcial S/.
325.65 5,210.40
254.35 2,034.80
7,245.20
1,200.00
Precio S/. Parcial S/.
1,200.00 1,200.00
1,200.00
510.00
Precio S/. Parcial S/.
8.50 510.00
510.00
1,978.28
Precio S/. Parcial S/.
17.80 284.80
11.40 182.40
467.20
12.00 48.00
28.50 114.00
36.50 146.00
65.00 260.00
95.00 380.00
268.00 536.00
1,484.00
13.54 27.08
27.08
1.53
Precio S/. Parcial S/.
11.40 0.46
16.44 0.33
0.79
15.00 0.30
28.50 0.14
0.44
4.50 0.09
8.65 0.17
25.00 0.04
0.30
EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL
9.80
Precio S/. Parcial S/.
11.40 0.61
0.61
0.61 0.03
342.97 9.16
9.19
24.86
Precio S/. Parcial S/.
174.94 6.37
254.35 18.49
24.86
3.38
Precio S/. Parcial S/.
17.80 0.01
12.61 0.08
11.40 0.30
0.39
0.39 0.01
89.70 0.60
175.06 1.17
180.15 1.21
2.99
15.24
Precio S/. Parcial S/.
17.80 0.05
12.61 0.17
11.40 0.61
0.83
32.50 8.45
8.45
0.83 0.04
89.70 1.19
175.06 2.33
180.15 2.40
5.96
89.98
Precio S/. Parcial S/.
17.80 0.59
14.37 4.79
12.61 4.20
11.40 30.40
39.98
68.75 12.38
45.24 3.62
15.25 27.45
4.50 0.37
8.00 0.29
44.11
5.65 0.24
16.95 5.65
5.89
5.82
Precio S/. Parcial S/.
14.37 1.15
12.61 0.50
11.40 0.46
2.11
42.50 3.40
1.02 0.20
3.60
2.11 0.11
0.11
7.35
Precio S/. Parcial S/.
14.37 3.83
11.40 3.04
6.87
10.55 0.40
42.37 0.08
0.48
5.98
Precio S/. Parcial S/.
14.37 0.26
11.40 0.41
0.67
48.50 2.91
42.00 0.84
3.75
0.67 0.02
86.49 1.54
1.56
5.98
Precio S/. Parcial S/.
14.37 0.26
11.40 0.41
0.67
48.50 2.91
42.00 0.84
3.75
0.67 0.02
86.49 1.54
1.56
9.22
Precio S/. Parcial S/.
17.80 0.24
14.37 1.92
11.40 1.52
3.68
48.50 2.91
42.00 2.52
5.43
3.68 0.11
0.11
158.59
Precio S/. Parcial S/.
14.37 28.74
11.40 45.60
74.34
68.75 42.97
45.24 23.66
15.25 13.73
8.00 0.17
80.53
74.34 3.72
3.72
35.37
Precio S/. Parcial S/.
14.37 2.87
2.87
32.50 32.50
32.50
1.53
Precio S/. Parcial S/.
11.40 0.46
16.44 0.33
0.79
15.00 0.30
28.50 0.14
0.44
4.50 0.09
8.65 0.17
25.00 0.04
0.30
15.71
Precio S/. Parcial S/.
11.40 3.04
3.04
12.56 1.67
82.50 11.00
12.67
31.64
Precio S/. Parcial S/.
17.80 4.07
11.40 26.06
30.13
30.13 1.51
1.51
10.83
Precio S/. Parcial S/.
17.80 0.14
12.61 1.01
11.40 3.65
4.80
32.50 4.23
8.00 0.12
4.35
4.80 0.24
18.00 1.44
1.68
46.02
Precio S/. Parcial S/.
17.80 0.14
14.37 9.20
12.61 1.01
11.40 5.47
15.82
3.80 0.19
68.75 3.44
42.37 0.85
45.24 2.26
15.25 16.62
4.50 4.95
28.31
15.82 0.47
5.65 0.06
16.95 1.36
1.89
2.64
Precio S/. Parcial S/.
17.80 0.36
11.40 2.28
2.64
24.86
Precio S/. Parcial S/.
174.94 6.37
254.35 18.49
24.86
28.60
Precio S/. Parcial S/.
14.37 1.92
12.61 1.68
11.40 13.68
17.28
68.75 1.72
45.24 0.90
15.25 5.49
8.11
17.28 0.86
5.65 0.09
16.95 2.26
3.21
41.21
Precio S/. Parcial S/.
14.37 9.58
11.40 7.60
17.18
3.80 0.99
3.80 0.49
4.50 21.69
23.17
17.18 0.86
0.86
7.35
Precio S/. Parcial S/.
14.37 3.83
11.40 3.04
6.87
10.55 0.40
42.37 0.08
0.48
23.63
Precio S/. Parcial S/.
14.37 5.75
11.40 9.12
14.87
68.75 4.13
45.24 2.35
15.25 1.37
8.00 0.17
8.02
14.87 0.74
0.74
36.21
Precio S/. Parcial S/.
14.37 9.58
11.40 7.60
17.18
68.75 10.73
45.24 4.52
15.25 2.75
8.00 0.17
18.17
17.18 0.86
0.86
35.37
Precio S/. Parcial S/.
14.37 2.87
2.87
32.50 32.50
32.50
4,962.84
Precio S/. Parcial S/.
168.00 168.00
105.00 105.00
2,500.00 2,500.00
2,189.84 2,189.84
4,962.84
01/12/2012 12:00:00 AM
PLANILLA DE SUSTENTO DE METRADOS
PROYECTO : "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 , DISTRITO DE ATE - LIMA - LIMA"
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE ATE
DEPARTAMENTO : LIMA DISTRITO : ATE
01 OBRAS PROVISIONALES
PARTIDA 01.01.01 CARTEL DE IDENTIFICACION DE OBRA 5.60 X 3.60 UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
1.00 1.00 UND
TOTAL DE CARTEL DE IDENTIFICACION DE OBRA 5.60 X 3.60 :
PARTIDA 01.01.02 UNIDAD (EST)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
1.00 1.00 GLB
TOTAL DE MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS :
PARTIDA 01.01.03 CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN UNIDAD (GLB)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
1.00 1.00 GLB
TOTAL DE CASETA PROVISIONAL PARA GUARDIANIA Y ALMACEN :
01 OBRAS PROVISIONALES
PARTIDA 01.01.04 INSTALACION DE SS.HH. PROVISIONALES UNIDAD (MES)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
PROVINCIA: LIMA
Confección, instalación y desistalación de un cartel de identificación de la obra
MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS
Movilización de personal y equipo necesario para ejecutar la obra, dentro del radio de urbano de Lima
Construcción de una caseta para la obra o el alquiler de un inmueble destinado a ser oficina para el contratista, la supervisión y el almacén de obra.
3.00 3.00 GLB
TOTAL DE INSTALACION DE SS.HH. PROVISIONALES :
01 OBRAS PROVISIONALES
PARTIDA 01.01.05 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL UNIDAD (MES)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
2.00 2.00
TOTAL DE MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL :
02 TRABAJOS PRELIMINARES
PARTIDA 01.02.01 TRAZO, NIVELACION Y REPLANTEO UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
CALLE A0+0.00 0+241.85 241.85 5.40 1,305.990+00 Martillo VER CAD 5.39
59.52241.85 Martillo VER CAD 9.10
2.68 1,382.68 M2
CALLE 10+0.00 Mz A 0+118.08 118.08 5.40 637.63
0+00 Martillo VER CAD 2.2015.52
0+118.08 Martillo VER CAD 2.7312.48 670.56 M2
CALLE 20+0.00 Mz G 0+15.52 15.52 5.40 83.81
0+00 Martillo VER CAD 28.682.39
0+0.00 Mz A y B 0+91.23 91.23 5.40 492.640+00 Martillo VER CAD 2.20
15.520+91.23 Martillo VER CAD 2.73
12.48 640.45 M2
CALLE 40+0.00 Mz H 0+13.17 13.17 5.40 71.12
0+00 Martillo VER CAD 4.62
Colocación de señales en la vía para el desvío del transito vehicular y peatonal
Colocación de señales en la vía para el desvío del transito vehicular y peatonal
6.130+0.00 Mz C y I 0+61.76 61.76 5.40 333.50
0+00 Martillo VER CAD 4.994.54
0+61.76 Martillo VER CAD 0.6348.35 473.88 M2
TOTAL DE TRAZO, NIVELACION Y REPLANTEO :
03 MOVIMIENTO DE TIERRAS
PARTIDA 01.03.01 UNIDAD (M3)
DENOMINACIONH= PROM AREA VOLUMEN CANTIDAD
(M) (M2) (M3) SUBTOTAL
CALLE A0+0.00 0+241.85 0.35 1,305.99 457.100+00 Martillo 0.35 5.39 1.89
0.35 59.52 20.83241.85 Martillo 0.35 9.10 3.18
0.35 2.68 0.94 483.94 M3
CALLE 10+0.00 Mz A 0+118.08 0.35 637.63 223.17
0+00 Martillo 0.35 2.20 0.770.35 15.52 5.43
0+118.08 Martillo 0.35 2.73 0.960.35 12.48 4.37 234.70 M3
CALLE 20+0.00 Mz G 0+15.52 0.35 83.81 29.33
0+00 Martillo 0.35 28.68 10.040.35 2.39 0.84
0+0.00 Mz A y B 0+91.23 0.35 492.64 172.420+00 Martillo 0.35 2.20 0.77
0.35 15.52 5.430+91.23 Martillo 0.35 2.73 0.96
0.35 12.48 4.37 224.16 M3
CALLE 40+0.00 Mz H 0+13.17 0.35 71.12 24.89
0+00 Martillo 0.35 4.62 1.620.35 6.13 2.15
0+0.00 Mz C y I 0+61.76 0.35 333.50 116.730+00 Martillo 0.35 4.99 1.75
0.35 4.54 1.590+61.76 Martillo 0.35 0.63 0.22 148.94 M3
EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL
TOTAL DE EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPO EN TERRENO NORMAL :
03 MOVIMIENTO DE TIERRAS
PARTIDA 01.03.02 EXCAVACION MANUAL PARA ZANJA SARDINELES SUMERGIDOS UNIDAD (M)
DENOMINACION CANTIDALONGITUD PISTA ESPESOR AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
CALLE A 2.00 241.85 483.700+0.00 0+241.85
CALLE 10+0.00 Mz G y F 0+48.49 2.00 48.49 96.98
0+0.00 Mz A 0+118.08 2.00 118.08 236.16
CALLE 20+0.00 Mz G 0+15.52 2.00 15.52 31.04
0+0.00 Mz A y B 0+91.23 2.00 91.23 182.46
CALLE 4 2.00 13.17 26.340+0.00 Mz H 0+13.17
TOTAL DE EXCAVACION MANUAL PARA ZANJA SARDINELES SUMERGIDOS :
03 MOVIMIENTO DE TIERRAS
PARTIDA 01.03.03 ELIMINACION DE MATERIAL EXCEDENTE UNIDAD (M3)
DENOMINACIONESPS AREA VOLUMEN ESPONJ ELIMINAC CANTIDAD (M) (M2) (M3) % (M3) SUBTOTAL
Excav. para pista 1,091.73 30.00 1,419.25 1,419.25 M3Excav. para sardineles 0.09 1,056.68 30.00 123.63 123.63 M3
TOTAL DE ELIMINACION DE MATERIAL EXCEDENTE :
04 PAVIMENTACIÓN
PARTIDA 01.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
VER PARTIDA 02.01 1.00 3,167.57 3,167.57 M2
TOTAL DE CONFORMACION Y COMPACTACION DE SUBRASANTE :
Trabajos de nivelación, conformación con motoniveladora y compactación con rodillo liso vibratorio de la sub rasante.
TOTAL DE CONFORMACION Y COMPACTACION DE SUBRASANTE :
PARTIDA 01.04.02 SUB BASE GRANULAR e=0.15 m UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
VER PARTIDA 02.01 1.00 3,167.57 3,167.57 M2
TOTAL DE SUB BASE GRANULAR e=0.15 m :
04 PAVIMENTACIÓN
PARTIDA 01.04.03 BASE GRANULAR E=0.15 m UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
VER PARTIDA 02.01 1.00 3,167.57 3,167.57 M2
TOTAL DE BASE GRANULAR E=0.15 m :
PARTIDA 01.04.04 IMPRIMACION ASFALTICA C/CAMION IMPRIMADOR UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 02.01 1.00 3,167.57 3,167.57 M2
TOTAL DE IMPRIMACION ASFALTICA C/CAMION IMPRIMADOR :
PARTIDA 01.04.05 CARPETA ASFALTICA EN CALIENTE DE 2" UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 02.01 1.00 3,167.57 3,167.57 M2
TOTAL DE CARPETA ASFALTICA EN CALIENTE DE 2" :
06 SARDINELES
PARTIDA 01.05.01 UNIDAD (M)
Trabajos de nivelación, conformación con motoniveladora y compactación con rodillo liso vibratorio de la sub rasante.
Trabajos de nivelación, conformación con motoniveladora y compactación con rodillo liso vibratorio de la sub rasante.
SARDINEL SUMERGIDO DE CONCRETO F'C=175 KG/CM2 INC. ENCOFRADO
DENOMINACION CANTIDALONGITUD PISTA ESPESOR AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
CALLE A 2.00 241.85 483.70 M0+0.00 0+241.85
CALLE 10+0.00 Mz A 0+118.08 2.00 118.08 236.16 M
CALLE 20+0.00 Mz G 0+15.52 2.00 15.52 31.04 M
0+0.00 Mz A y B 0+91.23 2.00 91.23 182.46 M
CALLE 4 2.00 13.17 26.34 M0+0.00 Mz H 0+13.17
TOTAL DE SARDINEL SUMERGIDO DE CONCRETO F'C=175 KG/CM2 INC. ENCOFRADO :
06 SARDINELES
PARTIDA 01.05.02 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" UNIDAD (M)
DENOMINACION CANTIDALONGITUD ALTURA ESPESOR
VECESCANTIDAD
(M) (M) (M) SUBTOTAL
CALLE A0+0.00 0+241.85 2.00 241.85 48.00 14.40 M
CALLE 10+0.00 Mz A 0+118.08 2.00 118.08 23.00 6.90 M
CALLE 20+0.00 Mz G 0+15.52 2.00 15.52 3.00 0.90 M
0+0.00 Mz A y B 0+91.23 2.00 91.23 18.00 5.40 M
CALLE 40+0.00 Mz H 0+13.17 2.00 13.17 2.00 0.60 M
TOTAL DE JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" :
PARTIDA 01.06.01 PINTURA LINEAL DISCONTINUA E= 0.10 m UNIDAD (M)
DENOMINACION CANTIDAEJE
VECESLONG. ESPESOR CANTIDAD
(M) (M) (M) SUBTOTAL
CALLE 1 15.00 3.00 45.00 MCALLE A
0+0.00 0+241.85 30.00 3.00 90.00 M
CALLE 10+0.00 Mz A 0+118.08 15.00 3.00 45.00 M
CALLE 20+0.00 Mz G 0+15.52 2.00 3.00 6.00 M
0+0.00 Mz A y B 0+91.23 12.00 3.00 36.00 M
CALLE 40+0.00 Mz H 0+13.17 2.00 3.00 6.00 M
TOTAL DE PINTURA LINEAL DISCONTINUA E= 0.10 m :
05 SEÑALIZACIÓN
PARTIDA 01.06.02 PINTURA LINEAL CONTINUA E= 0.10 m UNIDAD (M)
DENOMINACION CANTIDAEJE
VECESLONG. ESPESOR CANTIDAD
(M) (M) (M) SUBTOTAL
IDEM PARTIDA 03.03 1.00 1,056.68 1,056.68 M
TOTAL DE PINTURA LINEAL CONTINUA E= 0.10 m :
PARTIDA 01.06.03 PINTURA DE LETRAS Y SIMBOLOS UNIDAD (M2)
DENOMINACION CANTIDALONGITUD AREA RADIO ESPESOR CANTIDAD
(M) (M2) (M) (M) SUBTOTAL
FLECHAS UNIDIRECCIONALES 4.00 1.21 4.84 M2FLECHAS BIDIRECCIONALES 4.00 2.19 8.76 M2FLECHAS CON GIRO 8.00 1.59 12.72 M2FLECHAS CON DOBLE GIRO 2.00 3.18 6.36 M2LINEA DE RETENCION "PARE" 4.00 0.50 2.00 M2CRUCERO PEATONAL 10.00 0.50 5.00 M2PARE 4.00 3.83 15.32 M2DESPACIO COLEGIO 0.00 14.82 0.00 M2
TOTAL DE PINTURA DE LETRAS Y SIMBOLOS :
07 VARIOS
PARTIDA 01.07.01 NIVELACION DE BUZONES EN GENERAL UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
8.00 8.00
TOTAL DE NIVELACION DE BUZONES EN GENERAL :
PARTIDA 01.07.02 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
60.00 60.00
TOTAL DE COSTO DE OPERACION (INC. BASE Y SUB RASANTE) :
08.01 OBRAS PRELIMINARES
PARTIDA 02.01.01 TRAZO, NIVELACION Y REPLANTEO UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
MZ F
VER CAD 129.42RAMPA DISCAPACITADO 3.00 1.80 0.90 4.86 134.28 M2
FRENTE MZ A y FVER CAD 282.86
RAMPA DISCAPACITADO 4.00 1.80 0.90 6.48 289.34 M2
MZ AVER CAD 344.81
RAMPA DISCAPACITADO 6.00 1.80 0.90 9.72 354.53 M2
MZ B y CVER CAD 322.71
RAMPA DISCAPACITADO 6.00 1.80 0.90 9.72 322.71 M2MZ I
VER CAD 148.15RAMPA DISCAPACITADO 4.00 1.80 0.90 6.48 154.63 M2
MZ HVER CAD 78.82
RAMPA DISCAPACITADO 3.00 1.80 0.90 4.86 83.68 M2
MZ PARQUEVER CAD 160.29
RAMPA DISCAPACITADO 4.00 1.80 0.90 6.48 166.77 M2
MZ GVER CAD 127.93
RAMPA DISCAPACITADO 4.00 1.80 0.90 6.48 134.41 M2
TOTAL DE TRAZO, NIVELACION Y REPLANTEO :
PARTIDA 02.01.02 DEMOLICION DE VEREDAS DE e= 0.10M UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
MZ F0.00 M2
FRENTE MZ A y F
0.00 M2
MZ A 6.00 1.00 6.006.00 1.00 6.006.00 1.60 9.606.90 1.40 9.664.70 1.20 5.643.20 1.10 3.522.45 1.10 2.706.00 0.85 5.106.00 1.00 6.00
54.22 M2
MZ B y C 6.00 1.00 6.006.50 1.00 6.506.00 1.35 8.103.10 1.00 3.106.20 1.20 7.446.45 1.00 6.456.50 1.00 6.508.25 1.00 8.25
10.80 0.90 9.7262.06 M2
MZ I 9.00 1.00 9.009.82 1.00 9.82
18.82 M2
MZ H
0.00 M2
MZ PARQUE
0.00 M2
MZ G 9.00 2.70 24.304.00 1.80 7.20
12.45 1.25 15.5613.15 1.25 16.44
63.50 M2
TOTAL DE DEMOLICION DE VEREDAS DE e= 0.10M :
08.02 MOVIMIENTO DE TIERRASPARTIDA 02.02.01 CORTE A NIVEL DE SUBRASANTE EN VEREDAS UNIDAD (M3)
DENOMINACION CANTIDAAREA ALT ESP AREA CANTIDAD (M2) (M) (M) (M2) SUBTOTAL
MZ F
129.42 0.20 25.88RAMPA DISCAPACITADO 3.00 4.86 0.20 0.97 26.86 M3
FRENTE MZ A y F282.86 0.20 56.57
RAMPA DISCAPACITADO 4.00 6.48 0.20 1.30 57.87 M3
MZ A344.81 0.20 68.96
RAMPA DISCAPACITADO 6.00 9.72 0.20 1.94 70.91 M3
MZ B y C322.71 0.20 64.54
RAMPA DISCAPACITADO 6.00 9.72 0.20 1.94 64.54 M3MZ I
148.15 0.20 29.63RAMPA DISCAPACITADO 4.00 6.48 0.20 1.30 30.93 M3
MZ H78.82 0.20 15.76
RAMPA DISCAPACITADO 3.00 4.86 0.20 0.97 16.74 M3
MZ PARQUE160.29 0.20 32.06
RAMPA DISCAPACITADO 4.00 6.48 0.20 1.30 33.35 M3
MZ G127.93 0.20 25.59
RAMPA DISCAPACITADO 4.00 6.48 0.20 1.30 26.88 M3
TOTAL DE CORTE A NIVEL DE SUBRASANTE EN VEREDAS :
PARTIDA 02.02.02 UNIDAD (M)
DENOMINACION CANTIDALONG. ESP LONGITUD CANTIDAD
(M) (M) (M) SUBTOTAL
MZ F 1.00 8.52 8.521.00 28.49 28.491.00 3.20 3.201.00 8.47 8.471.00 1.80 1.801.00 3.20 3.201.00 36.08 36.083.00 1.80 5.40 95.16 M
FRENTE MZ A y F 1.00 19.96 19.96
EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS
1.00 20.26 20.261.00 6.44 6.441.00 108.75 108.751.00 8.53 8.536.00 1.80 10.80 174.74 M
MZ A 1.00 10.30 10.301.00 102.35 102.351.00 9.78 9.781.00 38.57 38.571.00 7.11 7.111.00 80.52 80.521.00 8.55 8.558.00 1.80 14.40 271.58 M
MZ B y C 1.00 7.36 7.361.00 80.76 80.761.00 35.90 35.901.00 45.15 45.151.00 7.12 7.121.00 56.60 56.601.00 4.70 4.70
10.00 1.80 18.00 255.59 M
MZ I 1.00 9.41 9.411.00 5.59 5.591.00 42.18 42.181.00 7.85 7.851.00 24.99 24.991.00 8.57 8.576.00 1.80 10.80 109.39 M
MZ H 1.00 7.60 7.601.00 26.85 26.851.00 7.85 7.851.00 8.11 8.114.00 1.80 7.20 57.61 M
MZ PARQUE 1.00 8.49 8.491.00 8.25 8.251.00 81.46 81.461.00 7.90 7.901.00 10.63 10.634.00 1.80 7.20 123.93 M
MZ G 1.00 10.63 10.631.00 7.83 7.831.00 37.56 37.561.00 14.53 14.531.00 41.08 41.084.00 1.80 7.20 118.83 M
TOTAL DE EXCAVACION MANUAL DE ZANJA PARA SARDINELES EN VEREDAS :
PARTIDA 02.02.03 UNIDAD (M3)
DENOMINACIONESPS AREA VOLUMEN ESPONJ ELIMINAC CANTIDAD (M) (M2) (M3) % (M3) SUBTOTAL
Excav. Para vereda 328.07 30.00 426.49 426.49 M3Excav. sardineles veredas 0.09 1,206.83 30.00 141.20 141.20 M3Demolicion 0.10 198.60 50.00 25.82 25.82 M3
TOTAL DE ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO VOLQ. 10M3,D=10KM :
PARTIDA 02.03.01 AFIRMADO DE 4" PARA VEREDAS UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 08.01.01 1.00 1,640.35 1,640.35 M2
TOTAL DE AFIRMADO DE 4" PARA VEREDAS :
08.03 OBRAS DE CONCRETO SIMPLE
PARTIDA 02.03.02 VEREDA DE CONCRETO DE 4" UNIDAD (M2)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 08.01.01 1.00 1,640.35 1,640.35 M2
TOTAL DE VEREDA DE CONCRETO DE 4" :
PARTIDA 02.03.03 SARDINELES DE CONCRETO f'c=175 kg/cm2 UNIDAD (M)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 08.01.01 1.00 1,206.83 M 1,206.83 M2
TOTAL DE SARDINELES DE CONCRETO f'c=175 kg/cm2 :
PARTIDA 02.03.04 ENCOFRADO Y DESENCOFRADO PARA SARDINEL UNIDAD (M)
DENOMINACION CANTIDALONGITUD ANCHO AREA ESPESOR CANTIDAD
(M) (M) (M2) (M) SUBTOTAL
IDEM PARTIDA 08.01.01 1.00 1,206.83 M 0.1 120.68 M2
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO VOLQ. 10M3,D=10KM
TOTAL DE ENCOFRADO Y DESENCOFRADO PARA SARDINEL :
PARTIDA 02.03.05 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" UNIDAD (M)
DENOMINACION CANTIDALONGITUD ANCHO ESPS AREA CANTIDAD
(M) (M) (M) (M2) SUBTOTAL
MZ F
27.00 1.20 32.40RAMPA DISCAPACITADO 3.00 1.20 3.60 36.00 M
FRENTE MZ A y F59.00 1.20 70.80
RAMPA DISCAPACITADO 4.00 1.20 4.80 75.60 M
MZ A72.00 1.20 86.40
RAMPA DISCAPACITADO 6.00 1.20 7.20 93.60 M
MZ B y C67.00 1.20 80.40
RAMPA DISCAPACITADO 6.00 1.20 7.20 80.40 MMZ I
31.00 1.20 37.20RAMPA DISCAPACITADO 4.00 1.20 4.80 42.00 M
MZ H16.00 1.20 19.20
RAMPA DISCAPACITADO 3.00 1.20 3.60 22.80 M
MZ PARQUE33.00 1.20 39.60
RAMPA DISCAPACITADO 4.00 1.20 4.80 44.40 M
MZ G27.00 1.20 32.40
RAMPA DISCAPACITADO 4.00 1.20 4.80 37.20 M
TOTAL DE JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" :
08.04 VARIOSPARTIDA 02.04.01 NIVELACION DE CAJAS DOMICILIARIAS DE AGUA UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
Mz A 29.00 29.00 UNDMz B 25.00 25.00 UNDMz C 22.00 22.00 UNDMz F 4.00 4.00 UNDMz G 5.00 5.00 UND
Mz H 1.00 1.00 UNDMz I 6.00 6.00 UND
TOTAL DE NIVELACION DE CAJAS DOMICILIARIAS DE AGUA :
PARTIDA 02.04.02 NIVELACION DE TAPAS DE DESAGUE DOMICILIARIAS UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
Mz A 29.00 29.00 UNDMz B 25.00 25.00 UNDMz C 22.00 22.00 UNDMz F 4.00 4.00 UNDMz G 5.00 5.00 UNDMz H 1.00 1.00 UNDMz I 6.00 6.00 UND
TOTAL DE NIVELACION DE TAPAS DE DESAGUE DOMICILIARIAS :
PARTIDA 02.04.03 COSTO DE OPERACION (INC. BASE Y SUB RASANTE) UNIDAD (UND)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
10.00 10.00 UND
TOTAL DE COSTO DE OPERACION (INC. BASE Y SUB RASANTE) :
PARTIDA 01.07.03 VEREDAS Y SARDINELES UNIDAD (MES)
DENOMINACION CANTIDALONGITUD ANCHO RADIO ESPESOR CANTIDAD
(M) (M) (M) (M) SUBTOTAL
mitigacion de Impacto Ambiental1.00 1.00 GLB
TOTAL DE VEREDAS Y SARDINELES :
PLANILLA DE SUSTENTO DE METRADOS
: "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 , DISTRITO DE ATE - LIMA - LIMA"
UNIDAD (UND)CANTIDAD
TOTAL
1.00 UND
1.00 UND
UNIDAD (EST)CANTIDAD
TOTAL
1.00 GLB
1.00 GLB
UNIDAD (GLB)CANTIDAD
TOTAL
1.00 GLB
1.00 GLB
UNIDAD (MES)CANTIDAD
TOTAL
3.00 GLB
3.00 GLB
UNIDAD (MES)CANTIDAD
TOTAL
2.00
2.00
UNIDAD (M2)CANTIDAD
TOTAL
CALLES LARGO ANCHO AREACALLE A 241.85 5.40 1305.99Martillo1 64.91Martillo2 11.78CALLE 1 118.08 5.40 637.632Martillo1 17.72Martillo2 15.21CALLE 2 15.52 5.40 83.808
Martillo1 31.07
91.23 5.40 492.642Martillo3 17.72Martillo4 15.21CALLE 4 13.17 5.40 71.118Martillo1 10.75
61.76 5.40 333.504Martillo2 9.53
Martillo3 48.98
3,167.57 M2
UNIDAD (M3)
CANTIDADTOTAL
1,091.73 M3
UNIDAD (M)CANTIDAD
TOTAL
1,056.68 M
UNIDAD (M3)
CANTIDADTOTAL
1,542.88 M3
UNIDAD (M2)
CANTIDADTOTAL
3,167.57 M2
3,167.57 M2
3,167.57 M2
UNIDAD (M2)CANTIDAD
TOTAL
3,167.57 M2
3,167.57 M2
UNIDAD (M2)CANTIDAD
TOTAL
3,167.57 M2
3,167.57 M2
UNIDAD (M2)CANTIDAD
TOTAL
3,167.57 M2
3,167.57 M2
UNIDAD (M2)CANTIDAD
TOTAL
3,167.57 M2
3,167.57 M2
UNIDAD (M)
CANTIDADTOTAL
959.70 M
UNIDAD (M)CANTIDAD
TOTAL
28.20 M
28.20 M
UNIDAD (M)CANTIDAD
TOTAL
228.00 M
228.00 M
UNIDAD (M)CANTIDAD
TOTAL
1,056.68 M
1,056.68 M
UNIDAD (M2)CANTIDAD
TOTAL
55.00 M2
55.00 M2
UNIDAD (UND)CANTIDAD
TOTAL
8.00 UND
UNIDAD (UND)CANTIDAD
TOTAL
60.00 UND
UNIDAD (M2)CANTIDAD
TOTAL
1,640.35 M2
UNIDAD (M2)CANTIDAD
TOTAL
198.60 M2
UNIDAD (M3)CANTIDAD
TOTAL
328.07 M3
UNIDAD (M)CANTIDAD
TOTAL
1,206.83 M
1,206.83 M
UNIDAD (M3)CANTIDAD
TOTAL
593.51 M3
UNIDAD (M2)CANTIDAD
TOTAL
1,640.35 M2
1,640.35 M2
UNIDAD (M2)
CANTIDADTOTAL
1,640.35 M2
1,640.35 M2
UNIDAD (M)CANTIDAD
TOTAL
1,206.83 M2
1,206.83 M2
UNIDAD (M)CANTIDAD
TOTAL
120.68 M2
120.68 M2
UNIDAD (M)CANTIDAD
TOTAL
432.00 M
UNIDAD (UND)CANTIDAD
TOTAL
92.00 UND
92.00 UND
UNIDAD (UND)CANTIDAD
TOTAL
92.00 UND
92.00 UND
UNIDAD (UND)CANTIDAD
TOTAL
10.00 UND
10.00 UND
UNIDAD (MES)CANTIDAD
TOTAL
1.00 GLB
1.00 GLB
CALLES LARGO ANCHO AREACALLE A 241.85 5.40 1305.99
76.69CALLE 1 118.08 5.40 637.632
32.93CALLE 2 106.75 5.40 576.45
64.00CALLE 4 74.93 5.40 404.622
69.26
541.61 3167.574
S10
Precios y cantidades de recursos requeridos por tipoObra
SubpresupuestoFecha Dec-12Lugar 150103 LIMA - LIMA - ATECódigo Recurso Unidad Cantidad Precio S/.
MANO DE OBRA0101010002 CAPATAZ hh 243.9377 17.800101010003 OPERARIO hh 1,958.5050 14.370101010004 OFICIAL hh 832.1352 12.610101010005 PEON hh 5,581.5521 11.4001010300000005 OPERARIO TOPOGRAFO hh 102.0168 16.44
MATERIALES0201040002 KEROSENE INDUSTRIAL gal 173.0245 12.8502010500010001 ASFALTO RC-250 gal 865.1225 10.020201050002 EMULSION ASFALTICA gal 17.3587 10.550201050005 MEZCLA ASFALTICA m3 242.2343 412.0002040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 137.0448 3.8002041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 173.6392 3.8002070100010002 PIEDRA CHANCADA 1/2" m3 137.0842 68.7502070200010001 ARENA FINA m3 33.7424 42.3702070200010002 ARENA GRUESA m3 124.3462 45.240207030001 HORMIGON m3 0.6700 38.140207040001 MATERIAL GRANULAR m3 1,349.5908 32.5002070400010002 MATERIAL GRANULAR PARA BASE m3 213.3079 32.500213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 2,256.0039 15.2502130400010001 TIZA BOLSA DE 40 kg und 102.0168 15.000218020001 PERNO HEXAGONAL und 10.0000 3.5002190100010010 CONCRETO PREMEZCLADO F'C=210 kg/cm2 m3 47.5506 235.000231010001 MADERA TORNILLO p2 3,857.4406 4.000231220005 GIGANTOGRAFIA TIPO BANNER DE 5.6M X 3.6M und 1.0000 400.000240020001 PINTURA ESMALTE gal 25.5043 28.500240060001 PINTURA PARA TRAFICO gal 81.4608 48.5002400800150001 SOLVENTE XILOL gal 29.3536 42.0002670100010008 CASCOS CON CINTAS REFLECTIVAS und 8.0000 12.000267060018 CHALECO REFLECTIVO und 8.0000 28.500267100001 EXTINTOR DE POLVO QUIMICO SECO (PQS) und 1.0000 168.000267100005 BOTIQUIN (equipado segun lista de materiales) und 1.0000 167.210267110013 CONOS REFLECTANTES und 8.0000 36.5002671100140002 TRANQUERA DE MADERA DE 1.20 X 1.20 m und 8.0000 65.0002671100140003 TRANQUERA DE MADERA DE 2.40 X 1.20 m und 8.0000 95.0002671100160005 SEÑALIZACION PREVENTIVAS und 4.0000 268.000267110022 ACONDICIONAMIENTO DE BOTADEROS glb 1.0000 2,500.000290130022 AGUA m3 31.8201 8.0002902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 70.0000 32.5002902400010031 CASETA DE GUARDIANIA Y ALMACEN DE OBRA glb 1.0000 1,200.000291030001 PROGRAMA DE CONTINGENCIA glb 1.0000 1,500.00
EQUIPOS
03010000020032 HERRAMIENTAS MANUALES %03010000020002 NIVEL TOPOGRAFICO hm 102.0168 4.500301000011 TEODOLITO hm 102.0168 8.650301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 131.2664 18.0003011000040001 RODILLO NEUMATICO AUTOPREPULSADO 5.5 - 20 ton hm 15.2262 89.70
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA
03011000050001 RODILLO TANDEM EST 8-10 ton hm 15.2262 94.7203011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HP hm 93.4333 89.7003011200020001 EQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO hm 23.1877 86.4903011400020003 MARTILLO HIDRAULICO (para minicargador) hm 26.4734 12.560301150001 RADIO TRANSMISOR día 4.0000 13.5403011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 82.5432 150.0003011600020001 MINI CARGADOR BOB CAT 953 hm 26.4734 82.5003011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 31.8865 300.0003012000010001 MOTONIVELADORA 130 - 135 HP hm 93.4333 150.2603012200010002 CAMION PLATAFORMA 4 X 2 122 HP hm 16.0000 200.0003012200040001 CAMION VOLQUETE DE 15 m3 hm 172.8596 171.0003012200050002 CAMION CISTERNA (3,500 GLNS.) hm 93.4333 171.0003012200080002 CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl hm 7.9591 131.2803012900010004 VIBRADOR A GASOLINA día 45.0158 5.6503012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 292.1368 16.9503013500010007 CONTENEDOR DE DUCHAS día 180.0000 8.5003013900020002 PAVIMENTADORA SOBRE ORUGAS 69 HP 10-16' hm 15.2262 130.9203013900050001 BARREDORA MECANICA 10-20 HP 7 P.LONG. hm 7.9591 45.9603014900010001 CORDEL rll 7.6512 25.00
Total S/.
Página : 1
Precios y cantidades de recursos requeridos por tipo
LIMA - LIMA - ATEParcial S/.
MANO DE OBRA4,342.09
28,143.7210,493.2263,629.691,677.16 MANO DE OBRA CALIFICADA= 44,656.19
108,285.88 MANO DE OBRA NO CALIFICADA = 63,629.69
MATERIALES MATERIAL Y EQUIPO = 377,280.692,223.36 485,566.578,668.53
183.1399,800.53
520.77659.83
9,424.541,429.675,625.42
25.5543,861.706,932.51
34,404.061,530.25
35.0011,174.3915,429.76
400.00726.87
3,950.851,232.85
96.00228.00168.00167.21292.00520.00760.00
1,072.002,500.00
254.562,275.001,200.001,500.00
259,272.35
EQUIPOS
3,484.59459.08882.45
2,362.801,365.79
1,442.238,380.972,005.50
332.5154.16
12,381.482,184.069,565.95
14,039.293,200.00
29,558.9915,977.091,044.87
254.344,951.721,530.001,993.41
365.80191.28
118,008.34
485,566.57 485,566.57
S10
Precios y cantidades de recursos requeridos por tipo
Obra
Fecha ###Lugar LIMA - LIMA - ATE
Código Recurso Unidad Cantidad Precio S/. Parcial S/.
MANO DE OBRA
0101010002 CAPATAZ hh 285.1174 17.80 5,075.09
0101010003 OPERARIO hh 3,616.1995 14.37 51,964.79
0101010004 OFICIAL hh 1,823.6407 12.61 22,996.11
0101010005 PEON hh 14,745.8343 11.40 168,102.51
01010300000005 OPERARIO TOPOGRAFO hh 102.0168 16.44 1,677.16
249,815.65
MATERIALES
0201050002 EMULSION ASFALTICA gal 90.1875 10.55 951.48
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 31.3768 3.80 119.23
02040600010003 ACERO LISO EN VARILLAS DE 5/8" X 6 m var 355.2912 30.00 10,658.74
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 99.6716 3.80 378.75
02052700010006 TUBERIA DE PVC 3/4" m 888.2280 1.02 905.99
02070100010002 PIEDRA CHANCADA 1/2" m3 759.9724 58.26 44,275.99
02070200010001 ARENA FINA m3 37.6266 42.37 1,594.24
02070200010002 ARENA GRUESA m3 401.1854 45.24 18,149.63
0207030001 HORMIGON m3 0.6700 38.14 25.55
0207040001 MATERIAL GRANULAR m3 899.7274 32.50 29,241.14
02070400010002 MATERIAL GRANULAR PARA BASE m3 213.3079 32.50 6,932.51
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8,484.8859 15.25 129,394.51
02130400010001 TIZA BOLSA DE 40 kg und 102.0168 15.00 1,530.25
0218020001 PERNO HEXAGONAL und 10.0000 3.50 35.00
0231010001 MADERA TORNILLO p2 2,824.8494 4.00 11,299.40
0231220005 GIGANTOGRAFIA TIPO BANNER DE 5.6M X 3.6M und 1.0000 400.00 400.00
0240020001 PINTURA ESMALTE gal 25.5043 28.50 726.87
0240060001 PINTURA PARA TRAFICO gal 81.4608 48.50 3,950.85
02400800150001 SOLVENTE XILOL gal 29.3536 42.00 1,232.85
02670100010008 CASCOS CON CINTAS REFLECTIVAS und 8.0000 12.00 96.00
0267060018 CHALECO REFLECTIVO und 8.0000 28.50 228.00
0267100001 EXTINTOR DE POLVO QUIMICO SECO (PQS) und 1.0000 168.00 168.00
0267100005 BOTIQUIN (equipado segun lista de materiales) und 1.0000 105.00 105.00
0267110013 CONOS REFLECTANTES und 8.0000 36.50 292.00
02671100140002 TRANQUERA DE MADERA DE 1.20 X 1.20 m und 8.0000 65.00 520.00
02671100140003 TRANQUERA DE MADERA DE 2.40 X 1.20 m und 8.0000 95.00 760.00
02671100160005 SEÑALIZACION PREVENTIVAS und 4.0000 268.00 1,072.00
0267110022 ACONDICIONAMIENTO DE BOTADEROS glb 1.0000 2,500.00 2,500.00
0290130022 AGUA m3 156.3977 8.00 1,251.18
02902300500002 PRUEBAS DE DENSIDAD DE CAMPO und 70.0000 32.50 2,275.00
02902400010031 CASETA DE GUARDIANIA Y ALMACEN DE OBRA glb 1.0000 1,200.00 1,200.00
0291030001 PROGRAMA DE CONTINGENCIA glb 1.0000 1,500.00 1,500.00
273,770.16
CONSTRUCCION DE PISTAS Y VEREDAS DE LA ASOCIACION DE PROPIETARIOS LOS GIRASOLES DE ATE ZONA 6 SUB ZONA 1 DISTRITO DE ATE LIMA LIMA
EQUIPOS03010000020032 HERRAMIENTAS MANUALES % 3,732.10
03010000020002 NIVEL TOPOGRAFICO hm 102.0168 4.50 459.08
0301000011 TEODOLITO hm 102.0168 8.65 882.45
0301100001 hm 131.2664 18.00 2,362.80
03011000060003 hm 69.2098 89.70 6,208.12
03011200020001 hm 23.1877 86.49 2,005.50
03011400020003 MARTILLO HIDRAULICO (para minicargador) hm 26.4734 12.56 332.51
0301150001 RADIO TRANSMISOR día 4.0000 13.54 54.16
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 82.5577 174.94 14,442.64
03011600020001 MINI CARGADOR BOB CAT 953 hm 26.4734 82.50 2,184.06
03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 31.8865 300.00 9,565.95
03012000010001 MOTONIVELADORA 130 - 135 HP hm 69.2098 150.26 10,399.46
03012200010002 CAMION PLATAFORMA 4 X 2 122 HP hm 16.0000 180.00 2,880.00
03012200040001 CAMION VOLQUETE DE 15 m3 hm 150.5556 171.00 25,745.01
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 68.2420 171.00 11,669.38
03012900010004 VIBRADOR A GASOLINA día 161.1210 5.65 910.33
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1,440.5180 16.95 24,416.78
03013500010007 CONTENEDOR DE DUCHAS día 180.0000 8.50 1,530.00
03014900010001 CORDEL rll 7.6512 25.00 191.28
119,971.60Total S/. 643,557.42
Fecha : 06/09/2012 11:27:58 AM
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HPRODILLO LISO VIBRATORIO AUTOPROPULSADO 70 - 100 HPEQUIPO PARA PINTAR MARCAS EN EL PAVIMENTO
Página :
Precios y cantidades de recursos requeridos por tipo
LIMA - LIMA - ATE
Parcial S/.
MANO DE OBRA
5,075.09
51,964.79
22,996.11
168,102.51
1,677.16 MANO DE OBRA CALIFICADA= 81,713.14 12.70%249,815.65 MANO DE OBRA NO CALIFICADA = 168,102.51 26.12%
MATERIALES MATERIALES= 393,741.77 61.18%643,557.42 100.00%
951.48
119.23
10,658.74
378.75
905.99
44,275.99 58.2627121,594.24
18,149.63
25.55
29,241.14
6,932.51
129,394.51
1,530.25
35.00
11,299.40
400.00
726.87
3,950.85
1,232.85
96.00
228.00
168.00
105.00
292.00
520.00
760.00
1,072.00
2,500.00
1,251.18
2,275.00
1,200.00
1,500.00
273,770.16
EQUIPOS3,732.10
459.08
882.45
2,362.80
6,208.12
2,005.50
332.51
54.16
14,442.64
2,184.06
9,565.95
10,399.46
2,880.00
25,745.01
11,669.38
910.33
24,416.78
1,530.00
191.28
119,971.60643,557.42