RESUMENRESUMEN DE METRADOS

Obra: CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS Ubicacin: LAMUDSNIP:283218Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAFecha:Enero de 2015Hecho:E.O.J.P.

ITENDESCRIPCIONMEDIDAS UNIDADTOTAL01OBRAS PROVISIONALES01.01CARTEL IDENTIFICACIN DE OBRA 3.60 x 8.50 MUND1.0001.02ALMACEN, OFICINA Y GUARDIANIAMES4.0001.03MOVILIZACION Y DESMOVILIZACIONGLB1.0002SEGURIDAD Y SALUD02.01ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJOGLB1.0002.02EQUIPOS DE PROTECCION INDIVIDUALUND20.0002.03SEALIZACION DEL TRANSITO VEHICULAR Y SEGURIDADGLB1.0002.04CERCO DE MALLA DE PROTECCION, CINTA, TRANQUERAS, CONOSGLB1.0002.05PASES TEMPORALES VEHICULARES Y PEATONALESGLBERROR:#REF!03 PISTAS , VEREDAS Y CUNETAS03.01PISTAS 03.01.01TRABAJOS PRELIMINARES 03.01.01.01TRAZO Y REPLANTEO M28,102.2903.01.02MOVIMIENTOS DE TIERRAS03.01.02.01CORTE A NIVEL DE SUB RASANTE CON MAQUINARIA (ver plantilla de metrados )M32,912.2603.01.02.02REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN PAVIMENTOM28,078.4903.01.02.03ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPOM33,785.9403.01.03SUB BASE Y BASE 03.01.03.01SUB-BASE GRANULAR EN PAVIMENTO e= 0.20 MM28,078.4903.01.03.02BASE GRANULAR EN PAVIMENTO e= 0.20 MM28,078.4903.01.04CONCRETO SIMPLE03.01.04.01LOSA DE CONCRETO F'C=210 KG/CM2, e=0.20m, Inc/Dowls EN PAVIMENTOM28,078.4903.01.04.02ENCOFRADO Y DESENCOFRADO DE LOSA EN PAVIMENTOM22,430.3903.01.05JUNTAS Y OTROS 03.01.05.01JUNTAS MEZCLA ASFALTICA e = 1" (CONTRACCION Y DILATACION)ML6,849.4703.01.05.02ACERO LISO FY= 4200 kg/cm2 GRADO 60 - DOWELLSKG21,460.5603.02.VEREDAS Y RAMPAS03.02.01TRABAJOS PRELIMINARES 03.02.01.01DEMOLICION DE VEREDASM2404.6803.02.01.02TRAZO Y REPLANTEO M23,513.7803.02.02MOVIMIENTOS DE TIERRAS03.02.02.01CORTE HASTA NIVEL DE SUBRASANTE EN VEREDA - MANUALM3883.7503.02.02.02CORTE HASTA NIVEL DE SUBRASANTE EN RAMPAS - MANUALM327.5403.02.02.03REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN VEREDASM23,008.4403.02.02.04REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN RAMPASM2183.6003.02.02.05ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPOM31,184.6803.02.03SUB BASE Y BASE 03.02.03.01BASE GRANULAR EN VEREDAS e= 0.10 MM23,535.0003.02.03.02BASE GRANULAR EN RAMPAS e= 0.10 MM2183.6003.02.04PISOS Y PAVIMENTOS 03.02.04.01LOSA DE CONCRETO F'C=175 KG/CM2, e=0.10m, EN VEREDASM23,535.0003.02.04.02LOSA DE CONCRETO F'C=175 KG/CM2, EN RAMPASM2183.6003.02.04.03ENCOFRADO Y DESENCOFRADO EN VEREDASM21,030.7603.02.04.04ENCOFRADO Y DESENCOFRADO EN RAMPASM24.2003.02.05JUNTAS Y OTROS 03.02.05.01JUNTAS MEZCLA ASFALTICA e = 1" (CONTRACCION Y DILATACION)ML4,123.0303.03CUNETAS, ALCANTARILLAS PLUVIAL03.03.01TRABAJOS PRELIMINARES 03.03.01.01TRAZO Y REPLANTEO M21,414.3303.03.02MOVIMIENTO DE TIERRAS03.03.02.01EXCAVACION DE ZANJA PARA CUNETASM3636.4503.03.02.02EXCAVACION DE ZANJA PARA ALCANTARILLASM325.5503.03.02.03REFINE, NIVELACION, COMPACTACION DE SUBRASANTE PARA CUNETASM21,433.3403.03.02.04REFINE, NIVELACION, COMPACTACION DE SUBRASANTE PARA ALCANTARILLASM251.1003.03.02.05ELIMINACION DE MATERIAL EXCEDENTEM3860.6003.03.03CONCRETO SIMPLE03.03.03.01CONCRETO F'c= 175 Kg/cm2 PARA CUNETASM3164.7303.03.03.02CONCRETO F'C=175KG/CM2 PARA ALCANTARILLAM311.2403.03.03.03ENCOFRADO Y DESENCOFRADO PARA CUNETASM2719.3503.03.03.04ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLASM281.7603.03.03.05ACERO DE REFUERZO fy =4200kg/CM2 KG539.9303.03.04JUNTAS Y OTROS 03.03.04.01JUNTAS ASFALTICAS e=1" (CONTRACCION Y DILATACION)ML5,994.2203.03.04.02INSTALACION Y COLOCACION DE REJILLAS EN ALCANTARILLASML102.2003.05MUROS DE CONTENCION03.05.01TRABAJOS PRELIMINARES 03.05.01.01TRAZO Y REPLANTEO M2823.0403.05.02MOVIMIENTO DE TIERRAS03.05.02.01EXCAVACION DE ZANJA M31,163.1303.05.02.02REFINE, NIVELACION COMPACTACION DE SUB RASANTE EN MURO DE CONTENCION M2823.0403.05.02.03ELIMINACION DE MATERIAL EXEDENTEM31,512.0703.05.03CONCRETO ARMADO03.05.03.01CONCRETO DE F'C' =210 KG/CM2M3737.0303.05.03.02ENCOFRADO Y DESENCOFRADO PARA MUROM21,794.8503.05.03.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60KG48,976.6203.05.03.04JUNTAS ASFALTICAS e=1" (CONTRACCION Y DILATACION)ML896.4603.06SEALIZACION03.06.01PINTADO DE TRAFICO (SIMBOLOS Y LETRAS) M2200.4604.00MITIGACION E IMPACTO AMBIENTAL04.01MITIGACION DEL IMPACTO AMBIENTALGLB1.00

&G

PISTA, VEREDA, CUNETAPLANILLA DE METRADOS

Obra:CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS Ubicacin:LAMUDDistrito:LAMUDProvincia:LUYARegin:AMAZONASLUYA - AMAZONASPropietario:MUNICIPALIDAD PROVINCIAL DE LUYASNIP:283218Fecha:Enero de 2015Hecho:E.O.J.P.ITEMDESCRIPCINCANTIDADMEDIDASPARCIALUNIDAD MEDIDATOTALLargoAnchoAltoAreaVolumen01OBRAS PROVISIONALES01.01CARTEL IDENTIFICACIN DE OBRA 3.60 x 8.50 M1.001.00UND1.0001.02ALMACEN, OFICINA Y GUARDIANIA4.004.00MES4.0001.03MOVILIZACION Y DESMOVILIZACION1.001.00GLB1.0002SEGURIDAD Y SALUD02.01ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO1.001.00GLB1.00Capacitacin en Seguridad y Salubridad1.001.00UNDElaboracin Implementacin del Plan de Seguridad y Salud en el Trabajo1.001.00UND02.02EQUIPOS DE PROTECCION INDIVIDUAL20.0020.00UND20.00Casco20.0020.00UNDLentes de Policarbona luna clara20.0020.00UNDGuantes de cuero20.0020.00UNDBotas de seguridad20.0020.00UNDChalecos con cinta reflexiva20.0020.00UND02.03SEALIZACION DEL TRANSITO VEHICULAR Y SEGURIDAD1.001.00GLB1.00Sealizacin para desvio vehicular2.002.00UND02.04CERCO DE MALLA DE PROTECCION, CINTA, TRANQUERAS, CONOS1.001.00GLB1.00Malla para barricadas 50m x 1.0m50.0050.00RLLCono de Seguridad de 28"10.0010.00UNDTranquera de madera4.004.00UNDCinta de sealizacin amarillo x 200m10.0010.00RLL03 PISTAS , VEREDAS Y CUNETAS03.01PISTAS 03.01.01TRABAJOS PRELIMINARES 03.01.01.01TRAZO Y REPLANTEO M28,102.2913318.58JR. COLON (CDRA 1, 2, 3 Y 4)3,134.305139.70000.00+1.0010.005.0050.00M20010.00+1.0010.005.0050.00M20020.00+1.0010.005.0050.00M20030.00+1.0010.005.0050.00M20040.00+1.0010.005.0050.00M20050.00+1.0010.005.0050.00M20060.00+1.0010.005.0050.00M20070.00+1.0010.005.0050.00M20080.00+1.0010.003.9039.00M20090.00+1.0010.003.9039.00M20100.00+1.0010.003.9039.00M20110.00+1.0010.003.9039.00M20120.00+1.0010.003.9039.00M20130.00+1.0010.003.9039.00M20140.00+1.0010.003.7037.00M20150.00+1.0010.003.7037.00M20160.00+1.0010.003.7037.00M20170.00+1.0010.003.7037.00M20180.00+1.0010.003.7037.00M20190.00+1.0010.003.7037.00M20200.00+1.0010.003.7037.00M20210.00+1.0010.003.7037.00M20220.00+1.0010.004.2542.50M20230.00+1.0010.005.1951.90M20240.00+1.0010.005.1951.90M20250.00+1.0010.006.9069.00M20260.00+1.0010.006.9069.00M20270.00+1.0010.006.9069.00M20280.00+1.0010.006.9069.00M20290.00+1.0010.006.9069.00M20300.00+1.0010.006.9069.00M20310.00+1.0010.006.9069.00M20320.00+1.0010.006.9069.00M20330.00+1.0010.006.9069.00M20340.00+1.0010.006.9069.00M20350.00+1.0010.006.9069.00M20360.00+1.0010.006.9069.00M20370.00+1.0010.006.9069.00M20380.00+1.0010.006.9069.00M20390.00+1.0010.006.9069.00M20400.00+1.0010.006.9069.00M20410.00+1.0010.006.9069.00M20420.00+1.0010.006.9069.00M20430.00+1.0010.006.9069.00M20440.00+1.0010.006.9069.00M20450.00+1.0010.006.9069.00M20460.00+1.0010.006.9069.00M20470.00+1.0010.006.9069.00M20480.00+1.0010.006.9069.00M20490.00+1.0010.006.9069.00M20500.00+1.0010.006.9069.00M20510.00+1.0010.006.9069.00M20520.00+1.0010.006.9069.00M20530.00+1.0010.006.9069.00M20532.00+1.002.006.9013.80M2Interseccin Jr. Coln y Jr. Santo Toribio1.0043.2043.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,744.972828.930000.00+1.0010.004.7047.00M20010.00+1.0010.004.7047.00M20020.00+1.0010.004.7047.00M20030.00+1.0010.004.7047.00M20040.00+1.0010.004.7047.00M20050.00+1.0010.004.7047.00M20060.00+1.0010.004.7047.00M20070.00+1.0010.004.7047.00M20080.00+1.0010.004.7047.00M20090.00+1.0010.004.7047.00M20100.00+1.0010.004.7047.00M20110.00+1.0010.004.7047.00M20120.00+1.0010.004.7047.00M20130.00+1.0010.004.7047.00M20140.00+1.0010.004.7047.00M20150.00+1.0010.005.6056.00M20160.00+1.0010.005.6056.00M20170.00+1.0010.005.6056.00M20180.00+1.0010.005.6056.00M20190.00+1.0010.005.6056.00M20200.00+1.0010.005.6056.00M20210.00+1.0010.005.6056.00M20220.00+1.0010.005.6056.00M20230.00+1.0010.005.0050.00M20240.00+1.0010.005.0050.00M20250.00+1.0010.005.0050.00M20260.00+1.0010.005.0050.00M20270.00+1.0010.005.0050.00M20280.00+1.0010.005.0050.00M20290.00+1.0010.005.0050.00M20300.00+1.0010.005.0050.00M2Interseccin Jr. Alto Per y Jr. Garcilazo de la Vega1.0010.4510.45M2Interseccin Jr. Alto Per y Psje Sucre1.0019.9619.96M2Interseccin Jr. Alto Per y Psje San Juan1.0045.2045.20M2Interseccin Jr. Alto Per y Jr. Coln 11.0046.8746.87M2Interseccin Jr. Alto Per y Jr. Coln 21.0069.4969.49M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)2,051.393308.390000.00+1.0010.0011.61116.10M20010.00+1.0010.003.4034.00M20020.00+1.0010.003.4034.00M20030.00+1.0010.003.4034.00M20040.00+1.0010.005.3853.80M20050.00+1.0010.003.6036.00M20060.00+1.0010.003.6036.00M20070.00+1.0010.003.6036.00M20080.00+1.0010.003.6036.00M20090.00+1.0010.003.6036.00M20100.00+1.0010.003.6036.00M20110.00+1.0010.003.6036.00M20120.00+1.0010.003.6036.00M20130.00+1.0010.003.6036.00M20140.00+1.0010.003.6036.00M20150.00+1.0010.003.6036.00M20160.00+1.0010.003.6036.00M20170.00+1.0010.003.6036.00M20180.00+1.0010.003.6036.00M20190.00+1.0010.003.6036.00M20200.00+1.0010.003.6036.00M20210.00+1.0010.004.6046.00M20220.00+1.0010.004.6046.00M20230.00+1.0010.004.6046.00M20240.00+1.0010.004.6046.00M20250.00+1.0010.004.6046.00M20260.00+1.0010.004.6046.00M20270.00+1.0010.004.6046.00M20280.00+1.0010.004.6046.00M20290.00+1.0010.004.6046.00M20300.00+1.0010.004.6046.00M20310.00+1.0010.004.6046.00M20320.00+1.0010.004.6046.00M20330.00+1.0010.004.6046.00M20340.00+1.0010.004.6046.00M20350.00+1.0010.004.6046.00M20360.00+1.0010.004.6046.00M20370.00+1.0010.004.6046.00M20380.00+1.0010.004.6046.00M20390.00+1.0010.004.6046.00M20400.00+1.0010.004.6046.00M20410.00+1.0010.004.6046.00M2Interseccin Av.Alfonso Ugarte y Jr. Colon1.0042.7142.71M2Interseccin Av.Alfonso Ugarte y Jr. Bolivar1.00111.17111.17M2Interseccin Av.Alfonso Ugarte y Jr. Sucre1.0037.2137.21M2Interseccin Av.Alfonso Ugarte y Jr. San Martin1.0046.4046.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)1,171.632041.560000.00+1.0010.0014.52145.20M20010.00+1.0010.005.0750.70M20020.00+1.0010.004.2042.00M223.790030.00+1.0010.004.2042.00M20040.00+1.0010.004.2042.00M20050.00+1.0010.004.2042.00M20060.00+1.0010.004.2042.00M20070.00+1.0010.004.2042.00M20080.00+1.0010.004.2042.00M20090.00+1.0010.004.2042.00M20100.00+1.0010.004.2042.00M20110.00+1.0010.004.2042.00M20120.00+1.0010.004.2042.00M20130.00+1.0010.004.0040.00M20140.00+1.0010.004.0040.00M20150.00+1.0010.004.0040.00M20160.00+1.0010.004.0040.00M20170.00+1.0010.004.0040.00M20180.00+1.0010.004.0040.00M20190.00+1.0010.003.4034.00M20200.00+1.0010.003.4034.00M20210.00+1.0010.003.4034.00M20220.00+1.0010.003.4034.00M20230.00+1.0010.003.4034.00M20240.00+1.0010.003.4034.00M20250.00+1.0010.003.4034.00M20260.00+1.0010.003.4034.00M20263.00+1.0010.003.4034.00M2Interseccin Jr. Bolivar y Psje Santo Toribio1.0019.9819.98M2Interseccin Jr. Bolivar y Jr. Coln-1.0031.18-31.18M2Puente-1.0021.07-21.07M203.01.02MOVIMIENTOS DE TIERRAS03.01.02.01CORTE A NIVEL DE SUB RASANTE CON MAQUINARIA (ver plantilla de metrados )1.002,912.262,912.26M32,912.2603.01.02.02REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN PAVIMENTOM28,078.49JR. COLON (CDRA 1, 2, 3 Y 4)3,134.300000.00+1.0010.005.0050.00M20010.00+1.0010.005.0050.00M20020.00+1.0010.005.0050.00M20030.00+1.0010.005.0050.00M20040.00+1.0010.005.0050.00M20050.00+1.0010.005.0050.00M20060.00+1.0010.005.0050.00M20070.00+1.0010.005.0050.00M20080.00+1.0010.003.9039.00M20090.00+1.0010.003.9039.00M20100.00+1.0010.003.9039.00M20110.00+1.0010.003.9039.00M20120.00+1.0010.003.9039.00M20130.00+1.0010.003.9039.00M20140.00+1.0010.003.7037.00M20150.00+1.0010.003.7037.00M20160.00+1.0010.003.7037.00M20170.00+1.0010.003.7037.00M20180.00+1.0010.003.7037.00M20190.00+1.0010.003.7037.00M20200.00+1.0010.003.7037.00M20210.00+1.0010.003.7037.00M20220.00+1.0010.004.2542.50M20230.00+1.0010.005.1951.90M20240.00+1.0010.005.1951.90M20250.00+1.0010.006.9069.00M20260.00+1.0010.006.9069.00M20270.00+1.0010.006.9069.00M20280.00+1.0010.006.9069.00M20290.00+1.0010.006.9069.00M20300.00+1.0010.006.9069.00M20310.00+1.0010.006.9069.00M20320.00+1.0010.006.9069.00M20330.00+1.0010.006.9069.00M20340.00+1.0010.006.9069.00M20350.00+1.0010.006.9069.00M20360.00+1.0010.006.9069.00M20370.00+1.0010.006.9069.00M20380.00+1.0010.006.9069.00M20390.00+1.0010.006.9069.00M20400.00+1.0010.006.9069.00M20410.00+1.0010.006.9069.00M20420.00+1.0010.006.9069.00M20430.00+1.0010.006.9069.00M20440.00+1.0010.006.9069.00M20450.00+1.0010.006.9069.00M20460.00+1.0010.006.9069.00M20470.00+1.0010.006.9069.00M20480.00+1.0010.006.9069.00M20490.00+1.0010.006.9069.00M20500.00+1.0010.006.9069.00M20510.00+1.0010.006.9069.00M20520.00+1.0010.006.9069.00M20530.00+1.0010.006.9069.00M20532.00+1.002.006.9013.80M2Interseccin Jr. Coln y Jr. Santo Toribio1.0043.2043.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,744.970000.00+1.0010.004.7047.00M20010.00+1.0010.004.7047.00M20020.00+1.0010.004.7047.00M20030.00+1.0010.004.7047.00M20040.00+1.0010.004.7047.00M20050.00+1.0010.004.7047.00M20060.00+1.0010.004.7047.00M20070.00+1.0010.004.7047.00M20080.00+1.0010.004.7047.00M20090.00+1.0010.004.7047.00M20100.00+1.0010.004.7047.00M20110.00+1.0010.004.7047.00M20120.00+1.0010.004.7047.00M20130.00+1.0010.004.7047.00M20140.00+1.0010.004.7047.00M20150.00+1.0010.005.6056.00M20160.00+1.0010.005.6056.00M20170.00+1.0010.005.6056.00M20180.00+1.0010.005.6056.00M20190.00+1.0010.005.6056.00M20200.00+1.0010.005.6056.00M20210.00+1.0010.005.6056.00M20220.00+1.0010.005.6056.00M20230.00+1.0010.005.0050.00M20240.00+1.0010.005.0050.00M20250.00+1.0010.005.0050.00M20260.00+1.0010.005.0050.00M20270.00+1.0010.005.0050.00M20280.00+1.0010.005.0050.00M20290.00+1.0010.005.0050.00M20300.00+1.0010.005.0050.00M2Interseccin Jr. Alto Per y Jr. Garcilazo de la Vega1.0010.4510.45M2Interseccin Jr. Alto Per y Psje Sucre1.0019.9619.96M2Interseccin Jr. Alto Per y Psje San Juan1.0045.2045.20M2Interseccin Jr. Alto Per y Jr. Coln 11.0046.8746.87M2Interseccin Jr. Alto Per y Jr. Coln 21.0069.4969.49M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)2,051.390000.00+1.0010.0011.61116.10M20010.00+1.0010.003.4034.00M20020.00+1.0010.003.4034.00M20030.00+1.0010.003.4034.00M20040.00+1.0010.005.3853.80M20050.00+1.0010.003.6036.00M20060.00+1.0010.003.6036.00M20070.00+1.0010.003.6036.00M20080.00+1.0010.003.6036.00M20090.00+1.0010.003.6036.00M20100.00+1.0010.003.6036.00M20110.00+1.0010.003.6036.00M20120.00+1.0010.003.6036.00M20130.00+1.0010.003.6036.00M20140.00+1.0010.003.6036.00M20150.00+1.0010.003.6036.00M20160.00+1.0010.003.6036.00M20170.00+1.0010.003.6036.00M20180.00+1.0010.003.6036.00M20190.00+1.0010.003.6036.00M20200.00+1.0010.003.6036.00M20210.00+1.0010.004.6046.00M20220.00+1.0010.004.6046.00M20230.00+1.0010.004.6046.00M20240.00+1.0010.004.6046.00M20250.00+1.0010.004.6046.00M20260.00+1.0010.004.6046.00M20270.00+1.0010.004.6046.00M20280.00+1.0010.004.6046.00M20290.00+1.0010.004.6046.00M20300.00+1.0010.004.6046.00M20310.00+1.0010.004.6046.00M20320.00+1.0010.004.6046.00M20330.00+1.0010.004.6046.00M20340.00+1.0010.004.6046.00M20350.00+1.0010.004.6046.00M20360.00+1.0010.004.6046.00M20370.00+1.0010.004.6046.00M20380.00+1.0010.004.6046.00M20390.00+1.0010.004.6046.00M20400.00+1.0010.004.6046.00M20410.00+1.0010.004.6046.00M2Interseccin Av.Alfonso Ugarte y Jr. Colon1.0042.7142.71M2Interseccin Av.Alfonso Ugarte y Jr. Bolivar1.00111.17111.17M2Interseccin Av.Alfonso Ugarte y Jr. Sucre1.0037.2137.21M2Interseccin Av.Alfonso Ugarte y Jr. San Martin1.0046.4046.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)1,147.830000.00+1.0010.0014.52145.20M20010.00+1.0010.005.0750.70M20020.00+1.0010.004.2042.00M20030.00+1.0010.004.2042.00M20040.00+1.0010.004.2042.00M20050.00+1.0010.004.2042.00M20060.00+1.0010.004.2042.00M20070.00+1.0010.004.2042.00M20080.00+1.0010.004.2042.00M20090.00+1.0010.004.2042.00M20100.00+1.0010.004.2042.00M20110.00+1.0010.004.2042.00M20120.00+1.0010.004.2042.00M20130.00+1.0010.004.0040.00M20140.00+1.0010.004.0040.00M20150.00+1.0010.004.0040.00M20160.00+1.0010.004.0040.00M20170.00+1.0010.004.0040.00M20180.00+1.0010.004.0040.00M20190.00+1.0010.003.4034.00M20200.00+1.0010.003.4034.00M20210.00+1.0010.003.4034.00M20220.00+1.0010.003.4034.00M20230.00+1.0010.003.4034.00M20240.00+1.0010.003.4034.00M20250.00+1.0010.003.4034.00M20260.00+1.0010.003.4034.00M20263.00+1.003.003.4010.20M2Interseccin Jr. Bolivar y Psje Santo Toribio1.0019.9819.98M2Interseccin Jr. Bolivar y Jr. Coln-1.0031.18-31.18M2Puente-1.0021.07-21.07M203.01.02.03ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO1.30Espongamiento 30%2,912.263,785.94M33,785.9403.01.03SUB BASE Y BASE 03.01.03.01SUB-BASE GRANULAR EN PAVIMENTO e= 0.20 MM28,078.49JR. COLON (CDRA 1, 2, 3 Y 4)3,134.300000.00+1.0010.005.0050.00M20010.00+1.0010.005.0050.00M20020.00+1.0010.005.0050.00M20030.00+1.0010.005.0050.00M20040.00+1.0010.005.0050.00M20050.00+1.0010.005.0050.00M20060.00+1.0010.005.0050.00M20070.00+1.0010.005.0050.00M20080.00+1.0010.003.9039.00M20090.00+1.0010.003.9039.00M20100.00+1.0010.003.9039.00M20110.00+1.0010.003.9039.00M20120.00+1.0010.003.9039.00M20130.00+1.0010.003.9039.00M20140.00+1.0010.003.7037.00M20150.00+1.0010.003.7037.00M20160.00+1.0010.003.7037.00M20170.00+1.0010.003.7037.00M20180.00+1.0010.003.7037.00M20190.00+1.0010.003.7037.00M20200.00+1.0010.003.7037.00M20210.00+1.0010.003.7037.00M20220.00+1.0010.004.2542.50M20230.00+1.0010.005.1951.90M20240.00+1.0010.005.1951.90M20250.00+1.0010.006.9069.00M20260.00+1.0010.006.9069.00M20270.00+1.0010.006.9069.00M20280.00+1.0010.006.9069.00M20290.00+1.0010.006.9069.00M20300.00+1.0010.006.9069.00M20310.00+1.0010.006.9069.00M20320.00+1.0010.006.9069.00M20330.00+1.0010.006.9069.00M20340.00+1.0010.006.9069.00M20350.00+1.0010.006.9069.00M20360.00+1.0010.006.9069.00M20370.00+1.0010.006.9069.00M20380.00+1.0010.006.9069.00M20390.00+1.0010.006.9069.00M20400.00+1.0010.006.9069.00M20410.00+1.0010.006.9069.00M20420.00+1.0010.006.9069.00M20430.00+1.0010.006.9069.00M20440.00+1.0010.006.9069.00M20450.00+1.0010.006.9069.00M20460.00+1.0010.006.9069.00M20470.00+1.0010.006.9069.00M20480.00+1.0010.006.9069.00M20490.00+1.0010.006.9069.00M20500.00+1.0010.006.9069.00M20510.00+1.0010.006.9069.00M20520.00+1.0010.006.9069.00M20530.00+1.0010.006.9069.00M20532.00+1.002.006.9013.80M2Interseccin Jr. Coln y Jr. Santo Toribio1.0043.2043.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,744.970000.00+1.0010.004.7047.00M20010.00+1.0010.004.7047.00M20020.00+1.0010.004.7047.00M20030.00+1.0010.004.7047.00M20040.00+1.0010.004.7047.00M20050.00+1.0010.004.7047.00M20060.00+1.0010.004.7047.00M20070.00+1.0010.004.7047.00M20080.00+1.0010.004.7047.00M20090.00+1.0010.004.7047.00M20100.00+1.0010.004.7047.00M20110.00+1.0010.004.7047.00M20120.00+1.0010.004.7047.00M20130.00+1.0010.004.7047.00M20140.00+1.0010.004.7047.00M20150.00+1.0010.005.6056.00M20160.00+1.0010.005.6056.00M20170.00+1.0010.005.6056.00M20180.00+1.0010.005.6056.00M20190.00+1.0010.005.6056.00M20200.00+1.0010.005.6056.00M20210.00+1.0010.005.6056.00M20220.00+1.0010.005.6056.00M20230.00+1.0010.005.0050.00M20240.00+1.0010.005.0050.00M20250.00+1.0010.005.0050.00M20260.00+1.0010.005.0050.00M20270.00+1.0010.005.0050.00M20280.00+1.0010.005.0050.00M20290.00+1.0010.005.0050.00M20300.00+1.0010.005.0050.00M2Interseccin Jr. Alto Per y Jr. Garcilazo de la Vega1.0010.4510.45M2Interseccin Jr. Alto Per y Psje Sucre1.0019.9619.96M2Interseccin Jr. Alto Per y Psje San Juan1.0045.2045.20M2Interseccin Jr. Alto Per y Jr. Coln 11.0046.8746.87M2Interseccin Jr. Alto Per y Jr. Coln 21.0069.4969.49M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)2,051.390000.00+1.0010.0011.61116.10M20010.00+1.0010.003.4034.00M20020.00+1.0010.003.4034.00M20030.00+1.0010.003.4034.00M20040.00+1.0010.005.3853.80M20050.00+1.0010.003.6036.00M20060.00+1.0010.003.6036.00M20070.00+1.0010.003.6036.00M20080.00+1.0010.003.6036.00M20090.00+1.0010.003.6036.00M20100.00+1.0010.003.6036.00M20110.00+1.0010.003.6036.00M20120.00+1.0010.003.6036.00M20130.00+1.0010.003.6036.00M20140.00+1.0010.003.6036.00M20150.00+1.0010.003.6036.00M20160.00+1.0010.003.6036.00M20170.00+1.0010.003.6036.00M20180.00+1.0010.003.6036.00M20190.00+1.0010.003.6036.00M20200.00+1.0010.003.6036.00M20210.00+1.0010.004.6046.00M20220.00+1.0010.004.6046.00M20230.00+1.0010.004.6046.00M20240.00+1.0010.004.6046.00M20250.00+1.0010.004.6046.00M20260.00+1.0010.004.6046.00M20270.00+1.0010.004.6046.00M20280.00+1.0010.004.6046.00M20290.00+1.0010.004.6046.00M20300.00+1.0010.004.6046.00M20310.00+1.0010.004.6046.00M20320.00+1.0010.004.6046.00M20330.00+1.0010.004.6046.00M20340.00+1.0010.004.6046.00M20350.00+1.0010.004.6046.00M20360.00+1.0010.004.6046.00M20370.00+1.0010.004.6046.00M20380.00+1.0010.004.6046.00M20390.00+1.0010.004.6046.00M20400.00+1.0010.004.6046.00M20410.00+1.0010.004.6046.00M2Interseccin Av.Alfonso Ugarte y Jr. Colon1.0042.7142.71M2Interseccin Av.Alfonso Ugarte y Jr. Bolivar1.00111.17111.17M2Interseccin Av.Alfonso Ugarte y Jr. Sucre1.0037.2137.21M2Interseccin Av.Alfonso Ugarte y Jr. San Martin1.0046.4046.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)1,147.830000.00+1.0010.0014.52145.20M20010.00+1.0010.005.0750.70M20020.00+1.0010.004.2042.00M20030.00+1.0010.004.2042.00M20040.00+1.0010.004.2042.00M20050.00+1.0010.004.2042.00M20060.00+1.0010.004.2042.00M20070.00+1.0010.004.2042.00M20080.00+1.0010.004.2042.00M20090.00+1.0010.004.2042.00M20100.00+1.0010.004.2042.00M20110.00+1.0010.004.2042.00M20120.00+1.0010.004.2042.00M20130.00+1.0010.004.0040.00M20140.00+1.0010.004.0040.00M20150.00+1.0010.004.0040.00M20160.00+1.0010.004.0040.00M20170.00+1.0010.004.0040.00M20180.00+1.0010.004.0040.00M20190.00+1.0010.003.4034.00M20200.00+1.0010.003.4034.00M20210.00+1.0010.003.4034.00M20220.00+1.0010.003.4034.00M20230.00+1.0010.003.4034.00M20240.00+1.0010.003.4034.00M20250.00+1.0010.003.4034.00M20260.00+1.0010.003.4034.00M20263.00+1.003.003.4010.20M2Interseccin Jr. Bolivar y Psje Santo Toribio1.0019.9819.98M2Interseccin Jr. Bolivar y Jr. Coln-1.0031.18-31.18M2Puente-1.0021.07-21.07M203.01.03.02BASE GRANULAR EN PAVIMENTO e= 0.20 MM28,078.49JR. COLON (CDRA 1, 2, 3 Y 4)3,134.300000.00+1.0010.005.0050.00M20010.00+1.0010.005.0050.00M20020.00+1.0010.005.0050.00M20030.00+1.0010.005.0050.00M20040.00+1.0010.005.0050.00M20050.00+1.0010.005.0050.00M20060.00+1.0010.005.0050.00M20070.00+1.0010.005.0050.00M20080.00+1.0010.003.9039.00M20090.00+1.0010.003.9039.00M20100.00+1.0010.003.9039.00M20110.00+1.0010.003.9039.00M20120.00+1.0010.003.9039.00M20130.00+1.0010.003.9039.00M20140.00+1.0010.003.7037.00M20150.00+1.0010.003.7037.00M20160.00+1.0010.003.7037.00M20170.00+1.0010.003.7037.00M20180.00+1.0010.003.7037.00M20190.00+1.0010.003.7037.00M20200.00+1.0010.003.7037.00M20210.00+1.0010.003.7037.00M20220.00+1.0010.004.2542.50M20230.00+1.0010.005.1951.90M20240.00+1.0010.005.1951.90M20250.00+1.0010.006.9069.00M20260.00+1.0010.006.9069.00M20270.00+1.0010.006.9069.00M20280.00+1.0010.006.9069.00M20290.00+1.0010.006.9069.00M20300.00+1.0010.006.9069.00M20310.00+1.0010.006.9069.00M20320.00+1.0010.006.9069.00M20330.00+1.0010.006.9069.00M20340.00+1.0010.006.9069.00M20350.00+1.0010.006.9069.00M20360.00+1.0010.006.9069.00M20370.00+1.0010.006.9069.00M20380.00+1.0010.006.9069.00M20390.00+1.0010.006.9069.00M20400.00+1.0010.006.9069.00M20410.00+1.0010.006.9069.00M20420.00+1.0010.006.9069.00M20430.00+1.0010.006.9069.00M20440.00+1.0010.006.9069.00M20450.00+1.0010.006.9069.00M20460.00+1.0010.006.9069.00M20470.00+1.0010.006.9069.00M20480.00+1.0010.006.9069.00M20490.00+1.0010.006.9069.00M20500.00+1.0010.006.9069.00M20510.00+1.0010.006.9069.00M20520.00+1.0010.006.9069.00M20530.00+1.0010.006.9069.00M20532.00+1.002.006.9013.80M2Interseccin Jr. Coln y Jr. Santo Toribio1.0043.2043.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,744.970000.00+1.0010.004.7047.00M20010.00+1.0010.004.7047.00M20020.00+1.0010.004.7047.00M20030.00+1.0010.004.7047.00M20040.00+1.0010.004.7047.00M20050.00+1.0010.004.7047.00M20060.00+1.0010.004.7047.00M20070.00+1.0010.004.7047.00M20080.00+1.0010.004.7047.00M20090.00+1.0010.004.7047.00M20100.00+1.0010.004.7047.00M20110.00+1.0010.004.7047.00M20120.00+1.0010.004.7047.00M20130.00+1.0010.004.7047.00M20140.00+1.0010.004.7047.00M20150.00+1.0010.005.6056.00M20160.00+1.0010.005.6056.00M20170.00+1.0010.005.6056.00M20180.00+1.0010.005.6056.00M20190.00+1.0010.005.6056.00M20200.00+1.0010.005.6056.00M20210.00+1.0010.005.6056.00M20220.00+1.0010.005.6056.00M20230.00+1.0010.005.0050.00M20240.00+1.0010.005.0050.00M20250.00+1.0010.005.0050.00M20260.00+1.0010.005.0050.00M20270.00+1.0010.005.0050.00M20280.00+1.0010.005.0050.00M20290.00+1.0010.005.0050.00M20300.00+1.0010.005.0050.00M2Interseccin Jr. Alto Per y Jr. Garcilazo de la Vega1.0010.4510.45M2Interseccin Jr. Alto Per y Psje Sucre1.0019.9619.96M2Interseccin Jr. Alto Per y Psje San Juan1.0045.2045.20M2Interseccin Jr. Alto Per y Jr. Coln 11.0046.8746.87M2Interseccin Jr. Alto Per y Jr. Coln 21.0069.4969.49M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)2,051.390000.00+1.0010.0011.61116.10M20010.00+1.0010.003.4034.00M20020.00+1.0010.003.4034.00M20030.00+1.0010.003.4034.00M20040.00+1.0010.005.3853.80M20050.00+1.0010.003.6036.00M20060.00+1.0010.003.6036.00M20070.00+1.0010.003.6036.00M20080.00+1.0010.003.6036.00M20090.00+1.0010.003.6036.00M20100.00+1.0010.003.6036.00M20110.00+1.0010.003.6036.00M20120.00+1.0010.003.6036.00M20130.00+1.0010.003.6036.00M20140.00+1.0010.003.6036.00M20150.00+1.0010.003.6036.00M20160.00+1.0010.003.6036.00M20170.00+1.0010.003.6036.00M20180.00+1.0010.003.6036.00M20190.00+1.0010.003.6036.00M20200.00+1.0010.003.6036.00M20210.00+1.0010.004.6046.00M20220.00+1.0010.004.6046.00M20230.00+1.0010.004.6046.00M20240.00+1.0010.004.6046.00M20250.00+1.0010.004.6046.00M20260.00+1.0010.004.6046.00M20270.00+1.0010.004.6046.00M20280.00+1.0010.004.6046.00M20290.00+1.0010.004.6046.00M20300.00+1.0010.004.6046.00M20310.00+1.0010.004.6046.00M20320.00+1.0010.004.6046.00M20330.00+1.0010.004.6046.00M20340.00+1.0010.004.6046.00M20350.00+1.0010.004.6046.00M20360.00+1.0010.004.6046.00M20370.00+1.0010.004.6046.00M20380.00+1.0010.004.6046.00M20390.00+1.0010.004.6046.00M20400.00+1.0010.004.6046.00M20410.00+1.0010.004.6046.00M2Interseccin Av.Alfonso Ugarte y Jr. Colon1.0042.7142.71M2Interseccin Av.Alfonso Ugarte y Jr. Bolivar1.00111.17111.17M2Interseccin Av.Alfonso Ugarte y Jr. Sucre1.0037.2137.21M2Interseccin Av.Alfonso Ugarte y Jr. San Martin1.0046.4046.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)1,147.830000.00+1.0010.0014.52145.20M20010.00+1.0010.005.0750.70M20020.00+1.0010.004.2042.00M20030.00+1.0010.004.2042.00M20040.00+1.0010.004.2042.00M20050.00+1.0010.004.2042.00M20060.00+1.0010.004.2042.00M20070.00+1.0010.004.2042.00M20080.00+1.0010.004.2042.00M20090.00+1.0010.004.2042.00M20100.00+1.0010.004.2042.00M20110.00+1.0010.004.2042.00M20120.00+1.0010.004.2042.00M20130.00+1.0010.004.0040.00M20140.00+1.0010.004.0040.00M20150.00+1.0010.004.0040.00M20160.00+1.0010.004.0040.00M20170.00+1.0010.004.0040.00M20180.00+1.0010.004.0040.00M20190.00+1.0010.003.4034.00M20200.00+1.0010.003.4034.00M20210.00+1.0010.003.4034.00M20220.00+1.0010.003.4034.00M20230.00+1.0010.003.4034.00M20240.00+1.0010.003.4034.00M20250.00+1.0010.003.4034.00M20260.00+1.0010.003.4034.00M20263.00+1.003.003.4010.20M2Interseccin Jr. Bolivar y Psje Santo Toribio1.0019.9819.98M2Interseccin Jr. Bolivar y Jr. Coln-1.0031.18-31.18M2Puente-1.0021.07-21.07M203.01.04CONCRETO SIMPLE03.01.04.01LOSA DE CONCRETO F'C=210 KG/CM2, e=0.20m, Inc/Dowls EN PAVIMENTOM28,078.49JR. COLON (CDRA 1, 2, 3 Y 4)3,134.300000.00+1.0010.005.0050.00M20010.00+1.0010.005.0050.00M20020.00+1.0010.005.0050.00M20030.00+1.0010.005.0050.00M20040.00+1.0010.005.0050.00M20050.00+1.0010.005.0050.00M20060.00+1.0010.005.0050.00M20070.00+1.0010.005.0050.00M20080.00+1.0010.003.9039.00M20090.00+1.0010.003.9039.00M20100.00+1.0010.003.9039.00M20110.00+1.0010.003.9039.00M20120.00+1.0010.003.9039.00M20130.00+1.0010.003.9039.00M20140.00+1.0010.003.7037.00M20150.00+1.0010.003.7037.00M20160.00+1.0010.003.7037.00M20170.00+1.0010.003.7037.00M20180.00+1.0010.003.7037.00M20190.00+1.0010.003.7037.00M20200.00+1.0010.003.7037.00M20210.00+1.0010.003.7037.00M20220.00+1.0010.004.2542.50M20230.00+1.0010.005.1951.90M20240.00+1.0010.005.1951.90M20250.00+1.0010.006.9069.00M20260.00+1.0010.006.9069.00M20270.00+1.0010.006.9069.00M20280.00+1.0010.006.9069.00M20290.00+1.0010.006.9069.00M20300.00+1.0010.006.9069.00M20310.00+1.0010.006.9069.00M20320.00+1.0010.006.9069.00M20330.00+1.0010.006.9069.00M20340.00+1.0010.006.9069.00M20350.00+1.0010.006.9069.00M20360.00+1.0010.006.9069.00M20370.00+1.0010.006.9069.00M20380.00+1.0010.006.9069.00M20390.00+1.0010.006.9069.00M20400.00+1.0010.006.9069.00M20410.00+1.0010.006.9069.00M20420.00+1.0010.006.9069.00M20430.00+1.0010.006.9069.00M20440.00+1.0010.006.9069.00M20450.00+1.0010.006.9069.00M20460.00+1.0010.006.9069.00M20470.00+1.0010.006.9069.00M20480.00+1.0010.006.9069.00M20490.00+1.0010.006.9069.00M20500.00+1.0010.006.9069.00M20510.00+1.0010.006.9069.00M20520.00+1.0010.006.9069.00M20530.00+1.0010.006.9069.00M20532.00+1.002.006.9013.80M2Interseccin Jr. Coln y Jr. Santo Toribio1.0043.2043.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,744.970000.00+1.0010.004.7047.00M20010.00+1.0010.004.7047.00M20020.00+1.0010.004.7047.00M20030.00+1.0010.004.7047.00M20040.00+1.0010.004.7047.00M20050.00+1.0010.004.7047.00M20060.00+1.0010.004.7047.00M20070.00+1.0010.004.7047.00M20080.00+1.0010.004.7047.00M20090.00+1.0010.004.7047.00M20100.00+1.0010.004.7047.00M20110.00+1.0010.004.7047.00M20120.00+1.0010.004.7047.00M20130.00+1.0010.004.7047.00M20140.00+1.0010.004.7047.00M20150.00+1.0010.005.6056.00M20160.00+1.0010.005.6056.00M20170.00+1.0010.005.6056.00M20180.00+1.0010.005.6056.00M20190.00+1.0010.005.6056.00M20200.00+1.0010.005.6056.00M20210.00+1.0010.005.6056.00M20220.00+1.0010.005.6056.00M20230.00+1.0010.005.0050.00M20240.00+1.0010.005.0050.00M20250.00+1.0010.005.0050.00M2309.720260.00+1.0010.005.0050.00M20270.00+1.0010.005.0050.00M20280.00+1.0010.005.0050.00M20290.00+1.0010.005.0050.00M20300.00+1.0010.005.0050.00M2Interseccin Jr. Alto Per y Jr. Garcilazo de la Vega1.0010.4510.45M2Interseccin Jr. Alto Per y Psje Sucre1.0019.9619.96M2Interseccin Jr. Alto Per y Psje San Juan1.0045.2045.20M2Interseccin Jr. Alto Per y Jr. Coln 11.0046.8746.87M2Interseccin Jr. Alto Per y Jr. Coln 21.0069.4969.49M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)2,051.390000.00+1.0010.0011.61116.10M20010.00+1.0010.003.4034.00M20020.00+1.0010.003.4034.00M20030.00+1.0010.003.4034.00M20040.00+1.0010.005.3853.80M20050.00+1.0010.003.6036.00M20060.00+1.0010.003.6036.00M20070.00+1.0010.003.6036.00M20080.00+1.0010.003.6036.00M20090.00+1.0010.003.6036.00M20100.00+1.0010.003.6036.00M20110.00+1.0010.003.6036.00M20120.00+1.0010.003.6036.00M20130.00+1.0010.003.6036.00M20140.00+1.0010.003.6036.00M20150.00+1.0010.003.6036.00M20160.00+1.0010.003.6036.00M20170.00+1.0010.003.6036.00M20180.00+1.0010.003.6036.00M20190.00+1.0010.003.6036.00M20200.00+1.0010.003.6036.00M20210.00+1.0010.004.6046.00M20220.00+1.0010.004.6046.00M20230.00+1.0010.004.6046.00M20240.00+1.0010.004.6046.00M20250.00+1.0010.004.6046.00M20260.00+1.0010.004.6046.00M20270.00+1.0010.004.6046.00M20280.00+1.0010.004.6046.00M20290.00+1.0010.004.6046.00M20300.00+1.0010.004.6046.00M20310.00+1.0010.004.6046.00M20320.00+1.0010.004.6046.00M20330.00+1.0010.004.6046.00M20340.00+1.0010.004.6046.00M20350.00+1.0010.004.6046.00M20360.00+1.0010.004.6046.00M20370.00+1.0010.004.6046.00M20380.00+1.0010.004.6046.00M20390.00+1.0010.004.6046.00M20400.00+1.0010.004.6046.00M20410.00+1.0010.004.6046.00M2Interseccin Av.Alfonso Ugarte y Jr. Colon1.0042.7142.71M2Interseccin Av.Alfonso Ugarte y Jr. Bolivar1.00111.17111.17M2Interseccin Av.Alfonso Ugarte y Jr. Sucre1.0037.2137.21M2Interseccin Av.Alfonso Ugarte y Jr. San Martin1.0046.4046.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)1,147.830000.00+1.0010.0014.52145.20M20010.00+1.0010.005.0750.70M20020.00+1.0010.004.2042.00M20030.00+1.0010.004.2042.00M20040.00+1.0010.004.2042.00M20050.00+1.0010.004.2042.00M20060.00+1.0010.004.2042.00M20070.00+1.0010.004.2042.00M20080.00+1.0010.004.2042.00M20090.00+1.0010.004.2042.00M20100.00+1.0010.004.2042.00M20110.00+1.0010.004.2042.00M20120.00+1.0010.004.2042.00M20130.00+1.0010.004.0040.00M20140.00+1.0010.004.0040.00M20150.00+1.0010.004.0040.00M20160.00+1.0010.004.0040.00M20170.00+1.0010.004.0040.00M20180.00+1.0010.004.0040.00M20190.00+1.0010.003.4034.00M20200.00+1.0010.003.4034.00M20210.00+1.0010.003.4034.00M20220.00+1.0010.003.4034.00M20230.00+1.0010.003.4034.00M20240.00+1.0010.003.4034.00M20250.00+1.0010.003.4034.00M20260.00+1.0010.003.4034.00M20263.00+1.003.003.4010.20M2Interseccin Jr. Bolivar y Psje Santo Toribio1.0019.9819.98M2Interseccin Jr. Bolivar y Jr. Coln-1.0031.18-31.18M2Puente-1.0021.07-21.07M203.01.04.02ENCOFRADO Y DESENCOFRADO DE LOSA EN PAVIMENTOM22,430.39505.42JR. COLON (CDRA 1, 2, 3)Longitudinal3.00236.000.35247.80M2Transversal79.004.200.35116.13M2JR. COLON (CDRA 4)Longitudinal3.00287.530.35301.91M2Transversal96.006.900.35231.84M2JR. ALTO PERU (CDRA 1, 2 Y 3)1,516.13Longitudinal3.00319.600.35335.58M2Transversal107.005.100.35191.00M2AV. ALFONSO UGARTE (CDRA 1, 2, 3, 4, 5, 6 Y 7)Longitudinal3.00410.000.35430.50M2Transversal137.003.760.35180.29M2JR. BOLIVAR (CDRA 1, 2 Y 3)Longitudinal3.00263.000.35276.15M2Transversal88.003.870.35119.20M203.01.05JUNTAS Y OTROS 03.01.05.01JUNTAS MEZCLA ASFALTICA e = 1" (CONTRACCION Y DILATACION)ML6,849.47JR. COLON (CDRA 1, 2, 3)Longitudinal3.00236.00708.00MLTransversal79.004.20331.80MLJR. COLON (CDRA 4)Longitudinal3.00287.53862.59MLTransversal96.006.90662.40MLJR. ALTO PERU (CDRA 1, 2 Y 3)Longitudinal3.00300.00900.00MLTransversal100.005.10510.00MLAV. ALFONSO UGARTE (CDRA 6 Y 7)Longitudinal3.00410.001,230.00MLTransversal137.003.76515.12MLJR. BOLIVAR (CDRA 1, 2 Y 3)Longitudinal3.00263.00789.00MLTransversal88.003.87340.56ML03.01.05.02ACERO LISO FY= 4200 kg/cm2 GRADO 60 - DOWELLS1.00KG21,460.56JR. COLON (CDRA 1, 2, 3 Y 4)1.00Ver Planilla de Metrado de Aceros =>11,643.1911,643.19KGJR. ALTO PERU (CDRA 1, 2 Y 3)1.00Ver Planilla de Metrado de Aceros =>7,920.007,920.00KGAV. ALFONSO UGARTE (CDRA 6 Y 7)1.00Ver Planilla de Metrado de Aceros =>1,084.251,084.25KGJR. BOLIVAR (CDRA 1, 2 Y 3)1.00Ver Planilla de Metrado de Aceros =>813.12813.12KG03.02.VEREDAS Y RAMPAS03.02.01TRABAJOS PRELIMINARES 03.02.01.01DEMOLICION DE VEREDASM2404.68JR. COLON (CDRA 1, 2, 3 Y 4)1.0099.6899.68M2JR. ALTO PERU (CDRA 1, 2 Y 3)1.0094.1894.18M2JR. BOLIVAR (CDRA 1, 2 Y 3)1.00121.88121.88M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)1.0088.9488.94M203.02.01.02TRAZO Y REPLANTEO M23,513.78JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 11.0073.331.2088.00M2Vereda N 21.0074.501.2089.40M2Vereda N 31.0053.171.2063.80M2Vereda N 41.0052.501.2063.00M2Vereda N 51.0087.851.20105.42M2Vereda N 61.00109.381.20131.26M2Vereda N 71.00283.031.20339.64M2Vereda N 81.00285.381.20342.46M27.003.001.2025.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 91.00108.981.20130.78M2Vereda N 101.00115.431.20138.52M2Vereda N 111.00108.531.20130.24M2Vereda N 121.0097.631.20117.16M2Vereda N 131.0081.291.2097.55M2Vereda N 141.0076.171.2091.40M210.003.001.2036.00M2JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 151.00123.761.20148.51M2Vereda N 161.00116.521.20139.82M2Vereda N 171.0051.481.2061.78M2Vereda N 181.0052.051.2062.46M2Vereda N 191.0033.021.2039.62M2Vereda N 201.0031.131.2037.36M2Vereda N 211.0028.771.2034.52M2Vereda N 221.0029.831.2035.80M212.003.001.2043.20M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 231.0054.301.2065.16M2Vereda N 241.0057.301.2068.76M2Vereda N 251.0054.301.2065.16M2Vereda N 261.0054.301.2065.16M2Vereda N 271.0054.301.2065.16M2Vereda N 281.0054.301.2065.16M2Vereda N 291.0087.151.20104.58M2Vereda N 301.0083.331.20100.00M2Vereda N 311.0054.301.2065.16M2Vereda N 321.0057.631.2069.16M2Vereda N 331.0045.031.2054.04M2Vereda N 341.0045.181.2054.22M222.003.001.2079.20M203.02.02MOVIMIENTOS DE TIERRAS03.02.02.01CORTE HASTA NIVEL DE SUBRASANTE EN VEREDA - MANUALM3883.75JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 11.0073.991.200.2522.20M3Vereda N 21.0074.521.200.2522.36M3Vereda N 31.0053.171.200.2515.95M3Vereda N 41.0052.501.200.2515.75M3Vereda N 51.0087.851.200.2526.36M3Vereda N 61.00109.371.200.2532.81M3Vereda N 71.00329.431.200.2598.83M3Vereda N 81.00326.931.200.2598.08M3JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 91.00108.981.200.2532.69M3Vereda N 101.00115.431.200.2534.63M3Vereda N 111.00108.531.200.2532.56M3Vereda N 121.0097.631.200.2529.29M3Vereda N 131.0081.291.200.2524.39M3Vereda N 141.0076.171.200.2522.85M3JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 151.00123.761.200.2537.13M3Vereda N 161.00116.521.200.2534.96M3Vereda N 171.0051.481.200.2515.44M3Vereda N 181.0052.051.200.2515.62M3Vereda N 191.0033.021.200.259.91M3Vereda N 201.0031.131.200.259.34M3Vereda N 211.0028.771.200.258.63M3Vereda N 221.0029.831.200.258.95M3AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 231.0045.391.200.2513.62M3Vereda N 241.0041.101.200.2512.33M3Vereda N 251.0091.441.200.2527.43M3Vereda N 261.0085.851.200.2525.76M3Vereda N 271.0068.391.200.2520.52M3Vereda N 281.0076.611.200.2522.98M3Vereda N 291.0087.151.200.2526.15M3Vereda N 301.0085.331.200.2525.60M3Vereda N 311.0054.311.200.2516.29M3Vereda N 321.0057.721.200.2517.32M3Vereda N 331.0045.021.200.2513.51M3Vereda N 341.0045.171.200.2513.55M303.02.02.02CORTE HASTA NIVEL DE SUBRASANTE EN RAMPAS - MANUALM327.54JR. COLON (CDRA 1, 2, 3 Y 4)7.003.001.200.153.78M3JR. ALTO PERU (CDRA 1, 2 Y 3)10.003.001.200.155.40M3AV. ALFONSO UGARTE (CDRA 6 Y 7)12.003.001.200.156.48M3JR. BOLIVAR (CDRA 1, 2 Y 3)22.003.001.200.1511.88M303.02.02.03REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN VEREDASM23,008.44JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 11.0073.991.2088.79M2Vereda N 21.0074.521.2089.42M2Vereda N 31.0053.171.2063.80M2Vereda N 41.0052.501.2063.00M2Vereda N 51.0087.851.20105.42M2Vereda N 61.00109.371.20Vereda N 71.00329.431.20Vereda N 81.00326.931.20392.32M2JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 91.00108.981.20130.78M2Vereda N 101.00115.431.20138.52M2Vereda N 111.00108.531.20130.24M2Vereda N 121.0097.631.20117.16M2Vereda N 131.0081.291.2097.55M2Vereda N 141.0076.171.2091.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 151.00123.761.20148.51M2Vereda N 161.00116.521.20139.82M2Vereda N 171.0051.481.2061.78M2Vereda N 181.0052.051.2062.46M2Vereda N 191.0033.021.2039.62M2Vereda N 201.0031.131.2037.36M2Vereda N 211.0028.771.2034.52M2Vereda N 221.0029.831.2035.80M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 231.0045.391.2054.47M2Vereda N 241.0041.101.2049.32M2Vereda N 251.0091.441.20109.73M2Vereda N 261.0085.851.20103.02M2Vereda N 271.0068.391.2082.07M2Vereda N 281.0076.611.2091.93M2Vereda N 291.0087.151.20104.58M2Vereda N 301.0085.331.20102.40M2Vereda N 311.0054.311.2065.17M2Vereda N 321.0057.721.2069.26M2Vereda N 331.0045.021.2054.02M2Vereda N 341.0045.171.2054.20M203.02.02.04REFINE, NIVELACION, COMPACTACION DE SUBRASANTE EN RAMPASM2183.60JR. COLON (CDRA 1, 2, 3 Y 4)7.003.001.2025.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)10.003.001.2036.00M2AV. ALFONSO UGARTE (CDRA 6 Y 7)12.003.001.2043.20M2JR. BOLIVAR (CDRA 1, 2 Y 3)22.003.001.2079.20M203.02.02.05ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO1.30Espongamiento 30%911.291,184.68M31,184.6803.02.03SUB BASE Y BASE 03.02.03.01BASE GRANULAR EN VEREDAS e= 0.10 MM23,535.00JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 11.0073.991.2088.79M2Vereda N 21.0074.521.2089.42M2Vereda N 31.0053.171.2063.80M2Vereda N 41.0052.501.2063.00M2Vereda N 51.0087.851.20105.42M2Vereda N 61.00109.371.20131.24M2Vereda N 71.00329.431.20395.32M2Vereda N 81.00326.931.20392.32M2JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 91.00108.981.20130.78M2Vereda N 101.00115.431.20138.52M2Vereda N 111.00108.531.20130.24M2Vereda N 121.0097.631.20117.16M2Vereda N 131.0081.291.2097.55M2Vereda N 141.0076.171.2091.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 151.00123.761.20148.51M2Vereda N 161.00116.521.20139.82M2Vereda N 171.0051.481.2061.78M2Vereda N 181.0052.051.2062.46M2Vereda N 191.0033.021.2039.62M2Vereda N 201.0031.131.2037.36M2Vereda N 211.0028.771.2034.52M2Vereda N 221.0029.831.2035.80M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 231.0045.391.2054.47M2Vereda N 241.0041.101.2049.32M2Vereda N 251.0091.441.20109.73M2Vereda N 261.0085.851.20103.02M2Vereda N 271.0068.391.2082.07M2Vereda N 281.0076.611.2091.93M2Vereda N 291.0087.151.20104.58M2Vereda N 301.0085.331.20102.40M2Vereda N 311.0054.311.2065.17M2Vereda N 321.0057.721.2069.26M2Vereda N 331.0045.021.2054.02M2Vereda N 341.0045.171.2054.20M203.02.03.02BASE GRANULAR EN RAMPAS e= 0.10 MM2183.60JR. COLON (CDRA 1, 2, 3 Y 4)7.003.001.2025.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)10.003.001.2036.00M2AV. ALFONSO UGARTE (CDRA 6 Y 7)12.003.001.2043.20M2JR. BOLIVAR (CDRA 1, 2 Y 3)22.003.001.2079.20M203.02.04PISOS Y PAVIMENTOS 03.02.04.01LOSA DE CONCRETO F'C=175 KG/CM2, e=0.10m, EN VEREDASM23,535.00JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 11.0073.991.2088.79M2Vereda N 21.0074.521.2089.42M2Vereda N 31.0053.171.2063.80M2Vereda N 41.0052.501.2063.00M2Vereda N 51.0087.851.20105.42M2Vereda N 61.00109.371.20131.24M2Vereda N 71.00329.431.20395.32M2Vereda N 81.00326.931.20392.32M2JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 91.00108.981.20130.78M2Vereda N 101.00115.431.20138.52M2Vereda N 111.00108.531.20130.24M2Vereda N 121.0097.631.20117.16M2Vereda N 131.0081.291.2097.55M2Vereda N 141.0076.171.2091.40M2JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 151.00123.761.20148.51M2Vereda N 161.00116.521.20139.82M2Vereda N 171.0051.481.2061.78M2Vereda N 181.0052.051.2062.46M2Vereda N 191.0033.021.2039.62M2Vereda N 201.0031.131.2037.36M2Vereda N 211.0028.771.2034.52M2Vereda N 221.0029.831.2035.80M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 231.0045.391.2054.47M2Vereda N 241.0041.101.2049.32M2Vereda N 251.0091.441.20109.73M2Vereda N 261.0085.851.20103.02M2Vereda N 271.0068.391.2082.07M2Vereda N 281.0076.611.2091.93M2Vereda N 291.0087.151.20104.58M2Vereda N 301.0085.331.20102.40M2Vereda N 311.0054.311.2065.17M2Vereda N 321.0057.721.2069.26M2Vereda N 331.0045.021.2054.02M2Vereda N 341.0045.171.2054.20M203.02.04.02LOSA DE CONCRETO F'C=175 KG/CM2, EN RAMPASM2183.60JR. COLON (CDRA 1, 2, 3 Y 4)7.003.001.2025.20M2JR. ALTO PERU (CDRA 1, 2 Y 3)10.003.001.2036.00M2AV. ALFONSO UGARTE (CDRA 6 Y 7)12.003.001.2043.20M2JR. BOLIVAR (CDRA 1, 2 Y 3)22.003.001.2079.20M203.02.04.03ENCOFRADO Y DESENCOFRADO EN VEREDASM21,030.76JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 1Longitudinal1.0073.990.2518.50M2Transversal25.001.200.257.50M2Vereda N 2Longitudinal1.0074.520.2518.63M2Transversal25.001.200.257.50M2Vereda N 3Longitudinal1.0053.170.2513.29M2Transversal18.001.200.255.40M2Vereda N 4Longitudinal1.0052.500.2513.13M2Transversal18.001.200.255.40M2Vereda N 5Longitudinal1.0087.850.2521.96M2Transversal29.001.200.258.70M2Vereda N 6Longitudinal1.00109.370.2527.34M2Transversal36.001.200.2510.80M2Vereda N 7Longitudinal1.00329.430.2582.36M2Transversal110.001.200.2533.00M2Vereda N 8Longitudinal1.00326.930.2581.73M2Transversal109.001.200.2532.70M2JR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 9Longitudinal1.00108.980.2527.25M2Transversal36.001.200.2510.80M2Vereda N 10Longitudinal1.00115.430.2528.86M2Transversal38.001.200.2511.40M2Vereda N 11Longitudinal1.00108.530.2527.13M2Transversal36.001.200.2510.80M2Vereda N 12Longitudinal1.0097.630.2524.41M2Transversal33.001.200.259.90M2Vereda N 13Longitudinal1.0081.290.2520.32M2Transversal27.001.200.258.10M2Vereda N 14Longitudinal1.0076.170.2519.04M2Transversal25.001.200.257.50M2JR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 15Longitudinal1.00123.760.2530.94M2Transversal41.001.200.2512.30M2Vereda N 16Longitudinal1.00116.520.2529.13M2Transversal39.001.200.2511.70M2Vereda N 17Longitudinal1.0051.480.2512.87M2Transversal17.001.200.255.10M2Vereda N 18Longitudinal1.0052.050.2513.01M2Transversal17.001.200.255.10M2Vereda N 19Longitudinal1.0033.020.258.26M2Transversal11.001.200.253.30M2Vereda N 20Longitudinal1.0031.130.257.78M2Transversal10.001.200.253.00M2Vereda N 21Longitudinal1.0028.770.257.19M2Transversal10.001.200.253.00M2Vereda N 22Longitudinal1.0029.830.257.46M2Transversal10.001.200.253.00M2AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 23Longitudinal1.0045.390.2511.35M2Transversal15.001.200.254.50M2Vereda N 24Longitudinal1.0041.100.2510.28M2Transversal14.001.200.254.20M2Vereda N 25Longitudinal1.0091.440.2522.86M2Transversal30.001.200.259.00M2Vereda N 26Longitudinal1.0085.850.2521.46M2Transversal29.001.200.258.70M2Vereda N 27Longitudinal1.0068.390.2517.10M2Transversal23.001.200.256.90M2Vereda N 28Longitudinal1.0076.610.2519.15M2Transversal26.001.200.257.80M2Vereda N 29Longitudinal1.0087.150.2521.79M2Transversal29.001.200.258.70M2Vereda N 30Longitudinal1.0085.330.2521.33M2Transversal28.001.200.258.40M2Vereda N 31Longitudinal1.0054.310.2513.58M2Transversal18.001.200.255.40M2Vereda N 32Longitudinal1.0057.720.2514.43M2Transversal19.001.200.255.70M2Vereda N 33Longitudinal1.0045.020.2511.26M2Transversal15.001.200.254.50M2Vereda N 34Longitudinal1.0045.170.2511.29M2Transversal15.001.200.254.50M203.02.04.04ENCOFRADO Y DESENCOFRADO EN RAMPASM24.20JR. COLON (CDRA 1, 2, 3 Y 4)Longitudinal1.003.000.250.75M2Transversal1.001.200.250.30M2JR. ALTO PERU (CDRA 1, 2 Y 3)Longitudinal1.003.000.250.75M2Transversal1.001.200.250.30M2AV. ALFONSO UGARTE (CDRA 6 Y 7)Longitudinal1.003.000.250.75M2Transversal1.001.200.250.30M2JR. BOLIVAR (CDRA 1, 2 Y 3)Longitudinal1.003.000.250.75M2Transversal1.001.200.250.30M203.02.05JUNTAS Y OTROS 03.02.05.01JUNTAS MEZCLA ASFALTICA e = 1" (CONTRACCION Y DILATACION)ML4,123.03JR. COLON (CDRA 1, 2, 3 Y 4)Vereda N 1Longitudinal1.0073.9973.99MLTransversal25.001.2030.00MLVereda N 2Longitudinal1.0074.5274.52MLTransversal25.001.2030.00MLVereda N 3Longitudinal1.0053.1753.17MLTransversal18.001.2021.60MLVereda N 4Longitudinal1.0052.5052.50MLTransversal18.001.2021.60MLVereda N 5Longitudinal1.0087.8587.85MLTransversal29.001.2034.80MLVereda N 6Longitudinal1.00109.37109.37MLTransversal36.001.2043.20MLVereda N 7Longitudinal1.00329.43329.43MLTransversal110.001.20132.00MLVereda N 8Longitudinal1.00326.93326.93MLTransversal109.001.20130.80MLJR. ALTO PERU (CDRA 1, 2 Y 3)Vereda N 9Longitudinal1.00108.98108.98MLTransversal36.001.2043.20MLVereda N 10Longitudinal1.00115.43115.43MLTransversal38.001.2045.60MLVereda N 11Longitudinal1.00108.53108.53MLTransversal36.001.2043.20MLVereda N 12Longitudinal1.0097.6397.63MLTransversal33.001.2039.60MLVereda N 13Longitudinal1.0081.2981.29MLTransversal27.001.2032.40MLVereda N 14Longitudinal1.0076.1776.17MLTransversal25.001.2030.00MLJR. BOLIVAR (CDRA 1, 2 Y 3)Vereda N 15Longitudinal1.00123.76123.76MLTransversal41.001.2049.20MLVereda N 16Longitudinal1.00116.52116.52MLTransversal39.001.2046.80MLVereda N 17Longitudinal1.0051.4851.48MLTransversal17.001.2020.40MLVereda N 18Longitudinal1.0052.0552.05MLTransversal17.001.2020.40MLVereda N 19Longitudinal1.0033.0233.02MLTransversal11.001.2013.20MLVereda N 20Longitudinal1.0031.1331.13MLTransversal10.001.2012.00MLVereda N 21Longitudinal1.0028.7728.77MLTransversal10.001.2012.00MLVereda N 22Longitudinal1.0029.8329.83MLTransversal10.001.2012.00MLAV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Vereda N 23Longitudinal1.0045.3945.39MLTransversal15.001.2018.00MLVereda N 24Longitudinal1.0041.1041.10MLTransversal14.001.2016.80MLVereda N 25Longitudinal1.0091.4491.44MLTransversal30.001.2036.00MLVereda N 26Longitudinal1.0085.8585.85MLTransversal29.001.2034.80MLVereda N 27Longitudinal1.0068.3968.39MLTransversal23.001.2027.60MLVereda N 28Longitudinal1.0076.6176.61MLTransversal26.001.2031.20MLVereda N 29Longitudinal1.0087.1587.15MLTransversal29.001.2034.80MLVereda N 30Longitudinal1.0085.3385.33MLTransversal28.001.2033.60MLVereda N 31Longitudinal1.0054.3154.31MLTransversal18.001.2021.60MLVereda N 32Longitudinal1.0057.7257.72MLTransversal19.001.2022.80MLVereda N 33Longitudinal1.0045.0245.02MLTransversal15.001.2018.00MLVereda N 34Longitudinal1.0045.1745.17MLTransversal15.001.2018.00ML03.03CUNETAS, ALCANTARILLAS PLUVIAL03.03.01TRABAJOS PRELIMINARES 03.03.01.01TRAZO Y REPLANTEO M21,414.33JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 11.0072.630.5036.32M2Cunetas N 21.0060.600.4024.24M2Cunetas N 31.0061.380.5030.69M2Cunetas N 41.0044.610.4017.84M2Cunetas N 51.0095.030.5047.52M2Cunetas N 61.0092.900.4037.16M2Cunetas N 71.00289.530.50144.77M2Cunetas N 81.00290.240.40116.10M2JR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 91.00117.660.5058.83M2Cunetas N 101.00123.000.4049.20M2Cunetas N 111.00114.170.5057.09M2Cunetas N 121.00101.250.4040.50M2Cunetas N 131.0081.170.5040.59M2Cunetas N 141.0088.830.4035.53M2JR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 151.00131.330.5065.67M2Cunetas N 161.00124.230.5062.12M2Cunetas N 171.0059.170.5029.59M2Cunetas N 181.0058.530.5029.27M2Cunetas N 191.0036.670.5018.34M2Cunetas N 201.0035.300.5017.65M2Cunetas N 211.0034.930.5017.47M2Cunetas N 221.0034.430.5017.22M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)Cunetas N 231.0047.930.5023.97M2Cunetas N 241.0044.410.5022.21M2Cunetas N 251.0093.950.5046.98M2Cunetas N 261.0088.510.5044.26M2Cunetas N 271.0071.280.5035.64M2Cunetas N 281.0079.120.5039.56M2Cunetas N 291.0095.260.5047.63M2Cunetas N 301.0091.940.5045.97M2Cunetas N 311.0061.740.5030.87M2Cunetas N 321.0065.030.5032.52M2Cunetas N 331.0051.030.5025.52M2Cunetas N 341.0051.150.5025.58M203.03.02MOVIMIENTO DE TIERRAS03.03.02.01EXCAVACION DE ZANJA PARA CUNETASM3636.45JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 11.0072.630.500.4516.34M3Cunetas N 21.0060.600.400.4510.91M3Cunetas N 31.0061.380.500.4513.81M3Cunetas N 41.0044.610.400.458.03M3Cunetas N 51.0095.030.500.4521.38M3Cunetas N 61.0092.900.400.4516.72M3Cunetas N 71.00289.530.500.4565.14M3Cunetas N 81.00290.240.400.4552.24M3JR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 91.00117.660.500.4526.47M3Cunetas N 101.00123.000.400.4522.14M3Cunetas N 111.00114.170.500.4525.69M3Cunetas N 121.00101.250.400.4518.23M3Cunetas N 131.0081.170.500.4518.26M3Cunetas N 141.0088.830.400.4515.99M3JR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 151.00131.330.500.4529.55M3Cunetas N 161.00124.230.500.4527.95M3Cunetas N 171.0059.170.500.4513.31M3Cunetas N 181.0058.530.500.4513.17M3Cunetas N 191.0036.670.500.458.25M3Cunetas N 201.0035.300.500.457.94M3Cunetas N 211.0034.930.500.457.86M3Cunetas N 221.0034.430.500.457.75M3AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)Cunetas N 231.0047.930.500.4510.78M3Cunetas N 241.0044.410.500.459.99M3Cunetas N 251.0093.950.500.4521.14M3Cunetas N 261.0088.510.500.4519.91M3Cunetas N 271.0071.280.500.4516.04M3Cunetas N 281.0079.120.500.4517.80M3Cunetas N 291.0095.260.500.4521.43M3Cunetas N 301.0091.940.500.4520.69M3Cunetas N 311.0061.740.500.4513.89M3Cunetas N 321.0065.030.500.4514.63M3Cunetas N 331.0051.030.500.4511.48M3Cunetas N 341.0051.150.500.4511.51M303.03.02.02EXCAVACION DE ZANJA PARA ALCANTARILLASM325.55JR. COLON (CDRA 1, 2, 3 Y 4)Alcantarillas N 11.005.650.500.501.41M3Alcantarillas N 21.004.650.500.501.16M3Alcantarillas N 31.007.150.500.501.79M3Alcantarillas N 41.005.150.500.501.29M3Alcantarillas N 51.007.250.500.501.81M3Alcantarillas N 61.007.650.500.501.91M3JR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarillas N 71.008.300.500.502.08M3Alcantarillas N 81.005.750.500.501.44M3JR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarillas N 91.006.500.500.501.63M3AV. ALFONSO UGARTE (CDRA 6 Y 7)Alcantarillas N 101.005.200.500.501.30M3Alcantarillas N 111.004.250.500.501.06M3Alcantarillas N 121.006.900.500.501.73M3Alcantarillas N 131.005.500.500.501.38M3Alcantarillas N 141.004.700.500.501.18M3Alcantarillas N 151.005.800.500.501.45M3Alcantarillas N 161.005.300.500.501.33M3Alcantarillas N 171.006.500.500.501.63M303.03.02.03REFINE, NIVELACION, COMPACTACION DE SUBRASANTE PARA CUNETASM21,433.34JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 11.0072.630.5036.32M2Cunetas N 21.0060.600.4024.24M2Cunetas N 31.0061.380.5030.69M2Cunetas N 41.0044.610.4017.84M2Cunetas N 51.0095.030.5047.52M2Cunetas N 61.0092.900.4037.16M2Cunetas N 71.00289.530.50144.77M2Cunetas N 81.00290.240.40116.10M2JR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 91.00117.660.5058.83M2Cunetas N 101.00123.000.4049.20M2Cunetas N 111.00114.170.5057.09M2Cunetas N 121.00101.250.5050.63M2Cunetas N 131.0081.170.5040.59M2Cunetas N 141.0088.830.5044.42M2JR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 151.00131.330.5065.67M2Cunetas N 161.00124.230.5062.12M2Cunetas N 171.0059.170.5029.59M2Cunetas N 181.0058.530.5029.27M2Cunetas N 191.0036.670.5018.34M2Cunetas N 201.0035.300.5017.65M2Cunetas N 211.0034.930.5017.47M2Cunetas N 221.0034.430.5017.22M2AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)Cunetas N 231.0047.930.5023.97M2Cunetas N 241.0044.410.5022.21M2Cunetas N 251.0093.950.5046.98M2Cunetas N 261.0088.510.5044.26M2Cunetas N 271.0071.280.5035.64M2Cunetas N 281.0079.120.5039.56M2Cunetas N 291.0095.260.5047.63M2Cunetas N 301.0091.940.5045.97M2Cunetas N 311.0061.740.5030.87M2Cunetas N 321.0065.030.5032.52M2Cunetas N 331.0051.030.5025.52M2Cunetas N 341.0051.150.5025.58M203.03.02.04REFINE, NIVELACION, COMPACTACION DE SUBRASANTE PARA ALCANTARILLASM251.10JR. COLON (CDRA 1, 2, 3 Y 4)Alcantarillas N 11.005.650.502.83M2Alcantarillas N 21.004.650.502.33M2Alcantarillas N 31.007.150.503.58M2Alcantarillas N 41.005.150.502.58M2Alcantarillas N 51.007.250.503.63M2Alcantarillas N 61.007.650.503.83M2JR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarillas N 71.008.300.504.15M2Alcantarillas N 81.005.750.502.88M2JR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarillas N 91.006.500.503.25M2AV. ALFONSO UGARTE (CDRA 6 Y 7)Alcantarillas N 101.005.200.502.60M2Alcantarillas N 111.004.250.502.13M2Alcantarillas N 121.006.900.503.45M2Alcantarillas N 131.005.500.502.75M2Alcantarillas N 141.004.700.502.35M2Alcantarillas N 151.005.800.502.90M2Alcantarillas N 161.005.300.502.65M2Alcantarillas N 171.006.500.503.25M203.03.02.05ELIMINACION DE MATERIAL EXCEDENTE1.00esponjamiento = 30%1.30662.00860.60M3860.6003.03.03CONCRETO SIMPLE03.03.03.01CONCRETO F'c= 175 Kg/cm2 PARA CUNETASM3164.73JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 1Lateral Derecho1.0072.630.240.101.74M3Losa de Fondo1.0072.630.330.102.40M3Cunetas N 2Lateral Izquierdo1.0060.600.240.101.45M3Losa de Fondo1.0060.600.230.101.39M3Cunetas N 3Lateral Derecho1.0061.380.240.101.47M3Losa de Fondo1.0061.380.330.102.03M3Cunetas N 4Lateral Izquierdo1.0044.610.240.101.07M3Losa de Fondo1.0044.610.230.101.03M3Cunetas N 5Lateral Derecho1.0095.030.240.102.28M3Losa de Fondo1.0095.030.330.103.14M3Cunetas N 6Lateral Izquierdo1.0092.900.240.102.23M3Losa de Fondo1.0092.900.230.102.14M3Cunetas N 7Lateral Derecho1.00289.600.240.106.95M3Losa de Fondo1.00289.600.330.109.56M3Cunetas N 8Lateral Izquierdo1.00290.240.240.106.97M3Losa de Fondo1.00290.240.230.106.68M3JR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 9Lateral Derecho1.00117.660.240.102.82M3Losa de Fondo1.00117.660.330.103.88M3Cunetas N 10Lateral Izquierdo1.00123.000.240.102.95M3Losa de Fondo1.00123.000.230.102.83M3Cunetas N 11Lateral Derecho1.00114.170.240.102.74M3Losa de Fondo1.00114.170.330.103.77M3Cunetas N 12Lateral Izquierdo1.00101.250.240.102.43M3Losa de Fondo1.00101.250.330.103.34M3Cunetas N 13Lateral Derecho1.0089.170.240.102.14M3Losa de Fondo1.0089.170.330.102.94M3Cunetas N 14Lateral Izquierdo1.0088.830.240.102.13M3Losa de Fondo1.0088.830.330.102.93M3JR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 15Lateral Derecho e Izquierdo1.00131.330.240.103.15M3Losa de Fondo1.00131.330.330.104.33M3Cunetas N 16Lateral Derecho e Izquierdo1.00124.530.240.102.99M3Losa de Fondo1.00124.530.330.104.11M3Cunetas N 17Lateral Derecho e Izquierdo1.0059.170.240.101.42M3Losa de Fondo1.0059.170.330.101.95M3Cunetas N 18Lateral Derecho e Izquierdo1.0058.530.240.101.40M3Losa de Fondo1.0058.530.330.101.93M3Cunetas N 19Lateral Derecho e Izquierdo1.0036.670.240.100.88M3Losa de Fondo1.0036.670.330.101.21M3Cunetas N 20Lateral Derecho e Izquierdo1.0035.300.240.100.85M3Losa de Fondo1.0035.300.330.101.16M3Cunetas N 21Lateral Derecho e Izquierdo1.0034.930.240.100.84M3Losa de Fondo1.0034.930.330.101.15M3Cunetas N 22Lateral Derecho e Izquierdo1.0034.430.240.100.83M3Losa de Fondo1.0034.430.330.101.14M3AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)Cunetas N 23Lateral Derecho1.0047.930.240.101.15M3Losa de Fondo1.0047.930.330.101.58M3Cunetas N 24Lateral Izquierdo1.0044.410.240.101.07M3Losa de Fondo1.0044.410.330.101.47M3Cunetas N 25Lateral Derecho1.0093.950.240.102.25M3Losa de Fondo1.0093.950.330.103.10M3Cunetas N 26Lateral Izquierdo1.0088.510.240.102.12M3Losa de Fondo1.0088.510.330.102.92M3Cunetas N 27Lateral Derecho1.0071.280.240.101.71M3Losa de Fondo1.0071.280.330.102.35M3Cunetas N 28Lateral Izquierdo1.0079.120.240.101.90M3Losa de Fondo1.0079.120.330.102.61M3Cunetas N 29Lateral Derecho1.0095.260.240.102.29M3Losa de Fondo1.0095.260.330.103.14M3Cunetas N 30Lateral Izquierdo1.0091.940.240.102.21M3Losa de Fondo1.0091.940.330.103.03M3Cunetas N 31Lateral Derecho1.0061.740.240.101.48M3Losa de Fondo1.0061.740.330.102.04M3Cunetas N 32Lateral Izquierdo1.0065.030.240.101.56M3Losa de Fondo1.0065.030.330.102.15M3Cunetas N 33Lateral Derecho1.0051.030.240.101.22M3Losa de Fondo1.0051.030.330.101.68M3Cunetas N 34Lateral Izquierdo1.0051.150.240.101.23M3Losa de Fondo1.0051.150.330.101.69M303.03.03.02CONCRETO F'C=175KG/CM2 PARA ALCANTARILLAM311.24JR. COLON (CDRA 1, 2, 3 Y 4)Alcantarillas N 1Lateral Derecho e Izquierdo2.005.650.100.400.45M3Losa de Fondo1.005.650.300.100.17M3Alcantarillas N 2Lateral Derecho e Izquierdo2.004.650.100.400.37M3Losa de Fondo1.004.650.300.100.14M3Alcantarillas N 3Lateral Derecho e Izquierdo2.007.150.100.400.57M3Losa de Fondo1.007.150.300.100.21M3Alcantarillas N 4Lateral Derecho e Izquierdo2.005.150.100.400.41M3Losa de Fondo1.005.150.300.100.15M3Alcantarillas N 5Lateral Derecho e Izquierdo2.007.250.100.400.58M3Losa de Fondo1.007.250.300.100.22M3Alcantarillas N 6Lateral Derecho e Izquierdo2.007.650.100.400.61M3Losa de Fondo1.007.650.300.100.23M3JR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarillas N 7Lateral Derecho e Izquierdo2.008.300.100.400.66M3Losa de Fondo1.008.300.300.100.25M3Alcantarillas N 8Lateral Derecho e Izquierdo2.005.750.100.400.46M3Losa de Fondo1.005.750.300.100.17M3JR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarillas N 9Lateral Derecho e Izquierdo2.006.500.100.400.52M3Losa de Fondo1.006.500.300.100.20M3AV. ALFONSO UGARTE (CDRA 6 Y 7)Alcantarillas N 10Lateral Derecho e Izquierdo2.005.200.100.400.42M3Losa de Fondo1.005.200.300.100.16M3Alcantarillas N 11Lateral Derecho e Izquierdo2.004.250.100.400.34M3Losa de Fondo1.004.250.300.100.13M3Alcantarillas N 12Lateral Derecho e Izquierdo2.006.900.100.400.55M3Losa de Fondo1.006.900.300.100.21M3Alcantarillas N 13Lateral Derecho e Izquierdo2.005.500.100.400.44M3Losa de Fondo1.005.500.300.100.17M3Alcantarillas N 14Lateral Derecho e Izquierdo2.004.700.100.400.38M3Losa de Fondo1.004.700.300.100.14M3Alcantarillas N 15Lateral Derecho e Izquierdo2.005.800.100.400.46M3Losa de Fondo1.005.800.300.100.17M3Alcantarillas N 16Lateral Derecho e Izquierdo2.005.300.100.400.42M3Losa de Fondo1.005.300.300.100.16M3Alcantarillas N 17Lateral Derecho e Izquierdo2.006.500.100.400.52M3Losa de Fondo1.006.500.300.100.20M303.03.03.03ENCOFRADO Y DESENCOFRADO PARA CUNETASM2719.35JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 1Lateral Derecho1.0072.630.2417.43M2Cunetas N 2Lateral Izquierdo1.0060.600.2414.54M2Cunetas N 3Lateral Derecho1.0061.380.2414.73M2Cunetas N 4Lateral Izquierdo1.0044.610.2410.71M2Cunetas N 5Lateral Derecho1.0095.030.2422.81M2Cunetas N 6Lateral Izquierdo1.0092.900.2422.30M2Cunetas N 7Lateral Derecho1.00289.600.2469.50M2Cunetas N 8Lateral Izquierdo1.00290.240.2469.66M2JR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 9Lateral Derecho e Izquierdo1.00117.660.2428.24M2Cunetas N 10Lateral Derecho e Izquierdo1.00123.000.2429.52M2Cunetas N 11Lateral Derecho e Izquierdo1.00114.170.2427.40M2Cunetas N 12Lateral Derecho e Izquierdo1.00101.250.2424.30M2Cunetas N 13Lateral Derecho e Izquierdo1.0089.170.2421.40M2Cunetas N 14Lateral Derecho e Izquierdo1.0088.830.2421.32M2JR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 15Lateral Derecho e Izquierdo1.00131.330.2431.52M2Cunetas N 16Lateral Derecho e Izquierdo1.00124.530.2429.89M2Cunetas N 17Lateral Derecho e Izquierdo1.0059.170.2414.20M2Cunetas N 18Lateral Derecho e Izquierdo1.0058.530.2414.05M2Cunetas N 19Lateral Derecho e Izquierdo1.0036.670.248.80M2Cunetas N 20Lateral Derecho e Izquierdo1.0035.300.248.47M2Cunetas N 21Lateral Derecho e Izquierdo1.0034.930.248.38M2Cunetas N 22Lateral Derecho e Izquierdo1.0034.430.248.26M2AV. ALFONSO UGARTE (CDRA 6 Y 7)Cunetas N 23Lateral Derecho e Izquierdo1.0047.930.2411.50M2Cunetas N 24Lateral Derecho e Izquierdo1.0044.410.2410.66M2Cunetas N 25Lateral Derecho e Izquierdo1.0093.950.2422.55M2Cunetas N 26Lateral Derecho e Izquierdo1.0088.510.2421.24M2Cunetas N 27Lateral Derecho e Izquierdo1.0071.280.2417.11M2Cunetas N 28Lateral Derecho e Izquierdo1.0079.120.2418.99M2Cunetas N 29Lateral Derecho e Izquierdo1.0095.260.2422.86M2Cunetas N 30Lateral Derecho e Izquierdo1.0091.940.2422.07M2Cunetas N 31Lateral Derecho e Izquierdo1.0061.740.2414.82M2Cunetas N 32Lateral Derecho e Izquierdo1.0065.030.2415.61M2Cunetas N 33Lateral Derecho e Izquierdo1.0051.030.2412.25M2Cunetas N 34Lateral Derecho e Izquierdo1.0051.150.2412.28M203.03.03.04ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLASM281.76JR. COLON (CDRA 1, 2, 3 Y 4)Alcantarillas N 1Lateral Derecho e Izquierdo2.005.650.404.52M2Alcantarillas N 2Lateral Derecho e Izquierdo2.004.650.403.72M2Alcantarillas N 3Lateral Derecho e Izquierdo2.007.150.405.72M2Alcantarillas N 4Lateral Derecho e Izquierdo2.005.150.404.12M2Alcantarillas N 5Lateral Derecho e Izquierdo2.007.250.405.80M2Alcantarillas N 6Lateral Derecho e Izquierdo2.007.650.406.12M2JR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarillas N 7Lateral Derecho e Izquierdo2.008.300.406.64M2Alcantarillas N 8Lateral Derecho e Izquierdo2.005.750.404.60M2JR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarillas N 9Lateral Derecho e Izquierdo2.006.500.405.20M2AV. ALFONSO UGARTE (CDRA 6 Y 7)Alcantarillas N 10Lateral Derecho e Izquierdo2.005.200.404.16M2Alcantarillas N 11Lateral Derecho e Izquierdo2.004.250.403.40M2Alcantarillas N 12Lateral Derecho e Izquierdo2.006.900.405.52M2Alcantarillas N13Lateral Derecho e Izquierdo2.005.500.404.40M2Alcantarillas N 14Lateral Derecho e Izquierdo2.004.700.403.76M2Alcantarillas N 15Lateral Derecho e Izquierdo2.005.800.404.64M2Alcantarillas N 16Lateral Derecho e Izquierdo2.005.300.404.24M2Alcantarillas N 17Lateral Derecho e Izquierdo2.006.500.405.20M203.03.03.05ACERO DE REFUERZO fy =4200kg/CM2 1.00Ver Planilla de Metrado de Aceros =>539.93539.93KG539.9303.03.04JUNTAS Y OTROS 03.03.04.01JUNTAS ASFALTICAS e=1" (CONTRACCION Y DILATACION)1.00ML5,994.22JR. COLON (CDRA 1, 2, 3 Y 4)Cunetas N 1Lateral Derecho e Izquierdo2.0072.63145.26MLCunetas N 2Lateral Derecho e Izquierdo2.0060.60121.20MLCunetas N 3Lateral Derecho e Izquierdo2.0061.38122.76MLCunetas N 4Lateral Derecho e Izquierdo2.0044.6189.22MLCunetas N 5Lateral Derecho e Izquierdo2.0095.03190.06MLCunetas N 6Lateral Derecho e Izquierdo2.0092.90185.80MLCunetas N 7Lateral Derecho e Izquierdo2.00289.60579.20MLCunetas N 8Lateral Derecho e Izquierdo2.00290.24580.48MLJR. ALTO PERU (CDRA 1, 2 Y 3)Cunetas N 9Lateral Derecho e Izquierdo2.00117.66235.32MLCunetas N 10Lateral Derecho e Izquierdo2.00123.00246.00MLCunetas N 11Lateral Derecho e Izquierdo2.00114.17228.34MLCunetas N 12Lateral Derecho e Izquierdo2.00101.25202.50MLCunetas N 13Lateral Derecho e Izquierdo2.0089.17178.34MLCunetas N 14Lateral Derecho e Izquierdo2.0088.83177.66MLJR. BOLIVAR (CDRA 1, 2 Y 3)Cunetas N 15Lateral Derecho e Izquierdo2.00131.33262.66MLCunetas N 16Lateral Derecho e Izquierdo2.00124.23248.46MLCunetas N 17Lateral Derecho e Izquierdo2.0059.17118.34MLCunetas N 18Lateral Derecho e Izquierdo2.0058.63117.26MLCunetas N 19Lateral Derecho e Izquierdo2.0036.6773.34MLCunetas N 20Lateral Derecho e Izquierdo2.0035.3070.60MLCunetas N 21Lateral Derecho e Izquierdo2.0034.9369.86MLCunetas N 22Lateral Derecho e Izquierdo2.0034.4368.86MLAV. ALFONSO UGARTE (CDRA 6 Y 7)Cunetas N 23Lateral Derecho e Izquierdo2.0047.9395.86MLCunetas N 24Lateral Derecho e Izquierdo2.0044.4188.82MLCunetas N 25Lateral Derecho e Izquierdo2.0093.95187.90MLCunetas N 26Lateral Derecho e Izquierdo2.0088.51177.02MLCunetas N 27Lateral Derecho e Izquierdo2.0071.28142.56MLCunetas N 28Lateral Derecho e Izquierdo2.0079.12158.24MLCunetas N 29Lateral Derecho e Izquierdo2.0095.26190.52MLCunetas N 30Lateral Derecho e Izquierdo2.0091.94183.88MLCunetas N 31Lateral Derecho e Izquierdo2.0061.74123.48MLCunetas N 32Lateral Derecho e Izquierdo2.0065.03130.06MLCunetas N 33Lateral Derecho e Izquierdo2.0051.03102.06MLCunetas N 34Lateral Derecho e Izquierdo2.0051.15102.30ML03.03.04.02INSTALACION Y COLOCACION DE REJILLAS EN ALCANTARILLASML102.20JR. COLON (CDRA 1, 2, 3 Y 4) Alcantarillas N 11.005.655.65MLAlcantarillas N 21.004.654.65MLAlcantarillas N 31.007.157.15MLAlcantarillas N 41.005.155.15MLAlcantarillas N 51.007.257.25MLAlcantarillas N 61.007.657.65MLJR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarillas N 71.008.308.30MLAlcantarillas N 81.005.755.75MLJR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarillas N 91.006.506.50MLAV. ALFONSO UGARTE (CDRA 6 Y 7)Alcantarillas N 101.005.205.20MLAlcantarillas N 111.004.254.25MLAlcantarillas N 121.006.906.90MLAlcantarillas N 131.005.505.50MLAlcantarillas N 141.004.704.70MLAlcantarillas N 151.005.805.80MLAlcantarillas N 161.005.305.30MLAlcantarillas N 171.006.506.50ML03.05MUROS DE CONTENCION03.05.01TRABAJOS PRELIMINARES 03.05.01.01TRAZO Y REPLANTEO M2823.04JR. COLON (CDRA 1, 2, y 3)1.00221.511.35299.04M2JR. COLON (CDRA 4)1.00284.701.35384.35M2JR. ALTO PERU1.00103.451.35139.66M203.05.02MOVIMIENTO DE TIERRAS03.05.02.01EXCAVACION DE ZANJA M31,163.13JR. COLON (CDRA 1, 2, y 3)1.00221.511.351.60478.46M3JR. COLON (CDRA 4)1.00284.701.351.20461.21M3JR. ALTO PERU1.00103.451.351.60223.45M303.05.02.02REFINE, NIVELACION COMPACTACION DE SUB RASANTE EN MURO DE CONTENCION M2823.04JR. COLON (CDRA 1, 2, y 3)1.00221.511.35299.04M2JR. COLON (CDRA 4)1.00284.701.35384.35M2JR. ALTO PERU1.00103.451.35139.66M203.05.02.03ELIMINACION DE MATERIAL EXEDENTE1.30Espojamiento 30%1,163.131,512.07M31,512.0703.05.03CONCRETO ARMADO03.05.03.01CONCRETO DE F'C' =210 KG/CM2M3737.03JR. COLON (CDRA 1, 2, y 3)Zapata 1.00221.511.350.40119.62M3Muro1.00221.510.251.6088.60M3JR. COLON (CDRA 4)Zapata 1.00284.701.350.40153.74M3Muro1.00284.700.251.2085.41M3JR. ALTO PERUZapata 1.00103.451.400.4057.93M3Muro1.00103.451.401.60231.73M303.05.03.02ENCOFRADO Y DESENCOFRADO PARA MUROM21,794.85JR. COLON (CDRA 1, 2, y 3)Muro Lateral Derecho e Izquierdo2.00221.511.60708.83M2Transversal74.000.251.6029.60M2JR. COLON (CDRA 4)Muro Lateral Derecho e Izquierdo2.00284.701.20683.28M2Transversal95.000.251.2028.50M2JR. ALTO PERUMuro Lateral Derecho e Izquierdo2.00103.451.60331.04M2Transversal34.000.251.6013.60M203.05.03.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 601.00Ver Planilla de Metrado de Aceros =>48,976.6248,976.62KG48,976.6203.05.03.04JUNTAS ASFALTICAS e=1" (CONTRACCION Y DILATACION)ML896.46JR. COLON (CDRA 1, 2, y 3)Muro Lateral Derecho1.00221.51221.51MLTransversal74.001.60118.40MLJR. COLON (CDRA 4)Muro Lateral Derecho1.00284.70284.70MLTransversal95.001.20114.00MLJR. ALTO PERUMuro Laterales Derecho1.00103.45103.45MLTransversal34.001.6054.40ML03.06SEALIZACION03.06.01PINTADO DE TRAFICO (SIMBOLOS Y LETRAS) M2200.46JR. COLON (CDRA 1, 2, 3 Y 4)

==>C21.009.309.30M2==>C31.0011.3011.30M2==>C43.007.6022.80M2

==>7.001.309.10M2

==>2.001.783.56M2

==>1.002.062.06M2

JR. ALTO PERU (CDRA 1, 2 Y 3)

==>C11.0011.2011.20M2==>C21.0010.8010.80M2==>C31.0013.1013.10M2

==>3.001.303.90M2

==>2.001.783.56M2

==>1.002.062.06M2

AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)

==>C21.007.607.60M2==>C31.0015.1015.10M2==>C4,52.007.7015.40M2==>C61.009.609.60M2

==>11.001.3014.30M2

JR. BOLIVAR (CDRA 1, 2 Y 3)

==>C11.009.409.40M2==>C21.009.309.30M2==>C31.007.507.50M2

==>3.001.303.90M2

==>2.001.783.56M2

==>1.002.062.06M2

04.00MITIGACION E IMPACTO AMBIENTAL04.01MITIGACION DEL IMPACTO AMBIENTAL1.00M213,318.58Recuperacion de las Areas Intervenidas1.0013,318.5813,318.58M2

MOVIMIENTO DE TIERRAPLANILLA DE METRADOS DE MOVIMIENTO DE TIERRA

Obra: CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS

Ubicacin: LAMUDSNIP:283218Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAFecha:Enero de 2015Hecho:E.O.J.P.

03.01.02.01CORTE A NIVEL DE SUB RASANTE CON MAQUINARIAProgresivaDistancia (m)Area (m2)Volumen (m3)ParcialAcumuladaCorteRellenoCorteRellenoJR. COLON (CDRA 1, 2, 3 Y 4)0000.00+0.000.002.750.000.000.000020.00+20.0020.003.490.0062.400.000040.00+20.0040.003.140.0066.350.000060.00+20.0060.002.250.0053.950.000080.00+20.0080.002.580.0048.300.000100.00+20.00100.002.100.0046.800.000120.00+20.00120.001.600.0037.000.000140.00+20.00140.002.510.0041.100.000160.00+20.00160.003.320.0058.300.000180.00+20.00180.004.350.0076.700.000200.00+20.00200.002.160.0065.100.000220.00+20.00220.001.800.0039.600.000240.00+20.00240.001.990.0037.900.000260.00+20.00260.001.940.0039.300.000280.00+20.00280.002.340.0042.800.000300.00+20.00300.002.400.0047.400.000320.00+20.00320.002.210.0046.100.000340.00+20.00340.002.070.0042.800.000360.00+20.00360.002.170.0042.400.000380.00+20.00380.000.470.0026.400.000400.00+20.00400.002.680.0031.500.000420.00+20.00420.001.280.0039.600.000440.00+20.00440.002.990.0042.700.000460.00+20.00460.002.050.0050.400.000480.00+20.00480.001.860.0039.100.000500.00+20.00500.001.140.0030.000.000520.00+20.00520.002.190.0033.300.000532.00+12.00532.003.340.0033.180.00Total532.0065.170.001,220.480.00

JR. ALTO PERU (CDRA 1, 2 Y 3)0000.00+0.000.003.510.000.000.000020.00+20.0020.002.550.0060.600.000040.00+20.0040.000.000.0025.500.000060.00+20.0060.000.000.000.000.000080.00+20.0080.002.320.0023.200.000100.00+20.00100.002.420.0047.400.000120.00+20.00120.002.870.0052.900.000140.00+20.00140.005.310.0081.800.000160.00+20.00160.001.430.0067.400.000180.00+20.00180.000.200.0016.260.000200.00+20.00200.002.060.0022.560.000220.00+20.00220.004.050.0061.100.000240.00+20.00240.001.570.0056.200.000260.00+20.00260.002.500.0040.700.000280.00+20.00280.000.200.0027.000.000300.00+20.00300.002.940.0031.400.00Total300.0030.420.00614.010.00

AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)0000.00+0.000.001.860.000.000.000020.00+20.0020.002.350.0042.100.000040.00+20.0040.002.160.0045.100.000060.00+20.0060.001.960.0041.200.000080.00+20.0080.002.020.0039.800.000100.00+20.00100.001.560.0035.800.000120.00+20.00120.003.250.0048.100.000140.00+20.00140.001.530.0047.800.000160.00+20.00160.001.360.0028.900.000180.00+20.00180.001.250.0026.100.000200.00+20.00200.001.330.0025.800.000220.00+20.00220.001.900.0032.300.000240.00+20.00240.001.250.0031.500.000260.00+20.00260.001.270.0025.200.000280.00+20.00280.001.250.0025.200.000300.00+20.00300.001.520.0027.700.000320.00+20.00320.001.620.0031.400.000340.00+20.00340.001.420.0030.400.000360.00+20.00360.001.380.0028.000.000380.00+20.00380.001.690.0030.700.000400.00+20.00400.002.620.0043.100.000410.00+10.00410.002.320.0024.700.00Total410.0037.010.00710.900.00

JR. BOLIVAR (CDRA 1, 2 Y 3)0000.00+0.000.006.650.000.000.000020.00+20.0020.001.770.0084.200.000040.00+20.0040.001.160.0029.300.000060.00+20.0060.001.160.0023.200.000080.00+20.0080.000.850.0020.100.000100.00+20.00100.000.120.009.700.000120.00+20.00120.001.270.0013.900.000140.00+20.00140.002.660.0039.300.000160.00+20.00160.000.740.0034.000.000180.00+20.00180.000.000.007.400.000200.00+20.00200.001.610.0016.100.000220.00+20.00220.000.750.0023.600.000240.00+20.00240.001.700.0024.500.000260.00+20.00260.001.700.0034.000.000263.00+3.00263.003.350.007.580.00Total263.0018.840.00366.880.00

Resumen de Movimiento de TierraRESUMEN DE METRADOS

Obra: CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS Ubicacin: LAMUDSNIP:283218Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAFecha:Enero de 2015Hecho:E.O.J.P.ItemCalleDistanciaArea (m2)Volumen (m3)ACARVCVR1JR. COLON (CDRA 1, 2, 3 Y 4)532.0065.170.001,220.480.002JR. ALTO PERU (CDRA 1, 2 Y 3)300.0030.420.00614.010.003AV. ALFONSO UGARTE (CDRA 2, 3, 4, 5, 6 Y 7)410.0037.010.00710.900.004JR. BOLIVAR (CDRA 1, 2 Y 3)263.0018.840.00366.880.00Total1,505.00151.440.002,912.260.00

ACERO DOWELLSHOJA DE METRADOS DE ACERO

Proyecto:CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS SNIP:283218Fecha:Enero de 2015Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAHecho por:E.O.J.P.Ubicacin:LAMUDDistrito:LAMUDProvincia y Regin:LUYA - AMAZONAS

PART.ELEMENTOFIERRO /ELEMENTOTOTAL (M)TOTALNo.DENOMINACIONVECESD"CANT.LONGITUD1/4"3/8"1/2"5/8"3/4"7/8"1"D"KG

03.05.03.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60JR. COLON (CDRA 1, 2, 3)Dowells70.001/2700.803920.001/23880.80JR. COLON (CDRA 4)Dowells99.001/2990.807840.801/27762.39JR. ALTO PERU (CDRA 1, 2 Y 3)Dowells100.001/21000.808000.001/27920.00AV. ALFONSO UGARTE (CDRA1,2,3,4,5, 6 Y 7)Dowells37.001/2370.801095.201/21084.25JR. BOLIVAR (CDRA 1, 2 Y 3)Dowells88.001/2120.80821.331/2813.12LONGITUD TOTAL21677.33TOTAL KILOGRAMO0.221/4"0.583/8"0.991/2"21460.561.555/8"2.243/4"3.077/8"3.971"TOTAL21460.56

ACERO ALCANTARILLADOHOJA DE METRADOS DE ACERO

Proyecto:CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS SNIP:283218Fecha:Enero de 2015Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAHecho por:E.O.J.P.Ubicacin:LAMUDDistrito:LAMUDProvincia y Regin:LUYA - AMAZONAS

PART.ELEMENTOFIERRO /ELEMENTOTOTAL (M)TOTALNo.DENOMINACIONVECESD"CANT.LONGITUD1/4"3/8"1/2"5/8"3/4"7/8"1"D"KG

03.04.04.04ACERO DE REFUERZO fy =4200kg/CM2 JR. COLON (CDRA 1, 2, 3 Y 4)Alcantarilla 1Longitudinal13/875.6539.553/822.94Transversal13/8161.3221.123/812.2513/8161.8429.443/817.08Alcantarilla 2Longitudinal13/874.6532.553/818.88Transversal13/8131.3217.163/89.9513/8131.8423.923/813.87Alcantarilla 3Longitudinal13/877.1550.053/829.03Transversal13/8201.3226.43/815.3113/8201.8436.83/821.34Alcantarilla 4Longitudinal13/875.1536.053/820.91Transversal13/8151.3219.83/811.4813/8151.8427.63/816.01Alcantarilla 5Longitudinal13/877.2550.753/829.44Transversal13/8211.3227.723/816.0813/8211.8438.643/822.41Alcantarilla 6Longitudinal13/877.6553.553/831.06Transversal13/8221.3229.043/816.8413/8221.8440.483/823.48JR. ALTO PERU (CDRA 1, 2 Y 3)Alcantarilla 7Longitudinal13/878.3058.13/833.70Transversal13/8241.3231.683/818.3713/8241.8444.163/825.61Alcantarilla 8Longitudinal13/875.7540.253/823.35Transversal13/8161.3221.123/812.2513/8161.8429.443/817.08JR. BOLIVAR (CDRA 1, 2 Y 3)Alcantarilla 9Longitudinal13/876.5045.53/826.39Transversal13/8191.3225.083/814.5513/8191.8434.963/820.28LONGITUD TOTAL930.91TOTAL KILOGRAMO0.221/4"0.583/8"539.930.991/2"1.555/8"2.243/4"3.077/8"3.971"TOTAL539.93

ACERO MUROHOJA DE METRADOS DE ACERO

Proyecto:CREACION DE PISTAS, VEREDAS Y DRENAJE PLUVIAL DE LAS CALLES: JR. COLON, JR. ALTO PERU, AV. ALFONSO UGARTE Y JR. BOLIVAR DE LA LOCALIDAD DE LAMUD, PROVINCIA DE LUYA - AMAZONAS SNIP:283218Fecha:Enero de 2015Propietario:MUNICIPALIDAD PROVINCIAL DE LUYAHecho por:E.O.J.P.Ubicacin:LAMUDDistrito:LAMUDProvincia y Regin:LUYA - AMAZONAS

PART.ELEMENTOFIERRO /ELEMENTOTOTAL (M)TOTALNo.DENOMINACIONVECESD"CANT.LONGITUD1/4"3/8"1/2"5/8"3/4"7/8"1"D"KG

03.01.05.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60JR. COLON (CDRA 1, 2, y 3) H=1.60Longitudinal1.001/241221.519,081.911/28,991.0918310.35Transversal1.001/28862.692,383.341/22,359.511.001/28862.352,082.101/22,061.28Zapata1.001/214773.354,947.951/24,898.47JR. COLON (CDRA 4) H=1.20Longitudinal1.001/239284.7011,103.301/210,992.2722113.15Transversal1.001/211392.312,631.091/22,604.781.001/211391.972,243.831/22,221.39Zapata1.001/218983.356,358.301/26,294.72JR. ALTO PERU (CDRA 1, 2 Y 3) H=1.60Longitudinal1.001/241103.454,241.451/24,199.048553.11Transversal1.001/24142.691,113.661/21,102.521.001/24142.35972.901/2963.17Zapata1.001/26903.352,311.501/22,288.39LONGITUD TOTAL46186.93TOTAL KILOGRAMO0.221/4"0.583/8"0.991/2"48,976.621.555/8"2.243/4"3.077/8"3.971"TOTAL48,976.62