MATERIAL COMPRA GASTO 1.00 CEMENTO 1,180 210.00 2.00 TRABAJOS DE ALCANTARILLA 3.00 APORTE COMUNAL 4.00

MATERIALES 1.00 PIEDRA DESCUENTO 10,814.00 2.00 ARENA GRUESA DESCUENTO NO SE ENCUENTRADO 3.00 PIEDRA CHANCADA DESCUENTO 2 M3 4.00 PETROLEO 200 GLNS DESCUENTO TOTAL 100 GALONES 5.00 GASOLINA 250 GLNS 50 GLNS GASTO 200 GALONES 6.00 MADERA 7.00 HERRAMIENTA

2,768.00 DESCUENTO 8.00

SERVICIOS 1.00 AFIRMADO 2.00 PERFILADO Y COMPACTADO 3.00 CORTE EN MATERIAL SUELTO 4.00

SALDO EN CANCHA FALTA SALDO S/. 970.00 920 50.00 1,150.00

180.00

180.00 3,500.00 7,314.00

NO SE ENCUENTRADO 10,814.00

11002500

AFIRMADO 0.28 28,785.60 8,059.97

10400

93000 67,354.00

25,646.00

AFIRMADO 33,705.97

30,105.97