ANEXO Nº 01
DISEÑO HIDRAULICO
COMUNIDAD: Tantarpata PROVINCIA: La Mar REGION: Ayacucho.SECTOR: Tantarpata DISTRITO: Chungui
TUBERIA PVC
Diámetro nominal Pulg. 1/2 3/4 1 1 1/2 2 2 1/2 3 4 6 mm 21 26.5 33 48 63 75 90 110 160
Espesor mm
Diámetro interior (mm)
Clase-15 54.20 64.40 77.40 94.60 137.60Clase-10 17.4 22.9 29.4 43.4 57.00 67.80 81.40 99.40 144.60
C = 150 Clase-7.5 44.4 58.40 69.40 83.40 102.00 148.40Clase-5 59.80 71.20 85.60 104.60 152.00
CALCULO HIDRAULICO DE LA RED DE DISTRIBUCION
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
ZONA MILLPOCCATA-CAP. TUB. 8" 3.52CT-01 H-003 34.93 35.29 3435.00 3430.00 0.66 1 1/2 44.40 C-7.5 5.00 0.43 0.00 0.17 4.83H-003 H-002 34.21 39.13 3430.00 3411.00 0.44 1 29.40 C-10.0 19.00 0.65 0.02 0.65 23.19H-002 H-001 181.60 181.70 3411.00 3417.00 0.22 1 29.40 C-10.0 -6.00 0.32 0.00 0.89 16.30CT-01 CR-01 100.00 111.00 3435.00 3386.83 2.20 2 58.40 C-7.5 48.17 0.82 0.01 1.18 46.99CR-01 D-01 28.72 31.88 3386.83 3373.00 2.20 2 58.40 C-7.5 13.83 0.82 0.01 0.34 13.49D-01 H-004 61.40 66.29 3373.00 3348.00 0.22 1 29.40 C-10.0 25.00 0.32 0.00 0.32 38.17D-01 H-005 29.97 30.24 3373.00 3369.00 0.22 1 29.40 C-10.0 4.00 0.32 0.00 0.15 17.34D-01 H-006 64.62 70.83 3373.00 3344.00 1.76 2 58.40 C-7.5 29.00 0.66 0.01 0.51 41.98H-006 CR-02 60.00 68.26 3344.00 3311.46 1.54 2 58.40 C-7.5 32.54 0.57 0.01 0.39 74.13CR-02 D-02 22.98 26.14 3311.46 3299.00 1.54 2 58.40 C-7.5 12.46 0.57 0.01 0.15 12.31D-02 H-011 102.06 107.26 3299.00 3266.00 0.22 1 29.40 C-10.0 33.00 0.32 0.00 0.53 44.79D-02 H-010 139.50 139.86 3299.00 3289.00 1.32 2 58.40 C-7.5 10.00 0.49 0.00 0.61 21.70H-010 H-013 60.80 71.17 3289.00 3252.00 1.10 2 58.40 C-7.5 37.00 0.41 0.00 0.22 58.48H-013 H-012 55.44 56.17 3252.00 3243.00 0.22 1 29.40 C-10.0 9.00 0.32 0.00 0.28 67.20H-013 CR-03 23.00 25.97 3252.00 3239.95 0.88 1 1/2 44.40 C-7.5 12.05 0.57 0.01 0.20 70.32CR-03 H-014 41.90 47.30 3239.95 3218.00 0.88 1 1/2 44.40 C-7.5 21.95 0.57 0.01 0.37 21.58H-014 H-015 39.70 41.77 3218.00 3231.00 0.22 1 29.40 C-10.0 -13.00 0.32 0.00 0.20 8.37H-014 H-016 42.43 46.49 3218.00 3199.00 0.44 1 29.40 C-10.0 19.00 0.65 0.02 0.77 39.81H-016 H-017 72.10 80.15 3199.00 3164.00 0.22 1 29.40 C-10.0 35.00 0.32 0.00 0.39 74.42
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
CT-01 H-007 42.49 53.19 3435.00 3403.00 0.66 1 1/2 44.40 C-7.5 32.00 0.43 0.00 0.25 31.75H-007 H-008 40.61 40.92 3403.00 3398.00 0.44 1 29.40 C-10.0 5.00 0.65 0.02 0.68 36.07H-008 H-009 57.28 64.20 3398.00 3369.00 0.22 1 29.40 C-10.0 29.00 0.32 0.00 0.31 64.76ZONA MILLPOCCATA-CAP. TUB. 8" 7.48CT-02 H-018 41.59 42.78 3429.00 3419.00 0.22 1 29.40 C-10.0 10.00 0.32 0.00 0.21 9.79CT-02 H-019 62.13 62.64 3429.00 3421.00 1.76 2 58.40 C-7.5 8.00 0.66 0.01 0.45 7.55H-019 H-020 94.54 98.32 3421.00 3394.00 0.66 1 1/2 44.40 C-7.5 27.00 0.43 0.00 0.47 34.08H-020 H-021 41.44 51.75 3394.00 3363.00 0.22 1 29.40 C-10.0 31.00 0.32 0.00 0.25 64.83H-020 H-022 75.24 82.98 3394.00 3359.00 0.22 1 29.40 C-10.0 35.00 0.32 0.00 0.41 68.68H-019 H-023 91.76 101.34 3421.00 3378.00 0.88 1 1/2 44.40 C-7.5 43.00 0.57 0.01 0.80 49.75H-023 H-024 53.60 56.54 3378.00 3360.00 0.22 1 29.40 C-10.0 18.00 0.32 0.00 0.28 67.48H-023 CR-04 25.00 27.75 3378.00 3365.95 0.44 1 29.40 C-10.0 12.05 0.65 0.02 0.46 61.34CR-04 H-025 26.87 29.83 3365.95 3353.00 0.44 1 29.40 C-10.0 12.95 0.65 0.02 0.49 12.46H-025 H-026 62.26 70.94 3353.00 3319.00 0.22 1 29.40 C-10.0 34.00 0.32 0.00 0.35 46.11CT-02 CR-05 150.00 164.83 3429.00 3360.68 5.50 3 83.40 C-7.5 68.32 1.01 0.01 1.93 66.39CR-05 H-027 30.04 33.01 3360.68 3347.00 5.50 3 83.40 C-7.5 13.68 1.01 0.01 0.39 13.29H-027 H-028 44.28 44.29 3347.00 3346.00 0.44 1 29.40 C-10.0 1.00 0.65 0.02 0.73 13.56H-028 H-030 29.15 31.92 3346.00 3333.00 0.22 1 29.40 C-10.0 13.00 0.32 0.00 0.16 26.41H-027 H-029 31.30 36.62 3347.00 3328.00 4.84 3 83.40 C-7.5 19.00 0.89 0.01 0.34 31.96H-029 D-03A 47.42 50.05 3328.00 3312.00 4.62 3 83.40 C-7.5 16.00 0.85 0.01 0.42 47.53D-03A H-031 54.33 58.62 3312.00 3290.00 0.44 1 29.40 C-10.0 22.00 0.65 0.02 0.97 68.56H-031 H-032 0.50 0.50 3290.00 3290.00 0.22 1 29.40 C-10.0 0.00 0.32 0.00 0.00 68.56D-03A H-033 98.95 99.94 3312.00 3298.00 3.08 2 58.40 C-7.5 14.00 1.15 0.02 1.92 44.04H-033 H-034 61.81 61.81 3298.00 3298.00 1.32 1 1/2 44.40 C-7.5 0.00 0.85 0.02 0.99 43.05H-034 H-035 55.01 58.20 3298.00 3279.00 1.10 1 1/2 44.40 C-7.5 19.00 0.71 0.01 0.68 61.37H-035 H-036 26.40 30.36 3279.00 3294.00 0.88 1 1/2 44.40 C-7.5 -15.00 0.57 0.01 0.24 46.13H-036 H-037 18.44 19.72 3294.00 3301.00 0.22 1 29.40 C-10.0 -7.00 0.32 0.00 0.10 39.04H-036 H-038 33.42 41.74 3294.00 3269.00 0.44 1 29.40 C-10.0 25.00 0.65 0.02 0.69 70.44H-038 H-039 50.01 57.31 3269.00 3241.00 0.22 1 29.40 C-10.0 28.00 0.32 0.00 0.28 98.16H-033 H-040 21.02 21.02 3298.00 3298.00 1.54 1 1/2 44.40 C-7.5 0.00 0.99 0.02 0.44 43.59H-040 CR-06 40.00 44.68 3298.00 3278.10 1.32 1 1/2 44.40 C-7.5 19.90 0.85 0.02 0.71 62.78CR-06 H-041 36.38 40.63 3278.10 3260.00 1.32 1 1/2 44.40 C-7.5 18.10 0.85 0.02 0.65 17.45H-041 H-043 61.10 63.42 3260.00 3243.00 0.22 1 29.40 C-10.0 17.00 0.32 0.00 0.31 34.14H-041 H-042 25.50 26.73 3260.00 3252.00 0.88 1 1/2 44.40 C-7.5 8.00 0.57 0.01 0.21 41.93H-042 CR-07 20.00 21.59 3252.00 3243.87 0.66 1 1/2 44.40 C-7.5 8.13 0.43 0.00 0.10 49.96CR-07 H-044 26.75 28.87 3243.87 3233.00 0.66 1 1/2 44.40 C-7.5 10.87 0.43 0.00 0.14 10.73H-044 H-045 68.18 76.64 3233.00 3198.00 0.44 1 29.40 C-10.0 35.00 0.65 0.02 1.27 44.47
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
H-045 H-046 29.21 31.58 3198.00 3186.00 0.22 1 29.40 C-10.0 12.00 0.32 0.00 0.15 56.31D-03A D-03 92.11 102.08 3312.00 3268.00 1.10 2 58.40 C-7.5 44.00 0.41 0.00 0.32 43.68D-03 H-047 46.87 51.36 3268.00 3247.00 0.22 1 29.40 C-10.0 21.00 0.32 0.00 0.25 64.43D-03 H-048 46.32 49.34 3268.00 3251.00 0.44 1 29.40 C-10.0 17.00 0.65 0.02 0.82 80.61H-048 H-049 23.32 26.70 3251.00 3238.00 0.22 1 29.40 C-10.0 13.00 0.32 0.00 0.13 93.48D-03 CR-08 80.00 88.61 3268.00 3229.91 0.44 1 29.40 C-10.0 38.09 0.65 0.02 1.46 92.94CR-08 H-050 71.24 78.90 3229.91 3196.00 0.44 1 29.40 C-10.0 33.91 0.65 0.02 1.30 32.61H-050 H-051 27.66 35.34 3196.00 3174.00 0.22 1 29.40 C-10.0 22.00 0.32 0.00 0.17 54.43ZONA PICOTA-CAP. TUB. 8" 1.54CT-03 D-04 73.80 89.71 3413.00 3362.00 1.54 1 1/2 44.40 C-7.5 51.00 0.99 0.02 1.88 49.12D-04 H-052 35.13 35.14 3362.00 3363.00 0.88 1 1/2 44.40 C-7.5 -1.00 0.57 0.01 0.28 47.84H-052 H-053 71.18 71.88 3363.00 3353.00 0.22 1 29.40 C-10.0 10.00 0.32 0.00 0.35 57.49H-052 H-054 48.17 54.27 3363.00 3338.00 0.44 1 29.40 C-10.0 25.00 0.65 0.02 0.90 71.95H-054 H-055 41.34 45.92 3338.00 3318.00 0.22 1 29.40 C-10.0 20.00 0.32 0.00 0.22 91.72D-04 H-056 41.39 45.54 3362.00 3343.00 0.66 1 1/2 44.40 C-7.5 19.00 0.43 0.00 0.22 67.90H-056 CR-09 50.00 54.77 3343.00 3320.64 0.44 1 29.40 C-10.0 22.36 0.65 0.02 0.91 89.36CR-09 D-05 66.29 72.61 3320.64 3291.00 0.44 1 29.40 C-10.0 29.64 0.65 0.02 1.20 28.44D-05 H-057 38.29 43.67 3291.00 3270.00 0.22 1 29.40 C-10.0 21.00 0.32 0.00 0.21 49.23D-05 H-058 74.22 78.32 3291.00 3266.00 0.22 1 29.40 C-10.0 25.00 0.32 0.00 0.38 53.06ZONA CHACCATO PUQUIO 0.44CC-01 D-06 221.33 223.35 3125.00 3095.00 0.44 1 1/2 44.40 C-7.5 30.00 0.28 0.00 0.52 29.48D-06 H-059 106.01 106.58 3095.00 3084.00 0.22 1 29.40 C-10.0 11.00 0.32 0.00 0.52 39.96D-06 H-060 104.27 117.89 3095.00 3040.00 0.22 1 29.40 C-10.0 55.00 0.32 0.00 0.58 83.90ZONA FINAL CANAL ENTUBADO-CAP. TUB. 8" 3.96CT-04 H-063 191.18 200.98 3399.00 3337.00 0.66 1 1/2 44.40 C-7.5 62.00 0.43 0.00 0.95 61.05H-063 H-062 46.06 46.93 3337.00 3328.00 0.44 1 1/2 44.40 C-7.5 9.00 0.28 0.00 0.11 69.94H-062 H-061 87.13 92.15 3328.00 3298.00 0.22 1 29.40 C-10.0 30.00 0.32 0.00 0.45 99.49CT-04 H-064 401.64 406.71 3399.00 3335.00 3.30 2 58.40 C-7.5 64.00 1.23 0.02 8.82 55.18H-064 CR-10 40.00 43.44 3335.00 3318.05 3.08 2 58.40 C-7.5 16.95 1.15 0.02 0.83 71.29CR-10 H-066 106.33 115.48 3318.05 3273.00 3.08 2 58.40 C-7.5 45.05 1.15 0.02 2.22 42.83H-066 H-065 50.45 53.24 3273.00 3290.00 0.22 1 29.40 C-10.0 -17.00 0.32 0.00 0.26 25.57H-066 H-067 23.43 23.62 3273.00 3270.00 2.64 2 58.40 C-7.5 3.00 0.99 0.01 0.35 45.48H-067 D-07 29.07 29.09 3270.00 3271.00 2.42 2 58.40 C-7.5 -1.00 0.90 0.01 0.37 44.12D-07 H-068 28.32 36.48 3271.00 3248.00 0.66 1 29.40 C-10.0 23.00 0.97 0.03 1.23 65.89H-068 H-069 0.50 0.50 3248.00 3248.00 0.44 1 29.40 C-10.0 0.00 0.65 0.02 0.01 65.88H-069 H-070 56.92 57.35 3248.00 3241.00 0.22 1 29.40 C-10.0 7.00 0.32 0.00 0.28 72.60D-07 D-08 23.67 24.42 3271.00 3265.00 1.76 1 1/2 44.40 C-7.5 6.00 1.14 0.03 0.65 49.47
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
D-08 H-071 76.67 76.90 3265.00 3271.00 0.44 1 29.40 C-10.0 -6.00 0.65 0.02 1.27 42.20H-071 CR-11 20.00 27.23 3271.00 3252.52 0.22 1 29.40 C-10.0 18.48 0.32 0.00 0.13 60.55CR-11 H-072 55.74 75.90 3252.52 3201.00 0.22 1 29.40 C-10.0 51.52 0.32 0.00 0.37 51.15D-08 CR-12 30.00 31.87 3265.00 3254.24 1.32 1 1/2 44.40 C-7.5 10.76 0.85 0.02 0.51 59.72CR-12 D-09 34.13 36.26 3254.24 3242.00 1.32 1 1/2 44.40 C-7.5 12.24 0.85 0.02 0.58 11.66D-09 H-073 33.24 33.48 3242.00 3238.00 0.22 1 29.40 C-10.0 4.00 0.32 0.00 0.16 15.50D-09 H-074 107.00 110.60 3242.00 3214.00 1.10 1 1/2 44.40 C-7.5 28.00 0.71 0.01 1.28 38.38H-074 H-078 48.00 52.39 3214.00 3193.00 0.22 1 29.40 C-10.0 21.00 0.32 0.00 0.26 59.12H-074 H-075 83.10 83.25 3214.00 3209.00 0.66 1 1/2 44.40 C-7.5 5.00 0.43 0.00 0.39 42.98H-075 H-076 21.93 25.49 3209.00 3196.00 0.44 1 29.40 C-10.0 13.00 0.65 0.02 0.42 55.56H-076 H-077 32.25 36.46 3196.00 3179.00 0.22 1 29.40 C-10.0 17.00 0.32 0.00 0.18 72.38ZONA PUQUIAL VISTA ALEGRE 0.22CC-02 H-079 324.05 325.44 3454.00 3424.00 0.22 1 29.40 C-10.0 30.00 0.32 0.00 1.59 28.41ZONA RIACHUELO TACCEPA 0.22CC-03 H-080 179.17 182.37 2981.00 2947.00 0.22 1 29.40 C-10.0 34.00 0.32 0.00 0.89 33.11ZONA PUQUIAL SECCSES 0.22CC-04 H-106 26.02 29.55 3254.00 3240.00 0.22 1 29.40 C-10.0 14.00 0.32 0.00 0.14 13.86ZONA PUQUIAL PUCAPUQUIO 0.22CC-05 H-081 215.41 219.09 3349.00 3309.00 0.22 1 29.40 C-10.0 40.00 0.32 0.00 1.07 38.93ZONA HATUN MARCO - CAP. TUB. 1" 0.66CT-05 H-082 69.72 69.75 3357.00 3359.00 0.22 1 29.40 C-10.0 -2.00 0.32 0.00 0.34 22.66CT-05 H-083 0.00 2.00 3357.00 3355.00 0.44 1 29.40 C-10.0 2.00 0.65 0.02 0.03 26.97H-083 H-084 36.12 38.06 3355.00 3343.00 0.22 1 29.40 C-10.0 12.00 0.32 0.00 0.19 38.78ZONA HATUN MARCO - CAP. TUB. 1" 0.22CT-06 H-085 30.08 31.13 3350.00 3342.00 0.22 1 29.40 C-10.0 8.00 0.32 0.00 0.15 32.85
0.22CT-07 H-086 63.80 64.92 3301.00 3289.00 0.22 3/4 22.90 C-10.0 12.00 0.53 0.02 1.04 35.96ZONA HATUN MARCO - CAP. TUB. 1" 0.44CT-08 H-087 7.21 8.25 3291.00 3287.00 0.44 1 29.40 C-10.0 4.00 0.65 0.02 0.14 28.86H-087 H-088 20.81 21.19 3287.00 3283.00 0.22 1 29.40 C-10.0 4.00 0.32 0.00 0.10 32.76ZONA HATUN MARCO - CAP. TUB. 1" 0.22CT-09 H-089 29.83 31.46 3290.00 3280.00 0.22 1 29.40 C-10.0 10.00 0.32 0.00 0.15 34.85ZONA HATUN MARCO - CAP. TUB. 1" 0.88CT-10 H-091 0.00 0.00 3376.00 3376.00 0.22 1 29.40 C-10.0 0.00 0.32 0.00 0.00 25.00CT-10 H-090 0.00 0.00 3374.00 3374.00 0.66 1 29.40 C-10.0 0.00 0.97 0.03 0.00 25.00H-090 H-092 22.63 25.61 3374.00 3362.00 0.44 1 29.40 C-10.0 12.00 0.65 0.02 0.42 36.58H-092 H-093 119.81 131.83 3362.00 3307.00 0.22 1 29.40 C-10.0 55.00 0.32 0.00 0.65 90.93
ZONA HATUN MARCO - CAP. TUB. ¾"
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
ZONA UCHUY MARCO CANAL ENTUBADO-CAP. TUB. 6" 2.64CT-11 D-10 42.05 48.92 3484.00 3459.00 2.64 2 58.40 C-7.5 25.00 0.99 0.01 0.72 24.28D-10 H-105 44.69 44.87 3459.00 3455.00 0.22 1 29.40 C-10.0 4.00 0.32 0.00 0.22 28.06D-10 CR-13 40.00 47.67 3459.00 3433.06 2.42 2 58.40 C-7.5 25.94 0.90 0.01 0.60 49.62CR-13 D-11 20.13 24.00 3433.06 3420.00 2.42 2 58.40 C-7.5 13.06 0.90 0.01 0.30 12.76D-11 H-104 90.00 90.55 3420.00 3410.00 0.44 1 29.40 C-10.0 10.00 0.65 0.02 1.50 21.26H-104 H-103 37.44 43.43 3410.00 3388.00 0.22 1 29.40 C-10.0 22.00 0.32 0.00 0.21 43.05D-11 D-12 15.14 17.61 3420.00 3411.00 1.98 2 58.40 C-7.5 9.00 0.74 0.01 0.16 21.60D-12 CR-14 70.00 77.64 3411.00 3377.41 0.44 1 29.40 C-10.0 33.59 0.65 0.02 1.28 53.91CR-14 D-15 38.38 42.57 3377.41 3359.00 0.44 1 29.40 C-10.0 18.41 0.65 0.02 0.70 17.71D-15 H-102 20.02 20.12 3359.00 3357.00 0.22 1 29.40 C-10.0 2.00 0.32 0.00 0.10 19.61D-15 H-101 116.68 126.55 3359.00 3310.00 0.22 1 29.40 C-10.0 49.00 0.32 0.00 0.62 66.09D-12 H-100 125.44 126.22 3411.00 3397.00 1.54 1 1/2 44.40 C-7.5 14.00 0.99 0.02 2.65 32.96H-100 D-13 119.69 119.69 3397.00 3397.00 1.32 1 1/2 44.40 C-7.5 0.00 0.85 0.02 1.91 31.04D-13 H-099 32.80 41.85 3397.00 3371.00 0.22 1 29.40 C-10.0 26.00 0.32 0.00 0.21 56.84D-13 D-14 99.01 99.19 3397.00 3391.00 1.10 1 1/2 44.40 C-7.5 6.00 0.71 0.01 1.15 35.89D-14 CR-15 50.00 60.02 3391.00 3357.80 0.44 1 29.40 C-10.0 33.20 0.65 0.02 0.99 63.25CR-15 H-097 84.04 100.88 3357.80 3302.00 0.44 1 29.40 C-10.0 55.80 0.65 0.02 1.67 54.13H-097 H-098 53.60 56.54 3302.00 3284.00 0.22 1 29.40 C-10.0 18.00 0.32 0.00 0.28 71.86D-14 H-095 54.08 55.00 3391.00 3381.00 0.66 1 1/2 44.40 C-7.5 10.00 0.43 0.00 0.26 45.63H-095 H-096 64.29 76.25 3381.00 3340.00 0.22 1 29.40 C-10.0 41.00 0.32 0.00 0.37 86.25H-095 H-094 128.41 128.41 3381.00 3381.00 0.22 1 29.40 C-10.0 0.00 0.32 0.00 0.63 45.00
TOTAL= 8445.62 9024.97
CANTIDAD TOTAL DE TUBERIAS LINEA DE CONDUCCION - RED DE DISTRIBUCION1 3/4 1 1/2 2 3 4 6 8 8
5111.77 m 64.92 2023.45 m 1540.33 m 284.50 m 0.00 m 0.00 m 0.00 m
TRAMO LONG.HORIZ. LONG. INCL. COTA TRAMO CAUDAL DIÁM. TUB. CLASE * DN VELOC. PÉRD. CARGA (m) PRESION(m) (m) INICIAL FINAL (l/s) Nom. (Pulg.) Int. (mm) (m) (m/s) J (m/m) Hf (m) (m)
Cantidad de tubería por clases y diámetrosCantidad de tubería por clases Descripción Clase Ø Longitud Tuberias
C-5.0 0.00 m Tubo PVC SAP C-5 6 0.00 m 0C-7.5 3848.28 m Tubo PVC SAP C-5 4 0.00 m 0
C-10.0 5176.69 m Tubo PVC SAP C-7.5 4 0.00 m 0C-15.0 0.00 m Tubo PVC SAP C-10 4 0.00 m 0
Total 9024.97 m Tubo PVC SAP C-5 3 0.00 m 0Tubo PVC SAP C-7.5 3 284.50 m 57Tubo PVC SAP C-10 3 0.00 m 0Tubo PVC SAP C-5 2 0.00 m 0Tubo PVC SAP C-7.5 2 1540.33 m 308Tubo PVC SAP C-7.5 1 1/2 2023.45 m 405Tubo PVC SAP C-10 2 0.00 m 0Tubo PVC SAP C-10 1 5111.77 m 1022Tubo PVC SAP C-10 3/4 64.92 m 13
Total 9024.97 m
ANEXO Nº 02
HOJA DE METRADOS
Proyecto: PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
ITEM DESCRIPCION CANTIDADDIMENSIONES
LARGO
1.
1.1 1.1) PROMOCION Y CONFORMACION DE N.E Y NECa) Conformar los NE y NEC
1.2 1.2) DISEÑO DEL PROYECTO DE ASISTENCIA TECNICA Y CAPACITACION1.2 a) Elaborar del expediente técnico - ET1.2 Honorarios del Proyectista1.2 Gastos del NEC para gestion de la elaboración del ET1.2 Gastos Bancarios para elaboración del ET1.2 1.3) IMPLEMENTACION DE AT y CAPACITACION Y ENTREGA DE ACTIVOS1.2 a) Coordinar y gestionar la ejecución de los proyectos del NEC1.2 Honorarios del Coordinador del NEC1.2 Movilidad del Coordinador del NEC1.2 Seguro del Coordinador del NEC 1.2 b) Difusión del Proyecto1.2 Cartel del Proyecto1.2 c) Capacitación de Campesino a Campesino 1/1.2 c.1) Capacitar Campesino a Campesino - 1er Año1.2 Honorarios del Yachachiq al 1er Año1.2 Movilidad de yachachiq 1er año1.2 Seguro del Yachachiq al 1er Año1.2 c.2) Capacitar Campesino a Campesino - 2do Año1.2 Honorarios del Yachachiq al 2do Año1.2 Movilidad de yachachiq 2do año1.2 Seguro del Yachachiq al 2do año1.2 c.3) Capacitar Campesino a Campesino - 3er año1.2 Honorarios del Yachachiq al 3er año1.2 Movilidad de yachachiq 3er año1.2 Seguro del Yachachiq al 3er año1.2 c.4) Capacitar en las tecnologías1.2 Materiales de Capacitacion en Tecnologias Productivas 1er y 2 do año1.2 d) Pasantias o talleres de capacitacion de yachachiq 1.2 Alojamiento para pasantias de especializacion de yachachiq1.2 Movilidad para pasantias de especializacion de yachachiq1.2 Alimentación para pasantias de especializacion de yachachiq1.2 e) Implementar Tecnologias Productivas Familiares1.2 Instalación de tecnologías productivas1.2 f) Capacitación para mejorar las condiciones del predio Rural1.2 Materiales y premios para mejoramiento de espacios para la produccion (CM, RS, AS)1.2 g) Realizar Concursos intra NE1.2 Premios por concurso intra NE1.2 h) Rendir Cuentas/ Gastos1.2 Servicio de apoyo contable para la rendicion de cuentas1.2 i) Traslado de Insumos1.2 Flete para insumos1.2 j) Gastos de Seguimiento del NEC1.2 j.1) Seguimiento participativo1.2 Servicio de recojo y registro de informacion1.2 j.2) Elaboración periodica y memoria anual de gestión NEC 1.2 Gastos Generales para elaboracion de informes.1.2 j.3) Elaboración de Video editado de la implementación de proyectos 1.2 Servicio de difusión de resultados
1.2
1.2 2.1) DESARROLLO DE LOS CONCURSOS PARA LA EVALUACION Y ASIGNACION DE RECURSOS 1.2 a) Promocion y difusion del concurso. 1.2 Materiales de promoción y difusión (banner, afiches, talleres, etc)1.2 b) Desarrollar concursos para la selección de emprendimientos (CLAR)1.2 Gastos Generales para el desarrollo de concursos
1.2
1.2 a) Desarrollar emprendimientos 1.2 Asistencia tecnica a emprendimientos1.2 Activos para emprendimientos1.2 b) Promocionar el ahorro formal y de otros productos financieros 1.2 b.1) Adquirir materiales de capacitacion financiera1.2 Material de capacitación en educación financiera por usuarios1.2 b.2) Capacitar y apoyar tecnicamente en educacion financiera1.2 Honorarios del Facilitador Financiero del NEC1.2 b.3) Capacitar Campesino a Campesino - educación financiera1.2 Movilidad, alimentación y materiales yachachiq financiero 1.2 c) Gastos generales del NEC 1.2 Alquiler de Local y Servicios1.2 Material para la gestión de ejecución del NEC1.2 Gastos generales del NEC (Presidente y Tesorero)
NUMERO DE VECES
PRODUCTO 1: Hogares rurales con economías de subsistencia reciben asistencia técnica y capacitación para el desarrollo de capacidades productivas.
PRODUCTO 2: Grupos de hogares rurales con economías de subsistencia reciben asistencia técnica, capacitación y dotación de activos para la gestión de emprendimientos rurales
2.2) IMPLEMENTACION DE LA A.T. Y CAPACITACION ESPECIALIZADA Y ENTREGA DE ACTIVOS PARA LA PUESTA EN MARCHA DE EMPRENDIMIENTOS
1.2 Movilidad del NEC durante la ejecución del proyecto (Presidente y Tesorero)1.2 Gastos de Cuentas Bancarias del NEC para la ejecución del Proyecto1.2 2.3) PROMOCION DE ESPACIOS DE INTERCAMBIO COMERCIAL LOCAL (P.E. FERIAS)1.2 a) Organizar y Participar en ferias locales 1.2 Alojamiento para participantes1.2 Alimentacion para participantes1.2 Movilidad para participantes1.2 Gastos Generales para participacion en ferias locales1.21.21.21.21.21.21.21.21.2
1.1. Implementación de Tecnologías1.1.1. Instalación de riego tecnificado1.1.1.1. Unid 1.00 5.001.1.1.2. Unid 1.00 7.001.1.1.3. Unid 1.00 3.001.1.1.4. Unid 1.00 2.001.1.1.5. Unid 1.00 8.001.1.1.6. Unid 1.00 6.001.1.1.7. Unid 1.00 1.001.1.1.8. Instalación de Codo PVC de 45º - 1" Unid 1.00 51.001.1.1.9. Instalación de Codo PVC de 45º - 1½" Unid 1.00 34.001.1.1.10. Instalación de Codo PVC de 45º - 2" Unid 1.00 10.001.1.1.11. Instalación de Codo PVC de 45º - 3" Unid 1.00 1.001.1.1.12. Instalación de Codo PVC de 90º - 1" Unid 1.00 15.001.1.1.13. Instalación de Codo PVC de 90º - 1½" Unid 1.00 6.001.1.1.14. Instalación de Codo PVC de 90º - 2" Unid 1.00 6.001.1.1.15. Instalación de Tee PVC de 1" Unid 1.00 7.001.1.1.16. Instalación de Tee PVC de 1½" Unid 1.00 15.001.1.1.17. Instalación de Tee PVC de 2" Unid 1.00 18.001.1.1.18. Instalación de Tee PVC de 3" Unid 1.00 6.001.1.1.19. Instalación de Reducción PVC de 1½" - 1" Unid 1.00 25.001.1.1.20. Instalación de Reducción PVC de 2" - 1½" Unid 1.00 10.001.1.1.21. Instalación de Reducción PVC de 2" - 1" Unid 1.00 16.001.1.1.22. Instalación de Reducción PVC de 3" - 2" Unid 1.00 3.001.1.1.23. Instalación de Llave de paso de 1" Unid 1.00 52.001.1.1.24. Instalación de Llave de paso de 1½" Unid 1.00 2.001.1.1.25. Instalación de Llave de paso de 2" Unid 1.00 4.001.1.1.26. Construcción de Caja de llave de paso Unid 1.00 58.001.1.1.27. Unid 1.00 73.001.1.1.28. Unid 1.00 23.001.1.1.29. Unid 1.00 8.001.1.1.30. Unid 1.00 2.001.1.1.31. Instalación de Tubería PVC SAP C-10, Ø=¾" m 1.00 1.00 64.921.1.1.32. Instalación de Tubería PVC SAP C-10, Ø=1" m 1.00 1.00 5,111.771.1.1.33. Instalación de Tubería PVC SAP C-7.5, Ø=1½" m 1.00 1.00 2,023.451.1.1.34. Instalación de Tubería PVC SAP C-7.5, Ø=2" m 1.00 1.00 1,540.331.1.1.35. Instalación de Tubería PVC SAP C-7.5, Ø=3" m 1.00 1.00 284.501.1.1.36. Instalación de sistema móvil Unid 1.00 106.00
1.1.2. Produc. de actividades agropec. orientas al Mcdo.1.1.2.1. Huerto fijo de hortalizas a campo abierto1.1.2.1.1. Producción de zanahoria ha 6.00 0.2121.1.2.1.2. Producción de cebolla ha 6.00 0.2121.1.2.1.3. Producción de betarraga ha 6.00 0.2121.1.2.1.4. Producción de coliflor ha 6.00 0.2121.1.2.1.5. Producción de acelga ha 6.00 0.2121.1.2.2. Parcela de pastos asociados1.1.2.2.1. Parcela producción de alfalfa ha 1.00 5.3001.1.2.3. Miniparcelas para la producción granos andinos1.1.2.3.1. Producción de quinua ha 2.00 2.1201.1.2.3.2. Producción de papa blanca ha 2.00 2.1201.1.2.3.3. Producción de frejol canario ha 2.00 2.1201.1.2.3.4. Producción de arveja ha 2.00 2.1201.1.2.4. Agroforestería Familia 1.00 106.0001.1.2.5. Módulo de producción de abono orgánico - compost Módulo 1.00 106.0001.1.2.6. Módulo de crianza de gallinas Módulo 1.00 106.0001.1.2.7. Módulo de crianza de cuyes Módulo 1.00 106.000
1.1.3. Flete y transporte de materiales e insumos1.1.3.1. Flete - transporte de materiales e insumos Glb 1.00 1.000
1.2. Materiales de Capacitación para las tecnologías1.2.1. Materiales de capacitación para las tecnologías Glb 1.00 1.0001.3. Capacitación de campesino a campesino1.3.1. Contratación de Yachachiq (primer año) Mes 1.00 12.0001.3.2. Contratación de Yachachiq (segundo año) Mes 1.00 12.0001.3.3. Contratación de Yachachiq (tercer año) Mes 1.00 12.000
Cámara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m³Instalación de collarín de captación de 25 mm * ¾"Instalación de collarín de captación de 150 mm * 2"Instalación de collarín de captación de 200 mm * 1½"Cámara rompe presión (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m³Cámara rompe presión (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m³Cámara rompe presión (5,50 l/s) de 1,50*1,50*1,50 m³
Instalación de collarines para hidrantes de 25 mm * ¾"Instalación de collarines para hidrantes de 38 mm * ¾"Instalación de collarines para hidrantes de 50 mm * ¾"Instalación de collarines para hidrantes de 75 mm * ¾"
1.4. Seguro básico de Yachachiq1.4.1. Seguro básico de Yachachiq (primer año) Año 1.00 1.0001.4.2. Seguro básico de Yachachiq (segundo y tercer año) Año 1.00 2.0001.5. Movilidad de Yachachiq1.5.1. Movilidad de Yachachiq para capacitación (primer año) Mes 1.00 12.0001.5.2. Movilidad de Yachachiq para capacitación (2do. Y 3er año) Mes 1.00 24.0001.6. Concursos entre Núcleos Ejecutores - NE1.6.1. Concursos en la aplicación y mejora de tecnologías Concur. 1.00 20.0001.7. Participación en Ferias Locales1.7.1. Participación en Ferias Locales Feria 1.00 2.0001.8. Pasantías Yachachiq1.8.1. Pasantías Yachachiq Pasantía 1.00 2.000
2. Implementación y mejora de la vivienda saludable2.1. Instalación de cocina mejorada Módulo 1.00 106.0002.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda Eventos 3.00 1.0002.2.2. Capacitación en salud y nutrición familiar Eventos 3.00 1.0002.3. Agua segura Módulo 1.00 106.000
3. Promoción de Negocios Rurales Inclusivos3.1. Asistencia técnica para articulación al mercado Evento 3.00 60.0003.2. Concursos de Planes de negocios 3/. Concurs. 1.00 2.000
4. Fomento de capacidades financieras4.1. Promoción, convocatoria y concursos Mes 1.00 6.0004.2. Materiales de capacitación Glb 1.00 1.0004.3. Honorarios facilitador financiero Mes 1.00 6.0004.4. Honorarios yachachiq financiero Mes 1.00 6.0004.5. Viáticos y apoyo logístico facilitador financiero Glb 1.00 1.000
ANEXO Nº 02
HOJA DE METRADOS
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
DIMENSIONESPARCIAL TOTAL
ANCHO ALTO
5.00 25.00 25.007.00 49.00 49.003.00 9.00 9.002.00 4.00 4.008.00 64.00 64.006.00 36.00 36.001.00 1.00 1.00
51.00 2,601.00 2,601.0034.00 1,156.00 1,156.0010.00 100.00 100.00
1.00 1.00 1.0015.00 225.00 225.00
6.00 36.00 36.006.00 36.00 36.007.00 49.00 49.00
15.00 225.00 225.0018.00 324.00 324.00
6.00 36.00 36.0025.00 625.00 625.0010.00 100.00 100.0016.00 256.00 256.00
3.00 9.00 9.0052.00 2,704.00 2,704.00
2.00 4.00 4.004.00 16.00 16.00
58.00 3,364.00 3,364.0073.00 5,329.00 5,329.0023.00 529.00 529.00
8.00 64.00 64.002.00 4.00 4.001.00 64.92 64.921.00 5,111.77 5,111.771.00 2,023.45 2,023.451.00 1,540.33 1,540.331.00 284.50 284.50
106.00 11,236.00 11,236.00
0.212 1.270.212 1.270.212 1.270.212 1.270.212 1.27
5.300 5.30
2.120 4.242.120 4.242.120 4.242.120 4.24
106.000 106.00106.000 106.00106.000 106.00106.000 106.00
1.000 1.00
1.000 1.00
12.000 12.0012.000 12.0012.000 12.00
1.000 1.002.000 2.00
12.000 12.0024.000 24.00
20.000 20.00
2.000 2.00
2.000 2.00
106.000 106.00
1.000 3.001.000 3.00
106.000 106.00
60.000 180.002.000 2.00
6.000 6.001.000 1.006.000 6.006.000 6.001.000 1.00
CUADROS Nº 01
ANALISIS DE COSTOS UNITARIOS
1.1.1. Instalación de riego tecnificado
1.1.1.1. Cámara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m³COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 224.150 224.150 0.000 0.000
Arena hormigón 0.300 70.000 21.000 21.000Cemento Portland tipo I / 42,50 kg Bolsa 1.200 22.000 26.400 26.400
m 40.000 0.720 28.800 28.800Juego de panel reforzado (0,6*0,6*0,6 m3) Unid 0.250 75.000 18.750 18.750Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.000 12.600 12.600 12.600
Unid 1.000 12.000 12.000 12.000Malla mosquitero verde 0.500 6.000 3.000 3.000Alambre galvanizado Nº 16 kg 0.050 9.000 0.450 0.450
Unid 1.000 9.000 9.000 9.000UPR PVC Adaptador de 1½ˮ Unid 2.000 4.500 9.000 9.000Llave de paso de 1½ˮ Unid 1.000 9.000 9.000 9.000Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.000 6.000 48.000 48.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Codo PVC, 90º - 2" Unid 1.000 8.000 8.000 8.000
Unid 0.125 26.000 3.250 3.250Cinta teflón Unid 1.000 1.200 1.200 1.200Lija Nº 40 Unid 0.250 2.800 0.700 0.700
2. MANO DE OBRA 125.000 0.000 0.000 125.000Mano de obra no calificada Jornal 5.000 25.000 125.000 125.000
3. EQUIPOS 6.250 0.000 0.000 6.250Herramientas (5,00 % MONC) % 0.050 125.000 6.250 6.250
COSTO TOTAL 355.400 224.150 0.000 131.250
1.1.1.2. Instalación de collarín de captación de 25 mm * ¾"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 134.720 134.720 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de ¾" Unid 1.000 9.000 9.000 9.000Tubería PVC SAP, C-10, ¾ˮ x 5m m 1.000 2.000 2.000 2.000Codo PVC 45°, ¾ˮ unid 1.000 2.500 2.500 2.500Válvula doble Universal de bola de ¾" Unid 1.000 17.000 17.000 17.000
Unid 3.000 2.000 6.000 6.000Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 160.970 134.720 0.000 26.250
1.1.1.3. Instalación de collarín de captación de 150 mm * 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 227.720 227.720 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de 150 mm X 2" Unid 1.000 75.000 75.000 75.000Tubería PVC SAP, C-7,50, 2ˮ x 5m m 1.000 6.000 6.000 6.000Codo PVC 45°, 2" unid 1.000 8.000 8.000 8.000Válvula doble Universal de bola de 2" Unid 1.000 21.000 21.000 21.000UPR PVC Adaptador de 2ˮ Unid 3.000 6.500 19.500 19.500Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 253.970 227.720 0.000 26.250
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ¼ˮ
Tee PVC, 3ˮm²
Reducción PVC, 3" - 1½ˮ
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
UPR PVC Adaptador de ¾ˮ
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
ANALISIS DE COSTOS UNITARIOS
1.1.1.4. Instalación de collarín de captación de 200 mm * 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 232.720 232.720 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de 200 mm X 1½" Unid 1.000 95.000 95.000 95.000Tubería PVC SAP, C-7,50, 1½" x 5m m 1.000 4.000 4.000 4.000Codo PVC 45°, 1½" unid 1.000 5.000 5.000 5.000Válvula doble Universal de bola de 1½" Unid 1.000 17.000 17.000 17.000
Unid 3.000 4.500 13.500 13.500Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 258.970 232.720 0.000 26.250
1.1.1.5. Cámara rompe presión (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m³COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 251.280 251.280 0.000 0.000
Arena hormigón 0.400 70.000 28.000 28.000Cemento Portland tipo I / 42,50 kg Bolsa 1.600 22.000 35.200 35.200
m 54.000 0.720 38.880 38.880Juego de panel reforzado (0,7*0,7*0,7 m3) Unid 0.250 80.000 20.000 20.000Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.000 12.600 12.600 12.600
Unid 1.000 12.000 12.000 12.000Malla mosquitero verde 0.500 6.000 3.000 3.000Alambre galvanizado Nº 16 kg 0.050 9.000 0.450 0.450Reducción PVC, 3" - 1½ˮ Unid 1.000 9.000 9.000 9.000Llave de paso de 1½" Unid 1.000 9.000 9.000 9.000
Unid 2.000 4.500 9.000 9.000Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.000 6.000 48.000 48.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Codo PVC, 90º - 2" Unid 1.000 8.000 8.000 8.000
Unid 0.125 26.000 3.250 3.250Cinta teflón Unid 1.000 1.200 1.200 1.200Lija Nº 40 Unid 0.250 2.800 0.700 0.700
2. MANO DE OBRA 125.000 0.000 0.000 125.000Mano de obra no calificada Jornal 5.000 25.000 125.000 125.000
3. EQUIPOS 6.250 0.000 0.000 6.250Herramientas (5,00 % MONC) % 0.050 125.000 6.250 6.250
COSTO TOTAL 382.530 251.280 0.000 131.250
1.1.1.6. Cámara rompe presión (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m³COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 418.230 418.230 0.000 0.000
Arena hormigón 0.900 70.000 63.000 63.000Cemento Portland tipo I / 42,50 kg Bolsa 3.600 22.000 79.200 79.200
m 86.000 1.280 110.080 110.080Juego de panel reforzado (1,10*1,10*1,10 m3) Unid 0.250 115.000 28.750 28.750Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.000 12.600 12.600 12.600
Unid 1.000 12.000 12.000 12.000Malla mosquitero verde 0.500 6.000 3.000 3.000Alambre galvanizado Nº 16 kg 0.050 9.000 0.450 0.450Reducción PVC, 3" - 2ˮ Unid 1.000 9.000 10.000 10.000Llave de paso de 2" Unid 1.000 12.000 12.000 12.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.000 6.000 48.000 48.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Codo PVC, 90º - 2" Unid 1.000 8.000 8.000 8.000
Unid 0.125 26.000 3.250 3.250Cinta teflón Unid 1.000 1.200 1.200 1.200Lija Nº 40 Unid 0.250 2.800 0.700 0.700
2. MANO DE OBRA 125.000 0.000 0.000 125.000Mano de obra no calificada Jornal 5.000 25.000 125.000 125.000
3. EQUIPOS 6.250 0.000 0.000 6.250Herramientas (5,00 % MONC) % 0.050 125.000 6.250 6.250
COSTO TOTAL 549.480 418.230 0.000 131.250
PRECIO UNITAR.
PRECIO TOTAL
m³
UPR PVC Adaptador de 1½ˮ
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ¼"
Tee PVC, 3ˮm²
UPR PVC Adaptador de 1½ˮ
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de 8 mm
Tee PVC, 3ˮm²
Pegamento OATEY x ¼ galón
ANALISIS DE COSTOS UNITARIOS
1.1.1.7. Cámara rompe presión (5,50 l/s) de 1,50*1,50*1,50 m³COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 656.050 656.050 0.000 0.000
Arena hormigón 1.700 70.000 119.000 119.000Cemento Portland tipo I / 42,50 kg Bolsa 6.800 22.000 149.600 149.600
m 125.000 1.720 215.000 215.000Juego de panel reforzado (1,50*1,50*1,50 m3) Unid 0.250 145.000 36.250 36.250Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.000 12.600 12.600 12.600
Unid 1.000 12.000 12.000 12.000Malla mosquitero verde 0.500 6.000 3.000 3.000Alambre galvanizado Nº 16 kg 0.050 9.000 0.450 0.450Reducción PVC, 3" - 2ˮ Unid 1.000 9.000 9.000 9.000Llave de paso de 2" Unid 1.000 12.000 12.000 12.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.000 6.000 48.000 48.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000Codo PVC, 90º - 2" Unid 1.000 8.000 8.000 8.000
Unid 0.125 26.000 3.250 3.250Cinta teflón Unid 1.000 1.200 1.200 1.200Lija Nº 40 Unid 0.250 2.800 0.700 0.700
2. MANO DE OBRA 125.000 0.000 0.000 125.000Mano de obra no calificada Jornal 5.000 25.000 125.000 125.000
3. EQUIPOS 6.250 0.000 0.000 6.250Herramientas (5,00 % MONC) % 0.050 125.000 6.250 6.250
COSTO TOTAL 787.300 656.050 0.000 131.250
1.1.1.8. Instalación de Codo PVC de 45º - 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 2.936 2.936 0.000 0.000
Codo PVC 45°, 1ˮ Unid 1.000 2.500 2.500 2.500Unid 0.010 26.000 0.260 0.260
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 3.724 2.936 0.000 0.788
1.1.1.9. Instalación de Codo PVC de 45º - 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 5.566 5.566 0.000 0.000
Codo PVC 45°, 1½" Unid 1.000 5.000 5.000 5.000Unid 0.015 26.000 0.390 0.390
Lija Nº 40 Unid 0.060 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 6.354 5.566 0.000 0.788
1.1.1.10. Instalación de Codo PVC de 45º - 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 8.696 8.696 0.000 0.000
Codo PVC, 45º - 2" Unid 1.000 8.000 8.000 8.000Unid 0.020 26.000 0.520 0.520
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 9.484 8.696 0.000 0.788
1.1.1.11. Instalación de Codo PVC de 45º - 3"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ⅜ˮ
Tee PVC, 3ˮm²
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS 1. MATERIALES E INSUMOS 12.326 12.326 0.000 0.000
Codo PVC, 45º - 3" Unid 1.000 11.500 11.500 11.500Unid 0.025 26.000 0.650 0.650
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 13.114 12.326 0.000 0.788
1.1.1.12. Instalación de Codo PVC de 90º - 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 2.936 2.936 0.000 0.000
Codo PVC 90°, 1ˮ Unid 1.000 2.500 2.500 2.500Unid 0.010 26.000 0.260 0.260
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 3.724 2.936 0.000 0.788
1.1.1.13. Instalación de Codo PVC de 90º - 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 5.566 5.566 0.000 0.000
Codo PVC 90°, 1½" Unid 1.000 5.000 5.000 5.000Unid 0.015 26.000 0.390 0.390
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 6.354 5.566 0.000 0.788
1.1.1.14. Instalación de Codo PVC de 90º - 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 8.696 8.696 0.000 0.000
Codo PVC 90º, 2ˮ Unid 1.000 8.000 8.000 8.000Unid 0.020 26.000 0.520 0.520
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 9.484 8.696 0.000 0.788
1.1.1.15. Instalación de Tee PVC de 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 6.696 6.696 0.000 0.000
Tee PVC, 1ˮ Unid 1.000 6.000 6.000 6.000Unid 0.020 26.000 0.520 0.520
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 7.484 6.696 0.000 0.788
1.1.1.16. Instalación de Tee PVC de 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 8.956 8.956 0.000 0.000
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS Tee PVC, 1½ˮ Unid 1.000 8.000 8.000 8.000
Unid 0.030 26.000 0.780 0.780Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 9.744 8.956 0.000 0.788
1.1.1.17. Instalación de Tee PVC de 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 10.216 10.216 0.000 0.000
Tee PVC, 2ˮ Unid 1.000 9.000 9.000 9.000Unid 0.040 26.000 1.040 1.040
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 11.004 10.216 0.000 0.788
1.1.1.18. Instalación de Tee PVC de 3"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 13.476 13.476 0.000 0.000
Tee PVC, 3ˮ Unid 1.000 12.000 12.000 12.000Unid 0.050 26.000 1.300 1.300
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 14.264 13.476 0.000 0.788
1.1.1.19. Instalación de Reducción PVC de 1½" - 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 6.956 6.956 0.000 0.000
Reducción PVC, 1½" - 1ˮ Unid 1.000 6.000 6.000 6.000Unid 0.030 26.000 0.780 0.780
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 7.744 6.956 0.000 0.788
1.1.1.20. Instalación de Reducción PVC de 2" - 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 6.476 6.476 0.000 0.000
Reducción PVC, 2" - 1½" Unid 1.000 5.000 5.000 5.000Unid 0.050 26.000 1.300 1.300
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 7.264 6.476 0.000 0.788
1.1.1.21. Instalación de Reducción PVC de 2" - 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 7.976 7.976 0.000 0.000
Reducción PVC, 2" - 1" Unid 1.000 6.500 6.500 6.500
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS Unid 0.050 26.000 1.300 1.300
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 8.764 7.976 0.000 0.788
1.1.1.22. Instalación de Reducción PVC de 3" - 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 10.736 10.736 0.000 0.000
Reducción PVC, 3" - 2ˮ Unid 1.000 9.000 9.000 9.000Unid 0.060 26.000 1.560 1.560
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 11.524 10.736 0.000 0.788
1.1.1.23. Instalación de Llave de paso de 1"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 10.896 10.896 0.000 0.000
Llave de paso de 1" Unid 1.000 6.200 6.200 6.200Unid 2.000 2.000 4.000 4.000Unid 0.020 26.000 0.520 0.520
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 11.684 10.896 0.000 0.788
1.1.1.24. Instalación de Llave de paso de 1½"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 18.956 18.956 0.000 0.000
Llave de paso de 1½" Unid 1.000 9.000 9.000 9.000Unid 2.000 4.500 9.000 9.000Unid 0.030 26.000 0.780 0.780
Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 19.744 18.956 0.000 0.788
1.1.1.25. Instalación de Llave de paso de 2"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 26.216 26.216 0.000 0.000
Llave de paso de 2" Unid 1.000 12.000 12.000 12.000UPR PVC Adaptador de 2ˮ Unid 2.000 6.500 13.000 13.000
Unid 0.040 26.000 1.040 1.040Lija Nº 40 Unid 0.063 2.800 0.176 0.176
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 27.004 26.216 0.000 0.788
1.1.1.26. Construcción de Caja de llave de pasoCOSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
UPR PVC Adaptador de 1ˮPegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
UPR PVC Adaptador de 1½ˮPegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS 1. MATERIALES E INSUMOS 94.740 94.740 0.000 0.000
Arena hormigón m³ 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.120 22.000 2.640 2.640Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
2. MANO DE OBRA 0.750 0.000 0.000 0.750Mano de obra no calificada Jornal 0.030 25.000 0.750 0.750
3. EQUIPOS 0.038 0.000 0.000 0.038Herramientas (5,00 % MONC) % 0.050 0.750 0.038 0.038
COSTO TOTAL 95.528 94.740 0.000 0.788
1.1.1.27. Instalación de collarines para hidrantes de 25 mm * ¾"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 138.020 138.020 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación del hidranteCollarín HDPE de 25 mm X ¾" Unid 1.000 9.000 9.000 9.000Niple de ¾" Unid 1.000 4.000 4.000 4.000Llave de paso de ¾" Unid 1.000 4.800 4.800 4.800Válvula de acople rápido de ¾" Unid 1.000 22.000 22.000 22.000Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 164.270 138.020 0.000 26.250
1.1.1.28. Instalación de collarines para hidrantes de 38 mm * ¾"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 140.020 140.020 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de 38 mm X ¾" Unid 1.000 11.000 11.000 11.000Niple de ¾" Unid 1.000 4.000 4.000 4.000Llave de paso de ¾" Unid 1.000 4.800 4.800 4.800Válvula de acople rápido de ¾" Unid 1.000 22.000 22.000 22.000Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 166.270 140.020 0.000 26.250
1.1.1.29. Instalación de collarines para hidrantes de 50 mm * ¾"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 141.020 141.020 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de 50 mm X ¾" Unid 1.000 12.000 12.000 12.000Niple de ¾" Unid 1.000 4.000 4.000 4.000Llave de paso de ¾" Unid 1.000 4.800 4.800 4.800Válvula de acople rápido de ¾" Unid 1.000 22.000 22.000 22.000Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 167.270 141.020 0.000 26.250
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
ANALISIS DE COSTOS UNITARIOS
1.1.1.30. Instalación de collarines para hidrantes de 75 mm * ¾"COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 148.020 148.020 0.000 0.0001.1. Caja de concreto de Protección
Arena hormigón 0.030 70.000 2.100 2.100Cemento Portland tipo I / 42,50 kg Bolsa 0.110 22.000 2.420 2.420Tapa metálica con seguro de 35x35 cm Unid 1.000 90.000 90.000 90.000
1.2. Accesorios para instalación de CollarínCollarín HDPE de 75 mm X ¾" Unid 1.000 19.000 19.000 19.000Niple de ¾" Unid 1.000 4.000 4.000 4.000Llave de paso de ¾" Unid 1.000 4.800 4.800 4.800Válvula de acople rápido de ¾" Unid 1.000 22.000 22.000 22.000Cinta teflón Unid 2.000 1.200 2.400 2.400
Unid 0.050 26.000 1.300 1.300
2. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
3. EQUIPOS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 174.270 148.020 0.000 26.250
1.1.1.31. Instalación de Tubería PVC SAP C-10, Ø=¾"COSTO/m
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 2.162 2.162 0.000 0.000
Tubería PVC SAP, C-10, 1ˮ x 5m m 1.000 2.000 2.000 2.000Unid 0.005 26.000 0.130 0.130
Sierra metálica Unid 0.002 5.000 0.010 0.010Lija Nº 40 Unid 0.008 2.800 0.022 0.022
2. MANO DE OBRA 2.500 0.000 0.000 2.500Mano de obra no calificada Jornal 0.100 25.000 2.500 2.500
3. EQUIPOS 0.125 0.000 0.000 0.125Herramientas (5,00 % MONC) % 0.050 2.500 0.125 0.125
COSTO TOTAL 4.787 2.162 0.000 2.625
1.1.1.32. Instalación de Tubería PVC SAP C-10, Ø=1"COSTO/m
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 2.962 2.962 0.000 0.000
Tubería PVC SAP, C-10, 1ˮ x 5m m 1.000 2.800 2.800 2.800Unid 0.005 26.000 0.130 0.130
Sierra metálica Unid 0.002 5.000 0.010 0.010Lija Nº 40 Unid 0.008 2.800 0.022 0.022
2. MANO DE OBRA 2.500 0.000 0.000 2.500Mano de obra no calificada Jornal 0.100 25.000 2.500 2.500
3. EQUIPOS 0.125 0.000 0.000 0.125Herramientas (5,00 % MONC) % 0.050 2.500 0.125 0.125
COSTO TOTAL 5.587 2.962 0.000 2.625
1.1.1.33. Instalación de Tubería PVC SAP C-7.5, Ø=1½"COSTO/m
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 4.240 4.240 0.000 0.000
Tubería PVC SAP, C-7,50, 1½" x 5m m 1.000 4.000 4.000 4.000Unid 0.008 26.000 0.208 0.208
Sierra metálica Unid 0.002 5.000 0.010 0.010Lija Nº 40 Unid 0.008 2.800 0.022 0.022
2. MANO DE OBRA 2.500 0.000 0.000 2.500Mano de obra no calificada Jornal 0.100 25.000 2.500 2.500
3. EQUIPOS 0.125 0.000 0.000 0.125Herramientas (5,00 % MONC) % 0.050 2.500 0.125 0.125
COSTO TOTAL 6.865 4.240 0.000 2.625
1.1.1.34. Instalación de Tubería PVC SAP C-7.5, Ø=2"COSTO/m
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 6.297 6.297 0.000 0.000
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 1.000 6.000 6.000 6.000Unid 0.010 26.000 0.260 0.260
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
ANALISIS DE COSTOS UNITARIOS Sierra metálica Unid 0.003 5.000 0.015 0.015Lija Nº 40 Unid 0.008 2.800 0.022 0.022
2. MANO DE OBRA 2.500 0.000 0.000 2.500Mano de obra no calificada Jornal 0.100 25.000 2.500 2.500
3. EQUIPOS 0.125 0.000 0.000 0.125Herramientas (5,00 % MONC) % 0.050 2.500 0.125 0.125
COSTO TOTAL 8.922 6.297 0.000 2.625
1.1.1.35. Instalación de Tubería PVC SAP C-7.5, Ø=3"COSTO/m
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 12.897 12.897 0.000 0.000
Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.000 12.600 12.600 12.600Unid 0.010 26.000 0.260 0.260
Sierra metálica Unid 0.003 5.000 0.015 0.015Lija Nº 40 Unid 0.008 2.800 0.022 0.022
2. MANO DE OBRA 2.500 0.000 0.000 2.500Mano de obra no calificada Jornal 0.100 25.000 2.500 2.500
3. EQUIPOS 0.125 0.000 0.000 0.125Herramientas (5,00 % MONC) % 0.050 2.500 0.125 0.125
COSTO TOTAL 15.522 12.897 0.000 2.625
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
ANALISIS DE COSTOS UNITARIOS 1.1.1.36. Instalación de sistema móvil
COSTO/Unid
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES 220.200 220.200 0.000 0.000
Unid 1.000 12.000 12.000 12.000Unid 2.000 10.000 20.000 20.000
Manguera PEDB de 25 mm, C-4 m 50.000 1.100 55.000 55.000Unid 1.000 9.000 9.000 9.000Unid 1.000 3.000 3.000 3.000
Aspersor VYR 60 - ¾" / sectorial (bronce) Unid 1.000 85.000 85.000 85.000Unid 1.000 35.000 35.000 35.000
Cinta teflón Unid 1.000 1.200 1.200 1.200
2. MANO DE OBRA 6.250 0.000 0.000 6.250Mano de obra no calificada Jornal 0.250 25.000 6.250 6.250
3. EQUIPOS 0.313 0.000 0.000 0.313Herramientas (5,00 % MONC) % 0.050 6.250 0.313 0.313
COSTO TOTAL 226.763 220.200 0.000 6.563
1.1.2. Produc. de actividades agropec. orientas al Mcdo.1.1.2.1. Huerto fijo de hortalizas a campo abierto1.1.2.1.1. Producción de zanahoria
VARIEDAD "Senimis"NIVEL TECNICO BajaRDTO (kg/ha) 7,500.00PRECIO (S/./kg) 0.50 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 2,360.000 360.000 0.000 2,000.000
Semillas de Zanahoria kg 4.000 90.000 360.000 360.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 1,850.000 0.000 0.000 1,850.000Preparación de terreno Jornal 15.000 25.000 375.000 375.000Siembra Jornal 12.000 25.000 300.000 300.000Labores culturales Jornal 24.000 25.000 600.000 600.000Riegos Jornal 8.000 25.000 200.000 200.000Cosecha Jornal 15.000 25.000 375.000 375.000
3. HERRAMIENTAS 92.500 0.000 0.000 92.500Herramientas (5,00 % MONC) % 0.050 1,850.000 92.500 92.500
COSTO TOTAL 4,302.500 360.000 0.000 3,942.500
1.1.2.1.2. Producción de cebollaVARIEDAD "Roja Arequipeña"NIVEL TECNICO BajaRDTO (kg/ha) 11,000.00PRECIO (S/./kg) 1.50 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 2,472.000 472.000 0.000 2,000.000
Semillas de cebolla kg 4.000 118.000 472.000 472.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 1,150.000 0.000 0.000 1,150.000Preparación de terreno Jornal 8.000 25.000 200.000 200.000Siembra Jornal 10.000 25.000 250.000 250.000Labores culturales Jornal 10.000 25.000 250.000 250.000Riegos Jornal 8.000 25.000 200.000 200.000Cosecha Jornal 10.000 25.000 250.000 250.000
3. HERRAMIENTAS 57.500 0.000 0.000 57.500Herramientas (5,00 % MONC) % 0.050 1,150.000 57.500 57.500
COSTO TOTAL 3,679.500 472.000 0.000 3,207.500
1.1.2.1.3. Producción de betarragaVARIEDAD "Viroflay"NIVEL TECNICO BajaRDTO (kg/ha) 6,500.00PRECIO (S/./kg) 0.60 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 2,900.000 900.000 0.000 2,000.000
Semillas de betarraga kg 12.000 75.000 900.000 900.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 1,050.000 0.000 0.000 1,050.000Preparación de terreno Jornal 8.000 25.000 200.000 200.000Siembra Jornal 8.000 25.000 200.000 200.000Labores culturales Jornal 8.000 25.000 200.000 200.000Riegos Jornal 8.000 25.000 200.000 200.000Cosecha Jornal 10.000 25.000 250.000 250.000
PRECIO UNITAR.
PRECIO TOTAL
Llave bayoneta de ¾ˮCodo HDPE de 25 mm x ¾ˮ R/H
Niple PVC de ¾ˮ x 1,20 m (Elevador)Unión roscada HDPE de ¾ˮ
Trípode metal ¾ˮ x 1,10 m c/abraz. A presión
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS 3. HERRAMIENTAS 52.500 0.000 0.000 52.500
Herramientas (5% M.O.) % 0.050 1,050.000 52.500 52.500
COSTO TOTAL 4,002.500 900.000 0.000 3,102.500
1.1.2.1.4. Producción de coliflorVARIEDAD "Snowball"NIVEL TECNICO BajaRDTO (kg/ha) 6,000.00PRECIO (S/./kg) 1.00 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 2,425.000 425.000 0.000 2,000.000
Semillas de coliflor kg 2.500 170.000 425.000 425.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 1,050.000 0.000 0.000 1,050.000Preparación de terreno Jornal 8.000 25.000 200.000 200.000Siembra Jornal 8.000 25.000 200.000 200.000Labores culturales Jornal 8.000 25.000 200.000 200.000Riegos Jornal 8.000 25.000 200.000 200.000Cosecha Jornal 10.000 25.000 250.000 250.000
3. HERRAMIENTAS 52.500 0.000 0.000 52.500Herramientas (5% M.O.) % 0.050 1,050.000 52.500 52.500
COSTO TOTAL 3,527.500 425.000 0.000 3,102.500
1.1.2.1.5. Producción de acelgaVARIEDAD "Blanca Lucullus"NIVEL TECNICO BajaRDTO (kg/ha) 5,000.00PRECIO (S/./kg) 0.70 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 2,400.000 400.000 0.000 2,000.000
Semillas de acelga kg 5.000 80.000 400.000 400.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 1,850.000 0.000 0.000 1,850.000Preparación de terreno Jornal 15.000 25.000 375.000 375.000Siembra Jornal 12.000 25.000 300.000 300.000Labores culturales Jornal 24.000 25.000 600.000 600.000Riegos Jornal 8.000 25.000 200.000 200.000Cosecha Jornal 15.000 25.000 375.000 375.000
3. HERRAMIENTAS 92.500 0.000 0.000 92.500Herramientas (5,00 % MONC) % 0.050 1,850.000 92.500 92.500
COSTO TOTAL 4,342.500 400.000 0.000 3,942.500
1.1.2.2. Parcela de pastos asociados1.1.2.2.1. Parcela producción de alfalfa
VARIEDAD Super Alabama 550 PL NIVEL TECNICO BajaRDTO (kg/ha) 60,000.00PRECIO (S/./kg) 0.25 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. INSUMOS 3,050.000 1,050.000 0.000 2,000.000
Semilla de Alfalfa Super Alabama 550 PL kg 25.000 42.000 1,050.000 1,050.000Guano de corral Saco 200.000 10.000 2,000.000 2,000.000
2. MANO DE OBRA 3,575.000 0.000 0.000 3,575.000Preparación de terreno Jornal 35.000 25.000 875.000 875.000Siembra Jornal 28.000 25.000 700.000 700.000Labores culturales Jornal 35.000 25.000 875.000 875.000Riegos Jornal 10.000 25.000 250.000 250.000Cosecha Jornal 35.000 25.000 875.000 875.000
3. HERRAMIENTAS 178.750 0.000 0.000 178.750Herramientas (5,00 % MONC) % 0.050 3,575.000 178.750 178.750
COSTO TOTAL 6,803.750 1,050.000 0.000 5,753.750
1.1.2.3. Miniparcelas para la producción granos andinos1.1.2.3.1. Producción de quinua
VARIEDADNIVEL TECNICO MediaRDTO (kg/ha) 1,800.00PRECIO (S/./kg) 3.50 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MANO DE OBRA 2,500.000 0.000 0.000 2,500.000
1.1. PREPARACION DEL TERRENOLimpieza de terreno Jornal 2.000 25.000 50.000 50.0001.2. SIEMBRA
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS Aplicación del primer abonamiento Jornal 4.000 25.000 100.000 100.000Siembra chorro continuo por surcos Jornal 4.000 25.000 100.000 100.000Tapado de semilla Jornal 2.000 25.000 50.000 50.000Riego de machaco y remojo Jornal 2.000 25.000 50.000 50.0001.3. LABORES CULTURALESPrimer deshierbe y aporque Jornal 20.000 25.000 500.000 500.000Segundo abonamiento Jornal 4.000 25.000 100.000 100.000Segundo aporque Jornal 15.000 25.000 375.000 375.000Segundo deshierbo Jornal 5.000 25.000 125.000 125.0001.4. COSECHACorte Jornal 15.000 25.000 375.000 375.000Traslado, amontonado y secado Jornal 5.000 25.000 125.000 125.000Trillado Jornal 14.000 25.000 350.000 350.000Venteo Jornal 4.000 25.000 100.000 100.000Ensacado y cocido Jornal 2.000 25.000 50.000 50.000Almacenamiento Jornal 2.000 25.000 50.000 50.000
2. TRACCION ANIMAL 385.000 0.000 0.000 385.0002.1. PREPARACION DEL TERRENOBarbecho o Arado o roturación Yunta 5.000 35.000 175.000 175.000Cruza o desterronado Yunta 4.000 35.000 140.000 140.000Surcado Yunta 2.000 35.000 70.000 70.000
3. INSUMOS 1,447.450 147.450 0.000 1,300.0003.1. SEMILLA Semilla de quinua kg 15.000 9.830 147.450 147.4503.2. FERTILIZANTESGuano de corral Saco 130.000 10.000 1,300.000 1,300.000
4. HERRAMIENTAS 125.000 0.000 0.000 125.000Herramientas (5,00 % MONC) % 0.050 2,500.000 125.000 125.000
COSTO TOTAL 4,457.450 147.450 0.000 4,310.000
1.1.2.3.2. Producción de papa blancaVARIEDAD CanchánNIVEL TECNICO MediaRDTO (kg/ha) 26,000.00PRECIO (S/./kg) 0.60
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MANO DE OBRA 3,100.000 0.000 0.000 3,100.000
1.1. PREPARACION DEL TERRENOLimpieza y quema de rastrojo Jornal 1.000 25.000 25.000 25.000Riego de remojo o machaco Jornal 1.000 25.000 25.000 25.0001.2. SIEMBRAReseleccion de semilla Jornal 2.000 25.000 50.000 50.000Mezcla y abonamiento Jornal 3.000 25.000 75.000 75.000Distribucion de semillas Jornal 8.000 25.000 200.000 200.0001.3. LABORES CULTURALESPrimer aporque Jornal 15.000 25.000 375.000 375.000Segundo aporque Jornal 15.000 25.000 375.000 375.0001.4. COSECHAEscarbe de surcos Jornal 25.000 25.000 625.000 625.000Recojo manual Jornal 20.000 25.000 500.000 500.000Traslado y amontonamiento Jornal 9.000 25.000 225.000 225.000Selección y clasificacion Jornal 15.000 25.000 375.000 375.000Ensacado y cosido Jornal 5.000 25.000 125.000 125.000Almacenado Jornal 5.000 25.000 125.000 125.000
2. TRACCION ANIMAL 350.000 0.000 0.000 350.0002.1. PREPARACION DEL TERRENOBarbecho o Arado o roturacion Yunta 5.000 35.000 175.000 175.000Cruza o desterronado Yunta 3.000 35.000 105.000 105.0002.2. SIEMBRASurqueo o melgueo Yunta 1.000 35.000 35.000 35.000Tapado de semilla Yunta 1.000 35.000 35.000 35.000
3. INSUMOS 6,750.000 5,250.000 0.000 1,500.0003.1. SEMILLA Semilla de papa kg 1,500.000 3.500 5,250.000 5,250.0003.2. FERTILIZANTESGuano de corral Saco 150.000 10.000 1,500.000 1,500.000
4. HERRAMIENTAS 155.000 0.000 0.000 155.000Herramientas (5,00 % MONC) % 0.050 3,100.000 155.000 155.000
COSTO TOTAL 10,355.000 5,250.000 0.000 5,105.000
1.1.2.3.3. Producción de frejol canarioVARIEDAD Frejol canarioNIVEL TECNICO MediaRDTO (kg/ha) 800.00PRECIO (S/./kg) 3.00 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MANO DE OBRA 1,600.000 0.000 0.000 1,600.000
1.1. PREPARACION DEL TERRENOLimpieza de terreno Jornal 2.000 25.000 50.000 50.000
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS 1.2. SIEMBRAReselección y desinfección Jornal 1.000 25.000 25.000 25.000Mezcla y primer abonamiento Jornal 2.000 25.000 50.000 50.000Distribución de semilla Jornal 3.000 25.000 75.000 75.0001.3. LABORES CULTURALESPrimer deshierbe a mano Jornal 8.000 25.000 200.000 200.000Primer control fitosanitario Jornal 2.000 25.000 50.000 50.000Primer aporque Jornal 16.000 25.000 400.000 400.000Segundo control fitosanitario Jornal 2.000 25.000 50.000 50.0001.4. COSECHACorte o siega Jornal 8.000 25.000 200.000 200.000Traslado, amontonado Jornal 6.000 25.000 150.000 150.000Trilla Jornal 8.000 25.000 200.000 200.000Despaje y venteo Jornal 2.000 25.000 50.000 50.000Ensacado y cosido Jornal 2.000 25.000 50.000 50.000Almacenamiento Jornal 2.000 25.000 50.000 50.000
2. TRACCION ANIMAL 350.000 0.000 0.000 350.0002.1. PREPARACION DEL TERRENOBarbecho o Arado o roturación Yunta 4.000 35.000 140.000 140.000Cruza o desterronado Yunta 2.000 35.000 70.000 70.0002.2. SIEMBRASurcado Yunta 2.000 35.000 70.000 70.000Tapado de semilla Yunta 2.000 35.000 70.000 70.000
3. INSUMOS 1,790.000 390.000 0.000 1,400.0003.1. SEMILLA Semilla de frejol canario kg 60.000 6.500 390.000 390.0003.2. FERTILIZANTESGuano de corral Saco 140.000 10.000 1,400.000 1,400.000
4. HERRAMIENTAS 80.000 0.000 0.000 80.000Herramientas (5,00 % MONC) % 0.050 1,600.000 80.000 80.000
COSTO TOTAL 3,820.000 390.000 0.000 3,430.000
1.1.2.3.4. Producción de arvejaVARIEDAD BlancaNIVEL TECNICO MedioRDTO (kg/ha) 2,000.00PRECIO (S/./kg) 1.40 COSTO/ha
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MANO DE OBRA 1,425.000 0.000 0.000 1,425.000
1.1. PREPARACION DEL TERRENOLimpieza de terreno Jornal 1.000 25.000 25.000 25.0001.2. SIEMBRAReselec. Y desinfección de semilla Jornal 1.000 25.000 25.000 25.000Mezcla y primer abonamiento Jornal 2.000 25.000 50.000 50.000Distribución de semilla Jornal 3.000 25.000 75.000 75.0001.3. LABORES CULTURALESPrimer deshierbe a mano Jornal 8.000 25.000 200.000 200.000Primer aporque Jornal 16.000 25.000 400.000 400.0001.4. COSECHACorte a mano con hoz Jornal 8.000 25.000 200.000 200.000Traslado de gavilla a la era Jornal 4.000 25.000 100.000 100.000Trilla con garrote Jornal 8.000 25.000 200.000 200.000Venteo Jornal 2.000 25.000 50.000 50.000Ensacado y cocido Jornal 2.000 25.000 50.000 50.000Traslado y almacenamiento Jornal 2.000 25.000 50.000 50.000
2. TRACCION ANIMAL 350.000 0.000 0.000 350.0002.1. PREPARACION DEL TERRENOBarbecho o Arado o roturación Yunta 4.000 35.000 140.000 140.000Cruza o desterronado o Rastra Yunta 2.000 35.000 70.000 70.0001.2. SIEMBRASurcado Yunta 2.000 35.000 70.000 70.000Tapado de semilla Yunta 2.000 35.000 70.000 70.000
3. INSUMOS 1,554.000 354.000 0.000 1,200.0003.1. SEMILLA Semilla de arveja kg 60.000 5.900 354.000 354.0003.2. FERTILIZANTESGuano de corral Saco 120.000 10.000 1,200.000 1,200.000
4. HERRAMIENTAS 71.250 0.000 0.000 71.250Herramientas (5,00 % MONC) % 0.050 1,425.000 71.250 71.250
COSTO TOTAL 3,400.250 354.000 0.000 3,046.250
1.1.2.4. AgroforesteríaCOSTO/Familia
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES 30.000 30.000 0.000 0.000
Plantones de pino Unid. 20.000 1.500 30.000 30.000
2. MANO DE OBRA 50.000 0.000 0.000 50.000Mano de obra no calificada Jornal 2.000 25.000 50.000 50.000
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS
3. HERRAMIENTAS 2.500 0.000 0.000 2.500Herramientas (5,00 % MONC) % 0.050 50.000 2.500 2.500
TOTAL COSTOS DIRECTOS (S/.) 82.500 30.000 0.000 52.500
1.1.2.5. Módulo de producción de abono orgánico - compostproduc. = 20 sacos/familia - sacos=S/. 15,00 COSTO/Módulo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MANO DE OBRA 135.000 0.000 0.000 135.000
1.1. PREPARACION DE LA POZAPerforacion de 02 pozas (1 x 8 x 0,5 m) Jornal 1.000 25.000 25.000 25.0001.2. RECOLECCION DE MALEZAS Y GUANO CORRALRecolección de malezas (mala hierba etc.) Jornal 1.000 25.000 25.000 25.000Recolección de guano (fresco y/o seco) Jornal 1.000 25.000 25.000 25.0001.3. LABORES CULTURALESSecado de malezas Jornal 0.300 25.000 7.500 7.500Mezcla de malezas y guano Jornal 0.300 25.000 7.500 7.500Primera inundación de la poza Jornal 0.300 25.000 7.500 7.500Primer volteo de la mezcla Jornal 0.300 25.000 7.500 7.500Segunda inundación de la mezcla Jornal 0.300 25.000 7.500 7.500Segundo volteo de la mezcla Jornal 0.300 25.000 7.500 7.5001.4. OBTENCION DEL COMPOSTRemoción del compost Jornal 0.300 25.000 7.500 7.500Ensacado del compost Jornal 0.300 25.000 7.500 7.500
2. INSUMOS 18.200 9.000 0.000 9.2002.1. MALLA ARPILLERAMalla arpillera 5.000 1.800 9.000 9.000Ceniza kg 6.000 0.200 1.200 1.200
Unid 2.000 4.000 8.000 8.000
3. HERRAMIENTAS 6.750 0.000 0.000 6.750Herramientas (5,00 % MONC) % 0.050 135.000 6.750 6.750
COSTO TOTAL 159.950 9.000 0.000 150.950
1.1.2.6. Módulo de crianza de gallinasCOSTO/Módulo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. IMPLEMENTACIÓN DE JAULAS Y COMPRA DE POLLOS 103.200 53.200 0.000 50.000
Malla gallinero m 4.000 2.800 11.200 11.200Instalaciones (construcción de jaulas) Gbl 1.000 50.000 50.000 50.000Alambre negro Nº 16 kg 1.500 5.000 7.500 7.500Clavos de 4ˮ kg 0.500 5.000 2.500 2.500Gallinas criollas de doble propósito Unid 4.000 8.000 32.000 32.000
2. ALIMENTO DE GALLINAS 8.800 8.800 0.000 0.000Alimento balanceado kg 4.000 2.200 8.800 8.800
3. BOTIQUÍN VETERINARIO 4.200 4.200 0.000 0.000Antibiótico (Biomycin Súper x 20 g) Unid 0.500 2.800 1.400 1.400Antiparasitario ext. (Fipecto Frasco de 1,00 l) Fco. 0.020 140.000 2.800 2.800
4. TRANSPORTE 2.000 2.000 0.000 0.000Transporte semovientes Cbza 4.000 0.500 2.000 2.000
5. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
5. HERRAMIENTAS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 144.450 68.200 0.000 76.250
1.1.2.7. Módulo de crianza de cuyesCOSTO/Módulo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. IMPLEMENTACIÓN DE POZAS 36.200 16.200 0.000 20.000
Unid 5.000 4.000 20.000 20.000Malla gallinero m 4.000 2.800 11.200 11.200Clavos de 2ˮ kg 0.500 5.000 2.500 2.500Clavos de 4ˮ kg 0.500 5.000 2.500 2.500
2. AQUISICIÓN DE REPRODUCTORES 184.000 184.000 0.000 0.000Cuyes reproductores (macho) Unid 1.000 24.000 24.000 24.000Cuyes reproductores (hembras) Unid 8.000 20.000 160.000 160.000
3. BOTIQUÍN VETERINARIO 6.355 6.355 0.000 0.000Tintura de Yodo al 2% x 1,00 l Fco. 0.015 65.000 0.975 0.975Algodón paquete de 50,00 g Pqte. 1.000 3.000 3.000 3.000Antibiótico (Enropro al 20% - Frasco de 0,50 l) Fco. 0.020 49.000 0.980 0.980Antiparasitario ext. (Fipecto Frasco de 1,00 l) Fco. 0.010 140.000 1.400 1.400
4. TRANSPORTE 4.500 4.500 0.000 0.000
PRECIO UNITAR.
PRECIO TOTAL
m²
Rollizos de eucalipto Ø=2ˮ x 2,20 m
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Rollizos de eucalipto Ø=2ˮ x 2,20 m
ANALISIS DE COSTOS UNITARIOS Transporte semovientes Cbza 9.000 0.500 4.500 4.500
5. MANO DE OBRA 25.000 0.000 0.000 25.000Mano de obra no calificada Jornal 1.000 25.000 25.000 25.000
6. HERRAMIENTAS 1.250 0.000 0.000 1.250Herramientas (5,00 % MONC) % 0.050 25.000 1.250 1.250
COSTO TOTAL 257.305 211.055 0.000 46.250
1.2. Materiales de Capacitación para las tecnologías1.2.1. Materiales de capacitación para las tecnologías
COSTO/Glb
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 3,179.000 3,179.000 0.000 0.000
Cuaderno de 100 hojas T-A4 Unid 110.000 5.000 550.000 550.000Lapiceros punta fina Unid 220.000 1.000 220.000 220.000Papelógrafo cuadriculado Ciento 3.600 40.000 144.000 144.000Plumones para papel Nº 47 Unid 216.000 2.500 540.000 540.000Manual en riego (15 hojas /manual) Unid 115.000 5.000 575.000 575.000Manual en producción agrícola y pecuaria (15 hojas Unid 115.000 5.000 575.000 575.000Manual en cocinas mejoradas y agua segura (15 hojaUnid 115.000 5.000 575.000 575.000
COSTO TOTAL 3,179.000 3,179.000 0.000 0.000
1.3. Capacitación de campesino a campesino1.3.1. Contratación de Yachachiq (primer año)
COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 3,000.000 3,000.000 0.000 0.000Contratación de Yachachiq (3 Yachachiq) Honorar. 3.000 1,000.000 3,000.000 3,000.000
COSTO TOTAL 3,000.000 3,000.000 0.000 0.000
1.3.2. Contratación de Yachachiq (segundo año)COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 1,000.000 500.000 500.000 0.000Contratación de Yachachiq (1 Yachachiq) Honorar. 1.000 1,000.000 1,000.000 500.000 500.000
COSTO TOTAL 1,000.000 500.000 500.000 0.000
1.3.3. Contratación de Yachachiq (tercer año)COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 1,000.000 0.000 1,000.000 0.000Contratación de Yachachiq (1 Yachachiq) Honorar. 1.000 1,000.000 1,000.000 1,000.000
COSTO TOTAL 1,000.000 0.000 1,000.000 0.000
1.4. Seguro básico de Yachachiq1.4.1. Seguro básico de Yachachiq (primer año)
COSTO/Año
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 1,455.480 1,455.480 0.000 0.000
Seguro de Yachachiq Seguro 3.000 485.160 1,455.480 1,455.480
COSTO TOTAL 1,455.480 1,455.480 0.000 0.000
1.4.2. Seguro básico de Yachachiq (segundo y tercer año)COSTO/Año
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 485.160 121.290 363.870 0.000
Seguro de Yachachiq Seguro 1.000 485.160 485.160 121.290 363.870
COSTO TOTAL 485.160 121.290 363.870 0.000
1.5. Movilidad de Yachachiq1.5.1. Movilidad de Yachachiq para capacitación (primer año)
COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS 1. MATERIALES E INSUMOS 600.000 600.000 0.000 0.000
Movilidad Yachachiq para capacitación (3 Yachachiq)Movil. 3.000 200.000 600.000 600.000
COSTO TOTAL 600.000 600.000 0.000 0.000
1.5.2. Movilidad de Yachachiq para capacitación (2do. Y 3er año)COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 100.000 25.000 75.000 0.000
Movilidad Yachachiq para capacitación (1 Yachachiq)Movil. 1.000 100.000 100.000 25.000 75.000
COSTO TOTAL 100.000 25.000 75.000 0.000
1.6. Concursos entre Núcleos Ejecutores - NE1.6.1. Concursos en la aplicación y mejora de tecnologías
COSTO/Concurso
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 300.000 300.000 0.000 0.000
Premios Primer Puesto Premio 1.000 200.000 200.000 200.000Premios Segundo Puesto Premio 1.000 100.000 100.000 100.000
COSTO TOTAL 300.000 300.000 0.000 0.000
1.7. Participación en Ferias Locales1.7.1. Participación en Ferias Locales
COSTO/Feria
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 950.000 950.000 0.000 0.000
Banner 0,80 x 1,20 m Unid 1.000 120.000 120.000 120.000Trípticos Millar 1.000 650.000 650.000 650.000Malla arpillera 100.000 1.800 180.000 180.000
2. MOVILIDAD 940.000 940.000 0.000 0.000Movilidad de participantes Pasaje 188.000 5.000 940.000 940.000
3. ALIMENTACIÓN 752.000 752.000 0.000 0.000Alimentación de participantes Ración 94.000 8.000 752.000 752.000
COSTO TOTAL 2,642.000 2,642.000 0.000 0.000
1.8. Pasantías Yachachiq1.8.1. Pasantías Yachachiq
COSTO/Pasantía
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MOVILIDAD 470.000 470.000 0.000 0.000
Movilidad de Chungui - Vinchos (viceversa) Pasaje 3.000 90.000 270.000 270.000Movilidad local Día 2.000 100.000 200.000 200.000
2. ALIMENTACIÓN 225.000 225.000 0.000 0.000Alimentación pasantes Día 3.000 75.000 225.000 225.000
3. ALOJAMIENTO 270.000 270.000 0.000 0.000Alojamiento de pasantes Noche 2.000 135.000 270.000 270.000
COSTO TOTAL 965.000 965.000 0.000 0.000
2. Implementación y mejora de la vivienda saludable2.1. Instalación de cocina mejorada
COSTO/Módulo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 161.760 139.760 0.000 22.0001.1. Cámara de combustión
Ladrillos de pared (artesanal) Unid 20.000 0.600 12.000 12.000Alambre negro Nº 16 kg 0.040 5.000 0.200 0.200
m 3.000 1.720 5.160 5.1601.2. Construcción de la losa y hornillas
Cemento Portland tipo I / 42,50 kg Bolsa 0.180 22.000 3.960 3.960m 0.500 4.000 2.000 2.000
Arena de asentar 0.020 70.000 1.400 1.400m 2.000 4.670 9.340 9.340
1.3. Construcción de la chimeneaLadrillos de pared (artesanal) Unid 40.000 0.600 24.000 24.000Alambre negro Nº 08 kg 0.020 5.000 0.100 0.100
Unid 1.000 36.000 36.000 36.000Sombrero capucha 0,18 x 07,00 cm con perno abrazaUnid 1.000 10.000 10.000 10.000
1.4. Otros materialesFibraforte transparente de 1,80 x 0,80 x 0,22 mm Unid 1.000 28.000 28.000 28.000Adobe Unid 40.000 0.250 10.000 10.000Ceniza kg 60.000 0.200 12.000 12.000Arena fina 0.080 85.000 6.800 6.800Tierra de chacra 0.080 10.000 0.800 0.800
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
m²
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Fierro corrugado x ⅜ˮ (rejilla cenicero)
Malla electrosoldada de ½ˮm³
Fierro corrugado de ½ˮ
Chimenea de ɸ=0,12 x 1,20 m x 0,60 mm
m³m³
ANALISIS DE COSTOS UNITARIOS
2. MANO DE OBRA 37.500 0.000 0.000 37.500Construcción de la cocina Jornal 1.500 25.000 37.500 37.500
3. HERRAMIENTAS 1.875 0.000 0.000 1.875Herramientas (5,00 % MONC) % 0.050 37.500 1.875 1.875
COSTO TOTAL 201.135 139.760 0.000 61.375
2.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda (ACU_Cap.(V.S. Formato de capacitación FONCODES)2.2.2. Capacitación en salud y nutrición familiar (ACU_Cap.(V.S. Formato de capacitación FONCODES)
2.3. Agua seguraCOSTO/Módulo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES 21.500 21.500 0.000 0.000
Balde con caño x 12 litros Unidad 1.000 14.000 14.000 14.000Vaso de vidrio x 7 onz Unidad 3.000 2.500 7.500 7.500
COSTO TOTAL 21.500 21.500 0.000 0.000
3. Promoción de Negocios Rurales Inclusivos3.1. Asistencia técnica para articulación al mercado
COSTO/Evento
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 50.000 50.000 0.000 0.000Asistente Técnico articulador Evento 1.000 50.000 50.000 50.000
COSTO TOTAL 50.000 50.000 0.000 0.000
3.2. Concursos de Planes de negocios 3/.COSTO/Concurso
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 23,475.000 23,475.000 0.000 0.000
Premio a la idea del negocio ganador Premio 1.000 23,475.000 23,475.000 23,475.000
COSTO TOTAL 23,475.000 23,475.000 0.000 0.000
4. Fomento de capacidades financieras4.1. Promoción, convocatoria y concursos
COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES MIDIS GOB. LOCAL1. MATERIALES E INSUMOS 77.000 77.000 0.000 0.000
Convocatorias Unid 94.000 0.500 47.000 47.000Movilidad para convocatoria Glb 1.000 30.000 30.000 30.000
COSTO TOTAL 77.000 77.000 0.000 0.000
4.2. Materiales de capacitaciónCOSTO/Glb
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES MIDIS GOB. LOCAL1. MATERIALES E INSUMOS 3,705.200 3,705.200 0.000 0.0001.1. Para el desarrollo del módulo con los usuarios
Incentivos para concursos (15 usuarios del NE) Glb 15.000 140.000 2,100.000 2,100.000Edición de video (durac. 15 min)- temas central moduUnid 6.000 25.000 150.000 150.000Edición e impresión de guías de módulo para yachahUnid 10.000 10.000 100.000 100.000Edición e impresión de guías de módulo para líderes Unid 6.000 5.000 30.000 30.000Edición e impresión de cuadernos de módulos para uUnid 5.000 6.000 30.000 30.000Papel craf Unid 192.000 0.400 76.800 76.800Papelógrafo cuadriculado Ciento 2.000 40.000 80.000 80.000Plumones para pizarra acrílica Unid 64.000 3.000 192.000 192.000Cartulinas de colores ecológicos Unid 128.000 0.600 76.800 76.800Cuadernos A-5 (para notas de usuarios) Unid 94.000 1.000 94.000 94.000Cuadernos A-4 (para actas del grupo) Unid 3.000 5.000 15.000 15.000Lapiceros Unid 94.000 0.500 47.000 47.000Papel bond A-4 Millar 3.000 23.000 69.000 69.000Chinchotes Caja 6.000 7.000 42.000 42.000Clavos de cemento de 2" Docena 6.000 2.500 15.000 15.000
1.2. Para el uso del facilitador financieroEdición e impresión de guías de módulos para facilit. Unid 1.670 10.000 16.700 16.700Diseño de láminas Unid 10.000 10.000 100.000 100.000Servicios de arte gráfico Unid 10.000 15.000 150.000 150.000Impresión de láminas plastificadas A-3 Unid 10.000 15.000 150.000 150.000Impresión de láminas plastificadas 8x30 cm Unid 10.000 2.000 20.000 20.000Impresión de billetes y monedas plastificadas Millar 0.170 280.000 47.600 47.600Banner para recepción de imagen (con ojales) 2x1,5 Unid 0.330 50.000 16.500 16.500Banner en blanco de 2x1,20 m (con ojales) Unid 0.330 50.000 16.500 16.500Banner (con imp. De logotipo y nombre del Pyto.) 2, Unid 0.330 70.000 23.100 23.100
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS Pasador o cuerda sintética (grosor 50 mm) Unid 0.330 30.000 9.900 9.900Ganchos de plástico Docena 0.670 1.000 0.670 0.670Puntero graduable Unid 0.330 10.000 3.300 3.300Tijeras punta roma medianas Unid 0.330 5.000 1.650 1.650Cuchilla corta papel (cutter) Unid 0.330 1.000 0.330 0.330Maletín porta meteriales Unid 0.330 80.000 26.400 26.400
1.3. EquiposLinterna Unid 0.330 15.000 4.950 4.950
COSTO TOTAL 3,705.200 3,705.200 0.000 0.000
4.3. Honorarios facilitador financieroCOSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 1,500.000 1,500.000 0.000 0.000Facilitador financiero Honorar. 1.000 1,500.000 1,500.000 1,500.000
COSTO TOTAL 1,500.000 1,500.000 0.000 0.000
4.4. Honorarios yachachiq financieroCOSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 1,000.000 1,000.000 0.000 0.000Yachachiq financiero Honorar. 1.000 1,000.000 1,000.000 1,000.000
COSTO TOTAL 1,000.000 1,000.000 0.000 0.000
4.5. Viáticos y apoyo logístico facilitador financieroCOSTO/Glb
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 450.000 450.000 0.000 0.000
Combustible - facilitador financiero Gln 10.000 15.000 150.000 150.000Viáticos facilitador (hospedaje, alimentación y pasajeDía 1.250 240.000 300.000 300.000
2. MANO DE OBRA CALIFICADA
COSTO TOTAL 450.000 450.000 0.000 0.000
B. COSTO INDIRECTO1. Gastos Generales del Núcleo Ejecutor Central - NEC1.1. Movillidad del Presidente y Tesorero del NEC
COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES Y EQUIPOS 83.330 83.330 0.000 0.000
2. MOVILIDAD DEL NECMovilidad del Presidente y Tesorero del NEC Mes 1.000 83.330 83.330 83.330
COSTO TOTAL 83.330 83.330 0.000 0.000
1.2. Pago de revisor de cuentasCOSTO/Trimestre
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 300.000 300.000 0.000 0.000Revisor Honorar. 1.000 300.000 300.000 300.000
COSTO TOTAL 300.000 300.000 0.000 0.000
1.3. Cartel del NE e implementación del NECCOSTO/Glb
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES Y EQUIPOS 1,508.000 1,508.000 0.000 0.000
Cartel de obra Unid 1.000 600.000 600.000 600.000Adquisición de muebles de cómputo con silla Unid 0.500 300.000 150.000 150.000Adquisicón de mesa de trabajo Unid 0.330 250.000 82.500 82.500Adquisción de sillas de plástico Docena 0.500 480.000 240.000 240.000Engrapador + grapas Unid 0.500 90.000 45.000 45.000Perforador de papel Unid 0.500 90.000 45.000 45.000Cuchillas corta papel Unid 3.000 3.500 10.500 10.500Goma de papel l 0.500 10.000 5.000 5.000Cuaderno de Obra Unid 2.000 35.000 70.000 70.000Lapiceros de colores Caja 1.000 50.000 50.000 50.000Regla de 30 cm Unid 3.000 4.000 12.000 12.000
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS Pizarra acrílica Unid 1.000 180.000 180.000 180.000Mota para pizarra acrílica Unid 1.000 3.000 3.000 3.000Tijeras Unid 3.000 5.000 15.000 15.000
COSTO TOTAL 1,508.000 1,508.000 0.000 0.000
1.4. Gastos Bancarios del NECCOSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES Y EQUIPOS 6.000 6.000 0.000 0.000
2. GASTOS BANCARIOS Gastos bancarios del NEC Mes 1.000 6.000 6.000 6.000
COSTO TOTAL 6.000 6.000 0.000 0.000
1.5. Otros gastos del NEC (materiales, servicios)COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. EQUIPO DE COMPUTO 49.950 49.950 0.000 0.000
Alquiler de computadoras con impresora Unid 0.333 150.000 49.950 49.950
2. ÚTILES DE ESCRITORIO E INSUMOS 193.320 193.320 0.000 0.000Tóner de la impresora Unid 0.500 180.000 90.000 90.000Papel bond A-4 Millar 2.000 23.000 46.000 46.000Folder manila A-4 con fástener Ciento 0.500 40.000 20.000 20.000Papelógrafos Ciento 0.333 40.000 13.320 13.320Plumones para pizarra acrílica Unid 3.000 3.000 9.000 9.000Plumones para papel Nº 47 Unid 6.000 2.500 15.000 15.000
3. ALQUILER DE OFICINA Y SERVICIOS 49.950 0.000 49.950 0.000Alquiler de oficina Mes 0.333 50.000 16.650 16.650Servicio de energía Mes 0.333 80.000 26.640 26.640Servicio de agua potable Mes 0.333 20.000 6.660 6.660
COSTO TOTAL 293.220 243.270 49.950 0.000
2. Gastos de elaboración de expediente técnico2.1. Elaboración de expediente técnico
COSTO/Pyto.
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 12,000.000 12,000.000 0.000 0.000Proyectista Exp. Tco. 1.000 12,000.000 12,000.000 12,000.000
COSTO TOTAL 12,000.000 12,000.000 0.000 0.000
2.2. Gastos bancarios pago de proyectistaCOSTO/Pyto.
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES Y EQUIPOS 32.000 32.000 0.000 0.000
2. GASTOS BANCARIOS Gastos bancarios del NEC Pyto. 1.000 32.000 32.000 32.000
COSTO TOTAL 32.000 32.000 0.000 0.000
2.3. Movillidad del Presidente y Tesorero del NEC pago proyectistaCOSTO/Pyto.
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES Y EQUIPOS 250.000 250.000 0.000 0.000
2. MOVILIDAD DEL NECMovilidad del Presidente y Tesorero del NEC Pyto. 1.000 250.000 250.000 250.000
COSTO TOTAL 250.000 250.000 0.000 0.000
3. Gastos de ejecución del proyecto3.1. Administración del proyecto (contratación del Coord. Tco. del NEC)
COSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MANO DE OBRA CALIFICADA 1,500.000 1,500.000 0.000 0.000Coordinador Técnico Honorar. 1.000 1,500.000 1,500.000 1,500.000
COSTO TOTAL 1,500.000 1,500.000 0.000 0.000
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANALISIS DE COSTOS UNITARIOS
3.2. Seguro de Coordinador Técnico COSTO/Año
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 396.000 396.000 0.000 0.000
Seguro de Coordinador Técnico Seguro 0.330 1,200.000 396.000 396.000
COSTO TOTAL 396.000 396.000 0.000 0.000
3.3. Movilidad de Coordinador TécnicoCOSTO/Mes
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS
2. MOVILIDAD DEL COORDINADOR TÉCNICO 200.000 200.000 0.000 0.000Movilidad del coordinador técnico Movil. 1.000 200.000 200.000 200.000
COSTO TOTAL 200.000 200.000 0.000 0.000
4. Gastos de seguimiento del NEC4.1. Fotografías de seguimiento de proyectos
COSTO/Informe
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 70.000 70.000 0.000 0.000
Fotografías de seguimiento de proyectos Seguim. 1.000 70.000 70.000 70.000
2. MANO DE OBRA CALIFICADA 0.000 0.000 0.000 0.000
COSTO TOTAL 70.000 70.000 0.000 0.000
4.2. Elaboración de informes de gestión del NECCOSTO/Informe
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 125.000 125.000 0.000 0.000
Informe de gestión del NEC Informe 1.000 125.000 125.000 125.000
2. MANO DE OBRA CALIFICADA 0.000 0.000 0.000 0.000
COSTO TOTAL 125.000 125.000 0.000 0.000
4.3. Elaboración de vídeo de implementación de proyectosCOSTO/Vídeo
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO1. MATERIALES E INSUMOS 450.000 450.000 0.000 0.000
Elaboración de vídeo de implementación de proyectoVideo 1.000 450.000 450.000 450.000
2. MANO DE OBRA CALIFICADA 0.000 0.000 0.000 0.000
COSTO TOTAL 450.000 450.000 0.000 0.000
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
CUADRO Nº 02
FORMATO FONCODES
EVENTOS DE CAPACITACIÓN - MEJORA DE VIVIENDA SALUDABLE
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
EXPEDIENTE N° 202013005
CAPACITACIÓN EN PRÁCTICAS ADECUADAS MEJORA DE VIVIENDA, SALUD Y NUTRICIÓN FAMILIAR
VARIABLES DE CAPACITACIÓNCantidad de Grupos 3N° de Veces del Servicio 1 Sesiones x GrupoDuración de Cada Sesión (Horas) 3 Horas x SesiónTotal de sesiones 3 Total de SesionesTotal de Horas x Grupo 3 Total de Horas x GrupoTotal de Horas x Localidad 9 Total de Horas x Localidad
N° de Capacitados94
Usuarios32
Capacitación (S/.)
RUBROS Cantidad Unidad Costo Unitario Costo Total
I.- COSTOS FIJOS 256.701.1 ORGANIZACIÓN Y COORDINACIÓN 50.00
Alquiler de Equipo multimedia 1 Sesión 50.00 50.001.2 INFORMES 5.50
CD 1 Unidad 1.00 1.00
Impresión de fotografías digitales 9 Fotos 0.50 4.50
1.3201.20
Lapiceros 32 Unidad 0.50 16.00Plumones de papel 3 Unidad 2.50 7.50Plumones de pizarra acrílica/tiza 6.00 Unidad 3.00 18.00Papel Bond 75 g 0.20 Millar 25.00 12.00Papelógrafo 20 Unidad 0.50 10.00Cuaderno A4 de 100 hojas 32 Unidad 4.00 128.00Cinta Masking tape 1 Unidad 2.00 2.00Chinches 0.5 Cajas 1.20 0.60Mota 0 Unidad 3.00 0.00Cartulina de Colores 10 Pliego 0.50 5.00Folders A4 con fasteners 3 Unidad 0.70 2.10TOTAL COSTO FIJO 256.70
II.- COSTOS VARIABLES 530.00
2.370.00
Guía de capacitación 35 Unidad 2.00 70.00Triptico / Folleto Unidad 0.00
2.4 3 Unidad100.00 300.00
2.5REFRIGERIO PARA LOS PARTICIPANTES 160.00
Refrigerios 32 Refrigerios 5.00 160.00
TOTAL COSTOS VARIABLES 530.00COSTO TOTAL FIJO + VARIABLES 786.70
PERSONAS X GRUPO
MATERIALES DE APOYO - UTILES DE ESCRITORIO
MATERIALES DIDACTICO PARA SER ENTREGADOS
EXPERTO EN PRACTICAS ADECUADAS DE MEJORA DE VIVIENDA
ANALISIS DE COSTOS UNITARIOS META CANTIDAD
1.1.1. Instalación de riego tecnificado
1.1.1.1. Cámara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m³COSTO/Unid 25.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 224.15 224.15 0.00 0.00 Tantarpata
Arena hormigón 0.3000 70.00 21.00 21.00 Tantarpata 7.50
Cemento Portland tipo I / 42,50 kg Bolsa 1.2000 22.00 26.40 26.40 Tantarpata 30.00
m 40.0000 0.72 28.80 28.80 Tantarpata 1,000.00
Juego de panel reforzado (0,6*0,6*0,6 m3) Unid 0.2500 75.00 18.75 18.75 Tantarpata 6.25
Tubería PVC C-7,5, 3ˮ, 5 m m 1.0000 12.60 12.60 12.60 Tantarpata 25.00
Unid 1.0000 12.00 12.00 12.00 Tantarpata 25.00
Malla mosquitero verde 0.5000 6.00 3.00 3.00 Tantarpata 12.50
Alambre galvanizado Nº 16 kg 0.0500 9.00 0.45 0.45 Tantarpata 1.25
Unid 1.0000 9.00 9.00 9.00 Tantarpata 25.00
UPR PVC Adaptador de 1½ˮ Unid 2.0000 4.50 9.00 9.00 Tantarpata 50.00
Llave de paso de 1½ˮ Unid 1.0000 9.00 9.00 9.00 Tantarpata 25.00
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.0000 6.00 48.00 48.00 Tantarpata 200.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 50.00
Codo PVC, 90º - 2" Unid 1.0000 8.00 8.00 8.00 Tantarpata 25.00
Unid 0.1250 26.00 3.25 3.25 Tantarpata 3.13
Cinta teflón Unid 1.0000 1.20 1.20 1.20 Tantarpata 25.00
Lija Nº 40 Unid 0.2500 2.80 0.70 0.70 Tantarpata 6.25
Tantarpata
2. MANO DE OBRA 125.00 0.00 0.00 125.00 Tantarpata
Mano de obra no calificada Jornal 5.0000 25.00 125.00 125.00 Tantarpata 125.00
Tantarpata
3. EQUIPOS 6.25 0.00 0.00 6.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 125.00 6.25 6.25 Tantarpata 1.25
Tantarpata
COSTO TOTAL 355.40 224.15 0.00 131.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.2. Instalación de collarín de captación de 25 mm * ¾" Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ¼ˮ
Tee PVC, 3ˮ
m²
Reducción PVC, 3" - 1½ˮ
Pegamento OATEY x ¼ galón
COSTO/Unid Tant 49.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 134.72 134.72 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 1.47
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 5.39
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 49.00
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de ¾" Unid 1.0000 9.00 9.00 9.00 Tantarpata 49.00
Tubería PVC SAP, C-10, ¾ˮ x 5m m 1.0000 2.00 2.00 2.00 Tantarpata 49.00
Codo PVC 45°, ¾ˮ unid 1.0000 2.50 2.50 2.50 Tantarpata 49.00
Válvula doble Universal de bola de ¾" Unid 1.0000 17.00 17.00 17.00 Tantarpata 49.00
Unid 3.0000 2.00 6.00 6.00 Tantarpata 147.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 98.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 2.45
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 49.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 2.45
Tantarpata
COSTO TOTAL 160.97 134.72 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.3. Instalación de collarín de captación de 150 mm * 2" TantarpataCOSTO/Unid Tant 9.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 228.52 228.52 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 0.27
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 0.99
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 9.00
PRECIO UNITAR.
PRECIO TOTAL
m³
UPR PVC Adaptador de ¾ˮ
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de 150 mm X 2" Unid 1.0000 75.00 75.00 75.00 Tantarpata 9.00
Tubería PVC SAP, C-10, 2" x 5m m 1.0000 6.80 6.80 6.80 Tantarpata 9.00
Codo PVC 45°, 2" unid 1.0000 8.00 8.00 8.00 Tantarpata 9.00
Válvula doble Universal de bola de 2" Unid 1.0000 21.00 21.00 21.00 Tantarpata 9.00
UPR PVC Adaptador de 2ˮ Unid 3.0000 6.50 19.50 19.50 Tantarpata 27.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 18.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 0.45
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 9.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 0.45
Tantarpata
COSTO TOTAL 254.77 228.52 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.4. Instalación de collarín de captación de 200 mm * 1½" TantarpataCOSTO/Unid Tant 4.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 232.72 232.72 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 0.12
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 0.44
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 4.00
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de 200 mm X 1½" Unid 1.0000 95.00 95.00 95.00 Tantarpata 4.00
Tubería PVC SAP, C-7,50, 1½" x 5m m 1.0000 4.00 4.00 4.00 Tantarpata 4.00
Codo PVC 45°, 1½" unid 1.0000 5.00 5.00 5.00 Tantarpata 4.00
Válvula doble Universal de bola de 1½" Unid 1.0000 17.00 17.00 17.00 Tantarpata 4.00
Unid 3.0000 4.50 13.50 13.50 Tantarpata 12.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 8.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 0.20
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
UPR PVC Adaptador de 1½ˮ
Pegamento OATEY x ¼ galón
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 0.20
Tantarpata
COSTO TOTAL 258.97 232.72 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.5. Cámara rompe presión (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m³ Tantarpata
COSTO/Unid Tant 64.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 251.28 251.28 0.00 0.00 Tantarpata
Arena hormigón 0.4000 70.00 28.00 28.00 Tantarpata 25.60
Cemento Portland tipo I / 42,50 kg Bolsa 1.6000 22.00 35.20 35.20 Tantarpata 102.40
m 54.0000 0.72 38.88 38.88 Tantarpata 3,456.00
Juego de panel reforzado (0,7*0,7*0,7 m3) Unid 0.2500 80.00 20.00 20.00 Tantarpata 16.00
Tubería PVC C-7,5, 3ˮ, 5 m m 1.0000 12.60 12.60 12.60 Tantarpata 64.00
Unid 1.0000 12.00 12.00 12.00 Tantarpata 64.00
Malla mosquitero verde 0.5000 6.00 3.00 3.00 Tantarpata 32.00
Alambre galvanizado Nº 16 kg 0.0500 9.00 0.45 0.45 Tantarpata 3.20
Reducción PVC, 3" - 1½ˮ Unid 1.0000 9.00 9.00 9.00 Tantarpata 64.00
Llave de paso de 1½" Unid 1.0000 9.00 9.00 9.00 Tantarpata 64.00
Unid 2.0000 4.50 9.00 9.00 Tantarpata 128.00
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.0000 6.00 48.00 48.00 Tantarpata 512.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 128.00
Codo PVC, 90º - 2" Unid 1.0000 8.00 8.00 8.00 Tantarpata 64.00
Unid 0.1250 26.00 3.25 3.25 Tantarpata 8.00
Cinta teflón Unid 1.0000 1.20 1.20 1.20 Tantarpata 64.00
Lija Nº 40 Unid 0.2500 2.80 0.70 0.70 Tantarpata 16.00
Tantarpata
2. MANO DE OBRA 125.00 0.00 0.00 125.00 Tantarpata
Mano de obra no calificada Jornal 5.0000 25.00 125.00 125.00 Tantarpata 320.00
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ¼"
Tee PVC, 3ˮ
m²
UPR PVC Adaptador de 1½ˮ
Pegamento OATEY x ¼ galón
Tantarpata
3. EQUIPOS 6.25 0.00 0.00 6.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 125.00 6.25 6.25 Tantarpata 3.20
Tantarpata
COSTO TOTAL 382.53 251.28 0.00 131.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.6. Cámara rompe presión (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m³ Tantarpata
COSTO/Unid Tant 36.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 418.23 418.23 0.00 0.00 Tantarpata
Arena hormigón 0.9000 70.00 63.00 63.00 Tantarpata 32.40
Cemento Portland tipo I / 42,50 kg Bolsa 3.6000 22.00 79.20 79.20 Tantarpata 129.60
m 86.0000 1.28 110.08 110.08 Tantarpata 3,096.00
Juego de panel reforzado (1,10*1,10*1,10 m3) Unid 0.2500 115.00 28.75 28.75 Tantarpata 9.00
Tubería PVC C-7,5, 3ˮ, 5 m m 1.0000 12.60 12.60 12.60 Tantarpata 36.00
Unid 1.0000 12.00 12.00 12.00 Tantarpata 36.00
Malla mosquitero verde 0.5000 6.00 3.00 3.00 Tantarpata 18.00
Alambre galvanizado Nº 16 kg 0.0500 9.00 0.45 0.45 Tantarpata 1.80
Reducción PVC, 3" - 2ˮ Unid 1.0000 10.00 10.00 10.00 Tantarpata 36.00
Llave de paso de 2" Unid 1.0000 12.00 12.00 12.00 Tantarpata 36.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 72.00
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.0000 6.00 48.00 48.00 Tantarpata 288.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 72.00
Codo PVC, 90º - 2" Unid 1.0000 8.00 8.00 8.00 Tantarpata 36.00
Unid 0.1250 26.00 3.25 3.25 Tantarpata 4.50
Cinta teflón Unid 1.0000 1.20 1.20 1.20 Tantarpata 36.00
Lija Nº 40 Unid 0.2500 2.80 0.70 0.70 Tantarpata 9.00
Tantarpata
2. MANO DE OBRA 125.00 0.00 0.00 125.00 Tantarpata
Mano de obra no calificada Jornal 5.0000 25.00 125.00 125.00 Tantarpata 180.00
Tantarpata
3. EQUIPOS 6.25 0.00 0.00 6.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 125.00 6.25 6.25 Tantarpata 1.80
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de 8 mm
Tee PVC, 3ˮ
m²
Pegamento OATEY x ¼ galón
Tantarpata
COSTO TOTAL 549.48 418.23 0.00 131.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.7. Cámara rompe presión (5,50 l/s) de 1,50*1,50*1,50 m³ Tantarpata
COSTO/Unid Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 657.05 657.05 0.00 0.00 Tantarpata
Arena hormigón 1.7000 70.00 119.00 119.00 Tantarpata 1.70
Cemento Portland tipo I / 42,50 kg Bolsa 6.8000 22.00 149.60 149.60 Tantarpata 6.80
m 125.0000 1.72 215.00 215.00 Tantarpata 125.00
Juego de panel reforzado (1,50*1,50*1,50 m3) Unid 0.2500 145.00 36.25 36.25 Tantarpata 0.25
Tubería PVC C-7,5, 3ˮ, 5 m m 1.0000 12.60 12.60 12.60 Tantarpata 1.00
Unid 1.0000 12.00 12.00 12.00 Tantarpata 1.00
Malla mosquitero verde 0.5000 6.00 3.00 3.00 Tantarpata 0.50
Alambre galvanizado Nº 16 kg 0.0500 9.00 0.45 0.45 Tantarpata 0.05
Reducción PVC, 3" - 2ˮ Unid 1.0000 10.00 10.00 10.00 Tantarpata 1.00
Llave de paso de 2" Unid 1.0000 12.00 12.00 12.00 Tantarpata 1.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 2.00
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 8.0000 6.00 48.00 48.00 Tantarpata 8.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 2.00
Codo PVC, 90º - 2" Unid 1.0000 8.00 8.00 8.00 Tantarpata 1.00
Unid 0.1250 26.00 3.25 3.25 Tantarpata 0.13
Cinta teflón Unid 1.0000 1.20 1.20 1.20 Tantarpata 1.00
Lija Nº 40 Unid 0.2500 2.80 0.70 0.70 Tantarpata 0.25
Tantarpata
2. MANO DE OBRA 125.00 0.00 0.00 125.00 Tantarpata
Mano de obra no calificada Jornal 5.0000 25.00 125.00 125.00 Tantarpata 5.00
Tantarpata
3. EQUIPOS 6.25 0.00 0.00 6.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 125.00 6.25 6.25 Tantarpata 0.05
Tantarpata
COSTO TOTAL 788.30 657.05 0.00 131.25 Tantarpata
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
m³
Fierro corrugado de ⅜ˮ
Tee PVC, 3ˮ
m²
Pegamento OATEY x ¼ galón
Tantarpata
1.1.1.8. Instalación de Codo PVC de 45º - 1" TantarpataCOSTO/Unid Tant 2,601.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 2.94 2.94 0.00 0.00 TantarpataCodo PVC 45°, 1ˮ Unid 1.0000 2.50 2.50 2.50 Tantarpata 2,601.00
Unid 0.0100 26.00 0.26 0.26 Tantarpata 26.01
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 163.86
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 80.63
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 130.05
Tantarpata
COSTO TOTAL 3.76 2.94 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.9. Instalación de Codo PVC de 45º - 1½" TantarpataCOSTO/Unid Tant 1,156.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 5.57 5.57 0.00 0.00 Tantarpata
Codo PVC 45°, 1½" Unid 1.0000 5.00 5.00 5.00 Tantarpata 1,156.00
Unid 0.0150 26.00 0.39 0.39 Tantarpata 17.34
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 72.83
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 35.84
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 57.80
Tantarpata
COSTO TOTAL 6.39 5.57 0.00 0.82 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Tantarpata
Tantarpata
1.1.1.10. Instalación de Codo PVC de 45º - 2" TantarpataCOSTO/Unid Tant 100.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 8.70 8.70 0.00 0.00 Tantarpata
Codo PVC, 45º - 2" Unid 1.0000 8.00 8.00 8.00 Tantarpata 100.00
Unid 0.0200 26.00 0.52 0.52 Tantarpata 2.00
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 6.30
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 3.10
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 5.00
Tantarpata
COSTO TOTAL 9.52 8.70 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.11. Instalación de Codo PVC de 45º - 3" TantarpataCOSTO/Unid Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 12.33 12.33 0.00 0.00 Tantarpata
Codo PVC, 45º - 3" Unid 1.0000 11.50 11.50 11.50 Tantarpata 1.00
Unid 0.0250 26.00 0.65 0.65 Tantarpata 0.03
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 0.06
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 0.03
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 0.05
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
COSTO TOTAL 13.15 12.33 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.12. Instalación de Codo PVC de 90º - 1" TantarpataCOSTO/Unid Tant 225.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 2.94 2.94 0.00 0.00 TantarpataCodo PVC 90°, 1ˮ Unid 1.0000 2.50 2.50 2.50 Tantarpata 225.00
Unid 0.0100 26.00 0.26 0.26 Tantarpata 2.25
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 14.18
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 6.98
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 11.25
Tantarpata
COSTO TOTAL 3.76 2.94 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.13. Instalación de Codo PVC de 90º - 1½" TantarpataCOSTO/Unid Tant 36.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 5.57 5.57 0.00 0.00 Tantarpata
Codo PVC 90°, 1½" Unid 1.0000 5.00 5.00 5.00 Tantarpata 36.00
Unid 0.0150 26.00 0.39 0.39 Tantarpata 0.54
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 2.27
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 1.12
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 1.80
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Tantarpata
COSTO TOTAL 6.39 5.57 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.14. Instalación de Codo PVC de 90º - 2" TantarpataCOSTO/Unid Tant 36.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 8.70 8.70 0.00 0.00 TantarpataCodo PVC 90º, 2ˮ Unid 1.0000 8.00 8.00 8.00 Tantarpata 36.00
Unid 0.0200 26.00 0.52 0.52 Tantarpata 0.72
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 2.27
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 1.12
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 1.80
Tantarpata
COSTO TOTAL 9.52 8.70 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.15. Instalación de Tee PVC de 1" TantarpataCOSTO/Unid Tant 49.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 6.70 6.70 0.00 0.00 TantarpataTee PVC, 1ˮ Unid 1.0000 6.00 6.00 6.00 Tantarpata 49.00
Unid 0.0200 26.00 0.52 0.52 Tantarpata 0.98
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 3.09
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 1.52
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 2.45
Tantarpata
COSTO TOTAL 7.52 6.70 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.16. Instalación de Tee PVC de 1½" TantarpataCOSTO/Unid Tant 225.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 8.96 8.96 0.00 0.00 TantarpataTee PVC, 1½ˮ Unid 1.0000 8.00 8.00 8.00 Tantarpata 225.00
Unid 0.0300 26.00 0.78 0.78 Tantarpata 6.75
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 14.18
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 6.98
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 11.25
Tantarpata
COSTO TOTAL 9.78 8.96 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.17. Instalación de Tee PVC de 2" TantarpataCOSTO/Unid Tant 324.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 10.22 10.22 0.00 0.00 TantarpataTee PVC, 2ˮ Unid 1.0000 9.00 9.00 9.00 Tantarpata 324.00
Unid 0.0400 26.00 1.04 1.04 Tantarpata 12.96
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 20.41
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 10.04
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 16.20
Tantarpata
COSTO TOTAL 11.04 10.22 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.18. Instalación de Tee PVC de 3" TantarpataCOSTO/Unid Tant 36.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 13.98 13.98 0.00 0.00 TantarpataTee PVC, 3ˮ Unid 1.0000 12.50 12.50 12.50 Tantarpata 36.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 1.80
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 2.27
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 1.12
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 1.80
Tantarpata
COSTO TOTAL 14.80 13.98 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.19. Instalación de Reducción PVC de 1½" - 1" TantarpataCOSTO/Unid Tant 625.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 6.96 6.96 0.00 0.00 TantarpataReducción PVC, 1½" - 1ˮ Unid 1.0000 6.00 6.00 6.00 Tantarpata 625.00
Unid 0.0300 26.00 0.78 0.78 Tantarpata 18.75
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 39.38
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 19.38
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 31.25
Tantarpata
COSTO TOTAL 7.78 6.96 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.20. Instalación de Reducción PVC de 2" - 1½" TantarpataCOSTO/Unid Tant 100.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 6.48 6.48 0.00 0.00 TantarpataReducción PVC, 2" - 1½" Unid 1.0000 5.00 5.00 5.00 Tantarpata 100.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 5.00
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 6.30
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 3.10
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 5.00
Tantarpata
COSTO TOTAL 7.30 6.48 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.21. Instalación de Reducción PVC de 2" - 1" TantarpataCOSTO/Unid Tant 256.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 7.98 7.98 0.00 0.00 TantarpataReducción PVC, 2" - 1" Unid 1.0000 6.50 6.50 6.50 Tantarpata 256.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 12.80
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 16.13
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 7.94
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 12.80
Tantarpata
COSTO TOTAL 8.80 7.98 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.22. Instalación de Reducción PVC de 3" - 2" TantarpataCOSTO/Unid Tant 9.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 10.24 10.24 0.00 0.00 TantarpataReducción PVC, 3" - 2" Unid 1.0000 8.50 8.50 8.50 Tantarpata 9.00
Unid 0.0600 26.00 1.56 1.56 Tantarpata 0.54
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 0.57
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 0.28
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 0.45
Tantarpata
COSTO TOTAL 11.06 10.24 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.24. Instalación de Llave de paso de 1½" TantarpataCOSTO/Unid Tant 4.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 18.96 18.96 0.00 0.00 Tantarpata
Llave de paso de 1½" Unid 1.0000 9.00 9.00 9.00 Tantarpata 4.00
Unid 2.0000 4.50 9.00 9.00 Tantarpata 8.00
Unid 0.0300 26.00 0.78 0.78 Tantarpata 0.12
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 0.25
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
UPR PVC Adaptador de 1½ˮ
Pegamento OATEY x ¼ galón
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 0.12
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 0.20
Tantarpata
COSTO TOTAL 19.78 18.96 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.25. Instalación de Llave de paso de 2" TantarpataCOSTO/Unid Tant 16.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 26.22 26.22 0.00 0.00 Tantarpata
Llave de paso de 2" Unid 1.0000 12.00 12.00 12.00 Tantarpata 16.00
UPR PVC Adaptador de 2ˮ Unid 2.0000 6.50 13.00 13.00 Tantarpata 32.00
Unid 0.0400 26.00 1.04 1.04 Tantarpata 0.64
Lija Nº 40 Unid 0.0630 2.80 0.18 0.18 Tantarpata 1.01
Tantarpata
2. MANO DE OBRA 0.78 0.00 0.00 0.78 Tantarpata
Mano de obra no calificada Jornal 0.0310 25.00 0.78 0.78 Tantarpata 0.50
Tantarpata
3. EQUIPOS 0.04 0.00 0.00 0.04 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.78 0.04 0.04 Tantarpata 0.80
Tantarpata
COSTO TOTAL 27.04 26.22 0.00 0.82 Tantarpata
Tantarpata
Tantarpata
1.1.1.26. Construcción de Caja de llave de paso TantarpataCOSTO/Unid Tant 3,364.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 94.74 94.74 0.00 0.00 Tantarpata
Arena hormigón m³ 0.0300 70.00 2.10 2.10 Tantarpata 100.92
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Cemento Portland tipo I / 42,50 kg Bolsa 0.1200 22.00 2.64 2.64 Tantarpata 403.68
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 3,364.00
Tantarpata
2. MANO DE OBRA 0.63 0.00 0.00 0.63 Tantarpata
Mano de obra no calificada Jornal 0.0250 25.00 0.63 0.63 Tantarpata 84.10
Tantarpata
3. EQUIPOS 0.03 0.00 0.00 0.03 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 0.63 0.03 0.03 Tantarpata 168.20
Tantarpata
COSTO TOTAL 95.40 94.74 0.00 0.66 Tantarpata
Tantarpata
Tantarpata
1.1.1.27. Instalación de collarines para hidrantes de 25 mm * ¾" TantarpataCOSTO/Unid Tant 5,329.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 138.02 138.02 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 159.87
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 586.19
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 5,329.00
1.2. Accesorios para instalación del hidrante Tantarpata
Collarín HDPE de 25 mm X ¾" Unid 1.0000 9.00 9.00 9.00 Tantarpata 5,329.00
Niple de ¾" Unid 1.0000 4.00 4.00 4.00 Tantarpata 5,329.00
Llave de paso de ¾" Unid 1.0000 4.80 4.80 4.80 Tantarpata 5,329.00
Válvula de acople rápido de ¾" Unid 1.0000 22.00 22.00 22.00 Tantarpata 5,329.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 10,658.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 266.45
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 5,329.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 266.45
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
COSTO TOTAL 164.27 138.02 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.28. Instalación de collarines para hidrantes de 38 mm * ¾" TantarpataCOSTO/Unid Tant 529.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 140.02 140.02 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 15.87
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 58.19
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 529.00
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de 38 mm X ¾" Unid 1.0000 11.00 11.00 11.00 Tantarpata 529.00
Niple de ¾" Unid 1.0000 4.00 4.00 4.00 Tantarpata 529.00
Llave de paso de ¾" Unid 1.0000 4.80 4.80 4.80 Tantarpata 529.00
Válvula de acople rápido de ¾" Unid 1.0000 22.00 22.00 22.00 Tantarpata 529.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 1,058.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 26.45
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 529.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 26.45
Tantarpata
COSTO TOTAL 166.27 140.02 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.29. Instalación de collarines para hidrantes de 50 mm * ¾" TantarpataCOSTO/Unid Tant 64.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 141.02 141.02 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
m³
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 1.92
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 7.04
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 64.00
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de 50 mm X ¾" Unid 1.0000 12.00 12.00 12.00 Tantarpata 64.00
Niple de ¾" Unid 1.0000 4.00 4.00 4.00 Tantarpata 64.00
Llave de paso de ¾" Unid 1.0000 4.80 4.80 4.80 Tantarpata 64.00
Válvula de acople rápido de ¾" Unid 1.0000 22.00 22.00 22.00 Tantarpata 64.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 128.00
Unid 0.0500 26.00 1.30 1.30 Tantarpata 3.20
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 64.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 3.20
Tantarpata
COSTO TOTAL 167.27 141.02 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.30. Instalación de collarines para hidrantes de 75 mm * ¾" TantarpataCOSTO/Unid Tant 4.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 148.02 148.02 0.00 0.00 Tantarpata
1.1. Caja de concreto de Protección Tantarpata
Arena hormigón 0.0300 70.00 2.10 2.10 Tantarpata 0.12
Cemento Portland tipo I / 42,50 kg Bolsa 0.1100 22.00 2.42 2.42 Tantarpata 0.44
Tapa metálica con seguro de 35x35 cm Unid 1.0000 90.00 90.00 90.00 Tantarpata 4.00
1.2. Accesorios para instalación de Collarín Tantarpata
Collarín HDPE de 75 mm X ¾" Unid 1.0000 19.00 19.00 19.00 Tantarpata 4.00
Niple de ¾" Unid 1.0000 4.00 4.00 4.00 Tantarpata 4.00
Llave de paso de ¾" Unid 1.0000 4.80 4.80 4.80 Tantarpata 4.00
Válvula de acople rápido de ¾" Unid 1.0000 22.00 22.00 22.00 Tantarpata 4.00
Cinta teflón Unid 2.0000 1.20 2.40 2.40 Tantarpata 8.00
m³
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
m³
Unid 0.0500 26.00 1.30 1.30 Tantarpata 0.20
Tantarpata
2. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.00
Tantarpata
3. EQUIPOS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 0.20
Tantarpata
COSTO TOTAL 174.27 148.02 0.00 26.25 Tantarpata
Tantarpata
Tantarpata
1.1.1.31. Instalación de Tubería PVC SAP C-10, Ø=¾" TantarpataCOSTO/m Tant 64.92
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 2.16 2.16 0.00 0.00 Tantarpata
Tubería PVC SAP, C-10, 1ˮ x 5m m 1.0000 2.00 2.00 2.00 Tantarpata 64.92
Unid 0.0050 26.00 0.13 0.13 Tantarpata 0.32
Sierra metálica Unid 0.0020 5.00 0.01 0.01 Tantarpata 0.13
Lija Nº 40 Unid 0.0080 2.80 0.02 0.02 Tantarpata 0.52
Tantarpata
2. MANO DE OBRA 2.50 0.00 0.00 2.50 Tantarpata
Mano de obra no calificada Jornal 0.1000 25.00 2.50 2.50 Tantarpata 6.49
Tantarpata
3. EQUIPOS 0.13 0.00 0.00 0.13 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2.50 0.13 0.13 Tantarpata 3.25
Tantarpata
COSTO TOTAL 4.79 2.16 0.00 2.63 Tantarpata
Tantarpata
Tantarpata
1.1.1.32. Instalación de Tubería PVC SAP C-10, Ø=1" TantarpataCOSTO/m Tant 5,111.77
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 2.96 2.96 0.00 0.00 Tantarpata
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Tubería PVC SAP, C-10, 1ˮ x 5m m 1.0000 2.80 2.80 2.80 Tantarpata 5,111.77
Unid 0.0050 26.00 0.13 0.13 Tantarpata 25.56
Sierra metálica Unid 0.0020 5.00 0.01 0.01 Tantarpata 10.22
Lija Nº 40 Unid 0.0080 2.80 0.02 0.02 Tantarpata 40.89
Tantarpata
2. MANO DE OBRA 2.50 0.00 0.00 2.50 Tantarpata
Mano de obra no calificada Jornal 0.1000 25.00 2.50 2.50 Tantarpata 511.18
Tantarpata
3. EQUIPOS 0.13 0.00 0.00 0.13 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2.50 0.13 0.13 Tantarpata 255.59
Tantarpata
COSTO TOTAL 5.59 2.96 0.00 2.63 Tantarpata
Tantarpata
Tantarpata
1.1.1.33. Instalación de Tubería PVC SAP C-7.5, Ø=1½" TantarpataCOSTO/m Tant 2,023.45
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 4.24 4.24 0.00 0.00 Tantarpata
Tubería PVC SAP, C-7,50, 1½" x 5m m 1.0000 4.00 4.00 4.00 Tantarpata 2,023.45
Unid 0.0080 26.00 0.21 0.21 Tantarpata 16.19
Sierra metálica Unid 0.0020 5.00 0.01 0.01 Tantarpata 4.05
Lija Nº 40 Unid 0.0080 2.80 0.02 0.02 Tantarpata 16.19
Tantarpata
2. MANO DE OBRA 2.50 0.00 0.00 2.50 Tantarpata
Mano de obra no calificada Jornal 0.1000 25.00 2.50 2.50 Tantarpata 202.35
Tantarpata
3. EQUIPOS 0.13 0.00 0.00 0.13 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2.50 0.13 0.13 Tantarpata 101.17
Tantarpata
COSTO TOTAL 6.87 4.24 0.00 2.63 Tantarpata
Tantarpata
Tantarpata
1.1.1.34. Instalación de Tubería PVC SAP C-7.5, Ø=2" TantarpataCOSTO/m Tant 1,540.33
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 6.30 6.30 0.00 0.00 Tantarpata
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 1.0000 6.00 6.00 6.00 Tantarpata 1,540.33
Unid 0.0100 26.00 0.26 0.26 Tantarpata 15.40
Sierra metálica Unid 0.0030 5.00 0.02 0.02 Tantarpata 4.62
Lija Nº 40 Unid 0.0080 2.80 0.02 0.02 Tantarpata 12.32
Tantarpata
2. MANO DE OBRA 2.50 0.00 0.00 2.50 Tantarpata
Mano de obra no calificada Jornal 0.1000 25.00 2.50 2.50 Tantarpata 154.03
Tantarpata
3. EQUIPOS 0.13 0.00 0.00 0.13 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2.50 0.13 0.13 Tantarpata 77.02
Tantarpata
COSTO TOTAL 8.93 6.30 0.00 2.63 Tantarpata
Tantarpata
Tantarpata
1.1.1.35. Instalación de Tubería PVC SAP C-7.5, Ø=3" TantarpataCOSTO/m Tant 284.50
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 12.90 12.90 0.00 0.00 Tantarpata
Tubería PVC SAP, C-7,50, 3ˮ x 5m m 1.0000 12.60 12.60 12.60 Tantarpata 284.50
Unid 0.0100 26.00 0.26 0.26 Tantarpata 2.85
Sierra metálica Unid 0.0030 5.00 0.02 0.02 Tantarpata 0.85
Lija Nº 40 Unid 0.0080 2.80 0.02 0.02 Tantarpata 2.28
Tantarpata
2. MANO DE OBRA 2.50 0.00 0.00 2.50 Tantarpata
Mano de obra no calificada Jornal 0.1000 25.00 2.50 2.50 Tantarpata 28.45
Tantarpata
3. EQUIPOS 0.13 0.00 0.00 0.13 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2.50 0.13 0.13 Tantarpata 14.23
Tantarpata
COSTO TOTAL 15.53 12.90 0.00 2.63 Tantarpata
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
PRECIO UNITAR.
PRECIO TOTAL
Pegamento OATEY x ¼ galón
Tantarpata
1.1.1.36. Instalación de sistema móvil TantarpataCOSTO/Unid Tant 11,236.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES 220.20 220.20 0.00 0.00 Tantarpata
Unid 1.0000 12.00 12.00 12.00 Tantarpata 11,236.00
Unid 2.0000 10.00 20.00 20.00 Tantarpata 22,472.00
Manguera PEDB de 25 mm, C-4 m 50.0000 1.10 55.00 55.00 Tantarpata 561,800.00
Unid 1.0000 9.00 9.00 9.00 Tantarpata 11,236.00
Unid 1.0000 3.00 3.00 3.00 Tantarpata 11,236.00
Aspersor VYR 60 - ¾" / sectorial (bronce) Unid 1.0000 85.00 85.00 85.00 Tantarpata 11,236.00
Unid 1.0000 35.00 35.00 35.00 Tantarpata 11,236.00
Cinta teflón Unid 1.0000 1.20 1.20 1.20 Tantarpata 11,236.00
Tantarpata
2. MANO DE OBRA 6.25 0.00 0.00 6.25 Tantarpata
Mano de obra no calificada Jornal 0.2500 25.00 6.25 6.25 Tantarpata 2,809.00
Tantarpata
3. EQUIPOS 0.31 0.00 0.00 0.31 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 6.25 0.31 0.31 Tantarpata 561.80
Tantarpata
COSTO TOTAL 226.76 220.20 0.00 6.56 Tantarpata
Tantarpata
Tantarpata
1.1.2. Produc. de actividades agropec. orientas al Mcdo. Tantarpata
1.1.2.1. Huerto fijo de hortalizas a campo abierto Tantarpata
1.1.2.1.1. Producción de zanahoria TantarpataVARIEDAD "Senimis" TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 7,500.00 TantarpataPRECIO (S/./kg) 0.50 COSTO/ha Tant 1.27
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. INSUMOS 2,360.00 360.00 0.00 2,000.00 Tantarpata
Semillas de Zanahoria kg 4.0000 90.00 360.00 360.00 Tantarpata 5.08
PRECIO UNITAR.
PRECIO TOTAL
Llave bayoneta de ¾ˮ
Codo HDPE de 25 mm x ¾ˮ R/H
Niple PVC de ¾ˮ x 1,20 m (Elevador)
Unión roscada HDPE de ¾ˮ
Trípode metal ¾ˮ x 1,10 m c/abraz. A presión
PRECIO UNITAR.
PRECIO TOTAL
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 254.00
Tantarpata
2. MANO DE OBRA 1,850.00 0.00 0.00 1,850.00 Tantarpata
Preparación de terreno Jornal 15.0000 25.00 375.00 375.00 Tantarpata 19.05
Siembra Jornal 12.0000 25.00 300.00 300.00 Tantarpata 15.24
Labores culturales Jornal 24.0000 25.00 600.00 600.00 Tantarpata 30.48
Riegos Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Cosecha Jornal 15.0000 25.00 375.00 375.00 Tantarpata 19.05
Tantarpata
3. HERRAMIENTAS 92.50 0.00 0.00 92.50 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 1,850.00 92.50 92.50 Tantarpata 0.06
Tantarpata
COSTO TOTAL 4,302.50 360.00 0.00 3,942.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.1.2. Producción de cebolla TantarpataVARIEDAD "Roja Arequipeña" TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 11,000.00 TantarpataPRECIO (S/./kg) 1.50 COSTO/ha Tant 1.27
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. INSUMOS 2,472.00 472.00 0.00 2,000.00 Tantarpata
Semillas de cebolla kg 4.0000 118.00 472.00 472.00 Tantarpata 5.08
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 254.00
Tantarpata
2. MANO DE OBRA 1,150.00 0.00 0.00 1,150.00 Tantarpata
Preparación de terreno Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Siembra Jornal 10.0000 25.00 250.00 250.00 Tantarpata 12.70
Labores culturales Jornal 10.0000 25.00 250.00 250.00 Tantarpata 12.70
Riegos Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Cosecha Jornal 10.0000 25.00 250.00 250.00 Tantarpata 12.70
Tantarpata
3. HERRAMIENTAS 57.50 0.00 0.00 57.50 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 1,150.00 57.50 57.50 Tantarpata 0.06
PRECIO UNITAR.
PRECIO TOTAL
Tantarpata
COSTO TOTAL 3,679.50 472.00 0.00 3,207.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.1.3. Producción de betarraga TantarpataVARIEDAD "Viroflay" TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 6,500.00 TantarpataPRECIO (S/./kg) 0.60 COSTO/ha Tant 1.27
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. INSUMOS 2,900.00 900.00 0.00 2,000.00 Tantarpata
Semillas de betarraga kg 12.0000 75.00 900.00 900.00 Tantarpata 15.24
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 254.00
Tantarpata
2. MANO DE OBRA 1,050.00 0.00 0.00 1,050.00 Tantarpata
Preparación de terreno Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Siembra Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Labores culturales Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Riegos Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Cosecha Jornal 10.0000 25.00 250.00 250.00 Tantarpata 12.70
Tantarpata
3. HERRAMIENTAS 52.50 0.00 0.00 52.50 Tantarpata
Herramientas (5% M.O.) % 0.0500 1,050.00 52.50 52.50 Tantarpata 0.06
Tantarpata
COSTO TOTAL 4,002.50 900.00 0.00 3,102.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.1.4. Producción de coliflor TantarpataVARIEDAD "Snowball" TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 6,000.00 TantarpataPRECIO (S/./kg) 1.00 COSTO/ha Tant 1.27
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
1. INSUMOS 2,425.00 425.00 0.00 2,000.00 Tantarpata
Semillas de coliflor kg 2.5000 170.00 425.00 425.00 Tantarpata 3.18
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 254.00
Tantarpata
2. MANO DE OBRA 1,050.00 0.00 0.00 1,050.00 Tantarpata
Preparación de terreno Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Siembra Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Labores culturales Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Riegos Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Cosecha Jornal 10.0000 25.00 250.00 250.00 Tantarpata 12.70
Tantarpata
3. HERRAMIENTAS 52.50 0.00 0.00 52.50 Tantarpata
Herramientas (5% M.O.) % 0.0500 1,050.00 52.50 52.50 Tantarpata 0.06
Tantarpata
COSTO TOTAL 3,527.50 425.00 0.00 3,102.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.1.5. Producción de acelga TantarpataVARIEDAD "Blanca Lucullus" TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 5,000.00 TantarpataPRECIO (S/./kg) 0.70 COSTO/ha Tant 1.27
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. INSUMOS 2,400.00 400.00 0.00 2,000.00 Tantarpata
Semillas de acelga kg 5.0000 80.00 400.00 400.00 Tantarpata 6.35
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 254.00
Tantarpata
2. MANO DE OBRA 1,850.00 0.00 0.00 1,850.00 Tantarpata
Preparación de terreno Jornal 15.0000 25.00 375.00 375.00 Tantarpata 19.05
Siembra Jornal 12.0000 25.00 300.00 300.00 Tantarpata 15.24
Labores culturales Jornal 24.0000 25.00 600.00 600.00 Tantarpata 30.48
Riegos Jornal 8.0000 25.00 200.00 200.00 Tantarpata 10.16
Cosecha Jornal 15.0000 25.00 375.00 375.00 Tantarpata 19.05
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
3. HERRAMIENTAS 92.50 0.00 0.00 92.50 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 1,850.00 92.50 92.50 Tantarpata 0.06
Tantarpata
COSTO TOTAL 4,342.50 400.00 0.00 3,942.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.2. Parcela de pastos asociados Tantarpata
1.1.2.2.1. Parcela producción de alfalfa TantarpataVARIEDAD Super Alabama 550 PL TantarpataNIVEL TECNICO Baja TantarpataRDTO (kg/ha) 60,000.00 TantarpataPRECIO (S/./kg) 0.25 COSTO/ha Tant 5.30
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. INSUMOS 3,050.00 1,050.00 0.00 2,000.00 Tantarpata
Semilla de Alfalfa Super Alabama 550 PL kg 25.0000 42.00 1,050.00 1,050.00 Tantarpata 132.50
Guano de corral Saco 200.0000 10.00 2,000.00 2,000.00 Tantarpata 1,060.00
Tantarpata
2. MANO DE OBRA 3,575.00 0.00 0.00 3,575.00 Tantarpata
Preparación de terreno Jornal 35.0000 25.00 875.00 875.00 Tantarpata 185.50
Siembra Jornal 28.0000 25.00 700.00 700.00 Tantarpata 148.40
Labores culturales Jornal 35.0000 25.00 875.00 875.00 Tantarpata 185.50
Riegos Jornal 10.0000 25.00 250.00 250.00 Tantarpata 53.00
Cosecha Jornal 35.0000 25.00 875.00 875.00 Tantarpata 185.50
Tantarpata
3. HERRAMIENTAS 178.75 0.00 0.00 178.75 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 3,575.00 178.75 178.75 Tantarpata 0.27
Tantarpata
COSTO TOTAL 6,803.75 1,050.00 0.00 5,753.75 Tantarpata
Tantarpata
Tantarpata
1.1.2.3. Miniparcelas para la producción granos andinos Tantarpata
1.1.2.3.1. Producción de quinua TantarpataVARIEDAD TantarpataNIVEL TECNICO Media Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
RDTO (kg/ha) 1,800.00 TantarpataPRECIO (S/./kg) 3.50 COSTO/ha Tant 4.24
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MANO DE OBRA 2,500.00 0.00 0.00 2,500.00 Tantarpata
1.1. PREPARACION DEL TERRENO Tantarpata
Limpieza de terreno Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
1.2. SIEMBRA Tantarpata
Aplicación del primer abonamiento Jornal 4.0000 25.00 100.00 100.00 Tantarpata 16.96
Siembra chorro continuo por surcos Jornal 4.0000 25.00 100.00 100.00 Tantarpata 16.96
Tapado de semilla Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Riego de machaco y remojo Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
1.3. LABORES CULTURALES Tantarpata
Primer deshierbe y aporque Jornal 20.0000 25.00 500.00 500.00 Tantarpata 84.80
Segundo abonamiento Jornal 4.0000 25.00 100.00 100.00 Tantarpata 16.96
Segundo aporque Jornal 15.0000 25.00 375.00 375.00 Tantarpata 63.60
Segundo deshierbo Jornal 5.0000 25.00 125.00 125.00 Tantarpata 21.20
1.4. COSECHA Tantarpata
Corte Jornal 15.0000 25.00 375.00 375.00 Tantarpata 63.60
Traslado, amontonado y secado Jornal 5.0000 25.00 125.00 125.00 Tantarpata 21.20
Trillado Jornal 14.0000 25.00 350.00 350.00 Tantarpata 59.36
Venteo Jornal 4.0000 25.00 100.00 100.00 Tantarpata 16.96
Ensacado y cocido Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Almacenamiento Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Tantarpata
2. TRACCION ANIMAL 385.00 0.00 0.00 385.00 Tantarpata
2.1. PREPARACION DEL TERRENO Tantarpata
Barbecho o Arado o roturación Yunta 5.0000 35.00 175.00 175.00 Tantarpata 21.20
Cruza o desterronado Yunta 4.0000 35.00 140.00 140.00 Tantarpata 16.96
Surcado Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
Tantarpata
3. INSUMOS 1,447.45 147.45 0.00 1,300.00 Tantarpata
3.1. SEMILLA Tantarpata
Semilla de quinua kg 15.0000 9.83 147.45 147.45 Tantarpata 63.60
3.2. FERTILIZANTES Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Guano de corral Saco 130.0000 10.00 1,300.00 1,300.00 Tantarpata 551.20
Tantarpata
4. HERRAMIENTAS 125.00 0.00 0.00 125.00 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 2,500.00 125.00 125.00 Tantarpata 0.21
Tantarpata
COSTO TOTAL 4,457.45 147.45 0.00 4,310.00 Tantarpata
Tantarpata
Tantarpata
1.1.2.3.2. Producción de papa blanca TantarpataVARIEDAD Canchán TantarpataNIVEL TECNICO Media TantarpataRDTO (kg/ha) 26,000.00 TantarpataPRECIO (S/./kg) 0.60 Tant 4.24
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MANO DE OBRA 3,100.00 0.00 0.00 3,100.00 Tantarpata
1.1. PREPARACION DEL TERRENO Tantarpata
Limpieza y quema de rastrojo Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.24
Riego de remojo o machaco Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.24
1.2. SIEMBRA Tantarpata
Reseleccion de semilla Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Mezcla y abonamiento Jornal 3.0000 25.00 75.00 75.00 Tantarpata 12.72
Distribucion de semillas Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
1.3. LABORES CULTURALES Tantarpata
Primer aporque Jornal 15.0000 25.00 375.00 375.00 Tantarpata 63.60
Segundo aporque Jornal 15.0000 25.00 375.00 375.00 Tantarpata 63.60
1.4. COSECHA Tantarpata
Escarbe de surcos Jornal 25.0000 25.00 625.00 625.00 Tantarpata 106.00
Recojo manual Jornal 20.0000 25.00 500.00 500.00 Tantarpata 84.80
Traslado y amontonamiento Jornal 9.0000 25.00 225.00 225.00 Tantarpata 38.16
Selección y clasificacion Jornal 15.0000 25.00 375.00 375.00 Tantarpata 63.60
Ensacado y cosido Jornal 5.0000 25.00 125.00 125.00 Tantarpata 21.20
Almacenado Jornal 5.0000 25.00 125.00 125.00 Tantarpata 21.20
Tantarpata
2. TRACCION ANIMAL 350.00 0.00 0.00 350.00 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
2.1. PREPARACION DEL TERRENO Tantarpata
Barbecho o Arado o roturacion Yunta 5.0000 35.00 175.00 175.00 Tantarpata 21.20
Cruza o desterronado Yunta 3.0000 35.00 105.00 105.00 Tantarpata 12.72
2.2. SIEMBRA Tantarpata
Surqueo o melgueo Yunta 1.0000 35.00 35.00 35.00 Tantarpata 4.24
Tapado de semilla Yunta 1.0000 35.00 35.00 35.00 Tantarpata 4.24
Tantarpata
3. INSUMOS 6,750.00 5,250.00 0.00 1,500.00 Tantarpata
3.1. SEMILLA Tantarpata
Semilla de papa kg 1,500.0000 3.50 5,250.00 5,250.00 Tantarpata 6,360.00
3.2. FERTILIZANTES Tantarpata
Guano de corral Saco 150.0000 10.00 1,500.00 1,500.00 Tantarpata 636.00
Tantarpata
4. HERRAMIENTAS 155.00 0.00 0.00 155.00 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 3,100.00 155.00 155.00 Tantarpata 0.21
Tantarpata
COSTO TOTAL 10,355.00 5,250.00 0.00 5,105.00 Tantarpata
Tantarpata
Tantarpata
1.1.2.3.3. Producción de frejol canario TantarpataVARIEDAD Frejol canario TantarpataNIVEL TECNICO Media TantarpataRDTO (kg/ha) 800.00 TantarpataPRECIO (S/./kg) 3.00 COSTO/ha Tant 4.24
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MANO DE OBRA 1,600.00 0.00 0.00 1,600.00 Tantarpata
1.1. PREPARACION DEL TERRENO Tantarpata
Limpieza de terreno Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
1.2. SIEMBRA Tantarpata
Reselección y desinfección Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.24
Mezcla y primer abonamiento Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Distribución de semilla Jornal 3.0000 25.00 75.00 75.00 Tantarpata 12.72
1.3. LABORES CULTURALES Tantarpata
Primer deshierbe a mano Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
PRECIO UNITAR.
PRECIO TOTAL
Primer control fitosanitario Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Primer aporque Jornal 16.0000 25.00 400.00 400.00 Tantarpata 67.84
Segundo control fitosanitario Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
1.4. COSECHA Tantarpata
Corte o siega Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
Traslado, amontonado Jornal 6.0000 25.00 150.00 150.00 Tantarpata 25.44
Trilla Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
Despaje y venteo Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Ensacado y cosido Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Almacenamiento Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Tantarpata
2. TRACCION ANIMAL 350.00 0.00 0.00 350.00 Tantarpata
2.1. PREPARACION DEL TERRENO Tantarpata
Barbecho o Arado o roturación Yunta 4.0000 35.00 140.00 140.00 Tantarpata 16.96
Cruza o desterronado Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
2.2. SIEMBRA Tantarpata
Surcado Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
Tapado de semilla Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
Tantarpata
3. INSUMOS 1,790.00 390.00 0.00 1,400.00 Tantarpata
3.1. SEMILLA Tantarpata
Semilla de frejol canario kg 60.0000 6.50 390.00 390.00 Tantarpata 254.40
3.2. FERTILIZANTES Tantarpata
Guano de corral Saco 140.0000 10.00 1,400.00 1,400.00 Tantarpata 593.60
Tantarpata
4. HERRAMIENTAS 80.00 0.00 0.00 80.00 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 1,600.00 80.00 80.00 Tantarpata 0.21
Tantarpata
COSTO TOTAL 3,820.00 390.00 0.00 3,430.00 Tantarpata
Tantarpata
Tantarpata
1.1.2.3.4. Producción de arveja TantarpataVARIEDAD Blanca TantarpataNIVEL TECNICO Medio TantarpataRDTO (kg/ha) 2,000.00 Tantarpata
PRECIO (S/./kg) 1.40 COSTO/ha Tant 4.24
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MANO DE OBRA 1,425.00 0.00 0.00 1,425.00 Tantarpata
1.1. PREPARACION DEL TERRENO Tantarpata
Limpieza de terreno Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.24
1.2. SIEMBRA Tantarpata
Reselec. Y desinfección de semilla Jornal 1.0000 25.00 25.00 25.00 Tantarpata 4.24
Mezcla y primer abonamiento Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Distribución de semilla Jornal 3.0000 25.00 75.00 75.00 Tantarpata 12.72
1.3. LABORES CULTURALES Tantarpata
Primer deshierbe a mano Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
Primer aporque Jornal 16.0000 25.00 400.00 400.00 Tantarpata 67.84
1.4. COSECHA Tantarpata
Corte a mano con hoz Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
Traslado de gavilla a la era Jornal 4.0000 25.00 100.00 100.00 Tantarpata 16.96
Trilla con garrote Jornal 8.0000 25.00 200.00 200.00 Tantarpata 33.92
Venteo Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Ensacado y cocido Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Traslado y almacenamiento Jornal 2.0000 25.00 50.00 50.00 Tantarpata 8.48
Tantarpata
2. TRACCION ANIMAL 350.00 0.00 0.00 350.00 Tantarpata
2.1. PREPARACION DEL TERRENO Tantarpata
Barbecho o Arado o roturación Yunta 4.0000 35.00 140.00 140.00 Tantarpata 16.96
Cruza o desterronado o Rastra Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
1.2. SIEMBRA Tantarpata
Surcado Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
Tapado de semilla Yunta 2.0000 35.00 70.00 70.00 Tantarpata 8.48
Tantarpata
3. INSUMOS 1,554.00 354.00 0.00 1,200.00 Tantarpata
3.1. SEMILLA Tantarpata
Semilla de arveja kg 60.0000 5.90 354.00 354.00 Tantarpata 254.40
3.2. FERTILIZANTES Tantarpata
Guano de corral Saco 120.0000 10.00 1,200.00 1,200.00 Tantarpata 508.80
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
4. HERRAMIENTAS 71.25 0.00 0.00 71.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 1,425.00 71.25 71.25 Tantarpata 0.21
Tantarpata
COSTO TOTAL 3,400.25 354.00 0.00 3,046.25 Tantarpata
Tantarpata
Tantarpata
1.1.2.4. Agroforestería TantarpataCOSTO/Familia Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES 30.00 30.00 0.00 0.00 Tantarpata
Plantones de pino Unid. 20.0000 1.50 30.00 30.00 Tantarpata 2,120.00
Tantarpata
2. MANO DE OBRA 50.00 0.00 0.00 50.00 Tantarpata
Mano de obra no calificada Jornal 2.0000 25.00 50.00 50.00 Tantarpata 212.00
Tantarpata
3. HERRAMIENTAS 2.50 0.00 0.00 2.50 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 50.00 2.50 2.50 Tantarpata 5.30
Tantarpata
TOTAL COSTOS DIRECTOS (S/.) 82.50 30.00 0.00 52.50 Tantarpata
Tantarpata
Tantarpata
1.1.2.5. Módulo de producción de abono orgánico - compost Tantarpata
produc. = 20 sacos/familia - sacos=S/. 15,00 COSTO/Módulo Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MANO DE OBRA 135.00 0.00 0.00 135.00 Tantarpata
1.1. PREPARACION DE LA POZA Tantarpata
Perforacion de 02 pozas (1 x 8 x 0,5 m) Jornal 1.0000 25.00 25.00 25.00 Tantarpata 106.00
1.2. RECOLECCION DE MALEZAS Y GUANO CORRAL Tantarpata
Recolección de malezas (mala hierba etc.) Jornal 1.0000 25.00 25.00 25.00 Tantarpata 106.00
Recolección de guano (fresco y/o seco) Jornal 1.0000 25.00 25.00 25.00 Tantarpata 106.00
1.3. LABORES CULTURALES Tantarpata
Secado de malezas Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Mezcla de malezas y guano Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Primera inundación de la poza Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Primer volteo de la mezcla Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Segunda inundación de la mezcla Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Segundo volteo de la mezcla Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
1.4. OBTENCION DEL COMPOST Tantarpata
Remoción del compost Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Ensacado del compost Jornal 0.3000 25.00 7.50 7.50 Tantarpata 31.80
Tantarpata
2. INSUMOS 18.20 9.00 0.00 9.20 Tantarpata
2.1. MALLA ARPILLERA Tantarpata
Malla arpillera 5.0000 1.80 9.00 9.00 Tantarpata 530.00
Ceniza kg 6.0000 0.20 1.20 1.20 Tantarpata 636.00
Unid 2.0000 4.00 8.00 8.00 Tantarpata 212.00
Tantarpata
3. HERRAMIENTAS 6.75 0.00 0.00 6.75 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 135.00 6.75 6.75 Tantarpata 5.30
Tantarpata
COSTO TOTAL 159.95 9.00 0.00 150.95 Tantarpata
Tantarpata
Tantarpata
1.1.2.6. Módulo de crianza de gallinas TantarpataCOSTO/Módulo Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. IMPLEMENTACIÓN DE JAULAS Y COMPRA DE POLLOS 103.20 53.20 0.00 50.00 Tantarpata
Malla gallinero m 4.0000 2.80 11.20 11.20 Tantarpata 424.00
Instalaciones (construcción de jaulas) Gbl 1.0000 50.00 50.00 50.00 Tantarpata 106.00
Alambre negro Nº 16 kg 1.5000 5.00 7.50 7.50 Tantarpata 159.00
Clavos de 4ˮ kg 0.5000 5.00 2.50 2.50 Tantarpata 53.00
Gallinas criollas de doble propósito Unid 4.0000 8.00 32.00 32.00 Tantarpata 424.00
Tantarpata
2. ALIMENTO DE GALLINAS 8.80 8.80 0.00 0.00 Tantarpata
Alimento balanceado kg 4.0000 2.20 8.80 8.80 Tantarpata 424.00
Tantarpata
3. BOTIQUÍN VETERINARIO 4.20 4.20 0.00 0.00 Tantarpata
m²
Rollizos de eucalipto Ø=2ˮ x 2,20 m
PRECIO UNITAR.
PRECIO TOTAL
Antibiótico (Biomycin Súper x 20 g) Unid 0.5000 2.80 1.40 1.40 Tantarpata 53.00
Antiparasitario ext. (Fipecto Frasco de 1,00 l) Fco. 0.0200 140.00 2.80 2.80 Tantarpata 2.12
Tantarpata
4. TRANSPORTE 2.00 2.00 0.00 0.00 Tantarpata
Transporte semovientes Cbza 4.0000 0.50 2.00 2.00 Tantarpata 424.00
Tantarpata
5. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 106.00
Tantarpata
5. HERRAMIENTAS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 5.30
Tantarpata
COSTO TOTAL 144.45 68.20 0.00 76.25 Tantarpata
Tantarpata
Tantarpata
1.1.2.7. Módulo de crianza de cuyes TantarpataCOSTO/Módulo Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. IMPLEMENTACIÓN DE POZAS 36.20 16.20 0.00 20.00 Tantarpata
Unid 4.0000 5.00 20.00 20.00 Tantarpata 424.00
Malla gallinero m 4.0000 2.80 11.20 11.20 Tantarpata 424.00
Clavos de 2ˮ kg 0.5000 5.00 2.50 2.50 Tantarpata 53.00
Clavos de 4ˮ kg 0.5000 5.00 2.50 2.50 Tantarpata 53.00
Tantarpata
2. AQUISICIÓN DE REPRODUCTORES 184.00 184.00 0.00 0.00 Tantarpata
Cuyes reproductores (macho) Unid 1.0000 24.00 24.00 24.00 Tantarpata 106.00
Cuyes reproductores (hembras) Unid 8.0000 20.00 160.00 160.00 Tantarpata 848.00
Tantarpata
3. BOTIQUÍN VETERINARIO 6.36 6.36 0.00 0.00 Tantarpata
Tintura de Yodo al 2% x 1,00 l Fco. 0.0150 65.00 0.98 0.98 Tantarpata 1.59
Algodón paquete de 50,00 g Pqte. 1.0000 3.00 3.00 3.00 Tantarpata 106.00
Antibiótico (Enropro al 20% - Frasco de 0,50 l) Fco. 0.0200 49.00 0.98 0.98 Tantarpata 2.12
Antiparasitario ext. (Fipecto Frasco de 1,00 l) Fco. 0.0100 140.00 1.40 1.40 Tantarpata 1.06
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
Rollizos de eucalipto Ø=2ˮ x 2,20 m
4. TRANSPORTE 4.50 4.50 0.00 0.00 Tantarpata
Transporte semovientes Cbza 9.0000 0.50 4.50 4.50 Tantarpata 954.00
Tantarpata
5. MANO DE OBRA 25.00 0.00 0.00 25.00 Tantarpata
Mano de obra no calificada Jornal 1.0000 25.00 25.00 25.00 Tantarpata 106.00
Tantarpata
6. HERRAMIENTAS 1.25 0.00 0.00 1.25 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 25.00 1.25 1.25 Tantarpata 5.30
Tantarpata
COSTO TOTAL 257.31 211.05 0.00 46.25 Tantarpata
Tantarpata
Tantarpata
1.2. Materiales de Capacitación para las tecnologías Tantarpata
1.2.1. Materiales de capacitación para las tecnologías TantarpataCOSTO/Glb Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 3,179.00 3,179.00 0.00 0.00 Tantarpata
Cuaderno de 100 hojas T-A4 Unid 110.0000 5.00 550.00 550.00 Tantarpata 110.00
Lapiceros punta fina Unid 220.0000 1.00 220.00 220.00 Tantarpata 220.00
Papelógrafo cuadriculado Ciento 3.6000 40.00 144.00 144.00 Tantarpata 3.60
Plumones para papel Nº 47 Unid 216.0000 2.50 540.00 540.00 Tantarpata 216.00
Manual en riego (15 hojas /manual) Unid 115.0000 5.00 575.00 575.00 Tantarpata 115.00
Manual en producción agrícola y pecuaria (15 hojas Unid 115.0000 5.00 575.00 575.00 Tantarpata 115.00
Manual en cocinas mejoradas y agua segura (15 hojaUnid 115.0000 5.00 575.00 575.00 Tantarpata 115.00
Tantarpata
COSTO TOTAL 3,179.00 3,179.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.3. Capacitación de campesino a campesino Tantarpata
1.3.1. Contratación de Yachachiq (primer año) TantarpataCOSTO/Mes Tant 12.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Tantarpata
2. MANO DE OBRA CALIFICADA 3,000.00 3,000.00 0.00 0.00 Tantarpata
Contratación de Yachachiq (3 Yachachiq) Honorar. 3.0000 1,000.00 3,000.00 3,000.00 Tantarpata 36.00
Tantarpata
COSTO TOTAL 3,000.00 3,000.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.3.2. Contratación de Yachachiq (segundo año) TantarpataCOSTO/Mes Tant 12.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 1,000.00 1,000.00 0.00 0.00 Tantarpata
Contratación de Yachachiq (1 Yachachiq) Honorar. 1.0000 1,000.00 1,000.00 1,000.00 Tantarpata 12.00
Tantarpata
COSTO TOTAL 1,000.00 1,000.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.3.3. Contratación de Yachachiq (tercer año) TantarpataCOSTO/Mes Tant 12.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 1,000.00 0.00 1,000.00 0.00 Tantarpata
Contratación de Yachachiq (1 Yachachiq) Honorar. 1.0000 1,000.00 1,000.00 1,000.00 Tantarpata 12.00
Tantarpata
COSTO TOTAL 1,000.00 0.00 1,000.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.4. Seguro básico de Yachachiq Tantarpata
1.4.1. Seguro básico de Yachachiq (primer año) TantarpataCOSTO/Año Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Nº DESCRIPCIÓN UNID. CANT.FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 1,455.48 1,455.48 0.00 0.00 Tantarpata
Seguro de Yachachiq Seguro 3.0000 485.16 1,455.48 1,455.48 Tantarpata 3.00
Tantarpata
COSTO TOTAL 1,455.48 1,455.48 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.4.2. Seguro básico de Yachachiq (segundo y tercer año) TantarpataCOSTO/Año Tant 2.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 485.16 485.16 0.00 0.00 Tantarpata
Seguro de Yachachiq Seguro 1.0000 485.16 485.16 485.16 Tantarpata 2.00
Tantarpata
COSTO TOTAL 485.16 485.16 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.5. Movilidad de Yachachiq Tantarpata
1.5.1. Movilidad de Yachachiq para capacitación (primer año) TantarpataCOSTO/Mes Tant 12.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 600.00 600.00 0.00 0.00 Tantarpata
Movilidad Yachachiq para capacitación (3 Yachachiq)Movil. 3.0000 200.00 600.00 600.00 Tantarpata 36.00
Tantarpata
COSTO TOTAL 600.00 600.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.5.2. Movilidad de Yachachiq para capacitación (2do. Y 3er año) TantarpataCOSTO/Mes Tant 24.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 200.00 200.00 0.00 0.00 Tantarpata
Movilidad Yachachiq para capacitación (1 Yachachiq)Movil. 1.0000 200.00 200.00 200.00 Tantarpata 24.00
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
COSTO TOTAL 200.00 200.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.6. Concursos entre Núcleos Ejecutores - NE Tantarpata
1.6.1. Concursos en la aplicación y mejora de tecnologías Tantarpata
COSTO/Concurso Tant 20.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 300.00 300.00 0.00 0.00 Tantarpata
Premios Primer Puesto Premio 1.0000 200.00 200.00 200.00 Tantarpata 20.00
Premios Segundo Puesto Premio 1.0000 100.00 100.00 100.00 Tantarpata 20.00
Tantarpata
COSTO TOTAL 300.00 300.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.7. Participación en Ferias Locales Tantarpata
1.7.1. Participación en Ferias Locales Tantarpata
COSTO/Feria Tant 2.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 950.00 950.00 0.00 0.00 Tantarpata
Banner 0,80 x 1,20 m Unid 1.0000 120.00 120.00 120.00 Tantarpata 2.00
Trípticos Millar 1.0000 650.00 650.00 650.00 Tantarpata 2.00
Malla arpillera 100.0000 1.80 180.00 180.00 Tantarpata 200.00
Tantarpata
2. MOVILIDAD 940.00 940.00 0.00 0.00 Tantarpata
Movilidad de participantes Pasaje 188.0000 5.00 940.00 940.00 Tantarpata 376.00
Tantarpata
3. ALIMENTACIÓN 752.00 752.00 0.00 0.00 Tantarpata
Alimentación de participantes Ración 94.0000 8.00 752.00 752.00 Tantarpata 188.00
Tantarpata
COSTO TOTAL 2,642.00 2,642.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.8. Pasantías Yachachiq Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
m²
1.8.1. Pasantías Yachachiq Tantarpata
COSTO/Pasantía Tant 2.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MOVILIDAD 470.00 470.00 0.00 0.00 Tantarpata
Movilidad de Chungui - Vinchos (viceversa) Pasaje 3.0000 90.00 270.00 270.00 Tantarpata 6.00
Movilidad local Día 2.0000 100.00 200.00 200.00 Tantarpata 4.00
Tantarpata
2. ALIMENTACIÓN 225.00 225.00 0.00 0.00 Tantarpata
Alimentación pasantes Día 3.0000 75.00 225.00 225.00 Tantarpata 6.00
Tantarpata
3. ALOJAMIENTO 90.00 90.00 0.00 0.00 Tantarpata
Alojamiento de pasantes Noche 2.0000 45.00 90.00 90.00 Tantarpata 4.00
Tantarpata
COSTO TOTAL 785.00 785.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
2. Implementación y mejora de la vivienda saludable Tantarpata
2.1. Instalación de cocina mejorada TantarpataCOSTO/Módulo Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 161.76 138.96 0.00 22.80 Tantarpata
1.1. Cámara de combustión Tantarpata
Ladrillos de pared (artesanal) Unid 20.0000 0.60 12.00 12.00 Tantarpata 2,120.00
Alambre negro Nº 16 kg 0.0400 5.00 0.20 0.20 Tantarpata 4.24
m 3.0000 1.72 5.16 5.16 Tantarpata 318.00
1.2. Construcción de la losa y hornillas Tantarpata
Cemento Portland tipo I / 42,50 kg Bolsa 0.1800 22.00 3.96 3.96 Tantarpata 19.08
m 0.5000 4.00 2.00 2.00 Tantarpata 53.00
Arena de asentar 0.0200 70.00 1.40 1.40 Tantarpata 2.12
m 2.0000 4.67 9.34 9.34 Tantarpata 212.00
1.3. Construcción de la chimenea Tantarpata
Ladrillos de pared (artesanal) Unid 40.0000 0.60 24.00 24.00 Tantarpata 4,240.00
Alambre negro Nº 08 kg 0.0200 5.00 0.10 0.10 Tantarpata 2.12
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Fierro corrugado x ⅜ˮ (rejilla cenicero)
Malla electrosoldada de ½ˮ
m³
Fierro corrugado de ½ˮ
Unid 1.0000 36.00 36.00 36.00 Tantarpata 106.00
Sombrero capucha 0,18 x 07,00 cm con perno abraz Unid 1.0000 10.00 10.00 10.00 Tantarpata 106.00
1.4. Otros materiales Tantarpata
Fibraforte transparente de 1,80 x 0,80 x 0,22 mm Unid 1.0000 28.00 28.00 28.00 Tantarpata 106.00
Adobe Unid 40.0000 0.25 10.00 10.00 Tantarpata 4,240.00
Ceniza kg 60.0000 0.20 12.00 12.00 Tantarpata 6,360.00
Arena fina 0.0800 85.00 6.80 6.80 Tantarpata 8.48
Tierra de chacra 0.0800 10.00 0.80 0.80 Tantarpata 8.48
Tantarpata
2. MANO DE OBRA 37.50 0.00 0.00 37.50 Tantarpata
Construcción de la cocina Jornal 1.5000 25.00 37.50 37.50 Tantarpata 159.00
Tantarpata
3. HERRAMIENTAS 1.88 0.00 0.00 1.88 Tantarpata
Herramientas (5,00 % MONC) % 0.0500 37.50 1.88 1.88 Tantarpata 5.30
Tantarpata
COSTO TOTAL 201.14 138.96 0.00 62.18 Tantarpata
Tantarpata
Tantarpata
2.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar Tantarpata
2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda (ACU_Cap.(V.S. Formato de capacitación FONCODES) Tantarpata
2.2.2. Capacitación en salud y nutrición familiar (ACU_Cap.(V.S. Formato de capacitación FONCODES) Tantarpata
Tantarpata
2.3. Agua segura TantarpataCOSTO/Módulo Tant 106.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES 21.50 21.50 0.00 0.00 Tantarpata
Balde con caño x 12 litros Unidad 1.0000 14.00 14.00 14.00 Tantarpata 106.00
Vaso de vidrio x 7 onz Unidad 3.0000 2.50 7.50 7.50 Tantarpata 318.00
Tantarpata
COSTO TOTAL 21.50 21.50 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
3. Promoción de Negocios Rurales Inclusivos Tantarpata
3.1. Asistencia técnica para articulación al mercado Tantarpata
Chimenea de ɸ=0,12 x 1,20 m x 0,60 mm
m³
m³
PRECIO UNITAR.
PRECIO TOTAL
COSTO/Evento Tant 180.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 50.00 50.00 0.00 0.00 Tantarpata
Asistente Técnico articulador Evento 1.0000 50.00 50.00 50.00 Tantarpata 180.00
Tantarpata
COSTO TOTAL 50.00 50.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
3.2. Concursos de Planes de negocios 3/. Tantarpata
COSTO/Concurso Tant 2.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 23,684.86 23,684.86 0.00 0.00 Tantarpata
Premio a la idea del negocio ganador Premio 1.0000 23,684.86 23,684.86 23,684.86 Tantarpata 2.00
Tantarpata
COSTO TOTAL 23,684.86 23,684.86 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4. Fomento de capacidades financieras Tantarpata
4.1. Promoción, convocatoria y concursos TantarpataCOSTO/Mes Tant 6.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES MIDIS GOB. LOCAL Tantarpata
1. MATERIALES E INSUMOS 77.00 77.00 0.00 0.00 Tantarpata
Convocatorias Unid 94.0000 0.50 47.00 47.00 Tantarpata 564.00
Movilidad para convocatoria Glb 1.0000 30.00 30.00 30.00 Tantarpata 6.00
Tantarpata
COSTO TOTAL 77.00 77.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4.2. Materiales de capacitación TantarpataCOSTO/Glb Tant 1.00
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES MIDIS GOB. LOCAL Tantarpata
1. MATERIALES E INSUMOS 3,705.20 3,705.20 0.00 0.00 Tantarpata
1.1. Para el desarrollo del módulo con los usuarios Tantarpata
Incentivos para concursos (15 usuarios del NE) Glb 15.0000 140.00 2,100.00 2,100.00 Tantarpata 15.00
Edición de video (durac. 15 min)- temas central moduUnid 6.0000 25.00 150.00 150.00 Tantarpata 6.00
Edición e impresión de guías de módulo para yachahUnid 10.0000 10.00 100.00 100.00 Tantarpata 10.00
Edición e impresión de guías de módulo para líderes Unid 6.0000 5.00 30.00 30.00 Tantarpata 6.00
Edición e impresión de cuadernos de módulos para uUnid 5.0000 6.00 30.00 30.00 Tantarpata 5.00
Papel craf Unid 192.0000 0.40 76.80 76.80 Tantarpata 192.00
Papelógrafo cuadriculado Ciento 2.0000 40.00 80.00 80.00 Tantarpata 2.00
Plumones para pizarra acrílica Unid 64.0000 3.00 192.00 192.00 Tantarpata 64.00
Cartulinas de colores ecológicos Unid 128.0000 0.60 76.80 76.80 Tantarpata 128.00
Cuadernos A-5 (para notas de usuarios) Unid 94.0000 1.00 94.00 94.00 Tantarpata 94.00
Cuadernos A-4 (para actas del grupo) Unid 3.0000 5.00 15.00 15.00 Tantarpata 3.00
Lapiceros Unid 94.0000 0.50 47.00 47.00 Tantarpata 94.00
Papel bond A-4 Millar 3.0000 23.00 69.00 69.00 Tantarpata 3.00
Chinchotes Caja 6.0000 7.00 42.00 42.00 Tantarpata 6.00
Clavos de cemento de 2" Docena 6.0000 2.50 15.00 15.00 Tantarpata 6.00
1.2. Para el uso del facilitador financiero Tantarpata
Edición e impresión de guías de módulos para facilit.Unid 1.6700 10.00 16.70 16.70 Tantarpata 1.67
Diseño de láminas Unid 10.0000 10.00 100.00 100.00 Tantarpata 10.00
Servicios de arte gráfico Unid 10.0000 15.00 150.00 150.00 Tantarpata 10.00
Impresión de láminas plastificadas A-3 Unid 10.0000 15.00 150.00 150.00 Tantarpata 10.00
Impresión de láminas plastificadas 8x30 cm Unid 10.0000 2.00 20.00 20.00 Tantarpata 10.00
Impresión de billetes y monedas plastificadas Millar 0.1700 280.00 47.60 47.60 Tantarpata 0.17
Banner para recepción de imagen (con ojales) 2x1,5 Unid 0.3300 50.00 16.50 16.50 Tantarpata 0.33
Banner en blanco de 2x1,20 m (con ojales) Unid 0.3300 50.00 16.50 16.50 Tantarpata 0.33
Banner (con imp. De logotipo y nombre del Pyto.) 2, Unid 0.3300 70.00 23.10 23.10 Tantarpata 0.33
Pasador o cuerda sintética (grosor 50 mm) Unid 0.3300 30.00 9.90 9.90 Tantarpata 0.33
Ganchos de plástico Docena 0.6700 1.00 0.67 0.67 Tantarpata 0.67
Puntero graduable Unid 0.3300 10.00 3.30 3.30 Tantarpata 0.33
Tijeras punta roma medianas Unid 0.3300 5.00 1.65 1.65 Tantarpata 0.33
Cuchilla corta papel (cutter) Unid 0.3300 1.00 0.33 0.33 Tantarpata 0.33
Maletín porta meteriales Unid 0.3300 80.00 26.40 26.40 Tantarpata 0.33
PRECIO UNITAR.
PRECIO TOTAL
1.3. Equipos Tantarpata
Linterna Unid 0.3300 15.00 4.95 4.95 Tantarpata 0.33
Tantarpata
COSTO TOTAL 3,705.20 3,705.20 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4.3. Honorarios facilitador financiero Tantarpata
COSTO/Mes Tant 6.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 1,500.00 1,500.00 0.00 0.00 Tantarpata
Facilitador financiero Honorar. 1.0000 1,500.00 1,500.00 1,500.00 Tantarpata 6.00
Tantarpata
COSTO TOTAL 1,500.00 1,500.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4.4. Honorarios yachachiq financiero Tantarpata
COSTO/Mes Tant 6.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 1,000.00 1,000.00 0.00 0.00 Tantarpata
Yachachiq financiero Honorar. 1.0000 1,000.00 1,000.00 1,000.00 Tantarpata 6.00
Tantarpata
COSTO TOTAL 1,000.00 1,000.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4.5. Viáticos y apoyo logístico facilitador financiero Tantarpata
COSTO/Glb Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 450.00 450.00 0.00 0.00 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Combustible - facilitador financiero Gln 10.0000 15.00 150.00 150.00 Tantarpata 10.00
Viáticos facilitador (hospedaje, alimentación y pasajeDía 1.2500 240.00 300.00 300.00 Tantarpata 1.25
Tantarpata
2. MANO DE OBRA CALIFICADA Tantarpata
Tantarpata
COSTO TOTAL 450.00 450.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
B. COSTO INDIRECTO Tantarpata
1. Gastos Generales del Núcleo Ejecutor Central - NEC Tantarpata
1.1. Movillidad del Presidente y Tesorero del NEC TantarpataCOSTO/Mes Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES Y EQUIPOS 83.33 83.33 0.00 0.00 Tantarpata
Tantarpata
2. MOVILIDAD DEL NEC Tantarpata
Movilidad del Presidente y Tesorero del NEC Mes 1.0000 83.33 83.33 83.33 Tantarpata 18.00
Tantarpata
COSTO TOTAL 83.33 83.33 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.2. Pago de revisor de cuentas TantarpataCOSTO/Trimestre Tant 6.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 300.00 300.00 0.00 0.00 Tantarpata
Revisor Honorar. 1.0000 300.00 300.00 300.00 Tantarpata 6.00
Tantarpata
COSTO TOTAL 300.00 300.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.3. Cartel del NE e implementación del NEC Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
COSTO/Glb Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES Y EQUIPOS 1,508.00 1,508.00 0.00 0.00 Tantarpata
Cartel de obra Unid 1.0000 600.00 600.00 600.00 Tantarpata 1.00
Adquisición de muebles de cómputo con silla Unid 0.5000 300.00 150.00 150.00 Tantarpata 0.50
Adquisicón de mesa de trabajo Unid 0.3300 250.00 82.50 82.50 Tantarpata 0.33
Adquisción de sillas de plástico Docena 0.5000 480.00 240.00 240.00 Tantarpata 0.50
Engrapador + grapas Unid 0.5000 90.00 45.00 45.00 Tantarpata 0.50
Perforador de papel Unid 0.5000 90.00 45.00 45.00 Tantarpata 0.50
Cuchillas corta papel Unid 3.0000 3.50 10.50 10.50 Tantarpata 3.00
Goma de papel l 0.5000 10.00 5.00 5.00 Tantarpata 0.50
Cuaderno de Obra Unid 2.0000 35.00 70.00 70.00 Tantarpata 2.00
Lapiceros de colores Caja 1.0000 50.00 50.00 50.00 Tantarpata 1.00
Regla de 30 cm Unid 3.0000 4.00 12.00 12.00 Tantarpata 3.00
Pizarra acrílica Unid 1.0000 180.00 180.00 180.00 Tantarpata 1.00
Mota para pizarra acrílica Unid 1.0000 3.00 3.00 3.00 Tantarpata 1.00
Tijeras Unid 3.0000 5.00 15.00 15.00 Tantarpata 3.00
Tantarpata
COSTO TOTAL 1,508.00 1,508.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.4. Gastos Bancarios del NEC TantarpataCOSTO/Mes Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES Y EQUIPOS 6.00 6.00 0.00 0.00 Tantarpata
Tantarpata
2. GASTOS BANCARIOS Tantarpata
Gastos bancarios del NEC Mes 1.0000 6.00 6.00 6.00 Tantarpata 18.00
Tantarpata
COSTO TOTAL 6.00 6.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
1.5. Otros gastos del NEC (materiales, servicios) Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
COSTO/Mes Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. EQUIPO DE COMPUTO 49.95 49.95 0.00 0.00 Tantarpata
Alquiler de computadoras con impresora Unid 0.3330 150.00 49.95 49.95 Tantarpata 5.99
Tantarpata
2. ÚTILES DE ESCRITORIO E INSUMOS 193.32 193.32 0.00 0.00 Tantarpata
Tóner de la impresora Unid 0.5000 180.00 90.00 90.00 Tantarpata 9.00
Papel bond A-4 Millar 2.0000 23.00 46.00 46.00 Tantarpata 36.00
Folder manila A-4 con fástener Ciento 0.5000 40.00 20.00 20.00 Tantarpata 9.00
Papelógrafos Ciento 0.3330 40.00 13.32 13.32 Tantarpata 5.99
Plumones para pizarra acrílica Unid 3.0000 3.00 9.00 9.00 Tantarpata 54.00
Plumones para papel Nº 47 Unid 6.0000 2.50 15.00 15.00 Tantarpata 108.00
Tantarpata
3. ALQUILER DE OFICINA Y SERVICIOS 49.95 33.30 16.65 0.00 Tantarpata
Alquiler de oficina Mes 0.3330 50.00 16.65 16.65 Tantarpata 5.99
Servicio de energía Mes 0.3330 80.00 26.64 26.64 Tantarpata 5.99
Servicio de agua potable Mes 0.3330 20.00 6.66 6.66 Tantarpata 5.99
Tantarpata
COSTO TOTAL 293.22 276.57 16.65 0.00 Tantarpata
Tantarpata
Tantarpata
2. Gastos de elaboración de expediente técnico Tantarpata
2.1. Elaboración de expediente técnico TantarpataCOSTO/Pyto. Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 12,000.00 12,000.00 0.00 0.00 Tantarpata
Proyectista Exp. Tco. 1.0000 12,000.00 12,000.00 12,000.00 Tantarpata 1.00
Tantarpata
COSTO TOTAL 12,000.00 12,000.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
2.2. Gastos bancarios pago de proyectista TantarpataCOSTO/Pyto. Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES Y EQUIPOS 32.00 32.00 0.00 0.00 Tantarpata
Tantarpata
2. GASTOS BANCARIOS Tantarpata
Gastos bancarios del NEC Pyto. 1.0000 32.00 32.00 32.00 Tantarpata 1.00
Tantarpata
COSTO TOTAL 32.00 32.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
2.3. Movillidad del Presidente y Tesorero del NEC pago proyectista TantarpataCOSTO/Pyto. Tant 1.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES Y EQUIPOS 250.00 250.00 0.00 0.00 Tantarpata
Tantarpata
2. MOVILIDAD DEL NEC Tantarpata
Movilidad del Presidente y Tesorero del NEC Pyto. 1.0000 250.00 250.00 250.00 Tantarpata 1.00
Tantarpata
COSTO TOTAL 250.00 250.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
3. Gastos de ejecución del proyecto Tantarpata
3.1. Administración del proyecto (contratación del Coord. Tco. del NEC) TantarpataCOSTO/Mes Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MANO DE OBRA CALIFICADA 1,500.00 1,500.00 0.00 0.00 Tantarpata
Coordinador Técnico Honorar. 1.0000 1,500.00 1,500.00 1,500.00 Tantarpata 18.00
Tantarpata
COSTO TOTAL 1,500.00 1,500.00 0.00 0.00 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Tantarpata
Tantarpata
3.2. Seguro de Coordinador Técnico TantarpataCOSTO/Año Tant 1.50
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 396.00 396.00 0.00 0.00 Tantarpata
Seguro de Coordinador Técnico Seguro 0.3300 1,200.00 396.00 396.00 Tantarpata 0.50
Tantarpata
COSTO TOTAL 396.00 396.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
3.3. Movilidad de Coordinador Técnico TantarpataCOSTO/Mes Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS Tantarpata
Tantarpata
2. MOVILIDAD DEL COORDINADOR TÉCNICO 200.00 200.00 0.00 0.00 Tantarpata
Movilidad del coordinador técnico Movil. 1.0000 200.00 200.00 200.00 Tantarpata 18.00
Tantarpata
COSTO TOTAL 200.00 200.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4. Gastos de seguimiento del NEC Tantarpata
4.1. Fotografías de seguimiento de proyectos TantarpataCOSTO/Informe Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 70.00 70.00 0.00 0.00 Tantarpata
Fotografías de seguimiento de proyectos Seguim. 1.0000 70.00 70.00 70.00 Tantarpata 18.00
Tantarpata
2. MANO DE OBRA CALIFICADA 0.00 0.00 0.00 0.00 Tantarpata
Tantarpata
COSTO TOTAL 70.00 70.00 0.00 0.00 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
Tantarpata
Tantarpata
4.2. Elaboración de informes de gestión del NEC TantarpataCOSTO/Informe Tant 18.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 125.00 125.00 0.00 0.00 Tantarpata
Informe de gestión del NEC Informe 1.0000 125.00 125.00 125.00 Tantarpata 18.00
Tantarpata
2. MANO DE OBRA CALIFICADA 0.00 0.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
COSTO TOTAL 125.00 125.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
4.3. Elaboración de vídeo de implementación de proyectos TantarpataCOSTO/Vídeo Tant 2.00
Nº DESCRIPCIÓN UNID. CANT.FINANCIAMIENTO Tantarpata
FONCODES GOB. LOCAL USUARIO Tantarpata
1. MATERIALES E INSUMOS 450.00 450.00 0.00 0.00 Tantarpata
Elaboración de vídeo de implementación de proyectoVideo 1.0000 450.00 450.00 450.00 Tantarpata 2.00
Tantarpata
2. MANO DE OBRA CALIFICADA 0.00 0.00 0.00 0.00 Tantarpata
Tantarpata
Tantarpata
COSTO TOTAL 450.00 450.00 0.00 0.00 Tantarpata
PRECIO UNITAR.
PRECIO TOTAL
PRECIO UNITAR.
PRECIO TOTAL
ANEXO Nº 05: RELACIÓN DE INSUMOS DEL PROYECTO
1.1.1. Instalación de riego tecnificado
Nº DESCRIPCIÓN UNID.
Alambre galvanizado Nº 16 kg 1.00
Arena hormigón m³ 17.08
Aspersor VYR 60 - ¾" / sectorial (bronce) Unid 106.00
Cemento Portland tipo I / 42,50 kg Bolsa 67.14
Cinta teflón Unid 362.00
Codo HDPE de 25 mm x ¾ˮ R/H Unid 212.00
Codo PVC 45°, ¾ˮ unid 7.00Codo PVC 45°, 1ˮ Unid 51.00
Codo PVC 45°, 1½" unid 36.00
Codo PVC 45°, 2" unid 3.00Codo PVC 90°, 1ˮ Unid 15.00
Codo PVC 90°, 1½" Unid 6.00Codo PVC 90º, 2ˮ Unid 6.00
Codo PVC, 45º - 2" Unid 10.00
Codo PVC, 45º - 3" Unid 1.00
Codo PVC, 90º - 2" Unid 20.00
Collarín HDPE de ¾" Unid 7.00
Collarín HDPE de 150 mm X 2" Unid 3.00
Collarín HDPE de 200 mm X 1½" Unid 2.00
Collarín HDPE de 25 mm X ¾" Unid 73.00
Collarín HDPE de 38 mm X ¾" Unid 23.00
Collarín HDPE de 50 mm X ¾" Unid 8.00
Collarín HDPE de 75 mm X ¾" Unid 2.00
m 632.00
m 125.00
Fierro corrugado de 8 mm m 516.00
Herramientas (5,00 % MONC) % 480.10
Juego de panel reforzado (0,6*0,6*0,6 m3) Unid 1.25
Juego de panel reforzado (0,7*0,7*0,7 m3) Unid 2.00
Juego de panel reforzado (1,10*1,10*1,10 m3) Unid 1.50
Juego de panel reforzado (1,50*1,50*1,50 m3) Unid 0.25
Lija Nº 40 Unid 94.90
Llave bayoneta de ¾ˮ Unid 106.00
Llave de paso de ¾" Unid 106.00
Llave de paso de 1" Unid 52.00
Llave de paso de 1½ˮ Unid 15.00
Llave de paso de 2" Unid 11.00
Malla mosquitero verde m² 10.00
Manguera PEDB de 25 mm, C-4 m 5,300.00
Mano de obra no calificada Jornal 1,157.16
Niple de ¾" Unid 106.00
Niple PVC de ¾ˮ x 1,20 m (Elevador) Unid 106.00
CANTIDAD TOTAL
Fierro corrugado de ¼ˮ
Fierro corrugado de ⅜ˮ
Pegamento OATEY x ¼ galón Unid 75.42Reducción PVC, 1½" - 1ˮ Unid 25.00Reducción PVC, 2" - 1" Unid 16.00Reducción PVC, 2" - 1½" Unid 10.00
Unid 13.00
Reducción PVC, 3" - 2ˮ Unid 10.00
Sierra metálica Unid 19.87
Tapa metálica con seguro de 35x35 cm Unid 176.00Tee PVC, 1ˮ Unid 7.00Tee PVC, 1½ˮ Unid 15.00Tee PVC, 2ˮ Unid 18.00
Tee PVC, 3ˮ Unid 26.00
Trípode metal ¾ˮ x 1,10 m c/abraz. A presión Unid 106.00
Tubería PVC C-7,5, 3ˮ, 5 m m 20.00
Tubería PVC SAP, C-10, ¾ˮ x 5m m 7.00
Tubería PVC SAP, C-10, 1ˮ x 5m m 5,176.69
Tubería PVC SAP, C-10, 2" x 5m m 3.00
Tubería PVC SAP, C-7,50, 1½" x 5m m 2,025.45
Tubería PVC SAP, C-7,50, 2ˮ x 5m m 1,700.33
Tubería PVC SAP, C-7,50, 3ˮ x 5m m 284.50
Unión roscada HDPE de ¾ˮ Unid 106.00
UPR PVC Adaptador de ¾ˮ Unid 21.00
UPR PVC Adaptador de 1ˮ Unid 104.00
UPR PVC Adaptador de 1½ˮ Unid 36.00
UPR PVC Adaptador de 2ˮ Unid 71.00
Válvula de acople rápido de ¾" Unid 106.00
Válvula doble Universal de bola de ¾" Unid 7.00
Válvula doble Universal de bola de 1½" Unid 2.00
Válvula doble Universal de bola de 2" Unid 3.00
1.1.2. Produc. de actividades agropec. orientas al Mcdo.
Nº DESCRIPCIÓN UNID.
Alambre negro Nº 16 kg 159.00
Algodón paquete de 50,00 g Pqte. 106.00
Alimentación de participantes Ración 188.00
Alimentación pasantes Día 6.00
Alimento balanceado kg 424.00
Almacenado Jornal 3,570.16
Alojamiento de pasantes Noche 4.00
Antibiótico (Biomycin Súper x 20 g) Unid 53.00
Antibiótico (Enropro al 20% - Frasco de 0,50 l) Fco. 2.12
Antiparasitario ext. (Fipecto Frasco de 1,00 l) Fco. 3.18
Banner 0,80 x 1,20 m Unid 2.00
Barbecho o Arado o roturacion Yunta 173.84
Reducción PVC, 3" - 1½ˮ
CANTIDAD TOTAL
Ceniza kg 636.00
Clavos de 2ˮ kg 53.00
Clavos de 4ˮ kg 106.00
Contratación de Yachachiq (1 Yachachiq) Honorar. 60.00
Cuaderno de 100 hojas T-A4 Unid 110.00
Cuyes reproductores (hembras) Unid 848.00
Cuyes reproductores (macho) Unid 106.00
Gallinas criollas de doble propósito Unid 424.00
Guano de corral Saco 4,619.60
Herramientas (5% M.O.) % 22.63
Instalaciones (construcción de jaulas) Gbl 106.00
Lapiceros punta fina Unid 220.00
Malla arpillera m² 730.00
Malla gallinero m 848.00
Manual en cocinas mejoradas y agua segura (15 hojas /manual) Unid 115.00
Manual en producción agrícola y pecuaria (15 hojas /manual) Unid 115.00
Manual en riego (15 hojas /manual) Unid 115.00
Movilidad de Chungui - Vinchos (viceversa) Pasaje 6.00
Movilidad de participantes Pasaje 376.00
Movilidad local Día 4.00
Movilidad Yachachiq para capacitación (1 Yachachiq) Movil. 60.00
Papelógrafo cuadriculado Ciento 3.60
Plantones de pino Unid. 2,120.00
Plumones para papel Nº 47 Unid 216.00
Premios Primer Puesto Premio 20.00
Premios Segundo Puesto Premio 20.00
Rollizos de eucalipto Ø=2ˮ x 2,20 m Unid 636.00
Seguro de Yachachiq Seguro 5.00
Semilla de Alfalfa Super Alabama 550 PL kg 132.50
Semilla de arveja kg 254.40
Semilla de frejol canario kg 254.40
Semilla de papa kg 6,360.00
Semilla de quinua kg 63.60
Semillas de acelga kg 6.35
Semillas de betarraga kg 15.24
Semillas de cebolla kg 5.08
Semillas de coliflor kg 3.18
Semillas de Zanahoria kg 5.08
Tintura de Yodo al 2% x 1,00 l Fco. 1.59
Transporte semovientes Cbza 1,378.00
Trípticos Millar 2.00
2. Implementación y mejora de la vivienda saludable
Nº DESCRIPCIÓN UNID. CANTIDAD TOTAL
Adobe Unid 4,240.00
Alambre negro Nº 08 kg 2.12
Alambre negro Nº 16 kg 4.24
Arena de asentar m³ 2.12
Arena fina m³ 8.48
Balde con caño x 12 litros Unidad 106.00
Cemento Portland tipo I / 42,50 kg Bolsa 19.08
Ceniza kg 6,360.00
Chimenea de ɸ=0,12 x 1,20 m x 0,60 mm Unid 106.00
Construcción de la cocina Jornal 159.00
Fibraforte transparente de 1,80 x 0,80 x 0,22 mm Unid 106.00
Fierro corrugado de ½ˮ m 212.00
Fierro corrugado x ⅜ˮ (rejilla cenicero) m 318.00
Herramientas (5,00 % MONC) % 5.30
Ladrillos de pared (artesanal) Unid 6,360.00
Malla electrosoldada de ½ˮ m 53.00
Sombrero capucha 0,18 x 07,00 cm con perno abrazador Unid 106.00
Tierra de chacra m³ 8.48
Vaso de vidrio x 7 onz Unidad 318.00
3. Promoción de Negocios Rurales Inclusivos
Nº DESCRIPCIÓN UNID.
Asistente Técnico articulador Evento 180.00
Premio a la idea del negocio ganador Premio 2.00
4. Fomento de capacidades financieras
Nº DESCRIPCIÓN UNID.
Banner (con imp. De logotipo y nombre del Pyto.) 2,5x1,3 m Unid 0.33
Banner en blanco de 2x1,20 m (con ojales) Unid 0.33
Banner para recepción de imagen (con ojales) 2x1,50 m Unid 0.33
Cartulinas de colores ecológicos Unid 128.00
Chinchotes Caja 6.00
Clavos de cemento de 2" Docena 6.00
Combustible - facilitador financiero Gln 10.00
Convocatorias Unid 564.00
Cuadernos A-4 (para actas del grupo) Unid 3.00
Cuadernos A-5 (para notas de usuarios) Unid 94.00
Cuchilla corta papel (cutter) Unid 0.33
Diseño de láminas Unid 10.00
Edición de video (durac. 15 min)- temas central modulo Unid 6.00
Edición e impresión de cuadernos de módulos para usuarios Unid 5.00
CANTIDAD TOTAL
CANTIDAD TOTAL
Edición e impresión de guías de módulo para líderes Unid 6.00
Edición e impresión de guías de módulo para yachahiq y NE Unid 10.00
Edición e impresión de guías de módulos para facilit. Financ. Unid 1.67
Facilitador financiero Honorar. 6.00
Ganchos de plástico Docena 0.67
Impresión de billetes y monedas plastificadas Millar 0.17
Impresión de láminas plastificadas 8x30 cm Unid 10.00
Impresión de láminas plastificadas A-3 Unid 10.00
Incentivos para concursos (15 usuarios del NE) Glb 15.00
Lapiceros Unid 94.00
Linterna Unid 0.33
Maletín porta meteriales Unid 0.33
Movilidad para convocatoria Glb 6.00
Papel bond A-4 Millar 3.00
Papel craf Unid 192.00
Papelógrafo cuadriculado Ciento 2.00
Pasador o cuerda sintética (grosor 50 mm) Unid 0.33
Plumones para pizarra acrílica Unid 64.00
Puntero graduable Unid 0.33
Servicios de arte gráfico Unid 10.00
Tijeras punta roma medianas Unid 0.33
Viáticos facilitador (hospedaje, alimentación y pasaje) Día 1.25
Yachachiq financiero Honorar. 6.00
CUADRO Nº 04: PRESUPUESTO DEL PROYECTO
Nº DE EXPEDIENTE TÉCNICO: 2,020,030,005NOMBRE DEL PROYECTO:
PROYECTISTA: Ing. …………………………..FECHA: marzo, 2014Nº USUARIOS: 80 Familias
Nº DESCRIPCIÓN CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIOSA. COSTO DIRECTO 4,459,427.07 3,997,495.17 20,527.74 441,404.161. Fortal.Consol. Sist. Producción familiar rural y mejora de viviendas saludables 4,355,540.36 3,900,114.21 20,527.74 434,898.411.1. Implementación de Tecnologías 4,267,121.56 3,832,223.15 0.00 434,898.411.1.1. Instalación de Riego Tecnificado 4,036,142.09 3,755,635.98 0.00 280,506.111.1.1.1. Cámara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m³ Unid 25.000 355.40 8,885.00 5,603.75 0.00 3,281.251.1.1.2. Instalación de collarín de captación de 25 mm * ¾" Unid 49.000 160.97 7,887.53 6,601.28 0.00 1,286.251.1.1.3. Instalación de collarín de captación de 150 mm * 2" Unid 9.000 253.97 2,285.73 2,049.48 0.00 236.251.1.1.4. Instalación de collarín de captación de 200 mm * 1½" Unid 4.000 258.97 1,035.88 930.88 0.00 105.001.1.1.5. Cámara rompe presión (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m³ Unid 64.000 382.53 24,481.92 16,081.92 0.00 8,400.001.1.1.6. Cámara rompe presión (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m³ Unid 36.000 549.48 19,781.28 15,056.28 0.00 4,725.001.1.1.7. Cámara rompe presión (5,50 l/s) de 1,50*1,50*1,50 m³ Unid 1.000 787.30 787.30 656.05 0.00 131.251.1.1.8. Instalación de Codo PVC de 45º - 1" Unid 2,601.000 3.72 9,686.12 7,636.54 0.00 2,049.591.1.1.9. Instalación de Codo PVC de 45º - 1½" Unid 1,156.000 6.35 7,345.22 6,434.30 0.00 910.931.1.1.10. Instalación de Codo PVC de 45º - 2" Unid 100.000 9.48 948.40 869.60 0.00 78.801.1.1.11. Instalación de Codo PVC de 45º - 3" Unid 1.000 13.11 13.11 12.33 0.00 0.791.1.1.12. Instalación de Codo PVC de 90º - 1" Unid 225.000 3.72 837.90 660.60 0.00 177.301.1.1.13. Instalación de Codo PVC de 90º - 1½" Unid 36.000 6.35 228.74 200.38 0.00 28.371.1.1.14. Instalación de Codo PVC de 90º - 2" Unid 36.000 9.48 341.42 313.06 0.00 28.371.1.1.15. Instalación de Tee PVC de 1" Unid 49.000 7.48 366.72 328.10 0.00 38.611.1.1.16. Instalación de Tee PVC de 1½" Unid 225.000 9.74 2,192.40 2,015.10 0.00 177.301.1.1.17. Instalación de Tee PVC de 2" Unid 324.000 11.00 3,565.30 3,309.98 0.00 255.311.1.1.18. Instalación de Tee PVC de 3" Unid 36.000 14.26 513.50 485.14 0.00 28.371.1.1.19. Instalación de Reducción PVC de 1½" - 1" Unid 625.000 7.74 4,840.00 4,347.50 0.00 492.501.1.1.20. Instalación de Reducción PVC de 2" - 1½" Unid 100.000 7.26 726.40 647.60 0.00 78.801.1.1.21. Instalación de Reducción PVC de 2" - 1" Unid 256.000 8.76 2,243.58 2,041.86 0.00 201.731.1.1.22. Instalación de Reducción PVC de 3" - 2" Unid 9.000 11.52 103.72 96.62 0.00 7.09
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
UNID. MEDID.
COSTO UNITAR.
INVERSIÓN TOTAL
Nº DE EXPEDIENTE TÉCNICO: 2,020,030,005NOMBRE DEL PROYECTO:
PROYECTISTA: Ing. …………………………..FECHA: marzo, 2014Nº USUARIOS: 80 Familias
Nº DESCRIPCIÓN CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIOS
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
UNID. MEDID.
COSTO UNITAR.
INVERSIÓN TOTAL
1.1.1.23. Instalación de Llave de paso de 1" Unid 2,704.000 11.68 31,593.54 29,462.78 0.00 2,130.751.1.1.24. Instalación de Llave de paso de 1½" Unid 4.000 19.74 78.98 75.82 0.00 3.151.1.1.25. Instalación de Llave de paso de 2" Unid 16.000 27.00 432.06 419.46 0.00 12.611.1.1.26. Construcción de Caja de llave de paso Unid 3,364.000 95.53 321,356.19 318,705.36 0.00 2,650.831.1.1.27. Instalación de collarines para hidrantes de 25 mm * ¾" Unid 5,329.000 164.27 875,394.83 735,508.58 0.00 139,886.251.1.1.28. Instalación de collarines para hidrantes de 38 mm * ¾" Unid 529.000 166.27 87,956.83 74,070.58 0.00 13,886.251.1.1.29. Instalación de collarines para hidrantes de 50 mm * ¾" Unid 64.000 167.27 10,705.28 9,025.28 0.00 1,680.001.1.1.30. Instalación de collarines para hidrantes de 75 mm * ¾" Unid 4.000 174.27 697.08 592.08 0.00 105.001.1.1.31. Instalación de Tubería PVC SAP C-10, Ø=¾" m 64.920 4.79 310.77 140.36 0.00 170.421.1.1.32. Instalación de Tubería PVC SAP C-10, Ø=1" m 5,111.770 5.59 28,560.46 15,142.06 0.00 13,418.401.1.1.33. Instalación de Tubería PVC SAP C-7.5, Ø=1½" m 2,023.450 6.87 13,890.98 8,579.43 0.00 5,311.561.1.1.34. Instalación de Tubería PVC SAP C-7.5, Ø=2" m 1,540.330 8.92 13,742.82 9,699.46 0.00 4,043.371.1.1.35. Instalación de Tubería PVC SAP C-7.5, Ø=3" m 284.500 15.52 4,416.01 3,669.20 0.00 746.811.1.1.36. Instalación de sistema móvil Unid 11,236.000 226.76 2,547,909.07 2,474,167.20 0.00 73,741.87
1.1.2. Produc. de actividades agropec. orientas al Mcdo. 222,979.47 68,587.17 0.00 154,392.301.1.2.1. Huerto fijo de hortalizas a campo abierto1.1.2.1.1. Producción de zanahoria ha 1.270 4,302.50 5,464.18 457.20 0.00 5,006.981.1.2.1.2. Producción de cebolla ha 1.270 3,679.50 4,672.97 599.44 0.00 4,073.531.1.2.1.3. Producción de betarraga ha 1.270 4,002.50 5,083.18 1,143.00 0.00 3,940.181.1.2.1.4. Producción de coliflor ha 1.270 3,527.50 4,479.93 539.75 0.00 3,940.181.1.2.1.5. Producción de acelga ha 1.270 4,342.50 5,514.98 508.00 0.00 5,006.981.1.2.2. Parcela de pastos asociados1.1.2.2.1. Parcela producción de alfalfa ha 5.300 6,803.75 36,059.88 5,565.00 0.00 30,494.881.1.2.3. Miniparcelas para la producción granos andinos1.1.2.3.1. Producción de quinua ha 4.240 4,457.45 18,899.59 625.19 0.00 18,274.401.1.2.3.2. Producción de papa blanca ha 4.240 10,355.00 43,905.20 22,260.00 0.00 21,645.201.1.2.3.3. Producción de frejol canario ha 4.240 3,820.00 16,196.80 1,653.60 0.00 14,543.20
Nº DE EXPEDIENTE TÉCNICO: 2,020,030,005NOMBRE DEL PROYECTO:
PROYECTISTA: Ing. …………………………..FECHA: marzo, 2014Nº USUARIOS: 80 Familias
Nº DESCRIPCIÓN CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIOS
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
UNID. MEDID.
COSTO UNITAR.
INVERSIÓN TOTAL
1.1.2.3.4. Producción de arveja ha 4.240 3,400.25 14,417.06 1,500.96 0.00 12,916.101.1.2.4. Agroforestería Familia 106.000 82.50 8,745.00 3,180.00 0.00 5,565.001.1.2.5. Módulo de producción de abono orgánico - compost Módulo 106.000 159.95 16,954.70 954.00 0.00 16,000.701.1.2.6. Módulo de crianza de gallinas Módulo 106.000 144.45 15,311.70 7,229.20 0.00 8,082.501.1.2.7. Módulo de crianza de cuyes Módulo 106.000 257.31 27,274.33 22,371.83 0.00 4,902.50
1.1.3. Flete y transporte de materiales e insumos 8,000.00 8,000.00 0.00 0.001.1.3.1. Flete - transporte de materiales e insumos Glb 1.000 8,000.00 8,000.00 8,000.00 0.00 0.00
1.2. Materiales de Capacitación para las tecnologías 3,179.00 3,179.00 0.00 0.001.2.1. Materiales de capacitación para las tecnologías Glb 1.000 3,179.00 3,179.00 3,179.00 0.00 0.001.3. Capacitación de campesino a campesino 60,000.00 42,000.00 18,000.00 0.001.3.1. Contratación de Yachachiq (primer año) Mes 12.000 3,000.00 36,000.00 36,000.00 0.00 0.001.3.2. Contratación de Yachachiq (segundo año) Mes 12.000 1,000.00 12,000.00 6,000.00 6,000.00 0.001.3.3. Contratación de Yachachiq (tercer año) Mes 12.000 1,000.00 12,000.00 0.00 12,000.00 0.001.4. Seguro básico de Yachachiq 2,425.80 1,698.06 727.74 0.001.4.1. Seguro básico de Yachachiq (primer año) Año 1.000 1,455.48 1,455.48 1,455.48 0.00 0.001.4.2. Seguro básico de Yachachiq (segundo y tercer año) Año 2.000 485.16 970.32 242.58 727.74 0.001.5. Movilidad de Yachachiq 9,600.00 7,800.00 1,800.00 0.001.5.1. Movilidad de Yachachiq para capacitación (primer año) Mes 12.000 600.00 7,200.00 7,200.00 0.00 0.001.5.2. Movilidad de Yachachiq para capacitación (2do. Y 3er año) Mes 24.000 100.00 2,400.00 600.00 1,800.00 0.001.6. Concursos entre Núcleos Ejecutores - NE 6,000.00 6,000.00 0.00 0.001.6.1. Concursos en la aplicación y mejora de tecnologías Concur. 20.000 300.00 6,000.00 6,000.00 0.00 0.001.7. Participación en Ferias Locales 5,284.00 5,284.00 0.00 0.001.7.1. Participación en Ferias Locales Feria 2.000 2,642.00 5,284.00 5,284.00 0.00 0.001.8. Pasantías Yachachiq 1,930.00 1,930.00 0.00 0.001.8.1. Pasantías Yachachiq Pasantía 2.000 965.00 1,930.00 1,930.00 0.00 0.00
Nº DE EXPEDIENTE TÉCNICO: 2,020,030,005NOMBRE DEL PROYECTO:
PROYECTISTA: Ing. …………………………..FECHA: marzo, 2014Nº USUARIOS: 80 Familias
Nº DESCRIPCIÓN CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIOS
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
UNID. MEDID.
COSTO UNITAR.
INVERSIÓN TOTAL
2. Implementación y mejora de la vivienda saludable 28,319.51 21,813.76 0.00 6,505.752.1. Instalación de cocina mejorada Módulo 106.000 201.14 21,320.31 14,814.56 0.00 6,505.752.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda Eventos 3.000 786.70 2,360.10 2,360.10 0.00 0.002.2.2. Capacitación en salud y nutrición familiar Eventos 3.000 786.70 2,360.10 2,360.10 0.00 0.002.3. Agua segura Módulo 106.000 21.50 2,279.00 2,279.00 0.00 0.00
3. Promoción de Negocios Rurales Inclusivos 55,950.00 55,950.00 0.00 0.003.1. Asistencia técnica para articulación al mercado Evento 180.000 50.00 9,000.00 9,000.00 0.00 0.003.2. Concursos de Planes de negocios 3/. Concurs. 2.000 23,475.00 46,950.00 46,950.00 0.00 0.00
4. Fomento de capacidades financieras 19,617.20 19,617.20 0.00 0.004.1. Promoción, convocatoria y concursos Mes 6.000 77.00 462.00 462.00 0.00 0.004.2. Materiales de capacitación Glb 1.000 3,705.20 3,705.20 3,705.20 0.00 0.004.3. Honorarios facilitador financiero Mes 6.000 1,500.00 9,000.00 9,000.00 0.00 0.004.4. Honorarios yachachiq financiero Mes 6.000 1,000.00 6,000.00 6,000.00 0.00 0.004.5. Viáticos y apoyo logístico facilitador financiero Glb 1.000 450.00 450.00 450.00 0.00 0.00
B. COSTO INDIRECTO 58,079.90 57,180.80 899.10 0.001. Gastos Generales del Núcleo Ejecutor Central - NEC 10,193.90 9,294.80 899.10 0.001.1. Movillidad del Presidente y Tesorero del NEC Mes 18.000 83.33 1,499.94 1,499.94 0.00 0.001.2. Pago de revisor de cuentas Trimest. 6.000 300.00 1,800.00 1,800.00 0.00 0.001.3. Cartel del NE e implementación del NEC Glb 1.000 1,508.00 1,508.00 1,508.00 0.00 0.001.4. Gastos Bancarios del NEC Mes 18.000 6.00 108.00 108.00 0.00 0.001.5. Otros gastos del NEC (materiales, servicios) Mes 18.000 293.22 5,277.96 4,378.86 899.10 0.00
2. Gastos de elaboración de expediente técnico 12,282.00 12,282.00 0.00 0.002.1. Elaboración de expediente técnico Pyto. 1.000 12,000.00 12,000.00 12,000.00 0.00 0.00
Nº DE EXPEDIENTE TÉCNICO: 2,020,030,005NOMBRE DEL PROYECTO:
PROYECTISTA: Ing. …………………………..FECHA: marzo, 2014Nº USUARIOS: 80 Familias
Nº DESCRIPCIÓN CANT.FINANCIAMIENTO
FONCODES GOB. LOCAL USUARIOS
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCALES"
UNID. MEDID.
COSTO UNITAR.
INVERSIÓN TOTAL
2.2. Gastos bancarios pago de proyectista Pyto. 1.000 32.00 32.00 32.00 0.00 0.002.3. Movillidad del Presidente y Tesorero del NEC pago proyectista Pyto. 1.000 250.00 250.00 250.00 0.00 0.00
3. Gastos de ejecución del proyecto 31,194.00 31,194.00 0.00 0.003.1. Administración del proyecto (contratación del Coord. Tco. del NEC) Mes 18.000 1,500.00 27,000.00 27,000.00 0.00 0.003.2. Seguro de Coordinador Técnico Año 1.500 396.00 594.00 594.00 0.00 0.003.3. Movilidad de Coordinador Técnico Mes 18.000 200.00 3,600.00 3,600.00 0.00 0.00
4. Gastos de seguimiento del NEC 4,410.00 4,410.00 0.00 0.004.1. Fotografías de seguimiento de proyectos Informe 18.000 70.00 1,260.00 1,260.00 0.00 0.004.2. Elaboración de informes de gestión del NEC Informe 18.000 125.00 2,250.00 2,250.00 0.00 0.004.3. Elaboración de vídeo de implementación de proyectos Vídeo 2.000 450.00 900.00 900.00 0.00 0.00
COSTO TOTAL 4,517,506.97 4,054,675.96 21,426.84 441,404.16PARTICIPACIÓN (%) 100.00% 89.75% 0.47% 9.77%
CUADRO Nº 06: CRONOGRAMA ANALITICO DE EJECUCIÓN DEL PROYECTO
#REF! #REF!#REF! #REF!
#REF! #REF!#REF! #REF!#REF! #REF! #REF!
SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO
Nº DESCRIPCIÓN META PPTO. TOTALCRONOGRAMA DE EJECUCIÓN TRIMESTRAL
0 I II III IV V VI VII VIII IX X XI XIIA. COSTO DIRECTO 4,459,427.071. Fortal.Consol. Sist. Producción familiar rural y mejora de viviendas saludables 4,355,540.361.1. Implementación de Tecnologías 4,267,121.561.1.1. Instalación de Riego Tecnificado Módulo #REF! 4,036,142.091.1.2. Produc. de actividades agropec. orientas al Mcdo. 222,979.471.1.2.1. Huerto fijo de hortalizas a campo abierto ha 6.35 25,215.211.1.2.2. Parcela de pastos asociados ha 5.3 36,059.881.1.2.3. Miniparcelas para la producción granos andinos ha 16.96 93,418.651.1.2.4. Agroforestería Familia 106 8,745.001.1.2.5. Módulo de producción de abono orgánico - compost Módulo 106 16,954.701.1.2.6. Módulo de crianza de gallinas Módulo 106 15,311.701.1.2.7. Módulo de crianza de cuyes Módulo 106 27,274.331.1.3. Flete y transporte de materiales e insumos Glb 1 8,000.00
1.2. Materiales de Capacitación para las tecnologías Glb 1 3,179.001.3. Capacitación de campesino a campesino Mes 36 60,000.001.4. Seguro básico de Yachachiq Año 3 2,425.801.5. Movilidad de Yachachiq Mes 36 9,600.001.6. Concursos entre Núcleos Ejecutores - NE Concur. 20 6,000.001.7. Participación en Ferias Locales Feria 2 5,284.001.8. Pasantías Yachachiq Pasantía 2 1,930.00
2. Implementación y mejora de la vivienda saludable 28,319.512.1. Instalación de cocina mejorada Módulo 106 21,320.312.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda Eventos 3 2,360.102.2.2. Capacitación en salud y nutrición familiar Eventos 3 2,360.102.3. Agua segura Módulo 106 2,279.00
3. Promoción de Negocios Rurales Inclusivos 55,950.003.1. Asistencia técnica para articulación al mercado Evento 180 9,000.003.2. Concursos de Planes de negocios 3/. Concurs. 2 46,950.00
4. Fomento de capacidades financieras 19,617.204.1. Promoción, convocatoria y concursos Mes 6 462.004.2. Materiales de capacitación Glb 1 3,705.204.3. Honorarios facilitador financiero Mes 6 9,000.004.4. Honorarios yachachiq financiero Mes 6 6,000.004.5. Viáticos y apoyo logístico facilitador financiero Glb 1 450.00
B. COSTO INDIRECTO 58,079.901. Gastos Generales del Núcleo Ejecutor Central - NEC 10,193.901.1. Movillidad del Presidente y Tesorero del NEC Mes 18 1,499.941.2. Pago de revisor de cuentas Trimest. 6 1,800.001.3. Cartel del NE e implementación del NEC Glb 1 1,508.001.4. Gastos Bancarios del NEC Mes 18 108.001.5. Otros gastos del NEC (materiales, servicios) Mes 18 5,277.96
2. Gastos de elaboración de expediente técnico 12,282.002.1. Elaboración de expediente técnico Pyto. 1 12,000.002.2. Gastos bancarios pago de proyectista Pyto. 1 32.002.3. Movillidad del Presidente y Tesorero del NEC pago proyectista Pyto. 1 250.00
UNID. MEDIDA
#REF! #REF!#REF! #REF!
#REF! #REF!#REF! #REF!#REF! #REF! #REF!
SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO
Nº DESCRIPCIÓN META PPTO. TOTALCRONOGRAMA DE EJECUCIÓN TRIMESTRAL
0 I II III IV V VI VII VIII IX X XI XIIUNID.
MEDIDA
3. Gastos de ejecución del proyecto 31,194.003.1. Administración del proyecto (contratación del Coord. Tco. del NEC) Mes 18 27,000.003.2. Seguro de Coordinador Técnico Año 1.5 594.003.3. Movilidad de Coordinador Técnico Mes 18 3,600.00
4. Gastos de seguimiento del NEC 4,410.004.1. Fotografías de seguimiento de proyectos Informe 18 1,260.004.2. Elaboración de informes de gestión del NEC Informe 18 2,250.004.3. Elaboración de vídeo de implementación de proyectos Vídeo 2 900.00
COSTO TOTAL 4,517,506.97PARTICIPACIÓN (%)
CUADRO Nº 07: CRONOGRAMA DE EJECUCIÓN CUALITATIVO DEL PROYECTO
#REF! #REF!#REF! #REF!
#REF! #REF!#REF! #REF!#REF! #REF! #REF!
SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO
Nº DESCRIPCIÓN META PPTO. TOTALCRONOGRAMA DE EJECUCIÓN TRIMESTRAL
0 I II III IV V VI VII VIII IX X XI XIIA. COSTO DIRECTO 4,459,427.071. Fortal.Consol. Sist. Producción familiar rural y mejora de viviendas saludables 4,355,540.361.1. Implementación de Tecnologías 4,267,121.561.1.1. Instalación de Riego Tecnificado Módulo #REF! 4,036,142.09 #REF! #REF!1.1.2. Produc. de actividades agropec. orientas al Mcdo. 222,979.471.1.2.1. Huerto fijo de hortalizas a campo abierto ha 6.35 25,215.21 1.06 1.06 1.06 1.06 1.06 1.061.1.2.2. Parcela de pastos asociados ha 5.3 36,059.88 5.301.1.2.3. Miniparcelas para la producción granos andinos ha 16.96 93,418.65 8.48 8.481.1.2.4. Agroforestería Familia 106 8,745.00 106.001.1.2.5. Módulo de producción de abono orgánico - compost Módulo 106 16,954.70 106.001.1.2.6. Módulo de crianza de gallinas Módulo 106 15,311.70 53.00 53.001.1.2.7. Módulo de crianza de cuyes Módulo 106 27,274.33 53.00 53.001.1.3. Flete y transporte de materiales e insumos Glb 1 8,000.00 0.05 0.95
1.2. Materiales de Capacitación para las tecnologías Glb 1 3,179.00 1.001.3. Capacitación de campesino a campesino Mes 36 60,000.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.001.4. Seguro básico de Yachachiq Año 3 2,425.80 1.00 1.00 1.001.5. Movilidad de Yachachiq Mes 36 9,600.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.001.6. Concursos entre Núcleos Ejecutores - NE Concur. 20 6,000.00 4.00 4.00 4.00 4.00 4.001.7. Participación en Ferias Locales Feria 2 5,284.00 1.00 1.001.8. Pasantías Yachachiq Pasantía 2 1,930.00 1.00 1.00
2. Implementación y mejora de la vivienda saludable 28,319.512.1. Instalación de cocina mejorada Módulo 106 21,320.31 53.00 53.002.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda Eventos 3 2,360.10 2.00 1.002.2.2. Capacitación en salud y nutrición familiar Eventos 3 2,360.10 2.00 1.002.3. Agua segura Módulo 106 2,279.00 106.00
3. Promoción de Negocios Rurales Inclusivos 55,950.003.1. Asistencia técnica para articulación al mercado Evento 180 9,000.00 90.00 90.003.2. Concursos de Planes de negocios 3/. Concurs. 2 46,950.00 1.00 1.00
4. Fomento de capacidades financieras 19,617.204.1. Promoción, convocatoria y concursos Mes 6 462.00 3.00 3.004.2. Materiales de capacitación Glb 1 3,705.20 1.004.3. Honorarios facilitador financiero Mes 6 9,000.00 3.00 3.004.4. Honorarios yachachiq financiero Mes 6 6,000.00 3.00 3.004.5. Viáticos y apoyo logístico facilitador financiero Glb 1 450.00 0.50 0.50
B. COSTO INDIRECTO 58,079.901. Gastos Generales del Núcleo Ejecutor Central - NEC 10,193.901.1. Movillidad del Presidente y Tesorero del NEC Mes 18 1,499.94 3.00 3.00 3.00 3.00 3.00 3.001.2. Pago de revisor de cuentas Trimest. 6 1,800.00 1.00 1.00 1.00 1.00 1.00 1.001.3. Cartel del NE e implementación del NEC Glb 1 1,508.00 1.001.4. Gastos Bancarios del NEC Mes 18 108.00 3.00 3.00 3.00 3.00 3.00 3.001.5. Otros gastos del NEC (materiales, servicios) Mes 18 5,277.96 3.00 3.00 3.00 3.00 3.00 3.00
2. Gastos de elaboración de expediente técnico 12,282.002.1. Elaboración de expediente técnico Pyto. 1 12,000.00 1.002.2. Gastos bancarios pago de proyectista Pyto. 1 32.00 1.002.3. Movillidad del Presidente y Tesorero del NEC pago proyectista Pyto. 1 250.00 1.00
UNID. MEDIDA
3. Gastos de ejecución del proyecto 31,194.003.1. Administración del proyecto (contratación del Coord. Tco. del NEC) Mes 18 27,000.00 3.00 3.00 3.00 3.00 3.00 3.003.2. Seguro de Coordinador Técnico Año 1.5 594.00 1.00 0.503.3. Movilidad de Coordinador Técnico Mes 18 3,600.00 3.00 3.00 3.00 3.00 3.00 3.00
4. Gastos de seguimiento del NEC 4,410.004.1. Fotografías de seguimiento de proyectos Informe 18 1,260.00 3.00 3.00 3.00 3.00 3.00 3.004.2. Elaboración de informes de gestión del NEC Informe 18 2,250.00 3.00 3.00 3.00 3.00 3.00 3.004.3. Elaboración de vídeo de implementación de proyectos Vídeo 2 900.00 1.00 1.00
COSTO TOTAL 4,517,506.97PARTICIPACIÓN (%)
CUADRO Nº 08: CRONOGRAMA DE EJECUCIÓN CUALITATIVO DEL PROYECTO
#REF! #REF!#REF! #REF!
#REF! #REF!#REF! #REF!#REF! #REF! #REF!
SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO
Nº DESCRIPCIÓN META PPTO. TOTALCRONOGRAMA DE EJECUCIÓN TRIMESTRAL
0 I II III IV V VI VII VIII IX X XI XIIA. COSTO DIRECTO 4,459,427.07 0.00 122,644.91 63,273.10 ### ### 103,633.17 7,322.00 7,682.54 7,682.54 3,965.16 3,480.00 3,480.00 3,480.001. Fortal.Consol. Sist. Producción familiar rural y mejora de viviendas saludables 4,355,540.36 0.00 120,365.91 38,224.70 ### ### 57,042.02 7,322.00 7,682.54 7,682.54 3,965.16 3,480.00 3,480.00 3,480.001.1. Implementación de Tecnologías 4,267,121.56 0.00 104,326.43 26,584.70 ### ### 50,911.86 0.00 4,202.54 4,202.54 0.00 0.00 0.00 0.001.1.1. Instalación de Riego Tecnificado Módulo #REF! 4,036,142.09 ### ###1.1.2. Produc. de actividades agropec. orientas al Mcdo. 222,979.47 0.00 103,926.43 26,584.70 21,293.02 11,858.39 50,911.86 0.00 4,202.54 4,202.54 0.00 0.00 0.00 0.001.1.2.1. Huerto fijo de hortalizas a campo abierto ha 6.35 25,215.21 4,202.54 4,202.54 4,202.54 4,202.54 4,202.54 4,202.541.1.2.2. Parcela de pastos asociados ha 5.3 36,059.88 36,059.881.1.2.3. Miniparcelas para la producción granos andinos ha 16.96 93,418.65 46,709.32 46,709.321.1.2.4. Agroforestería Familia 106 8,745.00 8,745.001.1.2.5. Módulo de producción de abono orgánico - compost Módulo 106 16,954.70 16,954.701.1.2.6. Módulo de crianza de gallinas Módulo 106 15,311.70 7,655.85 7,655.851.1.2.7. Módulo de crianza de cuyes Módulo 106 27,274.33 13,637.17 13,637.171.1.3. Flete y transporte de materiales e insumos Glb 1 8,000.00 400.00 7,600.00
1.2. Materiales de Capacitación para las tecnologías Glb 1 3,179.00 3,179.001.3. Capacitación de campesino a campesino Mes 36 60,000.00 9,000.00 9,000.00 9,000.00 9,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.001.4. Seguro básico de Yachachiq Año 3 2,425.80 1,455.48 485.16 485.161.5. Movilidad de Yachachiq Mes 36 9,600.00 1,440.00 1,440.00 1,440.00 1,440.00 480.00 480.00 480.00 480.00 480.00 480.00 480.00 480.001.6. Concursos entre Núcleos Ejecutores - NE Concur. 20 6,000.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.001.7. Participación en Ferias Locales Feria 2 5,284.00 2,642.00 2,642.001.8. Pasantías Yachachiq Pasantía 2 1,930.00 965.00 965.00
2. Implementación y mejora de la vivienda saludable 28,319.51 0.00 2,279.00 1,573.40 2,360.10 11,446.86 10,660.15 0.00 0.00 0.00 0.00 0.00 0.00 0.002.1. Instalación de cocina mejorada Módulo 106 21,320.31 10,660.15 10,660.152.2. Capacitación en prácticas adecuadas mejora de vivienda, salud y nutrición familiar2.2.1. Capacitación en prácticas adecuadas de mejora de vivienda Eventos 3 2,360.10 1,573.40 786.702.2.2. Capacitación en salud y nutrición familiar Eventos 3 2,360.10 1,573.40 786.702.3. Agua segura Módulo 106 2,279.00 2,279.00
3. Promoción de Negocios Rurales Inclusivos 55,950.00 0.00 0.00 23,475.00 0.00 4,500.00 27,975.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003.1. Asistencia técnica para articulación al mercado Evento 180 9,000.00 4,500.00 4,500.003.2. Concursos de Planes de negocios 3/. Concurs. 2 46,950.00 23,475.00 23,475.00
4. Fomento de capacidades financieras 19,617.20 0.00 0.00 0.00 0.00 11,661.20 7,956.00 0.00 0.00 0.00 0.00 0.00 0.00 0.004.1. Promoción, convocatoria y concursos Mes 6 462.00 231.00 231.004.2. Materiales de capacitación Glb 1 3,705.20 3,705.204.3. Honorarios facilitador financiero Mes 6 9,000.00 4,500.00 4,500.004.4. Honorarios yachachiq financiero Mes 6 6,000.00 3,000.00 3,000.004.5. Viáticos y apoyo logístico facilitador financiero Glb 1 450.00 225.00 225.00
B. COSTO INDIRECTO 58,079.90 12,282.00 9,036.65 7,132.65 7,582.65 7,132.65 7,330.65 7,582.65 0.00 0.00 0.00 0.00 0.00 0.001. Gastos Generales del Núcleo Ejecutor Central - NEC 10,193.90 0.00 2,955.65 1,447.65 1,447.65 1,447.65 1,447.65 1,447.65 0.00 0.00 0.00 0.00 0.00 0.001.1. Movillidad del Presidente y Tesorero del NEC Mes 18 1,499.94 249.99 249.99 249.99 249.99 249.99 249.991.2. Pago de revisor de cuentas Trimest. 6 1,800.00 300.00 300.00 300.00 300.00 300.00 300.001.3. Cartel del NE e implementación del NEC Glb 1 1,508.00 1,508.001.4. Gastos Bancarios del NEC Mes 18 108.00 18.00 18.00 18.00 18.00 18.00 18.001.5. Otros gastos del NEC (materiales, servicios) Mes 18 5,277.96 879.66 879.66 879.66 879.66 879.66 879.66
2. Gastos de elaboración de expediente técnico 12,282.00 12,282.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002.1. Elaboración de expediente técnico Pyto. 1 12,000.00 12,000.002.2. Gastos bancarios pago de proyectista Pyto. 1 32.00 32.002.3. Movillidad del Presidente y Tesorero del NEC pago proyectista Pyto. 1 250.00 250.00
UNID. MEDIDA
#REF! #REF!#REF! #REF!
#REF! #REF!#REF! #REF!#REF! #REF! #REF!
SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO SET-NOV DIC-FEB MAR-MAY JUN-AGO
Nº DESCRIPCIÓN META PPTO. TOTALCRONOGRAMA DE EJECUCIÓN TRIMESTRAL
0 I II III IV V VI VII VIII IX X XI XIIUNID.
MEDIDA
3. Gastos de ejecución del proyecto 31,194.00 0.00 5,496.00 5,100.00 5,100.00 5,100.00 5,298.00 5,100.00 0.00 0.00 0.00 0.00 0.00 0.003.1. Administración del proyecto (contratación del Coord. Tco. del NEC) Mes 18 27,000.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.003.2. Seguro de Coordinador Técnico Año 1.5 594.00 396.00 198.003.3. Movilidad de Coordinador Técnico Mes 18 3,600.00 600.00 600.00 600.00 600.00 600.00 600.00
4. Gastos de seguimiento del NEC 4,410.00 0.00 585.00 585.00 1,035.00 585.00 585.00 1,035.00 0.00 0.00 0.00 0.00 0.00 0.004.1. Fotografías de seguimiento de proyectos Informe 18 1,260.00 210.00 210.00 210.00 210.00 210.00 210.004.2. Elaboración de informes de gestión del NEC Informe 18 2,250.00 375.00 375.00 375.00 375.00 375.00 375.004.3. Elaboración de vídeo de implementación de proyectos Vídeo 2 900.00 450.00 450.00
COSTO TOTAL 4,517,506.97 12,282.00 131,681.56 70,405.75 ### ### 110,963.82 14,904.65 7,682.54 7,682.54 3,965.16 3,480.00 3,480.00 3,480.00PARTICIPACIÓN (%)