PROYECTO CMH - MARSA (PEC) 2011 (VALORIZACIÒN MENSUAL US$/MES) SCTR PENSIÓN 38% LABOR SECCION Und PU MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Crucero (Jumbo) 4.50 x 4.20 m 548.57 90 49,371.42 105 57,599.99 90 49,371.42 105 57,599.99 105 57,599.99 495.00 271,542.81 Rampa negativa (Jumbo) 3.50 x 3.50 m 492.52 150 73,878.03 166 81,758.35 145 71,415.43 140 68,952.83 130 64,027.63 731 360,032.27 Crucero (Jumbo) 3.50 x 3.50 m 477.86 - 25 11,946.39 15 7,167.83 15 7,167.83 - 55 26,282.05 Refugios 2.00 x 2.00 m 337.31 8 2,698.48 8 2,698.48 6 2,023.86 4 1,349.24 4 1,349.24 30 10,119.29 Pocket 2.00 x 2.00 m - - 20 - - - 20 - Sub Total Avances 240 123,249.45 271 ### 235 ### 245 ### 235 ### 1331.00 667,976.42 Perno de 8' Pza 29.49 1522 44,883.85 1944 57,328.65 1727 50,929.31 1795 52,934.64 1692 49,897.16 8680.00 255,973.62 Malla electrosoldada m2 10.07 410 4,129.46 680 6,848.86 821 8,268.99 821 8,268.99 763 7,684.82 3495 35,201.11 Shotcrette de 2" m2 47.40 608 28,821.77 856 40,578.02 720 34,131.05 769 36,453.86 738 34,984.33 3691 174,969.03 Shotcrette de 3" m2 71.06 863 61,323.49 955 67,860.87 805 57,202.09 805 57,202.09 748 53,151.76 4176 296,740.30 Sub Total Sostenimiento 3403 139,158.57 4435 172,616.41 4073 150,531.45 4190 154,859.58 3941 145,718.07 20042.00 762,884.07 Costos Fijos 90,638.93 90,638.93 90,638.93 90,638.93 90,638.93 453,194.64 Gastos Generales 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 20,000.00 Sub Total Costos Fijos y GG 94,638.93 94638.93 94638.93 94638.93 94638.93 473,194.64 TOTAL GENERAL 357,046.95 406,613.68 365,957.22 376,051.32 361,984.61 ### Nota: los PU de las labores incluyen costo directo + Utilidad + Contingencias ### 309,067.37 Equipos Solicitados 2 Jumbos de 1 brazo 1 Scoops de 4 yd3 1 Scoop de 6yd3 1 Bolter 2 Shotcretteras

Upload: lourdes-abigail-flores-vitor

Post on 03-Jan-2016

92 views

Category:

Documents


0 download

TRANSCRIPT

PROYECTO CMH - MARSA (PEC) 2011 (VALORIZACIÒN MENSUAL US$/MES) SCTR PENSIÓN 38%

LABOR SECCION Und PUMES 1 MES 2 MES 3 MES 4 MES 5 TOTAL

Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs Cantidad Val US$/mtrs PromedioCrucero (Jumbo) 4.50 x 4.20 m 548.57 90 49,371.42 105 57,599.99 90 49,371.42 105 57,599.99 105 57,599.99 495.00 271,542.81 99Rampa negativa (Jumbo) 3.50 x 3.50 m 492.52 150 73,878.03 166 81,758.35 145 71,415.43 140 68,952.83 130 64,027.63 731 360,032.27 146.2Crucero (Jumbo) 3.50 x 3.50 m 477.86 - 25 11,946.39 15 7,167.83 15 7,167.83 - 55 26,282.05 11Refugios 2.00 x 2.00 m 337.31 8 2,698.48 8 2,698.48 6 2,023.86 4 1,349.24 4 1,349.24 30 10,119.29 6Pocket 2.00 x 2.00 m - - 20 - - - 20 - 4

Sub Total Avances 240 123,249.45 271 139,358.34 235 120,786.85 245 126,552.82 235 121,627.62 1331.00 667,976.42 266.2Perno de 8' Pza 29.49 1522 44,883.85 1944 57,328.65 1727 50,929.31 1795 52,934.64 1692 49,897.16 8680.00 255,973.62 1736Malla electrosoldada m2 10.07 410 4,129.46 680 6,848.86 821 8,268.99 821 8,268.99 763 7,684.82 3495 35,201.11 699Shotcrette de 2" m2 47.40 608 28,821.77 856 40,578.02 720 34,131.05 769 36,453.86 738 34,984.33 3691 174,969.03 738.2Shotcrette de 3" m2 71.06 863 61,323.49 955 67,860.87 805 57,202.09 805 57,202.09 748 53,151.76 4176 296,740.30 835.2

Sub Total Sostenimiento 3403 139,158.57 4435 172,616.41 4073 150,531.45 4190 154,859.58 3941 145,718.07 20042.00 762,884.07 4008.4Costos Fijos 90,638.93 90,638.93 90,638.93 90,638.93 90,638.93 453,194.64

Gastos Generales 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 20,000.00

Sub Total Costos Fijos y GG 94,638.93 94638.93 94638.93 94638.93 94638.93 473,194.64

TOTAL GENERAL 357,046.95 406,613.68 365,957.22 376,051.32 361,984.61 1,904,055.13

Nota: los PU de las labores incluyen costo directo + Utilidad + Contingencias 1,594,987.76309,067.37

Equipos Solicitados2 Jumbos de 1 brazo1 Scoops de 4 yd31 Scoop de 6yd31 Bolter2 Shotcretteras

ZICSA Contratistas Generales S. A.

Unidad PEC

ANALISIS DE PRECIOS PARA PROYECTO PEC

SCTR Pensión 38%

DESCRIPCION SECCION UNIDAD CANT.P.U. Directo Contingencias Utilidad

PRECIO TOTAL US$. PRECIO TOTAL US$. DIFERENCIA US$. OBSERVACIONES DE PU CONTRATO

US$. 5% 10%

1'. AVANCE LINEAL TRACK LES

Rampa Negativa Con Jumbo, Con Scoop 4.50 x 4.20 US$./ m. ………… 482.21 24.11 48.22 554.55 587.61 33.07 5.96%

Crucero Con Jumbo, Con Scoop 4.50 x 4.20 US$./ m. ………… 451.33 22.57 45.13 519.03 548.57 29.54 5.69%

Rampa Negativa Con Jumbo, Con Scoop 3.50 x 3.50 US$./ m. ………… 402.98 20.15 40.30 463.42 492.52 29.10 6.28%

Crucero Con Jumbo, Con Scoop 3.50 x 3.50 US$./ m. ………… 390.22 19.51 39.02 448.76 477.86 29.10 6.48%

Rampa Negativa Con Jumbo, Con Scoop 3.00 x 3.00 US$./ m. ………… 348.02 17.40 34.80 400.23 431.75 31.52 7.88%

Crucero Con Jumbo, Con Scoop 3.00 x 3.00 US$./ m. ………… 339.27 16.96 33.93 390.16 421.64 31.48 8.07%

Crucero Con Jumbo, Con Scoop 2.00 x 2.00 US$./ m. ………… 274.25 13.71 27.43 315.39 337.31 21.92 6.95%

5. SOSTENIMIENTO / OTROS TRABAJOS

Colocación de Split Set o Perno Helicoidal de 6' pies US$./ Pza. ………… 18.84 0.94 1.88 21.66 23.46 1.80 8.30%

Colocación de Split Set o Perno Helicoidal de 8' pies US$./ Pza. ………… 23.77 1.19 2.38 27.33 29.49 2.16 7.89%

Instalación de Malla electrosoldado de 4" x 4" US$./ Pza. ………… 8.31 0.42 0.83 9.56 10.07 0.51 5.36%

Shotcrete o Concreto Lanzado de 1" US$ / m2 ………… 19.51 0.98 1.95 22.43 23.49 1.06 4.71%

Shotcrete o Concreto Lanzado de 2" US$ / m2 ………… 39.36 1.97 3.94 45.26 47.40 2.14 4.73%

Shotcrete o Concreto Lanzado de 3" US$ / m2 ………… 59.00 2.95 5.90 67.85 71.06 3.21 4.73%

6. COSTOS FIJOS Y GASTOS GENERALES DE OBRA

Costos Fijos de Obra mensual 1 77,493.57 77,493.57 90,638.93 13,145.35 16.96%

Gastos Generales mensual 1 4,000.00 4,000.00 4,000.00 0.00 0.00%

81,493.57 94,638.93 13,145.35

COSTO TOTAL PROYECTO US$

SCTR Pensión 4.05%

DIFERENCIA %

ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO

TIPO DE CAMBIO: 2.761

CATEG CATEGORIA UNIDAD JORNAL S/. JORNAL U.S.$ L.SOCIALES TOTALM1 MAESTRO JUMBERO/CHOFER DUMPER S/.XJORNAL 78.00 28.25 41.98 70.23M2 MAESTRO SOSTENIMIENTO S/.XJORNAL 51.00 18.47 27.45 45.92M3 MAESTRO PERFORISTA S/.XJORNAL 54.00 19.56 29.06 48.62A1 AYUDANTE OPERACIONES S/.XJORNAL 48.00 17.39 25.83 43.22

M1 ESCOOPERO/CAMION S/.XJORNAL 66.00 23.90 35.52 59.43

FACTOR INCREMENTO REGIMEN LABORAL 1.00

EQUIPOS UNIDAD

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) U.S.$/HR 118.58SCOOP DIESEL 4 YD3(Inlcuye petroleo) U.S.$/HR 72.76CAMION DE BAJO PERFIL U.S.$/HRB OMBA DE 10 HP U.S.$/HR 8.00ALQUILER DE PERFORADORA U.S.$/Pie 0.24

GASTOS GENERALES %CONTINGENCIAS % 5%UTILIDAD % 10%

COSTO PROPIEDAD

COSTO OPERACIÓN

COSTO TOTAL

LISTADO DE PRECIOS DE MATERIALES

TIPO DESCRIPCION UNIDAD

MATERIALES

Aceite de Perforación Almo U.S.$/Gln 8.40Alambre # 16 U.S.$/Kg 1.22Alcayata triple de 1/2" para tuberia de 2" U.S.$/Pza 5.12Grampa de Fe corrugado 3/8" U.S.$/Pza 1.21Malla Electrosoldad de 4"x4" U.S.$/Mt2 3.06Adaptador de Perno U.S.$/Pza 88.00Perno helicohidal de 6'+tuerca+placa U.S.$/Pza 8.12Perno helicohidal de 8'+tuerca+placa U.S.$/Pza 9.54Perno Hydrabolt 6',tuerca,placa U.S.$/Pza 12.82Perno Hydrabolt 7',tuerca,placa U.S.$/Pza 13.48Cartucho Cemento U.S.$/Pza 0.22Resina Unidad 0.75

manga ventilacion 30" U.S.$/Mt 4.66

Petroleo S./Gln 13.21 4.78Cemento S./Bls 30.24 10.95Acelerante U.S.$/Kgs 0.91Dramix U.S.$/Kgs 1.58Calibradores U.S.$/Pza 0.11

Tuberia de polietileno de 2" AGUA U.S.$/Pza 2.28

Tuberia de polietileno de 4" AIRE U.S.$/Pza 7.45Tubo PVC ( Recorte Voladura) U.S.$/Pza 0.40Manguera de Aire 1" U.S.$/Mts 2.48Manguera de Agua 1/2" U.S.$/Mts 1.27Soldadura Supercito 1 /8" U.S.$/Kg 3.80Sacos de polipropileno (50 Kgs/saco) U.S.$/Unid 0.36Fierro corrugado 3/4" x 8" (cancamo) U.S.$/Pza 5.82Varilla 1/2" x 9 U.S.$/Pza 9.60Varilla 3/4" x9 U.S.$/Pza 21.84Varilla 5/8" x9 U.S.$/Pza 14.85Dramix U.S.$/Kg 1.58

Calibradores U.S.$/Pza 0.11Barra de extension porta broca conica 2' U.S.$/Pza 60.50Barra de extension porta broca conica 4', 7876-6112-11 U.S.$/Pza 68.20Barra de extension porta broca conica 6', 7876-6118-11 U.S.$/Pza 94.60Barra de extension porta broca conica 8', 7876-1124-11 U.S.$/Pza 103.40Broca de 40 mm U.S.$/Pza 25.30Broca de 38 mm U.S.$/Pza 24.75Barra MF T38 X H35 X R32 X 14", 7324-6543-20 U.S.$/Pza 581.90Broca boton R32 X 1-3/4", 7733-5245-S45 U.S.$/Pza 93.50Shank adapter HLX5 X T38, 7304-7585-01 U.S.$/Pza 366.30Aco Top Cen R38 55,7994-3655 (COPLAS) U.S.$/Pza 71.50Broca escar. 4" GRADOS 12,7721-4802-S45 (RIMADORA) U.S.$/Pza 233.20Adaptador PIL R32 40 12 GRADOS,7821-3440 (ADAPT U.S.$/Pza 271.70Shank adapter hembra (BOLTER) U.S.$/Pza 346.50Barra de extension R32 H25 (BOLTER) U.S.$/Pza 174.90Broca boton R25 x 37 mm (BOLTER) U.S.$/Pza 85.80

Afiladora de Brocas U.S.$/Pza 1100.00Cordon detonante 5p (pentacord)(caja x 1500) U.S.$/Mts 0.21Igniter cord U.S.$/Pza 0.41Guia ensamblada 2.4 mts - carmex (300) U.S.$/Pza 0.63Emulex 45% 1 1/8" x 12" (128) U.S.$/Cart 0.49Emulex 45% 1 1/8" x 12" (128) (25 kGS) U.S.$/Kgs 2.51Exsadit 45% 7/8" x 7" (328) U.S.$/Cart 0.23Exsadit 45% 7/8" x 7" (328) (25 Kgs) U.S.$/Kgs 2.23Exsablock 7/8" x 7" (276) U.S.$/Cart 0.16Exsablock 7/8" x 7" (276) (20 Kgs) U.S.$/Kgs 2.21Exsanel 2.1 mts U.S.$/Pza 1.14Exsanel 2.4 mts U.S.$/PzaExsanel 4.2 mts U.S.$/PzaExsanel 3.0 mts N 288 (200) U.S.$/Pza 1.32Exsanel 4.8 mts N 180 (200) U.S.$/Pza 1.58Fanel blanco 1 al 10 (caja x 150) U.S.$/PzaFulminante electrico de 4 m U.S.$/Pza 3.54Emulsion 65% (1"x 8") U.S.$/PzaEmulnor 1000 1" x 7" (264) U.S.$/Kgs 1.79Emulnor 3000 1 1/8" x 12" (114) U.S.$/Kgs 1.96

MADERA Tabla 8" x 2" x 4' S./Pza 7.97 2.89Botas U.S.$/Pza 15.91Chaleco de malla con cinta reflectiva U.S.$/Pza 7.14Casco tipo Sombrero con orejera U.S.$/Pza 127.45 46.16Faja Ergonomica de proteccion lumbar U.S.$/Pza 19.1 6.92Casco tipo Sombrero U.S.$/Pza 11.32Barbiquejo U.S.$/Pza 0.67Respirador U.S.$/Pza 23.13Filtro U.S.$/Pza 3.18Cartucho U.S.$/Pza 4.52Retenedor U.S.$/Pza 2.63Guantes de Cuero U.S.$/Pza 3.30Correa Portalampara U.S.$/Pza 3.53Tapon de oido U.S.$/Pza 0.61Mameluco U.S.$/Pza 17.53Pantalon de Jebe U.S.$/Pza 8.33Casaca de jebe U.S.$/Pza 8.33Lampara U.S.$/Pza 17.00Anteojo U.S.$/Pza 5.20Cordon Sujetador U.S.$/Pza 2.28

Tafilete U.S.$/Pza 4.21

HERRAMIENTAS

Corvina U.S.$/Pza 51.70Palana U.S.$/Pza 8.97Pico U.S.$/Pza 6.77Comba de 6 Lbs U.S.$/Pza 6.38Llave Stilson de 8" U.S.$/Pza 4.79Llave Francesa de 8" U.S.$/Pza 5.90Azuela de 3 Lbs U.S.$/Pza 9.24

Chotana U.S.$/Pza 11.18

PRECIO 2011 S/.

PRECIO MAYO 2011 U.S.$

ACEROS DE PERFORACION

EXPLOSIVOS Y ACCESORIOS

IMPLEMENTOS DE SEGURIDAD

D42
EL 1 ER MONTO ES EL PRECIO DE COMPRA EL 2DO MONTO ES EL FLETE 10%
D43
EL 1 ER MONTO ES EL PRECIO DE COMPRA EL 2DO MONTO ES EL FLETE 10%

LEYES SOCIALES DE CTTA A TODO COSTO

T Anual : 365.00

41.01 D.NORMALES 273.00 22.75

DOMINGOS 52.00

Basico 31.33 1,500.00 DESC.MEDICO 4.00

Asig. Fam. 2.000 60.00 FERIADOS 10.00

33.33 1560.00 VACAC. 26.00

INGRESO: MENSUAL ANUAL

Cálculo de Leyes SocialesObreros Empleados Obreros Empleados Obreros Empleados Conceptos

% % Obreros

Mensual: 758.26 1,560.00 9,099.09 18,720.00

CTS 98.56 0.00 1,182.72 0.00 13.00% 14/12/12*365/273

1 VACACIONES 83.33 0.00 999.96 0.00 10.99% (30/273)

2 GRATIFICACIONES 166.65 0.00 1,999.80 0.00 21.98% (60/273)

3 DOMINGOS & FERIADOS-DESC.MEDICO 172.21 0.00 2,066.52 0.00 22.71% (62/273)

DESCANSO MEDICO 11.11 0.00 133.32 0.00 1.47% (4/273)

ESSALUD 68.24 0.00 818.92 0.00 9.00% A

JUBILACION ANTICIPADA 15.17 0.00 181.98 0.00 2.00% B

SCTR-SALUD 7.36 0.00 88.26 0.00 0.97% C

SCTR-PENSIONES(interior Mina) 288.14 0.00 3,457.65 0.00 38.00% D

VIDA LEY 3.26 0.00 39.13 0.00 0.43% E

APORTES REM. PRINCIPAL 50.40%

ESSALUD 7.50 0.00 89.99 0.00 0.99% 1*A

IES 1.67 0.00 20.00 0.00 0.22% 1*B

SCTR-SALUD 0.81 0.00 9.70 0.00 0.11% 1*C

SCTR-PENSIONES 31.66 0.00 379.96 0.00 4.18% 1*D

VIDA LEY 0.36 0.00 4.30 0.00 0.05% 1*E

IMPUESTOS VACACIONES 5.54%

ESSALUD 15.00 0.00 179.98 0.00 1.98% 2*A

IES 3.33 0.00 40.00 0.00 0.44% 2*B

SCTR-SALUD 1.62 0.00 19.40 0.00 0.21% 2*C

SCTR-PENSIONES 63.33 0.00 759.92 0.00 8.35% 2*D

VIDA LEY 0.72 0.00 8.60 0.00 0.09% 2*E

IMPUESTO GRATIFICACIONES 11.08%

ESSALUD 15.50 0.00 185.98 0.00 2.04% 3*A

IES 3.44 0.00 41.33 0.00 0.45% 3*B

SCTR-SALUD 1.67 0.00 20.04 0.00 0.22% 3*C

SCTR-PENSIONES 65.44 0.00 785.25 0.00 8.63% 3*D

VIDA LEY 0.74 0.00 8.89 0.00 0.10% 3*E

IMPUESTO DOM Y FER.DES.MED. 11.45%

TOTAL: 1,885.08 1,560.00 22,620.69 18,720.00 148.603%

DIAS UTILES DOMINGOS FERIADOS DES.MEDI VACACIONESENERO 0 5 0 26FEBRERO 24 4 0MARZO 27 4 0ABRIL 23 5 2MAYO 26 4 1JUNIO 25 4 1JULIO 24 5 2AGOSTO 26 4 1SEPTIEMBRE 26 4 0OCTUBRE 25 5 1NOVIEMBRE 25 4 1DICIEMBRE 22 4 1 4

273 52 10 4 26ACUMULADO 273 325 335 339 365

TIPO DE CAMBIO (Venta): 2.761

EQUIPOS UNIDAD COSTO PROPIED COSTO OPERACIÓ COSTO TOTAL

U.S.$/HR U.S.$/HR U.S.$/HR

JUMBO ELECTROHIDR DE 1 BRAZO (*) $/HR 86.87 23.13 110.00

SCOOP DIESEL 4 YD3 $/HR 45.79 17.21 63.00

CONTINGENCIAS % 3%

GASTOS GENERALES % 0%

UTILIDAD % 10%

FACTOR DE EFICIENCIA EN COLOCADO CUADROS MADERA 100%

PRODUCCION TAJEOS

COSTO HORARIO DE EQUIPOS U.S.$/HR MESES UNIDAD CANTIDAD

WINCHES ELECTRICOS DE ARRASTRE JOY DE 20 3.65 ENERO TMS 27,417.00

PALA NEUMATICA 12B 6.31 FEBRERO TMS 33,724.00

BOMBA SUMERGIBLE GRINDEX MODELO MAJOR H, 1.16 MARZO TMS 32,548.00

VENTILADORES ELECT 6000CFM 15H 0.92 ABRIL TMS 31,181.00

SHOTCRETERA ALIVA 5.91 MAYO TMS 28,884.00

LOCOMOTORA 3.5 TN A BATERIA U.S.$/Mes 1,400.00 JUNIO TMS 26,491.00

LOCOMOTORA 5.5 TN A BATERIA U.S.$/Mes 2,200.00 JULIO TMS 30,759.00

LOCOMOTORA TROLLEY DE 5.5 TN U.S.$/Mes 3,400.00 AGOSTO TMS 27,152.00

LOCOMOTORA TROLLEY DE 10 TN U.S.$/Mes 8,000.00 SEPTIEMBRE TMS 27,055.00

CARROS MINEROS GRAMBY 90.82 OCTUBRE TMS 27,835.00

CARROS MINEROS U35 47.03 NOVIEMBRE TMS 32,217.00

CARROS MINEROS GRAMBY 180.00 PROMEDIO TMS 29,569.36

MEZCLADORA U.S.$/Hr 4.44 Consumo Unidad

SCOOP 2.2 Yd3 $/Hr 50.00 3.00 Glns/Hr

SCOOP 1.5 Yd3 $/Hr 40.00 2.00 Glns/Hr

SCOOP 3.5 Yd3 $/Hr 63.00 3.50 Glns/Hr

JUMBO ROCKET BOOMER $/Hr 90.00 1.50 Glns/Hr

VOLQUETE BAJO PERFIL $/Hr 50.00 4.00 Glns/Hr

PERFORADORA JACK LEG (U.S.$/Ft) $/Hr 0.10

COSTO DE TRANSPORTE DE MADERA

RUBRO Und CONSUMO P.UNIT COSTO TOTAL COSTO UNIT OBSERVACION

$/pie

MADERA Pie2-Mina-mes 530,984.18 0.00 0.00 0.00

PERSONAL Glb 1.00 19,175.25 19,175.25 0.04

GASTOS ADMINISTRATIVOS % 0.07 0.00

MANTENIMIENTO CALESAS Und 39.00 23.00 897.00 0.00 Entregada x CMHSA

COSTO LOCOMOTORA SERVICIOS Glb 1.00 1,196.00 1,196.00 0.00

CAMION DYNA Und 1.00 0.00 0.00 0.00 Transporte Madera Boca a Interior Mina x Rampa RNG

T O T A L 0.04

NOTA: 2,236.62

Factor de correccion longitud madera (pies a mts) 0.98

Transporte Madera Boca a Interior Mina x Rampa RNG

COSTOS FIJOS MENSUALES ZONA ALTA ZONA BAJA

L.SOC. OBR. 148.60% L.SOC. EMP. 103.53% T.CAMBIO 2.761

DESCRIPCION CANT L.SOCIALES TOTAL S/. TOTAL US$ CANT U.S.$

Ing. Residente 0.50 7,000.00 7,246.99 14,246.99 5,160.08 2,580.04 2,580.04 0.50 2,580.04 1.00 Ingeniero de Seguridad 0.50 6,000.00 6,211.71 12,211.71 4,422.93 2,211.46 2,211.46 0.50 2,211.46 1.00 Ing. Asistente Seguridad 0.50 4,500.00 4,658.78 9,158.78 3,317.20 1,658.60 1,658.60 0.50 1,658.60 1.00 Ingeniero Jefe de Guardia 1.50 5,000.00 5,176.42 10,176.42 3,685.77 5,528.66 5,528.66 1.50 5,528.66 3.00 Administrador 0.50 3,000.00 3,105.85 6,105.85 2,211.46 1,105.73 1,105.73 0.50 1,105.73 1.00 Operador de Costos/Sistemas 0.50 4,500.00 4,658.78 9,158.78 3,317.20 1,658.60 1,658.60 0.50 1,658.60 1.00 Asistenta Social 0.50 2,000.00 2,070.57 4,070.57 1,474.31 737.15 737.15 0.50 737.15 1.00 Jefe de Almacén 0.50 2,000.00 2,070.57 4,070.57 1,474.31 737.15 737.15 0.50 737.15 1.00 Auxiliar Almacen 1.00 1,470.00 1,521.87 2,991.87 1,083.62 1,083.62 1,083.62 1.00 1,083.62 2.00

- Capataz 3.00 2,400.00 2,484.68 4,884.68 1,769.17 5,307.51 5,307.51 3.00 5,307.51 6.00 Bodeguero/Afilador /Lamparero 1.50 1,380.00 1,428.69 2,808.69 1,017.27 1,525.91 1,525.91 1.50 1,525.91 3.00 Inspector Seguridad 1.50 1,530.00 1,583.99 3,113.99 1,127.85 1,691.77 1,691.77 1.50 1,691.77 3.00 Mecanico Perforadoras 1.00 1,530.00 1,583.99 3,113.99 1,127.85 1,127.85 1,127.85 1.00 1,127.85 2.00 Soldador 0.50 1,500.00 1,552.93 3,052.93 1,105.73 552.87 552.87 0.50 552.87 1.00 Alquiler Lamparas 1.00 1,200.00

28,706.93 27,506.93TOTAL COSTO FIJO 28,706.93 27,506.93

GASTOS GENERALESMOVILIDAD Y OTROS 1.00Camioncito Servicios 0.50 6,511.14 3,255.57 0.50 3,255.57 Camioneta Operaciones 0.50 6,511.14 3,255.57 0.50 3,255.57

Precio/Dia Dia Mes SistemaAlimentacion supervisores 6 16.00 30.00 0.67 115.90 695.40 6 695.40 Alimentacion obreros 38 16.00 30.00 0.67 115.90 4,346.25 38 4,346.25 Examen médico 44 190.00 6.00 2.00 22.94 997.83 44 997.83

38 250.00 1.00 0.67 60.36 2,263.67 38 2,263.67

Pasajes Supervisores (Lima - Mina 8 249.50 2.00 1.00 180.73 1,355.49 6 1,084.39

IMPLEMENTOS SEGURIDAD 1.00Supervisores y otros 27.00 36.18 976.76 10.50 379.85

GASTOS GENERALES PROPIAMENTEGastos Generales Lima 4,000.00Gastos Generales operación mina 1,000.00SUB TOTAL US$ 22,146.53 16,278.53 SUB TOTAL GENERAL US$ 50,853.47 43,785.46

TOTAL GENERAL US$ 94,638.93

COSTO ACTUAL CAMIONETA (Inlcuido Petroleo) Dias trabajadosU.S.$/Día Cantidad U.S.$/Mes 30.00 p' vehi

Camioneta $107.27 1.00 3,218.10 S/. U.S.$Choferes $35.38 3.00 3,184.51 48.00 49.69 97.69 35.38EPPS 1.81 3.00 108.53 Petroleo 180 4.10 738.00 24.60TOTAL MES 6,511.14

SUELDO BASICO

TOTAL U.S.$

SUB-TOTAL U.S.

$

Pasajes Obreros (Parcoy - Trujillo - Parcoy)

RAMPA 4.5 M X 4.2 M CON EQUIPOS

GRADIENTE: 5/1000 N° de Taladros 51.00 Avance/Disp. 3.00 MTFactor Incidencia 12%

MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 70.23 70.23AYUDANTE OPER.JUMBO Hom/Disp 1.00 1.00 1.00 43.22 43.22OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 59.43 59.43OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 59.43 0.00CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 48.62 145.87BOMBERO Hom/Disp 1.00 1.00 1.00 43.22 43.22SERVICIOS AUXILIARES Hom/Disp 1.00 1.00 1.00 43.22 43.22

SUB-TOTAL 405.18 135.24

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 200.47 2,500 0.08 581.90 15.58BROCAS DE 45 MM MT/DISP 189.34 200 0.95 93.50 29.54SHANK ADAPTER MT/DISP 200.47 3,500 0.06 366.30 7.00AFILADOR BROCAS MT/DISP 189.34 100,000 0.00 1,100.00 0.70COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 233.20 4.33ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 271.70 5.05TUBO PVC (Voladura recorte) PZAS/DISP 10.00 0.40 1.34TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45 0.00HERRAMIENTAS GLB 1.01 0.34 MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.84

PETROLEO 3.50 3.50 4.78 19.56SUB-TOTAL 94.93

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

IMPLEMENTOS SEGURIDAD Unidad 8.00 2.57 20.54 6.86

VOLADURA

DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT

EMULEX 45% 1 1/8" X 12" Cebos TALADROS 20.00 11.30 226.00 44.14 2.51 36.98EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 11.00 12.27 135.00 26.37 2.51 22.09EXADIT 45% 7/8" X 7" Corona TALADROS 17.00 6.00 102.00 7.77 2.23 5.79CORDON DETONANTE 5P MTS 45.00 0.21 3.15GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.63 0.42EXANEL 4.8 Mts PZAS 48.00 1.58 25.31

SUB-TOTAL 93.75

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.50 110.00 275.00SCOOP DIESEL 4 YD3 (inlcuye petroleo) HORAS 3.50 63.00 220.50CAMION DE BAJO PERFIL (2 CAMIONES X 2HrsxDi HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15BOMBA DE 50 HP HORAS 0.00 0.00BOMBA DE 10 HP HORAS 5.00 1.06 3.00 4.06 20.30PERFORADORA P.P 12.00 0.24 2.88

SUB-TOTAL 539.83 180.19

TOTAL COSTOS DIRECTOS 510.97

CONTINGENCIA 5% 25.55UTILIDAD 10% 51.10

SUB TOTAL COSTOS INDIRECTOS 76.64

TOTAL COSTOS U.S.$/Mt (Con equipos) 587.61

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 3.00LONG BARRA DE EXTEN PIES 14.00 Arranque 3.00 39.00 0.00EFIC DE PERF % 87% 1ra Ayuda Arranque 4.00 44.00 0.00LONG PERFORACION MT 3.71 2da Ayuda Arranque 4.00 44.00 0.00EFIC.AVANCE % 81% 3ra Ayuda Arranque 4.00 44.00 0.00LONG DE AVANCE EFECTIVA MT 3.00 Ayudas de Alzas 5.00 55.00 0.00DURACION GUARDIA H 11 Ayudas de Arrastre 4.00 0.00 44.00GUARDIAS/DIA GDA/D 2 Contorno 4.00 0.00 24.00 0.00PRODUCCION/DIA M/D 11.98 Contorno de Recorte 13.00 0.00 78.00 0.00

Arrastres 7.00 0.00 91.00VOLUMEN POR DISPARO LABOR TOTAL 51.00 226.00 102.00 135.00

ANCHO LABOR MT 4.5 TOTAL KGS 51.00 44.14 7.77 26.37ALTO LABOR MT 4.2LONGITUD MT 3.00 PESO Kgs/Cartucho 0.20 0.08 0.20SOBREROTURA % 6%VOLUMEN TOTAL M3 60.13 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 159.36 Densidad de Carga Kgs/mt 26.13

Factor de Carga Kgs/Ton 0.49

FACTOR INCIDENCIA

VIDA UTIL MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

COSTO U.S.$

CANTIDAD/ TALADRO

CANTIDAD PZAS

COSTO U.S.$/Kg

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.$

ESTANDAR

EMULEX 45% 1 1/8"X12

Cebo

EXADIT 45%

7/8"X7"

Corona

EMULEX 45% 1

1/8"X12 Arrastre

CRUCERO 4.5 M X 4.2 M CON EQUIPOS

GRADIENTE: 5/1000 N° de Taladros 48.00 Avance/Disp. 3.00 MTFactor Incidencia 12%

MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 70.23 70.23AYUDANTE OPER.JUMBO Hom/Disp 1.00 1.00 1.00 43.22 43.22OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 59.43 59.43OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 59.43 0.00CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 48.62 145.87BOMBERO Hom/Disp 0.00 1.00 1.00 43.22 0.00SERVICIOS AUXILIARES Hom/Disp 1.00 1.00 1.00 43.22 43.22

SUB-TOTAL 361.96 120.82

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 185.62 2,500 0.07 581.90 14.42BROCAS DE 45 MM MT/DISP 178.20 200 0.89 93.50 27.81SHANK ADAPTER MT/DISP 185.62 3,500 0.05 366.30 6.48AFILADOR BROCAS MT/DISP 178.20 100,000 0.00 1,100.00 0.65COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00RIMADORA DE 89 MM MT/DISP 7.42 200 0.04 233.20 2.89ADAPTADOR DE RIMADORA MT/DISP 7.42 200 0.04 271.70 3.37TUBO PVC (Voladura recorte) PZAS/DISP 10.00 0.40 1.34TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45 0.00HERRAMIENTAS GLB 1.01 0.34 MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.84

PETROLEO 3.50 3.50 4.78 19.56SUB-TOTAL 88.35

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

IMPLEMENTOS SEGURIDAD Unidad 7.00 2.57 17.97 6.00

VOLADURA

DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT

EMULEX 45% 1 1/8" X 12" Cebos TALADROS 20.00 11.30 226.00 44.14 2.51 36.98EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 9.00 12.11 109.00 21.29 2.51 17.84EXADIT 45% 7/8" X 7" Corona TALADROS 17.00 6.00 102.00 7.77 2.23 5.79CORDON DETONANTE 5P MTS 45.00 0.21 3.15GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.63 0.42EXANEL 4.8 Mts PZAS 46.00 1.58 24.26

SUB-TOTAL 88.44

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.50 110.00 275.00SCOOP DIESEL 4 YD3 HORAS 3.50 63.00 220.50CAMION DE BAJO PERFIL (2 CAMIONES X 2HrsxDi HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15BOMBA DE 50 HP HORAS 0.00 0.00BOMBA DE 10 HP HORAS 0.00 4.06 0.00PERFORADORA HORAS 12.00 0.24 2.88

SUB-TOTAL 519.53 173.41

TOTAL COSTOS DIRECTOS 477.02

CONTINGENCIA 5% 23.85UTILIDAD 10% 47.70

SUB TOTAL COSTOS INDIRECTOS 71.55

TOTAL COSTOS U.S.$/Mt (Con equipos) 548.57

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE DATOS

EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD

DESCRIPCION

UNIDAD Malla Propuesta

Nª cartuchosTIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 2.00 3LONG BARRA DE EXTEN PIES 14.00 Arranque 3.00 39.00 0.00 3 13 39 Emulnor 3000EFIC DE PERF % 87% 1ra Ayuda Arranque 4.00 44.00 0.00 4 11 44 Emulnor 3000LONG PERFORACION MT 3.71 2da Ayuda Arranque 4.00 44.00 0.00 4 11 44 Emulnor 3000EFIC.AVANCE % 81% 3ra Ayuda Arranque 4.00 44.00 0.00 4 11 44 Emulnor 3000LONG DE AVANCE EFECTIVA MT 3.00 Ayudas de Alzas 5.00 55.00 0.00 5 11 55 Emulnor 3000DURACION GUARDIA H 11 Ayudas de Arrastre 4.00 0.00 44.00 4 11 44 Emulnor 3000GUARDIAS/DIA GDA/D 2 Contorno 4.00 0.00 24.00 0.00 4 6 24 Emulnor 1x7

PRODUCCION/DIA M/D 11.98 Contorno de Recorte 13.00 0.00 78.00 0.00 13 6 78 Emulnor 1x7

Arrastres 5.00 0.00 65.00 7 13 91 Emulnor 3000

VOLUMEN POR DISPARO LABOR TOTAL 48.00 226.00 102.00 109.00 51 463ANCHO LABOR MT 4.5 TOTAL KGS 48.00 44.14 7.77 21.29ALTO LABOR MT 4.2LONGITUD MT 3.00 PESO Kgs/Cartucho 0.20 0.08 0.20SOBREROTURA % 6%VOLUMEN TOTAL M3 60.13 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 159.36 Densidad de Carga Kgs/mt 24.43

Factor de Carga Kgs/Ton 0.46

FACTOR INCIDENCIA

VIDA UTIL MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

COSTO U.S.$

CANTIDAD/ TALADRO

CANTIDAD PZAS

COSTO U.S.$/Kg

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.$

ESTANDAR

EMULEX 45% 1 1/8"X12

Cebo

EXADIT 45%

7/8"X7"

Corona

EMULEX 45% 1

1/8"X12 Arrastre

RAMPA 3.50 M X 3.50 M CON EQUIPOS

GRADIENTE: 5/1000 N° de Taladros: 44.00 Avance/Disp. 3.00 MT

MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 70.23 70.23 AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 43.22 43.22 OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 59.43 59.43 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 59.43 0.00 CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 48.62 97.24 BOMBERO Hom/Disp 1.00 1.00 1.00 43.22 43.22 SERVICIOS AUXILIARES Hom/Disp 1.00 1.00 1.00 43.22 43.22

SUB-TOTAL 356.56 119.01

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 174.49 2,500 0.07 581.90 13.56 BROCAS DE 45 MM MT/DISP 163.35 200 0.82 93.50 25.49 SHANK ADAPTER MT/DISP 174.49 3,500 0.05 366.30 6.10 AFILADOR BROCAS MT/DISP 163.35 100,000 0.00 1,100.00 0.60 COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00 RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 233.20 4.33 ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 271.70 5.05 TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 0.40 1.34 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45 0.00 HERRAMIENTAS 1.01 0.34

MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66 ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.84 PETROLEO 3.50 2.50 4.78 13.97

SUB-TOTAL 82.27

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT

IMPLEMENTOS SEGURIDAD Unidad 7.00 2.57 17.97 6.00

VOLADURA

DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT

EMULEX 45% 1 1/8" X 12" Cebos TALADROS 18.00 11.44 206.00 40.23 2.51 33.71EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 9.00 12.33 111.00 21.68 2.51 18.16EXADIT 45% 7/8" X 7" Corona TALADROS 14.00 6.00 84.00 6.40 2.23 4.77CORDON DETONANTE 5P MTS 41.00 0.21 2.87GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.63 0.42EXANEL 4.8 Mts PZAS 41.00 1.58 21.62

SUB-TOTAL 81.55

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 110.00 220.00SCOOP DIESEL 4 YD3 HORAS 2.50 63.00 157.50CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrHORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15BOMBA DE 50 HP HORAS 0.00 9.30 0.00BOMBA DE 10 HP HORAS 4.00 4.06 16.24PERFORADORA HORAS 12.00 0.24 2.88

SUB-TOTAL 417.77 139.44

TOTAL COSTOS DIRECTOS 428.28

CONTINGENCIA 5% 21.41UTILIDAD 10% 42.83

SUB TOTAL COSTOS INDIRECTOS 64.24

TOTAL COSTOS U.S.$/Mt (Sin equipos) 492.52

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDADDESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 3.00LONG BARRA DE EXTEN PIES 14.00 Arranque 4.00 52.00 0.00EFIC DE PERF % 87% 1ra Ayuda Arranque 4.00 44.00 0.00LONG PERFORACION MT 3.71 2da Ayuda Arranque 4.00 44.00 0.00EFIC.AVANCE % 81% 3ra Ayuda Arranque 4.00 44.00 0.00LONG DE PERF EFECTIVA MT 3.00 Ayudas de Alzas 2.00 22.00 0.00DURACION GUARDIA H 11 Ayudas de Arrastre 3.00 0.00 33.00GUARDIAS/DIA GDA/D 2 Contorno 9.00 0.00 54.00 0.00PRODUCCION/DIA M/D 11.98 Contorno de Recorte 5.00 0.00 30.00 0.00

Arrastres 6.00 0.00 78.00

VOLUMEN POR DISPARO LABOR TOTAL 44.00 206.00 84.00 111.00ANCHO LABOR MT 3.5 TOTAL KGS 44.00 40.23 6.40 21.68ALTO LABOR MT 3.2LONGITUD MT 3.00 PESO Kgs/Cartucho 0.20 0.08 0.20SOBREROTURA % 6%VOLUMEN TOTAL M3 35.64 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 94.43 Densidad de Carga Kgs/mt 22.80

Factor de Carga Kgs/Ton 0.72

FACTOR INCIDENCIA

VIDA UTIL MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

CANTIDAD/ TALADRO

CANTIDAD PZAS

COSTO U.S.$/Kg

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.$

ESTANDAR

EMULEX 45% 1 1/8"X12

Cebo

EXADIT 45% 7/8"X7"

Corona

EMULEX 45% 1 1/8"X12 Arrastre

CRUCERO 3.50 M X 3.50 M CON EQUIPOS

GRADIENTE: 5/1000 N° de Taladros: 42.00 Avance/Disp. 3.00 MT

MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 70.23 70.23 0.00 AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 43.22 43.22 OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 59.43 59.43 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 59.43 0.00 0.00 CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 48.62 97.24 0.00 BOMBERO Hom/Disp 0.00 1.00 1.00 43.22 0.00 0.00 SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 43.22 86.44 0.00

SUB-TOTAL 356.56 119.01

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 167.06 2,500 0.07 581.90 12.98 BROCAS DE 45 MM MT/DISP 155.92 200 0.78 93.50 24.33 SHANK ADAPTER MT/DISP 167.06 3,500 0.05 366.30 5.84 AFILADOR BROCAS MT/DISP 155.92 100,000 0.00 1,100.00 0.57 COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00 RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 233.20 4.33 ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 271.70 5.05 TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 0.40 1.34 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45 0.00 HERRAMIENTAS 1.01 0.34

MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66 ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.84 PETROLEO 3.50 2.50 4.78 13.97

SUB-TOTAL 80.24

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT

IMPLEMENTOS SEGURIDAD Unidad 7.00 2.57 17.97 6.00

VOLADURA

DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT

EMULEX 45% 1 1/8" X 12" Cebos TALADROS 18.00 11.44 206.00 40.23 2.51 33.71EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 7.00 12.14 85.00 16.60 2.51 13.91EXADIT 45% 7/8" X 7" Corona TALADROS 14.00 6.00 84.00 6.40 2.23 4.77CORDON DETONANTE 5P MTS 41.00 0.21 2.87GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.63 0.42EXANEL 4.8 Mts PZAS 39.00 1.58 20.57

SUB-TOTAL 76.24

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 110.00 220.00SCOOP DIESEL 4 YD3 HORAS 2.50 63.00 157.50CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDiHORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15BOMBA DE 50 HP HORAS 0.00 0.00 0.00B OMBA DE 10 HP HORAS 0.00 4.06 0.00PERFORADORA HORAS 12.00 0.24 2.88

SUB-TOTAL 401.53 134.02

TOTAL COSTOS DIRECTOS 415.53

CONTINGENCIA 5% 20.78UTILIDAD 10% 41.55

SUB TOTAL COSTOS INDIRECTOS 62.33

TOTAL COSTOS U.S.$/Mt (Sin equipos) 477.86

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDADDESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 3.00LONG BARRA DE EXTEN PIES 14.00 Arranque 4.00 52.00 0.00EFIC DE PERF % 87% 1ra Ayuda Arranque 4.00 44.00 0.00LONG PERFORACION MT 3.71 2da Ayuda Arranque 4.00 44.00 0.00EFIC.AVANCE % 81% 3ra Ayuda Arranque 4.00 44.00 0.00LONG DE AVANCE EFECTIVA MT 3.00 Ayudas de Alzas 2.00 22.00 0.00DURACION GUARDIA H 11 Ayudas de Arrastre 3.00 0.00 33.00GUARDIAS/DIA GDA/D 2 Contorno 9.00 0.00 54.00 0.00PRODUCCION/DIA M/D 11.98 Contorno de Recorte 5.00 0.00 30.00 0.00

Arrastres 4.00 0.00 52.00

VOLUMEN POR DISPARO LABOR TOTAL 42.00 206.00 84.00 85.00ANCHO LABOR MT 3.5 TOTAL KGS 42.00 40.23 6.40 16.60ALTO LABOR MT 3.2LONGITUD MT 3.00 PESO Kgs/Cartucho 0.20 0.08 0.20SOBREROTURA % 6%VOLUMEN TOTAL M3 35.64 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 94.43 Densidad de Carga Kgs/mt 21.11

Factor de Carga Kgs/Ton 0.67

FACTOR INCIDENCIA

VIDA UTIL MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

CANTIDAD/ TALADRO

CANTIDAD PZAS

COSTO U.S.$/Kg

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.$

ESTANDAR

EMULEX 45% 1 1/8"X12

Cebo

EXADIT 45% 7/8"X7"

Corona

EMULEX 45% 1 1/8"X12 Arrastre

RAMPA 3.0 M X 3.0 M CON EQUIPO

N° de Taladro 38 Avance/Disp. 3.00 MT

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 1.00 1.00 70.23 70.23 0.00 AYUDANTE OP. JUMBO 1.00 Hom/Disp 1.00 1.00 1.00 43.22 43.22 0.00 OPERADOR SCOOPTRAM 1.00 Hom/Disp 1.00 1.00 1.00 59.43 59.43 0.00 OPERADOR CAMION DE BAJO PERFIL 0.00 Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR 1.00 Hom/Disp 2.00 1.00 1.00 48.62 97.24 0.00 BOMBERO 0.00 Hom/Disp 1.00 1.00 1.00 43.22 43.22 0.00 SERVICIOS AUXILIARES 0.00 Hom/Disp 1.00 1.00 1.00 43.22 43.22 0.00

SUB-TOTAL 386.28 128.93

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 122.83 2,500 0.05 581.90 9.54BROCAS DE 45 MM MT/DISP 113.85 200 0.57 93.50 17.77SHANK ADAPTER MT/DISP 122.83 3,500 0.04 366.30 4.29AFILADOR BROCAS MT/DISP 113.85 100,000 0.00 1100.00 0.42COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00RIMADORA DE 89 MM MT/DISP 8.99 200 0.04 233.20 3.50ADAPTADOR DE RIMADORA MT/DISP 8.99 200 0.04 271.70 4.08TUBO PVC (Voladura recorte) PZAS/DISP 5.00 0.40 0.67TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45HERRAMIENTAS 1.01 0.34

MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66 ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.84 PETROLEO 3.50 2.50 4.78 13.97

SUB-TOTAL 66.06

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

Implementos Seguridad Unidad 7.50 2.57 19.26 6.43

VOLADURA

DESCRIPCION UNIDAD TALADROS UNIDAD KGS U.S.$/MT

EMULEX 45% 1 1/8" X 12" (128) TALADROS 24.00 7.25 174.00 33.98 2.51 28.47EXADIT 45% 7/8" X 7" (328) TALADROS 11.00 5.00 55.00 4.19 2.23 3.12CORDON DETONANTE 5P MTS 35.00 0.21 2.45GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.63 0.42EXSANEL 4.80 MTL PZAS 35.00 1.58 18.46

SUB-TOTAL 52.92

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50 110.00 165.00SCOOP DIESEL 3.5 YD3 HORAS 2.50 63.00 157.50CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDi HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15BOMBA DE 10 HP HORAS 4.00 4.06 16.24PERFORADORA PIES 12.00 0.24 2.88

SUB-TOTAL 362.77 121.09

TOTAL COSTOS DIRECTOS 375.44

CONTINGENCIA 5% 18.77UTILIDAD 10% 37.54

SUB TOTAL COSTOS INDIRECTOS 56.32

TOTAL COSTOS U.S.$/Mt (Con Jumbo) 431.75

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGODATOS

EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD DESCRIPCIO# CART # TAL TOTAL PZAS

TIEMPO DE CICLO H/DISP 3.21 Alivio de arranque 3.00LONG BARRA DE EXTEN PIES 14.00 Arranque 10.00 4.00 40.00 40.00 7.81EFIC DE PERF % 87% AXERA 1ra Ayuda Ar 9.00 2.00 18.00 18.00 3.52LONG PERFORACION MT 3.71 2da Ayuda Ar 9.00 2.00 18.00 18.00 3.52EFIC.AVANCE % 81% 3ra Ayuda Ar 6.00 2.00 12.00 12.00 2.34LONG DE PERF EFECTIVA MT 3.00 4ta Ayuda Ar 6.00 2.00 12.00 12.00 2.34DURACION GUARDIA H 11.00 Ayudas de Cu 4.00 2.00 8.00 8.00 1.56GUARDIAS/DIA GDA/D 2.00 Ayudas de Co 4.00 3.00 12.00 12.00 2.34PRODUCCION/DIA M/D 11.98 Ayudas de Arr 6.00 3.00 18.00 18.00 3.52

Cuadradores 5.00 6.00 30.00 30.00 2.29VOLUMEN POR DISPARO LABOR Coronas 5.00 5.00 25.00 25.00 1.91

ANCHO LABOR MT 3.00 Arrastres 9.00 4.00 36.00 36.00 7.03ALTO LABOR MT 3.00 TOTAL PERFORADOS 38.00 174.00 55.00 229.00 38.18LONGITUD MT 3.00 TOTAL CARGADOS 35.00 TOTAL KGSOBREROTURA % 6% TOTAL KG 33.98 4.19 38.18VOLUMEN TOTAL M3 28.64 PESO Kgs/Cartucho 0.195 0.076DENSIDAD MATERIAL TMS/M3 2.65

TONELAJE TMS/DISP 75.88 EFICIENCIAS

DESCRIPCIO UNIDAD VALOR Kgs/Cart 0.195 0.076Densidad de Kgs/mt 12.74 Cart/Caja 128.00 328.00Factor de Car Kgs/Ton 0.50 KGS/CAJA 25.00 25.00

VIDA ECONOMICA

MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

COSTO U.S.$

CANTIDAD/TALADRO

CANTIDAD PZA

COSTO U.S.$/Kgs

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.

$

ESTANDAR

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

TOTAL KGMS

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

PRECIOS UNITARIOS RAMPA 4.5 M X 4.2 M(CON JUMBO Y OPERADOR EQUIPO SIN VOLQUETE BAJO PERFIL)

GRADIENTE: 5/1000 N° de Taladros: 51.00 Avance/Disp. 3.00 MTCOD ´90001

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 0.50 1.00 70.23 35.12 0.00 AYUDANTE OPER.JUMBO Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFILHom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR Hom/Disp 3.00 0.50 1.00 48.62 72.93 0.00 BOMBERO Hom/Disp 1.00 0.50 1.00 43.22 21.61 0.00 SERVICIOS AUXILIARES Hom/Disp 2.00 0.50 1.00 43.22 43.22 0.00

SUB-TOTAL 253.92 84.64

MATERIALES CMHSA

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA BARRAS DE PERFORACION MT/DISP 189.34 2500 0.08 581.90 14.69 BROCAS DE 45 MM MT/DISP 189.34 200 0.95 93.50 29.50 SHANK ADAPTER MT/DISP 189.34 3500 0.05 366.30 6.61 AFILADOR BROCAS MT/DISP 189.34 100000 0.00 1,100.00 0.69 COPLAS MT/DISP 189.34 3000 0.06 71.50 1.50 RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 233.20 4.33 ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 271.70 5.04 TUBO PVC (Voladura recorte) PZAS/DISP 10.00 0.40 1.33 TUBERIA DE POLIETILENO DE 2" AGU PZAS/DISP 1.50 2.28 1.14 TUBERIA DE POLIETILENO DE 4" AIREPZAS/DISP 1.50 7.45 3.73 HERRAMIENTAS 1.01 0.34 ALCAYATAS DE 3/4" PZAS/DISP 4.00 5.12 6.83

SUB-TOTAL 75.73

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT COSTO U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 4.50 2.57 11.55 3.85

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD COSTO U.S.$/MT

PZAS KGS U.S.$/Kgs EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 20.00 11.30 226.00 49.56 1.96 32.38 EMULNOR 3000 1 1/8" X 12" Arrastre TALADROS 11.00 12.27 135.00 29.61 1.96 19.34 EMULNOR 1000 1"X7" CoronTALADROS 17.00 6.00 102.00 9.66 1.79 5.76 CORDON DETONANTE 5P MTS 45.00 0.21 3.15 GUIA ENSAMBLADA 1.8 mts (Carmex) PZAS 2.00 0.63 0.42 FANEL DE 1/2 segundo PZAS 48.00 0.00 0.00

SUB-TOTAL 61.06

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 0.00 0.00 0.00 0.00SCOOP DIESEL 4 YD3 HORAS 3.50 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00B OMBA DE 10 HP HORAS 4.00 0.00 0.00 0.00 0.00PERFORADORA HORAS 6.00 0.24 1.44

SUB-TOTAL 1.44 0.48

TOTAL COSTOS DIRECTOS 225.76

UTILIDAD 10.00% 22.58

TOTAL COSTOS 248.33395.86

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKETDATOS

EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAESTANDAR

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DIS 3.21 Taladro Alivio 3LONG BARRA DE EXTEN PIES 14.00 Arranque 3 39 0EFIC DE PERF % 87% 1ra Ayuda Arranque 4 44 0LONG PERFORACION MT 3.71 2da Ayuda Arranque 4 44 0EFIC.AVANCE % 81% 3ra Ayuda Arranque 4 44 0LONG DE PERF EFECTIV MT 3.01 Ayudas de Alzas 5 55 0DURACION GUARDIA H 11 Ayudas de Arrastre 4 0 44GUARDIAS/DIA GDA/D 2 Contorno 4 0 24.00 0PRODUCCION/DIA M/D 12.03 Contorno de Recorte 13 0 78.00 0

Arrastres 7 0 91VOLUMEN POR DISPARO LABOR TOTAL 51 226 102 135

ANCHO LABOR MT 4.5 TOTAL KGS 51 49.56 9.66 29.61ALTO LABOR MT 4.2LONGITUD MT 3.01 PESO Kgs/Cartucho 0.22 0.09 0.22SOBREROTURA % 13%VOLUMEN TOTAL M3 64.35 EFICIENCIASDENSIDAD MATERIAL TMS/M 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/D 170.52 Densidad de Carga Kgs/mt 29.54

Factor de Carga Kgs/Ton 0.52

VIDA ECONOMI

CA

CANTIDAD/TALADRO

COSTO PROPIEDA

D

COSTO OPERACIÓ

N

COSTO TOTAL U.S.$

CEBO(Cart.) EMULNOR

3000 1 1/8"X12

EMULNOR 1000

1"X7"

Corona

EMULNOR

3000 1 1/8" X 12"

GRADIENTE: 5/1000 N° de Taladro 48.00 Avance/Disp. 2.64 MTCOD

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 0.50 1.00 70.23 35.12 0.00 AYUDANTE OPER.JUMBO Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR Hom/Disp 3.00 0.50 1.00 48.62 72.93 0.00 BOMBERO Hom/Disp 1.00 0.50 1.00 43.22 21.61 0.00 SERVICIOS AUXILIARES Hom/Disp 2.00 0.50 1.00 43.22 43.22 0.00

SUB-TOTAL 253.92 96.14

MATERIALES CMHSA

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA BARRAS DE PERFORACION MT/DISP 152.74 2500 0.06 581.90 13.46 BROCAS DE 45 MM MT/DISP 152.74 200 0.76 93.50 27.04 SHANK ADAPTER MT/DISP 152.74 3500 0.04 366.30 6.05 AFILADOR BROCAS MT/DISP 152.74 100000 0.00 1,100.00 0.64 COPLAS MT/DISP 152.74 3000 0.05 71.50 1.38 RIMADORA DE 89 MM MT/DISP 9.55 200 0.05 233.20 4.21 ADAPTADOR DE RIMADORA MT/DISP 9.55 200 0.05 271.70 4.91 TUBO PVC (Voladura recorte) PZAS/DISP 10.00 0.40 1.51 TUBERIA DE POLIETILENO DE 2" AGU PZAS/DISP 1.32 2.28 1.14 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 1.32 7.45 3.73 HERRAMIENTAS 1.01 0.38 ALCAYATAS DE 3/4" PZAS/DISP 4.00 5.12 7.75

SUB-TOTAL 72.20

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT COSTO U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 4.50 2.57 11.55 4.37

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD COSTO U.S.$/MT

PZAS KGS U.S.$/Kgs EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 18.00 10.33 186.00 40.79 1.96 30.27 EMULNOR 3000 1 1/8" X 12" ArrastresTALADROS 11.00 11.27 124.00 27.19 1.96 20.18 EMULNOR 1000 1"X7" Coron TALADROS 16.00 5.00 80.00 7.58 1.79 5.13 CORDON DETONANTE 5P MTS 45.00 0.21 3.58 GUIA ENSAMBLADA 1.8 mts (Carmex) PZAS 2.00 0.63 0.48 FANEL DE 1/2 segundo PZAS 45.00 0.00 0.00

SUB-TOTAL 59.64

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 0.00 0.00 0.00 0.00SCOOP DIESEL 4 YD3 HORAS 3.50 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00B OMBA DE 10 HP HORAS 4.00 0.00 0.00 0.00 0.00PERFORADORA HORAS 6.00 0.24 1.44

SUB-TOTAL 1.44 0.55

TOTAL COSTOS DIRECTOS 232.90

UTILIDAD 10.00% 23.29

TOTAL COSTOS 256.19423.31

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKET

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDADESTANDAR

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 3LONG BARRA DE EXTEN PIES 12.00 Arranque 3 36 0EFIC DE PERF PIES 87% 1ra Ayuda Arranque 3 30 0LONG PERFORACION PIES 3.18 2da Ayuda Arranque 4 40 0EFIC.AVANCE PIES 83% 3ra Ayuda Arranque 4 40 0LONG DE PERF EFECTIVA PIES 2.64 Ayudas de Alzas 4 40 0DURACION GUARDIA PIES 11 Ayudas de Arrastre 4 0 40GUARDIAS/DIA PIES 2 Contorno 4 0 20.00 0PRODUCCION/DIA PIES 10.56 Contorno de Recorte 12 0 60.00 0

Arrastres 7 0 84

VOLUMEN POR DISPARO LABOR TOTAL 48 186 80 124

ANCHO LABOR MT 4.5 TOTAL KGS 48 40.79 7.58 27.19ALTO LABOR MT 4.2LONGITUD MT 2.64 PESO Kgs/Cartucho 0.22 0.09 0.22SOBREROTURA % 13%VOLUMEN TOTAL M3 56.52 EFICIENCIASDENSIDAD MATERIAL TMS/M 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/D 149.77 Densidad de Carga Kgs/mt 28.61

Factor de Carga Kgs/Ton 0.50

RAMPA 4.5 M X 4.2 M GRADO ALTA DIFICULTAD (CON JUMBO Y OPERADOR EQUIPO SIN VOLQUETE BAJO PERFIL)

SUB TOTAL

VIDA ECONOMICA

CANTIDAD/TALADRO

COSTO PROPIEDAD

COSTO OPERACIÓN

COSTO TOTAL U.S.$

CEBO(Cart.) EMULNOR

3000 1 1/8"X12

EMULNOR 1000

1"X7"

Corona

EMULNOR

3000 1 1/8" X 12"

GRADIENTE: 5/1000 N° de Taladros: 48.00 Avance/Disp. 2.64 MT

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 0.50 1.00 70.23 35.12 0.00 AYUDANTE OP. JUMBO Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR Hom/Disp 3.00 0.50 1.00 48.62 72.93 0.00 BOMBERO Hom/Disp 0.00 0.38 1.00 0.00 0.00 SERVICIOS AUXILIARES Hom/Disp 2.00 0.50 1.00 43.22 43.22 0.00

SUB-TOTAL 232.31 87.96

MATERIALES

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA BARRAS DE PERFORACION MT/DISP 152.74 2500 0.06 581.90 13.46 BROCAS DE 45 MM MT/DISP 152.74 200 0.76 93.50 27.04 SHANK ADAPTER MT/DISP 152.74 3500 0.04 366.30 6.05 AFILADOR BROCAS MT/DISP 152.74 100000 0.00 1,100.00 0.64 COPLAS MT/DISP 152.74 3000 0.05 71.50 1.38 RIMADORA DE 89 MM MT/DISP 9.55 200 0.05 233.20 4.21 ADAPTADOR DE RIMADORA MT/DISP 9.55 200 0.05 271.70 4.91 TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 0.40 1.51 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 1.32 2.28 1.14 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 1.32 7.45 3.73 HERRAMIENTAS 1.01 0.38 ALCAYATAS DE 3/4" PZAS/DISP 4.00 5.12 7.75

0.00SUB-TOTAL 72.20

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT COSTO U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 4.00 2.57 10.27 3.89

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD COSTO U.S.$/MT

PZAS KGS U.S.$/Kgs EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 20.00 9.30 186.00 40.79 1.96 30.27 EMULNOR 3000 1 1/8" X 12" Arrastres TALADROS 9.00 10.67 96.00 21.05 1.96 15.62 EMULNOR 1000 1"X7" Corona TALADROS 16.00 5.00 80.00 7.58 1.79 5.13 CORDON DETONANTE 5P MTS 45.00 0.21 3.58 GUIA ENSAMBLADA 1.8 mts (Carmex) PZAS 2.00 0.63 0.48 FANEL DE 1/2 segundo PZAS 45.00 0.00 0.00

SUB-TOTAL 55.0824

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 0.00 0.00 0.00 0.00SCOOP DIESEL 4 YD3 HORAS 3.00 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X 2HrsxDisparo) HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00B OMBA DE 10 HP HORAS 0.00 0.00PERFORADORA HORAS 6.00 0.24 1.44

SUB-TOTAL 1.44 0.55

TOTAL COSTOS DIRECTOS 219.68

UTILIDAD 10.00% 21.97

TOTAL COSTOS 241.64392.42

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKET

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD ESTANDAR

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 3LONG BARRA DE EXTEN PIES 12.00 Arranque 3 33 0EFIC DE PERF % 87% 1ra Ayuda Arranque 4 36 0LONG PERFORACION MT 3.18 2da Ayuda Arranque 4 36 0EFIC.AVANCE % 83% 3ra Ayuda Arranque 4 36 0LONG DE PERF EFECTIVA MT 2.64 Ayudas de Alzas 5 45 0DURACION GUARDIA H 11 Ayudas de Arrastre 4 0 36GUARDIAS/DIA GDA/D 2 Contorno 4 0 20.00 0PRODUCCION/DIA M/D 10.56 Contorno de Recorte 12 0 60.00 0

Arrastres 5 0 60

VOLUMEN POR DISPARO LABOR TOTAL 48 186 80 96ANCHO LABOR MT 4.5 TOTAL KGS 48 40.79 7.58 21.05ALTO LABOR MT 4.2LONGITUD MT 2.64 PESO Kgs/Cartucho 0.22 0.09 0.22SOBREROTURA % 13%VOLUMEN TOTAL M3 56.52 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 149.77 Densidad de Carga Kgs/mt 26.28

Factor de Carga Kgs/Ton 0.46

PRECIOS UNITARIOS CRUCERO 4.5 M X 4.2 M CON ALTO GRADO DIFICULTAD (CON JUMBO Y OPERADOR EQUIPO SIN VOLQUETE BAJO PERFIL)

VIDA ECONOMICA

CANTIDAD/TALADRO

COSTO PROPIEDAD

COSTO OPERACIÓN

COSTO TOTAL U.S.

$

CEBO(Cart.) EMULNOR

3000 1 1/8"X12

EMULNOR

1000 1"X7" Corona

EMULNOR

3000 1 1/8" X 12"

PRECIOS UNITARIOS CRUCERO 4.5 M X 4.2 M(CON JUMBO Y OPERADOR EQUIPO SIN VOLQUETE BAJO PERFIL)

GRADIENTE: 5/1000 N° de Taladros: 48.00 Avance/Disp. 3.00 MTCOD ´90002

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 0.50 1.00 70.23 35.12 0.00 AYUDANTE OP. JUMBO Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR Hom/Disp 3.00 0.50 1.00 48.62 72.93 0.00 BOMBERO Hom/Disp 0.00 0.38 1.00 0.00 0.00 SERVICIOS AUXILIARES Hom/Disp 2.00 0.50 1.00 43.22 43.22 0.00

SUB-TOTAL 232.31 77.44

MATERIALES

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA BARRAS DE PERFORACION MT/DISP 178.20 2500 0.07 581.90 13.83 BROCAS DE 45 MM MT/DISP 178.20 200 0.89 93.50 27.77 SHANK ADAPTER MT/DISP 178.20 3500 0.05 366.30 6.22 AFILADOR BROCAS MT/DISP 178.20 100000 0.00 1,100.00 0.65 COPLAS MT/DISP 178.20 3000 0.06 71.50 1.42 RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 233.20 4.33 ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 271.70 5.04 TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 0.40 1.33 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 1.50 2.28 1.14 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 1.50 7.45 3.73 HERRAMIENTAS 1.01 0.34 ALCAYATAS DE 3/4" PZAS/DISP 4.00 5.12 6.83

0.00SUB-TOTAL 72.61

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT COSTO U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 4.00 2.57 10.27 3.42

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD COSTO U.S.$/MT

PZAS KGS U.S.$/Kgs EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 20.00 11.30 226.00 49.56 1.96 32.38 EMULNOR 3000 1 1/8" X 12" Arrastres TALADROS 9.00 12.11 109.00 23.90 1.96 15.62 EMULNOR 1000 1"X7" Corona TALADROS 17.00 6.00 102.00 9.66 1.79 5.76 CORDON DETONANTE 5P MTS 45.00 0.21 3.15 GUIA ENSAMBLADA 1.8 mts (Carmex) PZAS 2.00 0.63 0.42 FANEL DE 1/2 segundo PZAS 46.00 0.00 0.00

SUB-TOTAL 57.3303

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 0.00 0.00 0.00 0.00SCOOP DIESEL 4 YD3 HORAS 3.00 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X 2HrsxDisparo) HORAS 0.00 0.00VENTILADOR DE 60,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00B OMBA DE 10 HP HORAS 0.00 0.00PERFORADORA HORAS 6.00 0.24 1.44

SUB-TOTAL 1.44 0.48

TOTAL COSTOS DIRECTOS 211.28

UTILIDAD 10.00% 21.13

TOTAL COSTOS 232.41364.76

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKET

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD ESTANDAR

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 2LONG BARRA DE EXTEN PIES 14.00 Arranque 3 39 0EFIC DE PERF % 87% 1ra Ayuda Arranque 4 44 0LONG PERFORACION MT 3.71 2da Ayuda Arranque 4 44 0EFIC.AVANCE % 81% 3ra Ayuda Arranque 4 44 0LONG DE PERF EFECTIVA MT 3.01 Ayudas de Alzas 5 55 0DURACION GUARDIA H 11 Ayudas de Arrastre 4 0 44GUARDIAS/DIA GDA/D 2 Contorno 4 0 24.00 0PRODUCCION/DIA M/D 12.03 Contorno de Recorte 13 0 78.00 0

Arrastres 5 0 65

VOLUMEN POR DISPARO LABOR TOTAL 48 226 102 109ANCHO LABOR MT 4.5 TOTAL KGS 48 49.56 9.66 23.90ALTO LABOR MT 4.2LONGITUD MT 3.01 PESO Kgs/Cartucho 0.22 0.09 0.22SOBREROTURA % 13%VOLUMEN TOTAL M3 64.35 EFICIENCIASDENSIDAD MATERIAL TMS/M3 2.65 DESCRIPCION UNIDAD VALORTONELAJE TMS/DISP 170.52 Densidad de Carga Kgs/mt 27.64

Factor de Carga Kgs/Ton 0.49

VIDA ECONOMICA

CANTIDAD/TALADRO

COSTO PROPIEDAD

COSTO OPERACIÓN

COSTO TOTAL U.S.

$

CEBO(Cart.) EMULNOR

3000 1 1/8"X12

EMULNOR

1000 1"X7" Corona

EMULNOR

3000 1 1/8" X 12"

PRECIOS UNITARIOS CRUCERO 3.50 M X 3.50 M (JACK LEG, CON OPERADOR EQUIPO SIN VOLQUETE BAJO PERFIL)

GRADIENTE: 5/1000 N° de Talad 42.00 Avance/Dis 1.60 MTCOD ´90004

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

PERFORISTA Hom/Disp 2.00 0.50 1.00 48.62 48.62 0.00 AYUDANTE OP. PERFORISTA Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 SERVICIOS AUXILIARES Hom/Disp 1.00 0.50 1.00 43.22 21.61 0.00

SUB-TOTAL 151.27 94.54

MATERIALES

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA Barra de 6¨ FTS/DISP 252.00 1820 0.14 94.60 8.19 Broca de 40 mm FTS/DISP 252.00 350 0.72 25.30 11.39 Aceite de Perforación GLNS/DISP 0.50 0 8.40 2.63 AFILADOR BROCAS MT/DISP 252.00 100000 0.00 1,100.00 1.73 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 1.60 2.28 2.28 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 1.60 7.45 7.45 HERRAMIENTAS 1.01 0.63 ALCAYATAS DE 3/4" PZAS/DISP 1.00 5.12 3.20

SUB-TOTAL 37.49

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT COSTO U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 3.00 2.57 7.70 4.81

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD U.S.$/MT

PZAS KGS U.S.$/PZA EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 18.00 6.22 112.00 24.56 1.96 30.09 EMULNOR 3000 1 1/8" X 12" Arrastres 7.00 6.57 46.00 10.09 1.96 12.36 EMULNOR 1000 1"X7" Corona 14.00 3.00 42.00 3.98 1.79 4.45FANEL TALADROS 39.00 0.00 0.00Carmex 8´ TALADROS 2.00 0.63 0.79Pentacord MTS 15.00 0.21 1.97Igniter Cord PZAS 0.25 0.41 0.06

SUB-TOTAL 49.72

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HR

SCOOP DIESEL 4 YD3 HORAS 1.80 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo) HORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00 0.00B OMBA DE 10 HP HORAS 0.00 0.00 0.00 0.00 0.00PERFORADORA HORAS 252.00 0.24 60.48

SUB-TOTAL 60.48 37.80

TOTAL COSTOS DIRECTOS 224.36

UTILIDAD 10.00% 22.44

TOTAL COSTOS 246.80291.65

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKET

DATOSDISTRIBUCION DE CARGA DE EXPLOSIVOS

DESCRIPCION

UNIDAD

Taladro Alivio 3Arranque 4 28 01ra Ayuda Arranque 4 24 02da Ayuda Arranque 4 24 03ra Ayuda Arranque 4 24 0Ayudas de Alzas 2 12 0Ayudas de Arrastre 3 0 18Contorno 9 0 27.00 0Contorno de Recorte 5 0 15.00 0Arrastres 4 0 28

TOTAL 42 112 42 46

TOTAL KGS 42 24.56 3.98 10.09

PESO Kgs/Cartucho 0.22 0.09 0.22

VIDA ECONOMICA

CANTIDAD/TALADRO

COSTO PROPIEDAD

COSTO OPERACIÓN COSTO TOTAL

U.S.$

CEBO(Cart.) EMULNOR 3000

1 1/8"X12

EMULNOR 1000 1"X7" Corona

EMULNOR

3000 1 1/8" X 12"

PRECIOS UNITARIOS CRUCERO 3.0 M X 3.0 M CON JUMBO

N° de Taladros 31.00 Avance/Disp. 3.00 MTCOD ´90008

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 0.50 1.00 70.23 35.12 0.00 AYUDANTE OP. JUMBO Hom/Disp 1.00 0.50 1.00 43.22 21.61 OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 OPERADOR CAMION DE BAJO PERFIL Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR Hom/Disp 2.00 0.50 1.00 48.62 48.62 0.00 BOMBERO Hom/Disp 0.00 0.38 1.00 0.00 0.00 SERVICIOS AUXILIARES Hom/Disp 0.00 0.50 1.00 43.22 0.00 0.00

SUB-TOTAL 164.77 54.92

MATERIALES

DESCRIPCION UNIDAD MTS/DISP ESTANDAR PRECIO U.S.$/MT

MTS PZAS/DISP U.S.$/PZA BARRAS DE PERFORACION MT/DISP 107.72 2500 0.04 581.90 8.36 BROCAS DE 45 MM MT/DISP 107.72 200 0.54 93.50 16.79 SHANK ADAPTER MT/DISP 107.72 3500 0.03 366.30 3.76 AFILADOR BROCAS MT/DISP 107.72 100000 0.00 1,100.00 0.39 COPLAS MT/DISP 107.72 3000 0.04 71.50 0.86 RIMADORA DE 89 MM MT/DISP 10.42 200 0.05 233.20 4.05 ADAPTADOR DE RIMADORA MT/DISP 10.42 200 0.05 271.70 4.72 TUBO PVC (Voaldura recorte) PZAS/DISP 5.00 0.40 0.67 TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 1.50 2.28 1.14 TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 7.45 0.00 HERRAMIENTAS 1.01 0.34 ALCAYATAS DE 3/4" PZAS/DISP 4.00 5.12 6.83

0.00SUB-TOTAL 47.89

IMPLEMENTOS SEGURIDADDESCRIPCION UNIDAD MTS/DISP COSTO UNIT U.S.$/MT

U.S.$/Pers U.S.$ Implementos Seguridad Unidad 2.50 2.57 6.42 2.14

VOLADURA

DESCRIPCION UNIDAD MTS/DISP CANTIDAD UNIDAD COSTO U.S.$/MT

PZAS KGS U.S.$/Kgs EMULNOR 3000 1 1/8" X 12" Cebos TALADROS 14.00 7.71 108.00 20.25 1.96 13.23 EMULNOR 3000 1 1/8" X 12" Arrastres TALADROS 7.00 7.14 50.00 10.96 1.96 7.16 EMULNOR 1000 1"X7" Corona TALADROS 8.00 5.13 41.00 6.13 1.79 3.66 CORDON DETONANTE 5P MTS 10.00 0.21 0.70 GUIA ENSAMBLADA 1.8 mts (Carmex) PZAS 2.00 0.63 0.42 FANEL DE 1/2 segundo PZAS 29.00 0.00 0.00

SUB-TOTAL 25.17

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP COSTO TOTAL U.S.$/MT

U.S.$/HR U.S.$/HR U.S.$/HRJUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50 0.00 0.00 0.00 0.00SCOOP DIESEL 4 YD3 HORAS 2.00 0.00 0.00 0.00 0.00CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo HORAS 0.00 0.00 0.00 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00VENTILADOR DE 20,000 CFM HORAS 0.00 0.00BOMBA DE 50 HP HORAS 0.00 0.00B OMBA DE 10 HP HORAS 0.00 0.00PERFORADORA HORAS 12.00 0.24 2.88

SUB-TOTAL 2.88 0.96

TOTAL COSTOS DIRECTOS 131.09

UTILIDAD 10.00% 13.11

TOTAL COSTOS 144.20234.23

LIMPIEZA SCOOPTRAM HASTA HASTA SIN SOBREDISTANCIA HASTA CARGUIO CON VOLQUETE O PCOKET

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD ESTANDAR

DESCRIPCION

UNIDAD

TIEMPO DE CICLO H/DISP 2 Taladro Alivio 2LONG BARRA DE EXTEN PIES 12.00 Arranque 2 20.0EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 2 16.0LONG PERFORACION MT 3.47 2da Ayuda Arranque 2 16.0EFIC.AVANCE % 87% 3ra Ayuda Arranque 2 16.0LONG DE PERF EFECTIVA MT 3.02 Ayudas de Cuadrador 2 16.0DURACION GUARDIA H 7 Ayudas de Corona 3 21.0GUARDIAS/DIA GDA/D 2 Ayudas de Arrastre 3 18.0PRODUCCION/DIA M/D 12.09 Cuadradores 4 24.00 0.0

Coronas 5 20.00 0.0

VOLUMEN POR DISPARO LABOR Arrastres 4 32.0ANCHO LABOR MT 3 TOTAL 31 44.00 155ALTO LABOR MT 3 TOTAL KGS 29 - 3.35 33.99LONGITUD MT 3.00SOBREROTURA % 13% PESO Kgs/Cartucho 0.08 0.22VOLUMEN TOTAL M3 30.57DENSIDAD MATERIAL TMS/M3 2.65 EFICIENCIASTONELAJE TMS/DISP 81.01 DESCRIPCION UNIDAD VALOR

Densidad de Carga Kgs/mt 12.45Factor de Carga Kgs/Ton 0.46

VIDA ECONOMICA

CANTIDAD/TALADRO

COSTO PROPIEDAD

COSTO OPERACIÓN COSTO

TOTAL U.S.$

CEBO(Cart.) EMULNOR 3000

1 1/8"X12

EXADIT 45% 7/8"X7"

Corona

EMULNOR 3000 1 1/8" X

12"

CRUCERO 3.0 M X 3.0 M CON EQUIPO

N° de Taladro 36 Avance/Disp. 3.00 MT

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 1.00 1.00 70.23 70.23 0.00 AYUDANTE OP. JUMBO 1.00 Hom/Disp 1.00 1.00 1.00 43.22 43.22 0.00 OPERADOR SCOOPTRAM 1.00 Hom/Disp 1.00 1.00 1.00 59.43 59.43 0.00 OPERADOR CAMION DE BAJO PERFIL 0.00 Hom/Disp 1.00 0.50 1.00 59.43 29.71 0.00 CARGADOR/DISPARADOR 1.00 Hom/Disp 2.00 1.00 1.00 48.62 97.24 0.00 BOMBERO 0.00 Hom/Disp 0.00 1.00 1.00 43.22 0.00 0.00 SERVICIOS AUXILIARES 0.00 Hom/Disp 2.00 1.00 1.00 43.22 86.44 0.00

SUB-TOTAL 386.28 128.76

MATERIALES

DESCRIPCION UNIDAD MTS/DISP U.S.$/MT

BARRAS DE PERFORACION MT/DISP 132.04 2,500 0.05 581.90 10.24BROCAS DE 45 MM MT/DISP 125.09 200 0.63 93.50 19.49SHANK ADAPTER MT/DISP 132.04 3,500 0.04 366.30 4.61AFILADOR BROCAS MT/DISP 125.09 100,000 0.00 1100.00 0.46COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00RIMADORA DE 89 MM MT/DISP 6.95 200 0.03 233.20 2.70ADAPTADOR DE RIMADORA MT/DISP 6.95 200 0.03 271.70 3.15TUBO PVC (Voladura recorte) PZAS/DISP 5.00 0.40 0.67TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.28 0.00TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 7.45 0.00HERRAMIENTAS 1.01 0.34

MANGA VENTILACION 30" MT/DISP 3.00 1 4.66 4.66 ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 5.12 6.83 PETROLEO 3.50 2.50 4.78 13.95

SUB-TOTAL 67.10

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT

Implementos Seguridad Unidad 7.50 2.57 19.26 6.42

VOLADURA

DESCRIPCION UNIDAD TALADROS UNIDAD KGS U.S.$/MT

EMULEX 45% 1 1/8" X 12" (128) TALADROS 22.00 7.09 156.00 30.47 2.51 25.49EXADIT 45% 7/8" X 7" (328) TALADROS 11.00 5.00 55.00 4.19 2.23 3.12CORDON DETONANTE 5P MTS 35.00 0.21 2.45GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.63 0.42EXSANEL 4.80 MTL PZAS 33.00 1.58 17.38

SUB-TOTAL 48.86

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP U.S.$/MT

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50 110.00 165.00SCOOP DIESEL 3.5 YD3 HORAS 2.50 63.00 157.50CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDi HORAS 0.00 0.00

VENTILADOR DE 20,000 CFM HORAS 9.00 1.65 0.70 2.35 21.15B OMBA DE 10 HP HORAS 0.00 4.06 0.00PERFORADORA PIES 12.00 0.24 2.88

SUB-TOTAL 346.53 115.51

TOTAL COSTOS DIRECTOS 366.64

CONTINGENCIA 5% 18.33UTILIDAD 10% 36.66

SUB TOTAL COSTOS INDIRECTOS 55.00

TOTAL COSTOS U.S.$/Mt (Con Jumbo) 421.64

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO

DATOSEFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD DESCRIPCIO# CART # TAL

TIEMPO DE CICLO H/DISP 3.21 Alivio de arranque 2.00LONG BARRA DE EXTEN PIES 12.00 Arranque 10.00 4.00 40.00 40.00 7.81EFIC DE PERF % 95% AXERA 1ra Ayuda Ar 9.00 2.00 18.00 18.00 3.52LONG PERFORACION MT 3.47 2da Ayuda Ar 9.00 2.00 18.00 18.00 3.52EFIC.AVANCE % 81% 3ra Ayuda Ar 6.00 2.00 12.00 12.00 2.34LONG DE PERF EFECTIVA MT 2.80 4ta Ayuda Ar 6.00 2.00 12.00 12.00 2.34DURACION GUARDIA H 11.00 Ayudas de Cu 4.00 2.00 8.00 8.00 1.56GUARDIAS/DIA GDA/D 2.00 Ayudas de Co 4.00 3.00 12.00 12.00 2.34PRODUCCION/DIA M/D 11.22 Ayudas de Arr 6.00 3.00 18.00 18.00 3.52

Cuadradores 5.00 6.00 30.00 30.00 2.29VOLUMEN POR DISPARO LABOR Coronas 5.00 5.00 25.00 25.00 1.91

ANCHO LABOR MT 3.00 Arrastres 9.00 2.00 18.00 18.00 3.52ALTO LABOR MT 3.00 TOTAL PERFORADOS 35.00 156.00 55.00 211.00 34.66LONGITUD MT 2.80 TOTAL CARGADOS 33.00 TOTAL KGSOBREROTURA % 6% TOTAL KG 30.47 4.19 34.66VOLUMEN TOTAL M3 26.80 PESO Kgs/Cartucho 0.195 0.076DENSIDAD MATERIAL TMS/M3 2.65

TONELAJE TMS/DISP 71.02 EFICIENCIAS

DESCRIPCIO UNIDAD VALOR Kgs/Cart 0.195 0.076

Densidad de Kgs/mt 12.36 Cart/Caja 128.00 328.00Factor de CarKgs/Ton 0.49 KGS/CAJA 25.00 25.00

VIDA ECONOMICA

MTS

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

CANTIDAD/TALADRO

CANTIDAD PZA

COSTO U.S.$/Kgs

COSTO PROPIEDAD

U.S.$/HR

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.$

ESTANDAR

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

TOTAL PZAS

TOTAL KGMS

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

CRUCERO 2.0 M X 2.0 M CON EQUIPO(REFUGIO)

N° de Taladro 28

MANO DE OBRA UNIDAD CANTIDAD FACTOR

OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 0.67 AYUDANTE OP. JUMBO 1.00 Hom/Disp 1.00 0.67 OPERADOR SCOOPTRAM 1.00 Hom/Disp 1.00 0.67 OPERADOR CAMION DE BAJO PERFIL 0.00 Hom/Disp 1.00 0.50 CARGADOR/DISPARADOR 1.00 Hom/Disp 2.00 0.67 BOMBERO 0.00 Hom/Disp 0.00 0.67 SERVICIOS AUXILIARES 0.00 Hom/Disp 2.00 0.67

SUB-TOTAL

MATERIALES

DESCRIPCION UNIDAD MTS/DISP

BARRAS DE PERFORACION MT/DISP 92.87 2,500BROCAS DE 45 MM MT/DISP 83.89 200SHANK ADAPTER MT/DISP 92.87 3,500AFILADOR BROCAS MT/DISP 83.89 100,000COPLAS MT/DISP 0.00 3,000RIMADORA DE 89 MM MT/DISP 8.99 200ADAPTADOR DE RIMADORA MT/DISP 8.99 200TUBO PVC (Voladura recorte) PZAS/DISP 5.00TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00HERRAMIENTAS

MANGA VENTILACION 30" MT/DISP 3.00 1 ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 PETROLEO 3.50

SUB-TOTAL

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP

Implementos Seguridad Unidad 5.19

VOLADURA

DESCRIPCION UNIDAD TALADROS

EMULEX 45% 1 1/8" X 12" (128) TALADROS 17.00 7.41EXADIT 45% 7/8" X 7" (328) TALADROS 8.00 5.00CORDON DETONANTE 5P MTSGUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZASEXSANEL 4.80 MTL PZAS

SUB-TOTAL

EQUIPOS

DESCRIPCION UNIDAD HRS/DISP

VIDA ECONOMICA

MTS

CANTIDAD/TALADRO

COSTO PROPIEDAD

U.S.$/HR

JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50SCOOP DIESEL 3.5 YD3 HORAS 2.00CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDi HORAS 0.00VENTILADOR DE 20,000 CFM HORAS 9.00 1.65B OMBA DE 10 HP 0.00 HORAS 0.00PERFORADORA PIES 12.00

SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIA 5%UTILIDAD 10%

SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Mt (Con Jumbo)

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGODATOS

EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS

CICLO UNIDAD DESCRIPCIO# CART

TIEMPO DE CICLO H/DISP 3.21 Alivio de arranqueLONG BARRA DE EXTEN PIES 14.00 Arranque 10.00EFIC DE PERF % 87% AXERA 1ra Ayuda Ar 9.00LONG PERFORACION MT 3.71 2da Ayuda Ar 9.00EFIC.AVANCE % 81% 3ra Ayuda Ar 6.00LONG DE PERF EFECTIVA MT 3.00 4ta Ayuda Ar 6.00DURACION GUARDIA H 11.00 Ayudas de Cu 4.00GUARDIAS/DIA GDA/D 2.00 Ayudas de Co 4.00PRODUCCION/DIA M/D 11.98 Ayudas de Arr 6.00

Cuadradores 5.00VOLUMEN POR DISPARO LABOR Coronas 5.00

ANCHO LABOR MT 3.00 Arrastres 9.00ALTO LABOR MT 3.00 TOTAL PERFORADOSLONGITUD MT 3.00 TOTAL CARGADOSSOBREROTURA % 6% TOTAL KGVOLUMEN TOTAL M3 28.64 PESO Kgs/CartuchoDENSIDAD MATERIAL TMS/M3 2.65

TONELAJE TMS/DISP 75.88 EFICIENCIAS

DESCRIPCIO UNIDADDensidad de Kgs/mtFactor de CarKgs/Ton

ESTANDAR

CRUCERO 2.0 M X 2.0 M CON EQUIPO(REFUGIO)

Avance/Disp. 3.00 MT

FACT MO PU SUB TOTAL U.S.$/MT

1.00 70.23 47.06 0.001.00 43.22 28.96 0.001.00 59.43 39.82 0.001.00 59.43 29.71 0.001.00 48.62 65.15 0.001.00 43.22 0.00 0.001.00 43.22 57.91 0.00

268.61 89.66

U.S.$/MT

0.04 581.90 7.220.42 93.50 13.090.03 366.30 3.240.00 1100.00 0.310.00 71.50 0.000.04 233.20 3.500.04 271.70 4.08

0.40 0.672.28 0.007.451.01 0.344.66 4.665.12 6.84

2.00 4.78 11.1855.11

U.S.$/MT

2.57 13.33 4.45

UNIDAD KGS U.S.$/MT

126.00 24.61 2.51 20.6240.00 3.05 2.23 2.2735.00 0.21 2.45

2.00 0.63 0.4225.00 1.58 13.18

38.95

U.S.$/MT

ESTANDAR PZAS/DISP

PRECIO U.S.$/PZA

COSTO UNIT U.S.$/Pers

COSTO U.S.$

CANTIDAD PZA

COSTO U.S.$/Kgs

COSTO OPERACIÓN

U.S.$/HR

COSTO TOTAL U.S.

$/HR

COSTO TOTAL U.S.

$

110.00 165.0063.00 126.00

0.000.70 2.35 21.15

4.06 0.000.24 2.88

315.03 105.15

293.31

14.6729.3344.00

337.31

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO

DISTRIBUCION DE CARGA DE EXPLOSIVOS

# TAL

3.003.00 30.00 30.00 5.862.00 18.00 18.00 3.522.00 18.00 18.00 3.522.00 12.00 12.00 2.341.00 6.00 6.00 1.171.00 4.00 4.00 0.782.00 8.00 8.00 1.562.00 12.00 12.00 2.344.00 20.00 20.00 1.524.00 20.00 20.00 1.522.00 18.00 18.00 3.52

28.00 126.00 40.00 166.00 27.6625.00 TOTAL KG

24.61 3.05 27.660.195 0.076

VALOR Kgs/Cart 0.195 0.0769.23 Cart/Caja 128.00 328.000.36 KGS/CAJA 25.00 25.00

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

TOTAL PZAS

TOTAL KGMS

EMULEX 11/8"X12"

EXADIT 45 7/8"X7"

INSTALACION PERNO HELICOIDAL DE 6' CEMBOL(Sin perno, resina, cembol)Solo instalación del perno

Longitud Taladro : 1.80 Mts.Rendimiento : 18.00 Unid.

DESCRIPCIÓNFACTOR INCIDENCIA

Unid. Cant. FACT Costo Vida Costo x Costo/Pza.MO Unit.$ Util Disp. $ (US$/pza.)

1. MANO DE OBRAPerforistas 1.00 Tarea 1.00 1.00 45.92 45.92Ayud. Perforista 1.00 Tarea 1.00 1.00 43.22 43.22Ayud. 1.00 Tarea 1.00 1.00 43.22 43.22

3.00 132.36 7.35 2. IMPLEMENTOS SEGURIDADTareas sin ropa de agua Tar. 3.00 2.57 7.70

7.70 0.43 3. MATERIALES Y HERRAMIENTASBarra conica 6' Pza 108 94.60 1,820 5.61Broca 40 mm Pza 108 25.30 350 7.81Aceite Perforación Gln. 0.22 8.40 1.85Perno Helicohidal de 6',tuerca,placa (1x18)=18 Pza. 18 8.12 146.16Resina (1x18)=18 Cart 18 0.75 13.50Cembolt (6x18)=108 Cart 108 0.22 23.76Adaptador para inst perno (1) Pza. 1 88.00 200 0.44Herramientas de mina Global 1.34

200.47 11.14 5. EQUIPO PERFORACIÓN-LIMPIEZAperforadora P.P. 108.00 0.24 25.92Manguera aire 1" Mts. 30.00 2.48 150.00 0.50Manguera agua 1/2" Mts. 30.00 1.27 150.00 0.25

26.67 1.48 COSTOS DIRECTOS 20.40 COSTOS FIJOS ( van en lista por separado )

20.40 Contingencia 5% 1.02 Utilidad 10% 2.04 COSTO TOTAL (US$/Pza. Con material) 23.46

INSTALACION PERNO HELICOIDAL DE 8' CEMBOL (Sin perno, resina, cembol)Solo instalación del perno

Longitud Taladro : 2.40 Mts.Rendimiento : 15.00 Unid.

DESCRIPCIÓNFACTOR INCIDENCIA

Unid. Cant. FACT Costo Vida Costo x Costo/Pza.MO Unit.$ Util Disp. $ (US$/pza.)

1. MANO DE OBRAPerforistas 1.00 Tarea 1.00 1.00 45.92 45.92Ayud. Perforista 1.00 Tarea 1.00 1.00 43.22 43.22Ayudante 1.00 Tarea 1.00 1.00 43.22 43.22

3.00 132.36 8.822. IMPLEMENTOS SEGURIDAD

Tareas sin ropa de agua Tar. 3.00 2.57 7.707.70 0.51

3. MATERIALES Y HERRAMIENTASBarra conica 8' P.P. 112.50 103.40 1,820 6.39Broca 40 mm Pza 112.50 25.30 350 8.13Aceite Perforación Gln. 0.23 8.40 1.93Perno Helicohidal de 8',tuerca,placa (1x15)=15 Pza. 15.00 9.54 143.10Resina (2x15)=30 Cart 30.00 0.75 22.50Cembol (10x15)=150 Cart 150.00 0.22 33.00Adaptador para inst perno (1) Pza. 1.00 88.00 200 0.44Herramientas de mina Global 1.34

216.84 14.465. EQUIPO PERFORACIÓN-LIMPIEZAperforadora P.P. 112.50 0.24 27.00Manguera aire 1" Mts. 30.00 2.48 150 0.50Manguera agua 1/2" Mts. 30.00 1.27 150 0.25

27.75 1.85COSTOS DIRECTOS 25.64COSTOS FIJOS ( van en lista por separado )

25.64Contingecia 5% 1.28Utilidad 10% 2.56COSTO TOTAL (US$/Pza. Con material) 29.49

INSTALACION DE MALLA ELECTROSOLDADA (Sin Malla, cemento. Grapa)

Rendimiento / Gdia. 42.50 M2 Taladros: 50

DESCRIPCIÓN Unid. Cant. FACT Costo Vida Costo x Costo/Pza.MO Unit.$ Util Disp. $ (US$/pza.)

1. MANO DE OBRAMaestro 1.00 Tarea 1.00 1.00 45.92 45.92Ayudante 1.00 Tarea 1.00 1.00 43.22 43.22

2.00 89.14 2.102. IMPLEMENTOS SEGURIDADImplementos Seguridad Tar. 2.00 2.57 5.14

5.14 0.123. MATERIALES Y HERRAMIENTASMalla Electrosoldada 4'x4' M2 50.00 3.06 1.00 153.00Cemento Bolsa 1.00 10.95 1.00 10.95Alambre No16 Kgs 3.00 1.22 1.00 3.66Grampa de Fe Coruugado 3/8" Pzas 75.00 1.21 1.00 90.75 Herramientas Global 1.34

259.71 6.115. EQUIPO PERFORACIÓN-LIMPIEZAPerforadora P.P. 50.00 0.24 12.00Barra de 4¨ P.P. 50.00 68.20 $/uni 1.87Broca de 40 mm PP 50.00 25.30 $/uni 3.61Manguera aire 1" Mts. 30.00 2.48 150.00 0.50Manguera agua 1/2" Mts. 30.00 1.27 150.00 0.25

18.24 0.43

COSTOS DIRECTOS 8.76

8.76Contingencia 5% 0.44Utilidad 10% 0.88COSTO TOTAL (US$/M2. Sin material) 10.07

Costo Incluye transporte de la cancha de madera a sus labores a cuenta ContrataMalla Electrosoldada y todos los materiales es a costo de CMHSA-MARSA

FACTOR INCIDENCIA

PRECIOS UNITARIOS SHOTCRETE 1"

SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)

Avance Mts 2/Cuadrilla...........: 3.00 M3 46.6 m2 15.53 M2/M3

DESCRIPCION UNIDAD CANTID. FACT MO COST./UNIT. INCID U.S.$ U.S.$/Gdia

MANO DE OBRA

Maestro Prepar. Mezcla Tarea - 1.00 45.92 - -

Ayudantes Prep. Mezcla Tarea 2.00 1.00 43.22 0.04 1.85

Maestro Shotcretero Tarea 1.00 1.00 45.92 0.02 0.99

Ayudantes Prep. Shotcre. Tarea - 1.00 43.22 - -

Ayud1 Tarea 1.00 1.00 43.22 0.02 0.93

Operador Scoop Tarea 0.38 1.00 59.43 0.01 0.48

4.38 4.25

IMPLEMENTOS SEGURIDAD Nº Tars.

Tareas con ropa de agua 4.38 2.57 0.09 0.24

- -

0.24

MATERIAL Y HERRAMIENTAS

Otras Herramientas Global 1.00 1.34 1.34

Pesaje material (3x10)=30$ $/M3 - 10.00 -

Cemento (10x3M3)=30 Bolsa 30.00 10.95 328.58

Fibra Acero (0,30,60,90,120 Kgs) Kg 120.00 1.58 189.60

Acelerante (15x3M3)=45 lt 45.00 0.91 40.95

Calibradores (46.60M2x1) Pza 46.60 0.11 5.13

Petroleo Glns/Hr 3.50 2.00 4.78 33.49

EQUIPOS 599.09 12.86

Scooptram de 2.2 Yd3. Hrs. 2.00 63.00 126.00

Shotcretera y accesorios Hrs. 3.00 5.91 17.73

143.73 3.08

SUB TOTAL DIRECTOS 20.43

SUB-TOTAL COSTOS DIRECTOS

Contingencia 5% 1.02

Utilidad 10% 2.04

COSTO TOTAL U.S.$/M2. 3.06

23.49

DRAMIX

DRAMIX (0 KGS/M3) 0 17.78

DRAMIX (10 KGS/M3) 30 18.95

DRAMIX (20 KGS/M3) 60 20.12

DRAMIX (30 KGS/M3) 90 21.29

DRAMIX (40 KGS/M3) 120 22.46

PRECIOS UNITARIOS SHOTCRETE 2"

SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)

Avance Mts 2/Cuadrilla...........: 3.00 M3 23.03 m2 7.68 M2/M3

DESCRIPCION UNIDAD CANTID. FACT MO COST./UNIT. INCID U.S.$ U.S.$/Gdia

MANO DE OBRA

Maestro Prepar. Mezcla Tarea - 1.00 45.92 - -

Ayudantes Prep. Mezcla Tarea 2.00 1.00 43.22 0.09 3.75

Maestro Shotcretero Tarea 1.00 1.00 45.92 0.04 1.99

Ayudantes Prep. Shotcre. Tarea - 1.00 43.22 - -

Ayud1 Tarea 1.00 1.00 43.22 0.04 1.88

Operador Scoop Tarea 0.38 1.00 59.43 0.02 0.97

4.38 8.59

IMPLEMENTOS SEGURIDAD Nº Tars.

Tareas con ropa de agua 4.38 2.57 0.19 0.49

- -

0.49

MATERIAL Y HERRAMIENTAS

Otras Herramientas Global 1.00 1.34 1.34

Pesaje material (3x10)=30$ $/M3 - 10.00 -

Cemento (10x3M3)=30 Bolsa 30.00 10.95 328.58

Fibra Acero (0,30,60,90,120 Kgs) Kg 120.00 1.58 189.60

Acelerante (15x3M3)=45 lt 45.00 0.91 40.95

Calibradores (23.30M2x1) Pza 23.03 0.11 2.53

Petroleo Glns/Hr 3.50 2.00 4.78 33.49

EQUIPOS 596.50 25.90

Scooptram de 2.2 Yd3. Hrs. 2.00 63.00 126.00

Shotcretera y accesorios Hrs. 3.00 5.91 17.73

143.73 6.24

SUB TOTAL DIRECTOS 41.22

SUB-TOTAL COSTOS DIRECTOS

Contingencia 5% 2.06

Utilidad 10% 4.12

COSTO TOTAL U.S.$/M2. 6.18

47.40

DRAMIX

DRAMIX (0 KGS/M3) 0 35.85

DRAMIX (10 KGS/M3) 30 38.22

DRAMIX (20 KGS/M3) 60 40.59

DRAMIX (30 KGS/M3) 90 42.95

DRAMIX (40 KGS/M3) 120 45.32

PRECIOS UNITARIOS SHOTCRETE 3"

SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)

Avance Mts 2/Cuadrilla...........: 3.00 M3 15.35 m2 5.12 M2/M3

DESCRIPCION UNIDAD CANTID. FACT MO COST./UNIT. INCID U.S.$ U.S.$/Gdia

MANO DE OBRA

Maestro Prepar. Mezcla Tarea - 1.00 45.92 - -

Ayudantes Prep. Mezcla Tarea 2.00 1.00 43.22 0.13 5.63

Maestro Shotcretero Tarea 1.00 1.00 45.92 0.07 2.99

Ayudantes Prep. Shotcre. Tarea - 1.00 43.22 - -

Ayud1 Tarea 1.00 1.00 43.22 0.07 2.82

Operador Scoop Tarea 0.38 1.00 59.43 0.02 1.45

4.38 12.89

IMPLEMENTOS SEGURIDAD Nº Tars.

Tareas con ropa de agua 4.38 2.57 0.29 0.73

- -

0.73

MATERIAL Y HERRAMIENTAS

Otras Herramientas Global 1.00 1.34 1.34

Pesaje material (3x10)=30$ $/M3 - 10.00 -

Cemento (10x3M3)=30 Bolsa 30.00 10.95 328.58

Fibra Acero (0,30,60,90,120 Kgs) Kg 120.00 1.58 189.60

Acelerante (15x3M3)=45 lt 45.00 0.91 40.95

Calibradores (15.35M2x1) Pza 15.35 0.11 1.69

Petroleo Glns/Hr 3.50 2.00 4.78 33.49

EQUIPOS 595.65 38.80

Scooptram de 2.2 Yd3. Hrs. 2.00 63.00 126.00

Shotcretera y accesorios Hrs. 3.00 5.91 17.73

143.73 9.36

SUB TOTAL DIRECTOS 61.79

SUB-TOTAL COSTOS DIRECTOS

Contingencia 5% 3.09

Utilidad 10% 6.18

COSTO TOTAL U.S.$/M2. 9.27

71.06

DRAMIX

DRAMIX (0 KGS/M3) 0 53.58

DRAMIX (10 KGS/M3) 30 57.13

DRAMIX (20 KGS/M3) 60 60.68

DRAMIX (30 KGS/M3) 90 64.24

DRAMIX (40 KGS/M3) 120 67.79

COSTO DE TAREA ADMINISTRATIVA

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Tarea.Unit.$ Tarea (US$/Tarea)

1. Mano de ObraAyudante Perforista Tarea 1.00 54.70 54.70

SUB TOTAL 54.70 54.70 54.70

IMPLEMENTOS SEGURIDAD MINEROS SUBTERRANEODESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNITARIO

US$/UNIDAD (Disparos) POR DISPAROBotas de Jebe Punta Acero Par 1.00 15.91 183.00 0.09Casco Tipo Sombrero Portalampara con orejera Pza 0.00 46.16 1,095.00 0.00Faja Ergonomica de proteccion lumbar Pza 0.00 6.92 183.00 0.00Chaleco de malla con cinta reflectiva Uni 1.00 7.14 90.00 0.08Casco Tipo Sombrero Portalámpara Pza 1.00 11.32 1,095.00 0.01Barbiquejo Elástico Gancho Metálico SEKUR Uni 1.00 0.67 90.00 0.01Respirador Pza 1.00 23.13 365.00 0.06Filtro Uni 2.00 3.18 7.00 0.91Cartucho para gases Uni 0.00 4.52 365.00 0.00Retenedor Uni 2.00 2.63 365.00 0.01Guante de cuero Par 1.00 3.30 7.00 0.47Correa Portalámpara Faja Plana 1 1/2" Uni 1.00 3.53 365.00 0.01Tapón de Oido Par 1.00 0.61 45.00 0.01Mameluco Jean Uni 1.00 17.53 183.00 0.10Pantalón de Jebe Uni 1.00 8.33 90.00 0.09Casaca de Jebe Uni 1.00 8.33 90.00 0.09Lámpara Uni 1.00 17.00 30.00 0.57Anteojos de cristal endurecido Uni 1.00 5.20 120.00 0.04Cordón Sujetador de Anteojos Uni 0.00 2.28 183.00 0.00Tafilete de 4 Puntas (Suspensión ECO V) Uni 1.00 4.21 365.00 0.01

SUB-TOTAL 2.57

HERRAMIENTAS 1.18COSTOS DIRECTOS SUB-TOTAL 58.44

IMPREVISTOS (Alimentacion S/10.5, Pasaje) 3.75UTILIDAD Y CONTINGENCIAS 10.00% 5.84

COSTOS INDIRECTOS SUB-TOTAL 9.59

COSTO TOTAL (US$/TAREA) 68.04

IMPLEMENTOS DE SEGURIDAD EMPLEADOS

DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. C. UNIT. C.UNIT.US$/UNIDAD (guardias) POR TAREA C/ropa agua

Botas de Jebe Punta Acero Par 1.00 15.91 90.00 0.18 0.18Casco Tipo Sombrero Portalampara con orejera Pza 0.00 46.16 300.00 0.00 0.00Faja Ergonomica de proteccion lumbar Pza 0.00 6.92 180.00 0.00 0.00Casco Tipo Sombrero Portalámpara Pza 1.00 11.32 360.00 0.03 0.03Barbiquejo Elástico Gancho Metálico SEKUR Uni 1.00 0.67 90.00 0.01 0.01Respirador Pza 1.00 23.13 365.00 0.06 0.06Filtro Par 2.00 3.18 25.00 0.25 0.25Cartucho para gases Par 1.00 4.52 25.00 0.18 0.18Retenedor Par 2.00 2.63 150.00 0.04 0.04Guante de cuero Par 1.00 3.30 15.00 0.22 0.22Correa Portalámpara Faja Plana 1 1/2" Uni 1.00 3.53 365.00 0.01 0.01Tapón de Oido Par 1.00 0.61 45.00 0.01 0.01Mameluco Jean Uni 1.00 17.53 183.00 0.10 0.10Pantalón de Jebe Uni 1.00 8.33 75.00 0.11Casaca de Jebe Uni 1.00 8.33 75.00 0.11Lámpara Uni 1.00 17.00 30.00 0.57 0.57Anteojos Uni 1.00 5.20 120.00 0.04 0.04Cordón Sujetador de Anteojos Uni 1.00 2.28 150.00 0.02 0.02Tafilete de 4 Puntas (Suspensión ECO V) Uni 1.00 4.21 365.00 0.01 0.01Zapato Seguridad Uni 1.00 30.57 365.00 0.08 0.08

SUB-TOTAL 1.81 2.03

HERRAMIENTAS

DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNITARIO$/UNIDAD (Disparos) POR DISPARO

Corvina Pzas 1.00 51.70 150.00 0.34Lampa Pzas 2.00 8.97 50.00 0.36Pico Pzas 2.00 6.77 50.00 0.27Combo 6 Lbs Pzas 1.00 6.38 75.00 0.09Llave Stilson de 8" Pzas 1.00 4.79 150.00 0.03LLave Francesa 8" Pzas 1.00 5.90 150.00 0.04Azuela Pzas 1.00 9.24 150.00 0.06Chotana Pzas 2.00 11.18 100.00 0.22

1.42

DESCRIPCION UNIDAD VALORHerramientas Avances U.S.$/Disp 1.01Herramientas Sostenimiento U.S.$/Disp 1.34

1.18

Proyectos Profundizacion " PEC" - Cronograma de avances Por Nivel 2430

Labor Mina Nivel Seccion Gradiente MES-1 MES-2 MES-3 MES-4 MES-5 TOTAL

Ancho Alto

RP-1897N (Camara de carguiol) Balcon 2430 3.5 3.5 0.5% 10 10

RP-1950N (Labor principal) Balcon 2430 3.5 3.5 -15% 70 116 140 140 120 586

RP1920N (Para pockets) Balcon 2430 3.5 3.5 15% 70 50 120

CX1885N (Para ventilacion) Balcon 2430 3.5 3.5 0.5% 10 10

Cx. (Camara Carguio) Balcon 2430 3.5 3.5 0.5% 15 15 15 45

Refugios Balcon 2430 2 2 0.5% 4 4 4 4 4 20

Poza bombeo de avance (c/200m.) Balcon 2430 3.5 3.5 -15% 5 10 15

Ch. Pockets (mineral Desmonte) Balcon 2360 2 2 0.0% 20 20

SUB TOTAL 154 195 184 159 134 826

Proyectos Profundizacion " PEC" - Cronograma de avances Ingreso por RP940N

Labor Mina Nivel Seccion Gradiente MES-1 MES-2 MES-3 MES-4 MES-5 TOTAL

Ancho Alto

CX1741N (Labor principal) Balcon 2220 4.5 4.2 0.5% 90 90 90 90 90 450

CX (Cámara Carguío) Balcon 2430 4.5 4.2 0.5% 15 15 15 45

Refugios Balcon 2430 2 2 0.5% 4 4 2 10

SUB TOTAL 94 109 92 105 105 505

PROYECCION ESTIMADA DE SOSTENIMIENTO EN EL PROYECTO DEL PEC

TIPO SOSTENIMIENTO 1 2 3 4 5 TOTALNV.2430 (PARTE ALTA)

RP-1897N (Camara de carguiol)PERNO 8' 70 70SHOT. A TODO COSTO 3" 58 58

RP-1950N (Labor principal)MALLA 2" 410 680 821 821 763 3,495PERNO 8' 490 812 980 980 910 4,172SHOT. A TODO COSTO 3" 403 667 805 805 748 3,428

RP1920N (Para pockets)PERNO 8' 350 250 600

SHOT. A TODO COSTO 3" 403 288 691

CX1885N (Para ventilacion)PERNO 8' 67 67SHOTCRETE 2" 62 62

Cx. (Camara Carguio)PERNO 8' 101 101 101 303SHOTCRETE 2" 93 93 93 279

Refugios SHOTCRETE 2" 25 25 25 25 25 125

Poza bombeo de avance (c/200m.)PERNO 8' 34 68 102SHOTCRETE 2" 31 62 93

RAMPA 940N (PARTE BAJA)

CX1741N (Labor principal)PERNO 8' 612 612 612 612 612 3,060SHOTCRETE 2" 558 558 558 558 558 2,790

Cámara CarguioPERNO 8' 102 102 102 306SHOTCRETE 2" 93 93 93 279

RefugiosPERNO 8' 0SHOTCRETE 2" 25 25 13 63

CALCULO COSTO TRANSPORTE MATERIAL CON SCOOP EN TODA LABOR SUBTERRANEA

TIEMPOS

DESCRIPCION UNIDAD CARGUIO IDA CARGADO DESCARGA

Muestras:11 Minutos 0.75 1.00 0.40 0.74

TIEMPO VARIABLEVelocidad Cargado (Espacio/Tie 100.00 Mts/Minuto 6.00 Km/HrVelocidad Vacio (Espacio/Tiempo 135.14 Mts/Minuto 8.11 Km/Hr

TIEMPOS FIJOSCARGUIO Minutos 0.75DESCARGA Minutos 0.40TIEMPOS MUERTOS Minutos 0.50

SUB TOTAL 1.15

SIMULACION DE TIEMPOS Y COSTOSDISTANCIA(Mts) 50.00 100.00 150.00 200.00 250.00Tiempo Ida (Cargado) 0.50 1.00 1.50 2.00 2.50Tiempo Vuelta (Vacio) 0.37 0.74 1.11 1.48 1.85

2.02 2.89 3.76 4.63 5.50 No Viajes Cucharas/Hora 29.70 20.76 15.96 12.96 10.91

61.32 42.86 32.94 26.75 22.52

63.00 63.00 63.00 63.00 63.00Petroleo 16.75 16.75 16.75 16.75 16.75

79.75 79.75 79.75 79.75 79.75Operador 7.43 7.43 7.43 7.43 7.43Implementos de seguridad 0.32 0.32 0.32 0.32 0.32Total 87.50 87.50 87.50 87.50 87.50COSTO U.S.$/M3 1.43 2.04 2.66 3.27 3.89COSTO U.S.$/TMS 0.48 0.68 0.89 1.09 1.30

4.001 Yda 3 de carguio = 0.764554 M3 0.76M3 INSITU/CUCHARA 2.06TMS POR CUCHARA 6.19

VUELTA VACIO

Total CICLO (FIJO+VARIABLE) Minutos

M3/HORA (INSITU: Medido Topograficamente)

COSTO SCOOP 4 Yds3 U.S.$/Hr

COSTO SCOOP 4 Yds3 U.S.$/Hr

CAPACIDAD CUCHARA SCOOPTRAM Yds

CALCULO COSTO TRANSPORTE MATERIAL CON SCOOP EN TODA LABOR SUBTERRANEA

TIEMPOS

CICLO OBSERVACION

2.89 100.00 MTS

NO300.00 350.00 400.00 450.00 500.00 550.00 600.00

3.00 3.50 4.00 4.50 5.00 5.50 6.002.22 2.59 2.96 3.33 3.70 4.07 4.44

6.37 7.24 8.11 8.98 9.85 10.72 11.59 9.42 8.29 7.40 6.68 6.09 5.60 5.18

19.44 17.11 15.27 13.79 12.57 11.55 10.69

63.00 63.00 63.00 63.00 63.00 63.00 63.0016.75 16.75 16.75 16.75 16.75 16.75 16.75

79.75 79.75 79.75 79.75 79.75 79.75 79.757.43 7.43 7.43 7.43 7.43 7.43 7.430.32 0.32 0.32 0.32 0.32 0.32 0.32

87.50 87.50 87.50 87.50 87.50 87.50 87.504.50 5.11 5.73 6.34 6.96 7.57 8.191.50 1.70 1.91 2.11 2.32 2.52 2.73

CALCULO COSTO TRANSPORTE MATERIAL CON SCOOP EN TODA LABOR SUBTERRANEA

650.00 700.00 750.00 800.00 850.00 900.00 950.006.50 7.00 7.50 8.00 8.50 9.00 9.504.81 5.18 5.55 5.92 6.29 6.66 7.03

12.46 13.33 14.20 15.07 15.94 16.81 17.68 4.82 4.50 4.23 3.98 3.76 3.57 3.39

9.94 9.29 8.72 8.22 7.77 7.37 7.01

63.00 63.00 63.00 63.00 63.00 63.00 63.0016.75 16.75 16.75 16.75 16.75 16.75 16.75

79.75 79.75 79.75 79.75 79.75 79.75 79.757.43 7.43 7.43 7.43 7.43 7.43 7.430.32 0.32 0.32 0.32 0.32 0.32 0.32

87.50 87.50 87.50 87.50 87.50 87.50 87.508.80 9.42 10.03 10.65 11.26 11.87 12.492.93 3.14 3.34 3.55 3.75 3.96 4.16

CALCULO COSTO TRANSPORTE MATERIAL CON SCOOP EN TODA LABOR SUBTERRANEA

1,000.0010.00

7.40

18.55 3.23

6.68

63.0016.75

79.757.430.32

87.5013.10

4.37

ITEM DESCRIPCIONAVANCES

ACCESORIOS DE PERFORACIONBARRAS DE PERFORACIONBROCAS DE 45 MMSHANK ADAPTERAFILADOR BROCASCOPLASRIMADORA DE 89 MMADAPTADOR DE RIMADORATUBO PVC (Voladura Recorte)HERRAMIENTASIMPLEMENTOS SEGURIDADTUBERIA DE POLIETILENO DE 2'' AGUATUBERIA DE POLIETILENO DE 4'' AIRE

EXPLOSIVOSEMULEX 45% 1 1/8'' x 12'' CebosEMULEX 45% 1 1/8'' x 12'' ArrastresEXADIR 45% 7/8'' x 7'' CoronaCORDON DETONANTE 5PGUIA ENSAMBLADORA 2.4 MTS (CARMEX)EXANEL 4.8 MTS

SOSTENIMIENTOBARRA CONICA 6', 8''BROCA 40 MMACEITE PERFORACIONADAPTADOR PARA INST. PERNOHERRAMIENTAS DE MINAPERNO HELICOIDAL TUERCA PLACA 6', 8'RESINACEMBOLTBARRA EXTENSION R32BROCA BOTON R25 x 37 MMSHANK ADAPTER HEMBRASOLDADURA SUPERCITO 1/8''PERNO HYDRABOLT 6', TUERCA, PLACACEMENTOMALLA ELECTROSOLDADA 4' x 4'ALAMBRE No 16GRAMPA DE FE CORRUGADO 3/8''CANCAMOSCIMBRA METALICAPLANCHA METALICA

EL CONTRATIS

TACONSORCIO

Y MARSA

LANZADO DE CONCRETOVAR. DE FIERRO CORRUGADO 1'VAR. DE FIERRO CORRUGADO 3/4'VAR. DE FIERRO CORRUGADO 3/8'ENTABLADO (8'' x 2'' x 4')SACO POLIPROPILENO

LEYES SOCIALESOBREROS EMPLEADOS

ESSALUD 9.00% 9.00%

JUBILACION ANTICIPADA 2.00% 2.00%

SCTR-SALUD 0.97% 0.97%

SCTR-PENSIONES(interior Mina) 4.05% 38.00%

SCTR Pension Prima 0.00% 0.00%

VIDA LEY 0.36% 0.30%

TOTAL 16.38% 50.27%

PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA

JORNAL 35.00 35.00 35.00 35.00CONCEPTOS % ENE. FEB. MAR. ABR.

dias 31 28 31 30

VAC

REMUNERACION 1,085.00 980.00 1,085.00VACACIONES 1,050.00GRATIFICACIONES Factor

ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00Descanso Medic 12 4.00 11.67 11.67 11.67 11.67Hrs Extras 1.25 - 0.00 0.00 0.00 0.00CTS 9.72% 105.49 95.28 105.49 102.08SUB TOTAL 1,202.15 1,086.94 1,202.15 1,163.75

1,096.67 991.67 1,096.67 1,061.67

APOR REM.PRI 16.38% 179.63 162.44 179.63 0.00APOR GRAT. 16.38% 0.00APOR VAC. 16.38% 173.90

TOTAL: 1,381.79 1,249.38 1,381.79 1,337.65

BASICO 1,500.00

ASIG.FAM. 50.00

1,550.00 VAC

51.67 51.67 51.67 51.67CONCEPTOS % ENE. FEB. MAR. ABR.

dias 30 30 30 10

9 9

REMUNERACION 1,550.00 1,550.00 1,550.00 516.67DIAS LIBRES 0.00 465.00 465.00 0.00APOR REM. 18.11% 280.71 364.92 364.92 93.57GRAT

APOR GRAT. 17.75%

VAC 0.00APOR VAC. 18.11% 0.00CTS 8.33% 129.12 167.85 167.85 43.04

TOTAL: 1,959.82 2,547.77 2,547.77 653.27

PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO

JORNAL 1500.00 1500.00 1500.00 1500.00CONCEPTOS % ENE. FEB. MAR. ABR.

Gravado(Afecto al Impuesto)

dias 31 28 31 30

VAC

REMUNERACION 1,500.00 1,500.00 1,500.00VACACIONES 1,500.00GRATIFICACIONES Factor

ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00Descanso Medic 360 4.00 16.67 16.67 16.67 0.00CTS 9.72% 145.83 145.83 145.83 145.83SUB TOTAL 1,662.50 1,662.50 1,662.50 1,645.83

1,516.67 1,516.67 1,516.67 1,500.00

APOR REM.PRI 50.27% 762.43 762.43 762.43 0.00APOR GRAT. 50.27% 0.00APOR VAC. 50.27% 754.05

TOTAL: 2,424.93 2,424.93 2,424.93 2,399.88

Gravado(Afecto al Impuesto)

PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA

35.00 35.00 35.00 35.00 35.00 35.00 35.00MAY. JUN. JUL. AGO. SET. OCT. NOV.

31 30 31 31 30 31 30

GRAT

1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,050.00

1,050.000.00 0.00 0.00 0.00 0.00 0.00 0.00

11.67 11.67 11.67 11.67 11.67 11.67 11.670.00 0.00 0.00 0.00 0.00 0.00 0.00

105.49 102.08 105.49 105.49 102.08 105.49 102.081,202.15 1,163.75 2,252.15 1,202.15 1,163.75 1,202.15 1,163.751,096.67 1,061.67 2,146.67 1,096.67 1,061.67 1,096.67 1,061.67

179.63 173.90 351.62 179.63 173.90 179.63 173.90

1,381.79 1,337.65 2,603.78 1,381.79 1,337.65 1,381.79 1,337.65

GRAT

51.67 51.67 51.67 51.67 51.67 51.67 51.67MAY. JUN. JUL. AGO. SET. OCT. NOV.

30 30 30 30 0 30 30

9 9 9 9 9

1,550.00 1,550.00 1,550.00 1,550.00 0.00 1,550.00 1,550.000.00 465.00 465.00 465.00 465.00 0.00 465.00

280.71 364.92 364.92 364.92 84.21 280.71 364.921,550.00

275.13

129.12 167.85 167.85 167.85 38.73 129.12 167.851,959.82 2,547.77 4,372.89 2,547.77 587.95 1,959.82 2,547.77

PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO

1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00MAY. JUN. JUL. AGO. SET. OCT. NOV.

31 30 31 31 30 31 30

GRAT

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

1,500.000.00 0.00 0.00 0.00 0.00 0.00 0.00

16.67 16.67 16.67 16.67 16.67 16.67 16.67145.83 145.83 145.83 145.83 145.83 145.83 145.83

1,662.50 1,662.50 3,162.50 1,662.50 1,662.50 1,662.50 1,662.501,516.67 1,516.67 3,016.67 1,516.67 1,516.67 1,516.67 1,516.67

762.43 762.43 1,516.48 762.43 762.43 762.43 762.43

2,424.93 2,424.93 4,678.98 2,424.93 2,424.93 2,424.93 2,424.93

PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA

35.00DIC TOTAL

31 365

GRAT

1,085.00 11,725.00

1,050.00

1,050.00 2,100.00

0.00 0.00

11.67 140.00

0.00 0.00

105.49 1,242.01

2,252.15 16,257.01

2,146.67 15,015.00

351.62 2,285.56

0.00

173.90

2,603.78 18,716.47

59.63%

GRAT

51.67 51.67DIC TOTAL

5 365

10

361.66 14,828.33

516.67 3,771.67

159.07 3,368.46

1,550.00 3,100.00

275.13 550.25

0.00

0.00

73.16 1,549.38

2,935.69 27,168.09

1.83

PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO

1500.00DIC TOTAL

31 365

GRAT

1,500.00 16,500.00

1,500.00

1,500.00 3,000.00

0.00 0.00

16.67 183.33

145.83 1,750.00

3,162.50 22,933.33

3,016.67 21,183.33

1,516.48 9,894.81

0.00

754.05

4,678.98 33,582.20

103.53%

ESTRUCTURA COSTO HORARIO SHOTCRETERA ALIVA OCMERDATOSDESCRIPCION UNID. 10 M3

PRECIO STOCK LIMA U.S.$ $36,430.00VALOR RESCATE (15%) U.S.$ $7,286.00VALOR NETO EQUIPO U.S.$ $29,144.00VIDA ECONOMICA EN HORAS(10*25*48) HRS 15,000.00HRS POR MES HRS 250.00VIDA ECONOMICA EN AÑOS UNID 5.00

MANTENIMIENTO DESCRIPCION UNIDAD CANTIDAD

Componentes % 50%

DEPRECIACION DE EQUIPOS

COSTO DE POSESIONDEPRECIACION U.S.$/HR 1.94

C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 1.19

SUB-TOTAL COSTO POSECION U.S.$/HR 3.13

COSTO DE OPERACIÓNMANTENIMIENTO RUTINARIO U.S.$/HR 1.56

PERSONAL MANTNMTO U.S.$/HR 1.22

SUB-TOTAL OPERACIONES U.S.$/HR 2.78

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 5.91